Santosh R. Shetty vs Rajan Deshraj Agarwal (Rp Of Sristi ...
- CitationComp. App. (AT) (Ins) No. 1378 of 2024
Ratio decidendi
The rule this decision rests on
Ratio 1: A suspended director of a corporate debtor who is also a personal guarantor of its debt is a "person aggrieved" under Section 61(1) of the Insolvency and Bankruptcy Code, 2016, and has locus standi to maintain an appeal against orders in the corporate insolvency resolution process, because his personal assets remain exposed to enforcement by the financial creditor. Ratio 2: An application filed before the Adjudicating Authority seeking to nullify the corporate insolvency resolution process, or to revalue the corporate debtor's assets, at the stage when a resolution plan approved by the Committee of Creditors is pending before the Adjudicating Authority, and after the applicant has knowingly remained absent from the process, may be dismissed as belated; the time-bound scheme of the Code does not permit a party to remain silent through the process and then file an isolated application at the final stage. Ratio 3: Non-supply of the minutes of a Committee of Creditors meeting, where the omission is a procedural lapse that the insolvency regulator has found not to be a material irregularity, does not constitute a material irregularity under Section 61(3) of the Code sufficient to set aside the insolvency process. Ratio 4: Where valuers have been appointed by the Resolution Professional in accordance with Regulations 27 and 35 of the CIRP Regulations and have conducted the valuation in accordance with those Regulations, and the Committee of Creditors has accepted the valuation, the valuation falls within the commercial wisdom of the Committee of Creditors and cannot be reopened by the Adjudicating Authority or the Appellate Tribunal on the bare allegations of a suspended director; only valuations by IBBI-registered valuers appointed after commencement of the CIRP are relevant to the Committee's decision, and pre-CIRP valuations have no bearing. Ratio 5: A commitment letter from a prospective investor does not constitute a resolution plan; a party who does not submit an Expression of Interest or a resolution plan in the prescribed form within the statutory process cannot claim to have been denied an opportunity to submit a competing plan. Ratio 6: The Appellate Tribunal's jurisdiction under Section 61(3) of the Code is confined to the enumerated grounds (contravention of the Code or law, material irregularity by the Resolution Professional, or non-provision for operational debts); the commercial wisdom of the Committee of Creditors in approving a resolution plan, including the adequacy of the consideration offered, is non-justiciable and cannot be a ground for setting aside an approved plan, and the Adjudicating Authority's role under Section 31 is limited to verifying compliance with Section 30(2).
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Comp. App. (AT) (Ins) No. 1378 of 2024 & I.A. No. 5018 of 2024
(Arising out of Impugned Order dated 07.05.2024 passed by the Hon'ble National Company Law Tribunal, Court-V, Mumbai Bench in I.A. No. 2141/2024 in C.P. (IB) No. 518(MB) of 2022) IN THE MATTER OF: Santosh R. Shetty 603, Oyster Shell, Juhu Beach, Mumbai 400049 Email: santosh_r_shetty@yahoo.com ...Appellant Versus 1. Mr. Rajan Deshraj Agarwal Having Office At: 404, Laxmi Mall, Laxmi Industrial Estate, New Link Road, Andheri West, Maharashtra, 400053. Email: iprajanagarwal@gmail.com ...Respondent No. 1
2. Committee Of Creditors Of Sristi Hospitality Private Limited Through The Resolution Professional 404, Laxmi Mall, Laxmi Industrial Estate, New Link Road, Andheri West, Maharashtra,400053 Email: vidyesh.dalvi@saraswatbank.com, milind.gawandi@saraswatbank.com mangesh.vaidya@saraswatbank.com hemant.komre@saraswatbank.com ...Respondent No. 2
3. Consortium of Admas Industries Pvt. Ltd., Subh Ashish Exim Pvt. Ltd And Amit Jatia, Hardcastle Restaurants Pvt. Ltd., 1001-1002, Tower-3,10th Floor, Indiabulls Finance Centre, Senapati Bapat Marg, Mumbai-400013 ...Respondent No. 3 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Present For Appellants: Mr. NPS Chawla, Mr. Aarsheya Sharoa, Mr. Abhinav Mishra, Mr. Shubham Raghuwanshi, Advocates.
For Respondents: Mr. Sumant Batra, Mr. Akshay Goel, Mr. Sarthak Bhandari, Mr. Ayushman Awasthi, Ms. Riya Kaur Arora, Advocates for R-1 along with RP in person.
Mr. Rajan Agarwal, RP. Mr. Janender Kr. Chumbak, Ms. Radhika, Mr. Keshav Gaud, Advocates for R-2. Mr. Sudhir K. Makkar, Sr. Advocate with Ms. Anjali Sharma, Ms. Ragini Vinaik, Ms. Hridyaa Singh, Ms. Aadhya Shrotiya, Advocates for R-3.
With Comp. App. (AT) (Ins) No. 1383 of 2024 (Arising out of Impugned Order dated 12.07.2024 passed by the Hon'ble National Company Law Tribunal, Mumbai Bench-V in I.A. No. 3612/2022 in C.P. (IB) No. 518 of 2022) IN THE MATTER OF: Santosh R. Shetty 603, Oyster Shell, Juhu Beach, Mumbai 400049 Email: santosh_r_shetty@yahoo.com ...Appellant Versus 1. Mr. Rajan Deshraj Agarwal Having Office At: 404, Laxmi Mall, Laxmi Industrial Estate, New Link Road, Andheri West, Maharashtra, 400053. Email: iprajanagarwal@gmail.com ...Respondent No. 1
Page 2 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
2. Committee Of Creditors Of Sristi Hospitality Private Limited Through The Resolution Professional 404, Laxmi Mall, Laxmi Industrial Estate, New Link Road, Andheri West, Maharashtra,400053 Email: vidyesh.dalvi@saraswatbank.com, milind.gawandi@saraswatbank.com mangesh.vaidya@saraswatbank.com ...Respondent No. 2 hemant.komre@saraswatbank.com
3. Consortium of Admas Industries Pvt. Ltd., Subh Ashish Exim Pvt. Ltd And Amit Jatia, Hardcastle Restaurants Pvt. Ltd., 1001-1002, Tower-3,10th Floor, Indiabulls Finance Centre, Senapati Bapat Marg, ...Respondent No. 3 Mumbai-400013
Present: For Appellant Mr. NPS Chawla, Mr. Aarsheya Sharoa, Mr. Abhinav Mishra, Mr. Shubham Raghuwanshi, Advocates.
For Respondents Mr. Sumant Batra, Mr. Akshay Goel, Mr. Sarthak Bhandari, Mr. Ayushman Awasthi, Ms. Riya Kaur Arora, Advocates for R-1 along with RP in person.
Mr. Rajan Agarwal, RP. Mr. Janender Kr. Chumbak, Ms. Radhika, Mr. Keshav Gaud, Advocates for R-2.
Mr. Sudhir K. Makkar, Sr. Advocate with Ms. Anjali Sharma, Ms. Ragini Vinaik, Ms. Hridyaa Singh, Ms. Aadhya Shrotiya, Advocates for R-3.
JUDGEMENT
(14.07.2026)
1. There are two appeals filed by the Appellant i.e., Santosh R. Shetty who is
the suspended Director and Promoter of the Sristi Hospitality Private Limited
Page 3 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
under Section 61 of the Insolvency and Bankruptcy Code, 2016 ("Code") against
the Impugned Order dated 07.05.2024 passed by National Company Law
Tribunal, Court-V, Mumbai Bench ("Adjudicating Authority") in I.A. No.
2141/2022 in C.P. (IB) No. 518(MB) of 2022 and against the Impugned Order
dated 12.07.2024 passed by National Company Law Tribunal, Court-V, Mumbai
Bench ("Adjudicating Authority") in I.A. No. 3612/2022 in C.P. (IB) No.
518(MB) of 2022.
Mr. Rajan Deshraj Agarwal, who is the Resolution professional of Sristi
Hospitality Pvt. Ltd., is the Respondent No.1 herein.
Committee of Creditors of Sristi Hospitality Private Limited, is the
Respondent No. 2 herein, comprises the sole financial creditor of the Corporate
Debtor, namely Saraswat Co-operative Bank Ltd.
Consortium of Admas Industries Pvt Ltd, Subh Ashish Exim Pvt. Ltd. and
Mr. Amit Jatia, Hardcastle Restaurants Pvt. Ltd. is the Respondent No.3 herein.
2. We note that the Corporate Debtor was incorporated in the year 2003 under
the Companies Act, 1956, and is also registered as an MSME and has been
engaged in the hospitality business.
3. The Appellant contended that there existed a long-standing agreement
between the Corporate Debtor and Hardcastle Restaurants Private Limited (then
managed by Mr. Amit Jatia) since 02.12.1997 for operating a Quick Service
Restaurant (QSR) under the McDonald's franchise from the premises of the
Page 4 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Corporate Debtor. This arrangement was the primary source of rental income for
the Corporate Debtor. Similar rental arrangements existed for other floors of the
building. The Appellant alleged that Respondent No.3 was therefore deeply
involved in the affairs of the Corporate Debtor throughout the CIRP and worked
in close coordination with Respondent No.1 to manipulate the valuation of the
Corporate Debtor and to undermine the sanctity and fairness of the statutory CIRP
process.
4. The Appellant stated that being one of the promoters of the Corporate
Debtor and having deep knowledge of the hospitality business, he is intimately
familiar with the operations of the Corporate Debtor. The Corporate Debtor's
only significant fixed asset is the land and building known as Liberty Lodge,
situated at Final Plot No. 80B, Vile Parle, TPS III, City Survey No. 1217, Village
Vile Parle West, Mumbai, with a built-up area of 20,789.12 sq. ft. (referred to as
the "Subject Property"). This prime-location property houses several
restaurants, permit rooms, and other commercial activities, and the main
business of the Corporate Debtor is to rent out these spaces and maintain the
property.
5. The Appellant contended that in 2017, the Corporate Debtor had availed a
term loan from Saraswat Co-op. Bank Ltd. (the Financial Creditor) against the
mortgage of the Subject Property. The Appellant, along with other members of
the Shetty family (Mrs. Rani Shetty, Mr. Aditya Shetty, and Ms. Girvani Shetty),
had provided 100% personal guarantees for the said loan. At the time of sanction
Page 5 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
of the loan, the Financial Creditor itself had got the Subject Property valued in
November 2017 at a market value of Rs. 57.65 Crore and distress value of Rs.
46.12 Crore. It is the case of the Appellant that the valuation further increased to
Rs. 76.72 Crore in October 2020, even during the challenging times of COVID-
19, as per valuation conducted by the Appellant.
6. The Appellant submitted that although the Corporate Debtor was running
its business successfully, it faced severe financial difficulties due to grave
personal issues, particularly the prolonged and serious illness of the Appellant's
wife, Mrs. Rani Shetty (a personal guarantor), who unfortunately passed away on
14.06.2020. Consequently, the account became a Non-Performing Asset (NPA)
and SARFAESI proceedings were initiated in 2019. The Corporate Debtor had
proactively written to the Financial Creditor on 09.11.2021 expressing its
willingness to sell the Subject Property and had even suggested investment
options, but could not find suitable buyers due to the adverse impact of COVID-
19 on the hospitality sector.
7. The Appellant stated that the Financial Creditor filed an application under
Section 7 of the IBC bearing C.P.(IB) No. 518 of 2022 on 31.03.2022 claiming
an amount of Rs. 28,30,42,444.42/-. The said application was admitted by the
Adjudicating Authority on 27.02.2023, initiating CIRP.
8. The Appellant contended that after the first CoC meeting, he was
deliberately given extremely short notices of barely 24 hours for subsequent CoC
meetings, which made it practically impossible for him to attend most of the
Page 6 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
meetings. Since the CoC consisted of only one financial creditor, Respondents
No.1 and 2 exercised unchecked authority and manipulated the entire CIRP
process.
9. The Appellant submitted that Respondent No.1, in the notice for the 6th
CoC meeting dated 28.07.2023, explicitly stated that the Appellant would not be
permitted to attend the portion of the meeting where resolution plans were to be
presented and discussed. No further communication was received by the
Appellant after 05.08.2023. The Appellant raised this issue and requested minutes
of the 7th CoC meeting vide email dated 30.10.2023, but the same were never
provided by the Respondent No. 1.
10. The Appellant contended that he was also never provided with a copy of
the resolution plan under consideration, despite repeated requests vide emails
dated 30.10.2023, 30.11.2023, and 01.12.2023. the Appellant pleaded this to be
in complete violation of the provisions of the code, CIRP Regulations, and settled
judgments of the Hon'ble Supreme Court and this Appellate Tribunal, which
recognize the vital interest of suspended directors especially those who have
given personal guarantees in the resolution process. The Financial Creditor also
did not invoke the personal guarantees, as the value of the Subject Property
substantially exceeds the outstanding loan amount.
11. The Appellant submitted that the Respondent No. 1 deliberately conducted
the entire CIRP behind the back of the Appellant with the sole intention of
pushing through the sale of the Corporate Debtor to the already identified
Page 7 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
purchaser (Respondent No.3). This is evident from short notices, non-supply of
minutes, and withholding of the resolution plan. An Interlocutory Application
bearing IA No. 12 of 2024 was filed by the Appellant on 22.12.2023, which is
still pending adjudication. The Appellant became aware of the details of the
resolution plan only upon perusal of the Impugned Order.
12. The Appellant contended that the Respondent No. 1 accepted the claim of
the Financial Creditor at Rs. 29,78,73,126/- whereas the audited financial
statements of the Corporate Debtor for A.Y. 2022-2023 dated 30.10.2022 showed
a total outstanding of only Rs. 26,42,64,000/-. This unjustified inflation of Rs.
3,36,09,126/- is highly irregular and against the interests of the Corporate Debtor
and the personal guarantors.
13. The Appellant submitted that the Respondent No. 1 filed multiple
untenable applications against the Appellant alleging lack of cooperation, solely
to harass him and mislead the Adjudicating Authority, while the Respondent No.
1 himself was acting in gross violation of the Code.
14. The Appellant contended that the most serious irregularity is the deliberate
and gross undervaluation of the Subject Property orchestrated by Respondent
No.1. Earlier valuations (2017 and 2020) clearly established a much higher fair
market value (up to Rs. 76.72 Crore), yet the valuation obtained during CIRP was
manipulated to enable Respondent No.3 to acquire the prime property at a
throwaway price. This establishes collusion between Respondent No.1 and
Respondent No.3.
Page 8 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
15. The Appellant stated that the Subject Property is located in a prime
commercial area of Vile Parle West. Even the 2020 valuation conducted by the
Appellant is more than double the value offered under the approved resolution
plan of Respondent No.3. Approving such an undervalued plan is unjust, contrary
to the objectives of the code, and defeats the goal of maximization of value of
assets.
16. The Appellant submitted that he is ready and willing to offer a substantially
better resolution proposal which will ensure full repayment to creditors, protect
the interests of all stakeholders, and lead to successful revival of the Corporate
Debtor. As the ex-promoter of an MSME, the Appellant has the first right of
priority to submit a resolution plan and is best placed to revive the business given
his vast experience and proven track record in the hospitality sector.
17. The Appellant contended that Respondent No.1 has breached his statutory
duties of impartiality and has acted hand-in-glove with Respondents No.2 and 3.
The entire CIRP process has been conducted in violation of the principles of
natural justice, provisions of the IBC, and the objective of value maximization
enshrined in the Preamble of the Code. The commercial wisdom of the CoC has
been exercised in a manifestly arbitrary and prejudicial manner.
18. The Appellant stated that the resolution plan of Respondent No.3,
proposing an investment of Rs. 32.41 Crore, was approved by the CoC and the
application for approval was filed on 10.08.2023. The Adjudicating Authority
ultimately approved the plan vide the Impugned Order dated 12.07.2024. The
Page 9 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Appellant's earlier IA No. 2141 of 2024 seeking various reliefs including fresh
valuation was dismissed on 07.05.2024 on technical grounds of delay without
adjudicating the merits of the serious allegations.
19. The Appellant submitted that in view of the glaring procedural
irregularities, collusion, undervaluation, inflated claims, suppression of material
facts, and violation of natural justice, the Impugned Orders are liable to be set
aside. The CIRP process deserves to be declared null and void, and the
Appellant's superior resolution proposal should be considered in the larger
interest of maximization of value, protection of stakeholders, and revival of the
MSME Corporate Debtor.
20. Concluding his arguments, the Appellant requested this Appellate Tribunal
to set aside the impugned order and allow the appeals.
21. Per contra, the Respondent No.1 dismiss the averments of the Appellant as
misleading and baseless.
22. The Respondent No. 1 submitted that the present Appeal arises out of the
order dated 07.05.2024 passed by the Adjudicating Authority in I.A. No. 2141 of
2023 in CP (IB) No. 518 (MB) of 2022, whereby the Adjudicating Authority
dismissed the application filed by the Appellant on the ground of gross delay and
laches. It is further submitted that Respondent No. 2 had filed a Petition under
Section 7 of the Code, bearing CP (IB) No. 518 of 2022 against the Corporate
Debtor, which came to be admitted by order dated 27.02.2023. Pursuant thereto,
Respondent No. 1 was appointed as the Interim Resolution Professional ("IRP")
Page 10 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
of the Corporate Debtor. The Respondent No. 1 contended that throughout the
CIRP period, the Corporate Debtor continued to operate as a going concern and
all efforts were made by Respondent No. 1 to preserve and maximise the value of
the assets of the Corporate Debtor.
23. The Respondent No. 1 submitted that immediately upon his appointment,
a public announcement in Form A was issued on 02.03.2023 inviting claims from
all stakeholders of the Corporate Debtor. Thereafter, claims received from
financial creditors, operational creditors and other stakeholders were duly
verified and collated strictly in accordance with the provisions of the Code and
the CIRP Regulations.
24. The Respondent No. 1 submitted that claims aggregating to Rs.
32,41,40,546/- were admitted by Respondent No. 1 after due verification. The
Respondent No. 1 specifically submitted that the list of creditors was always
available in the public domain and was accessible to all stakeholders including
the Appellant. It was further contended that claims submitted by Mr. Santosh
Reddy, Mr. Aditya Shetty and Ms. Girvani Shetty could not be admitted because
despite repeated follow-ups, the claimants failed to furnish supporting documents
and requisite details substantiating their claims. The Respondent No. 1 submitted
that the rejection of such claims was never challenged before any forum and
therefore attained finality.
25. The Respondent No. 1 submitted that the CoC was constituted solely with
Saraswat Co-operative Bank Limited as the only unrelated financial creditor since
Page 11 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
the remaining financial creditors were related parties of the Corporate Debtor and
therefore disentitled from participation in the CoC under the provisions of the
Code. It was specifically contended that the constitution of the CoC was never
challenged by the Appellant during the CIRP and the Appellant cannot now seek
to question the same belatedly.
26. It was further submitted that Respondent No. 1, with due approval of the
CoC, appointed five registered valuers for conducting valuation of the assets of
the Corporate Debtor including land and building, plant and machinery and
financial assets. Thereafter, Form G was published on 16.05.2023 inviting
Expressions of Interest ("EOIs") from prospective resolution applicants.
27. The Respondent No. 1 submitted that EOIs were received from six
prospective resolution applicants, namely: (i) Consortium of Satish Manohar
Phalke & Ors.; (ii) Gala Comp.; (iii) Krishna Sheet Processors Private Limited;
(iv) Wendt Corporate Services Private Limited; (v) H.R. Commercial Private
Limited; and (vi) Consortium of Admas Industries Private Limited & Ors. It was
submitted that the list of EOIs received was duly circulated to the CoC and also
shared with the suspended directors including the Appellant by email dated
08.06.2023.
28. The Respondent No. 1 further submitted that resolution plans were
received from three prospective resolution applicants on 20.06.2023, namely: (i)
Consortium of Satish Manohar Phalke & Ors.; (ii) Krishna Sheet Processors
Private Limited; and (iii) Consortium of Admas Industries Private Limited & Ors.
Page 12 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
It was specifically contended that despite full knowledge of the CIRP process, the
Appellant neither submitted any EOI nor filed any resolution plan at any stage of
the CIRP.
29. The Respondent No. 1 submitted that after compliance with Section 30(2)
of the Code, the three resolution plans were placed before the CoC for
consideration. Ultimately, the resolution plan submitted by Respondent No. 3
came to be approved with 100% voting share in the Seventh Meeting of the CoC
held on 05.08.2023. It was further submitted that none of the unsuccessful
resolution applicants challenged the approval of the plan, thereby demonstrating
the fairness and transparency of the process conducted by Respondent No. 1.
30. It was contended that the application seeking approval of the Resolution
Plan was filed before the Adjudicating Authority on 10.08.2023. However,
despite the CIRP process having concluded in August 2023, the Appellant chose
to file I.A. No. 2141 of 2024 only in April 2024 after a delay of approximately
eight months. Respondent No. 1 submitted that the conduct of the Appellant
clearly demonstrates that the proceedings have been initiated with oblique
motives and only to obstruct the resolution process.
31. The Respondent No. 1 submitted that the entire CIRP was completed
within the statutory period of 180 days without seeking any extension. It was
further submitted that the approved Resolution Plan proposed payment of 100%
of admitted claims to all creditors except the security deposit amount of Rs. 1.25
Page 13 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Crores paid by Hardcastle Restaurant Private Limited in relation to its agreement
with the Corporate Debtor.
32. The Respondent No. 1 submitted that throughout the CIRP, the suspended
directors including the Appellant failed to cooperate despite repeated requests and
reminders. It was contended that the suspended management failed to provide
even basic records and information including signed provisional accounts up to
the insolvency commencement date, accounting software records, usernames and
passwords of statutory portals, title deeds of Liberty Lodge, approved building
plans, MSME certificate, fixed asset register and other statutory registers required
under the Companies Act, 2013.
33. The Respondent No. 1 further submitted that despite numerous emails
dated 13.03.2023, 07.04.2023, 08.04.2023, 18.04.2023, 02.05.2023 and
06.05.2023 seeking information and cooperation, the Appellant remained non-
responsive. Respondent No. 1 contended that after the first CoC meeting, the
Appellant stopped answering calls, failed to revert to communications and did not
respond to emails addressed by Respondent No. 1. In view of such continued non-
cooperation, Respondent No. 1 submitted that he was constrained to file I.A. No.
3329 of 2023 under Section 19(2) of the Code seeking necessary directions
against the suspended directors. It was submitted that despite service, the
suspended directors failed to file any reply in the said application. Ultimately, the
application came to be disposed of after the Resolution Plan had already been
filed before the Adjudicating Authority.
Page 14 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
34. The Respondent No. 1 further submitted that during the CIRP, transactions
attracting Sections 43 and 66 of the Code were noticed and accordingly the matter
was informed to the CoC and the "IBBI". A transaction auditor, namely J.C.
Kabra & Associates, Chartered Accountants, was appointed for conducting a
transaction audit. However, even the transaction auditor faced complete non-
cooperation from the suspended directors including the Appellant, thereby
causing delay in finalisation of the audit report.
35. It was submitted that upon completion of the transaction audit report dated
27.11.2023, Respondent No. 1 filed I.A. No. 5841 of 2023 under Section 43 and
I.A. No. 12 of 2024 under Section 66 of the Code for avoidance of preferential
and fraudulent transactions. The said applications are presently pending
adjudication. Respondent No. 1 submitted that the Appellant has neither appeared
nor filed replies in those proceedings till date.
36. The Respondent No. 1 submitted that nine meetings of the CoC were
convened during the CIRP and notices of the eight meetings, along with agenda,
supporting documents and virtual meeting links, were duly served upon the
suspended directors including the Appellant. However, despite receipt of notices,
the Appellant attended only the first CoC meeting and deliberately abstained from
all subsequent meetings.
37. It is contended that even when the Appellant expressed inability to attend
the Fourth CoC meeting scheduled on 12.06.2023, Respondent No. 1 personally
urged the Appellant to participate in the meetings in the interest of smooth
Page 15 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
conduct of the CIRP. Despite such requests, the Appellant voluntarily chose not
to participate and cannot now be permitted to challenge a process in which he
consciously refused to participate.
38. The Respondent No. 1 further submitted that the conduct of the suspended
management severely jeopardised the business and assets of the Corporate
Debtor. It is submitted that on 15.06.2023, demolition of unauthorised
construction at Liberty Lodge was initiated by the Municipal Corporation of
Greater Mumbai pursuant to an order dated 14.02.2023 passed by the Hon'ble
Bombay High Court. Respondent No. 1 contended that despite knowledge of the
impending demolition, the suspended directors failed to inform the Respondent
No. 1.
39. The Respondent No. 1 submitted that upon learning about the demolition,
Respondent No. 1 immediately rushed to the site and successfully intervened to
stop further demolition. Thereafter, Respondent No. 1 met officials of the
Municipal Corporation and requested that no further coercive steps be taken until
completion of the CIRP. The Appellant himself acknowledged and appreciated
the efforts taken by Respondent No. 1 through email dated 16.06.2023.
40. With regard to the allegation concerning short notice for CoC meetings, the
Respondent No. 1 submitted that Regulation 19(2) of the CIRP Regulations
expressly permits the CoC to reduce the notice period for meetings from five days
to a minimum of twenty-four hours. It was submitted that in the First CoC
Meeting held on 29.03.2023, the CoC unanimously approved reduction of the
Page 16 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
notice period to twenty-four hours with 100% voting share. Consequently, all
subsequent meetings were convened strictly in accordance with statutory
provisions and cannot be termed illegal or arbitrary.
41. The Respondent No. 1 submitted that the Appellant has failed to respond
to communications, failed to cooperate with the RP and the transaction auditor,
failed to attend CoC meetings, failed to furnish the MSME certificate and failed
to execute the required Non-Disclosure Agreement necessary for sharing
confidential resolution plans. It is further submitted that minutes of the first six
CoC meetings has already been shared with the Appellant and the omission to
share minutes of the seventh meeting was purely inadvertent error on the part of
the Respondent No. 1.
42. The Respondent No. 1 denied the allegation that the CIRP was conducted
behind the back of the Appellant. It was submitted that all notices, agendas, links
and material updates were consistently shared with the Appellant. The Appellant
had also been provided copies of the Information Memorandum, Request for
Resolution Plan ("RFRP"), Evaluation Matrix, names of registered valuers and
details of EOIs received. Respondent No. 1 submitted that the Appellant was fully
aware of every stage of the CIRP but consciously chose not to participate.
43. The Respondent No. 1 submitted that no inflated claims were admitted. It
was contended that Saraswat Co-operative Bank had initially filed the Section 7
petition for Rs. 28,30,42,444.42/- as on 31.03.2022 and subsequently filed its
claim for Rs. 29,78,73,126/- as on the insolvency commencement date in
Page 17 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
accordance with the loan documents and contractual terms. The said claim was
duly verified and admitted in accordance with law. The Respondent No. 1
submitted that the list of admitted claims formed part of every CoC agenda
circulated to the Appellant and was never challenged during the CIRP.
44. It is submitted that the Adjudicating Authority granted protection against
coercive action and subsequently the Santacruz Police Station itself closed the
complaint vide letter dated 16.01.2024, specifically observing that Respondent
No. 1 had acted in accordance with the provisions of the Code and that any
grievance of the Appellant lay before the Adjudicating Authority and not the
police authorities.
45. The Respondent No. 1 further submitted that the Appellant's allegation
regarding filing of untenable applications is misconceived. It was contended that
I.A. No. 3329 of 2023 under Section 19(2), I.A. No. 5841 of 2023 under Section
43 and I.A. No. 12 of 2024 under Section 66 were filed strictly in discharge of
statutory duties cast upon the Resolution Professional under the Code. It was
submitted that filing such applications, where circumstances warrant, is not
optional but mandatory for an insolvency professional. With regard to the
allegation of undervaluation of the assets of the Corporate Debtor, Respondent
No. 1 submitted that valuation was carried out strictly in compliance with
Regulation 35 of the CIRP Regulations through two independent IBBI registered
valuers. Since there was no substantial variance between the two valuations,
appointment of a third valuer was not required.
Page 18 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
46. It is further submitted that after the allegations raised in the present Appeal,
Respondent No. 1 sought clarification from the valuers through emails dated
01.08.2024 and both valuers reaffirmed the correctness of their valuation reports
through emails dated 09.08.2024. The Respondent No. 1 further contended that
the suspended director, Mr. Aditya Shetty, himself accompanied the valuers
during site visits and assisted them in inspection of the property.
47. The Respondent No. 1 submitted that despite the demolition issue, the
valuers did not report any downward impact on valuation. It was further
submitted that the Appellant had failed to provide title documents and approved
building plans, compelling Respondent No. 1 to obtain records from the
Municipal Corporation through the Right to Information Act. Respondent No. 1
therefore contended that every possible effort was made to preserve the value of
the assets and secure the best possible valuation for the Corporate Debtor.
48. The Respondent No. 1 denied the allegation that he acted in collusion with
Respondent Nos. 2 and 3. The Respondent No. 1 submitted that the CIRP was
conducted transparently, professionally and strictly in accordance with statutory
provisions. The Respondent No. 1 contended that the Appellant has failed to
produce even a single document evidencing collusion or misconduct. It is further
submitted that Saraswat Co-operative Bank was the sole member of the CoC by
operation of law and therefore exercised voting powers vested in it under the
Code. The Respondent No. 1 submitted that statutory powers vested in the CoC
Page 19 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
cannot be characterised as collusion merely because the Appellant is dissatisfied
with the outcome of the CIRP.
49. The Respondent No. 1 also denied the Appellant's contention that being an
MSME, the suspended management had a first right to acquire the Corporate
Debtor. The Respondent No. 1 submitted that while the Code grants limited
exemptions to MSMEs from certain disqualifications under Section 29A, there
exists no concept of "first right of priority" in favour of suspended management.
The Appellant, despite having full opportunity, neither submitted an EOI nor
participated in the resolution process and therefore cannot now seek to reopen the
CIRP.
50. The Respondent No. 1 submitted that the Adjudicating Authority dismissed
the Appellant's application on the ground of delay and laches. It is contended that
the Appellant deliberately abstained from the CIRP process and approached the
Adjudicating Authority only after the Resolution Plan had already been approved
by the CoC and placed before the Adjudicating Authority. The Respondent No. 1
further submitted that the Resolution Plan has since been approved by the
Adjudicating Authority vide order dated 12.07.2024 and therefore the present
Appeal has become entirely infructuous.
51. Concluding arguments, the Respondent No. 1 requested this Appellate
Tribunal to dismiss the appeals with cost.
52. The Respondent No. 2 submitted that the Resolution Plan was approved by
the CoC with 100% voting share after due deliberation, evaluation and exercise
Page 20 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
of commercial wisdom. It was contended that the Appellant has sought to assail
a process which was conducted transparently and strictly in accordance with the
provisions of the Code but the Appellant failed to participate in the CIRP at the
relevant time.
53. The Respondent No. 2 submitted that the Corporate Debtor, namely Sristi
Hospitality Private Limited, had approached the Respondent No. 2 seeking
financial assistance. Pursuant thereto, the Respondent No. 2 sanctioned and
disbursed financial facilities in the nature of a "Term Loan against Property"
amounting to Rs. 21,00,00,000/- and an "Overdraft against Property" amounting
to Rs. 50,00,000/-, aggregating to Rs. 21,50,00,000/-. It was submitted that the
said financial facilities were sanctioned vide sanction letter dated 31.10.2017 and
the borrower executed the requisite Loan Agreement dated 30.12.2017 in favour
of Respondent No. 2.
54. The Respondent No. 2 further submitted that the said credit facilities were
secured by creation of mortgage over the immovable property known as "Liberty
Lodge", being land admeasuring approximately 809.34 square metres together
with the building standing thereon comprising ground plus two floors situated at
Dashrathlal Joshi Road and Sarojini Road, Final Plot No. 80-B, CTS No. 1217,
TPS III, Vile Parle (West), Mumbai - 400056. It was submitted that the mortgage
dated 16.01.2018 was duly registered with the Central Registry of Securitisation
Asset Reconstruction and Security Interest of India ("CERSAI"). In addition
Page 21 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
thereto, personal guarantees were also executed by the guarantors of the
Corporate Debtor vide guarantee letter dated 30.12.2017.
55. The Respondent No. 2 submitted that despite availing substantial financial
assistance, the Corporate Debtor committed persistent defaults in repayment of
the outstanding dues. Consequently, the loan account of the Corporate Debtor was
classified as a Non-Performing Asset ("NPA") on 30.03.2019. Thereafter,
Respondent No. 2 issued a demand notice dated 11.04.2019 under Section 13(2)
of the SARFAESI Act, 2002 calling upon the Corporate Debtor to repay the
outstanding dues.
56. It was further submitted that despite issuance of the statutory notice, the
Corporate Debtor failed and neglected to liquidate the outstanding liability.
Accordingly, Respondent No. 2 took symbolic possession of the secured asset
vide possession notice dated 17.06.2019.
57. The Respondent No. 2 submitted that owing to the continued default
committed by the Corporate Debtor, it initiated CIRP proceedings under Section
7 of the Code for resolution of the outstanding financial debt amounting to
Rs. 28,30,42,444.42/-. It was contended that the said petition came to be admitted
by the Adjudicating Authority vide order dated 27.02.2023, whereby CIRP was
initiated against the Corporate Debtor.
58. The Respondent No. 2 further submitted that pursuant to the admission
order, Respondent No. 1 issued public announcement in Form A under Section 15
of the Code read with Regulation 6 of the CIRP Regulations on 02.03.2023
Page 22 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
inviting claims from creditors on or before 13.03.2023. Thereafter, the CoC was
duly constituted and in the First CoC Meeting held on 29.03.2023.
59. The Respondent No. 2 submitted that the CoC, in compliance with the
CIRP Regulations, approved appointment of six registered valuers for carrying
out valuation across different asset classes including land and building, plant and
machinery, and securities and financial assets. The valuation exercise was
conducted in accordance with Regulation 27 of the CIRP Regulations for
determination of fair value and liquidation value of the assets of the Corporate
Debtor.
60. The Respondent No. 2 submitted that the Resolution Professional invited
Expressions of Interest from prospective resolution applicants and in the Fourth
CoC Meeting held on 12.06.2023, the CoC approved the eligibility criteria,
Request for Resolution Plan ("RFRP"), Evaluation Matrix and Information
Memorandum for circulation to prospective resolution applicants. Thereafter,
three resolution plans came to be received for consideration by the CoC.
61. The Respondent No. 2 submitted that in the Seventh CoC Meeting held on
05.08.2023, the Resolution Plan submitted by the Consortium of Admas
Industries Private Limited & Ors. was approved with 100% voting share. It was
contended that the approval was granted by the CoC strictly in exercise of its
commercial wisdom after evaluating the feasibility and viability of the competing
plans.
Page 23 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
62. The Respondent No. 2 submitted that the Appellant thereafter filed I.A.
No. 2141 of 2024 before the Adjudicating Authority under Section 60(5) of the
Code seeking declaration of the CIRP as null and void, declaration that the CoC
resolutions approving Respondent No. 3 as successful resolution applicant were
void, and directions for fresh valuation of the assets of the Corporate Debtor.
However, the said application was rightly dismissed by the Adjudicating
Authority in view of the inordinate delay on the part of the Appellant, particularly
when the Resolution Plan had already been approved by the CoC in August 2023.
63. The Respondent No. 2 submitted that the Appellant never displayed any
genuine interest in participating in the CIRP. It was contended that throughout the
insolvency process, the Appellant neither cooperated with the Resolution
Professional nor took any meaningful steps to protect the interests of the
Corporate Debtor. The present Appeal has been filed only to unnecessarily delay
the implementation of the approved Resolution Plan.
64. The Respondent No. 2 further submitted that even at the stage of the
Section 7 proceedings, the Appellant neither filed any substantive reply nor raised
any valid objections before the Adjudicating Authority. Similarly, despite being
aware of the ongoing CIRP proceedings, the Appellant neither challenged the
CIRP process nor participated in the same before approval of the Resolution Plan.
65. The Respondent No. 2 submitted that the valuation process was conducted
transparently and strictly in accordance with law. It is specifically contended that
two independent IBBI registered valuers carried out valuation of the land and
Page 24 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
building assets of the Corporate Debtor. The Respondent No. 2 further submitted
that the suspended director Mr. Aditya Shetty himself participated in and assisted
the valuation exercise and was fully aware of the process undertaken by the
valuers.
66. The Respondent No. 2 submitted that the allegation regarding
undervaluation of the property is entirely baseless and unsupported by evidence.
It is contended that if the Appellant genuinely believed that the property value
was approximately Rs. 76.72 Crores as alleged, the Appellant could have either
submitted a superior Resolution Plan or introduced a prospective purchaser
willing to acquire the property at such alleged value. However, no such step was
ever taken by the Appellant during the CIRP.
67. The Respondent No. 2 further denied the allegation of collusion or
connivance between the Respondents. It is submitted that every action undertaken
by Respondent No. 2 was based upon records, documents and recommendations
placed before the CoC by Respondent No. 1 in accordance with the provisions of
the Code. The entire CIRP process was duly documented and conducted
transparently and there was no illegality, impropriety or foul play whatsoever in
the approval of the Resolution Plan.
68. The Respondent No. 2 submitted that the Resolution Plan submitted by the
Consortium of Admas Industries Private Limited & Ors. was preferred because
the said plan was commercially more viable and feasible as compared to the other
plans received during the CIRP. It is submitted that the successful resolution
Page 25 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
applicant proposed payment of 100% admitted claims to all creditors and also
proposed the shortest timeline for implementation of the Resolution Plan.
Accordingly, the CoC, in exercise of its commercial wisdom, approved the said
plan unanimously with 100% voting share.
69. The Respondent No. 2 placed reliance upon the judgment of the Hon'ble
Supreme Court in K. Sashidhar v. Indian Overseas Bank & Others wherein it was
held that once the CoC approves a Resolution Plan with the requisite majority,
the role of the Adjudicating Authority is limited only to satisfying itself that the
requirements of Section 30(2) of the Code are fulfilled. It was submitted that the
Hon'ble Supreme Court categorically held that the commercial wisdom of the
CoC cannot be interfered with except within the limited parameters prescribed
under the Code.
70. The Respondent No. 2 further relied upon the judgment passed by this
Appellate Tribunal in Committee of Creditors Through its Representative Jaga
Ath Kar v. Anil Tayal, Resolution Professional of Horizon Buildcon Pvt. Ltd.
passed in Company Appeal (AT) (Ins.) No.1633 of 2023, wherein it was held that
once a Resolution Plan has been approved, even a prayer for fresh valuation does
not merit consideration so long as the procedure prescribed under the Code has
been duly followed. Reliance was also placed upon Hem Singh Bharana v.
Pawan Doot Estate Private Limited & Anr., Company Appeal (AT) (Insolvency)
No.1481 of 2022 wherein it was held that after approval of a Resolution Plan by
the CoC, neither the CoC nor any stakeholder can be permitted to revisit or reopen
Page 26 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
the process as the timelines prescribed under the Code are required to attain
finality and certainty.
71. The Respondent No. 2 further relied upon the judgment of the Hon'ble
Supreme Court in India Resurgence ARC Private Limited v. Amit Metaliks
Limited [(2021) 19 SCC 672] wherein it was reiterated that the process of
approval of a Resolution Plan lies within the exclusive domain of the commercial
wisdom of the CoC and the scope of judicial review under Section 30(2) of the
Code is extremely limited.
72. The Respondent No. 2 also relied upon the judgment of the Hon'ble
Supreme Court in Committee of Creditors of Essar Steel India Limited (Supra)
wherein the Hon'ble Apex Court held that neither the Adjudicating Authority nor
the Appellate Tribunal can trespass upon the commercial wisdom exercised by
the CoC while approving a Resolution Plan.
73. Concluding arguments, the Respondent No. 2 requested this Appellate
Tribunal to dismiss the appeals with cost.
74. The Respondent No. 3 submitted that the Respondent No. 3 is a consortium
comprising Admas Industries Pvt. Ltd., Subh Ashish Exim Pvt. Ltd. and Mr. Amit
Jatia, and is the Successful Resolution Applicant in the Corporate Insolvency
Resolution Process of Sristi Hospitality Private Limited. The Respondent No. 3
contended that its Resolution Plan came to be approved by the Committee of
Creditors with 100% voting share after due deliberations and evaluation in
accordance with the provisions of the Code and the applicable CIRP Regulations.
Page 27 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
75. The Respondent No. 3 contended that the allegation that it worked "very
closely" with Respondent No. 1 so as to manipulate the valuation process or
compromise the sanctity of the CIRP process is entirely false and imaginary. It is
submitted that at no stage did the Respondent No. 3 interfere with, influence,
manipulate or attempt to influence the statutory process conducted by the
Resolution Professional. The Respondent No. 3 further submitted that the
Appellant has failed to produce even a single document, communication or
circumstance evidencing any alleged collusion, connivance or misconduct. Mere
allegations, however strongly worded, cannot substitute proof.
76. The Respondent No. 3 submitted that the allegation that it intended to
acquire the subject property for a "throw away price" is equally false. It is
contended that the Resolution Plan submitted by the Respondent No. 3 was
evaluated strictly in accordance with the mechanism prescribed under the Code
and the CIRP Regulations and was ultimately approved by the Committee of
Creditors exercising its commercial wisdom with 100% voting share. The
Respondent No. 3 submitted that the approved plan was found to be feasible,
viable and commercially superior to the other competing plans received during
the CIRP process.
77. The Respondent No. 3 further submitted that the records of the Committee
of Creditors meetings clearly establish that the CIRP process was conducted
strictly in compliance with the provisions of the Code, and the applicable
Regulations. It is contended that notices of meetings were duly issued to the
Page 28 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Appellant. However, despite being aware of the CIRP proceedings, the Appellant
chose not to participate in the process. The Respondent No. 3 submitted that the
Appellant himself has admitted in the Appeal that he did not attend the meetings
of the Committee of Creditors. Having remained absent throughout the process,
the Appellant cannot now be permitted to challenge the same after approval of
the Resolution Plan.
78. The Respondent No. 3 submitted that the valuation exercise was conducted
through duly appointed independent registered valuers in accordance with
Regulation 27 of the CIRP Regulations. It is contended that the CoC approved
the appointment of registered valuers and the valuation reports submitted by the
aforesaid registered valuers formed the basis for determination of fair value and
liquidation value of the assets of the Corporate Debtor.
79. The Respondent No. 3 further submitted that the statutory process for
inviting Expressions of Interest from prospective resolution applicants was duly
followed. It is contended that Form G inviting Expressions of Interest was
published on 16.05.2023 by Respondent No. 1. Thereafter, upon approval of the
eligibility criteria, issuance of Request for Resolution Plan, evaluation matrix and
Information Memorandum, the Respondent No. 3 submitted its Resolution Plan
in accordance with the prescribed procedure. The Respondent No. 3 submitted
that apart from its Resolution Plan, two additional Resolution Plans were also
received and considered by the CoC. Upon comparative evaluation, the
Page 29 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Resolution Plan submitted by the Respondent No. 3 was approved unanimously
with 100% voting share.
80. The Respondent No. 3 submitted that the approved Resolution Plan is
comprehensive, commercially viable and in complete conformity with the
requirements of Section 30(2) of the Code. It is contended that under the approved
plan, 100% of the CIRP costs admitted by the Resolution Professional are
proposed to be paid. Further, 100% of the admitted claims of the secured financial
creditor are proposed to be paid. Likewise, 100% of the admitted claims of
operational creditors are also proposed to be satisfied under the Resolution Plan.
The Respondent No. 3 submitted that the Resolution Plan contains a clearly
defined implementation schedule and adequate provisions regarding management
of affairs of the Corporate Debtor, implementation and supervision of the plan.
81. The Respondent No. 3 further contended that the Adjudicating Authority,
while approving the Resolution Plan, specifically recorded findings that the
Resolution Applicant possesses the capability and financial capacity to
implement the Resolution Plan. It is further observed that the Resolution Plan
does not contravene any provision of law, is feasible and viable, and appropriately
balances the interests of all stakeholders.
82. The Respondent No. 3 submitted that the Appellant's challenge is
essentially directed against the valuation of the assets of the Corporate Debtor.
However, once the valuation exercise has been carried out by duly appointed IBBI
registered valuers in accordance with the CIRP Regulations and accepted by the
Page 30 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Committee of Creditors, the same cannot be reopened merely on the basis of
speculative allegations. It is contended that the Code provides a complete
statutory framework governing valuation during CIRP and the said framework
was duly adhered to in the present matter.
83. The Respondent No. 3 further relied upon the judgment of this Appellate
Tribunal in Madhukar Shetty vs. Bank of Baroda and Others, reported in 2024
SCC Online NCLAT 770, wherein it was held that only the valuation conducted
by IBBI registered valuers appointed after commencement of CIRP is relevant
for consideration by the CoC. The Respondent No. 3 submitted that any valuation
conducted prior to commencement of CIRP has no relevance under the statutory
framework of the Code.
84. The Respondent No. 3 further relied upon the judgment of the Hon'ble
Supreme Court in M.K. Rajagopalan vs. Dr. Periasamy Palani Gounder & Anr.,
reported in (2024) 1 SCC 42, wherein it was held that once the CoC has
considered and accepted the valuation process, allegations subsequently raised by
erstwhile directors regarding irregularities in valuation are liable to be rejected.
The Respondent No. 3 submitted that the ratio laid down in the aforesaid
judgment squarely applies to the facts of the present case.
85. The Respondent No. 3 contended that it is now well settled that the
commercial wisdom of the CoC is paramount and cannot be interfered with
except within the limited parameters prescribed under Section 30(2) and Section
61 of the Code. It was submitted that neither the Adjudicating Authority nor the
Page 31 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Appellate Tribunal can sit in appeal over the commercial decision taken by the
Committee of Creditors after due consideration of viability, feasibility and
commercial aspects of the Resolution Plan.
86. The Respondent No. 3 submitted that the present Appeal has been filed
merely as an afterthought with the sole intention of delaying implementation of
the approved Resolution Plan and frustrating the CIRP process. The Appellant
admittedly failed to participate in the CIRP process, failed to attend meetings,
failed to submit any resolution plan and failed to raise any contemporaneous
objection during the process. Having remained completely inactive throughout
the CIRP proceedings, the Appellant cannot now seek to derail a Resolution Plan
approved unanimously by the Committee of Creditors.
87. Concluding arguments, the Respondent No. 3 requested this Appellate
Tribunal to dismiss the appeals with cost.
Findings
88. First Appeal (CA/AT/Ins/1378/2024)
We note that the Appellant has raised several issues while challenging the
impugned order dated 07.05.2024. It is the case of the Appellant that the sole
property of the Corporate Debtor was grossly and deliberately undervalued by the
registered valuers acting under the supervision of the Resolution Professional,
resulting in the Resolution Plan being approved at a value far below the actual
fair market value of the asset, thereby defeating the core objective of IBC of value
Page 32 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
maximisation. The Appellant further claimed that the claims of creditors were
inflated and manipulated during the CIRP, and that the CIRP costs themselves
were artificially enhanced. Similarly, the Appellant was denied a fair opportunity
to present a resolution plan backed by an investor's commitment letter at a value
higher than that offered by the Consortium. The Appellant alleged that the entire
CIRP was marred by gross procedural violations of the Code and ought to be
declared void ab initio. The Appellant further submitted that the Adjudicating
Authority erred in dismissing the application on the ground of delay without
examining the merits of the serious allegations raised therein.
The Second Appeal (CA/AT/Ins/1383/2024)
In the Second Appeal, the Appellant challenges the impugned order dated
12.07.2024 approving the Resolution Plan on the several grounds including that
the Resolution Plan approved by the CoC and the Adjudicating Authority does
not satisfy the requirements of Section 30(2) of the Code, particularly the
objective of maximisation of value of assets under Section 30(2)(a) of the Code,
since the Plan was based on a grossly undervalued property. It is the case of the
Appellant that the Adjudicating Authority failed to independently apply its mind
to the serious allegations of procedural irregularities and valuation manipulation
before approving the Plan under Section 31 of the Code that the Appellant
submitted that as a personal guarantor whose personal assets were attached, has
a direct and material stake in the outcome of the CIRP, and was deprived of a
meaningful opportunity to be heard prior to approval of the Resolution Plan and
Page 33 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
further the Resolution Plan as approved does not adequately provide for CIRP
costs and operational creditors in accordance with the mandatory priority
waterfall under the Code. The Appellant stated that Adjudicating Authority
committed an error in approving a Resolution Plan that was tainted by the
admitted violations of the Code.
89. Both the appeals have been heard together since they are arising from a
common set of facts and involve overlapping legal question. We also consulted
both the parties who also agreed for common judgement on both appeals. After
detailed consideration of the impugned orders, the ground of appeal, the pleadings
and the written submissions filed by the parties, we now proceed to pass this
common judgement in the following parts.
90. It is noted that the secured financial debt of Respondent No. 2 amounting
to Rs. 29,78,73,126/- stood admitted in full. In addition, thereto, operational
creditor claims including Rs. 96,37,700/- claimed by K.K. Financial Services
Limited, Rs. 89,16,408/- claimed by Touch of Class Food Private Limited, and
Rs. 31,91,120/- towards BMC Property Tax were received. Further, claims of Rs.
9,08,600/- towards water charges and Rs.1,25,00,000/- towards security deposit
paid by Hardcastle Restaurant Private Limited under the agreement were also
received. It is noted that against total claims received amounting to Rs.
33,93,74,252/-, claims aggregating to Rs. 32,41,10,546/- were admitted by the
Resolution Professional after due verification and scrutiny. The Respondents
Page 34 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
contended that the Appellant never challenged the admitted claims during the
CIRP process and cannot now seek to question the same at a belated stage.
91. Based on the pleadings, written submissions, and the record of proceedings
before us, we find that the following Issues arise for determination of these two
Appeals:
ISSUE I: Locus Standi of the Appellant
ISSUE II: Validity of the Order Dismissing I.A. No. 2141/2024 as Belated
ISSUE III Alleged CIRP Violations and Conduct of the Resolution
Professional
ISSUE IV: Valuation Challenge and Re-Valuation Request
ISSUE V: Alleged Denial of opportunities to the Appellant to submit
Resolution Plan
ISSUE VI: Scope of Review -- Commercial Wisdom of CoC and Section 31
Compliance
92. ISSUE I: Locus Standi of the Appellant
The first and threshold question is whether the Appellant as the Suspended
Director of the Corporate Debtor, constitutes a "person aggrieved" within the
meaning of Section 61(1) of the Code and thereby has the locus standi to file these
Appeals.
93. The Respondents have contended that upon admission of the CIRP, the
Suspended Director stands wholly divested of his powers under Section 17 of the
Code and has no legal interest in the resolution outcome. The Respondent
Page 35 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
pleaded that the Appellant has no locus and thus, these appeals are not
maintainable.
94. However, we find that even independently, the Appellant's position as a
personal guarantor to the Corporate Debtor's debt creates a direct and quantifiable
legal and financial stake in the CIRP outcome. His personal assets remain exposed
to enforcement by the Financial Creditor thus, prima-facie the Appellant has
locus.
95. This Tribunal is also guided by the earlier decision of Hon'ble Supreme
Court in case of Vijay Kumar Jain v. Standard Chartered Bank & nr., (2019) 20
SCC 455, wherein the Hon'ble Supreme Court held that a former director who is
also a personal guarantor is an "aggrieved person" entitled to notice and
participation in CIRP proceedings.
96. We hold that the Appellant as the Suspended Director of the Corporate
Debtor and as a personal guarantor of the debts owed to the Financial Creditor,
constitutes a 'person aggrieved' within the meaning of Section 61(1) of the Code
and has the locus standi to maintain these Appeals.
97. ISSUE II : Validity of the Order Dismissing I.A. No. 2141/2024 as
Belated
98. The Company Appeal (AT) (INS) No.1378 of 2024 challenges the
Adjudicating Authority's impugned order dated 07.05.2024 passed in I.A. No.
2141/2024 in C.P. (IV) No. 518 (MB) of 2022, which dismissed the Appellant's
application for re-valuation of the property and a declaration of CIRP as void, on
Page 36 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
the ground that it was filed belatedly i.e. after the CoC had already approved the
Resolution Plan in July 2023 and the Resolution Professional had filed the
application for approval under Section 30(6) of the Code.
99. The grievance of the Appellant is that the Adjudicating Authority declined
to examine the substantive merits of his application and dismissed it solely on the
ground of delay. The Appellant contends that the gravity of the allegations
including inflation of creditor claims and manipulation of valuation warranted a
hearing on merits irrespective of the stage at which the application was filed.
100. We find that the Appellant wrote to Resolution Professional on 30.10.2023,
almost 3 months, after the filing of IA No. 3612/2023 for approval of resolution
plan before the Adjudicating Authority requesting the Resolution Professional for
copy of I.A. No. 3612/2023, minutes of 7th CoC and copy of SRA's Resolution
Plan. The RP replied on the same day i.e., 30.10.2023. Yet the Appellant did not
file any application before Adjudicating Authority to express any grievance or
seek any relief. The orders in IA No. 3612/2023 were ultimately reserved by
Adjudicating Authority on 05.04.2024. Only after more than 8 months from
approval of resolution plan by CoC, on 24.04.2024, the Appellant filed IA No.
2141/2024 objecting to the approval of SRA's Resolution Plan by CoC in its 7th
CoC meeting. We consciously note that the Appellant was aware that orders in IA
No. 3612/2023 had already been reserved on 05.04.2024, as he was present
during the hearing. The belated filing of the said Application does not support the
Page 37 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
allegations of the Appellant, wherein the application objecting to resolution plan,
was rejected by the Adjudicating Authority.
101. We find that the Adjudicating Authority rightly dismissed IA No.
2141/2024 on the grounds of delay and that I.A. No. 3612/2023 had been heard
and orders reserved on it on 05.04.2024. It is a well-settled principle of law that
the stages of reserving and pronouncing a judgment are in a continuum with no
gap as such in the two stages. This is supported by the judgement in the case of
Loramitra Rath (Suspended director of Maa Durga Commotrade Private
Limited) versus JM Financial Asset Reconstruction Co. Limited and Anr. in
Company Appeal (AT) (INS) No. 1359 and 1360 of 2023.
102. We are unable to accept the contention of the Appellant for the reasons. As
per the scheme of the Code, as interpreted by the Hon'ble Supreme Court
consistently, places a premium on time-bound resolution of insolvency. The Code
deliberately creates a tight and tiered system of remedies at defined stages of the
CIRP. Applications before the Adjudicating Authority are required to be made at
the appropriate stage and with reasonable promptitude. It is not open to a party
who has full knowledge of the CIRP proceedings including the valuation exercise
and the CoC meetings to remain silent throughout the process and then file an
isolated application seeking to nullify the entire CIRP at the very final stage when
the Resolution Plan approved by 100% of CoC, is before the Adjudicating
Authority for approval.
Page 38 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
103. We have taken into consideration that the Appellant duly received notice
dated 04.08.2023 together with agenda and notes on agenda items, which indicate
that the Appellant was aware that in its meeting, the CoC was going to consider
the resolution plans of three resolution applicants. It has been brought out that the
Appellant did not attended the CoC meeting nor sent any communication
expressing any grievance whatsoever on the agenda or non-receipt of any
document or material including copies of resolution plan or valuation reports at
that stage. We note that the Appellant attend only 1st meetings of CoC held on
29.03.2023. He did not attend 2nd to 6th meetings held between 20.04.2023 till
28.07.2023 despite admittedly being served notices/agenda of all meetings. This
fact was not denied by the Appellant. The Appellant was also duly provided the
minutes of all earlier CoC meetings. The Appellant was aware that resolution
plans had been discussed in 6th and 7th CoC meetings held on 28.07.2023 and
05.08.2023 respectively.
104. The Hon'ble Supreme Court, in Committee of Creditors of Essar Steel
India Ltd. v. Satish Kumar Gupta, (2020) 8 SCC 531, has emphasised that the
IBC is a time-bound framework and that every participant in the CIRP process
including the promoters and directors of the corporate debtor are bound to raise
objections at the appropriate stage. Belated challenges that seek to unravel an
entire CIRP at an advanced stage cannot ordinarily be entertained, as they
fundamentally undermine the integrity and object of the Code. Incidentally, we
note for the record that even if the application had been entertained on merits, the
Page 39 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
reliefs sought therein i.e. re-valuation and declaration of CIRP as void would, not
be sustainable in law.
105. Thus, we hold that the Adjudicating Authority did not err in dismissing I.A.
No. 2141/2024 on the ground of delay. The Appellant had full knowledge of the
CIRP proceedings and the valuation exercise but chose to approach the
Adjudicating Authority at very last stage only after the CoC had approved the
Resolution Plan and was pending before the Adjudicating Authority for approval.
Such belated applications, filed at the stage of final approval, are inconsistent
with the time-bound resolution framework of the IBC and cannot be entertained.
The First Appeal on this ground fails.
106. ISSUE III Alleged CIRP Violations and Conduct of the Resolution
Professional
107. The Appellant has made many allegations of gross violations of the Code
during the CIRP by the RP, including: (i) inflation of creditor claims; (ii)
manipulation of CIRP costs through valuations of non-existent assets; (iii) denial
of the Appellant's right to propose a competing resolution plan; and (iv) non-
cooperation by the RP in providing information to the Appellant; and (v) non
sharing of Resolution Plan and valuation report; and (vi) non circulating of the
7th COC minutes ;and (vii) misconduct on the part of the RP. These allegations, if
established, could potentially attract consequences under the Code and the IBBI
(Insolvency Professionals) Regulations.
Page 40 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
108. The Appellant places reliance of the complaint filed by him before the
Insolvency and Bankruptcy Board of India, inter-alia, for not being supplied
minutes of 7th CoC meeting. It has been brought out by the Respondent that the
said complaint was filed with respect to all the issued raised by the Appellant in
the appeals before us. It is observed that the complaint dated 23.08.2024 was filed
to IBBI more than one year after the approval of the resolution plan by the CoC
as CoC approved the Resolution Plan on 27.02.2023. It is noted that on
04.02.2025, the IBBI passed an order on the complaint that non-supply of minutes
was a procedural lapse and there was no material irregularity or any violation of
the CIRP Regulations. We also find that such procedural lapse cannot be
construed as a material irregularity to discard whole CIRP proceedings.
109. In the context of approving or setting aside a Resolution Plan, this
Appellate Tribunal's jurisdiction under Section 61(3) is limited to determining
whether there has been a contravention of the Code or material irregularity in the
exercise of powers by the Resolution Professional. It is not the function of this
Appellate Tribunal to conduct a roving inquiry into the conduct of the RP on the
basis of bare allegations unsupported by contemporaneous evidence.
Incidentally, the Appellant has not challenged the IBBI order 04.02.2025 before
us, thus, the same has attained finality. Hence, on this point we do not find any
merits on the allegations of the Appellant.
110. Similarly, the Appellant could not substantiate the allegations of inflated
claims. In fact, there is only one Financial Creditor i.e., Saraswat Co-operative
Page 41 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Bank Ltd., who is Respondent No. 2 in the present appeal. We wonder how the
Appellant is aggrieved by the claims of the Bank which are based on the terms
and conditions of the Loan Agreement. It is worth reiterating that it was
Respondent No. 2 who initiated Section 7 against the Corporate Debtor for
default. We have already noted that total claims filed were of Rs. 33,92,74,252
out of which claims of Rs. 32,41,10,546 were admit4ed and even out of total these
admitted claims, the Respondent No. 3 as Financial Creditor claims were Rs.
29,78,73,126. As such, we find ourselves unable to accept allegations of the
Appellant on this ground of acceptance of inflated claims.
111. Now, we will take up the issue raised by the Appellant regarding non-
circulation of the 7th CoC minutes. It is significant to take into consideration that
despite being fully aware that a meeting of the CoC was being held on
05.08.2023, the Appellant, neither attended the meeting nor raised any objection,
and remained silent. While it is correct as informed by the Resolution
Professional that the minutes of 7th CoC meeting were inadvertently not sent to
Appellant, the Appellant was fully aware that on 10.08.2023, IA No. 3612/2023
had been filed by RP under S. 30(6) of Code seeking approval of the Resolution
Plan. The said application was taken up by the Adjudicating Authority on a
number of occasions spanning a period of over seven months. IA No. 3612/2023
was listed on 04.09.2023, 11.10.2023, 04.12.2023, 03.01.2024 and 05.04.2024.
On each of these dates, as well as on the dates when orders were reserved, the
presence of the Appellant was duly recorded. Thus, the Appellant was fully aware
Page 42 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
of the pendency of plan approval application. We are of the view that the
Appellant was indeed entitled to receive the copy of the 7th CoC Minutes. The
Appellant also filed complaint to IBBI on this issue at much later stage and IBBI
noted this as a procedural issue and did not take any action against the Resolution
Professional. We have noted that this order of IBBI has not been challenged by
the Appellant, thus attained finality. Hence, although we are of the view that the
Resolution Professional should have sent minutes of the 7th CoC Meeting to the
Appellant, however we tend to agree with IBBI findings to be a procedural lapse.
We can't treat a material irregularity.
112. We will now examine the issue of the Appellant that copies of the valuation
reports were not provided by the Resolution Professional. We note that
Regulation 35(2) of CIRP Regulations stipulates duty upon the Resolution
Professional to provide valuation reports to every member of CoC on receiving
an undertaking from the members to the effect to maintain such confidentiality.
It is the case of the Respondents that the admitted position, as apparent from a
combined reading of Section 21 and 24 of Code, that Appellant was not a member
of CoC and therefore, RP was under no obligation to provide valuation reports to
him. The valuation reports were shared with the members of the CoC on
29.07.2023, after obtaining undertaking from the members of the CoC on
26.07.2023.
113. On this issue, we are guided by the judgement of the Hon'ble Supreme
Court of India in the case of Vijay Jain (Supra) according to which the Suspended
Page 43 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
Director of the Corporate Debtor is entitled to participate the CoC meeting
provided he has complied with CIRP Regulations requirements. We have noted
that the Appellant did not attend any meeting from 2nd CoC Meeting onwards and
has also not complied with the CIRP requirements as submitted by the Resolution
Professional. Hence, while holding that the Appellant was entitled to get
valuation report and right to participate in the CoC, we do not find much merits
in the arguments of the Appellant on this ground.
114. The Respondents submitted that the present appeals are only to derail the
process, as at no stage, during the CIRP process, when the resolution plans were
being considered by CoC, the Appellant made any request to provide the copy of
the resolution plan. The Appellant was invited to all the meetings of the CoC, in
which the resolution plans were discussed, the Appellant did not attend any
meeting in which resolution plans were discussed.
115. As regard, allegation of the Appellant regarding cooperation by the
Resolution Professional, we also note that the Appellant was not cooperating with
the Resolution Professional during the CIRP and the Resolution Professional had
to file I.A. No. 3329/2023 under Section 19(2) of the Code on 20.06.2023 to seek
directions against the Appellant from the Adjudicating Authority. No other
concrete pleadings have been made by the Appellant on this account.
116. In the absence of specific, contemporaneous and cogent evidence to
substantiate the allegations of CIRP violations, this Appellant Tribunal is not in a
position to set aside a duly approved Resolution Plan by 100% majority of the
Page 44 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
CoC, only on the basis of such bare allegations by the Appellant. We note that
under Section 60(5) of the Code, the Adjudicating Authority has the jurisdiction
to entertain and decide any question of fact or law arising out of or in relation to
the insolvency resolution, but the exercise of such jurisdiction must be on the
basis of evidence properly adduced. We have gone through both the impugned
orders and do not find any apparent error as alleged by the Appellant.
117. ISSUE IV: Valuation Challenge and Re-Valuation
118. The centrepiece of the Appellant's challenge is his contention that the sole
property of the Corporate Debtor on the basis of which the entire CIRP was built
was grossly undervalued, and that the Resolution Plan was consequently
approved for a consideration that is much lower than the actual fair value of the
property, defeating the very objective of the IBC of value maximisation under
Section 30(2)(a) of the Code.
119. It is the case of the Appellant that there has been marked difference
between the valuation reports of the Pre-Cirp and Post Cirp commencement. In
this connection, we find that is it has been held the Hon'ble Supreme Court and
this Hon'ble Appellate Tribunal in a catena of decisions that if the valuers have
been appointed by the Resolution Professional in accordance with Regulation 27
and the valuations have been conducted in accordance with the CIRP Regulations,
the Adjudicating Authority and the Appellate Tribunal should not go into the
matter of valuation, as the matter falls within the domain of commercial wisdom
of the CoC. It has been further held that only the valuation conducted by IBBI
Page 45 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
registered valuers appointed post the admission of Corporate Debtor into CIRP is
required to be considered by the CoC. Any valuation conducted in the past by any
entity, for whatever purposes prior to the initiation of CIRP, does not have any
relevance for the purposes of CIRP of the Corporate Debtor. This is supported by
the judgement in the case of Madhukar Shetty vs Bank of Baroda & Anr. in
Company Appeal (AT) (INS) No. 739-740 of 2024. Similarly, we are bound to
follow our own judgement in the case of Praful Satra versus Vaishali Patrikar
& Anr. bearing Company Appeal (AT) (INS) No. 1627 of 2024 where similar
position was upheld. We are of view that the valuation is only to provide guidance
to the CoC, but the CoC is not bound by the valuation and the CoC is free to
approve resolution plan even on lower than the liquidation value. The Hon'ble
Supreme Court in the matter of Maharashtra Seamless Limited vs
Padmanabhan Venkatesh & Anr. [(2020) 11 SCC 467] in Para 29 has held
similar position.
120. For the sake of providing emphasis, it is reiterated that it has been held in
catena of judgment that the matters of valuations are the domain of the experts
and it is best left to the wisdom of the experts and methodology adopted by the
them and various factors taken in consideration. The IBC and CIRP Regulations
a sound framework for the conduct of the valuation and provide adequate
safeguards to appoint two registered valuers to determine the fair and liquidation
value of Corporate Debtor. The Resolution Professional may appoint third valuer
if the two estimates different significantly. It also gives ability to the CoC to invite
Page 46 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
the valuers to the CoC, if they require any clarifications. The CoC can also ask
for fresh valuation, if needed. In the present appeals, we note that the Resolution
Professional had appointed two valuers in accordance with Code and the CIRP
Regulations. As such, there is no case against the procedural propriety of the
conduct of the valuation process.
121. It is the case of the Appellant that during the pendency of legal proceedings,
the Appellant wrote to the Resolution Professional a letter dated 09.11.2021,
wherein the Appellant sought intervention of the Resolution Professional to sell
the property to buyer in the range of Rs.45-50 Crores and, also to find
arrangements with third parties to pay the outstanding dues. The Appellant also
contended that, in 2023, the property was attracting offers in the range ofRs.70-
80 crores. The Resolution Professional, however denied these as contradiction to
the Appellant's earlier inability to conclude a sale at Rs.45-50 crores in 2021,
despite having options to sale the property as stated in his letter dated 09.11.2021.
122. It has been brought out that the subject property is an old and depreciated
structure, originally constructed around 1950, and has suffered a continuous
decline in value over time. The Resolution Professional also brought out that the
diminishing value of the property is, in fact, the primary reason why the Appellant
has been unable to effectuate its sale since the account was classified as a Non-
Performing Asset in 2019. The Appellant's assertion that the property was capable
of fetching higher value is inherently inconsistent with the factual position. The
Resolution Professional further elaborated that had the property truly commanded
Page 47 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
such market value, the Appellant could have independently sold the same and
liquidated the outstanding dues, which by his own admission, were significantly
lower than the alleged property valuation.
123. We find reasonable merits in the contentions of the Respondents that the
property is situated in close proximity to an airport, thereby attracting stringent
regulatory and developmental restrictions imposed by the competent airport
authorities and the property has been subject to action by the municipal
authorities on account of unauthorized construction. The structure itself is
substantially aged, being over seven decades old, which materially impacts its
marketability and valuation.
124. On the legal framework for valuation, we note that Regulation 27 of the
IBBI (Insolvency Resolution Process for Corporate Persons) Regulations, 2016
("CIRP Regulations") requires the Resolution Professional to appoint two
registered valuers from the panel maintained by the IBBI. These valuers are
required to independently determine the fair value and the liquidation value of
the Corporate Debtor's assets. Under Regulation 35, the average of the two
valuations is to be adopted as the fair value and the liquidation value respectively.
125. The Hon'ble Supreme Court of India in case of Ramkrishna Forgings
Limited v. Ravindra Loonkar, Civil Appeal No. 1527/ 2022 has emphatically
held that no casual interference with the commercial wisdom of the CoC is
permissible, and that the NCLT cannot direct re-valuation of the Corporate
Debtor's assets on the basis of an objection by a party who had not raised the issue
Page 48 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
before the CoC or at the appropriate CIRP stage. The Hon'ble Supreme Court had
set aside the Adjudicating Authority order that had directed the Official
Liquidator to conduct fresh valuation prior to plan approval, holding that this was
an impermissible intrusion into the CoC's domain.
126. We take note of this settled position in law, as reflected in a consistent line
of Supreme Court authority i.e., K. Sashidhar v. Indian Overseas Bank, [(2019)
12 SCC 150] through Committed of Creditors of Essar Steel India Ltd. (Supra)
is that the commercial wisdom of the CoC in approving a Resolution Plan is non-
justiciable, and the NCLT and NCLAT are not courts of equity empowered to
second-guess the CoC's assessment of the commercial adequacy.
127. We are of the view that once the CoC is satisfied with the valuation and
has approved the Resolution Plan such allegations of raised by ex-promoter of
the Corporate Debtor, cannot be entertained. This is supported by judgement M.K.
Rajagopalan (Supra) and Ramkrishna Forgings (Supra).
128. Moreover, the past valuations of the subject property can have no bearing;
and neither can the subject property be evaluated based on valuation done during
CIRP, as sought by the Appellant. This Appellate Tribunal in earlier case of
Madhukar Shetty (Supra) and Praful Satra (Supra) has categorically held that
only the valuation conducted by IBBI registered valuers appointed post
commencement of CIRP is required to be considered by the CoC. The judgment
passed by this Appellate Tribunal in Praful Satra (Supra) has also been upheld
Page 49 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
by the Hon'ble Supreme Court vide its order dated 07.11 .2025 in Civil Appeal
No. 12613/2025.
129. The Respondent No. 2 further relied upon the judgment passed by this
Appellate Tribunal in Committee of Creditors Through its Representative Jaga
Ath Kar (Supra), wherein it was held that once a Resolution Plan has been
approved, even a prayer for fresh valuation does not merit consideration so long
as the procedure prescribed under the Code has been duly followed.
130. The further and more specific principle that emerges from the case laws is
that the valuation of the Corporate Debtor's assets, once conducted by IBBI-
registered valuers in accordance with the CIRP Regulations, and accepted by the
CoC, cannot be challenged by a suspended director or promoter at the stage of
approval of the Resolution Plan. If the CoC disagrees with a valuation, it has the
power to direct a fresh valuation. If the CoC accepts the valuation, that decision
is final for the purposes of CIRP and cannot be interfered with by the Adjudicating
Authority or even this Appellate Tribunal, or appellate authorities only on
grounds of commercial inadequacy.
131. We note that the RP has produced the two valuation reports on record. We
further notice the fair value and liquidation value were clearly determined. We
also Note the consideration in the approved Resolution Plan i.e.,
Rs. 28,30,42,444 is above the liquidation value, which is ordinarily sufficient.
The Appellant's case that the property was worth substantially more rests on his
Page 50 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
own assertion and his own valuation done. In these circumstances, the Appellant
cannot succeed on this ground.
132. In view of above detailed discussion, we hold that the valuation exercise
conducted during the CIRP was carried out by IBBI-registered valuers in
accordance with Regulations 27 and 35 of the CIRP Regulations. The CoC
accepted the said valuations and arrived at its commercial decision to approve the
Resolution Plan. The scope of judicial review under Section 61(3) of the Code
does not extend to directing fresh valuation on the basis of the Appellant's bare
allegations.
133. ISSUE V: Alleged Denial of opportunities to the Appellant to submit
Resolution Plan
134. The Appellant's contention that he was denied the opportunity to present a
competing resolution plan backed by an investor's commitment letter deserves
careful examination. The Appellant claims that a higher value was available from
an investor who was willing to acquire the Corporate Debtor's property, but that
the Resolution Professional and the CoC failed to consider this option.
135. It is noted that the Appellant never submitted any Expression of Interest
despite claiming benefits available to Micro, Small and Medium Enterprises
("MSMEs"). It is contended that if the Appellant genuinely intended to revive the
Corporate Debtor, the Appellant could have participated in the CIRP by
submitting an EOI and thereafter filing a Resolution Plan. However, the Appellant
Page 51 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
deliberately abstained from the process and chose to challenge the same only after
approval of the Resolution Plan by the CoC with 100% voting share.
136. The scheme of the Code with respect to submission of resolution plans is
governed by Section 25(2)(h) of the Code read with Regulation 36A and Form G
of the CIRP Regulations. On the facts, the Appellant has not established that he
or any investor connected to him submitted any resolution plan. Further, even if
an eligible investor was in the background, a mere commitment letter from an
investor does not constitute a resolution plan in the prescribed form. An investor
commitment letter however genuine cannot substitute for compliance with the
statutory requirements of the Code. The RP and the CoC were under no legal
obligation to entertain informal expressions of willingness as resolution plans.
The Code requires that a resolution plan be in the prescribed form be submitted
within the timelines prescribed in Form G, and comply with all requirements of
Section 30(1) and (2) of the code.
137. We note that the Supreme Court in Ebix Singapore Pvt. Ltd. v. Committee
of Creditors of Educomp Solutions Ltd. & Anr., (2022) 2 SCC 401 has held that
the Code is a complete and self-contained code in respect of resolution of
insolvency, and that parties cannot invoke equitable or extra-statutory remedies
to bypass the statutory framework of the Code.
138. It is not in dispute that the Appellant neither submitted his EOI, nor
presented a Resolution Plan before the CoC at any stage during the CIRP. In fact,
he evinced no interest whatsoever, during the course of the process and
Page 52 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
proceedings. The Appellant conceded before us that he did not attend CoC
meetings except the first CoC and he filed an application seeking revaluation of
the subject property after 8 months after the CoC had approved the SRA's plan,
and after plan approval application filed by the RP had been reserved for orders
by the Adjudicating Authority.
139. In view of above discussion, we hold that the Appellant was not unlawfully
denied an opportunity to submit a competing resolution plan. The Code provides
a specific and exclusive process for submission of resolution plans, and
participation in that process requires full compliance with the statutory eligibility
requirements under the code and the procedural requirements under the CIRP
Regulations. An investor commitment letter or informal indication of willingness
does not constitute a resolution plan. The Appellant and his alleged investor did
not submit any resolution plan through the prescribed process. Thus, this ground
fails.
140. ISSUE VI: Scope of Review -- Commercial Wisdom of CoC and
Section 31 Compliance
141. This Issue strikes at the heart of the Second Appeal
(CA/AT/Ins/1383/2024) which challenges the impugned order dated 12.07.2024
approving the Resolution Plan. The fundamental question is whether this
Appellate Tribunal, exercising appellate jurisdiction under Section 61(3) of the
Code, can set aside the Adjudicating Authority's approval of the Resolution Plan
on grounds other than those specified in Section 61(3) of the Code.
Page 53 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
142. Section 61(3) of the Code specifically provides that an Appeal under
Section 61(1) shall not lie except on the grounds that the order of the Adjudicating
Authority is against the provisions of the Code or any law for the time being in
force or there has been a material irregularity in exercise of the powers by the
Resolution Professional; or the debt owed to operational creditors has not been
provided for in accordance with the provisions of the Code.
143. Section 31(1) of the Code empowers the Adjudicating Authority to approve
a Resolution Plan that meets the requirements of Section 30(2). The Adjudicating
Authority role at this stage is limited to verifying compliance with Section 30(2)
of the Code. It is not required to and must not assess the commercial viability,
feasibility or adequacy of the consideration offered in the Resolution Plan. This
position has been consistently affirmed by the Supreme Court. In K. Sashidhar
(Supra) the Hon'ble Supreme Court of India held that the commercial wisdom of
the CoC has been given paramount status under the Code without any judicial
intervention, and that neither the NCLT nor the NCLAT has jurisdiction to reverse
the commercial decision of the CoC or to act as a court of equity. The Court
further held that there is no provision in the IBC empowering the Adjudicating
Authority to oversee the justness of the CoC's commercial decisions. Further in
Committee of Creditors of Essar Steel India Ltd. (Supra), the Hon'ble Supreme
Court definitively settled that the jurisdiction of the NCLT under Section 31 of
the Code and of the NCLAT under Section 61 of the Code is confined by the
Page 54 of 57 Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
provisions of the Code. Neither tribunal is endowed with unchartered equitable
jurisdiction to deal with resolution plans beyond the strict statutory framework.
144. We note that in case of Torrent Power Ltd. (Supra), the Hon'ble Supreme
Court reaffirmed with force that the commercial wisdom of the CoC is non-
justiciable and the judicial review under Sections 31 and 61 of the Code is
confined to statutory compliance; and that unsuccessful resolution applicants and
other stakeholders cannot reopen CoC commercial decisions through litigation
under the guise of procedural impropriety. It can be said that when commercial
decisions are subjected to expansive judicial scrutiny, resolution timelines
lengthen, transaction costs rise, and the going-concern value of the Corporate
Debtor erodes, causing tangible economic harm to all stakeholders.
145. In the present case, the Appellant has not demonstrated any specific
violation of Section 30(2) of the Code in the approved Resolution Plan. The
allegation that the plan consideration is lower than fair value goes to the
commercial wisdom of the CoC and cannot form a ground of challenge under
Section 61(3) of the Code. The Adjudicating Authority's discretion under Section
31 is circumscribed by the Code, and that the Appellate Tribunal has a limited
scope of judicial review under Section 61(3) of the Code, confined to specific
grounds such as contravention of law or material irregularity. The CoC's decision,
arrived at after thorough examination of the plan's feasibility and viability,
constitutes a collective business decision that should not be interfered with by
judicial body.
Page 55 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
146. During hearing, it has been brought out that the Resolution Plan approved
by Adjudicating Authority on 12.07.2024 has been fully implemented on
30.07.2025. The Resolution Professional has filed an application bearing IA No.
456 of 2026 before the Adjudicating Authority to take on record that the third
status report on implementation of the Resolution Plan and relieve the Applicant
from filing status report on implementation of the Resolution Plan.
147. In view of detailed discussion, we hold that the approved Resolution Plan
does not suffer from any violation of the mandatory requirements of Section 30(2)
of the Code. The CoC exercised its commercial wisdom in approving the Plan at
the negotiated consideration. This Appellate Tribunal, exercising appellate
jurisdiction under Section 61(3) of the Code, cannot sit as a court of appeal over
the commercial wisdom of the CoC or substitute its judgment for that of the
collective financial creditors. No material irregularity in the exercise of powers
by the Resolution Professional has been established. The challenge by the
Appellant do not fall within any of the permissible grounds under Section 61(3)
of the Code.
148. In view of above detailed discussions, we do not find merits in either of the
appeal. Both the appeals fail and stand dismissed.
Page 56 of 57
Comp. App. (AT) (Ins) No. 1378 of 2024 & Comp. App. (AT) (Ins) No. 1383 of 2024
149. There shall be no order as to costs. All other pending Interlocutory
Applications in these Appeals stand disposed of.
[Justice Mohammad Faiz Alam Khan] Member (Judicial)
[Naresh Salecha] Member (Technical) Sim
Page 57 of 57
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.