Sp Probuild Llp vs Rabindra Kumar Mintri & Ors
- CitationCompany Appeal (AT) (Insolvency) No. 795 of 2024
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority's order of 05.03.2024 remitting the Resolution Plan to the Committee of Creditors for resubmission, following the Supreme Court's directions in Greater Noida Industrial Development Authority v. Prabhjit Singh Soni, operates to displace the earlier CoC approval of the Plan, so that the approval no longer stands as a bar to considering claims that were rejected on the ground that the Plan had already been approved. Pending applications seeking admission of claims that were rejected only on the ground of the CoC's earlier approval of the Plan are to be decided by the Adjudicating Authority before the Successful Resolution Applicant resubmits the Plan; the resubmitted Plan must await those determinations and incorporate any directions arising from them.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No. 795 of 2024 & I.A. No. 2872, 2873 of 2024 (Arising out of Order dated 05.03.2024 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi, Principal Bench I.A. No.2518/2021 in (IB)-923(PB)/2018)
IN THE MATTER OF: SP Probuild LLP ... Appellant Versus Rabindra Kumar Mintri & Ors ... Respondents
Present: For Appellants: Mr. Ramji Srinivasan, Sr. Advocate with Mr. Anirban Bhattacharya, Ms. Priyanka Bhatt, Ms. Honey Satpal, Ms. Vaishnavi Prakash, Ms. Ritika Prasad, Mr. Rajeev Chowdhary, Ms. Nandini Choudha and Ms. Namrata Sarogi, Advocates. For Respondents: Mr. Sunil Fernandes, Ms. Anuja Pethia, Mr. Noor Shergill, Mr. Rishabh Govila and Ms. Diksha Dadu, Advocates for SRA. Mr. Apoorv Agarwal and Ms. Akshita Singh, Advocate for RP. Mr. Rachit Mittal, Mr. Parish Mishra and Mr. Adarsh Srivastava, Advocate for R-2. With Company Appeal (AT) (Insolvency) No. 816 of 2024 & I.A. No. 2952 of 2024 (Arising out of Order dated 05.03.2024 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi, Principal Bench I.A. No.2518/2021 in (IB)-923(PB)/2018)
IN THE MATTER OF: Yashveer Singh ... Appellant Versus Rabindra Kumar Mintri & Ors ... Respondents
Present: For Appellants: Mr. Arun Kathpalia, Sr. Advocate with Mr. Nipun Gautam, Ms. Udita Singh, Mr. Kshitij Wadhwa and Ms. Bani Brar, Advocates.
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 1 For Respondents: Mr. Sunil Fernandes, Ms. Anuja Pethia, Mr. Noor Shergill, Mr. Rishabh Govila and Ms. Diksha Daddu, Advocates for SRA. Mr. Apoorv Agarwal and Ms. Akshita Singh, Advocate for RP. Mr. Rachit Mittal, Mr. Parish Mishra and Mr. Adarsh Srivastava, Advocate for R-2.
With Company Appeal (AT) (Insolvency) No. 817 of 2024 & I.A. No. 2954 of 2024 (Arising out of Order dated 05.03.2024 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi, Principal Bench I.A. No.2518/2021 in (IB)-923(PB)/2018)
IN THE MATTER OF: Reena ... Appellant
Versus
Rabindra Kumar Mintri & Ors ... Respondents
Present: For Appellants: Mr. Arun Kathpalia, Sr. Advocate with Mr. Nipun Gautam, Ms. Udita Singh, Mr. Kshitij Wadhwa and Ms. Bani Brar, Advocates. For Respondents: Mr. Sunil Fernandes, Ms. Anuja Pethia, Mr. Noor Shergill, Mr. Rishabh Govila and Ms. Diksha Daddu, Advocates for SRA. Mr. Apoorv Agarwal and Ms. Akshita Singh, Advocate for RP. Mr. Rachit Mittal, Mr. Parish Mishra and Mr. Adarsh Srivastava, Advocate for R-2.
JUDGMENT
ASHOK BHUSHAN, J.
These three Appeal(s) have been filed against the same order dated
05.03.2024 passed by National Company Law Tribunal, New Delhi,
Principal Bench in IA No.2518/2021, IA No.3615/2022 and IA
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 2 No.4172/2022, by which order, all the aforesaid IAs were disposed of and
with respect to other IAs, the Adjudicating Authority directed the same to
be listed on 30.04.2024. Aggrieved by the order dated 05.03.2024, these
Appeal(s) have been filed.
2. We may first notice the facts giving rise to these Appeal(s). Facts in
Company Appeal (AT) (Insolvency) No. 795 of 2024 are noted first and facts
in other two Appeal(s) shall be separately noticed:
Company Appeal (AT) (Insolvency) No. 795 of 2024
(i) The Appellant claims to have paid consideration towards
allotment of 50 flats in the Project of M/s Today Homes Noida
Pvt. Ltd., i.e., 'Ridge Residency', Sector-135, Noida. The
Appellant submits that he was given possession of 09 flats and
rest 41 flats were reflected in the website of the Corporate
Debtor, but the possession was not given.
(ii) By order dated 20.08.2019 - M/s Today Homes Noida Pvt. Ltd.
- the Corporate Debtor was admitted under insolvency. In the
Corporate Insolvency Resolution Process ("CIRP") of the
Corporate Debtor, Resolution Plan submitted by Consortium
of One Group was approved by the Committee of Creditors
("CoC") on 03.03.2020 by 100% vote shares. The Resolution
Professional ("RP") filed an IA No.2518/2021 under Section 30,
sub-section (2) of the Insolvency and Bankruptcy Code, 2016
(hereinafter referred to as "IBC")
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 3
(iii) On 16.06.2022, the Appellant filed its claim before the
Respondent No.1 (RP). On 24.03.2021, the RP rejected the
claim of the Appellant informing that Resolution Plan approved
by the CoC is pending approval before the Adjudicating
Authority.
(iv) The Appellant filed IA No.3213 of 2021 seeking various
directions including the direction to consider the claim of the
Appellant. IA No.3213/2021 was rejected by the Adjudicating
Authority on 21.09.2021 observing that Application has
become infructuous in view of the approval of the Resolution
Plan by the CoC. The Appellant filed Company Appeal (AT)
(Insolvency) No. 901 of 2021, challenging the order of
Adjudicating Authority, which Company Appeal was also
dismissed on 10.11.2021. Civil Appeal No.7907 of 2021 filed
by the Appellant was also dismissed by Hon'ble Supreme Court
on 12.01.2022.
(v) This Tribunal delivered judgment in "Puneet "Puneet Kaur
vs. KV Developers", CA (AT) (Ins) No. 390 of 2022" on
01.06.2022. On the strength of which judgment an IA No.3640
of 2022 was filed by the Appellant on 28.07.2022 before the
Adjudicating Authority and the Adjudicating Authority vide
order dated 30.11.2022 dismissed the IA 3640 of 2022. The
Appellant filed Company Appeal (AT) (Insolvency) No. 1529 of
2024 before this Tribunal, which too was dismissed by order
dated 04.07.2023. The Appellant thereafter preferred an
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 4 Appeal before the Hon'ble Supreme Court, being Civil Appeal
No.4650 of 2023, which too was dismissed by Hon'ble
Supreme Court on 21.08.2023.
(vi) An IA No.4815/2023 was filed by the Appellant on 28.08.2023,
objecting to the Resolution Plan filed by One Group.
(vii) Noida Authority filed an IA No.3615 of 2022 praying that
Resolution Plan submitted by One Group be rejected. Another
IA No.4172 of 2022 was filed by Noida Authority seeking
direction to RP to make payment of amount due and payable
towards outstanding dues, which have become due during
CIRP. The Adjudicating Authority heard IA No.2518 of 2021
filed by the RP for approval of Resolution Plan as well as above
two IAs filed by Noida Authority and by a common order all the
three IAs were disposed of. The Adjudicating Authority relied
on the judgment of Hon'ble Supreme Court in Civil Appeal
Nos. 7590-7591/2023 - Greater Noida Industrial
Development Authority Vs. Prabhjit Singh Soni & Ors.
Decided on 12.02.2024 and sent the Plan back to CoC for
resubmission after satisfying the parameters set out by the
Code in the light of the observations made by Hon'ble Supreme
Court in paragraphs 54(b) and (c). By the same order, the
Adjudicating Authority directed that other IAs, including the
IA No.4815 of 2022 filed by the Appellant be listed on
30.04.2024.
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 5
(viii) The Appellant aggrieved by the order dated 05.03.2024 has
filed this Appeal.
Company Appeal (AT) (Insolvency) No. 816 of 2024
(i) Company Appeal (AT) (Insolvency) No. 816 of 2024 has been
filed by Yashveer Singh claiming to be allotee of Unit J-0606
in the Project developed by the Corporate Debtor. The
Appellant claims that he has paid Rs.41,17,773/- to the
Corporate Debtor with respect to the above unit. The
Appellant filed its claim on 06.09.2023, which was rejected by
the RP vide email dated 09.09.2023, observing that claim
cannot be permitted on the ground of delay and approval of
Resolution Plan by the CoC. The Appellant thereafter filed an
IA No.5923 of 2023 before the Adjudicating Authority, seeking
condonation of delay in filing the claim as well as seeking
setting aside the Resolution Plan of One Group.
(ii) While the IA No.5923 of 2023 was pending before the
Adjudicating Authority for adjudication, the Adjudicating
Authority passed order dated 05.03.2024 in IA No.2518 of
2021 remitting back the Plan to the CoC and the IA filed by
the Appellant was directed to be listed on 30.04.2024.
Company Appeal (AT) (Insolvency) No. 817 of 2024
(i) The Appellant - Reena claims to be allottee of Unit Bearing
No.I-1406 and claimed to have paid an amount of
Rs.32,11,234/-. The Appellant filed its claim on 11.08.2023
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 6 in Form-CA. Vide his email dated 09.09.2023, the RP
expressed its inability to admit the claim. The Appellant filed
IA No.4906 of 2023 before the Adjudicating Authority, seeking
condonation of delay in filing the claim as well as setting aside
the Resolution Plan of One Group. IA No.4906 of 2023
remained pending and was directed to be listed on 30.04.2024,
whereas in IA No.2518 of 2021, the Adjudicating Authority
passed order on 05.03.2024, which is challenged in the
present Appeal.
3. We have heard Shri Ramji Srinivasan, learned Senior Counsel
appearing for the Appellant in Company Appeal (AT) (Insolvency) Nos. 795
of 2024; Shri Arun Kathpalia, learned Senior Counsel appearing for the
Appellant(s) in Company Appeal (AT) (Insolvency) Nos. 816 and 817 of
2024; Shri Sunil Fernandes, learned Counsel appearing for Successful
Resolution Applicant ("SRA"); and Shri Appoorv Agarwal, learned Counsel
for RP.
4. Shri Ramji Srinivasan, learned Senior Counsel in support of
Company Appeal (AT) (Insolvency) Nos. 795 of 2024 submits that when the
Resolution Plan, which was approved by the CoC on 03.03.2020 and the
same has not been approved by the Adjudicating Authority and has been
remitted back for resubmission, the Appellant's claim which was earlier
rejected on the ground that Resolution Plan has been approved by the CoC,
can now be considered. It is submitted that the Appellant is now not
reiterating its prayer raised in the earlier Applications, which stood rejected
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 7 upto the Hon'ble Supreme Court, but now is praying for consideration of
his claim, since the approval of Resolution Plan by the CoC is no longer in
existence and when the CoC is to resubmit the Resolution Plan, the claim
of all those homebuyers, whose claims were not considered on the ground
of approval of Resolution Plan by the CoC, can very well be considered. The
impugned order dated 05.03.2024, gives an opportunity to the RP as well
as SRA to consider the claim of the Appellant also, which is duly reflected
in the records of the Corporate Debtor. The payments made by the
Appellant has not been denied and earlier claim was not considered only
on the ground that since CoC has already approved the Plan on 30.03.2020
before filing the claim by the Appellant. The status which was existing after
approval of Resolution Plan on 03.03.2020, is no longer available due to
the impugned order passed by the Adjudicating Authority on 05.03.2024,
the Adjudicating Authority ought to have directed the consideration of
claim of the Appellant also. It is submitted that IA, which was filed by the
Appellant being IA No.4815 of 2023 is still pending and has been directed
to be considered on 30.04.2024, whereas Adjudicating Authority ought to
have considered the IA also.
5. Shri Arun Kathpalia, learned Senior Counsel appearing for the
Appellant(s) in Company Appeal (AT) (Insolvency) Nos. 816 and 817 of
2024, submits that Appellant(s) have not filed any earlier proceeding and
the only Application which have been filed by the Appellant(s) being IA Nos
5923 of 2023 and IA No.4906 of 2023, were the Applications filed by the
Appellant(s) seeking direction to admit the claim, which Applications are
still pending. In the fitness of things, the Adjudicating Authority ought to
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 8 have considered the said Applications and thereafter directed the CoC to
resubmit the Plan. It is submitted that the claim of the Appellant(s) were
rejected only on the ground that Resolution Plan has been approved by the
CoC on 03.03.2020, which situation is no longer operating, in view of the
order dated 05.03.2024. The approval of Resolution Plan by the CoC being
no longer operates, there is no impediment in consideration of the claim of
the Appellant(s), which is reflected in the records of the Corporate Debtor.
The RP and SRA are bound to consider the claim of the Appellant(s) and
consider the same in the Resolution Plan.
6. Shri Sunil Fernandes, learned Counsel appearing for SRA refuting
the submissions of Shri Ramji Srinivasan, submits that claim of SP
Probuild LLP - the Appellant has been rejected twice by the Adjudicating
Authority, this Tribunal as well as by the Hon'ble Supreme Court. Thus,
the Appellant has no right to claim consideration of its claim again in third
round, when the same has been rejected twice. The principal of res-
judicata prohibits the consideration of the claim of the Appellant. It is
submitted that order dated 05.03.2024, which has been passed by the
Adjudicating Authority, was in an Application filed by NOIDA and the
direction issued by the Adjudicating Authority is only to the SRA to
resubmit the Plan only with regard to claim of the NOIDA, which has been
held as Secured Creditor by the Hon'ble Supreme Court in its judgment
dated 12.02.2024 (supra). It is submitted that under the direction dated
05.03.2024, there is no occasion for RP or SRA to consider any other claim
including the claim of the Appellant. The order dated 05.03.2024 cannot
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 9 give any opportunity to the Appellant to re-agitate its claim, which has been
rejected.
7. Shri Sunil Fernandes, replying to the submissions of Shri Arun
Kathpalia submits that order dated 05.03.2024 is not an opportunity for
consideration of fresh claims by the RP or SRA. The Adjudicating Authority
has not directed to restart the CIRP, rather, has directed only to resubmit
the Plan after considering the claim of the NOIDA, which has been held to
be Secured Creditor. No benefit of the order dated 05.03.2024 can be taken
by these Appellant(s). It is submitted that the process in approval of Plan
has already been delayed and consideration of any other claim at this stage
is bound to further delay the finalization of Resolution Plan, which is not
in the interest of the homebuyers, who are awaiting for their homes to be
delivered.
8. Learned Counsel for the RP submits that RP shall comply any
directions issued by this Tribunal in these Appeal(s).
9. We have considered the submissions of learned Counsel for the
parties and have perused the records.
10. We need to first notice the contents of the order dated 05.03.2024
passed by the Adjudicating Authority, which is impugned in these
Appeal(s). The order dated 05.03.2024, notices the prayers made in three
IAs, i.e., IA No.2518 of 2021 filed by RP for approval of Resolution Plan, IA
No.3615 of 2022 and IA No.4172 of 2022 filed by the NOIDA, which prayers
are as follows:
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 10 "The prayer made in IA-2518/2021 which is filed by RP reads as follows:-
1. Approve the Resolution Plan submitted by One Group for the Corporate Debtor, Today Homes Noida Private Limited.
2. Pass any other appropriate orders this Adjudicating Authority may deem fit.
The prayer made in IA-3615/2022 which is filed by NOIDA reads as follows:-
(a) Reject the resolution plan of Respondent No.02- SRA approved by the Committee of Creditors and filed by Respondent No.1 - Resolution Professional vide IA No.2518 of 2021;
(b) Pass such other order / directions as this Hon'ble Bench may deem fit proper in the facts and circumstances of the case.
The prayer made in IA-4172/2022 which is filed by NOIDA reads as follows:-
(a) Allow the present application;
(b) Direct the Respondent- Resolution Professional to make the payment of amounts due and payable towards the outstanding dues which have become due during CIRP or in the alternative make them a part of the CIRP cost under Regulation 31(b) of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for corporate persons) Regulations, 2016;
(c) Pass such other order /directions as this Hon'ble Bench may deem fit and proper in the facts and circumstances of the case."
11. The NOIDA in support of its claim has relied on the judgment of the
Hon'ble Supreme Court passed in Civil Appeal Nos. 7590-7591/2023 -
Greater Noida Industrial Development Authority Vs. Prabhjit Singh
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 11 Soni & Ors. decided on 12.02.2024, which has been noticed by the
Adjudicating Authority and relevant extract have been reproduced in the
judgment. The Civil Appeal Nos.7590-7591 of 2023 filed by Greater Noida
Industrial Development Authority challenging the order of NCLAT, by
which order, the Appeal of GNOIDA against the order of NCLT was
dismissed. Noida Authority has filed two IAs before the Adjudicating
Authority. In one of the IAs the prayer was made to recall the order dated
04.08.2020, by which the Adjudicating Authority approved the Resolution
Plan. Another IA No.344 of 2021 filed where the Greater Noida has
questioned the decision of the RP in treating the Greater Noida as
Operational Creditor. The NCLT vide its order dated 05.04.2021, dismissed
both the Applications filed by GNOIDA. Aggrieved by which order,
Company Appeal (AT) (Insolvency) No.867 of 2021 was filed, which was
dismissed by the NCLAT on 24.11.2022, leaving the Greater Noida
Authority to file Civil Appeal Nos.7590-7591 of 2023. The Hon'ble Supreme
Court allowed the Appeals filed by Greater Noida Authority vide its
judgment dated 12.02.2024. Paragraphs 54 and 55, which are relevant in
the present Appeal(s) are as follows:
"The Resolution Plan did not meet the requirements of Section 30 (2) of the IBC read with Regulations 37 and 38 of the CIRP Regulations, 2016
54. In our view the resolution plan did not meet the requirements of Section 30(2) of the IBC read with Regulations 37 and 38 of the CIRP Regulations, 2016 for the following reasons:
a. The resolution plan disclosed that the appellant did not submit its claim, when the unrebutted case of the appellant
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 12 had been that it had submitted its claim with proof on 30.01.2020 for a sum of Rs.43,40,31,951/- No doubt, the record indicates that the appellant was advised to submit its claim in Form B (meant for operational creditor) in place of Form C (meant of financial creditor). But, assuming the appellant did not heed the advice, once the claim was submitted with proof, it could not have been overlooked merely because it was in a different Form. As already discussed above, in our view the Form in which a claim is to be submitted is directory. What is necessary is that the claim must have support from proof. Here, the resolution plan fails not only in acknowledging the claim made but also in mentioning the correct figure of the amount due and payable.
According to the resolution plan, the amount outstanding was Rs. 13,47,40,819/- whereas, according to the appellant, the amount due and for which claim was made was Rs. 43,40,31,951/- This omission or error, as the case may be, in our view, materially affected the resolution plan as it was a vital information on which there ought to have been application of mind. Withholding the information adversely affected the interest of the appellant because, firstly, it affected its right of being served notice of the meeting of the COC, available under Section 24 (3) (c) of the IBC to an operational creditor with aggregate dues of not less than ten percent of the debt and, secondly, in the proposed plan, outlay for the appellant got reduced, being a percentage of the dues payable. In our view, for the reasons above, the resolution plan stood vitiated. However, neither NCLT nor NCLAT addressed itself on the aforesaid aspects which render their orders vulnerable and amenable to judicial review. b. The resolution plan did not specifically place the appellant in the category of a secured creditor even though, by virtue of Section 13-A of the 1976 Act, in respect of the amount payable to it, a charge was created on the assets of the CD. As per Regulation 37 of the CIRP Regulations 2016, a resolution plan must provide for the measures, as may be
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 13 necessary, for insolvency resolution of the CD for maximization of value of its assets, including, but not limited to, satisfaction or modification of any security interest. Further, as per Explanation 1, distribution under clause (b) of sub-section (2) of Section 30 must be fair and equitable to each class of creditors. Nonplacement of the appellant in the class of secured creditors did affect its interest. However, neither NCLT nor NCLAT noticed this anomaly in the plan, which vitiates their order.
c. Under Regulation 38 (3) of the CIRP Regulations, 2016, a resolution plan must, inter alia, demonstrate that (a) it is feasible and viable; and (b) it has provisions for approvals required and the time-line for the same. In the instant case, the plan conceived utilisation of land owned by the appellant. Ordinarily, feasibility and viability of a plan are economic decisions best left to the commercial wisdom of the COC. However, where the plan envisages use of land not owned by the CD but by a third party, such as the appellant, which is a statutory body, bound by its own rules and regulations having statutory flavour, there has to be a closer examination of the plan's feasibility. Here, on the part of the CD there were defaults in payment of instalments which, allegedly, resulted in raising of demand and issuance of pre-cancellation notice. In these circumstances, whether the resolution plan envisages necessary approvals of the statutory authority is an important aspect on which feasibility of the plan depends. Unfortunately, the order of approval does not envisage such approvals. But neither NCLT nor NCLAT dealt with those aspects.
Relief
55. As we have found that neither NCLT nor NCLAT while deciding the application /appeal of the appellant took note of the fact that,-
(a) the appellant had not been served notice of the meeting of the COC; (b) the entire proceedings up to the stage of approval of the resolution plan were ex parte to the appellant; (c) the appellant had
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 14 submitted its claim, and was a secured creditor by operation of law, yet the resolution plan projected the appellant as one who did not submit its claim; and (d) the resolution plan did not meet all the parameters laid down in sub-section (2) of Section 30 of the IBC read with Regulations 37 and 38 of the CIRP Regulations, 2016, we are of the considered view that the appeals of the appellant are entitled to be allowed and are accordingly allowed. The impugned order dated 24.11.2022 is set aside. The order dated 04.08.2020 passed by the NCLT approving the resolution plan is set aside. The resolution plan shall be sent back to the COC for re-submission after satisfying the parameters set out by the Code as exposited above. There shall be no order as to costs"
12. The Hon'ble Supreme Court took the view that Resolution Plan,
which was submitted, did not meet the requirement of Section 30, sub-
section (2) read with Regulations 37 and 38 of CIRP Regulations, 2016. It
was also observed by the Hon'ble Supreme Court that Greater Noida
Authority was a Secured Creditor in view of Section 13A of UP Industrial
Development Act, 1976 and the claim of Greater Noida Authority was not
considered as Secured Creditor. Hence, the Plan does not meet the
requirements of law. The Adjudicating Authority in its order has also
extracted paragraphs 54 and 55 of the judgment and after extracting the
aforesaid two paragraphs, has issued following directions in its order dated
05.03.2024:
"In the instant case, we are concerned with para nos. 54 (b) and (c) which relates to placing the Appellant in the category of secured creditors and for ensuring that the plan envisages necessary approvals of the statutory authority.
In the light of the relief granted by the Hon'ble Supreme Court enunciated in para 55 above, we deem it appropriate to send the plan back to the CoC for resubmission after satisfying the
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 15 parameters set out by the Code, in the light of the observations of the Hon'ble Supreme Court's order (para 54 b & c. supra). Accordingly, IA-2518/2021, IA-3615/2022 and IA-4172/2022 stands disposed of in above terms.
IA-2059/2023 IA595/2021, IA-966/2021, IA-4024/2021, IA- 4182/2023, IA-2691/2023, IA-2979/2023, IA-2088/2023, IA- 3078/2023, IA4177/2023, IA4533/2023, IA-4711/2023, IA- 3401/2023, IA3790/2023, IA3963/2023, IA-4242/2023, IA- 4815/2023, RA-62/2023, IA-4879/2023, IA-4906/2023, IA- 5106/2023, IA-5107/2023, IA5487/2023, IA5837/2023, IA- 5923/2023, IA-6268/2023 & IA-685/2024 List all the these IAs on 30.04.2024."
13. Following the judgment of the Hon'ble Supreme Court, the
Adjudicating Authority found it appropriate to send the Plan back to CoC
for resubmission after satisfying the parameters set out by the Code, in the
light of the observations of the Hon'ble Supreme Court in paragraph 54 (b)
and (c). One of the consequences of the order dated 05.03.2024 of the
Adjudicating Authority is that the Resolution Plan approved by the CoC
dated 03.03.2020 is no longer in existence. Use of expression "to send the
plan back to CoC for resubmission after satisfying parameters set out
by the Code" clearly indicate that Resolution Plan has to be resubmitted
by the SRA to the CoC. The submission, which is much pressed by Shri
Sunil Fernandes, learned Counsel for SRA is that direction issued by the
Adjudicating Authority vide order dated 05.03.2024 cannot give any benefit
to the present Appellant(s), since the directions are only qua the NOIDA
with respect to their IA Nos.3615 and 4172 of 2022 and the SRA is only
obliged to consider the claim of NOIDA as Secured Creditor and resubmit
the Plan. Considering the NOIDA as Secured Creditor and the direction of
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 16 the Adjudicating Authority, cannot be read to mean that SRA has to
consider any other claims while resubmitting the Plan. No exception can
be taken to the submissions advanced by learned Counsel for the SRA that
order dated 05.03.2024 oblige the SRA, only to consider the claim of
Greater Noida Authority as Secured Creditor.
14. The submissions of the Appellant(s) on the other hand that by virtue
of the order passed on 05.03.2024, refusing to approve the Resolution Plan
approved by the CoC, the CoC can now consider the claim of the
Appellant(s), which were not considered, only due to the reason that claims
were filed subsequent to approval of Plan by the CoC on 03.03.2020. It is
submitted that the approval of Resolution Plan by the CoC on 03.03.2020
being no longer operating, there is no impediment on consideration of
claims of those homebuyers, which are reflected in the records of the
Corporate Debtor. We have noticed that Appellant - SP Probuild LLP has
filed IA No.4815 of 2023 and other two Appellants have filed their IA
Nos.5923 and 4906 of 2023. The Applications filed by the Appellant(s) in
Company Appeal (AT) (Insolvency) Nos.816 and 817 of 2024 were
Applications where prayer for acceptance of their claim, which was rejected
on the ground that Plan has been approved, were made. It is useful to
notice the email of RP, by which claim filed by the Appellant - Yashveer
Singh and Reena was rejected. In the email dated 09.09.2023 addressed
to Yashveer Singh, following was stated:
Dear Ma'am,
This is in reference to your trailing mail, the Insolvency Proceeding against Today Homes Noida Private Limited (Corporate Debtor) was
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 17 initiated vide Hon'ble National Company Law Tribunal order dated 19th August, 2019, and the Resolution Plan of the same was approved by the Committee of Creditor in the month of March 2020.
However, as per Regulation 12 and the powers vested in me vide the Insolvency and Bankruptcy Code, 2016, I regrettably inform you that your claim is time-barred as the Resolution Plan has been filed with the Adjudicating Authority. I would thus request you to approach the Hon'ble National Company Law Tribunal to find an efficacious remedy.
If the Adjudicating Authority permits your claim, I shall be obliged to honor the same. Till then, I have no remedy to offer to you. Thank you for reaching out to us!
Best regards Rabindra Kumar Mintri Resolution Professional | Today Homes Noida Private Limited"
15. We have also noticed that by the same order dated 05.03.2024, the
Applications, i.e., IA Nos.4815, 5923 and 4906 of 2023 have been directed
to be listed on 30.04.2024. The said Applications are still pending for
consideration.
16. Although, various submissions have been raised by the Appellant(s)
and Respondents in support of their respective claims, we are of the view
that in view of the pendency of the Applications of the Appellant(s) before
the Adjudicating Authority, which are yet to be adjudicated, we do not find
it necessary at this stage to enter into submission or express any opinion
on merits. We are of the view that approval of Resolution Plan by the CoC
on 03.03.2020 being no more in operation and the SRA has to resubmit
the Resolution Plan, as per direction of the Adjudicating Authority dated
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 18 05.03.2024 and has to include the claim of NOIDA as Secured Creditor
with respect to other Applications, which are pending consideration, it is
appropriate that resubmission of the Plan by SRA should await the disposal
of those Applications. Applications, including Applications for acceptance
of the claim, which although are belated claims, it is for the Adjudicating
Authority to consider the Applications and take a decision as to whether
the said claims have to be included or not.
17. The learned Counsel for the Appellant has also referred and relied on
the judgment of this Tribunal in "Puneet Kaur vs. KV Developers", CA
(AT) (Ins) No. 390 of 2022, where this Tribunal held that even if the
homebuyers has not filed the claim within the time, the RP is under
obligation to include the claims, which are reflected in the records of the
Corporate Debtor. In paragraph 21 to 23, this Tribunal has held as follows:
"21. When the allotment letters have been issued to the Homebuyers, payments have been received, there are Homebuyers and there is obligation on the part of real estate Company to provide possession of the houses along with other attached liabilities. The liability towards those Homebuyers, who have not filed their claim exists and required to be included in the Information Memorandum. Further, under Regulation 36, sub-regulation 2(l), there is column for other information, which the Resolution Professional deems relevant to the Committee. The liabilities which have been undertaken by the Corporate Debtor, huge money received by the Corporate Debtor from Homebuyers, whose claims, which could not be filed within time, could not be wished away by the Resolution Professional, on the convenient ground that claims have not been filed by such Homebuyers. The purpose of CIRP of Corporate Debtor is to find out all liabilities of the Corporate Debtor and take steps
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 19 towards resolution. Unless all liabilities of the Corporate Debtor are not known or included in the Information Memorandum, the occasion to complete the CIRP shall not arise.
22. In the above context, we refer to certain observation of this Tribunal in Company Appeal (AT) (Insolvency) No. 871-872 of 2019 - Santosh Wasantrao Salokar vs. Vijay Kumar V. Iyer decided on 24th January, 2020 along with other Appeals, where this Tribunal made observations in paragraph 23 as follows:
"23. It is further observed in respect of Company Appeal (AT) (Insolvency) No. 892-893 of 2019 &Company Appeal (AT) (Ins) No.924 - 925 of 2019 that various claims are collected by the Resolution Professional during the CIRP process by inviting the claim from individual, organisations etc. But there are several micro claimant as also large claimants like Government claimants particularly Sales tax department, Income Tax Department etc., who generally are not filing claim, filing claim at a belated stage or filing not in appropriate format as a result of which Government dues are not considered although it may be reflected in the financial statements/books of Accounts of Corporate Debtor and similarly micro claims relating to Individual, MSME, and other small traders are also not considered by the Resolution Professional because of time constraint, belated receipt or non receipt of the claim even though the same may be provisioned for in the books of Accounts of Corporate Debtor hence in order to strengthen the system including the preparation of information memorandum as per regulation 36 of IBBI, it would be fair and proper if appropriate provision is incorporated under IBBI, (Insolvency Resolution Process for Corporate persons) Regulation 2016 for preparation of Balance Sheet as on date of initiation of CIRP process and the same gets audited from a regular Statutory Auditor of the Corporate Debtor certifying all schedules, including micro details of both Assets and Liabilities so that admitted liabilities in the Corporate Debtor records are not ignored even if such claims are not received in time etc. It will aid &
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 20 smoothen the existing system of collection and consideration of claim and these small individuals, MSME, SME and Government Department will not be the sufferer. It will also avoid large number of cases being filed by such left out Creditors."
23. We thus are of the considered opinion that Information Memorandum ought to have included the claim of those Homebuyers, who have not even filed their claims to correct liabilities of the Corporate Debtor for its appropriate resolution. In the present case, in the reply filed by Resolution Professional in paragraph 11, following statement has been made:
"11. It is pertinent to mention herein that the claims towards the Homebuyer/ Allottees including the Appellant herein have already been dealt with in the Resolution Plan as submitted by Respondent No.4. it is stated that despite the same, the Appellant is abusing the process of this Hon'ble Appellate Authority by filing the captioned Appeal for seeking reliefs against the Respondents on frivolous grounds.""
18. The learned Counsel for SRA Shri Sunil Fernandes has reiterated his
submission that the Resolution Plan also considered the cases of those
homebuyers, who also have not filed their claims and has referred to
paragraph 18.4(iii) and 18.4 (xiii) of the Resolution Plan.
19. Shri Arun Kathpalia, learned Senior Counsel for the Appellant(s)
submits that the Addendum, which has been submitted by SRA and which
has been placed in the Company Appeal (AT) (Insolvency) Nos. 795 of 2024
along with additional affidavit, is not confined to the treatment of claim of
NOIDA as Secured Creditor, but Addendum dated 26.04.2024 also include
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 21 certain provision regarding homebuyers also. He has referred to Part-II of
the Addendum dated 26.04.2024, which provides as follows:
"II Additional terms for Beneficial Treatment of Homebuyers:
10. In addition to payments to NOIDA, the addendum also has additional terms for the benefit of Homebuyers. The beneficial changes to clauses for Allottees are as follows:
Sl.No. Clause Original clause Revised clause (Changes in clauses are I blue text for the convenience of CoC)
Discount to Allottees
22. 18.4 Table - Milestone of payments The extract of the clause will be substituted/ It is proposed that Residents shall replaced with the following pay INR 200 per square feet of text:
super area within 90 days of the Start Date. All allottees (regardless of being residents or non-
All other Allottees (besides the residents) have to pay an Residents) whose claim has been additional amount of accepted shall pay INR 400 per INR 200 psf at the time square feet of super area over and of offer of possession for above their overdue and balance fit out. amount. ... It is clarified that payment Discounts shall be provided to of INR 400 psf shall not be only Allottees .. the discounts shall demanded from non- be given at the stage of Offer of residents. Possession.
23. 18.4(iv) along with the additional amount Deleted of INR 200 psf for Resident and INR 400 psf for other Allottees according to the Plan
24. 18.13 In the event any recovery of money Deleted (vi) a is done from the previous management of THNPL, the entire amount collected shall be first used to give discount to only the Allottees who are paying additional amount of INR 400 psf, to the extent of INR 100 psf of super area.
Cancelled Units
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 22 26. 18.4 (i) Completion of the Project is The timelines for project
planned within a period of 2 years, completion will be brought 6 months from the Start Date. The forward by 9 months. The Completion of the Project shall be clause will be substituted done in phases as mentioned by -
below:
Completion of the Project Particulars Estimated is planned within a Timeline period of 1 years, 9 from Start months from the Start Date Date. The Completion of the Project shall be done Phase 1 - in phases as mentioned
i) 2 Towers (I and J) below 4 Qtr
(ii) Commercial Particulars Estimated Block Timeline Phase 2- from Start Date 4 Towers (P, Q, R, 8 Qtr Phase 1 -
and A) Phase 3 - i) 2 Towers (I and J) 3 Towers (F, G and 10 Qtr (ii) 4 Qtr H) Commercial Block Phase 2- 4 Towers (P, 6 Qtr Q, R, and A)
Phase 3 -
3 Towers (F, 7 Qtr G and H)
It is clarified that the work under Pool & Built shall continue. In support of the same, the RA has offered interim finance of INR 12 Crore to cover the shortfall in tower F, G, H I Q & R. The same is explained in clause 11 of this addendum.
It is also clarified that timelines for possession as per Pool & Built shall be adhered to.
Rest of the clause remains the same.
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 23 Scope of RA:
27. 18.4 New Clause The procurement of (xxiii) Occupancy Certificates and Completion Certificates shall be the responsibility of the RA.
The RA shall also be responsible for registration of the sub-
lease deed of the allottees, subject to the payment of stamp duty charges by the allottees.
For Residents:
28. 18.4(iii) The maintenance of the towers The following text shall be where possession has been given added to the clause - Upon shall be taken up by the Corporate receipt of payment by at Debtor only after at least 75% of least 75% of the the Residents have paid the residents residing in additional amount of INR 200 per that tower, repair work
square feet of super area. Till that and tower completion time, the RWA shall be responsible work in that tower shall for maintenance of the Project and be taken up. This collection of the running includes all work related maintenance fee. The Resolution to repainting and repair Applicant or the Corporate Debtor of façade, treatment of shall not be held liable for any expansion joints etc. maintenance of the Project till that time. However, it is clarified that repair of common facilities and facilities pertaining to fire safety shall be taken up on priority regardless of contribution by Residents
Power Backup
29. 18.4(vi) It must be noted that Power Back The text shall be up shall be provided only for substituted with the common area and common following text -
facilities... shall not be provided.
Power Backup shall be And mention of Power Backup in provided as per BBA. the table below.
20. It is submitted that Addendum, which according to SRA has been
prepared, considering the claims of homebuyers and granting certain
additional benefits to the homebuyers, there is no impediment in
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 24 considering the claims of both the homebuyers, whose claims are reflected
in the records of the Corporate Debtor. It is further submitted that there
cannot be different treatment of homebuyers, whose claims are reflected
and verified by the RP and those who have not filed their claims and whose
claims could not be verified, but reflected in the records of the Corporate
Debtor.
21. As observed above, Applications by different Applicants including
these two Appellant(s) being pending consideration, we are of the view that
at this stage, it is not necessary for this Tribunal to express any opinion on
the merits of the Applications, which are pending adjudication before the
Adjudicating Authority. As observed above, resubmission of the Resolution
Plan by the SRA has to await the decision of all other Applications, which
was deferred by the Adjudicating Authority for consideration on
30.04.2024, as per order dated 05.03.2024 itself. There is no doubt that
claim of the NOIDA has to be considered as per the direction dated
05.03.2024 as Secured Creditor, but since other Applications are still
pending, we are of the view that ends of justice will be served in disposing
of these Appeal(s) with following directions:
(I) The order dated 05.03.2024 passed by Adjudicating Authority
is not being interfered with.
(II) The Adjudicating Authority may consider and dispose of the
Applications as noted in the order dated 05.03.2024, which
were deferred for consideration on 30.04.2024 at an early date.
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 25 (III) The SRA, who has to resubmit the Resolution Plan before the
CoC for consideration, will await the decision of Adjudicating
Authority on the Applications, which are pending and as noted
in the order dated 05.03.2024. The Resolution Plan be put
before the CoC for consideration and voting after incorporating
the directions of Adjudicating Authority in above regard.
(IV) We request the Adjudicating Authority to consider the other
Applications as noted in the order dated 05.03.2024 at an early
date.
22. All the Appeal(s) are disposed of accordingly. All pending IAs in these
Appeal(s) are also disposed of. No order as to costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
[Arun Baroka] Member (Technical) NEW DELHI
8th May, 2024
Ashwani
Comp. App. (AT) (Ins.) Nos. 795, 816 & 817 of 2024 26
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free