Sendoz Commercial Private Limited vs Irel (India) Limited
- CitationCompany Appeal (AT) (Ins.) No. 533 of 2023
Ratio decidendi
The rule this decision rests on
A genuine and substantial dispute as to the quality of goods supplied, which existed before the issuance of the demand notice and was raised in accordance with the contractual inspection and rejection procedure, constitutes a pre-existing dispute within Section 8(2)(a) of the Code, and an application under Section 9 is liable to be rejected where such a dispute exists. A dispute that has been raised and communicated by the operational creditor's counterparty promptly upon delivery, supported by internal test results and minutes of meeting before the demand notice, is not rendered spurious merely because the creditor later obtains contrary test results or because the demand notice was issued afterwards; the question is whether a real dispute existed, not whether the defence is ultimately successful. Where the operational creditor itself has invoked the arbitration clause in respect of the same invoice and the same dispute, and an arbitrator has been appointed, the insolvency application founded on that same disputed debt is an attempt to use the Code as a coercive mechanism for recovery of a disputed claim and cannot be sustained.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
(Arising against the impugned order dated 24.02.2023 passed by the Hon'ble National Company Law Tribunal, Mumbai Bench in CP (IB) No.552/MB/2021)
IN THE MATTER OF:
Sendoz Commercial Pvt. Ltd. 644, Marshall House, 25, ...Appellant Strand Road, Kolkata - 700 001, West Bengal.
Versus
IREL (India) Ltd. Plot No. 1207, ECIL Building, Veer Savarkar Marg, Opposite Siddhivinayak Temple, Prabhadevi, ...Respondent
Mumbai - 400 028.
Present:
For Appellant: Ms. Swati Dalmia, Mr. Palzer Moktan, Ms. Mrinal Chaudhary, Advocates.
For Respondent: Mr. A.P. Singh, Mr. Abhijeet, Advocates.
J U D G M EN T (22nd August, 2025)
INDEVAR PANDEY, MEMBER (T)
The present Appeal arises from the impugned order dated 24.02.2023
passed by the National Company Law Tribunal, Mumbai Bench, in CP(IB)-
552/MB/2021, whereby the Adjudicating Authority dismissed the Application
filed by the Sendoz Commercial Pvt. Ltd./ Appellant herein, under Section 9
of the Insolvency and Bankruptcy Code, 2016 (hereinafter called the "Code").
The Adjudicating Authority concluded that the date of default fell within the
Cont'd..../ -2-
exclusion period stipulated under Section 10A of the IBC, and that there
existed a pre-existing dispute regarding the quality of goods supplied. The
Appellant, being aggrieved by the said order, has preferred the instant Appeal
under Section 61 of the IBC, contending that the findings of the Adjudicating
Authority are contrary to the evidence on record, the terms of the Purchase
Order, and the statutory scheme of the Code.
Brief facts of the case:
2. The brief facts of the case are as follows:
(i) The IREL (India) Limited, / Respondent herein, and Corporate Debtor is
a Government of India Undertaking under the Department of Atomic
Energy, engaged primarily in the mining and production of rare earths,
minerals, and related industrial inputs.
(ii) The Respondent floated an E-Tender (No. IREL/Ganjam/19-20/ET/330)
on 18.11.2019, for the supply of coal. Sendoz Commercial Pvt. Ltd /
Appellant herein, participated in the tender process and was declared the
successful bidder. The Respondent issued Purchase Order No.
36/P/02171/PT/P.O.36-01060 on 28.01.2020, requiring the Appellant
to supply 8000 MT (±10%) of coal with GCV ranging between 2800 to
3400 Kcal/Kg, in a staggered manner within four months.
(iii) The Appellant supplied a third lot comprising 4044.52 MT of coal worth
₹1,83,57,886/- on 22.02.2020, and raised a corresponding invoice. The
Respondent rejected the said lot on 25.02.2020, alleging that the
supplied coal's GCV was 2429 Kcal/Kg, below the acceptable threshold
Company Appeal (AT) (Ins.) No. 533 of 2023 -3-
prescribed in purchase order. The rejection was communicated via email
to the appellant.
(iv) On 29.02.2020, the Appellant invoking Clause 3.0 of the purchase
agreement, requested the respondent to get the samples tested by a
NABL-accredited government laboratory. The Respondent On
16.03.2020, requested the Appellant's presence for sampling at its site
on 17.03.2020, but the Appellant expressed its inability due to medical
reasons and the emerging COVID-19 lockdown.
(v) The Respondent again invited the Appellant for sampling on 04.08.2020
and later confirmed that testing would be conducted at NML,
Jamshedpur. On 11.08.2020, the Appellant confirmed attendance of its
representative at the Respondent's site on 13.08.2020, and thereafter the
samples were dispatched to NML, Jamshedpur for testing in the presence
of both parties.
(vi) The Appellant on 25.01.2021 issued a Demand Notice under Section 8
of the Code. The Respondent on 17.02.2021, replied to the legal notice,
rejecting the binding nature of the NML test result in violation of Clause
3.0.
(vii) Thereafter, the Appellant filed a Section 9 Application (CP(IB)-
552/MB/2021) before the NCLT, Mumbai, for initiating Corporate
Insolvency Resolution Process (CIRP) against the Respondent for
defaulting on payment of Rs. 1.83 crores. The said Section 9 Application
was dismissed by the Adjudicating Authority on 24.02.2023, holding that
Company Appeal (AT) (Ins.) No. 533 of 2023 -4-
the date of default 23.03.2020, fell within the Section 10A exclusion
window, and the rejection email dated 25.02.2020 clearly showed a pre-
existing dispute.
(viii) Accordingly, the Appellant has preferred the present Appeal under
Section 61 of IBC in April 2023, challenging the legality and correctness
of the impugned dismissal order dated 24.02.2023 on the grounds that:
(a) the invoice was payable within 30 days from supply (i.e., by
23.03.2020);
(b) the alleged "dispute" was spurious and unsupported; and
(c) the binding test result of 11.09.2020 from NML proved the coal was of
requisite GCV.
Submissions of the Appellant:
3. Ld. Counsel for the Appellant submits that the present Appeal arises
out of the impugned order dated 24.02.2023 passed by the Hon'ble National
Company Law Tribunal, Mumbai Bench-C-IV, whereby the Section 9
Application filed by the Appellant under the Insolvency and Bankruptcy Code,
2016 was erroneously rejected. The Adjudicating Authority, while passing the
said order, failed to appreciate that the Corporate Debtor raised a spurious
dispute regarding the quality of coal supplied, despite the existence of a
conclusive and binding report dated 11.09.2020 issued by National
Metallurgical Laboratory (NML), Jamshedpur, certifying that the coal met the
agreed calorific specifications. The rejection is completely devoid of any
judicial analysis regarding the existence or genuineness of the alleged dispute
Company Appeal (AT) (Ins.) No. 533 of 2023 -5-
and overlooks the report of NML, which was never disclosed by the Corporate
Debtor until much later during appellate proceedings.
4. Further, the date of default has been clearly set out in Part IV of the
Form 5 as well as in the Demand Notice dated 25.01.2021. It is submitted
that the default occurred on 23.03.2020, i.e., 30 days from the date of invoice
dated 22.02.2020, which falls squarely outside the moratorium period
prescribed under Section 10A of the Code. Therefore, the application under
Section 9 was maintainable in law and deserved admission.
5. Ld. Counsel submitted that the Respondent floated an e-tender on
18.11.2019 for the supply of coal, pursuant to which, the Appellant emerged
as the successful bidder on 04.12.2019 and duly deposited the Earnest Money
Deposit (EMD) of Rs. 3,87,400/-. A Purchase Order was issued on 28.01.2020
for supply of 8000 MT (±10%) coal with GCV between 2800-3400 Kcal/Kg.
The Appellant conducted tests and thereafter supplied the third consignment
of 4044.5 MT on 22.02.2020, generating an invoice of Rs. 1,83,57,886/-. The
Corporate Debtor arbitrarily rejected the consignment citing low GCV, despite
the Appellant having complied with specifications and testing protocols.
6. Ld. Counsel submits that repeated requests for resampling led to
testing by National Metallurgical Laboratory (NML), Jamshedpur on
14.08.2020. The test report dated 11.09.2020 confirmed the GCV of the
supplied coal to be 3275.6 and 3580.5 Cal/g, well within the contractually
accepted range. It is his submission that the said report was never shared
with the Appellant until 26.07.2023 and was suppressed before the NCLT.
Legal notice was issued by the Appellant on 12.11.2020, followed by the filing
Company Appeal (AT) (Ins.) No. 533 of 2023 -6-
of Section 9 Application on 27.03.2021. Arbitration proceedings were also
invoked on 22.03.2023, and Section 11 Application was allowed by Hon'ble
High Court of Orissa on 15.07.2025.
7. Ld. Counsel for the appellant points out that the Purchase Order (PO)
which forms the basis of the transaction between the parties, required the
Appellant to deposit a Security Deposit of 5% of the contract value, over and
above the EMD already paid. Clause 2 of the PO clearly stipulated that 100%
of the cost, taxes, and freight would be payable within 30 days of receipt and
acceptance of coal, failing which interest at 18% p.a. would be levied. The PO
mandated staggered delivery within 15 days of intimation.
8. Ld. Counsel submitted that the testing mechanism under Clause 3.0
provided that in case of dissatisfaction with results from IREL's lab, samples
could be tested at a government laboratory, and its results would be final and
binding. Clause 4.0 permitted rejection only if, GCV was below 2800 Kcal/Kg.
Clause 8.0 prescribed the penalty formula for shortfall in GCV and moisture
levels. These clauses, read holistically, leave no scope for unilateral testing or
arbitrary rejection by the Corporate Debtor, especially when the Appellant had
followed every contractual step, including government lab testing.
9. Ld. Counsel for the appellant asserts that the Corporate Debtor's
defence that the coal was substandard lacks credibility. The NML report dated
11.09.2020 certified that the coal had GCV readings of 3275.6 and 3580.5
Cal/g, both of which were well within the contractual range of 2800-3400
Kcal/Kg. The report was obtained through proper sampling on 14.08.2020, in
Company Appeal (AT) (Ins.) No. 533 of 2023 -7-
the presence of the Appellant's representative, and sent to an NABL-
accredited government lab, as per Clause 3.0 of the Purchase Order.
10. It is the submission of Ld. Counsel that the Corporate Debtor
intentionally withheld this report from the Appellant and chose instead to rely
on an internal and unilaterally commissioned test from CSIR Institute of
Minerals and Material Technology (IMMT), Bhubaneswar, dated 06.11.2020,
which was obtained without notice to the Appellant.
11. Additionally, the counsel pointed out that the Corporate Debtor's
assertion that the GCV was below 2800 Kcal/Kg is devoid of merit. The
consignment was accepted without protest and the rejection was
communicated only after internal testing by the Respondent, in contravention
of the Purchase Order. Clause 3.0 required sampling to be done in presence
of the Appellant's representative, and testing at either IREL's lab or
government lab. This protocol was not followed. In contrast, the Appellant
requested third-party testing and sent samples to NML, Jamshedpur--whose
results were binding but suppressed by the Respondent.
12. Ld. Counsel disputes the Respondent's assertion that even the second
consignment was below standards. Only the third consignment is in dispute.
The first two lots, delivered between 04.02.2020 and 13.06.2020, were duly
accepted and paid for without any objections. This confirms that the Appellant
was regularly supplying conforming material and the dispute regarding
quality is selective and fabricated.
Company Appeal (AT) (Ins.) No. 533 of 2023 -8-
13. Ld. Counsel vehemently denies the existence of any genuine or
documented dispute prior to the Section 8 Demand Notice dated 25.01.2021.
There is no written record of any objection to quality, testing procedures, or
invoice terms before the issuance of the notice. On the contrary, the NML
report which confirmed the coal quality was hidden by the Respondent and
disclosed for the first time only in July 2023. Therefore, the plea of pre-
existing dispute is baseless and manufactured.
14. Ld. Counsel has placed reliance on the decision of the Hon'ble Supreme
Court in Mobilox Innovations Pvt. Ltd. v. Kirusa Software Pvt. Ltd. [(2018) 1
SCC 353], which lays down that the Adjudicating Authority must determine
whether a dispute is genuine, real, and pre-existing. A mere assertion of
dispute, unsupported by prior documents, cannot defeat a Section 9
Application. The Appellant further relies on Ahluwalia Contracts v. Raheja
Developers (2019 SCC Online NCLAT 942), where this Appellate Tribunal held
that a dispute raised after the demand notice or one that lacks supporting
evidence cannot be construed as a pre-existing dispute.
15. Ld. Counsel states that this Appellate Tribunal in Henan Boom Gelatin
Co. Ltd. v. Sunil Healthcare Ltd. [2019 SCC OnLine NCLAT 5505], held that
only a credible, substantial, and genuine dispute raised prior to demand
notice would qualify under Section 8(2). The Appellant also cites Jai
International Pvt. Ltd. v. Jaroli Agro Pvt. Ltd. [2021 SCC OnLine NCLAT 442]
and Tek Travels Pvt. Ltd. v. PCM Worldwide Flights Pvt. Ltd. [2022 SCC OnLine
NCLAT 212] in support of its contention that a spurious or afterthought
defence cannot be used to defeat legitimate insolvency proceedings.
Company Appeal (AT) (Ins.) No. 533 of 2023 -9-
16. Regarding the date of default falling within Section 10A period, Ld.
Counsel for the appellant asserts that the Adjudicating Authority has gravely
erred in treating the date of default as the date of the legal notice i.e.,
12.11.2020, rather than the actual contractual date of default. As per the
invoice dated 22.02.2020 and its payment terms, the amount became due on
23.03.2020. This default date clearly falls outside the protection granted
under Section 10A, which applies only to defaults occurring on or after
25.03.2020. The Authority's finding ignores the provisions of Section 3(12) of
the Code, which defines "default" as non-payment of debt, when it becomes
due and payable. It includes even part payments or unpaid instalments.
17. It is his submission that the Adjudicating Authority, in essence, rewrote
the contract by relying on the date of legal notice as the starting point for
default, which is not tenable in law. The entire premise of rejecting the Section
9 Application under Section 10A is thus legally unsustainable and deserves
to be set aside.
18. Regarding the presence of the Arbitration clause in the Purchase
Agreement and its invocation, Ld. Counsel submitted that the existence of an
arbitration clause does not preclude the maintainability of an application
under Section 9 of the Code. The scope of the IBC is entirely distinct from
arbitration. While arbitration deals with contractual disputes, the IBC
addresses inability to pay debts and aims to preserve the economic viability
of a Corporate Debtor. Invocation of arbitration in March 2023 and even filing
of Section 11 proceedings in May 2024 does not undermine the insolvency
application already filed in March 2021.
Company Appeal (AT) (Ins.) No. 533 of 2023 -10-
19. Ld. Counsel prays that in view of the above submissions, the impugned
order dated 24.02.2023 passed by the Ld. NCLT, Mumbai Bench-C-IV be set
aside. The Appeal deserves to be allowed as the default occurred prior to
Section 10A cut-off, there is no genuine pre-existing dispute, and the
Appellant fulfilled all its contractual obligations. The Section 9 Application
may be admitted and appropriate orders for initiation of CIRP against the
Corporate Debtor be passed.
Submissions of the Respondent:
20. Per-Contra, Ld. Counsel for the Respondent stated that the facts of the
present case are very different. The Respondent is a public sector undertaking
engaged in the extraction of rare earth minerals such as Sillimanite, Zircon,
Rutile, Rare Earths, and Lanthanides, and that the Respondent was seriously
alarmed by the major discrepancies in the quality parameters of the
consignment dated 20.02.2020. Counsel further submits that the wide
variation in the calorific value and the extremely high ash content posed a
serious threat to the Respondent's furnace operations, with potential risk of
choking or damage. Counsel places on record that there are four test reports--
one conducted by an agency associated with the Appellant, one by the
Respondent's in-house lab, one by NML Jamshedpur (where the sample was
taken to the lab by the Appellant), and the fourth by CSIR-IMMT,
Bhubaneswar. Learned Counsel for the ease of reference of this Hon'ble
Tribunal, submitted the comparative data from these reports in tabular form.
21. Learned Counsel for the Respondent submits that from the comparative
analysis of test results, it is evident that there exist wide discrepancies in the
Company Appeal (AT) (Ins.) No. 533 of 2023 -11-
ash content and Gross Calorific Value (GCV). Counsel points out that these
discrepancies substantiate the Respondent's position in raising a bona fide
dispute after its lab analysis, and in rejecting the consignment after the CSIR-
IMMT report. Counsel asserts that, in such circumstances, no liability to pay
for the rejected supply arises, and the rejection is strictly in accordance with
Clause 4 of the Special Conditions of Contract.
22. Learned Counsel states that the present Appeal is nothing but a second
round of litigation instituted by the Appellant, who is a coal supplier, solely
for the purpose of seeking payment for one single lot of rejected coal, despite
the fact that several other lots had already been supplied and duly paid for
without any objection.
23. Learned Counsel submits that the Respondent has honoured all its
contractual obligations and made full payments for all other coal supplies
made by the Appellant. He further states that the only pending issue relates
to the Purchase Order dated 28.01.2020, which is the subject of the present
dispute and concerns a consignment that was rejected on quality grounds.
24. Learned Counsel further submits that the Respondent has always acted
in accordance with the terms of the agreement and has extended full
cooperation to the Appellant in relation to the testing and sampling of the coal
consignment in question.
25. He states that the Appellant has concealed a critical fact from this
Appellate Tribunal, that the Appellant had already filed a petition under
Section 11 of the Arbitration and Conciliation Act, 1996, on 05.04.2023,
Company Appeal (AT) (Ins.) No. 533 of 2023 -12-
bearing Arbitration Petition No. 40 of 2024, before the Hon'ble High Court of
Orissa. Counsel further states that the said petition pertains to the same
transaction, between the same parties, and arising out of the same dispute
that is the subject of the present appeal. Counsel draws attention to the fact
that by its order dated 15.07.2025, the Hon'ble High Court was pleased to
appoint Hon'ble Mr. Justice C.R. Dash (Retd.) as the Sole Arbitrator, thereby
affirming the subsistence of a valid arbitration agreement covering the present
dispute. Counsel also places reliance on the said order, which is annexed to
the record as Annexure - 1.
26. Learned Counsel submits that the order dated 15.07.2025 passed by
the Hon'ble High Court of Orissa reinforces the existence of factual disputes
between the parties. Learned Counsel states that since both parties had
agreed to an arbitration clause in the Purchase Order, it is only appropriate
that such disputes--especially those involving a public sector undertaking
and public funds--be resolved through arbitration and not in a summary
proceeding such as the present one under Section 9 of the Code.
27. Learned Counsel points out that the Ld. NCLT, after due consideration,
found that the Respondent had promptly disputed the quality of the coal
supplied on 20.02.2020 by way of its communication dated 25.02.2020. He
further states that the Tribunal correctly observed that the dispute
crystallised only after the Appellant issued a legal notice dated 12.11.2020,
followed by a demand notice dated 25.01.2021, which was replied to by the
Respondent on 17.02.2021. Thus, counsel submits that the date of default, if
any, falls squarely within the period protected by Section 10A of the Code (i.e.,
Company Appeal (AT) (Ins.) No. 533 of 2023 -13-
25.03.2020 to 24.03.2021), thereby rendering the application non-
maintainable.
28. It is the submission of Learned Counsel that the Appellant has failed to
point out any legal or factual infirmity in the impugned order dated
24.02.2023 passed by the NCLT, and that the findings recorded therein are
well-reasoned and fully supported by the materials on record.
29. Learned Counsel further submits that, even assuming the Appellant
had any grievance, it had already issued a notice for seeking arbitration
through its letter dated 31.05.2020 (appearing at pages 136-138 of the
Appeal), much prior to the filing of the Section 9 application under the Code.
Counsel submits that such invocation of the dispute resolution clause
precludes the Appellant from subsequently invoking insolvency jurisdiction.
30. Learned Counsel states that the Appellant's conduct amounts to a
misuse of legal process by initiating two parallel proceedings under two
separate enactments for the same cause of action viz., one under the
Arbitration and Conciliation Act and another under the Insolvency and
Bankruptcy Code.
31. Learned Counsel submits that once the Appellant had invoked
arbitration and the Hon'ble High Court had appointed an Arbitrator, there is
no legal basis for maintaining this parallel insolvency proceeding. Counsel
urges that the Appeal deserves to be dismissed on this ground alone.
Company Appeal (AT) (Ins.) No. 533 of 2023 -14-
32. In view of the foregoing submissions, Learned Counsel for the
Respondent prays that the present Appeal be dismissed with exemplary costs,
as it is frivolous, vexatious and amounts to an abuse of the process of law.
Analysis and Findings:
33. We have gone through the records of the case and heard the Ld.
Counsels of both the parties in detail. We have also gone through the Written
submissions filed by both the parties.
34. The key issue for determination in this case relates to existence of pre-
existing dispute in regard to quality of coal supplied by the Appellant, as the
appeal would not be maintainable under Section 8 (2) (a) of the Code in case
of pre-existing dispute. It is also to be determined as to whether such dispute
existed prior to the issuance of the Demand Notice.
35. The Appellant, Sendoz Commercial Pvt. Ltd., asserts that it supplied
4044.52 MT of imported Indonesian coal to IREL in accordance with Purchase
Order dated 28.01.2020 and raised an invoice dated 22.02.2020 for Rs. 1.83
crore. The Appellant alleges that the consignment was duly delivered and
accepted without protest, and that the Respondent defaulted in making the
payment despite repeated follow-ups and reminders. The Appellant contends
that the invocation of the insolvency mechanism under Section 9 was justified
in view of the non-payment of the operational debt that had crystallised after
the lapse of the 30-day credit period.
36. The Respondent, on the other hand, takes the position that the coal
consignment was clearly substandard and non-compliant with the
Company Appeal (AT) (Ins.) No. 533 of 2023 -15-
contractual specifications in terms of Gross Calorific Value (GCV) and ash
content. It is submitted that, as per Clause 3.0 of the Purchase Order, IREL
had a contractual right to inspect and test the coal and reject the same if
found unsuitable. The Clause 3.0 of the purchase order is extracted below for
reference:
"3. Tests: Tests will be carried out by IREL (INDIA) LIMITED's
Laboratory or by Third Party Agencies (testing agency) deputed by
IREL Samples may be collected from IREL (INDIA) LIMITED Plant
jointly for tests. You may depute your representative to witness sampling
of coal by IREL (INDIA) LIMITED and/or for collection of sample. If your
representative is not present at the time of collecting the sample, the sample
collected by IREL (INDIA) LIMITED's representative will be sent for testing.
The results of the test carried out at IREL (INDIA) LIMITED lab shall be
treated for adjustments in payments. Cost of collecting samples and testing
in lab shall be borne by IREL (INDIA) LIMITED. If you are not satisfied with
the test results, you may ask for referee sample to be tested in a
government lab whose results shall be final and binding. You shall have to
bear the cost of such test in the government lab and the same shall be
deposited by you to IREL (INDIA) LIMITED. Sample collection, sample
preparation, analysis and testing at destination shall be done as per latest
IS standards. (IS: 1350 latest revision)"
[Emphasis supplied]
37. It is clear from Clause 3 that the test are to be carried out in the
Respondents laboratory or in the lab of third party testing agencies. The
procedure for drawing the samples has also been laid down and it provides
for collection of samples for test in presence of both the parties provided the
supplier/ OC in this case depute his representatives for collection. In case no
Company Appeal (AT) (Ins.) No. 533 of 2023 -16-
representative of supplier/ OC is present then sample drawn by IREL India
would be sent for testing. It is clear from the aforesaid clause that the testing
was to be done in IREL lab contrary to assertion of Respondent in this regard.
The onus in this case was on Respondent to provide his representative at the
time of collection of samples. We note that samples were drawn as per the
procedure prescribed in Clause 3.
38. Para 1.4 of the scope of work document, which is part of the purchase
order as Annexure-I, lays down the quality parameters of coal to be supplied.
The same is extracted below:
39. It can be seen from the quality parameters that the Gross Calorific value
of coal supplied should be between 2800-3400 Kcal/Kg with Guaranteed GCV
of 3000. The ash content in the supplied coal had to be less than 50% by
weight. It is seen from the records that the GCV of the aforesaid consignment
of coal was 2429 Kcal/Kg and the ash content of the coal was 56.6%. The
consignment therefore failed on two critical parameters of Gross Calorific
value and ash content.
Company Appeal (AT) (Ins.) No. 533 of 2023 -17-
40. Clause 4 of the Purchase Order deals with matters relating to rejection
of coal supplies. The said clause is extracted below:
"4.0 Rejection: Coal received beyond acceptable GCV limit i.e. <2800KCal/Kg shall be rejected. No payment for rejected coal/ the logistic charges for the concerned supply shall be made, irrespective of consumption status of the rejected coal, not there shall be provision for returning the rejected coal as it is not possible to store the coal in separate identifiable lots till receipt of test reports. IREL (INDIA) LIMITED will not be held responsible or liable for any consequential losses. whatsoever, to you arising out of such an eventuality. You will be entirely responsible and liable for such eventuality."
[Emphasis supplied]
41. It is clear from the language of the Clause 4 that the coal received
beyond the acceptable calorific parameters of <2800KCal/Kg had to be
mandatorily rejected. The use of word 'shall' does not leave the respondent
with any choice except to reject the consignment. Accordingly, the entire
consignment of coal was rejected by the Respondent.
42. We further note that the rejection was formally communicated by the
Respondent through its email dated 25.02.2020. This email directly refers to
the inspection carried out and records the finding that the supplied lot had
failed the quality parameters. The said email is extracted below:
Company Appeal (AT) (Ins.) No. 533 of 2023 -18-
43. Relying on its internal lab reports dated 24.02.2020, the Respondent
rejected the consignment on 25.02.2020 by citing that the coal had a GCV of
2429 Kcal/kg and ash content of 56.6%, both of which were outside the
permissible limits of 2800-3400 Kcal/kg and 45% ± 5%, respectively. In term
of specific conditions in Clause-4 of purchase order the Respondent was left
with no other option, but to reject the consignment on quality considerations.
We note that the dispute as to quality arose immediately after supply; it was
Company Appeal (AT) (Ins.) No. 533 of 2023 -19-
genuine and consistently maintained throughout the correspondence, and
was later subjected to joint sampling and third-party testing.
44. A reading of the above clause 3 and 4 and the exchange of
communication between the Respondent and Appellant leaves no doubt that
the rejection of the consignment was carried out in strict exercise of
contractual rights and in accordance with the agreed inspection procedure.
The rejection was promptly conveyed within days of delivery, making it part
of the normal course of contractual performance, rather than a device to evade
payment.
45. We find merit in the Respondent's stand. The documents annexed with
the Appeal and Written Submissions, particularly the Purchase Order and the
emails exchanged in February 2020, confirm that the consignment was
delivered at IREL's Chavara unit on 22.02.2020 and rejected promptly on
25.02.2020 following internal lab testing. The test results revealed parameters
that were well outside the contractually agreed quality standards. There was
no delay or hesitation on the part of the Respondent in raising its objection,
and no indication of any mala fide conduct. The communication of rejection
was precise, technical, and fact-based. More importantly, the Appellant did
not dispute this rejection immediately. There was no counter-test report
submitted by the Appellant at that time, nor was any insistence made for
reconsideration or payment.
46. Further, the existence of a pre-existing dispute is evident from the
minutes of meeting dated 11.06.2020 held between the parties. These
minutes capture the differing stands on the quality findings and show that
Company Appeal (AT) (Ins.) No. 533 of 2023 -20-
the disagreement arose well before the issuance of section 8 demand notice.
Minutes of meeting have been extracted below:
Company Appeal (AT) (Ins.) No. 533 of 2023 -21-
47. As we can see from the minutes of the meeting which was attended by
two Directors of M/s Sendoz (Appellant) that the first lot of coal supplied could
not meet the specified GCV and hence was rejected by IREL lab. As per tender
conditions the supplying parties can seek referee sample from IREL for testing
at a government lab. However, the party due to Covid-19 restrictions could
not depute its personnel for same collection. The balance quantity of the
purchase order i.e. 4000 MT was supplied by the party which were found to
be as per laid down specifications in purchase order. In the aforesaid meeting
the supplier/Respondent stated that to meet the quality standards of previous
supply which could not meet the GCV norms they could blend the supplied
coal with high grade coal so as to meet the laid down GCV. The representatives
of appellant agreed to positively review the requests from Respondent side
provided they agreed to the quality control report and shall not raise any
further dispute in this regard. The respondent's representatives confirmed
that they shall put up a proposal for further action.
48. We see from the above that there was a clear-cut dispute regarding the
quality of first consignment which led to the meeting dated 11.06.2020.
Therefore, we are of the considered view that a genuine and substantial
dispute did exist.
49. What followed was a process of joint sampling initiated several months
later, in August 2020, with the mutual consent of both parties. The samples
were sent to two separate government-accredited CSIR laboratories--CSIR-
NML (Jamshedpur) and CSIR-IMMT (Bhubaneswar). The results of these tests
are extracted below:
Company Appeal (AT) (Ins.) No. 533 of 2023 -22-
50. The results were sharply inconsistent between the two CSIR labs. While
CSIR-NML reported favourable results showing GCVs above 3580.5 Kcal/kg
and acceptable ash content of 40.50%, CSIR-IMMT found the coal to have
GCV of 2053 Kcal/kg and ash content of 60.21%, which strongly corroborated
the Respondent's initial rejection. This wide variation in test results indicates
that the consignment was likely non-homogeneous, i.e., different portions of
the same consignment showed markedly different characteristics, raising
serious questions about its reliability and usability.
51. It would be important to note that IREL (India) Ltd. is a strategically
important public sector undertaking engaged in the processing of precious
and critical minerals under Ministry of Atomic Energy. It is the only company
in India which is involved in extraction and processing of Rare Earth Minerals
Company Appeal (AT) (Ins.) No. 533 of 2023 -23-
which are used in defence and high technology sectors. Such entities operate
under stringent quality and safety protocols, not merely for commercial
reasons, but to safeguard industrial processes of national significance. In
such a context, tolerance for deviation from quality is necessarily minimal,
and any non-compliance--especially in bulk fuel supplies like coal--must be
addressed with the highest degree of caution. The Respondent is, thus,
entitled to reject supplies, that do not meet the agreed specifications and such
actions on their part cannot be dismissed as a device to avoid payment.
52. We further note that the demand notice under Section 8 was issued
only on 20.11.2020 i.e., nearly nine months after the initial rejection and well
after extensive correspondence and testing had already taken place. The
entire chain of emails and letters exchanged from February to October 2020
reflect that the parties were actively engaged in resolving the quality dispute
and exploring technical verification, without any admission of liability on part
of the Respondent. This supports the conclusion that the claim was never
treated as undisputed or settled.
53. We also note that, apart from the present rejected lot, the Respondent
had accepted subsequent supplies from the Appellant and made full payment
without delay. This conduct shows there was no mens-rea or intention on the
part of the Respondent to avoid payment obligations. The withholding of
payment here is directly linked to the specific quality dispute and not to any
evasive conduct.
54. In this regard, we also take notice of the Judgment by the Hon'ble
Supreme Court in 'Mobilox Innovations Pvt. Ltd. v. Kirusa Software Pvt. Ltd.
Company Appeal (AT) (Ins.) No. 533 of 2023 -24-
[(2018) 1 SCC 353]', wherein the Hon'ble Supreme Court held that the
threshold for rejecting a Section 9 application is the mere existence of a real
dispute, not necessarily a legally correct or ultimately successful defense. If
the dispute is bona fide, based on some factual or contractual foundation,
and existed before the demand notice, the adjudicating authority must reject
the application.
55. The next issue concerns the legal effect of ongoing arbitration
proceedings between the parties in relation to the same underlying
transaction. The Appellant contends that the pendency of arbitration cannot
defeat its right under the IBC to recover its operational debt. It argues that
merely because arbitration proceedings are pending does not establish that
the debt is disputed or that the insolvency remedy becomes unavailable. The
Appellant insists that the debt remains unpaid and due, and the failure of the
Respondent to pay it amounts to a clear default under Section 3(12) of the
Code.
56. On the other hand, the Respondent submits that it is the Appellant
itself who gave their notice to invoke arbitration on 31.05.2020, concerning
the very same invoice, and filed Arbitration Petition No. 24 of 2021 before the
Hon'ble High Court of Orissa seeking appointment of an arbitrator. Vide order
dated 15.07.2025, the High Court appointed Justice C.R. Dash (Retd.) as the
sole arbitrator. The arbitration proceedings, it is submitted, are currently
ongoing and actively contested by both sides. The Respondent argues that the
existence of arbitration on the same dispute shows that the issue is not one
of insolvency but of contractual interpretation and technical adjudication.
Company Appeal (AT) (Ins.) No. 533 of 2023 -25-
57. We note that the Appellant intimated the respondent that they proposed
to invoke the Clause 12 of the purchase order i.e., the Arbitration clause
under the provisions of the Arbitration and Conciliation Act, 1996 by way of
a notice dated 31.05.2020, seeking resolution of its monetary claim arising
from the alleged non-payment of Invoice No. SCPL/2019-20/055 dated
22.02.2020. This was followed by the Appellant approaching the High Court
under Section 11 of the Arbitration Act for appointment of an arbitrator. The
Hon'ble High Court, after hearing both sides, appointed a sole arbitrator, who
is presently seized of the dispute. From the record, it is clear that the entire
controversy relating to the alleged supply, quality rejection, testing disputes,
and liability for payment is now being adjudicated through arbitration, at the
initiative of the Appellant itself.
58. We note that IREL has been very transparent in its dealing with the
appellant. The payment for subsequent consignment of coal which was found
to meet the quality parameters was made well in time which was also admitted
by the appellant. Regarding the consignment in question their stand has been
very clear that the same has to be dealt in the correct forum which is the
arbitration as per the Clause 12 of the purchase order. By no stretch of
imagination, a Public Sector Company which is solvent and working in
strategic sector of the economy can be taken to insolvency proceedings. The
aforesaid proceedings are clear-cut misuse of IBC. Hon'ble Supreme Court in
Mobilox Innovations Pvt. Ltd. v. Kirusa Software Pvt. Ltd. (supra) has also
cautioned that IBC should not be used as a coercive mechanism or a pressure
tactic to recover disputed claims.
Company Appeal (AT) (Ins.) No. 533 of 2023 -26-
59. Therefore, we hold that there existed a genuine and pre-existing dispute
between the parties regarding the quality of the coal supplied. The rejection
was timely, based on internal laboratory results and supported later by
independent lab findings. The dispute was rooted in the contractual
relationship and was raised long before the demand notice. In light of the legal
position under Section 8(2)(a) of the IBC and the settled judicial interpretation
in Mobilox (supra), the application under Section 9 was rightly rejected by
Adjudicating Authority. We, therefore, hold that the Impugned Order does not
suffer from any legal infirmity in this regard.
60. In view of the findings above, the appeal is dismissed. Pending I.As if
any, are also closed. There would be no order as to cost.
[Justice Yogesh Khanna] Member (Judicial)
[Mr. Indevar Pandey] Member (Technical)
SA/Pragya (LRA)
Company Appeal (AT) (Ins.) No. 533 of 2023
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free