Victory Iron Works Ltd vs Jitendra Lohia Rp Of Avani Towers Pvt Ltd ...
- CitationCompany Appeal (AT) (Insolvency) No. 508 of 2020
Ratio decidendi
The rule this decision rests on
The Tribunal's dismissal of the appeals rests on the following reasoning, drawn from the text: Section 14(1)(d) of the Insolvency and Bankruptcy Code, 2016 bars the recovery of property by an owner or lessor only where the property is occupied by or in the possession of the corporate debtor; the moratorium it imposes applies for the duration of the corporate insolvency resolution process, until a resolution plan is approved or liquidation is ordered, so that where a development agreement under which the corporate debtor holds development rights has not been terminated before the commencement of the CIRP, the moratorium applies to such rights and the resolution professional may take possession of the property for the purposes of the CIRP, the status of the property being disclosed in the information memorandum and related documents. A licensee whose leave and licence agreement has been granted over a portion of the land retains the privilege to use that portion in accordance with the terms of that agreement, and an order directing the resolution professional's possession of the corporate debtor's development rights does not, of itself, disturb that privilege.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No. 508 of 2020 In the matter of: Victory Iron Works Limited Registered Office at: P-26, Benaras Road, Salkia, Howrah - 711 106 ....Appellant
Vs. 1.Jitendra Lohia Resolution Professional of Avani Towers Pvt. Ltd. Having his office at: Todi Chambers, 2 Lal Bazar Street, Room No.204 & 205, 2nd Floor, Kolkata - 700 001 ....Respondent No.1
2.Energy Properties Private Limited Having its office at: Ramrajatalia Station Road LP-482/7/5, Howrah - 711 104 ....Respondent No.2
Present: Mr.Alok Dhir, Ms Varsha Banerjee, Mr. Mukund Rawat, Advocates for Appellant.
Mr. Saikat Sarkar, Mr. Jitendra Lohia, Mr Shaunak Mitra, Advocates for R1/RP. Mr. Jayant Mehta, Sr. Advocate, Mr Kumarjit Banerjee, Mr. Ashish Choudhury, Mr. Dhruv Surana, Advocates for R2.
With
Company Appeal (AT) (Ins) No. 377 of 2020
In the matter of: Energy Properties Private Limited Having its office at: Ramrajatalia Station Road LP-482/7/5, Howrah - 711 104 ....Appellant
Vs.
1 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 1.Jitendra Lohia Resolution Professional of Avani Towers Pvt. Ltd. Having his office at: 29, Ganesh Chandra Avenue Kolkata - 700 013 ....Respondent No.1
2. The Committee of Creditors of Avani Towers Private Limited, Having its office at Todi Chambers 2, lal bazar Street, Room No. 204 & 205 2nd Floor, Kolkata - 700 001 ...Respondent No.2
3.Victory Iron Works Limited Having its office at P-26 Benaras Road, Salkia, Howrah - 711 106 ...Respondent No.3
Present: Mr. Jayant Mehta, Sr. Advocate, Mr Kumarjit Banerjee, Mr. Ashish Choudhury, Mr. Dhruv Surana,Advocates for Appellant. Mr. Saikat Sarkar, Mr. Jitendra Lohia, Mr Shaunak Mitra, Advocates for R1/RP. Mr.Alok Dhir, Ms Varsha Banerjee, Mr. Mukund Rawat, Advocates for R3.
JUDGEMENT
DR. ASHOK KUMAR MISHRA, TECHNICAL MEMBER.
1. That the instant appeals have been preferred by two different Appellants
viz. M/s. Victory Irons Works Limited (Appellant in Company Appeal
(AT)(Ins) No. 508 of 2020) and M/s. Energy Properties Limited
(Appellant in Company Appeal (AT) (Ins) No. 377 of 2020 under Section
61 of the Insolvency and Bankruptcy Code, 2016 (in short 'Code')
against the Impugned order dated 12.02.2020 passed by the
Adjudicating Authority (National Company Law Tribunal, Kolkata
2 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 Bench) in CA(IB) Nos. 1807/KB/2019 and 146/KB/2020 in CP(IB) No.
372/KB/2018. Since both the appeals have been filed against the same
impugned order dated 12.02.2020, the appeals have been clubbed for
better appreciation and taking a holistic view.
2. In these two appeals as stated above one appeal - CA(AT)(Ins) No. 508
of 2020 has been filed by M/s. Victory Iron Works Ltd who is the
Licensee for an area of 10,000 Sq. ft. on a payment of Rs. 5000/- per
month by the Licensor - Avani Towers Pvt. Ltd and Energy Property Pvt
Ltd confirming party in terms of Leave and License Agreement dated
11.08.2011. The Appeal - Company Appeal (AT) (Ins) No. 377 of 2020
has been filed by M/s. Energy Properties Pvt Ltd the Original owner of
the property who has entered into an agreement for the Development
Agreement dated 16.06.2008 with M/s. Avani Towers Pvt. Ltd,
(Corporate Debtor in CIRP) Developer for the Development of said land
measuring more or less 10.19 acres and the owner has appointed the
Developer for the Development of said land and the Agreement shall
remained valid and enforceable till the Development and sale is
completed in all respects (vide clause 6.1 and 6.2 of the said
Agreement). As the MoU dated 24.01.2008 has been entered into
between Energy Property Pvt Ltd, Avani Towers Pvt Ltd and certain
specified shareholders determining the modus operandi for purchase of
the said 10.19 acres of land. Even this agreement deal with terms of
Escrow, Management of the Company, Obligations of the Company,
essential terms of Development Agreement etc.
3 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020
3. The Adjudicating Authority has disposed of both CA(IB) Nos.
1807/KB/2019 and 146/KB/2020 in CP(IB) No. 372/KB/2018 with
following orders/ observations:
"Para 8 - From materials on record, it can safely be concluded that till
admission of the Corporate Debtor in CIRP, MOU dated 24.01.2008 was
not cancelled/ revoked by the Respondents. Hence, the Corporate Debtor
remained in possession of the properties for the purpose of their
development. Upon Corporate Debtor's admission in CIRP, RP came in
possession therein by virtue of statutory provisions under the I&B Code,
2016. Hence, respondents cannot disturb/obstruct RP's possession in
those properties.
Para 9- We make it clear that the judgment in Supreme Court in Embassy
Property Development Pvt. Ltd. Vs. State of Karnataka cannot be made
applicable herein. We further make it clear that if at all the same is made
applicable to the instant that this authority does not have jurisdiction to
decide civil rights of the parties, still the same goes against the
respondents also. Unless the Respondent cancel/revoke MOU dated
24.01.2008, they cannot claim possession of those properties. Now there
above right to do stands foreclosed by virtue of moratorium under Section
14 of the Code.
Para 10 - Corporate Debtor is having development rights to the
properties. It is intangible assets of the corporate Debtor. RP holds same
development rights relating to those properties. He has to proceed with
the CIRP of the Corporate Debtor and invite resolution plan on the basis
of those rights. The respondents cannot obstruct his possession and
4 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 activities in any manner. Hence, we allow this application i.e. CA(IB) No.
1807/KB/2019.
Para 11- CA(IB) No. 146/KB/2020 is filed by one M/s. Victory iron Works
Ltd for modification of our order dated 09.01.2020 by that order, we
directed all parties to maintain status quo as far as materials lying in
above properties, as we were to decide as to who is in rightful possession
of those properties. While disposing off CA(IB) No.1807/KB/2019, we
held that RP is in legal and rightful possession of the properties. The
applicant is affected by order dated 09.01.2020 because admittedly the
corporate debtor and Energy Properties Pvt. Ltd. (Respondent in CA(IB)
No.1807/KB/2019) put the applicant in possession of 10,000 sq. ft. land
to carry on its activities/business.
Para 12- In fact, our order dated 09.01.2020 shall not affect the
applicant's possession and activities in that piece of land. It is brought to
our notice that term of leave and licence agreement dated 11.08.2011 of
the applicant is already expired, as it was only for 11 months. Be that as
it may, the original owner of the properties i.e. Respondent in CA(IB)
No.1807/KB/2019 have to take call on that aspect. Corporate Debtor's
development activities were not extended in relation to that piece of land.
Hence, corporate debtor and RP do not have any say thereto. In view of
this, we make it clear that our order dated 09.01.2020 shall not affect
the applicant's right to carry its business in that piece of land. In view of
above, we pass the following orders:
Order
5 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 The Respondent (or any other person acting through them in CA(IB)
No.1807/KB/2019) shall not obstruct RP's possession and his activities
relating to CIRP of the Corporate Debtor, until further orders, failing which
the local police are directed to give every assistance to the rP for
completion of CIRP of the Corporate Debtor effectively.
ii. Our order dated 09.01.2020 shall not affect the activities of Victory
Iron Works Ltd., in piece of land in their possession on the basis of leave
and licence agreement dated 11.08.2011 until the original owner of the
property decided further course of action as far as leave and licence
agreement is concerned. Hence, this Applicant i.e. CA(IB) No.
146/KB/20220 stands disposed off.
iii. Hence, CA(IB) No.1807/KB/2019 and CA(IB) No. 146/KB/2020 stand
disposed off.
Let the certified copy of the order be issued upon compliances with
requisite formalities."
4. The Appellant in Company Appeal (AT)(Ins) No. 377 of 2020 is aggrieved
from the said order as it claims that it is a drastic order by allowing the
Applications filed by Resolution Professional ('RP') of the Corporate
Debtor- M/s. Avani Towers Pvt. Ltd whereby and whereunder the
Appellant who is the owner of the subject property will be evicted from
their own property as the RP has been allowed to take exclusive
possession of the said property.
5. The Appellant in Company Appeal (AT)(Ins) No. 508 of 2020 has claimed
that the order passed by the Adjudicating Authority has wrongfully and
6 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 erroneously curtailed the rights of the Appellant in respect of the
property. The property is situated at Ramrajtala, Howrah.
6. In both the appeals the Appellants has largely sought the relief of setting
aside the impugned order dated 12.02.2020 passed by the Adjudicating
Authority etc.
7. The Appellant in Company Appeal (AT) (Ins) No. 377 of 2020 that the
Appellant is the owner in right, title and interest of the subject premises
measuring approximately 10.19 Acres located at Ramrajatala, Howrah.
The Corporate Debtor [under Corporate Insolvency Resolution
Professional ('CIRP')] was appointed as the Developer to develop the said
property under a Development Agreement dated 16.06.2008. The
Development Agreement was preceded by a formal Memorandum of
Understanding ('MOU') dated 24.01.2008 entered into between the
Appellant and the Corporate Debtor. The Appellant has purchased the
said property under the sale which took place under the provisions of
SARFAESI Act when the said property was sold by UCO Bank. The
Appellant had purchased the said property free from all encumbrances.
It was also submitted that no development work had ever commenced
in the said property which belongs to the Appellant and accordingly it
was decided that instead of keeping the said property idle and
unutilised for any useful purpose, M/s. Victory Iron Works Limited
(Appellant in Company Appeal (AT) (Ins) No. 508 of 2020), as the
licensee will be allowed to keep its goods, movables, equipment, build
temporary sheds and conduct business from the said land covering in
area much more than the area specified in Leave and Licence
7 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 Agreement. The Corporate Debtor had gone into CIRP on October 15,
2019. The RP, thereafter, has filed an Application before the
Adjudicating Authority being CA(IB) No. 1807/KB/2019 praying for
recovery of exclusive possession of the subject premises. It was also
submitted that this is beyond the purview of the Code and related
Regulations to grant relief for obtaining "Sole and Exclusive" possession
of subject premises not owned by the Corporate Debtor and also relief
as prayed for in the subject application also beyond the purview of
Section 14(1)(d) of the Code. It was also submitted that the provisions
of the Code cannot be resorted to obtain physical possession post CIRP
commencement. They have further gone to submit that the
Adjudicating Authority did not have the requisite jurisdiction under the
Code to direct recovery of possession of the subject premisses by the
RP. They have also mentioned that the Development Agreement ('DA')
dated 16.06.2008 vide clause 9.2 provides for the possession for the
said land in the manner laid down therein for brevity of clarity the same
is reproduced below:
"Clause 5.2 - MOU and Shareholders Agreement: The owner
in order to develop the said land executed a MOU dated
24.01.2008 with the Developer where in the broad terms and
conditions of Development are provided therein and also
executed a Shareholders Agreement of even date whereby
60% of the Shares of the owner were transferred by the Board,
of which the Developer holds 40% of the Transferred Shares
and 20% of the Transferred Shares are held by Shri
8 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 R.L.Gaggar of 6, Old Post Office Street Kolkata as security till
the completion of the Project.
Clause 6.1 - Appointment and Acceptance: The Owner hereby
appoints the Developer as the developer of the said land and
the developer hereby accepts such appointment. By virtue of
such appointment, the owner hereby grants and assigns
exclusive right to the Developer to build upon and exploit
commercially the said land by (1) demolishing the existing
structures, if any (2) constructing. The housing complex and (3)
causing marketing/ sale of both Developers allocation and
owners' allocation.
Clause 6.2- Commencement and Tenure: Consequent to such
appointment and acceptance of appointment, this agreement
commences and shall be deemed to have commenced on and
with effect from the date of execution as mentioned above and
this Agreement shall remain valid and in force till the
development and sale is completed in all respects and all
obligations of the Parties towards each other are fulfilled and
performed.
Clause 9.2 - Full Possession: The Owner- Energy Property Pvt.
Ltd shall make over khas and vacant possession of the entirety
of the Said Land to the Developer- Avani Property Pvt. Ltd, for
the purpose of carrying out the obligations of the Developer
under this Agreement within 60 days from execution hereof.
The Developer shall have the right to remain in possession for
9 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 doing the various acts necessary for fulfilment of this
Agreement."
They also submitted that the Corporate Debtor has not completed
construction within the stipulated period and hence M/s. Victory Iron
Works Limited were allowed subject premises. In view of this the
jurisdiction Adjudicating Authority to allow possession of the premises
through eviction of the person in actual physical possession is beyond
the purview of Adjudicating Authority under the Code.
8. While in Company Appeal (AT) (Ins) No. 508 of 2020, the Appellant has
submitted that M/s. Energy Property Pvt. Ltd is the owner of the said
property. They have also submitted that the Corporate Debtor (under
CIRP) never acted upon the said development agreement dated
16.06.2008 as such on request of the Appellant - M/s. Victory Iron
Works Limited to allow permissive use of said property and accordingly
they entered into Leave and License agreement dated 19.08.2011. The
Appellant through this agreement was granted leave to carry its busines
of manufacturing of exporting cast iron and ductile iron from the said
property. They were using an area over and above 10,000 square foot
for the said business activity. They have also made the allegation that
after initiation of CIRP of the Corporate Debtor vide Adjudicating
Authority order dated 15.10.2019 taking advantage of the moratorium
in terms of Section 14 of the Code; M/s. Sesa International and Avani
Groups (through its promoters) wants to take the control over the
property of the Corporate Debtor- M/s.Avani Towers Pvt. Ltd. And have
10 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 also referred a judgment of earlier attempt of this Group to take over
the property in a judgment dated 16.11.2017 passed by Hon'ble
Calcutta High Court in APO No. 439 of 2017 titled Sesa International
Ltd Vs. Avani Projects and Infrastructures Pvt. Ltd & Ors, wherein the
Hon'ble High Court while identifying the nexus and malafides of Sesa
International and the Avani Group promoters i.e. Mr. Anirudh Daga,
recorded as under:
"27.The action instituted by the plaintiff, the disingenuous manner in which its petition before the interlocutory court was fashioned, the unworthy interlocutory prayers that it carried to the court and the timing of the institution of the suit and the ex parte order that it obtained, reveal a dark side of the legal system. There is no doubt that the process of this court was abused to obtain an undeserving order a couple of days before the summer vacation to inflict maximum prejudice on parties against whom the plaintiff has no claim or the semblance of any cause of action. It was a vicious plan devised in the name of the plaintiff to aid the third defendant and his virtually bankrupt first defendant company to ward off R-Com. The entire exercise was designed to hijack the second defendant and its only valuable asset when the plaintiff had no cause to proceed against the second defendant.
28. No part of the untruthful story carried to court by the plaintiff is worthy of any credence. In addition, the second defendant has demonstrated by referring to another suit on similar lines filed by a sister concern of the plaintiff herein and also controlled by Shankar Lal Bagri, from which it is evident that Shankar Lal Bagri and third defendant Anirudh Daga are acquainted with each other and go back some distance in time.
29. It is difficult to accept that a sum of Rs.21 crore would be paid by one commercial entity to another without any document being executed in support thereof. Indeed, as the second defendant has emphasised, that
11 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 money was received by the first defendant from the plaintiff in the middle of the year 2014 proves nothing at all, even qua the first defendant. The story attempted to be sold by the plaintiff to the court is that after payment of a total amount of Rs.21 crore between March, 2014 and August 1, 2014, by November 15, 2014 the first defendant agreed to refund the payment at a high rate of interest of 18 per cent per annum and also unilaterally offered to pay Rs.8 crore by way of compensation. The purported letter of November 15, 2014, doubtless, would not appear in the records of the second defendant though the third defendant as a director of the second defendant purported to sign the same on behalf of the second defendant. The second defendant has squarely disowned such letter and the authority of Daga to issue the same on its behalf.
33. The entire scheme devised by the plaintiff smacks of collusion with the third defendant. There is no credible reason why the plaintiff made the payment till the beginning of August, 2014 and by October of the same year began negotiations to pull out of the project.......
35. The collusion between the plaintiff and the third defendant is also evidenced by the fact that the representation in court on behalf of the second defendant to virtually accept the plaintiff's claim was by a person who had not been authorised in such regard by the second defendant and who had to ultimately withdraw from the proceedings. The entire exercise by the plaintiff is an affront to the system and almost mocking at the court. The manner in which the plaintiff has conducted the matter is an insult to the intellect and borders on taunting the court at its perceived impotence to deal with such maladroit litigants and their representatives. The complexity of the plot hatched on behalf of the third defendant in the name of the plaintiff is such that it could not have emanated from Old Post Office Street and had to have its origin in some more up-market address. There is a limit to the court's endurance to such antics and it is time that a spade is called exactly what it is.
38. The extent of the complicity between the plaintiff or the Bagri in control thereof and third defendant Daga is stark in the plaintiff disowning the order passed by the interlocutory court by which the
12 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 residual rights of the first defendant in respect of a particular property have been attached......."
In the above judgment, the Hon'ble High Court has clearly highlighted the malafide nexus of Sesa International and the Avni Group. It may be noted that with similar intentions, Sesa International had initiated the CIRP of the Corporate Debtor (a group company of Avani Group) and is now, through the Resolution Professional, attempting to take control, custody and possession of the said property, which has neither being in the Corporate Debtor's possession, nor the said property is owned by the Corporate Debtor.
In order to execute the above illegal designs of Sesa International and the Avani Group, the Respondent No.1 malafidely preferred an application being CA(IB) No. 1807/KB/2019, under Section 60 of the Code seeking directions to the Appellant herein to not obstruct the Resolution Professional from taking possession of the said property and further to direct the local administration to assist the RP in taking possession of the said property.
On hearing the said application on interim reliefs, on 09.01.2020, the Adjudicating Authority directed the parties to maintain status quo in so far as the site and the material lying thereon was concerned. It is noteworthy that while passing the said status quo order, the Adjudicating Authority recorded as under:
"Since the question whether property under dispute is the assets of the corporate debtor is involved, where parties have counter-stakes, we direct all parties to maintain status quo as far as the site and the material lying thereon. Matter to appear on 20.01.2020 for further consideration"
In view of the above status quo order of the Adjudicating Authority, the RP while taking undue advantage of the said order, attempted to intermeddle and interfere in the day to day business affairs of the Appellant, which were being carried on by the Appellant on the said property. Aggrieved of the said fact, the Appellant preferred CA (IB) No. 146/KB/2020 before the Adjudicating Authority, seeking clarification
13 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 of the order dated 09.01.2020, with directions to the RP that the status quo in so far as the material lying thereon is concerned, will not disturb/ affect the day to day business operations of the Appellant from the said property.
It is worthwhile to mention that the RP had malafidely interpreted the order dated 09.01.2020 passed by the Adjudicating Authority in CA(IB) No.1807/KB/2019 and on basis the said order the RP was disrupting the day to day business activities of the Appellant at the said property. The Adjudicating Authority disposed of CA(IB) No.1807/KB/2019 alongwith CA(IB) No. 146/KB/2020 vide the impugned order dated 12.02.2020, there by erroneously allowing the prayers sought in CA(IB) No.1807/KB/2019 and further wrongly passing directions in respect of the rights of the Appellant over the said property.
9. Respondent No.2 - M/s. Energy Properties Pvt. Ltd has submitted in
CA(AT)(Ins) No. 508 of 2020 that it is supporting the cause of the
Appellant as it is also similarly aggrieved from the same impugned order
dated 12.02.2020. It is also stated by them that M/s. Victory Irons
Works Limited is in the actual physical possession of the subject
property since 2011 and they were carrying on their business in the
subject property also since 2011 and the Corporate Debtor (under CIRP)
was having the knowledge of the same. However, the Respondent No.2
- M/s. Energy Properties Pvt. Ltd is accepting that the Development
Agreement dated 16.06.2008 was not terminated before the
commencement of CIRP. They are also challenging that inspite of
Corporate Debtor (under CIRP) having been with the Development
Agreement has not done anything for the last 11 years and has virtually
abandoned the Development Agreement and forgone its rights of
14 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 Developers. M/s. Energy Properties Pvt. Ltd is the owner of the Property
and hence the impugned order clearly interferes and infringes its right.
10. The RP in Company Appeal (AT) (Ins) No. 508 of 2020 has
asserted that the order passed by the Adjudicating Authority was
necessary to protect and preserve the sub-stratum of the Corporate
Debtor and to ensure a positive outcome to the CIRP. The Development
right is the only valuable right and an "Intangible Asset" belonging to
the Corporate Debtor. They have also submitted that if the benefit of
such rights and interest are not protected, the Corporate Debtor will be
forced to go into liquation while will be contrary to the objectives and
spirit of Code. The RP has also stated that the Corporate Debtor (in
CIRP) has all along been in possession of the subject property pursuant
to the Development Agreement executed between the Appellant and the
Corporate Debtor and have also asserted that the Development
Agreement is subsisting and has not been terminated. It has also been
stated by the RP that M/s. Victory Iron Works Pvt. Ltd - Appellant in
CA(AT) (Ins) 508 of 2020 is wrongly claiming to be a licensee though the
licence agreement executed in its favour expired way back in the year
2012 and the Appellant has no existing right to be in possession of any
part of the said property. The Agreement with the Appellant stood
expired in the year 2012 and no rights can be claimed by the Appellant
on the basis thereof or otherwise in relation to the subject property.
Moreover, the Appellant was given a licence only to the extent of approx.
10,000 sq. ft. on the said land which is the small fraction of the total
area upon expiry of the Agreement the Appellant was obligated not to
15 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 use any part of the said property in any manner whatsoever and to
remove its material from the said property. The RP is also alleging that
M/s. Energy Properties Pvt. Ltd- Respondent No.2 in CA(AT)(Ins) No.
508 of 2020 has been planted by the Appellant - M/s. Victory Iron
Works Pvt. Ltd. to obstruct and defeat the right of the Corporate Debtor
to enjoy its valuable development right in respect of the said property.
It is also stated by the RP that the Corporate Debtor is having 40%
shareholding in the Respondent No.2- Energy Properties Pvt. Ltd which
is the owner of the property. By virtue of the MoU recording possession
dated 24.06.2010 executed between the Corporate Debtor and
respondent No.2 confirms that the Corporate Debtor was granted
exclusive development right in respect of the entirety of the said
property and the right subsist even as on date. In the preamble of the
Memorandum of Recording Possession made on 24th June, 2010
between Energy Properties Pvt. Ltd -R2 and Avain Properties Pvt. Ltd -
Corporate Debtor ( in CIRP) speaks of as follows:
"Clause A.- the Developer and Landlord have formed a company under
the name and style of Energy Properties Pvt Ltd (hereinafter referred to
as the Company) who had purchased and acquired all that the various
places and parcels of land containing by estimation 10.19 acres (more or
less) (Hereinafter referred to as the Ramrajatolla Property) which formerly
belonged to Shree Gobindo Glass works Ltd, a Company under the
control and management of the landlord.
Clause 1.- It is hereby recorded confirmed and declared that the entirety
of the said Ramrajatolla property has been delivered by the Landlord to
16 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 the Developer to be exclusively held by Developer in terms of Development
Agreement dated 16.06.2008 and in terms of the Shareholders
Agreement dated 24.01.2008."
11. In Company Appeal (AT)(Ins) No. 377 of 2020, the RP has submitted
that the Corporate Debtor has important intangible Possessory as well
as development right over the property and on account of moratorium
imposed under section 14 of the Code such possessory and
development right created under the terms of Development Agreement
dated 16.06.2008 cannot be terminated or sought to be terminated
during the CIRP period. The term of the Development Agreement was
till the Development, sale and until completion of all obligations of the
parties towards each other accordingly the Corporate Debtor was
handed over full and exclusive possession of the property which was
also recorded in the MOU dated 24.06.2010. Section 25(2)(a) of the
Code the RP is duty bound to take control of the assets of the Corporate
Debtor and such assets include all the tangible and intangible assets
including possessory and development right. It was also stated by the
counsel of the RP stated that the property was acquired by Energy
Property Pvt ltd in an auction by UCO Bank. For acquiring the property,
the Energy Property Pvt Ltd - Appellant has approached the Corporate
Debtor seeking financial assistance and purchase of the property and
CD (Under CIRP) has paid an amount of Rs. 2.7 Crore directly to UCO
for on behalf of the Energy Property Pvt Ltd for acquisition of property
and a sale certificate was issued in favour of Energy Properties Pvt. Ltd
on 29.01.2008 in addition thereto CD (under CIRP) has also advanced
17 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 a sum of Rs. 9.3 Crore for liquidation of all liabilities and obtaining
vacant possession of the property. It was also stated by the learned
counsel for the RP that to secure repayment of monies advanced by the
Corporate Debtor and also to protect the interest of the Corporate
Debtor, a Shareholders Agreement dated 24.01.2008 was also executed
between members of Jhunjhunwala Group, CD, Energy Properties and
Mr. Ratan Lal Gaggar ("Shareholder Agreement"). As per the terms of
the Shareholder Agreement, 40% of the shareholding of Energy
Properties was to be held by Jhunjhunwala Group and Corporate
Debtor respectively and the remaining 20% was held by Mr. Ratan Lal
Gaggar. Therefore, by virtue of the said 40% shareholding of Energy
Properties, the Corporate Debtor has vested interest in the property.
The Appeal has been filed by Energy Properties Pvt. Ltd without any
authorization. In addition to the above, as per the terms of the
Shareholders Agreement, out of the five directors of Energy Properties,
two directors were to be nominated by Corporate Debtor who held voting
rights. Evidently, no resolution was voted upon for filing of the present
Appeal. Therefore, in absence of any valid board resolution, the Appeal
filed by the Energy Properties is without any valid authorization and
hence liable to be dismissed. The RP has further submitted that as per
Leave and License Agreement dated 11.08.2011 a portion of property
was granted to Victory iron works Ltd for a term of 11 months.
Admittedly the License Agreement has expired on 18.07.2012 and has
not been renewed and/or extended thereafter. Therefore, any
occupation of any portion of the property by Victory Iron is illegal and
18 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 amount to encroachment and/or trespass. Despite the admitted fact
that Victory iron is in illegal possession of the portion of property.
Victory Iron has preferred the Appeal with malafide intent to mislead
this Tribunal and seek the reliefs which Victory Iron is otherwise not
entitled to. It is well settled that one cannot take advantage of its own
wrong. It is also noteworthy that in cases where the corporate debtor is
engaged in development of the property, the possessory and
development rights are the most crucial rights of the corporate debtor
without which effective resolution of the Corporate Debtor is not
possible. It is the general custom or practice to enter into Development
Agreements. If Development Agreements were said not to confer any
rights on the Corporate Debtor then all CIRP in respect of Corporate
Debtor(s) who are real estate developers are bound to fail. As in the
present case, for effective resolution of the Corporate Debtor, the
possessory and development rights entailed under the Development
Agreement are required to be protected.
12. We have gone through the various judgments cited by the Appellants
and Respondents and our observations applicable to the present appeal
of those judgments are follows:
a. Embassy Property Developments Pvt. Ltd Vs. State of Karnataka and
Ors. In Civil Appeal No. 9170 of 2019.
"Para - 46 - A lot of stress was made on the effect of Section 14
of IBC, 2016 on the deemed extension of lease. But we do not
think that the moratorium provided for in Section 14 could have
any impact upon the right of the Government to refuse the
19 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 extension of lease. The purpose of moratorium is only
to preserve the status quo and not to create a new right.
Therefore, nothing turns on Section 14 of IBC, 2016.
Even Section 14 (1) (d), of IBC, 2016, which prohibits, during
the period of moratorium, the recovery of any property by an
owner or lessor where such property is occupied by or in the
possession of the corporate debtor, will not go to the rescue of
the corporate debtor, since what is prohibited therein, is only
the right not to be dispossessed, but not the right to have
renewal of the lease of such property. In fact the right not to be
dispossessed, found in Section 14 (1) (d), will have nothing to
do with the rights conferred by a mining lease especially on a
government land. What is granted under the deed of mining
lease in ML 2293 dated 04.01.2001, by the Government of
Karnataka, to the Corporate Debtor, was the right to mine,
excavate and recover iron ore and red oxide for a specified
period of time. The Deed of Lease contains a Schedule divided
into several parts. Part-I of the Schedule describes the location
and area of the lease. Part-II indicates the liberties and
privileges of the lessee. The restrictions and conditions
subject to which the grant can be enjoyed are found in Part-III
of the Schedule. The liberties, powers and privileges reserved
to the Government, despite the grant, are indicated in Part-IV.
This Part-IV entitles the Government to work on other minerals
(other than iron ore and red oxide) on the same land, even
20 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 during the subsistence of the lease. Therefore, what was
granted to the Corporate Debtor was not an exclusive
possession of the area in question, so as to enable the
Resolution Professional to invoke Section 14 (1) (d). Section
14 (1) (d) may have no application to situations of this nature.
Para 47- Therefore, in fine, our answer to the first question
would be that NCLT did not have jurisdiction to entertain an
application against the Government of Karnataka for a direction
to execute Supplemental Lease Deeds for the extension of the
mining lease. Since NCLT chose to exercise a jurisdiction not
vested in it in law, the High Court of Karnataka was justified
in entertaining the writ petition, on the basis that NCLT was
coram non judice.
Para - 54- The upshot of the above discussion is that though
NCLT and NCLAT would have jurisdiction to enquire into
questions of fraud, they would not have jurisdiction to
adjudicate upon disputes such as those arising under MMDR
Act, 1957 and the rules issued thereunder, especially when the
disputes revolve around decisions of statutory or quasi judicial
authorities, which can be corrected only by way of judicial
review of administrative action. Hence, the High Court was
justified in entertaining the writ petition and we see no reason
to interfere with the decision of the High Court. Therefore, the
appeals are dismissed. There will be no order as to costs.
21 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 b. Rajendra K Bhutta Vs. Maharashtra Housing and Area Development
Authority and Anr., in Civil Appeal No. 12248 of 2018 decided on
19.02.2020.
"Para XI- On 03.07.2018, the Appellant filed an approved Resolution Plan before the NCLT, Mumbai by way of I.A. No.21433 of 2018. We are informed that this was within the extended period of 55 days so granted by the NCLAT. It may only be mentioned that the Resolution Plan was approved by 86.16% of the Committee of Creditors. Ultimately, the NCLAT, by the impugned order dated 14.12.2018, (after omitting to refer to the order dated 09.05.2018), stated that 270 days are over, as a result of which the entire discussion of Section 14(1)(d) would now become academic. However, it also decided:
"14. On perusal of record, we find that pursuant to the 'Joint Development Agreement' the land of the 'Maharashtra Housing and Area Development Authority' was handed over to the 'Corporate Debtor' and 'except for development work' the 'Corporate Debtor' has not accrued any right over the land in question. The land belongs to the 'Maharashtra Housing and Area Development Authority' which has not formally transferred it in favour of the 'Corporate Debtor'. Hence, it cannot be treated to be the asset of the 'Corporate Debtor' for application of provisions of Section 14(1)(d) of the 'I&B Code'."
Para - 12. A bare reading of Section 14(1)(d) of the Code would make it clear that it does not deal with any of the assets or legal right or beneficial interest in such assets of the corporate debtor. For this reason, any reference to Sections 18 and 36, as was made by the NCLT, becomes wholly unnecessary in deciding the scope of Section 14(1)(d), which stands on a separate footing. Under Section 14(1)(d) what is referred to is the "recovery of any property". The 'property' in this case consists of land, ad- measuring 47 acres, together with structures thereon that had to be demolished.
'Recovery' would necessarily go with what was parted by the corporate debtor, and for this one has to go to the next expression contained in the said sub-section.
22 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 Para 17- Regard being had to the aforesaid authorities, it is clear that when recovery of property is to be made by an owner under Section 14(1)(d), such recovery would be of property that is "occupied by" a corporate debtor.
Para 24. The conspectus of the aforesaid judgments would show that the expression "occupied by" would mean or be synonymous with being in actual physical possession of or being actually used by, in contra-distinction to the expression "possession", which would connote possession being either constructive or actual and which, in turn, would include legally being in possession, though factually not being in physical possession. Since it is clear that the Joint Development Agreement read with the Deed of Modification has granted a license to the developer (Corporate Debtor) to enter upon the property, with a view to do all the things that are mentioned in it, there can be no gain saying that after such entry, the property would be "occupied by" the developer. Indeed, this becomes clear from the termination notice dated 12.01.2018, issued by MHADA to the developer, in which it is stated:
"35. This is therefore to inform you that on the expiry of 30 days from the date of receipt of this notice, the Joint Development Agreement dated 10.04.2008 and Deed of Confirmation and Modification dated 03.11.2011 and Letter dated 18.01.2014 stands terminated and you will not be allowed to enter the property and your authority/license to enter the property or remain thereupon is terminated. MHADA thereupon will not allow you to do anything on or in relation to the property and MHADA shall take possession of all the structures standing at whatever stage they are situated at Goregaon (West) and bearing CTS No ..." It now remains for us to deal with some of the provisions of the MHADA Act as well as some of the judgments cited on behalf of the respondents. MHADA Act, as its preamble states, is an Act to unify, consolidate and amend the laws relating to housing, repairing and reconstructing dangerous buildings and carrying out improvement works in slum areas. By Section 4 of the Act, the Authority, i.e. the MHADA, is to be a corporate body, and is deemed to be a local authority for the purposes of the Act. By Section 5 the Rent Act, or any corresponding laws are not to apply. By Section 66, the Competent Authority is given power to evict persons from premises under certain circumstances. Sections 76 and 79, on which
23 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 great reliance was placed by Mr. Dave, are set out herein below:
"76. Duties relating to repairs and reconstruction of dilapidated buildings. Subject to the provisions of this Chapter, it shall be the duty of the Board -
(a) to undertake and carry out structural repairs to buildings, in such order of priority as the Board, having regard to the exigencies of the case and availability of resources, considers necessary, without recovering any expenses thereof from the owners or occupiers of such buildings;
(b) to provide temporary or alternative accommodation to the occupiers of any such building, when repairs thereto are undertaken, or a building collapses;
(c) to undertake, from time to time, the work of ordinary and tenantable repairs in respect of all premises placed at the disposal of the Board;
(d) to move the State Government to acquire old and dilapidated buildings and which are, in the opinion of the Board, beyond repairs; and to reconstruct or to get reconstructed new buildings thereon for the purpose of housing as many occupiers of those properties as possible, and for providing alternative accommodation to other affected occupiers;
79. Power of Board to undertake building repairs, building reconstruction and occupiers housing and rehabilitation schemes.
(1) The Authority may, on such terms and conditions as it may think fit to impose, entrust to the Board the framing and execution of schemes for building repairs or for reconstruction of buildings or for housing and rehabilitation of, dishoused occupiers, whether provided by this Act or not, and the Board shall thereupon undertake the framing and execution of such schemes as if it had been provided for by this Act.
(2) The Board may, on such terms and conditions as may be agreed upon and with the previous approval of the Authority-
(a) hand over the execution under its own supervision of any building repairs scheme, building reconstruction
24 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 scheme, or dishoused occupier's housing scheme to a Municipal Corporation or to a co-operative society or to any other agency recognized for the purpose by the Board, as it may deem necessary, and
(b) transfer by sale, exchange or otherwise in any manner whatsoever any new building constructed on any land acquired under this Chapter to any co- operative society, if it is formed by all the occupiers, or to apartment owners for the purposes of the Maharashtra Apartment Ownership Act, 1970 (the apartment owners being all such occupiers)."
13. We are also reproducing Section 14 of the 'Code' for ease of
convenience: -
Section 14: Moratorium;
(1) Subject to provisions of sub-sections (2) and (3), on the insolvency commencement date, the Adjudicating Authority shall by order declare moratorium for prohibiting all of the following, namely:--
(a) the institution of suits or continuation of pending suits or proceedings against the corporate debtor including execution of any judgment, decree or order in any court of law, tribunal, arbitration panel or other authority;
(b) transferring, encumbering, alienating or disposing of by the corporate debtor any of its assets or any legal right or beneficial interest therein;
(c) any action to foreclose, recover or enforce any security interest created by the corporate debtor in respect of its property including any action under the Securitisation and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002;
(d) the recovery of any property by an owner or lessor where such property is occupied by or in the possession of the corporate debtor.
Explanation - For the purposes of this sub- section, it is hereby clarified that notwithstanding anything contained in any other law for the time being in force, a license, permit, registration, quota, concession, clearances or a similar grant or right given by the Central Government, State Government, local authority, sectoral regulator or any other authority constituted under any other law for the time being in force, shall not be suspended or terminated on the grounds of insolvency, subject to the condition that there is no default in payment of current dues arising for the use or continuation of the license, permit, registration, quota, concession, clearances or a similar grant or right during the moratorium period;
25 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 (2) The supply of essential goods or services to the corporate debtor as may be specified shall not be terminated or suspended or interrupted during moratorium period.
(2A) Where the interim resolution professional or resolution professional, as the case may be, considers the supply of goods or services critical to protect and preserve the value of the corporate debtor and manage the operations or such corporate debtor as a going concern, then the supply of such goods or services shall not be terminated, suspended or interrupted during the period of moratorium, except where such corporate debtor has not paid dues arising from such supply during the moratorium period or in such circumstances as may be Specified.
(3) The provisions of sub-section (1) shall not apply to-
(a) such transactions, agreements or other arrangements as may be notified by the Central Government in consultation with any financial sector regulator or any other authority;
(b) a surety in a contract of guarantee to a corporate debtor. (4) The order of moratorium shall have effect from the date of such order till the completion of the corporate insolvency resolution process:
Provided that where at any time during the corporate insolvency resolution process period, if the Adjudicating Authority approves the resolution plan under sub-section (1) of section 31 or passes an order for liquidation of corporate debtor under section 33, the moratorium shall cease to have effect from the date of such approval or liquidation order, as the case may be.
14. What we observed from the aforesaid judgments that in case of
Embassy Properties (as stated supra) that the Adjudicating Authority
did not have jurisdiction to entertain an application against the Govt.
of Karnataka for a direction to execute Lease Deeds for extension of
mining lease. However, the Adjudicating Authority would have
jurisdiction to enquire into question of fraud to adjudicate upon
disputes. While in case of 'Rajendra K Bhutta' (as stated supra), it
has been made clear that Section 14(1)(d) of the 'Code' does not deal
26 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 with any of the assets or legal right in such assets of Corporate
Debtor but deal with recovery of 'Property'.
15. There are certain facts which are very clear from the deliberation of
submissions including the pleadings by the parties that M/s. Energy
Properties Pvt ltd is the owner of the property and the Corporate
Debtor (in CIRP) is a Developer of the Property in terms of the
Development Agreement dated 16.06.2008 and they will be governed
by inter - se agreements. Here the Adjudicating Authority has not
gone into the issue of ownership of the property, he has restricted its
role as provided in Section 14 of the 'Code' vide Section 14(1)(d)
including its explanations. It is also undisputed fact that the
Corporate Debtor (In CIRP) is holding the development right and the
Development Agreement dated 16.06.2008 has not been terminated
before the commencement of CIRP. In all such situations Section 14
of the 'Code' is applicable till it reaches the stage of approval of
Resolution Plan or Liquidation. However, the RP is to appropriately
disclose the status of the 'Property' in the Information Memorandum
and other documents as required in the IBBI (Insolvency Resolution
for Corporate Perrons) Regulations, 2016.
16. As far as M/s. Victory Iron works limited is concerned, they have
been provided space of 10,000 sq ft approximately on the said land
by virtue of leave and license agreement dated 11.08.2011 and it is
their privilege to use the land in terms of same leave and license
27 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020 agreement and this is also not disputed by Corporate Debtor in
Resolution through RP.
17. All these suggest that there is no infirmity in the impugned order dt.
12.02.2020 and the appeal deserves to be dismissed and is
dismissed with above observations.
18. Pending Interlocutory Application(s), if any, stands disposed of.
No order as to costs.
[Justice Bansi Lal Bhat] Acting Chairperson
[Dr. Ashok Kumar Mishra] Member (Technical)
(Ms Shreesha Merla) Member (Technical)
08th April, 2021
New Delhi
Raushan.K
28 Company Appeal (AT) (Insolvency) No. 508 of 2020 & 377 of 2020
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free