Western Electric & Trading Company & Anr vs Competition Commission Of India & Ors
- CitationAppeal No.07 of 2017)
Ratio decidendi
The rule this decision rests on
The principles this judgment rests on, as stated in the reasoning: Where a body of evidence (an e-mail distribution chart, call data records, and a co-conspirator's statement) shows that parties exchanged rates and then quoted identical or near-identical prices in tenders, an inference of a concerted arrangement among bidders is open to the Commission and is not displaced by bare denials; a party's explanation must be supported by evidence and must account for the surrounding conduct. A bidder's receipt and onward forwarding of a rate-sharing e-mail from a competitor, with knowledge of its contents, is evidence of participation in the understanding rather than an incidental event, where the surrounding conduct (contact with the sender, frequency of calls around the tender dates) makes innocent receipt implausible. A party cannot escape liability for a horizontal arrangement by characterising itself as a dealer or agent of a manufacturer where the evidence shows that it independently coordinated its bid prices with competitors and was not merely transmitting a principal's instructions. Penalty quantum under the Act is a matter for the Commission's discretion; that the appellant is a small family firm, has modest profits, or obtained no purchase orders does not, without more, render the penalty disproportionate so as to warrant interference.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Western Electric & Trading Company & Anr. ...Appellants
Versus
Competition Commission of India & Ors. ...Respondents
Present: For Appellants :- Mr. M. M. Sharma, Ms. Deepika Rajpal and Mr. Anand, Advocates
For Respondent No. 1 : Mr. Pallav Shishodia, Senior Advocate assisted by Mr. Febin M. Varghese, Advocate
TA (AT) Competition No. 38 of 2017 (Old Appeal No.15 of 2017)
IN THE MATTER OF:
R. Kanwar Electricals & Anr. ...Appellants
Versus
Competition Commission of India & Ors. ...Respondents
Present: For Appellants :- Mr. Jafar Alam and Mr. Gautam Chawla, Advocates
For Respondent No. 1 : Mr. Pallav Shishodia, Senior Advocate assisted by Mr. Febin M. Varghese, Advocate
For Respondent No. 2 : Mr. Kamal Nijhawan, Mr. Sumit Gaur and Mr. Alok Sharma, Advocates 2
JUDGMENT
SUDHANSU JYOTI MUKHOPADHAYA, J.
In both the appeals as common order dated 18TH January, 2017
passed by the 'Competition Commission of India' (is under challenge,
they were heard together and disposed of by this common judgment.
2. These appeals have been preferred by 'Western Electric & Trading
Co. & Anr. in TA (AT) Competition No. 37 of 2017 (Old Appeal No.07 of
2017) and 'R. Kanwar Electricals & Anr.' (Appellants) in TA (AT)
Competition No. 38 of 2017 (Old Appeal No.15 of 2017) against the order
dated 18th January, 2017 passed by the 'Competition Commission of
India' ('Commission', for short) in suo moto Case No. 03/2014, wherein
the Commission observed and passed the following penal order:
"8.13 As the Commission has already held that the
impugned acts/ conduct of OP 1, OP 2 and OP 3
are in contravention of the provisions of Section
3(1) read with Section 3(3)(c) and 3(3)(d) of the Act,
the liability of the persons in-charge of OP 1, OP 2
and OP 3 flows vicariously from the provisions of
Section 48 of the Act. In the present case, while
Shri Sandeep Goyal for OP 1 has accepted that he
played an active role in the cartelisation; Shri
TA (AT) Competition Nos. 37 & 38 of 2017 3
Ashish Jain for OP 2 and Shri Ramesh Parchani
for OP 3 have denied the allegations and have
taken bald pleas such as threat from OP 1,
absence of knowledge of e-mail, attributing calls
to combined procurement of 'die', etc. They have
not been able to show or bring on record, either
before the DG or the Commission, any evidence to
absolve themselves from the liability in terms of
the provisions of the Act.
8.14 Resultantly, considering the totality of facts and
circumstances of the present case, the
Commission decides to impose penalty on Shri
Sandeep Goyal for OP 1, Shri Ashish Jain for OP 2
and Shri Ramesh Parchani of OP 3. The penalty on
these persons-in-charge imposed in terms of
Section 27(b) of the Act calculated at the rate of 10
percent of the average of their income for the last
three preceding financial years is as follows:
S. Individuals Income Income Income Average @ 10 % No. for for for Income of 2011-12 2012-13 2013-14 for 3 average Years Income
1. Shri Sandeep Goyal (of 4,97,729 4,41,358 4,58,726 4,65,938 46,594 OP 1)
2. Shri Ashish Jain 8,50,343 10,20,541 6,74,226 8,48,370 84,837 (of OP 2)
3. Shri Ramesh 19,70,183 23,68,270 20,79,122 21,39,192 2,13,919 Parchani (of OP 3)
TA (AT) Competition Nos. 37 & 38 of 2017 4
8.15 Considering that the Commission has decided to
grant a 75 percent reduction in penalty to OP 1 under
Section 46 of the Act, as recorded hereinabove, the
Commission, also decides to allow the same
reduction in penalty to Shri Sandeep Goyal for OP 1
under Section 46 of the Act. Thus, the total amount
of penalty to be paid by Shri Sandeep Goyal is
Rs.11,648/-.
8.16 The Commission further directs the parties to deposit
the respective penalty amount within 60 days of
receipt of this order.
3. The brief facts of the case are as follows:
4. On 1st April, 2014 Central Bureau of Investigation (CBI) by its letter
informed the Commission that CBI during preliminary enquiry of
misconduct by a public servant found opposite parties to be involved in
cartelisation and bid rigging in respect of tenders floated by Indian Railways
and BEML for Brushless DC ("BLDC") fans.
5. CBI by its letter dated 1st April, 2014 informed the Commission that
during its investigation it came across an email dated 17th March, 2013
from the inbox of Mr. Ramesh Parchani (Partner at 'Western Electric &
Trading Co) along with an attachment which provided details of four
upcoming tenders floated by Indian Railways and BEML for procurement of
BLDC fans. The attachment to said email mentioned the quantity, unit
value and rate to be quoted by the 'Western Electric', 'RK Electricals' and
TA (AT) Competition Nos. 37 & 38 of 2017 5
'Pyramid Electronics' in four tenders floated by Indian Railways and BEML.
On verification from the Railways, CBI found that the rates mentioned in
the email against the opposite parties were the same as the rates quoted by
them in two tenders. The email dated 17th March, 2013 originated from the
email id of Mr. Sandeep Goyal (Partner at Pyramid Electronics) who sent the
same to Mr. Ashish Jain (Partner at RK Electricals). Mr. Ashish Jain further
sent the email to Mr. Gulshan Kapoor (office executive of Mr. Ramesh
Parchani), who forwarded the email to Mr. Ramesh Parchani (Partner of
Western Electric).
6. The Commission taking cognizance of the letter sent by CBI under
Section 19(1) of the Act suo moto initiated inquiry into the conduct of the
opposite parties. The Commission by its Order dated 23rd June, 2014 took
a prima facie view that the opposite parties were engaged in collusive
bidding in contravention of Section 3(1) and 3(3)(d) of the Act and further
directed the Director General (DG) to investigate into the matter under
Section 26(1) of the Act.
7. As per the letter dated 1st April, 2014, the CBI, while enquiring into
the alleged misconduct, found an e-mail dated 17th March, 2013 in the
e-mail inbox of Shri Ramesh Parchani, a partner of OP 3 (hereinafter
'Shri Ramesh Parchani'), along with an attachment providing details of
four tenders of Indian Railways and BEML for procurement of BLDC
fans. It contained the quantity unit value, rates to be quoted by opposite
parties and quantities to be shared amongst them in these four tenders.
A copy of the said e-mail along with the attachment was provided to the
TA (AT) Competition Nos. 37 & 38 of 2017 6
Commission. The Information contained in the said attachment is as
below:
Tender Description Nos. Railway Unit Total Value R. Kanwar Crompton Pyra Value (Western mid Electric)
O/B 0 0 0 0
27.02.13 301204020T460 BLDC fan 9368 NER 3,481 3,26,10,008 3481 3495 3510
4215 2810
14672415 9781610 0
20.03.13 45131110 BLDC Fan 1217 SCR 3,481 4,23,81,175 3495 3520 3481 5
2739 1826 4565
9534459 6356306 1589 0765
25.03.13 4102130113 BLDC Fan 4147 NR 3,481 1,44,35,707 3520 3495 3481
3110
0 0 1082 5910
26.03.13 BEML BLDC Fan 5437 BEML 5,437 2,95,60,969 3495 3481 3520
1632 2446
8873184 13298902 0
C/F 11,89,87,85 3,30,80,0 2, 2,67, 9 58 9436818 16,6 75
8. It was further stated that CBI had sought information from North
Eastern Railway (NER) and Northern Railway (NR) regarding the two
tenders mentioned in the said attachments i.e., tender No.
TA (AT) Competition Nos. 37 & 38 of 2017 7
30120402OT460 dated 27.2.2013 and tender No. 4102130113 dated
25.3.2013, in order to verify whether the rates mentioned in the e-mail
attachment were the same as quoted by the OPs in the said railway
tenders. It was found from the information received that the rates
mentioned in the e-mail against each OP were same as the rates quoted
by them against the said two tenders.
9. After examining all the material on record, the Commission was of
the prima facie view that the case involved contravention of provisions of
Section 3(1) read with Section 3(3)(d) of the Competition Act, 2002
(hereinafter 'Act'). Therefore, the Commission vide its order dated
23.06.2014 directed the Director General (hereinafter the 'DG') to
conduct an investigation into the matter under Section 26 (1) of the Act
and submit an investigation report. The Commission also noted that
apart from the three opposite parties identified by the CBI, the
probability of other bidders also indulging in the bid rigging could not be
ruled out and required investigation. The DG, accordingly, conducted an
investigation and submitted its investigation report dated 27.03.2015 to
the Commission.
10. During the investigation, the DG found that the vendors approved
by Research Designs and Standards Organisation, Lucknow (RDSO) are
divided into two categories namely 'Part I source/supplier' and 'Part II
source/supplier'. Part I suppliers are older approved vendors who have
earlier supplied as Part II suppliers and whose supplies have received
favourable report from the Railways. In the Railways tendering system,
TA (AT) Competition Nos. 37 & 38 of 2017 8
Part I supplier is eligible for 100% of tender quantity if it emerges as L1
and 75% of tendering quantity if a Part II supplier becomes L1. Also, the
Part I supplier is eligible to supply at the higher rate quoted by it against
the L1 rate of Part II supplier.
11. In the Tenders under investigation the Opposite Parties were
Part I suppliers whereas M/s Light Engineering Corporation,
Parwanoo; M/s Kapson Industries Ltd., Jalandhar and M/s. General
Auto Electric Corporation, Mumbai were part II suppliers. M/s BBC
Corporation was an unapproved supplier.
Role of Pyramid Electronics
12. The DG after analysing the email, call data records and statement
of Mr. Sandeep Goyal concluded that 'Pyramid Electronics' colluded
with 'RK Electricals' and 'Western Electric' to rig the bids.
13. The DG relied on the statements dated 17th February,2015
and 18th March, 2015 of Mr. Sandeep Goyal wherein he admitted
that the email dated 17th March, 2013 was sent by him to Mr. Ashish
Jain. Mr. Sandeep Goyal further admitted that he along with RK
Electricals and Western Electric formed a cartel in February, 2013
and rigged the bids for Tender No. 30120402OT460 (due date 27 th
February,2013) and Tender No. 4102130113 (due date 25th March,
2013). The limited purpose of the cartel was to ensure a market
share to each Opposite party and not for earning or sharing profits .
The cartel for the Tender dated 27th February, 2013 was arrived over
telephone and its rate was mentioned in the mail dated 17th March,
TA (AT) Competition Nos. 37 & 38 of 2017 9
2013 to keep records
14. On perusal of call data records of Mr. Sandeep Goyal and Mr.
Ashish Jam (call data record of Mr. Sandeep Goyal), the DG found that
Mr. Ashish Jain made/received more than 50 calls to/from Mr.
Sandeep Goyal from 25th February,2013 to 31st March, 2013. Mr.
Sandeep Goyal also received several calls from Mr. Ramesh Parchani
during this period.
Role of RK Electricals
15. The DG found that the rates quoted by RK Electricals for Tender
Nos. 30120420T460 (due dated 27 th February, 2013) and Tender No.
4102130113 (due dated 25 th March, 2013) were identical to the rates
mentioned in the email dated 17 th March, 2013.
16. In his statement dated 16th February, 2015, Mr. Ashish Jain
admitted that he received the email dated 17th March, 2013 from
Sandeep Goyal and forwarded the same to Mr. Gulshan Kapoor.
17. The DG found that Mr. Ashish Jain made/received nearly 26
calls from Mr. Ramesh Parchani between 25 th February, 2013 to 31st
March, 2013. Mr. Jain also made calls to partners of other firms
participating in the Tenders. These calls were more frequent around
the date of Tender.
18. The DG found the defence taken by Mr. Ashish Jain that the
conversation between Mr. Ashish Jam, Mr. Sandeep Goyal and Mr.
Ramesh Parchani during the time of the Tenders was with respect to
development of a die (of FRD connector, one of the components of BLDC
TA (AT) Competition Nos. 37 & 38 of 2017 10
fans) as unbelievable as the same was unsubstantiated. There was no
written document to show that Rs. 16,000/- was given for development
of a die. The DG concluded that Mr. Ashish Jain colluded to rig the bids
of Tenders issued by Indian Railways.
Role of Western Electric
19. After analysing the email dated 17 th March, 2013 and the rates
submitted by Western Electric, the DG in its report observed that the
rates quoted by Western Electric for Tender Nos. 30120420T460 (due
dated 27th February, 2013) and Tender No. 4102130113 (due dated
25th March, 2013) were identical to the rates mentioned in the email.
20. In his statement dated 18th February, 2015 Mr. Ramesh Parchani
admitted that he received the email dated 17.03.2013 from Mr. Gulshan
Kapoor. Mr. Gulshan Kapoor in his statement dated 18.02.2015
admitted that on 17th March, 2013 he received an email from Mr. Ashish
Jain and he forwarded the same to Mr. Ramesh Parchani.
21. Analysis of call data records of Mr. Ramesh Parchani revealed that
he spoke with Mr. Ashish Jain nearly 30 times between 25th February,
2013 to 31st March, 2013.
22. The DG did not accept the defence raised by Western Electric
that being the authorised dealer of Crompton Greaves Ltd., the rates
were dictated by Crompton Greaves. The DG relied on the statement
dated 3 rd March, 2015 by Mr. Asif Ali, Manager of Crompton Greaves
stating that the rates suggested by Crompton Greaves are not
binding on Western Electric. Mr. Ramesh Parchani failed to explain
TA (AT) Competition Nos. 37 & 38 of 2017 11
how Mr. Sandeep Goyal had privy to the rates suggested by
Crompton Greaves as the rates were mentioned in the email dated
17th March, 2013.
23. Based on call data records, emails and the statements by
parties the DC concluded that 'Pyramid Electronics', 'RK Electricals'
and 'Western Electric' colluded with each other to rig the bids
pertaining to the four Tenders in contravention of section 3 (3)(d) of
the Act.
SUPPLEMENTARY REPORT SUBMITTED BY DG
24. Pursuant to requests by RK Electricals and Western Electric, the
Commission by its order dated 14th August, 2015 allowed the Appellants
to cross-examine Mr. Sandeep Goyal.
25. The DG also submitted a supplementary report dated 19 th
October, 2015 with cross examination of Mr. Sandeep Goyal
conducted on 9th September, 2015. The DG concluded that there is
nothing on record which could refute the facts or evidence gathered
during the course of investigation and impeach the credibility of the
witness.
26. It is only thereafter the Commission noticed and heard the
parties and comparing the rates and other evidence came to the
conclusion and passed the order as referred above.
STAND OF THE APPELLANTS - 'Western Electric & Trading
Co.'
TA (AT) Competition Nos. 37 & 38 of 2017 12
27. Learned counsel for the Appellants highlighted the following
background :
a) Brushless Direct Current (BLDC) Fans 400 mm - sweep
- 110 Volts fixed type conforming to RDSO specifications;
designed specifically for Indian Railways by Crompton
Greaves / OEM No. 2002. BLDC fans saved energy up to
10 times compared with old conventional fans. Though
the demand increased gradually from 2010-11 but the
price has remained in the range of Rs.3445 (in 2007) to
Rs.3500( in 2013;
b) Connector- The CG/OEM does not manufacture the
Connectors and was supplying BLDC fans to ICF with
"Wago" connectors imported from UK and from 2006.
When the demand of BLDC fans increased, the
specifications for BLDC fans were changed with FRP(
Fibre Glass Reinforced Plastic) Connector, which were
locally _ produced and were cheaper ; 'Western Electric
& Trading Co.' (OP 3) was informed that 'Pyramid
Electronics' and 'Kanwar Electricals' (OP -1 & OP-2),
were supplying BLDC fans with FRP connectors. OP2
agreed to supply FRP connectors to 'Western Electric &
Trading Co.' @ Rs. 35/ piece. Evidence of supplies made
by 'Pyramid Electronics' and 'Kanwar Electricals' were
also submitted.
28. It was submitted that the Appellants 'Western Electric &
TA (AT) Competition Nos. 37 & 38 of 2017 13
Trading Co.' - a reputed dealer/trader only since 1971: Became a
dealer of OEM/CG for supply of BLDC fans to Railways in 2006.
'Pyramid Electronics (OP1- Sandeep Goyal) caught red handed with
cash of Rs. 90 Lakhs and arrested on 2 nd May 2013 by CBI while
investigating Mr. Kul Bhushan, the then Member Electrical, Rly
Board in the "Railway Bribery/ Cash for posting scam", spent 2
months in Tihar Jail, an under trial on bail in criminal case no.
03/2013 before the Special Judge PC Act/ASJ in New Delhi Courts
at Patiala House. Pyramid Electronics (OP-1) was delisted as RDSO
part supplier in May, 2013 after arrest of SG. 'Kanwar Electricals'
(OP -2- Ashish Jain), was the supplier of FRP connectors to OP-3
during 20.1.2013. Both 'Pyramid Electronics' and 'Kanwar
Electricals' ( OP-1 &OP-2) are RDSO approved Part-1 suppliers of
BLDC fans since 2010 along with OEM/CG, RDSO Part 1 supplier
since 2005.
29. It was submitted that the following facts was ignored by the
Commission :
Unique to WETC/Appellants-(Ignored by CCI)
1. Unlike 'Pyramid Electronics' and 'Kanwar Electricals' ( OP-
1 &OP-2), WETC is only an agent and not a manufacture of
BLDC fans, not direct competitor to 'Pyramid Electronics'
and 'Kanwar Electricals'( OP-1 &OP-2), and the actual
competitor is OEM/CG, had no authority to quote rates
indecently. (Horizontal agreement not legally possible under
section 3(3) of the Act.
TA (AT) Competition Nos. 37 & 38 of 2017 14
2. Unlike 'Pyramid Electronics' and 'Kanwar Electricals' ( OP-
1 &OP-2), WETC was always instructed the exact rates to be
quoted specifically before each tender by CG-OEM and not
only for the three tenders in question. Evidence supplied
but ignored by CCI (Annexure 8-page 221-222 -page 760-
761 Vol.3; Annexure 10- Page 232- Page 771 Vo. 3) &
Annexure 11- Page 346-348 Page 881 to 883 Vol.3) of WETC
objections dated 21.1.2016 to DG Report dated 21 st
January,2016).
Learned counsel for the Appellants referred to evidence as relied
in the impugned order against the Appellants are :
i) E-mail dated 17.3.2013 with attachment with respect to
the 4 tenders;
ii) Call Detail Records - calls exchanged between 'Western
Electric & Trading Co.' and 'Kanwar Electricals' and
'Western Electric & Trading Co.' and 'Pyramid
Electronics';
iii) Confessional Statement dated 18 th March, 2015 of
Sandeep Goyal to DG (after filing leniency application on
10th March, 2015 as compared with his earlier statement
as stated on 17th February, 2015.
With regards to the impugned e-mail dated 17th March, 2013, it
is submitted that the four tenders in which bid rigging is alleged are
:
(i) Tender No. 30120402 OT 460 dated 27 th February, 2013
TA (AT) Competition Nos. 37 & 38 of 2017 15
- by NE Railways;
(ii) Tender No. 45131110 dated 20 th March, 2013 - by SC
Railways;
(iii) Tender No. 4102130113 dated 25 th March, 2013 - by
Northn Railways; and
(iv) Tender No. DR01/RM2/1200120506, BEML dated 26 th
March, 2013 - by BEML.
30. Learned counsel also highlighted the facts about the 'Western
Electric & Trading Company' with regard to the above tenders, which
alleged to have been ignored by the Commission :
1. Tender dated 27 th February, 2013 by North Eastern
Railway (NER) - WETC did not quote Rs. 3495 as
suggested in the impugned e-mail but quoted Rs. 3491.98
(Rs. 3325.70 plus 5 % CST), the exact price directed by
CG vide letter dated 26 th February, 2013.
2. Tender dated 20 th March, 2013 by South Central Railway
(SCR) - The rate suggested for WETC/CG was Rs. 3520.
However, WETC quoted Rs. 3530 (Rs.3361.90 plus 5%
CST), the exact price directed by Crompton Greaves vide
letter dated 15th March, 2013. Moreover, the rates of
neither 'Pyramid Electronics' and 'Kanwar Electricals'
were matching with the impugned e mail. Being the
lowest (L-1), WETC received the order at the negotiated
rate of Rs. 3333.75 all inclusive.
3. Tender No. 4102130113 dated 25 th March, 2013 by
TA (AT) Competition Nos. 37 & 38 of 2017 16
Northern Railway (NR) - although the rates as suggested
in the attachment are the same, but as far WETC is
concerned, the exact price directed by CG vide their
letter dated 15 th March, 2013 were quoted by it, that is
Rs. 3495 (Rs.3328.57 plust 5 percent CST).
4. Tender BEML dated 26 th march, 2013 by Bharat Earth
Movers Ltd. (BEML) - although WETC could not quote
because only the OEM/RDSO approved suppliers
eligible. However, WETC were informed the rate to be
quoted by the OEM/CG vide their letter dated 16 th
March, 2013 and again vide their letter dated 26 th
March, 2013 for arranging supplies. The rate as per the
impugned email dated 17 th march, 2013 were Rs.3481
but the rate actually quoted by CG was Rs. 3498.6 (Rs.
3412.70 plus 2 percent CST) which again different from
the suggested e-mail rate. The rate quoted by 'Pyramid
Electronics' for 26th March, 2013 was Rs. 3570.75
which was also different from the suggested e-mail rate
of Rs. 3520.
31. With regard to 'Call Detail Records' detailed explanation and the
background for the telephonic calls has been given by the Appellants,
as under:
Call Detail Records :
Telephone calls exchanged between 'Ramesh Parchani' and
'Ashish Jain' and 'Sandeep Goyal' only 2 calls + 2 SMS mostly with
TA (AT) Competition Nos. 37 & 38 of 2017 17
'Ashish Jain'. 'Ramesh Parchani' never called 'Sandeep Goyal' but
received a single call on 17 th March, 2013 at 6.55 PM which was after
sending of the impugned email dated 17 th March, 2013 by 'Sandeep
Goyal' to 'Ashish Jain' i.e. at 2.19 PM. 'Ramesh Parchani' only
returned the call on 23rd March, 2013 for 39 second. Admitted that
the call on 23 rd March, 2013 may be in connection with procurement
of "dye" for FRP connectors.
Background for the telephonic calls between the Opposite Parties
32. In connection with the procurement of the "dye" for locally
manufacturing FRP connectors together, admitted directly by AJ12
and indirectly by SG13 in their statements before the DG.
33. In spite of the admission by 'Ashish Jain', which corroborated
'Ramesh Parchani' statement dated 18th March, 2015 DG/CCI has not
even bothered to verify the statements of all the 'Opposite Parties',
particularly, whether or not WETC was procuring them separately on
behalf of the OEM as stated in by RP in his statement dated 18th
March, 2015.
34. Commission has completely relied upon the denial of the above
in the statement of 'Sandeep Goyal' on the ground that "Western
Electric & Trading Co., who is not even a manufacturer but only a
dealer of Crompton Greaves, would still require a dye for
manufacturing a component of that item and wholly ignored the
objective justification provided by Western Electric & Trading Co..
35. Whereas DG/Commission ignored 7 calls exchanged between
'Ashish Jain' and 'Mr. Prashant Sehgal of 'M/s. Kapsons Industries -
TA (AT) Competition Nos. 37 & 38 of 2017 18
OP-5' and 29 calls between 'Ashish Jain' and Maninder Singh - OP-4
and 10 calls between 'Ashish Jain' and Mr. Hetal R. Gandhi - OP-6
though made regarding "supply of spare parts/quotation for spare
parts" on the ground that "details of conversation are not known".
The details of conversation i.e. transcript of the audio tapes of
telephonic conversation between 'Ashish Jain' and 'Ramesh Parchani'
or between 'Ramesh Parchani' and 'Sandeep Goyal'.
36. Confessional statement of 'Sandeep Goyal' dated 18 th March,
2015 (Leniency Applicant) has been contradicted.
37. Learned counsel for the Appellants raised legal objections as
under :
1. The elements of an agreement under Section 3 of the
Competition Act have not been established for WETC. Mere
exchange or gathering of information between parties for spare
parts (FRP Connector) in an inter-dependent or concentrated
marked does not constitute a cartel.
2. WETC is being a mere trader/dealer of OEM/CG is not
direct competitor of 'Pyramid Electronics' (OP-1) and 'R. Kanwar
Electricals' (OP-2), and, therefore cannot be charged under
Section 3(3)(d). The real beneficiary of the cartel if presumed to
be true was the OEM/CG - why has DG/CCI completely
exonerates the OEM/CG?
3. There is no appreciable adverse effect on competition
(AAEC) visible on the facts of this case. There has not been any
reduction in the number of suppliers of BLDC fans to Railway.
TA (AT) Competition Nos. 37 & 38 of 2017 19
4. Since the prices quoted by OEM/CG/WETC of BLDC fans
for Indian Railways has remained in the same range since 2011,
the finding of cartelization is against economic theory of
cartelization.
5. Instances of violations of principles of natural justice
committed during investigation ignored by the Commission.
6. Penalty imposed on the Appellants is grossly excessive
and disproportionate and arbitrary. Not based on the relevant
turn over principles as decided by 'Hon'ble Supreme Court in
'Excel Crop care Limited vs. Competition Commission of
India and Anr.' on 8th May, 2017 in C.A. No. 2480/2014.
38. Other points were also highlighted relating to quoting higher
rates for tender dated 20th March, 2013. Additional cost of PCB
charger, bid rotation etc. which according to Appellants not proved
since 'Pyramid Electronics' (OP-1) and 'Western Electric & Trading Co.
(OP-3)got the order in tender dated 27 th February, 2013 and 20 th
March, 2013 respectively. The tender dated 25 th March, 2013 was
cancelled.
Submissions of Appellants - 'Mr. R. Kanwar Electricals' & Mr. Ashish Jain
39. The facts as noticed above has also been highlighted by the
counsel for these Appellants.
40. It was submitted that the DG and the Respondent Commission
have failed to note that R. Kanwar Electricals did not derive any benefit
TA (AT) Competition Nos. 37 & 38 of 2017 20
from the alleged cartel, as R. Kanwar Electricals did not receive a
purchase order in any of the four tenders. There is therefore no material
or ground to suspect their involvement in the alleged cartel.
41. The Commission has failed to appreciate that 'Pyramid
Electronics" (Opposite Party No.1) had been delisted from the RDSO
owing to their illicit activities. Accordingly, Mr. Sandeep Goyal of (OP-1)
suspected Mr. Ashish Jain (OP-2) and 'Ramesh Parchani' (OP-3), who
were his competitors, of having given evidence against him during the
bribery related investigation conducted by the CBI. As such, it is clear
that Mr. Sandeep Goyal was a motivated individual who wanted to take
revenge against Opposite Party Nos.2 and 3, and yet the Respondent
Commission relied on his alleged "confessional" and contradictory
statement(s) without any corroborating evidence.
42. According to the Appellants, there are serious infirmities and
contradictions in relation to the evidence for each of the four tenders
alleged to have been rigged by the Opposite Parties, as explained below:
a. In relation to tender dated 27.02.2013,
i. The said tender had already been opened before
circulation of the alleged distribution list vide e-mail
dated 17 th March, 2013, and hence the bid prices were
known to all bidders.
ii. Mr. Sandeep Goyal/Opposite Party No.1 has made
contradictory statements in relation to this tender - at one
TA (AT) Competition Nos. 37 & 38 of 2017 21
place he admits that cartel was only in relation to the tenders
in March 2013, whereas at another place he states that
Opposite Parties cartelized tender dated 27th February, 2013
over telephone.
iii. It is an admitted position that the tender dated 27 th
February, 2013 was cancelled and no purchase orders
were issued.
b. In relation to tender dated 20 th March, 2013,
i. None of the bids match the prices in the e-mail dated 17th
March, 2013. RKE's actual price bid of Rs. 3757 was 7.5%
higher than the price bid stated in the e-mail dated 17th
March, 2013 (of Rs. 3495) and hence it is evident that RKE
did not follow the e-mail dated 17th March, 2013.
ii. As per the e-mail, 'Pyramid Electronics' (O.P -1) ought to
have won the tender. However, as per the actual tender,
'Western Electric & Trading Co. (OP- 3) won the tender.
iii. Mr. Sandeep Goyal's statement that each of the Opposite
Parties changed their price bids for this tender on the
date of the tender itself (i.e. 20 th March, 2013) is
completely contrary to the documents on record, namely
(a) the call detail records in the DG Report, and (b) data
regarding the tender submission time. No explanation was
TA (AT) Competition Nos. 37 & 38 of 2017 22
given by Mr. Sandeep Goyal in relation to this inconsistency
at the cross-examination.
iv. Mr. Sandeep Goyal contended that 'Western Electric &
Trading Co.' (Opposite Party No.3) wanted to be L-1 in this
tender for which purpose Mr. Ashish Jain called Mr.
Sandeep Goyal 6 times on 20th March, 2013. This is
completely contrary to the record as 'Western Electric &
Trading Co. (Opposite Party No.3) had already submitted its
bid at 17:22 hours on 19th March, 2013.
v. Mr. Ashish Jain made 6 calls to Mr. Sandeep Goyal after
'Pyramid Electronics' (Opposite Party No.1) had already
placed its bid (at 6:39am), 5 of which were after Opposite
Party No.2 had also placed its bid (at 08:47am). There was
no reason whatsoever for either of them to be talking to
one another about the tender after they had placed their
price bids. Clearly their conversations were not about the
tender.
c. In relation to tender dated 25 th March,2013,
i. R. Kanwar Electricals' price bid was identical to the price
stated in the e-mail dated 17th March, 2013 merely as a co-
incidence, given that it always bid in the same price range
(Rs. 3450 - Rs. 3750) and had submitted the price bid as per
its own calculation.
TA (AT) Competition Nos. 37 & 38 of 2017 23
ii. Without prejudice, this tender was ultimately cancelled
by the tendering authority (due to technical reasons, to
the best of Appellant's knowledge), and resultantly there
was no appreciable adverse effect on competition
("AAEC") caused by the alleged conduct of the Opposite
Parties.
d. In relation to tender dated 26.03.2013,
i. R. Kanwar Electricals did not submit a price bid in this
tender owing to independent business considerations, as
explained to the DG.
ii. Assuming without conceding that R. Kanwar Electricals' was
part of the cartel, it is inexplicable as to why R. Kanwar
Electricals' having fixed the prices for the upcoming tenders
does not even offer a price bid in one tender.
43. It was contended that there are serious infirmities in the evidence
in relation to each tender and the Respondent Commission has simply
assumed that quotation of identical prices for one tender dated 25 th
March, 2013 tantamount to violation of Competition Act. While doing
so, the Respondent Commission has failed to consider that (i) the said
tender dated 25 th March, 2013 was ultimately cancelled by the
tendering authority and resultantly there was AAEC caused by the
alleged conduct of the Opposite Parties, and (ii) no purchase orders
were issued to Appellants in any of the four tenders. This
TA (AT) Competition Nos. 37 & 38 of 2017 24
demonstrates that there was no AAEC caused by the conduct of the
Opposite Parties, and contrary to its own precedent in the Sugar Mills
case (Suo moto Case No. 1 of 2010), both the DG and the Commission
failed to carry out an examination of whether the conduct of the parties
caused any impact on competition in terms of the factors under section
19(3) of the Competition Act.
Submissions with regard to e-mail dated 17 th March, 2013
44. According to the learned counsel for the Appellants only of the
four tenders specified in the e-mail dated 17 th March, 2013, (i) the
first tender (dated 27 th February, 2013) had already been opened and
hence the bid prices were known to all bidders, (ii) R. Kanwar
Electricals' price bid did not match in the second tender (dated 20 th
March, 2013), (iii) the third tender (dated 25 th March, 2013) was
cancelled by the tendering authority (owing to technical reasons, to
the best of Appellants knowledge), and (iv) R. Kanwar Electricals' did
not submit a price bid in the fourth tender (dated 26 th March, 2013)
owing to independent business considerations. It is therefore evident
that R. Kanwar Electricals did not follow the prices stipulated in the
e-mail dated 17.03.2013.
45. It is also pointed out that Mr. Sandeep Goyal who made the
distribution chart in e-mail dated 17 th March, 2013, intended to
ensure that his firm, 'Pyramid Electronics' (Opposite Party No.1) is
the L-1 in two of the upcoming three tenders (and L-2 in the third
TA (AT) Competition Nos. 37 & 38 of 2017 25
tender) to ensure maximum gain to 'Pyramid Electronics' (Opposite
Party No.1). Further, Mr. Sandeep Goyal threated and directed Mr.
Ashish Jain to forward the e-mail to 'Western Electric & Trading Co.'
(Opposite Party No.3)
Submissions regarding call detail records
46. It is further contended that the Commission has relied on the
fact that 'Pyramid Electronics' (OP-1) and 'R. Kanwar Electricals
(OP-2) spoke 50 times and 'Pyramid Electronics' and 'Western
Electric & Trading Co. (OP-3) spoke 30 times between 25 th February,
2013 and 31st March, 2013 (para 6.16 of impugned order). However,
the Commission failed to consider that all the bidders spoke to each
other throughout the period between 25 th February, 2013 and 31 st
March, 2013. The frequency of the calls does not show any particular
pattern.
47. Further case of the Appellants is that during the same period,
'Pyramid Electronics' (OP-1) also spoke 29 times with Opposite Party
No. 4, and 'R. Kanwar Electricals (OP-2) also spoke several times with
Opposite Party No. 5 and Opposite Party No. 6, none of whom are
found guilty of cartelization. All the people who bid for railway
contracts know one another and talk to one another on spare parts,
bid technical specifications and such like as was stated by all the
Opposite Parties to the DG. The nature of discussions in the calls
between Mr. Sandeep Goyal and Mr. Ashish Jam, as admitted by Mr.
TA (AT) Competition Nos. 37 & 38 of 2017 26
Sandeep Goyal were limited to technical issues and exchange of ROSO
drawings.
48. It is an admitted position amongst the Opposite Parties that
they exchanged calls to discuss the procurement of a die (@ Q17 -18
of Mr. Sandeep Goyal's statement dated at internal page 170 of DG
Report r/w Q4 of Mr. Ramesh Parchani's statement dated 24.03.2015
at internal page 200 of DG Report r/w Q3 of Mr. Ashish Jam's
statement dated 17.03.2015 at internal page '183 of DG Report).
49. In relation to tender dated 26 th March, 2013, although the
Opposite Parties allegedly cartelized for this tender, only one call was
made between them after 23 rd March, 2013. The call was made by
'R. Kanwar Electricals (OP-2) on 'Pyramid Electronics' (OP-1), and
'R. Kanwar Electricals (OP-2) did not even participate in the tender
dated 26th March, 2013 so there was no reason for 'R. Kanwar
Electricals (OP-2)' to speak with 'Pyramid Electronics' (OP-1).
50. As such, it is submitted that the frequency of telephone calls does
not imply cartelization. Also, it is submitted that the call detail records
only show the factum of the calls exchanged and do not and cannot
provide the nature or content of the conversion amongst the Opposite
Parties.
Submissions regarding "confessional" statement
51. The Commission has relied upon the confessional statement
of Mr. Sandeep Goyal which decoy to Appellants is vague and
TA (AT) Competition Nos. 37 & 38 of 2017 27
inherently contradictory to the documents placed on record. The
Commission has failed to appreciate that Mr. Sandeep Goyal was a
motivated individual who was desperate for leniency as his firm had
been de-listed by the RDSO in effect shutting down his business.
Notably, Mr. Sandeep Goyal did not confess or complain of a cartel
until after the CBI investigation began, although he was purportedly
cartelizing under pressure from the other Opposite Parties.
52. The Respondent Commission relied on Mr. Sandeep Goyal's
statement that there was a meeting of the Opposite Parties in
February 2013 (Q5 of DG Report) where the bid rotation arrangement
was arrived at and it was agreed that Mr. Sandeep Goyal would
prepare and circulate the distribution chart keeping rates of tender
dated 27.02.2013 as reference distribution (Qs 22 and 24).
53. However, Mr. Sandeep Goyal is totally vague about the
specifics of the date, time and place of the meeting. Mr. Sandeep
Goyal is based out of Panchkula and would have had to travel
specifically for this meeting. It is therefore most strange that he did
not remember or have any other material particulars about this
meeting, nor has he produced any other proof of the meeting in the
form of hotel or travel receipts despite being asked about it (Q54 nw
Q62).
54. It was submitted that the month of February has 28 days, the
tender dated 27.02.2013 was opened on 27.02.2013 itself, and Mr.
TA (AT) Competition Nos. 37 & 38 of 2017 28
Sandeep Goyal claims that they met in February i.e. therefore they
could have only met on 28.02.2013 but in statement dated
18.03.2013 Shri Sandeep Goyal stated that he does not remember
the exact date of the meeting (Q5 and 16, internal page 169-170 of
DG Report). This is because there was no such meeting, as has been
denied by the Appellants as well as Opposite Party No.3.
55. In relation to tender dated 20.03.2013, in his first statement
dated 17.02.2015 Mr. Sandeep Goyal stated that Mr. Ashish Jain
called him on 20.03.2013 from 7am till 12:30pm but he did not
receive his call (Q13 at internal page 165 of DG Report), in his next
statement on 18.03.2015 he stated that the bid for tender dated
20.03.2013 was changed by the Opposite Parties on the insistence
of Mr. Ashish Jain on the date of the tender itself for which Mr.
Ashish Jain called him 6 times (Q10 of DG Report).
56. Considering the contradiction about the change/revision of bids for
tender dated 20.03.2013 and receipt of phone calls on 20.03.2013,
which was also contrary to the documents on record w.r.t. call detail
records in the DG Report and data regarding the tender submission
time as Opposite Party No.3 had already submitted their bid on
19.03.2013, an explanation was sought Mr. Shri Sandeep Goyal at
the cross-examination. Mr. Sandeep Goyal replied that he does not
remember the time of the bid submission, the same is a matter of
record, and he does not remember whether there were any revisions
TA (AT) Competition Nos. 37 & 38 of 2017 29
to the bid submission (Q lO-13 ), all of which are completely contrary
to the earlier statements. Such swinging stance of the Shri Sandeep
Goyal from his earlier statements, which is also inconsistent with the
documents on record, makes it amply clear his statement is
unreliable and motivated.
. Submissions on penalty
57. Based on the above submissions, it was submitted that the
Impugned Order including the penalty imposed on the Appellants
deserves to be set aside.
58. The Hon'ble Supreme Court of India in Excel Crop Care Limited
v. CCI & Anr, (2017) 8 SCC 47 held that the penalty imposed must
be based on the doctrine of proportionality, and the penalty should
not be so disproportionate so as to lead to shocking results. In the
present case, the following grounds shown to suggest between the
conduct of the Appellants and the quantum of penalty imposed,
a. 'R. Kanwar Electricals' (OP-2)'is a small family firm
comprising Appellants No.2 and his mother.
b. It is in fact registered as a small scale industrial firm (S.S.I)
with the Government of India's National Small Industries
Corporation Limited.
c. Another ground is that its net profit for the entire year of
2012-13 was Rs. 17.31 lakhs. The penalty amount of Rs.
TA (AT) Competition Nos. 37 & 38 of 2017 30
20.01 lakhs will grievously affect the day-to-day working of
RKE.
d. The Commission also found that the alleged cartel
existed for 3 tenders over a span of one month (February
- March 2013).
e. 'R. Kanwar Electricals (OP-2)'got no purchase orders on
any of the tenders that allegedly formed part of the bid
rigging.
f. 'R. Kanwar Electricals (OP-2)'has never been accused of
any anti-competitive acts except the present case, which
has been previously considered as a mitigation factor by
the erstwhile Competition Appellate Tribunal.
However, in absence of such facts brought before Commission,
facts beyond record cannot be taken to allege that the penal order is
disproportionate.
ANALYSIS OF FACTS & FINDING:
59. There are primarily three types of evidence in the present case
i.e. (a) e-mail, (b) call data records and (c) statement of OPs.
60. The e-mail dated 17th March, 2013 was initiated by Shri Sandeep
Goyal to Mr. Ashish Jain with the following comments :
""Dear Ashish, I have made the distribution for your reference. Please see and then we can discuss.
Thanking you,
TA (AT) Competition Nos. 37 & 38 of 2017 31
With warmest regards"
Thereafter, Shri Ashish Jain forwarded the e-mail to Shri Gulshan Kapoor, an office executive of OP 3 with the following remarks:
"Sir, please put the said mail with attachment on the table of Sir Ji"
61. On receipt of this e-mail, Mr. Gulshan Kapoor forwarded the e-
mail to Mr. Ramesh Parchani on the same day. It is from the inbox of
Shri Parchani that the CBI retrieved this e-mail.
62. Opposite party No. 1 accepted that the e-mail was sent in
pursuance of the agreement between the Opposite parties. However,
opposite party No. 2 (R. Kanwar Electricals) and Opposite Party No. 3
(Western Electric & Trading Co.) denied any such agreement.
63. Mr. Ashish Jain, Opposite Party No. 2 (R. Kanwar Electricals)
contended that though he forwarded the e-mail but he has done so
because Shri Sandeep Goyal had threatened him with dire
consequences. In the case of OP 3 (Western Electric & Trading Co.) both
Shri Gulshan Kapoor as well as Shri Ramesh Parchani denied
knowledge of the contents of the e-mail. Shri Gulshan Kapoor even went
to the extent of stating as to how Shri Ashish Jain got hold of their
e-mail and thereby accepted that it was his e-mail.
64. Shri Ramesh Parchani submitted that he first come to know of the
e-mail dated 17th March, 2013 when the CBI found it in his inbox but
such stand cannot be accepted.
TA (AT) Competition Nos. 37 & 38 of 2017 32
65. It is interesting to note that when Shri Gulshan Kapoor, who
claims that he did not know Shri Ashish Jain, received an e-mail from
Shri Ashish Jain with instructions to put it on table of "Sir Ji", he did
not ignore the e-mail and rather immediately forwarded the same to his
superior, Shri Ramesh Parchani. It is inconceivable that any prudent
person would forward an e-mail from an unknown source with unknown
contents without opening or reading the same, unless he knew the
sender and/ or the contents of the e-mail. Further, the call data records
of Shri Ashish Jain show that there were nine calls made between Shri
Ashish Jain and Shri Gulshan Kapoor from 27.02.2013 to 31.03.2013
with three calls being exchanged on the date of the e-mail itself i.e.,
17.03.2013. Thus, considering the above conduct of Shri Gulshan
Kapoor, his statement that he did not know Shri Ashish Jain is without
credence.
66. The evidence as adduced from the call data records forwarding the
e-mail an incidental event and this has rightly be held by the
Commission. Opposite Party No. 2 'R. Kanwar Electricals' and
Opposite Party No. 3 (Western Electric & Trading Co.) tried to project that
it was an incidental but the conduct makes it clear that there was an
understanding/arrangement arrived at amongst the Opposite parties to
rig the tenders floated by the Indian Railways and BEML.
67. Shri Asif Ali, Marketing Manager of CGL were recorded. In his
statement, recorded by the DG on 18th February, 2015 stated as :
"Generally, the notified tenders of railways
are communicated to us by M/s Western Electric &
TA (AT) Competition Nos. 37 & 38 of 2017 33
Trading Company and then we issue authorization
letter for specific tender before the opening of tender.
Thereafter, we issue a separate letter wherein the
suggested rates are mentioned (based on certain
factors including tender trends, tenderquantity etc.)
to be quoted by M/s Western Electric & Trading
Company in the railway tenders. The rates
mentioned in the said letters are just an advice and
are competitive price. We mention one figure as a
rate for quoting in the tenders. After issuance of
authorization letter, Crompton Greaves Ltd. hand
over the products i.e., BLDC fans to M/s Western
Electric & Trading Company and charge the total
price for the supply... M/s Western Electric &
Trading Company issues us periodic order for bulk
quantity on fix price independently of railways
orders. Crompton Greaves invoices to Western
Electric & Trading Company upon supply of BLDC
fans and receives payment from the later
independent of railway payment to Western Electric
& Trading Company....Thereafter, M/s Western
Electric & Trading Company bid in the railway
tenders and after getting orders from railways,
supply the same to the railways and charge the
price from the railways. Railways have to pay to
TA (AT) Competition Nos. 37 & 38 of 2017 34
M/s Western Electric & Trading Company and M/s
Western Electric & Trading Company has to pay to
us. We do not claim any money from railway directly
regarding supply of BLDC fans as billing is raised
by M/s Western Electric & Trading Company ..."
68. The statement of Asif Ali shows the clear relationship between OP-
3 (Western Electric & Trading Company) and OP-2 ('R. Kanwar
Electricals) Ashish Jain was not one of principal-agent as claimed by
OP-3 (Western Electric & Trading Company.) Shri Parchani has also
contended that he had quoted the same rates as given to him by CGL.
To support his contention he supplied a letter dated 18.02.2013, wherein
the rates were advised by CGL for the four tenders that are subject
matter of this case. He also provided another letter dated 15.03.2013 of
CGL wherein rates for tender dated 20.03.2013 were revised by CGL.
However, when the DG examined the rates suggested by CGL, it was
found that the rates proposed in the e-mail dated 17.03.2013 and the
rates advised by CGL in letter dated 18.02.2013 (final price after adding
5% CST) were same. This raises the issue how Shri Sandeep Goyal of OP
1 became privy to the rates suggested by CGL to OP 3.
69. The Commission has noticed the sequence of events which
conclusively shows that the rates were shared by Shri Ramesh Parchani
with Shri Ashish Jain and Shri Sandeep Goyal, directly or indirectly,
through e-mail or telephone. Thereafter, the Opposite Parties bid for
tender dated 27th February, 2013 as per mutually agreement rates and
then met at New Delhi to make their arrangement.
TA (AT) Competition Nos. 37 & 38 of 2017 35
70. For proper understanding, it is relevant to quote some of the
evidence, given by the Ashish Jain and others.
71. Mr. Ashish Jain (R. Kanwar Electricals) during his deposition, at
Question No. 16 makes the following statement :
"Question No. 16 : Have you received any mail on 17.03.2013 on your
mail ID rdso.fans@gmail.com from Sandeep Goyal
from his mail ID goyal.pk1@gmail.com? If yes, please
provide the details.
Answer: Yes, I have received a mail from Sandeep Goyal from
his mail ID goyal.pk1@gmail.com on 17.03.2013 with
an attachment relating to details of upcoming three
tenders and one tender which was already passed on
27.02.2013. After receiving the mail, I have not called
Mr. Sandeep Goyal. In fact, he has called me on same
day i.e. 17.03.2013 and threatened me that I will have
to forward it to Western Electric and Trading Company
and if I will not forward it then he will get me black
listed from RDSO because of his strong links. Also,
he has threatened that 'main tumhare pankhen
railways me fail karwa dunga, mere ML (member
electrical), Mr. Kulbhushan se personal relation hain,
RDSO mein bhi mere ache relation hain, wahan se
main tumhe black list kara dunga."
TA (AT) Competition Nos. 37 & 38 of 2017 36
Question No. 21 : When Mr. Sandeep Goyal of Pyramid has threatened
you on 17.03.2013 telephonically then why you have
not called the police?
Answer: I have not called the police because I was afraid that
Sandeep Goyal will shut down my business by using
his contacts in RDSO and Railway Board mainly
Member Electrical.
Question No. 22: The rates decided by you i.e. R. Kanwar Electricals
and Pyramid Electronics & Western Electric and
Trading Company and rates quoted in the tenders are
same (after showing the mail and tender documents).
Considering the same please specify that why the said
conduct of R. Kanwar Electricals and Pyramid
Electronics & Western Electric and Trading Company
should not be term to be cartelization and rigged the
bid?
Answer" Tender No. 301204020T460 due date 27.2.2013 was
already open and rates were known to all. In second
tender i.e. Tender No. 45131110 due date 20.3.2013,
I have not quoted the rates as given by Sandeep Goyal
and I have quoted as per my own calculations. As far
as third tender is concerned i.e. Tender No.
4102130113 due date 25.03.2013, I want to say that
it was the same rate as given by Sandeep Goyal in the
mail dated 17.03.2013 but the same was only due to
TA (AT) Competition Nos. 37 & 38 of 2017 37
co-incidence. And as far as fourth tender i.e. BEML is
concerned I have not participated in the bid.
Ramesh Parchani (Western Electric and Trading Company) in his
statement made the following statement :
Question Nos. 6: Do you have any agreement with Crompton Greaves
Ltd. regarding the supply/price to be quoted in
tenders?
Answer: We do not have any agreement with Crompton
Greaves Ltd. regarding dealership/supply/price to be
quoted in writing from inception but we are exclusive
agent of Crompton Greaves Ltd. for BLDC fans in India
since inception till date.
Question No. 7: Did you decide bidding rates independently or after
consultation with some other bidder?
Answer: I never consult any other person or firm or other
bidders for quoting my rates in railway tenders for
BLDC fans but Crompton Greaves Ltd. direct us what
price we should be quoted in tenders. Here by I am
submitting letters dated 18.02.2013 and 15.03.2013
(Annexure I) of Crompton Greaves Ltd. wherein they
have directed us to quote the rates in railway tenders.
I will also submit some more letters of Crompton
Greaves Ltd. wherein they have directed us to quote
the rates in railway tenders latest by 23.02.2015. We
TA (AT) Competition Nos. 37 & 38 of 2017 38
are advised by the OEM the indicative prices much
before the date of opening of the tenders however price
to be quoted is communicated to us one or two day
earlier before submission of the quotation.
72. Mr. Gulshan Kapoor (office Executive, Western Electrical &
Trading Company) in his deposition stated that :
Question No. 6 : Did you decide bidding rates independently or after
concern with some other bidder?
Answer: Yes, we decide bidding rates as per the price list given
by CGL and we never consult any other person and
firm for quoting our rates in railways tenders for BLDC
fans.
Question No. 7: What price you have quoted in Tender No.
30120402OT460 due date 27.02.2013, Tender No.
45131110 due date 20.03.2013, Tender No.
4102130113 due date 25.03.2013 and Tender No.
DR01/RM2/1200120506 due date 26.03.2013?
Answer:
Sl. Tender No. with due date Price in No. Rs. 1. 30120402OT460 (27.02.2013) 3491.98 2. 45131110 ( 20.03.2013) 3530/- 3. 4102130113 (25.03.2013) 3495/- 4. DR01/RM2/1200120506 3481 (26.03.2013) BEML (Quoted by CGL)
Question No. 8 : Are you were L-1 in any of these tenders? If yes, in
TA (AT) Competition Nos. 37 & 38 of 2017 39
which tender?
Answer: Yes, we were L-1 in tender No. 4513110 due date
20.3.2013. And in BEML tender due dated
26.03.2013 purchase order have been received by us.
Question No. 9 : Can you please explain what are the reasons for
quoting different prices for different tenders with in a
span of one month?
Answer: We have quoted the price given by the Crompton
Greaves Ltd. therefore I do not know what was the
reasons for quoting different prices for different
tenders.
xxx xxx xxx
Question No.13 : Have you received any mail on 17.03.2013 on your
mail ID kapoor.gulshanwestern@rediffmail.com from
Ashish Jain from his mail ID rke26@rerdiffmail.com ?
If yes, please provide the details.
Answer: Yes, I have received a mail from mail ID
rke26@rediffmail.com but I have not opened its
attachment and forward the same to mail IDs
rameshparchani@yahoo.com; Wetco3@gmail.com and
westernelectric@airtelmail.in. I came to know about
the attachment to this email only when CBI
approached Ramesh Parchani during June, 2013.
TA (AT) Competition Nos. 37 & 38 of 2017 40
73. The arrangement proposed in the e-mail was implemented by the
parties, it is evident if compared with the rates actually quoted by the
opposite parties in the four tenders as :
Tender No. and 30120402OT460, 45131110, 4102130113, DR01/RM2/1200120506, Due Date (27.02.2013) (20.03.2013) (25.03.2013) (26.03.2013) (1) (2) (3) (4) Procurer N.E Railway S.C Railway North Railway BEML OP 1 (Rate in e- 3510 3481 3481 3520 mail)
OP 1(Rate 3510 3610.80 3480.75 3570.75 quoted) OP 2 (Rate in e- 3481 3495 3520 3495 mail)
OP 2(Rate 3481.07 3757 3520 No bid quoted) OP 3 (Rate in e- 3495 3520 3495 3481 mail)
OP 3 (Rate 3491.98 3530 3495 3498.36 (Quoted by Crompton quoted) Greaves Ltd.) L1 based on OP 2 OP 1 OP 1 OP 3 rates in e-mail
L1 based on OP 2 OP 3 OP 1 Crompton Greaves rates quoted
From the above table, it is evident that:
a. as per arrangement, the rates agreed to be quoted by OPs were
Rs.3481 (by L1), Rs.3495 (by L2) and Rs.3520/3510 (by L3);
b. the arrangement was followed for tender dated 27th February,
2013. OP 2 quoted the same rate as was mentioned in e-mail
attachment i.e., Rs.3481 and was L1. OP 3 and OP 1 had also
quoted identical/similar rates as in e-mail attachment and were
L-2 and L-3, respectively;
c. the arrangement was not followed for tender dated 20.03.2013.
The rates quoted in this tender were different from what was
mentioned in the e-mail. Interestingly, all the three OPs, did not
TA (AT) Competition Nos. 37 & 38 of 2017 41
quote rates lower or equivalent to the previous L-1 i.e., Rs. 3481;
rather all quoted a higher rate. OP 3 was L-1 in this tender.
d. after deviating in tender dated 20.03.2013, the arrangement was
again followed by OP 1, OP 2 and OP 3 in tender dated 25.03.2013,
where OP 1 quoted Rs. 3480.75 and was L1, OP 3 and OP 2 quoted
identical rates as in e-mail and were L 2 and L 3, respectively.
e. the arrangement was not effectuated in tender dated 26.03.2013,
as instead of OP 3, CGL quoted directly in this tender. Further, OP
2 did not submit bid and the rates quoted by OP 1 did not match
with the rates in the e-mail.
74. There are other evidence on record which we have not discussed
but detailed by the Commission. Some of important evidence suggests
that OP-1 (Pyramid Electronics), OP-2 (R. Kanwar Electricals) and OP-3
(Western Electric & Trading Co.) not only rig the tender dated 25th
March, 2013 but also the tender dated 27th February, 2013.
75. In fact, the Opposite Party No. 1 had admitted to entering into the
arrangement with OP-2 (R. Kanwar Electricals) and OP-3 (Western
Electric & Trading Co.) to rig the four tenders for BLDC Fans and quoted
rates in three out of four tenders in collusion with OP-2 (R. Kanwar
Electricals)and OP-3 (Western Electric & Trading Co.) though latter have
denied that it was part of the cartel.
76. In view of the evidence on record and discussion as made and the
Commission having dealt with the matter in detail based on the
evidence, no case is made out to interfere with the findings of the
TA (AT) Competition Nos. 37 & 38 of 2017 42
Commission.
77. The grounds that 'R. Kanwar Electricals' is a small family firm or
is a small scale industries and on net profit for the entire year is less is
not a ground to interfere with the penalty as imposed by the Commission
on the Appellants. It deserves to be rejected.
Both the appeal are accordingly dismissed. No costs.
[Justice S.J. Mukhopadhaya] Chairperson
[ Justice A.I.S. Cheema ] Member (Judicial)
[ Balvinder Singh ] Member (Technical)
New Delhi
17th February, 2020
/ns/
TA (AT) Competition Nos. 37 & 38 of 2017
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free