Sun Pharmaceutical Industries Ltd vs Sumit Binani
- CitationCompany Appeal (AT) (Ins) No. 334 of 2021
Ratio decidendi
The rule this decision rests on
Where a windmill asset's title is in genuine dispute in a pending civil suit, whether that asset has passed to the buyer is a question for the civil court in that suit, and the insolvency adjudicating authority is not the forum to decide it. Under Section 36(4)(a) and (e) of the Insolvency and Bankruptcy Code, 2016, assets that are not owned by the corporate debtor, or that are subject to the exclusions specified, do not form part of the liquidation estate; where the adjudicating authority has earlier permitted a pre-CIRP sale of such assets to proceed outside the CIRP, it may direct that those assets be kept outside the liquidation estate, and in doing so it does not exceed its jurisdiction. The adjudicating authority does not exceed its jurisdiction by permitting a liquidator to apply for impleadment in a civil suit pending before the High Court, where the liquidator's participation is sought to protect the interests of the corporate debtor and the choice of party remains for the civil court. An adjudicating authority may correct an accidental slip or omission in its own order under Rule 154 of the NCLT Rules, 2016, and the deletion of words from an order to give effect to the parties' uncontested position is a correction of such a slip, not a review of the order.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
outside the jurisdiction aforesaid. ....Appellant No. 1
2. UNIMED TECHNOLOGIES LIMITED,
a company within the provisions of the Companies Act, 2018,
having its registered office at Baska, Ujeti Road,
Halol, Gujarat-389 350,
outside the jurisdiction aforesaid. ....Appellant No. 2
Vs.
1. SUMIT BINANI
As Liquidator of Gujarat NRE Coke Limited,
Registration No. IBBI/IPA-001/IP-N00005/2016-17/10025,
Having his office at 4th Floor, Room No. 06,
Commerce House, 2A, Ganesh Kolkata - 700013. ....Respondent No. 1
2. MONITORING COMMITTEE/STAKEHOLDERS
Consist of erstwhile member of CoC
being represented by State Bank of India,
Having its office at State Bank of India,
Conference Room, 1st Floor, State Bank of India, Page 2 of 30
SAMB II, Jeevandeep Building, 1,
Middleton Street, Kolkata - 700 013. ...Respondent No. 2.
Present:- For Appellant:- Mr. Ravindra Shrivastava Sr. Advocate, Mr. Shyam Kumar, Miss Nayan Gupta, Advocates For Respondent:- Mr. Sidharth Sharma, Mr. Arjun Asthana, Mr. Jishnu Chowdhury and Vjjaini Chatterjee, Advocates for R1. Mr. Krishna Venugopal, Sr. Advocate with Mr. VM Kannan, Mr. Sanjay Kapur, Mr. Lalit Rajput, Mr. Arjun Bhatia, Mrs. Shubhra Kapur, Advocates for R-2. Mr. Jitendra Lohia, IRP
JUDGMENT
Jarat Kumar Jain: J.
The Ld. Adjudicating Authority (National Company Law Tribunal,
Kolkata Bench) vide order dated 18.03.2021 partly allowed the Application
I.A. (IB) No. 1001/KB/2020 in CP (IB) No. 182/KB/2017 filed by the
Liquidator "Mr. Sumit Binani" against that order the Appeal is filed.
2. The Application filed by the Liquidator of Gujarat NRE Coke Ltd
(Corporate Debtor) seeking following directions:-
(i) Allowed the Liquidator to keep windmill assets of the Corporate Debtor outside the sale purview of Liquidation Estate.
(ii) Allowed the liquidator to distribute the sale proceeds from the sale of windmill, where Rs. 180 Crore is laying in a lien account of SBI in view of the fact that the sale was approved by this Tribunal by order dated 22.08.2017.
(iii) Allowed the Liquidator to get himself impleaded as a party in the Civil Suit No. 39 of 2019 titled as Sun Pharmaceutical Industries & Anr. Vs. State Bank of India & Ors., pending before the Hon'ble High Court.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 3 of 30
3 Ld. Adjudicating Authority by the impugned order dated 18.03.2021
partly allowed the Application which is as under:-
"The following orders are, therefore, passed:-
(a) The Application is allowed and the Liquidator is permitted to keep the windmill assets that are the subject matter ofthe Civil Suit No. 39 of 2019 before the Hon'ble Calcutta High Court, outside the sale purview of the Liquidation estate.
(b) The Application is not granted, since the question whether the invocation of bank guarantees by the Respondent No. 3/SBI, is correct or not is directly under challenge in Civil Suit No. 39 of 2019 before the Hon'ble Calcutta High court, and therefore, at this stage, it is not proper to order distribution of the sale proceeds.
(c) The Application is allowed, and the Liquidator is directed to file appropriate Application to intervene in the Civil Suit No. 39 of 2019 before the Hon'ble High Court and get himself impleaded as representative of the Corporate Debtor.
4. After passing of the impugned order, Ld. Adjudicating Authority vide
order dated 23.03.2021 deleted the word from clause (b) of the aforesaid
order. "and therefore, at this stage, it is not proper to order distribution of
the sale proceeds". The Appellants have challenged the impugned order and
the corrigendum dated 23.03.2021.
5. Brief and relevant facts of this Appeal are that the account of Gujarat
NRE Coke Ltd. (Corporate Debtor) was classified as a Non-Performing Asset
(NPA) by the State Bank of India (SBI) on 27.10.2013. Due to huge overdue
of the Corporate Debtor a proposal was made for sale of non-core assets of
the Corporate Debtor charged to the lender banks. The Windmill assets of
87.5 MW belonging to the Corporate Debtor located at Jamnagar and Kutch
in the State of Gujarat were finalised for the said purpose in August, 2016.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 4 of 30
6. SBI Caps services facilitated the sale transaction of the said windmill
asset by inviting bids. The Sun Pharmaceutical Industries (Appellant No. 1
herein) and Unimad Technologies Ltd. (Appellant No. 2 herein) were declared
as Successful Bidder for the 52 windmill assets and 10 windmill assets for
an amount of Rs. 154 Crores and 26 Crores respectively. As per terms of
the bid document 25% of the total bid amount alongwith bank guarantee for
the balance amount was to be deposited. Accordingly, the Appellant No. 1
remitted a sum of Rs. 38.5 Crores and the Appellant No. 2 remitted a sum of
Rs. 6.50 Crores on 21.10.2016 for the credit of the "No Lien Account" of the
bank. The Appellant No. 1 and 2 also submitted the balance amount of Rs.
115.50 Crores and 19.50 Crores respectively by way of bank guarantee in
favour of the SBI on the said date.
7. As per the letter of intent (LOI) dated 7.10.2016 issued to the
Appellant No. 1 and 2, the aforementioned bank guarantee were to be
invoked by the SBI in the event the buyer failed to comply with the
agreement. The said LOI had been acknowledged by both the Appellants and
pursuant thereto the agreement for sale was entered into between the
Corporate Debtor and the Appellants on 01.04.2017.
8. The Corporate Debtor was admitted into Corporate Insolvency
Resolution Process (CIRP) by the Adjudicating Authority vide order dated
07.04.2017 in CP (IB) No. 182/KB/2017 by allowing the Application under
Section 10 of IBC filed by the Corporate Debtor.
9. An Application bearing CA (IB) No. 326/KB/2017 was made before the
Adjudicating Authority by the SBI on behalf of CoC of the Corporate Debtor.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 5 of 30
Ld. Adjudicating Authority vide order dated 22.08.2017 approved the sale of
the windmill assets of the Corporate Debtor to the Appellants. However, Ld.
Adjudicating Authority did not accord its approval to distribute the sale
proceeds at the relevant point of time since the Corporate Debtor was
undergoing CIRP.
10. According to the liquidator, on being informed of the approval of sale
of the windmill assets by the Adjudicating Authority, the Appellants backed
out of the sale transaction. SBI, Representing Monitoring Committee
(Respondent No. 2) herein advised the Appellants to perform the sale
agreement failing which it would invoke the bank guarantee.
11. The Appellants instituted a Civil Suit 39 of 2019 before the Hon'ble
High Court of Calcutta inter alia seeking decree for declaration that the
Appellants are entitled to and have duly avoided the transaction with the
Respondent No. 2 recorded in the LOI dated 07.10.2016 and the same is not
binding on the Appellants and seeking refund of the upfront consideration
amount and to release of the bank guarantees.
12. In the suit the Appellants have filed an Application for interim relief
granting stay on invocation of the bank guarantees. Single Bench of Hon'ble
High Court of Calcutta allowed the Application. However, on Appeal the
Division Bench of the Hon'ble High Court of Calcutta vide order dated
04.09.2019 set aside the order of the Single Bench and allowed the
Respondent No. 2 SBI to invoke the bank guarantees. The said bank
guarantees have been encashed by the Respondent No. 2 on 06.09.2019 and
the said amount is lying in the "No Lien Account" of the Respondent No. 2
Company Appeal (AT) (Ins) No. 334 of 2021 Page 6 of 30
SBI. Thereafter, the Civil Suit No. 39 of 2019 before High Court of Calcutta
was amended inter alia by modifying the prayer for release of bank
guarantees to refund of the amount of bank guarantees, illegally invoked by
SBI (Respondent No. 2).
13. In a previous round of litigation involving Jindal Steel and Power Ltd.,
Arun Kumar Jagatramka (erstwhile promoter and member of Gujarat NRE
Coke Limited) and Gujarat NRE Coke Ltd., the Corporate Debtor i.e. Jindal
Steel and Power Ltd. Vs. Arun Kumar Jagatramka and Ors. [CA (AT) No.
221 of 2018] this Appellate Tribunal had directed the Liquidator to proceed
as per the direction given in the matter of Y. Shivram Prasad Vs. S. Dhanpal
and Ors. [CA (AT) No. 224 of 2017] that provided for a scheme of
compromise or arrangement with the creditors or class of creditors or
members or class of members in terms of Section 230 of the Companies Act,
2013 to be arrived at. Upon failure of this, the Liquidator was to take steps
to sale the business of the Corporate Debtor as a going concern in "its
totality with the employees". The last stage was to be death of the Corporate
Debtor by liquidation, which would be avoided.
14. In an Appeal against the said order of this Appellate Tribunal, the
Hon'ble Supreme Court vide order dated 24.02.2020 directed that the
liquidation proceedings may proceed and sales, if any, shall not be
confirmed.
15. The Liquidator has taken steps according to the direction of Y.
Shivram Prasad (Supra). The steps taken for revival by way of a scheme of
arrangement have failed. The Liquidator therefore, has to sale the entire
Company Appeal (AT) (Ins) No. 334 of 2021 Page 7 of 30
business as a going concern in its totality with the employees under the
directions of orders in Y. Shivram Prasad (Supra). However, the Liquidator is
faced with several impediments, inter alia, the fact that all the business
units of the Corporate Debtor are not functioning due to several reasons, the
Liquidator is facing non-cooperation from the members of suspended board
of directors, etc.
16. The stakeholders were of the opinion that the Liquidator should
consider selling the running business of the Corporate Debtor as a going
concern since the Corporate Debtor, as a whole, is not operating as a going
concern. They were also of the opinion that in case the Liquidator decides to
sell the Corporate Debtor as a going concern, he may do so without
considering the windmill assets.
17. The Liquidator has therefore, approached the Ld. Adjudicating
Authority and filed the Application with the prayer as aforementioned. Ld.
Adjudicating Authority after hearing Ld. Counsels for the parties passed the
impugned order dated 18.03.2021 and subsequently, a corrigendum order
dated 23.03.2021.
18. Ld. Sr. Counsel for the Appellants submitted that the Adjudicating
Authority has no jurisdiction to pass an order permitting to the Liquidator to
keep windmill asset outside the sale purview of the liquidation estate while
doing so the Ld. Adjudicating Authority has not considered the effect of the
order of liquidation dated 11.01.2018. This order of liquidation and the
directions contend therein supersedes all previous orders of the
Adjudicating Authority and transactions, if any, between the parties. The
Company Appeal (AT) (Ins) No. 334 of 2021 Page 8 of 30
impugned order excluding the windmill asset of the Corporate Debtor from
the purview of the liquidation process is prima facie contrary to the order of
liquidation dated 11.01.2018.
19. It is also submitted that windmill asset is an asset of the Corporate
Debtor and therefore, become part and partial of the liquidation estate
under Section 36 of the IBC. This section is complete Code in itself and only
exclusion provided is in sub-Section (4) thereof, which is exhaustive. There
can be no exclusion of an asset other than what is expressly provided in
sub-Section (4). Ld. Adjudicating Authority had no jurisdiction to exclude
windmill asset by passing an order which is clearly contrary to the
mandatory terms of Section 36 of the IBC. This aspect of the matter has not
been considered at all by the Ld. Adjudicating Authority but being question
of jurisdiction goes to the root of the power and authority of the Adjudicating
Authority or lack thereof to allow the Application of the Liquidator and direct
keeping away windmill asset from the purview of liquidation proceedings.
Such order is, therefore, void.
20. Ld. Sr. Counsel for the Appellants also pointed out that once the asset
become part of the liquidation estate, the Adjudicating Authority has no
power or jurisdiction to modify the liquidation estate or review any asset
outside the liquidation purview. For this purpose, he placed reliance on the
Judgment of the Hon'ble Supreme Court in the case of Ebix Singapor Pvt.
Ltd. Vs. Committee of Creditors of Educomp Solutions Pvt. Ltd.& Anr.
decided on 13.09.2021 in Civil Appeal No. 3224 of 2020 in this case Hon'ble
Supreme Court upheld the order of this Appellate Tribunal holding that
Company Appeal (AT) (Ins) No. 334 of 2021 Page 9 of 30
withdrawal of the resolution plan by the Resolution Applicant after its
approval by the CoC cannot be permitted, inter alia, because there is no
specific provisions in the IBC for allowing withdrawal.
21. Ld. Sr. Counsel for the Appellants further submitted that it is an
undisputed fact on record that by an email dated 18.08.2017 the Appellant
withdrew the proposal to purchase the windmill asset from the Corporate
Debtor and demanded refund of the advance deposit with interest the
factum of withdrawal of the proposal as aforesaid has not been considered
in the impugned order or earlier orders as a matter of fact, such a vital fact
has been suppressed by the SBI and also the Liquidator. The impugned
order as well as submissions of the Liquidator and the beneficiary (SBI)
proceeds on fallacious assumption that there is concluded sale in regard to
windmill asset of the Corporate Debtor, this assumption is absolutely
baseless and is indeed gross misrepresentation of the facts.
22. It is also submitted that the order of the Adjudicating Authority dated
22.08.2017 is illegal and not binding on the Appellant. This order was
passed in complete suppression of the facts as well as misrepresentation. A
fraud was played by SBI by not brining into notice of the Tribunal that the
proposal has already been withdrawn prior to the order being passed. An
order obtained by a fraud is nullity it does not bind anyone much less the
Appellant. Therefore, it cannot become the basis of passing the impugned
order dated 18.03.2017.
23. Ld. Sr. Counsel for the Appellants also submitted that the
Adjudicating Authority has wrongly concluded that Civil Suit is for
Company Appeal (AT) (Ins) No. 334 of 2021 Page 10 of 30
determining rights of parties over the windmill asset. The transaction was
terminated on 18.08.2017 and neither SBI nor RP (now Liquidator) took any
steps to go ahead with the transaction till liquidation order on 11.01.2019.
The Civil Suit was filed by the Appellant subsequent to liquidation order on
20.02.2019 against SBI and the banks issuing bank guarantees and the
prayer in the said suit is limited to refund of upfront consideration and
permanent injunction on invocation of bank guarantees. Since bank
guarantees were invoked upon vacation of stay order, the said suit was
amended with the prayer for refund of the amount of bank guarantees. Even
if the Appellants lose the Civil Suit there could be no decree for sale of
windmill asset and there cannot lie any execution proceedings to compel the
transfer of windmill assets to the Appellant. Hence, keeping the windmill
assets outside the liquidation serves no purpose.
24. It is also pointed out that while deciding the Appeal the observations
made by the Ld. Division Bench of the Hon'ble High Court of Calcutta are
only confined to the consideration of interim injunction. Those observations
are not final and do not decide the rights of the parties. Therefore, such
observations cannot be used against the Appellant. The Civil Court is in
seisin of the Civil Suit pending before it. Who should be proper or necessary
party in a Civil Suit is the sole discretion of the Civil Court. Therefore, no
direction can be issued by the Adjudicating Authority for impleadment or
even granting liberty to apply for impleadment in the Civil Suit. Hence, such
direction is solely without jurisdiction.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 11 of 30
25. Ld. Sr. Counsel for the Appellants further submitted that the
corrigendum dated 23.03.2021 is on the face of it without jurisdiction, Ld.
Adjudicating Authority is a Tribunal of limited jurisdiction and derives its
power under the IBC. It does not have any plenary and inherent power to
pass orders. No power of review has been conferred upon the Adjudicating
Authority. The impugned corrigendum order has been passed behind the
back of the Appellant and there was no occasion to pass the said
corrigendum order. A perusal of the direction would show that the said
direction follows a judicial determination. No Application for review was filed
by any party and it is surprising that the Ld. Adjudicating Authority deleted
the direction by which it had not allowed distribution of the sale proceeds.
The said corrigendum order was passed modifying the earlier order dated
18.03.2021 in complete violation of principle of natural justice and fair play.
The corrigendum order was passed without notice to the Appellant. The
argument of the Respondent No. 1 that it was passed upon oral mentioning
by him and the name of the matter was published in the cause list which
amounts to due notice is preposterous. Even the cause list which is being
relied upon by the Respondent does not have the name of the Appellants.
Rule 11 and Rule 154 of NCLT Rules does not confer power of review but
only allow rectification of clerical or arithmetical mistakes. For this purpose,
he placed reliance on the Judgment of this Appellate Tribunal in the case of
Shri Lalit Aggarwal Vs. Shri Bihari Forgings Pvt. Ltd. & Ors. Review
Application No. 04 of 2020 in CA (AT) No. 380 of 2018 and Peoples
International & Services Pvt. Ltd. Vs. Alliance Industries Ltd. CA (AT) No.
107 of 2018. Therefore, the impugned order deserves to be set aside.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 12 of 30
Submissions of the Respondent No. 1.
26. Per contra, Ld. Counsel appearing on behalf of the Respondent No. 1
(Liquidator) supports the impugned order and submitted that the Appellants
have misconstrued statements of Respondent No. 1 in fact the agreement for
sale of windmill asset was executed on 01.04.2017 prior to initiation of
CIRP. On the Application of the Respondent No. 2 being CA (IB) No
326/KB/2017, the Ld. Adjudicating Authority vide its order dated
22.08.2017 directed to keep the sale transaction outside the CIRP. The
entire sale consideration has been received by the Respondent No. 2. The
Civil Suit No. 39 of 2019 has been instituted against the Respondent No. 2
bank and not the Corporate Debtor. The windmill assets having been sold by
the Appellants prior to the initiation of CIRP and entire consideration having
been obtained by the Respondent No. 2 does not form part of liquidation
estate and as such does not contravene interim order of the Hon'ble
Supreme Court which now stands vacated.
27. It is also submitted that the initiation of CIRP was duly informed to
the Appellants by the Respondent No. 2 vide email dated 14.06.2017 and it
was decided between the Appellants and the Respondent No. 2 that
appropriate direction shall be sought from the Adjudicating Authority for
allowing sale of windmill assets to the Appellants outside the CIRP. The
Appellants agreed to extend the time for Respondent No. 2 to seek
appropriate direction from the Ld. Adjudicating Authority for execution of
sale of windmill assets outside the CIRP. For this purpose, he drew our
attention towards the email of the Appellants dated 14.06.2017 (which is at
Company Appeal (AT) (Ins) No. 334 of 2021 Page 13 of 30
Pg. 140 of the Appeal Paper Book). The sale transaction with respect to
windmill assets was finalised prior to initiation of CIRP and accordingly, by
order dated 22.08.2017 the said transaction was kept outside the purview of
CIRP. However, the Appellants refused to take over control and possession
of the windmill assets and also refused to take steps for execution of
conveyance deed despite the entire consideration having been obtained by
Respondent No. 2.
28. Ld. Counsel for the Respondent No. 1 further submitted that the
Division Bench of Hon'ble High Court of Calcutta vide its order dated
04.09.2019 observed that time was not the essence of the contract as the
Appellants were put to notice on 14.06.2017 and informed about the
initiation of CIRP, the Appellants without any compulsion extended the
period for performance and completion of sale of windmill assets. In so far
as the enforceability of the sale transaction of the windmill assets are
concerned, the same is pending adjudication before the Hon'ble High Court
of Calcutta in Civil Suit No. 39 of 2019. The Appellants cannot seek
adjudication of the contractual dispute, inter se Appellants and Respondent
No. 2 which is prior to initiation of CIRP of the Corporate Debtor.
29. Ld. Counsel for the Respondent No. 1 lastly submitted that the order
dated 23.03.2021, only proceeds to delete the embargo created in respect of
distribution of sale proceeds in respect of sale, which is outside the purview
of IBC and the same is not a matter of interest for the liquidation process of
the Corporate Debtor. In light of the aforesaid submissions, the Appeal
deserves to be dismissed with costs.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 14 of 30 Submissions of Respondent No. 2
30. Ld. Sr. Counsel representing the Respondent No. 2 (SBI) submitted
that the Ld. Adjudicating Authority has permitted the liquidator to keep the
windmill assets outside the liquidation estate as the same sold to the
Appellant against consideration as prior to the initiation of CIRP. The
Appellants, therefore, is not at all concerned with the process of liquidation
of the Corporate Debtor. The Appellants in its Appeal confirmed this position
in para 3 of the Synopsis (Pg. 3 of Appeal Paper Book) "Though the
Appellants have no role or relation with the liquidation proceedings of
Gujarat NRE Coke Ltd. (Corporate Debtor), however, they have
mischievously been dragged into such proceedings by SBI who had an
independent contract with the Appellants which was terminated by the
Appellants on 18.08.2017 on account of non-performance of obligations by
SBI."
31. It is submitted that the dispute between the Appellants and SBI is
contractual dispute relating to pre-CIRP period. The contractual dispute
overs around windmill assets which were non-core asset of the Corporate
Debtor. The pre-CIRP contractual dispute is already before the Hon'ble High
Court of Calcutta in Civil Suit and it is not open either to Ld. Adjudicating
Authority or this Appellate Tribunal to consider the said assets as part of
liquidation process. In Tata Consultancy Services Ltd. Vs. Vishal Ghisulal
Jain CA No. 3045 of 2020,(2020) SCC Online SC 1113 Hon'ble Supreme
Court has held that NCLT does not have any jurisdiction under Section
60(5) (c) to entertain the contractual dispute, which has arisen dehorse the
Company Appeal (AT) (Ins) No. 334 of 2021 Page 15 of 30
Insolvency of the Corporate Debtor. In view of the above, the Appellant
cannot be aggrieved by the impugned order keeping the windmill assets
outside the liquidation estate.
32. Ld. Sr. Counsel for the Respondent No. 2 further submitted that the
Appellants supported the prayer made before and granted by the
Adjudicating Authority as in the counter affidavit filed by the Appellant, it
was stated that "thus, it is made clear that the Respondent No. 1 and 2 are
not interested in the windmill assets of the Corporate Debtor as the sale of
windmill assets was never concluded and this Hon'ble Tribunal may pass
such orders on the liquidator's Application as it deem fit but should not
permit the liquidator to distribute the amount of Rs. 180 Crores".
Accordingly, the Ld. Adjudicating Authority while allowing the prayer order
to keep the windmill assets outside the liquidation estate, the second prayer
for distribution thereof was rejected as prayed by the Appellants and the
Respondent No. 2 (SBI). Thus, the Appellants cannot be aggrieved person
and maintain the Appeal under Section 61(1) of IBC.
33. Ld. Sr. Counsel for the Respondent No. 2 submitted that the
provisions in relation to formation /creation of liquidation estate are dealt
with in Section 36 of IBC. Sub-clauses (a) and (e) of Section 36 (4) of IBC are
attracted in the present case which provides that the assets owned by a
third party which are in possession of the Corporate Debtor shall not be
used for recovery in liquidation and also clause (e) provides that any other
assets as may be specified by the board, including assets which could be
subject to set-off on account of mutual dealings between the Corporate
Company Appeal (AT) (Ins) No. 334 of 2021 Page 16 of 30
Debtor and any creditor shall not be used for recovery in liquidation. The
windmill assets do not belong to the Corporate Debtor since there was a
binding and irrevocable sale in favour of the Appellants against full sale
consideration paid and the windmill asset were subject to set off in view of
Master Restructuring Agreement and the attempts thereafter made by the
consortium of banks led by SBI. Pursuant to which the Appellants have
taken commercial decision to purchase the same unconditionally and
irrevocably.
34. It is also submitted that admittedly the sale has concluded in favour
of the Appellant, was an irrevocable and binding sale, based on an
unequivocal acceptance thereof by the Appellants. Ld. Adjudicating
Authority has already granted the permission during the CIRP stage
approving the sale in favour of the Appellants. Thus, in view of the binding
LOI and agreement dated 01.04.2017, the sale stood concluded.
35. It is further submitted that the Appellant had filed the Civil Suit
before the Hon'ble Calcutta High Court seeking to unwind the transaction
for sale of the windmill assets as also, for injunction seeking restraint
against the encashment of bank guarantees. The Division Bench of the
Hon'ble High Court had permitted SBI to encash the bank guarantees.
Resultantly, the Appellants amended their Civil Suit seeking relief for refund
of balance sale consideration encashed under the bank guarantees.
Therefore, the entire dispute raised by the Appellants with respect to
concluded sale is pending before the Hon'ble Calcutta High Court.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 17 of 30
36. Ld. Sr. Counsel for the Respondent No. 2 submitted that the
corrigendum order dated 23.03.2021 is legal and within jurisdiction. It is
settled law that a Court/Tribunal is inherently empowered to correct its own
error in a Judgment, Decree or Order from any accidental slip or omission.
The Courts also have duty to see that record are true and present the
correct state of affair. Such power of Court is well recognized for this
purpose, he placed reliance on the Judgment of Hon'ble Supreme Court in
the case of Niyamat Ali Molla Vs. Sonargon Housing Co-operative Society
Ltd. & Ors. (2007) 13 SCC 421.
37. It is further submitted that Rule 154 of NCLT Rules permits the
Tribunal to correct the errors including on its own motion. The contention of
the Appellant that the corrigendum was passed behind its back is liable to
be rejected inasmuch as the matter was listed in the cause list and the
cause list is sufficient notice as held by the Hon'ble Supreme Court in the
case of Bar Association and Ors. Vs. B. D. Kaushik (2011) 13 SCC 774. The
corrigendum has to be appreciated on a complete reading of the impugned
order dated 18.03.2021 passed by the Ld. Adjudicating Authority both the
Appellants and SBI had supported the first prayer but the second prayer
was opposed by the parties which was ultimately not granted by the
Adjudicating Authority. The error due to accidental slip was manifest and no
Court would ever permit it to remain cited the Judgment of this Appellate
Tribunal in the case of Santosh Wasantrao Walokar Vs. Vijay Kumar V. Iyer
and another 2020 SCC Online NCLAT 128.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 18 of 30
38. It is further submitted that when the Adjudicating Authority has
allowed the prayer of keeping the windmill assets outside the liquidation
process it was obvious that the sale proceeds of such assets would also be
outside the liquidation process and would be dealt with as per direction in
Civil Suit No 39 of 2019 alone. When such is the position, the lines "and
therefore, at this stage, it is not possible to order distribution of the sale
proceeds" is not necessary, rather it was unwarranted.
39. Ld. Sr. Counsel for the Respondent No. 2 also submitted that the
Adjudicating Authority has rightly allowed the liquidator to implead himself
in the Civil Suit before the Hon'ble High Court. The Appellants have a
specific case before the High Court that the RP has not transferred the
assets despite the order dated 22.08.2017 passed by the Adjudicating
Authority. This would obviously require the RP/Liquidator to explain his
stand before the High Court. The Liquidator has also been repeatedly calling
upon the Appellants to take possession of the assets. The interest of the
Corporate Debtor in respect of which proceedings are pending before the
High Court ought to be protected by the Liquidator before the Hon'ble High
Court of Calcutta. It is, therefore, prayed that the Appeal being only an
abuse of process of law and liable to be dismissed with exemplary costs.
40. After hearing Ld. Counsels for the parties, we have gone though the
record.
41. Following issues arose for our consideration: -
(i) Whether the title of windmill asset has passed to Appellants is sub-judice
before the Calcutta High Court?
Company Appeal (AT) (Ins) No. 334 of 2021 Page 19 of 30
(ii) Whether the order for keeping the windmill asset out of the liquidation
estate is beyond the jurisdiction of Adjudicating Authority?
(iii) Whether the Adjudicating Authority has exceeded its jurisdiction in
passing an order for allowing the liquidator to implead in Civil Suit No. 39 of
2019 pending before the Calcutta High Court?
(iv) Whether the order of corrigendum dated 23.03.2021 is without
jurisdiction?
Issue No. (i)
Whether the title of windmill asset has passed to Appellants is sub-judice
before the Calcutta High Court?
42. For deciding the issue, we have considered the subject matter of Civil
Suit pending before the Hon'ble Calcutta High Court (in brief HC). In that
Civil Suit the Appellants have prayed the relief that the SBI, Yes Bank and
Indusland Bank may be restrained from invoking the bank guarantees with
respect of 75% remaining consideration and decree for the up front amount
Rs. 38.50 Crores and 6.5 Crores. The Single Bench of the HC has passed the
interim order in favour of the Appellants, however, on Appeal, the Division
Bench of the HC vide order dated 04.09.2019 set aside the order of the
Single Bench and allowed the Respondent No. 2/SBI to invoke the bank
guarantees. The bank guarantees have been encashed by the Respondent
No. 2 on 06.09.2019. Thereafter, the Appellants have amended their plaint
and sought the relief for return of total consideration Rs. 180 Crores i.e. the
Company Appeal (AT) (Ins) No. 334 of 2021 Page 20 of 30
amount of bank guarantees as well as up front amount (25% of the sale
consideration).
43. Whether the Appellants are entitled for refund of the consideration Rs.
180 Crores. To answer this issue HC has to examine whether in terms of the
LOI and the agreement dated 01.04.2017 the sale of the windmill assets has
been concluded as alleged by the Respondent No. 2 SBI. On behalf of the
Appellants, counter affidavit was filed before the Adjudicating Authority in
reply to the Application I.A. (IB) No. 1001/KB/2020. This affidavit is sworn
by Rakesh Chandra Sinha who is the Associate vice president of the
Appellant No. 1 and authorised signatory of the Respondent No. 2, we
would like to refer the Para 6 of the affidavit which as under:-
"6. With reference to ............................................................... I say that the rights of the respective parties over the windmill asset can only be determined upon adjudicating of Civil Suit No. 39 of 2019 by the Hon'ble High Court of Calcutta initiated by the said Respondents (Appellants herein). Accordingly, it is submitted that since the Hon'ble High Court of Calcutta is in seisin of the issues of sale of windmill assets and as such making the Respondent Nos. 1 and 2 as parties to the instant proceedings is uncalled for unjustified and their name should be accordingly be deleted from the array of the parties".
44. With the aforesaid admission of the Appellants in reply to the
Application, it is clear that they are of the firm view that the issues of sale of
windmill assets can only be determined upon adjudication of the Civil Suit
which is pending before the HC.
45. The Division Bench of the HC while deciding the Appeal arises from an
order passed by Trial Judge restrained the SBI from invoking bank
guarantees, observed that:-
"15...........................................................................
Company Appeal (AT) (Ins) No. 334 of 2021 Page 21 of 30
I categorically reject the contention made out in the notes of the arguments filed on behalf of the plaintiffs (though not made in the submissions during the course of hearing) that the bank guarantees were dependent on the performance of obligations under the letter of intent or linked to performance of any such obligations, this aspect of the matter was most relevant and required careful analysis by the Trial Court"
46. In the same judgment in Para 17, the Division Bench of the High
Court has observed that:
"17. ........................................................................ I am of the view that even on the merits of the disputes the underlying contract, it is highly debateable (a) whether the time was essence of the contract (b) the underlaying contract stood frustrated (c) whether the extension of the bank guarantee was obtained by coercion (d) whether there was a duty on the part of the Appellant bank to inform the plaintiffs of the initiation of proceedings before the NCLT and so on these all are issues which would decree which may be granted in favour of the plaintiffs. "18........................................................................... I am of the view thatthe whole case of the plaintiffs centers around the allegations with regard to alleged breaches of underlying contract by the Appellants. All the points urged by the plaintiffs (a) whethertime was essence of the contract (b) and that no objection certificate had been received (c) or that the sale could not be completed with the extended period (d) or that the contract stood frustrated in view of the proceedings before the NCLT (e) or that windmills could or could not be transferred have to be ultimately decided in the suit"
47. At this stage, we would like to refer the arguments of Ld. Counsels of
Appellants advanced before the Adjudicating Authority.
"5.1. Mr. Malay Kumar Ghosh, Ld. Sr. counsel appearing for Respondents No. 1 and 2 submitted that the sale of the windmill asset was never concluded and that the Respondent No. 3 SBI illegally invoked the bank guarantee. The rights of the respective parties over the windmill asset can only be determined upon adjudication of the Civil Suit No. 39 of 2019 by the Hon'ble Calcutta High court, since that court is in seisin of the same.
48. With the aforesaid it is apparent that whether the title of windmill
assets has been passed to the Appellants is to be decided in the Civil Suit
which is pending before the HC. Thus, we are unable to convince with the
Company Appeal (AT) (Ins) No. 334 of 2021 Page 22 of 30
argument of Ld. Sr. Counsel that the Adjudicating Authority has wrongly
concluded that the Civil Suit is for determining rights of the parties over the
windmill assets.
Issue No.(ii)
Whether the order for keeping the windmill asset out of the liquidation
estate is beyond the jurisdiction of Adjudicating Authority?
49. It is an admitted fact that before initiation of CIRP the Master
Restructuring Agreement (MRA) dated 02.03.2015 was entered into between
the Corporate Debtor and the consortium of lenders/Joint Lenders Forum
(JLF) led by SBI whereby SBI granted the right to auction non-core assets
i.e. windmill assets by private treaty. The Appellants participated in the bid
by submitting their respective offers of Rs. 154 Crores for 52 windmill assets
and 26 Crores for 10 windmill assets.
50. Thereafter, as per terms of the bid document 25% of the total bid
amount alongwith bank guarantee for the balance amount was to be
deposited. Accordingly, the Appellant No. 1 remitted a sum of Rs. 38.5
Crores and the Appellant No. 2 remitted a sum of Rs. 6.50 Crores on
21.10.2016 for the credit of the No Lien Account of the bank. The Appellant
No. 1 and 2 submitted the balance amount of Rs. 115.50 Crores and 19.50
Crores respectively by way of bank guarantee in favour of the SBI on the
said date. Subsequently, as we have already discussed above that as per the
order of Division Bench of Hon'ble High Court of Calcutta the bank
guarantees were invoked and the amount was deposited in the "No Line
Account" of SBI.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 23 of 30
51. Now we have considered the factual aspect of the matter. On
01.04.2017 an agreement entered into between the Appellants and SBI for
sale of the windmill assets i.e purchase agreement. Thereafter, on
07.04.2017 admitting the Application under Section 10 of IBC for initiation
of CIRP, moratorium on sale/disposal of assets of the Corporate Debtor was
declared. Subsequently, SBI filed an Application CA (IB) No. 326/KB/2017
under Section 60 (5) of IBC before the Adjudicating Authority for approval of
the proposed sale transaction of windmill assets belonging to the Corporate
Debtor. The Adjudicating Authority vide order dated 22.08.2017 allowed the
Application, operative portion of the order as under:-
"Upon the above said circumstances, even if the moratorium was declared by the Tribunal it appears to me that approval of sale process initiated by the RP if granted it would benefit the Corporate Debtor as well as Corporate Creditors. Denial of approval may cause economic loss and in connection to the Creditors, Corporate Debtor as well as to the prospective buyers. Therefore, I am inclined to permit RP to complete the proposed sale transaction initiated by him. The Applicant prays for distribution of the proceeds of the sale amongst JLF, considering total claims admitted by the RP. Considering that Corporate Insolvency Resolution Process is in progress and not yet finalised it is not fair and just to allow the said prayer of the Applicant at this stage. It is to be decided upon finalization of the process by the RP. If it is allowed at present, it would cause great injustice to the Corporate Debtor as well as to the unsecured creditors. In view of the above said discussion, the prayer for appropriation and distribution of proceeds of sale is hereby rejected.
In the result, the Application is allowed in part permitting the RP to complete the proposed sale transactions by executing the conveyance under the law in favour of the buyers."
52. According to the Appellants before passing of the aforesaid order they
have informed SBI vide email dated 18.08.2017 that the contract already
stood terminated prior to passing of the aforesaid order. Thus, the aforesaid
Company Appeal (AT) (Ins) No. 334 of 2021 Page 24 of 30
order was obtained by concealing the facts that the contract has been
terminated.
53. It is disputed fact that whether the contract is legally terminated on
18.08.2017. The effect of this email dated 18.08.2017 is yet to be considered
in Civil Suit. But now the order dated 22.08.2017 is in existence. It is also to
be noted that this order has not been challenged by the Appellants. By this
order, the Adjudicating Authority has directed to keep the windmill assets
outside the CIRP. Subsequently, the Corporate Debtor vide order dated
11.01.2018 gone into liquidation and Mr. Sumit Binani was appointed as
Liquidator. The Liquidator of the Corporate Debtor filed the present
Application I.A. No. 1001/KB/2020 before the Adjudicating Authority and
vide order dated 18.03.2021 the Adjudicating Authority has partly allowed
the Application and liquidator is permitted to keep the windmill assets
outside the sale purview of the liquidation estate.
54. We can say that impugned order dated 18.03.2021 is passed by the
Adjudicating Authority in the light of the earlier order dated 22.08.2017.
55. We have seen that the Appellants have not raised any objection in
their counter affidavit in regard to the relief claim in the Application that the
Liquidator may be permitted to keep the windmill asset outside the sale
purview of the liquidation estate. For this purpose, it is useful to refer the
counter affidavit sworn by Rakesh Chandra Sinha on behalf of the
Appellants. The Appellants in the affidavit have admitted that they have no
objection in allowing and granting the relief to the liquidator, the relevant
assertion is as under:-
Company Appeal (AT) (Ins) No. 334 of 2021 Page 25 of 30
"Thus, it is made clear that the Respondents No. 1 and 2 (Appellants herein) are not interested in the windmill assets of the Corporate Debtor as the sale of the windmill assets was never concluded and this Hon'ble Tribunal may pass such orders on the Liquidator's Application as it deems fit but should not permit the Liquidator to distribute the amount of Rs. 180 Crores which was procured by illegally invoking the bank guarantees and illegally appropriating the advances given. The amount of Rs. 180 Crores laying in the lien account of SBI consists of the advance payment made by the Respondents No. 1 and 2 and the bank guarantees illegally invoked by the SBI. The Respondent Nos. 1 and 2 are entitled to refund the entire sum of Rs. 180 Crores alongwith interest thereon"
56. With the aforesaid assertion it is clear that in regard to the Application
the Appellants have only objection that the amount of Rs. 180 Crores laying
in the lien account of SBI may not be disbursed. Therefore, the Adjudicating
Authority has not allowed the prayer for distribution of sale proceeds of the
windmill assets and refused to grant the prayer (b) of the Application.
57. Now, we have considered the legal aspect of the matter. As per the Ld.
Sr. Counsel for the Appellants in view of Section 36(4) of IBC. The
Adjudicating Authority cannot direct exclusion of windmill assets from the
liquidation estate. Section 36(4) provides that:-
"The following shall not be included in the liquidation estate assets and shall not be used for recovery in the liquidation:-
(a) assets owned by a third party which are in possession of the corporate debtor.
58. In this matter, the question is yet to be decided by the Hon'ble High
Court of Calcutta whether the title of windmill asset has been passed to the
Appellants. At this juncture, it is not clear that windmill assets is owned by
the Appellants or the Corporate Debtor. Ld. Sr. Counsel for the Respondent
No. 2 drew our attention towards the clause (e) of sub-Section (4) of Section
36 which provides that:-
Company Appeal (AT) (Ins) No. 334 of 2021 Page 26 of 30
"any other assets as may be specified by the board, including assets which could be subject to set-off on account of mutual dealings between the Corporate Debtor and any creditor shall not be included in the liquidation estate."
59. As we have seen that before initiation of CIRP the creditors of the
Corporate Debtor and the Corporate Debtor have decided to sale the
windmill assets belonging to the Corporate Debtor as contemplated under
the MRA dated 18.09.2014 and the supplemental MRA dated 02.03.2015.
The same were executed by the Corporate Debtor and the creditors forming
part of JLF of the Corporate Debtor constituted in October, 2013. As agreed
between the Corporate Debtor and the JLF lenders an asset sale committee
was formed and pursuant to a bid process on a private treaty basis
commencing in August, 2016 and considering this fact, the Adjudicating
Authority vide order dated 22.08.2017 directed that the windmill assets to
keep outside the CIRP. Thus, the case comes within the exclusion clause (a)
and (e) of sub-Section (4) of Section 36 of IBC.
60. We are of the view that the Adjudicating Authority while allowing the
prayer No. (i) of the Application has not committed any illegality.
Issue No. (iii)
Whether the Adjudicating Authority has exceeded its jurisdiction in passing
an order for allowing the liquidator to implead in Civil Suit No. 39 of 2019
pending before the Calcutta High Court?
61. The Adjudicating Authority vide order dated 11.01.2018 directed that
a suit or other legal proceedings may be instituted by the Liquidator on
behalf of the Corporate Debtor, with the prior approval of the Adjudicating
Company Appeal (AT) (Ins) No. 334 of 2021 Page 27 of 30
Authority (See Pg. 264). In the light of this order, the liquidator has sought
the permission. The Adjudicating Authority has assigned the reasons for
permitting the liquidator to get impleaded as representative of the Corporate
Debtor. Para 7.3 of the impugned order is as under: -
"The Applicant/Liquidator is not a party to that suit. If the Respondent Nos. 1 and 2 (Appellants herein) had indeed considered that the transaction in question in respect of the windmill asset was indeed not really concluded and therefore belonged to the Corporate Debtor, as Mr. Malay Kumar Ghosh, Ld. Sr. Counsel appearing for them, had vehemently argued, then the claim would primarily have arisen against the Corporate Debtor, now represented by the Liquidator. Therefore, the Corporate Debtor ought to have been made a party to the Civil Suit. Such is not the case here."
62. It means the Adjudicating Authority has only permitted the Liquidator
to file an Application before the Hon'ble Calcutta High court to get
impleaded as party. It cannot hold that the Adjudicating Authority has
exceeded its jurisdiction and encroached in the jurisdiction of the Hon'ble
Calcutta High Court. The Adjudicating Authority has only permitted the
Liquidator to file the Appropriate Application.
Issue No. (iv)
Whether the order of corrigendum dated 23.03.2021 is without jurisdiction?
63. The controversy arises when the Ld. Adjudicating Authority passed
the order on 18.03.2021 and partly allowed the Application filed by the
Liquidator. After passing of the order, Ld. Adjudicating Authority on
23.03.2021 deleted the words from the clause (b) of the aforesaid order "and
therefore, at this stage it is not proper to order distribution of the sale
proceeds" (Pease See Para 3 of the Judgment).
Company Appeal (AT) (Ins) No. 334 of 2021 Page 28 of 30
64. According to the Appellants this is a review of its own order by the
Adjudicating Authority which is not permissible in IBC and the Adjudicating
Authority while modifying the order has exceeded its jurisdiction.
65. On the other hand, Ld. Sr. Counsel for the Respondent No. 2
submitted that every Court/Tribunal inherently empowered to correct its
own error in a Judgment, Decree or Order from any accidental slip or
omission. Rule 154 of NCLT Rules, 2016 provides the Tribunal may correct
error arising from any accidental slip or omission at any time on its own
motion or on Application of any party. It is also pointed out that by the
corrigendum Ld. Adjudicating Authority deleted the aforesaid sentence as
the Appellants and Respondent No. 2 opposed second prayer which is
ultimately not granted by the Adjudicating Authority. The error due to
accidental slip was manifest and therefore, the Adjudicating Authority has
corrected it. The Adjudicating Authority has not reviewed its order. In
support of the argument, Ld. Sr. counsel for the Respondent No. 2 has
placed reliance on the Judgment of Hon'ble Supreme court in the case of
Niyamat Ali Molla Vs. Sonargon Housing Co-operative Society Ltd. &Ors
(2007) 13 SCC 421. Hon'ble Supreme Court held that
"Where it is the Court's own accidental slip or omission, or that of its ministerial officers. But it gives power to rectify any accidental slip or omission in a judgment, decree or order, and might include an accidental slip or omission traceable to the conduct of the parties themselves".
66. We have first considered what is the effect of this modification of the
order dated 18.03.2021. With this modification, the Adjudicating Authority
has directed that at this stage it is not proper to order distribution of sale
proceeds subsequently, these words are deleted from the order dated
Company Appeal (AT) (Ins) No. 334 of 2021 Page 29 of 30
18.03.2021. In this regard, it is useful to refer the earlier order passed by
the Adjudicating Authority on 22.08.2017, by this order, the Adjudicating
Authority, even during the moratorium considering the facts permitted the
RP to proceed further. The operative part of the order is that:-
"therefore, I am inclined to permit the RP to complete the proposed sale transaction initiated by him, the Applicant prays for distribution of the proceeds of sale amongst JLF, considering total claims admitted by the RP. Considered that the Corporate Debtor Insolvency Resolution Process is in progress and not yet finalised. It is not fair and just to allow the said prayer of the Applicant at this stage"
67. It is an admitted fact that the Appellants in the counter affidavit
which is filed in reply of the Application stated that they have no objection in
case the Adjudicating Authority allow the Application but should not permit
the Liquidator to distribute the amount of Rs. 180 Crores. The same prayer
was made by the Respondent No. 2. It seems that considering these prayers,
the Ld. Adjudicating Authority vide order dated 23.03.2021 deleted the
aforesaid words.
68. We are of the view that such deletion is not amount to review its order
by the Adjudicating Authority. It seems that it is an accidental slip or
omission by the Adjudicating Authority and the Adjudicating Authority can
rectify such mistakes under Rule 154 of NCLT Rules 2016. Thus, we find no
substance in the argument of Ld. Sr. Counsels for the Appellants that the
Adjudicating Authority vide order dated 23.03.2021 reviewed its own order
and exceeded its jurisdiction.
Company Appeal (AT) (Ins) No. 334 of 2021 Page 30 of 30
69. With the aforesaid discussions, no interference is called for by this
Appellate Tribunal in the impugned order. The impugned order dated
18.03.2021 and 23.03.2021 are upheld.
70. It is to be noted that during the course of the argument both the
parties have made submissions about the terms and conditions of LOI and
the agreement dated 01.04.2017 in regard to windmill assets but it is not
required to examine the terms and conditions by this Appellate Tribunal as
these issues will be decided in Civil Suit No. 39 of 2019.
Thus, the Appeal is dismissed. However, no order as to costs.
[Justice Jarat Kumar Jain] Member (Judicial)
[Dr. Ashok Kumar Mishra] Member (Technical)
New Delhi 18th January, 2022 SC
Company Appeal (AT) (Ins) No. 334 of 2021
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.