Where a financial creditor's Section 7 application concerns only a particular facility, and that facility has been assigned to a third party, it is the assignee alone that may be substituted in place of the assignor as the sole applicant, and it is not necessary or proper to admit the assignee as an additional applicant alongside the original creditor.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

NATIONAL COMPANY LAW APPELLATE TRIBUNAL PRINCIPAL BENCH, NEW DELHI Comp. App. (AT) (Ins) No. 1224 of 2024 IN THE MATTER OF: Vidarbha Industries Power Ltd. ...Appellants Versus CFM Asset Reconstruction Pvt. Ltd. & Anr. ...Respondents

WITH Comp. App. (AT) (Ins) No. 1230 of 2024 & I.A. No. 4086 of 2024 IN THE MATTER OF: Vidarbha Industries Power Ltd. ...Appellants Versus CFM Asset Reconstruction Pvt. Ltd. & Anr. ...Respondents

Present: For Appellant : Mr. Venkatesh, Mr. Sunael Buttan, Mr. Vineet Kumar and Mr. Nikunj Bhatnagar, Advocates. For Respondents : Mr. Arun Kathpalia Sr. Advocate with Mr. Manmeet Singh, Mr. Arfrey, Ms. Bhavika Deora and Mr. Samarth Sansar, Advocates.

ORDER

(Hybrid Mode)

12.08.2024:

CA (AT) (Ins) No. 1224 of 2024 with CA (AT) (Ins) No. 1230 of 2024

These two appeals filed by the same appellant challenging the order

passed by National Company Law Tribunal, Mumbai Bench-V in IA No. 4428 of

2023 and IA No. 4450 of 2023 respectively. By the order dated 07.03.2024 in

I.A. No. 4428 of 2023 Adjudicating Authority had allowed the application filed

by the respondent CFM Asset Reconstruction Pvt. Ltd. and applicant was allowed to be substituted as Financial Creditor in place of State Bank of India

who has initiated Section 7 application.

2. The Ld. Counsel for the appellant submits that a writ petition being W.P.

No. 2395 of 2023 has been filed in the Bombay High Court which has also been

noticed by Adjudicating Authority in paragraph-9. The order dated 07.03.2024

is an order allowing the applicant to be substituted as financial creditor on

basis of the assignment as mentioned in the impugned order dated 17.08.2023.

3. We do not find any error in the order passed by Adjudicating Authority

allowing the substitution of the CFM Asset Reconstruction Pvt. Ltd. in place of

the financial creditor there is no error in the order. Appeal is dismissed

accordingly.

CA (AT) (Ins) No. 1230 of 2024

4. This appeal has been filed by the appellant challenging the order dated

07.03.2024 passed in IA No. 4450 of 2023 by which order the application filed

by CFM Asset Reconstruction Pvt. Ltd. was allowed and applicant was allowed

to be impleaded as Financial Creditor No.2. The Section 7 application was filed

by the Axis Bank Limited and by order impugned applicant was impleaded as

Respondent No.2.

5. Ld. Counsel for the appellant challenging the order submits that Section

7 application was filed by the Axis Bank only for RTL-II Facility which is

mentioned in the Form-4 itself. Application having been filed only for RTL-II

Facility which having assigned by the Axis Bank to the CFM Asset

Reconstruction Pvt. Ltd. CFM Asset Reconstruction Ltd. at best could have Comp. App. (AT) (Ins) No. 1224 & 1230 of 2024 2 of 3 been substituted at place of Axis Bank Ltd. but there was no occasion to

permit applicant to be permitted as applicant no.2 and to continue with Axis

Bank as applicant no.1. Ld. Counsel for the appellant has also referred to the

order of the Bombay High Court passed in writ petition No. 2395 of 2023 which

has also been noticed by Adjudicating Authority in para- 11 of the order.

6. Shri Arun Kathpalia, Ld. Counsel appearing for the respondent submits

that financial creditor has no objection if CFM Asset Reconstruction Pvt. Ltd. is

substituted in place of Axis Bank to prosecute the proceedings.

7. We are after having heard the counsel for the parties, are of the view that

in above facts especially when the application was only for RTL-II loan which

has been assigned to CFM Asset Reconstruction Pvt. Ltd. it was CFM Asset

Reconstruction Pvt. Ltd. which could have been substituted in place of Axis

Bank, and there was no necessity of applicant to be impleaded as applicant

no.2 we are modify the order dated 07.03.2024 to the effect that CFM Asset

Reconstruction Pvt. Ltd. shall be substituted in place of Axis Bank as the sole

applicant to prosecute the proceedings.

With the above, the appeal is disposed of.

[Justice Ashok Bhushan] Chairperson

[Barun Mitra] Member (Technical)

[Arun Baroka] Member (Technical) harleen/NN

Comp. App. (AT) (Ins) No. 1224 & 1230 of 2024 3 of 3

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free