Where a licence fee is payable under a leave and licence agreement, a contractual arrangement to set off the licensee's expenditure against that fee is not given effect where the clause governing the fit-out period permits extension only for pandemic-related restrictions, and where the purported arrangement was communicated by a suspended director without board authorisation or the company's seal. A third party in possession of property owned by the corporate debtor, having no subsisting right to that possession, is obliged to hand it over to the resolution professional under Section 18 of the Code, the title remaining with the corporate debtor; the Adjudicating Authority is competent to direct such handover and recovery of dues arising under the agreement. The moratorium under Section 14 of the Code protects the corporate debtor and does not extend to third parties such as a licensee; the resolution professional may, with committee of creditors' approval, terminate a licence agreement in accordance with its contractual terms during the moratorium and may take legal action to recover possession and dues.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL PRINCIPAL BENCH, NEW DELHI Comp. App. (AT) (Ins) No. 524 of 2024 & I.A. No. 1835, 1836, 1837 of 2024 (Arising out of the Order dated 29.02.2024 passed by the National Company Law Tribunal, Mumbai Bench-IV in Interim Application No. 5065(MB) of 2023 in Company Petition (I.B) No. 543/MB/2022]
IN THE MATTER OF:
Wakai Hospitality Private Limited Through the Authorised representative C-3, Koregaon Park, Sangam Wadi, Pune, Maharashtra, India - 411001. ...Appellant
Versus
1. Ms. Palak Desai Liquidator in the matter of Rajmal Lakhichand Jewelers Private Limited IBBI Registration No. IBBI/IPA-001/IP- P01517/2019-20/12515 ...Respondent Office No. 1, Tower No. 5, World Trade Centre, Cuffe Parade, Mumbai-400005.
2. ASREC India Limited Having address at: Solitair Corporate Park, Bldg No. 201-202A & 200-202B, Ground Floor, Andheri Ghatkopar Link Road, Chakala, Andheri East Mumbai- 400093. Branch Office at : 917-18, Hemkunt Chamber, 89, Nehru Place, New Delhi-110019. Present
For Appellants: Mr. Aditya Shukla, Samsher Garud, Sonali Jain, Vignesh Iyer, Vinayak Sharda, Adv.
Page 1 of 31 For Respondent: Ms. Honey Satpal, Aniruth Purusothaman, Pooja Singh, Akash Agarwalla, Adv. for R1. Mr. Amit Mahaliuan, Adv. for R2
JUDGEMENT
(28.05.2025)
NARESH SALECHA, MEMBER (TECHNICAL)
1. The present appeal has been filed by the Appellant i.e. Wakai Hospitality
Pvt. Ltd. under Section 61 of the Insolvency and Bankruptcy Code, 2016 (Code),
challenging the Impugned Order dated 29.02.2024 passed by the National
Company Law Tribunal, Mumbai, Bench-IV (hereinafter referred to as
'Adjudicating Authority') in the Interim Application No. 5065(MB) of 2023 in
Company Petition (IB) No. 543/MB/2022.
2. Ms Palak Desai, who is the Liquidator of Rajmal Jewelers Private
Limited, is the Respondent herein.
ASREC India Limited, who is an ARC and assignee of the debts of the
Corporate Debtor, is the Respondent No.2 herein.
3. The Appellant submitted that it has been operating a restaurant under the
trade name 'Wakai'. Pursuant to a Leave and License Agreement (LLA) dated
14.07.2022, the Appellant was granted a license by the Corporate Debtor, Rajmal
Lakhichand Jewelers Private Limited, in respect of commercial premises situated
at Ground Floor, B Wing, along with the adjacent covered garage in 'Mangal
Sandesh Building', admeasuring approximately 2853.62 sq.ft. ("licensed
Page 2 of 31 premises"), five years, commencing from 12.07.2022 with a monthly license fee
of Rs. 7,50,000/- subject to a yearly escalation of 5%, and a security deposit of
Rs. 30,00,000/- paid by the Appellant. The agreement also stipulated a lock-in
period of three years for the Appellant and five years for the Corporate Debtor
from the date of commencement of the license.
4. The Appellant submitted that in compliance with the LLA, he commenced
renovation works on the licensed premises. However, the Appellant received a
notice dated 07.09.2022 from the Municipal Corporation of Greater Mumbai
(MCGM) under Sections 337, 342, and 347 of the Mumbai Municipal
Corporation Act, 1888, which restrained the Appellant from continuing
renovation activities and consequently, the Appellant was statutorily barred from
proceeding with the fit-out works until requisite permissions were secured which
was the obligation for the Corporate Debtor, as the owner of the premises.
5. The Appellant submitted that, in these circumstances, he sent a letter to
the Corporate Debtor on 11.10.2022 and subsequently as per mutual discussion,
the Corporate Debtor agreed to resolve the issues and the costs to be incurred by
the Appellant regarding the same would be deducted from the license fees.
Further it was also agreed that the LLA tenure would be correspondingly
extended from the date of obtaining the OC and excise license. The Appellant
submitted that, in response to its letter dated 11.10.2022, the Corporate Debtor,
by its reply dated 01.11.2022, agreed to and requested the Appellant to inform the
Page 3 of 31 Corporate Debtor of the expenses incurred and specifically requested that such
expenses be kept below Rs. 1 crore.
6. The Appellant submitted that it pursued the requisite licenses and
permissions from the concerned government authorities and MCGM granted the
completion certificate/occupation certificate on 28.03.2023. The Appellant
submitted that, in order to make the licensed premises suitable for its commercial
operations, it incurred substantial renovation costs amounting to Rs.
2,50,00,000/-. The Appellant was granted the requisite license from the Health
Department of the MGCM on 12.04.2023, and the necessary excise license on
17.05.2023.
7. The Appellant submitted that, pursuant to the grant of the necessary
permissions and licenses from the relevant government authorities, it addressed a
letter dated 23.06.2023 to the Corporate Debtor, duly informing it of the same. In
the said letter, the Appellant specifically set out the costs and expenses incurred
towards obtaining these licenses and permissions, and further intimated that such
amounts would be adjusted against the license fees payable. The Appellant also
clarified that the license tenure would commence from 01.07.2023.
8. The Appellant submitted that it received a letter dated 12.07.2023
(communicated via email on 18.07.2023) from the Respondent No.1, informing
the Appellant for the first time about the commencement of the corporate
insolvency resolution process (CIRP) against the Corporate Debtor pursuant to
an order dated 09.02.2023 passed by Adjudicating Authority as well as the public
Page 4 of 31 announcement dated 13.03.2023. In the said correspondence, the Respondent
No.1 also sought payment of rentals under the LLA from the Appellant and
requested further details in relation thereto.
9. The Appellant submitted that, in response, he addressed a letter dated
19.07.2023 to the Respondent No.1, wherein he clarified that, as per the
arrangement under the LLA and the correspondence exchanged between the
parties-read in conjunction with the fit-out clause-the obligation to pay license
fees would arise only after 01.07.2023. The Appellant reiterated that the expenses
incurred towards obtaining the necessary licenses and permissions were to be
deducted from the future license fees, and only the balance, if any, would be
payable thereafter. The Appellant submitted that on 02.08.2023, he addressed an
email to the Respondent No.1, wherein it set out its proposal and for amicable
resolution of the matter however, by email dated 09.08.2023, the Respondent
No.1 rejected the Appellant's offer and instead demanded payment of license fees
at the rate of Rs. 7,50,000/- per month for the period from 13.09.2022 to
31.07.2023, after accounting for the 60-day fit-out period.
10. The Appellant submitted that subsequently on 02.09.2023, the Advocates
for the Respondent No.1 issued a legal notice to the Appellant, demanding
payment of alleged outstanding license fees amounting to Rs. 87,25,000/- for the
period from 13.09.2022 to 31.08.2023. The notice further invoked Clause 12.1 of
the LLA, granting the Appellant a period of 30 days to remedy the alleged default,
failing which the Respondent No.1 threatened to initiate appropriate legal
Page 5 of 31 proceedings for recovery of the said license fees and for eviction of the Appellant
from the licensed premises. The Appellant submitted that, in response to the
aforesaid legal notice, he sent letter to the Respondent on 18.09.2023, wherein it
reiterated its position as consistently set out in the earlier correspondence,
particularly in its letter dated 19.07.2023.
11. Subsequently, on 26.10.2023, the Respondent filed an Interim
Application against the Appellant under Section 18(f) of the Code seeking
directions for the handover of vacant and peaceful possession of the licensed
premises by the Appellant within one calendar month, as well as payment of
alleged outstanding license fees aggregating to Rs. 1,14,84,348/- (inclusive of
18% interest) for the period from 13.08.2022 to 24.10.2023, purportedly under
Clause 6.2.1(iv) of the LLA.
12. The Appellant submitted that the Impugned Order failed to consider any
of the contentions raised by the Appellant including that the Respondent, even if
it had any cause of action, was required to seek reliefs before an appropriate
forum like Small Cause Court and that the Adjudicating Authority lacked the
jurisdiction to adjudicate upon the reliefs sought in the Interim Application. The
Appellant also stated that the Adjudicating Authority did not take into account the
nature and effect of the pre-CIRP correspondence exchanged between the
Appellant and the Corporate Debtor, which remains binding on the Respondent
No.1. The Adjudicating Authority completely overlooked the fact that the
Respondent had not adhered to the termination procedure stipulated under the
Page 6 of 31 LLA. The Appellant submitted that the Impugned Order disregards the settled
legal position that the Adjudicating Authority lacks jurisdiction to adjudicate
issues pertaining to the interpretation of agreements or contracts that arose prior
to the initiation of the CIRP.
13. The Appellant submitted that, by way of the Impugned Order, the
Adjudicating Authority directed the Appellant to vacate the premises and pay
arrears of rent amounting to Rs. 1.14 Crores to the erstwhile Resolution
Professional in respect of the premises owned by the Corporate Debtor. The
Appellant submitted that upon filing an appeal, this Appellate Tribunal, vide order
dated 15.03.2024, granted a stay on the operation of the Impugned Order, subject
to the condition that the Appellant deposit 50% of the amount directed by the
Adjudicating Authority and continue to pay the license fee on a monthly basis
with effect from 01.04.2022. The Appellant has duly complied with the said order
dated 15.03.2024 by depositing 50% of the dues as per the Order of this Appellate
Tribunal and has continued to pay the license fee.
14. Concluding his arguments, the Appellant requested this Appellate
Tribunal to set aside the Impugned Order and allow his appeal.
15. Per contra, the Respondent No.1, the main contesting Respondent, denied
all averments made by the Appellants as misleading and baseless.
16. The Respondent No. 1 submitted that he, as Resolution Professional of
the Corporate Debtor, validly invoked the termination clause under the LLA, and
the Appellant never challenged this termination before the Adjudicating Authority
Page 7 of 31 and by failing to file any application to contest the Respondent No.1's action at
the relevant time, the Appellant has effectively accepted the termination.
Consequently, the Appellant cannot now, by way of appeal, challenge the
termination that was never disputed before the Adjudicating Authority.
17. The Respondent No. 1 submitted that the Corporate Debtor entered into
a LLA with the Appellant on 14.07.2022, stipulating a monthly license fee of Rs.
7.5 lakhs, subject to a 5% annual increment. despite this, the Appellant failed to
pay any license fees from the commencement of the agreement. The Respondent
No.1, as Resolution Professional, was informed of the existence of the Agreement
only in May 2023, and accordingly, by letter dated 12.07.2023, he called upon
the Appellant to make payment of the outstanding license fees.
18. The Respondent No. 1 submitted that the Appellant, in its reply dated
19.07.2023, relied upon several documents. However these documents, clearly
indicate that the nature of the expenses incurred by the Appellant falls within the
clauses of the LLA and were to be borne by the Appellant.
19. The Respondent No. 1 submitted that, during the 6th meeting of the
Committee of Creditors (CoC) held on 25.08.2023, it was discussed and resolved
that all expenses the Appellant seeks to adjust against the outstanding rent are, as
per the terms of the LLA, to be borne by the Appellant himself. The CoC
accordingly instructed the Respondent No.1 to issue a demand notice to the
Appellant in accordance with the LLA, and to take appropriate action to protect
the interests of the Corporate Debtor in case of non-payment. Pursuant to these
Page 8 of 31 instructions, and due to non-receipt of rent for the period from 13.09.2022 to
31.07.2023, the Respondent No.1 issued a legal notice dated 02.09.2023 invoking
the termination clause of the lease deed, upon the Appellant's failure to surrender
vacant and peaceful possession of the premises and pay the outstanding license
fees, the Respondent No.1 filed I.A. No. 5065/2023 under Section 18(f) of the
code read with Rule 11 of the NCLT Rules, 2016, seeking appropriate reliefs. The
Respondent No. 1 submitted that the Adjudicating Authority, passed the
Impugned Order allowing the Interim Application, and the Adjudicating
Authority correctly found that the unauthenticated communications between the
Appellant and Corporate Debtor, lacking the company seal and board
authorization, are contrary to the terms of the LLA and therefore have no
detrimental bearing on the LLA.
20. The Respondent No. 1 submitted that, at the outset, this is not a case where
the Resolution Plan proposes automatic termination of the contract upon its
approval, nor is it a case where the Resolution Professional has failed to follow
the due process as prescribed in the LLA. The Respondent No.1 stated that there
is no express bar under Section 14 of the Code preventing the Resolution
Professional from terminating contracts during the moratorium period. What is
specifically prohibited under the Code is the action by third parties to (a) recover
any property occupied by or in possession of the Corporate Debtor, and (b)
terminate, interrupt, or suspend the supply of critical goods and services to the
Corporate Debtor during the CIRP. These restrictions are intended to ensure that
Page 9 of 31 the Corporate Debtor remains a going concern during the CIRP, thereby
maximizing the value of its assets and securing better realization for stakeholders.
21. The Respondent No. 1 submitted that, under Section 25(2)(a) and (b) of
the Code, the Resolution Professional is not only required to take control and
custody of the assets of the Corporate Debtor, but is also mandated to represent
and act on behalf of the Corporate Debtor in dealings with third parties. Further,
Section 17(2)(a) of the code empowers the Resolution Professional to act and
execute all deeds, receipts, and other documents in the name and on behalf of the
Corporate Debtor, while Section 23 of the code requires the Resolution
Professional to manage the operations of the Corporate Debtor. The Resolution
Professional, therefore, performs all functions and duties that would otherwise be
carried out by the management, always acting in the best interests of the
Corporate Debtor. The Respondent No.1 elaborated that in the present case, the
Licensee/Appellant failed to pay the license fees from the very commencement
of the LLA and was already in breach at the time of initiation of CIRP.
Accordingly, the CoC directed the Resolution Professional to take appropriate
action in the best interests of the Corporate Debtor, including issuing a notice for
termination of the Agreement. The Resolution Professional, has thus acted on
behalf of the Corporate Debtor, strictly in accordance with the terms of the LLA.
22. The Respondent No. 1 submitted that the Resolution Professional was
obligated to uphold the terms of the Agreement and could not have ignored the
Appellant's breach. The termination of the Agreement under Clause 12 was valid
Page 10 of 31 and well within the Resolution Professional's authority. The letter from Corporate
Debtor dated 01.11.2022 was issued without proper authorization and, therefore,
is not binding on the Corporate Debtor. The Respondent No.1 submitted that
reliance placed by the Appellant, on Rajendra K. Bhutta v. MHADA, (2020) 13
SCC 208, is misplaced in the present context, as the cited judgment restricted
MHADA from terminating a contract during the moratorium under Section
14(1)(d) of the Code. Such protection under Section 14 is intended to benefit the
Corporate Debtor, ensuring its continued viability, maximizing asset value, and
enhancing the prospects of successful insolvency resolution, which is not the case
in present appeal.
23. The Respondent No. 1 submitted that both the Adjudicating Authority
and this Appellate Tribunal possess the necessary jurisdiction to adjudicate all
matters impacting the insolvency process, particularly those relating to core value
maximization and the facilitation of resolution. The Respondent No.1 further
submitted that the arrangement between the parties is the LLA and not a tenancy
and this Appellate Tribunal, in the matter of Adinath Jewellery Exports v. Mr.
Brijendra Kumar Mishra & Anr., Company Appeal (AT) (Insolvency) No. 748 of
2022, has held that the Adjudicating Authority and this Appellate Tribunal have
residuary jurisdiction to decide upon the termination of contracts that affect the
survival of the Corporate Debtor.
24. The Respondent No. 1 submitted that, in a similar case, this Appellate
Tribunal in Company Appeal (AT) (Insolvency) No. 508 of 2020, by its judgment
Page 11 of 31 dated 08.04.2021, held that the Adjudicating Authority and this Appellate
Tribunal have jurisdiction to adjudicate questions relating to disputes and
recovery of property. This position was subsequently affirmed by the Hon'ble
Supreme Court in Civil Appeal No. 1743/2021, vide judgment dated 14.03.2023,
thereby confirming that such matters fall within the scope of the Adjudicating
Authority's powers under the Code.
25. The Respondent No. 1 submitted that there should be no distinction in the
powers of the Adjudicating Authority when it comes to addressing the termination
of a contract, irrespective of whether such termination is initiated by a third party
or by the Corporate Debtor itself. Furthermore, it is significant to note that Section
14(1)(d) of the Code, along with its explanation, restricts only the Central or State
Government or any authority from terminating licenses during the moratorium.
Therefore, if any other party terminates a contract, the Adjudicating Authority
retains the appropriate jurisdiction to adjudicate such matters, as they directly
pertain to the insolvency proceedings of the Corporate Debtor.
26. The Respondent No. 1 submitted that the Appellant's right to approach
any other court is expressly barred under the provisions of the Code. Given that
the agreement in question is in the nature of a lease, the validity of its termination
falls squarely within the jurisdiction of the Adjudicating Authority. The
Respondent No.1 submitted that the Appellant has already presented evidence,
which was duly examined and considered by the Adjudicating Authority while
passing the Impugned Order. Furthermore, the Resolution Professional cannot be
Page 12 of 31 compelled to initiate proceedings before the Small Causes Court and be subjected
to its uncertain timelines, which are inconsistent with the specific and expedited
timeframes prescribed under the Code.
27. The Respondent No. 1 submitted that the LLA expressly provided a 60-
day fit-out period, which was extendable only in the event of Covid-related
restrictions and the responsibility and cost of obtaining all necessary approvals
for renovation or repair work, as well as securing the requisite licenses, rested
solely with the Appellant.
28. Concluding his pleadings, the Respondent No.1 requested this Appellate
Tribunal to dismiss the appeal.
29. The Respondent No. 2 submitted that it is a company incorporated under
the Companies Act, 1956, and is registered as an Asset Reconstruction Company
with the Reserve Bank of India.
30. The Respondent No. 2 submitted that, in the year 2014, the Corporate
Debtor, M/s Rajmal Lakhichand Jewellers Pvt. Ltd., availed credit facilities from
Jalgaon People's Co-op Bank Ltd. These credit facilities are secured by the
several assets including Mortgage of piece and parcel of land or ground, together
with the building known as "Mangal Sandesh," comprising Wing "A"
(constructed up to the 10th floor) and Wing "B," situated at Khar Danda, Bombay
side of the 17th Road. The Respondent No. 2 submitted that he subsequently
acquired the account of M/s Rajmal Lakhichand Jewellers Pvt. Ltd. from Jalgaon
Page 13 of 31 People's Co-op Bank Ltd. pursuant to an Assignment Agreement dated
26.03.2020.
31. The Respondent No. 2 submitted that, thereafter, State Bank of India filed
an application bearing CP No. 543/MB/2022 under Section 7 of the Code before
the Adjudicating Authority against the Corporate Debtor for initiation of CIRP,
which was duly admitted by order dated 09.02.2023. In compliance with the CIRP
process, Respondent No. 2 filed its claim on 28.02.2023.
32. The Respondent No. 2 submitted that the Appellant has claimed that the
property known as "Mangal Sandesh," Khar (which is exclusively mortgaged to
the present applicant, ASREC India Limited) was let out by the Corporate Debtor
to the Appellant under a LLA dated 14.07.2022.
33. The Respondent No. 2 submitted that, during the pendency of the present
appeal, the Adjudicating Authority vide its order dated 11.06.2024, directed the
commencement of liquidation proceedings in respect of the Corporate Debtor and
appointed Ms. Palak Desai as the Liquidator under the provisions of the Code.
Subsequently, by letter dated 11.07.2024, Respondent No.2/ASREC India
Limited issued a notice of non-relinquishment of its security interest under
Section 52 of the Code, asserting its exclusive charge over the secured assets to
the Liquidator.
34. The Respondent No. 2 submitted that issues raised by the Appellant are
untenable under the provisions of the Code and the mortgage over the subject
property was created on 15.01.2015, whereas the purported LLA was registered
Page 14 of 31 much later, on 14.07.2022-almost seven years after the creation of the mortgage.
In view of this chronology and in accordance with Section 48 of the Transfer of
Property Act, 1882, Respondent No. 2-ASREC India Limited-holds a prior and
overriding charge on the said property.
35. Concluding his pleadings, the Respondent No.2 requested this Appellate
Tribunal to dismiss the appeal.
FINDINGS
36. We note that there is no dispute regarding title of the licensed premises
and the title vest only with the Corporate Debtor. It is also a fact that the licensed
premises was indeed given to the Appellant to run his restaurant based on LLA
utilising the licensed property of the Corporate Debtor.
37. We note that the Corporate Debtor had obtained certain financial facilities
from Jalgaon People's Co-op Bank Ltd, who later assigned the debts to
Respondent No. 2/ ASREC India Limited. It is suffice to note that SBI initiated
Section 7 application against the Corporate Debtor which was admitted and CIRP
proceeding was initiated vide order dated 09.02.2023 by the Adjudicating
Authority and now the same has been ordered for liquidation by the Adjudicating
Authority vide order dated 11.06.2024.
38. It is the case of the Appellant that there was proper contractual agreement
between the Appellant and the Corporate Debtor and based on terms and
Page 15 of 31 conditions of LLA, it was responsibility of Corporate Debtor to complete the
formalities before the fit out period of 60 days came into effect.
39. It is the case of the Appellant that due to non compliance of the Corporate
Debtor of various regulations, the Appellant had to incur huge cost in order to
obtain necessary licenses from MCGM, excise department, health department
etc and thereafter it was agreed between the Appellant and the Corporate Debtor
that the tenure of LLA would be suitable enhanced and the cost incurred by the
Appellant would be adjusted against the licensed fee payable, keeping upper limit
of Rs. 1 Crore. On the other hand, the Respondent No. 1, who is liquidator of the
Corporate Debtor brought out to our notice that the Appellant never paid any
license fee since inception. The Respondent No. 1 also brought out that when it
came to the notice of liquidator that for the said property no, payment has been
made by the Appellant, he wrote to the Appellant but the Respondent No.1 did
not receive any suitable response including money. Thereafter, the Respondent
No. 1 was compelled to file an application before the Adjudicating Authority
seeking the Adjudicating Authority's directives to the Appellant for handover of
the said property along with outstanding amount which was granted by the
Adjudicating Authority.
40. The Appellant has raised following issues in the present appeal
Issue No. (I) There was no money payable i.e. License fee by the Appellant
to the Corporate Debtor since it was agreed between the Appellant and the
Page 16 of 31 Corporate Debtor that the cost incurred by the Appellant would be settled
against License fee.
Issue No. (II) Another issue of the Appellant is that it is not within
jurisdiction of the Adjudicating Authority to adjudicate inter-se disputes
between the parties and for any remedy, the Respondent No. 1 was required
to approach the appropriate suitable judicial forum like the small cause
court.
Issue No. (III) As per Section 14 of the Code, the moratorium period
started and the Respondent No. 1 could not have initiated any proceedings
against the Appellant or terminated the LLA.
We shall deal issues raised by the Appellant in subsequent discussion
41. Issue No. (I) There was no money payable i.e. License fee by the
Appellant to the Corporate Debtor since it was agreed between the Appellant and
the Corporate Debtor that the cost incurred by the Appellant would be settled
against License fee.
(i) In this connection we would like to take into consideration relevant
portion of the LLA which reads as under:-
Page 17 of 31
(ii) From above, it is clear that the license was to commence from
12.07.2022 (license commencement date) for the period upto five
years. The LLA provided for a grace period i.e., fit out period to the
Appellant of 60 days from the date of commencement, within which
Page 18 of 31 the Appellant was supposed to commence the business and pay the
license fee as per the LLA.
(iii) We observe that only in the event on account of pandemic and if the
authority declare a lockdown or imposed restrictions which result in
stoppage of carrying fit out works, corresponding extension of fit out
period was to be extended in sync with such extended lockdown
period. Hence, it is crystal clear that the extension of fit out period
was available to the Appellant only on the ground of covid pandemic
related restrictions and not otherwise. Thus, we are unable to accept
the contentions of the Appellant that due to alleged non compliance
by the Corporate Debtor, the appellant could not obtain the requisites
licenses from MCGM, excise department, health department etc.,
and therefore he could not commencement the business. The
Appellant's pleading is that since he incurred more than Rs.1 Crore
to obtain such license, therefore he was not supposed to pay to the
Corporate Debtor as per their mutual understanding. We find that
this pleading is not legally tenable in view of clause 5 of LLA. We
observe that the Appellant was duty bound to pay the license fee after
the fit out period of 60 days was over.
(iv) As regard issue that it was mutually agreed between the Appellant
and the Corporate Debtor that the expenses incurred by the
Appellant would be reimbursed to the Appellant subject to limit of
Page 19 of 31 Rs. 1 Crore and also that the tenure of LLA would be enhanced
suitable by the correspondence period, we would like to look into
the correspondence exhanged between the Appellant and the
Corporate Debtor which was brought to our notice by the Appellant.
The letters are reproduces as under :-
Dated 11.10.2022
Page 20 of 31 Page 21 of 31 LETTER DATED 01.11.2022
Page 22 of 31 LETTER DATED 23.06.2023
Page 23 of 31
(v) We note that the there was no authorisation from the Corporate
Debtor to the suspended director of the Corporate Debtor to issue
such letters to the Appellant regarding issuance of such
correspondence as per record made available to us and also that the
letter do not bear the seal/stamp of the Corporate Debtor.
(vi) In this connection, we would also like to look into the relevant
portion of the Impugned Order which reads as under :-
"12.2. The Respondent, per its Reply dated 09.01.2024, contends that the purported adjustment of expenses is in consonance with L&LA dated 14.07.2022. We find that the same is devoid of any merits and place reliance hereto upon Clause (5) of the said L&LA pertaining to the 'FitOut Period'. The said clause expressly warrants for extension of the FitOut Period only in the eventuality/ on account of pandemic. Further, the correspondences relied upon by the Respondent with a member of the suspended Board of Directors of the Corporate Debtor, are contrary to the terms and conditions set out in the afore-stated L&LA dated 14.07.2022 and the said correspondences would thus have no detrimental bearing upon the same."
(Emphasis Supplied)
(vii) The Adjudicating Authority has categorically recorded that the
correspondence relied upon by the Appellant with the suspended
board of directors is contrary to the terms and conditions of LLA.
Page 24 of 31
(viii) In view of this, the contentions of the Appellant on this ground is
also not accepted.
42. Issue No. (II) Another issue of the Appellant is that it is not within
jurisdiction of the Adjudicating Authority to adjudicate inter-se disputes between
the parties and for any remedy, the Respondent No. 1 was required to approach
appropriate suitable judicial forum like the small cause court.
(i) In this connection, we note that in the judgment delivered by this
Appellate Tribunal in Encore Asset Reconstruction Company Pvt.
Ltd. vs. Ms. Charu Sandeep Desai (RP of Calyx Chemicals &
Pharmaceuticals Ltd.) & Ors., Company Appeal (AT) (Insolvency)
No. 719 of 2018, it was held that that an asset owned by the corporate
debtor but is in the possession of a third party or creditor, such party
is obligated to hand over possession to the Resolution Professional
under Section 18 of the Code, so long as the title remains with the
corporate debtor. The aforementioned judgment was challenged
before the Hon'ble Supreme Court of India and was duly upheld. The
facts are similar to present case and thus we find the same to be
applicable.
(ii) The Appellant has also pleaded that the Respondent No. 1 should
have initiated case under small cause court. We note that the CIRP
was ordered 09.02.2023 more than two years ago and since then the
Corporate Debtor has even been ordered for liquidation on
Page 25 of 31 11.06.2024. We observe that the timelines as stipulated in the code
have been stipulated with the objection for maximisation of value of
the Corporate Debtor. Recently in the case of Kalyani Transco v.
Bhushan Power & Steel Ltd., 2025 SCC OnLine SC 1010, the
Hon'ble Supreme Court of India has reiterated the importance of
timeline.
(iii) The Respondent No. 1 is duty bound to act in accordance with code
and according to which the liquidator is supposed to take over the
assets of the Corporate Debtor in terms of section 25 (2) (a) & (b) of
the Code. We have already noted that the Respondent No. 1 gave
due notice to the Appellant for termination of LLA after obtaining
approval of the CoC since the Appellant failed to make payment as
per notice by the Respondent No.1.
(iv) It is also noted that Respondent No 1 initiated the IA No. 5065 of
2023 before the Adjudicating Authority who passes the Impugned
Order asking the Appellant to vacate the said property and to pay the
necessary dues to the Respondent No.1.
(v) As such we do not find any merit in the argument of the Appellant
that the Adjudicating Authority erred in passing the Impugned Order
or it is only small cause court is competent to adjudicate such
matters. We hold that Impugned Order has been correctly passed by
the Adjudicating Authority.
Page 26 of 31
43. Issue No. (III) As per Section 14 of the Code, the moratorium period
started and the Respondent No. 1 could not have initiated any proceedings
against the Appellant or terminated the LLA.
(i) We note that the Resolution Professional after taking approval of the
CoC wrote a letter to the Appellant to make the payments and after
reasonable time period he invoked the termination notice period of
30 days as per LLA.
(ii) We have already noted that even after laps of termination notice
period the Appellant neither vacated premises nor repaid money to
the Corporate Debtor. Hence, the Resolution Professional i.e., the
Respondent No. 1 initiated IA before the Adjudicating Authority
seeking directions of the Appellant which were granted by the
Adjudicating Authority in the Impugned Order.
(iii) The objective of section 14 of the code is intended to protect
Corporate Debtor from legal hassels during resolution period and it
was never intended to give the protection of moratorium to third
party like the Appellant herein and therefore the contention of the
Appellant that during moratorium the Respondent No. 1 could not
have initiated any action against the Appellant is not convincing. We
must understand that the protection to the Corporate Debtor under
Section 14 of the Code is given so that the Resolution Professional
can try to resolve the Corporate Debtor under guidance of the CoC.
Page 27 of 31
(iv) It is an obligation as well as the right of the Resolution Professional
to protect the interest of the Corporate Debtor and take necessary
action including realising recoverable dues from third party like the
Appellant on behalf of the Corporate Debtor as well as take legal
action in accordance with law to take possession of property in given
circumstances. In the present case the Appellant has not paid the
license fee on certain assumptions which we have already discussed
in earlier paragraphs.
(v) As such we do not find any merit in the contentions of the Appellant
that during moratorium period the Respondent No. 1 could not have
terminated the LLA.
(vi) We note that the Corporate Debtor is the owner of the subject
property and the Appellant continued to occupy the premises under
the LLA without payment of the requisite license fees and without
challenging the termination before the Adjudicating Authority. The
Appellant acknowledged that this Appellate Tribunal, by order dated
15.03.2024, granted a stay on the Impugned Order subject to two
conditions: (a) payment of 50% of the amount directed by the
Adjudicating Authority, and (b) payment of Rs. 7.5 lakhs per month
with effect from 01.04.2024 The order dated 15.03.2024 reads as
under:
Page 28 of 31
"Learned counsel for the Appellant submits that the application filed by the Resolution Professional seeking recovery of possession and payment of outstanding license fees along with interest, was not maintainable since the question of Leave and Licence Agreement could not have been brought for consideration before the Adjudicating Authority. It is submitted that the Appellant has already paid more than Rs.1 Crore to the different authorities with respect to building in question and Appellant could start commencing his business only from July, 2023. Shri Ravi Raghunath, learned counsel appearing for the Respondent submits that the application was fully maintainable and the Adjudicating Authority has rightly relying on the judgment of this Tribunal in M/s. Jhanvi Rajpal Automotive Pvt. Ltd. v. R.P. of Rajpal Abhikaran Pvt. Ltd. & Ors. decided the application. It is submitted that the amount due is Rs.1.5 Crores and Leave and Licence Agreement was terminated on 03.10.2023 and even thereafter no payments have been made. Learned counsel for the Respondent has refuted the date of commencement as contented by learned counsel for the Appellant. Submissions raised by learned counsel for the parties need consideration. Issue notice. Let Reply be filed by the Respondent within two weeks. Rejoinder be filed within two weeks thereafter.
List this Appeal on 29.04.2024.
In the meantime, the effect and operation of the impugned order shall remain stayed subject to (i) Appellant depositing 50% of the amount directed by the Adjudicating Authority within 30 days from today; (ii) shall pay amount
Page 29 of 31 of Rs.7.5 Lakhs w.e.f. 01.04.2022 as use and occupation charges to the Resolution Professional.
This is without prejudice to the rights and contentions of both the parties."
(vi) It has been brought to our notice by the Respondent No.1 that the
Appellant even breached of these conditions and has been in default
for more than two months in payment of license fee. We have also
taken into consideration the submission made by the Respondent
No.2 that the Appellant has since then vacated the license property
and has also filed his claim before the liquidator i.e., the Respondent
No. 1 herein.
44. We also note that this Appellate Tribunal, in Company Appeal (AT) (Ins) No.
63/2024, in the matter of Deepak Sakharam Kulkarni & Anr. vs. Manoj
Kumar Agarwal, Resolution Professional of DS Kulkarni, has recognized the
power of the Resolution Professional to terminate agreements, and observe
that, while it is impermissible to deprive third parties of their rights solely on
the basis of the initiation of insolvency proceedings, there is no prohibition on
terminating agreements in accordance with the contractual terms during the
CIRP or even thereafter.
45. Thus, we hold that during moratorium the respondent could terminate the
LLA and also was entitled to take legal action against the Appellant. We reject
arguments of the Appellant on this ground.
Page 30 of 31
46. Based on above detailed observations, we do not find any error in the
Impugned Order. The Appeal devoid of any merit stand rejected. No cost. I.A.,
if any, are closed.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
[Mr. Indevar Pandey] Member (Technical) Sim
Page 31 of 31
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free