Ruchira Green Earth Private Limited vs Klb Komaki Private Limited
- CitationCompany Appeal (AT) (Insolvency) No. 1102 of 2025
Ratio decidendi
The rule this decision rests on
A pre-existing dispute, to defeat an application under Section 9 of the Insolvency and Bankruptcy Code, must be a genuine dispute truly existing in fact before the demand notice or the filing of the application, and not spurious, hypothetical or illusory; the test is whether a plausible contention requiring further investigation has been raised, and the Adjudicating Authority need not be satisfied that the defence is likely to succeed. Where the operational creditor's own correspondence shows that the debtor contemporaneously complained of defective goods, and the creditor admitted the defects and undertook replacement that remained unperformed, a dispute on quality and the existence of the debt is a genuine pre-existing dispute, and routine after-sales communications do not detract from that conclusion. An indemnity bond or warranty undertaking whose execution is not disputed, and whose terms bear directly on the operational debt, raises a dispute of contractual liability; a later plea that the bond was signed under coercion raises a question requiring evidence and trial, which cannot be decided in summary Section 9 proceedings.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Company Appeal (AT) (Insolvency) No. 1102 of 2025 [Arising out of the Impugned Order dated 09.06.2025 passed by the Adjudicating Authority, National Company Law Tribunal, New Delhi Bench, Court-IV in C.P. (IB) No. 870/ND/2022] In the matter of: Ruchira Green Earth Private Limited Through its Authorised Representative Mr. Paras Having Address at: 542-R Model Town, Yamuna Nagar, Haryana - 135001 ...Appellant Versus KLB Komaki Private Limited Having Address at: 10, First Floor, Rani Jhansi Road, Jhandewalan, New Delhi Central Delhi 110055 Email ID: KLBKOMAKI@GMAIL.COM .... Respondent Present: For Appellant : Mr. Anand Chhibbar, Sr. Advocate with Mr. Abhishek Anand, Mr. Karan Kohli, Mr. Vaibhav Sahni, Mr. Arjun Cbhibbar, Advocates.
For Respondent : Dr. Swaroop George, Mr. Abhinandan Jain, Mr. Sunil Roy, Mr. Shivam Prajapati, Mr. Kartikey, Advocates.
JUDGMENT
(Hybrid Mode)
Per: Barun Mitra, Member (Technical)
The present appeal filed under Section 61 of Insolvency and Bankruptcy
Code 2016 ('IBC' in short) by the Appellant arises out of the Order dated
09.06.2025 (hereinafter referred to as 'Impugned Order') passed by the
Adjudicating Authority (National Company Law Tribunal, New Delhi Bench-
IV) in C.P. (IB) No. 870/ND/2022. By the impugned order, the Adjudicating Authority has dismissed the Section 9 petition filed by the Appellant-
Operational Creditor. Aggrieved by the impugned order, the present appeal
has been preferred by the Appellant-Ruchira Green Earth Private Limited.
2. The brief factual matrix of the present case is that the Appellant-
Operational Creditor, namely, Ruchira Green Earth Pvt. Ltd. is an MSME
which was having business transactions with the Corporate Debtor-
Respondent, namely KLB Komaki Pvt. Ltd. for supply of batteries. The
Appellant had supplied batteries to the Respondent under purchase orders
raised from time to time and issued invoices for payments. Inspite of alleged
regular follow up by the Appellant, the Corporate Debtor started defaulting in
making payments from August 2022. In view of unpaid invoices, the Appellant
issued a Section 8 Demand Notice on 21.10.2022 on the Corporate Debtor.
Since the Corporate Debtor did not reply to the Section 8 Demand Notice nor
made the outstanding payments, the Appellant filed a Section 9 petition before
the Adjudicating Authority on 30.11.2022 seeking initiation of CIRP of the
Corporate Debtor. The Section 9 application was dismissed on 09.06.2025 by
the Adjudicating Authority. Assailing the impugned order, the present appeal
has been preferred by the Appellant.
3. Making his submissions, Shri Anand Chhibbar, Ld. Sr. Counsel for the
Appellant submitted that the Adjudicating Authority has erroneously
dismissed the Section 9 application by holding that there was a pre-existing
dispute between the Appellant and the Respondent. It was also submitted that
the outstanding amount was a legally enforceable operational debt as it was
supported by invoices, delivery confirmations and ledger entries. Reliance has
been placed on the judgment of this Tribunal in Naresh Choudhary Vs
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 2 of 17 Sterling Enamelled Wires Pvt. Ltd. in CA(AT)(Ins.) No. 39 of 2023 to
contend that the Section 9 petition deserves to be admitted as the Corporate
Debtor had acknowledged that an outstanding amount was due and payable
to the Operational Creditor and given an assurance to clear the said amount.
The invoices which formed the basis of the Section 9 application was
unrelated to the alleged pre-existing disputes and pertained to an entirely
separate set of invoices and transactions relating to supplies made between
April to August 2022 which had never been disputed. By conflating unrelated
transactions, the Corporate Debtor had fabricated a defence of pre-existing
dispute while in reality there was no dispute. It was contended that the alleged
dispute raised by the Corporate Debtor regarding the quality of battery
supplied was not a genuine dispute but a moonshine dispute which is
established by the fact that the Corporate Debtor even after raising complaints
had placed a high value purchase order of Rs 6.32 Cr. on 09.08.2022.
Further, the Adjudicating Authority wrongly relied on certain routine
WhatsApp communications exchanged between two employees of both parties
to hold them to be evidence of pre-existing disputes without properly
examining their relevance. The Adjudicating Authority also failed to
appreciate that the dispute raised by the Corporate Debtor that they had
indemnified themselves vide an indemnity bond was without basis since the
bond had been executed after the goods had already been supplied. The
warranty document was also not applicable since it was not formally executed
and hence could not have been treated as a ground of dispute. It was
contended that the Corporate Debtor has raised these frivolous disputes as
an afterthought to avoid discharging of their liabilities. The Ld. Sr. Counsel
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 3 of 17 also asserted that the finding of the Adjudicating Authority overlooks the
settled law laid down by the Supreme Court in Mobilox Innovations Pvt. Ltd.
Vs Kirusa Software Pvt. Ltd. (2018) 1 SCC 353 which held that a pre-
existing dispute must be genuine and one which is supported by evidence.
4. Refuting the contentions made by the Appellant, the Ld. Counsel for the
Respondent, Dr. Swaroop George submitted that the Operational Creditor had
been supplying faulty batteries which caused huge loss to the Corporate
Debtor due to resultant loss of consumer confidence in the Corporate Debtor.
Asserting that it is an irrefutable fact that regular conversation was held on
the WhatsApp Group between both parties regarding the defects in the
batteries supplied, it was added that the Operational Creditor in their
WhatsApp messages had admitted to the faults in the battery and assured to
take corrective measures. The faulty goods were however either not replaced
or even if replaced continued to remain faulty. Though the Operational
Creditor had assured to supply batteries free from any manufacturing defects
and had even given a warranty proposal of three years against all defects in
material and workmanship, the Operational Creditor did not honour the
warranty commitments. The failure on the part of the Operational Creditor to
provide after-sales service within the warranty period was yet another cause
of dispute between the parties. Further adverting attention to the indemnity
bond, it was contended that there is no crystallization of the claim and no
admission on the part of the Corporate Debtor qua the operational debt
claimed by the Appellant. Since there was no debt due or owed, the question
of default did not arise. Hence, it was contended that the Adjudicating
Authority has therefore rightly held basis the WhatsApp communications,
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 4 of 17 photographs, warranty terms and indemnity bond that there was evidence of
pre-existing dispute and therefore proceeded to dismiss the Section 9
application.
5. We have duly considered the arguments advanced by the Learned
Counsel for both the parties and perused the records carefully.
6. The short point for our consideration is whether an operational debt is
due and payable in the instant case and whether there is any pre-existing
dispute between the parties in the context of the debt in terms of the test laid
down by the Hon'ble Supreme Court in Mobilox Innovations (P) Ltd. v.
Kirusa Software (P) Ltd. (2018) 1 SCC 353.
7. It is the case of the Appellant that the Adjudicating Authority has
ignored material evidence on record that the Corporate Debtor had
acknowledged the outstanding operational debt and sent a communication
dated 16.08.2022 requesting the Appellant to send current invoices which is
a clear admission/acknowledgement of liability on their part towards the
Operational Creditor. The Adjudicating Authority had also committed an error
in ignoring the commercial conduct of both the parties which conduct does
not reveal any trace of dispute. The conduct of the Corporate Debtor by way
of placing of fresh purchase orders including a high-value purchase order of
Rs. 6.32 cr on 09.08.2022 shows that in reality there was no dispute.
Submission was also pressed that WhatsApp messages relied upon by the
Adjudicating Authority only reflected routine after-sales correspondences and
such informal grievances do not merit treatment as a genuine pre-existing
dispute envisaged under the IBC. Sans any independent test report, the
allegations of quality defects in respect of the batteries supplied by the
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 5 of 17 Appellant lacked conclusive proof. The Adjudicating Authority also failed to
appreciate that the issue of indemnity bond raised by the Respondent as a
ground of dispute was misplaced as this bond was executed after the goods
had already been supplied and therefore inapplicable in respect of the
outstanding operational debt which had already crystallised. The disputes
raised by the Respondent was therefore dubbed as moonshine dispute by the
Appellant.
8. Per contra, it is the case of the Respondent that in their reply filed to
the Section 9 application before the Adjudicating Authority they had
categorically denied and disputed the outstanding debt claimed by the
Operational Creditor. At no stage had they ever admitted the debt or assured
that necessary payments will be made to the Operational Creditor. It was
asserted that the Appellant had misconstrued the communication dated
16.08.2022 to send current invoices to be an admission/acknowledgement of
any liability on their part towards the Operational Creditor. The Learned
Counsel for the Respondent further pointed out that the Corporate Debtor
had raised issues with respect to deficient quality of battery and poor after-
sales services to the Operational Creditor from May 2022 onwards as
communicated through several WhatsApp messages from time to time. The
Operational Creditor had also admitted defects in the battery supplied by
them in their email dated 10.09.2022 and inspite of their assurances to
replace the battery did not take appropriate remedial measures in that
direction. From the contents of the above multifarious communications
available on record, it is clear that they had clearly articulated an array of
disputes arising from the warranty document, indemnity bond, defective and
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 6 of 17 faulty battery supply, denial of debt etc. It was vehemently contended that
the Adjudicating Authority not finding these disputes to be spurious, frivolous
or vexatious correctly applied the ratio of the Mobilox judgment supra in
dismissing the Section 9 application.
9. Before we deliberate on the issue at hand and weigh the rival
contentions made by both parties, it may be useful to notice the findings
recorded by the Adjudicating Authority. The relevant portions of the impugned
order are as extracted below:-
"6. ANALYSIS AND FINDINGS:
.......
iv. From the documents and submissions placed on record, it is evident that there were substantial quality issues in the batteries supplied by the Applicant, which were communicated to the Applicant at various stages starting from May 2022 as evident from the chat. The record reveals contemporaneous and repeated communications acknowledging and discussing the defects, including the Applicant's own assurances for rectification and replacement. It is also noted that the Applicant had signed an indemnity bond accepting responsibility for any fire hazards or defects, which were allegedly not honoured. The disputes cannot be termed as mere bald assertions or moonshine defences raised for the first time in response to the demand notice; rather, they appear to be genuine and pre-existing in nature.
v. The contention of the Operational Creditor that there was no such dispute is belied by the documents and communications filed by the Corporate Debtor. The Applicant's assertion in its affidavit under Section 9(3)(b) that no disputes were ever raised by the Corporate Debtor is, therefore, incorrect and appears to be a deliberate suppression of material facts. Such suppression further casts doubt on the bona fides of the Application and undermines its maintainability. Further, the cases relied upon by the Applicant are distinguishable on facts and not applicable to the present case.
(vi) These disputes in the present case are genuine and substantial, rather than being spurious, hypothetical, or illusory. It is well-settled by the Hon'ble Supreme Court in Mobilox Innovations Pvt. Ltd. v.
Kirusa Software Put. Ltd., (2018) 1 SCC 353, that if there exists
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 7 of 17 a genuine dispute prior to the issuance of demand notice, the Application under Section 9 is liable to be rejected.
(vii) In view of the above, this Adjudicating Authority finds that the existence of a pre-existing dispute between the parties serves as a valid ground for rejecting the present Application."
(Emphasis supplied)
From the above findings, we note that the Adjudicating Authority has applied
the test laid down in the Mobilox judgment supra in rejecting the Section 9
application by holding that the disputes raised by the Corporate Debtor was
both genuine and pre-existing and not spurious, hypothetical or illusory.
10. It is a well settled legal proposition that for a pre-existing dispute to be
a ground to nullify an application under Section 9, the dispute raised must
be truly existing at the time of filing a reply to notice of demand as
contemplated by Section 8(2) of IBC or even at the time of filing the Section 9
application.
11. We now proceed to examine whether in the instant factual matrix the
disputes raised by the Corporate Debtor can qualify to be treated as pre-
existing dispute which can constitute the basis for rejection of Section 9
application.
12. At the very outset we take notice that in the reply to the Section 9
application as placed at page 657 of APB, it has been clearly stated by the
Corporate Debtor that "there is no crystallisation of the claim, there is no debt
due or owed or default on the part of the Respondent and since that is sine qua
non for admission of an application under Section 9 of the Insolvency and
Bankruptcy Code 2016, the present petition deserves to be dismissed." We also
notice that the Corporate Debtor has further stated in the said reply that large
sums of money as well as replacement products are due from the Operational
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 8 of 17 Creditor and that for such reasons the Section 9 petition deserves to be
dismissed. Further the Appellant vide their WhatsApp message of 10.09.2022
had not only assured to resolve the complaints raised by the Respondent
regarding the batteries supplied by them on account of FRC (Fire Related
cases) but also admitted that more than Rs. 3 crores worth of batteries were
defective. Further, a few days before the Appellant sent the demand notice,
the Respondent had communicated to the Appellant that the replacement
batteries supplied were also defective. This by itself shows that the debt
amount was yet to crystallise and this coupled with the fact that the Appellant
had failed to replace the batteries by the time the demand notice was sent
clearly shows that there were pre-existing dispute between the two parties.
13. Having noticed that the Corporate Debtor has denied the existence of
debt qua the Appellant, we now proceed to examine the tenability of the
argument canvassed by the Corporate Debtor that the claim of Operational
Creditor had not crystallized since the transactions with the Operational
Creditor was embroiled in dispute. It is an indisputable fact that the Corporate
Debtor had placed purchase order of batteries on them between October 2021
to December 2021. The Corporate Debtor had purportedly received
complaints of manufacturing defects and quality issues from their
consumers/dealers of the batteries being sub-standard. This supply of
defective batteries was communicated on 29.12.2021 to the Operational
Creditor, a fact which has not been denied by the Appellant as noticed at page
727 of Appeal Paper Book (APB). Following the complaint, as per the
Corporate Debtor, an Engineer of the Operational Creditor carried out an
inspection and assured to replace the defective batteries but backtracked
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 9 of 17 thereafter and replaced only limited number of batteries which also turned
out to be defective. To the contrary, the Appellant in their Rejoinder Reply to
the Section 9 application admitted that while they had received this message
of defective batteries from the Corporate Debtor, they had replaced all
defective batteries prior to sending of Demand Notice and that the complaints
stood closed.
14. Quite clearly, there is clear difference of standpoint between the
Corporate Debtor and the Operational Creditor as to whether the complaint
with respect to defective batteries was a continuing dispute as claimed by the
Corporate Debtor or the same stood resolved with replacement of defective
battery as claimed by the Appellant.
15. When we further examine the exchange of correspondence between the
two parties, we find that the Respondent had informed the Appellant on
16.05.2022 that batteries 72*39 had got burnt due to the excessive increase
in temperature of battery on account of manufacturing defects. This was
reiterated through WhatsApp messages on 05.06.2022, 06.06.2022 and
07.06.2022 as placed at page 686-688 of APB. On 07.06.2022 we also find
that the Appellant apologized for the defects and admitted to the deficiency
besides agreeing to replace them as a corrective measure. Similar chats
continued to be exchanged in the subsequent months including short-
circuiting of batteries and fire related cases allegedly posing as hazard to life
and property as placed at pages 693, 698-699 of APB. The dispute between
them seemed to have reached a head in September-October 2022 as is evident
from the tone and tenor of messages exchanged as extracted below:
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 10 of 17 (On 10.09.2022)
Corporate Debtor: Replace all 600 batteries of December month with new batteries. Reason for ask - Multiple FRC cases for the same lot of December.
Operational Creditor: First of all, we want to say we stand by with every request Komaki makes and are ready to replace each and every battery to gain your trust and customer satisfaction. We have already given 135 new batteries till date for that lot. And are prepared to give the remaining amount as well. We have a couple of requests from our side.
1. Based on our learnings, we want to give new batteries only with Software BMS to ensure extra safety and better performance. We request Komaki to help us out with the additional cost.
2. Given the replacement will directly impact us with over 3 Cr hit, we request to increase our business with Komaki to the maximum possible so that we can cover for these losses in coming months.
(On 21.09.2022)
Corporate Debtor: What about 250 pcs replacement batteries you committed in our office las Week.
Operational Creditor: We have started production last week. Batteries are getting ready.
Operational Creditor: 250 pcs replacement had to reach us by last week end but nothing sent till today.
(On 17.10.2022) Corporate Debtor: These batteries provided by you are garbage replacement.
(Emphasis supplied)
16. It is also clear from the above messages that the Respondent was
consistently badgering the Appellant about defective batteries supplied by
them and insisted on their replacement. Even before the demand notice was
issued on 21.10.2022, the Corporate Debtor had sent a terse message to the
Appellant that even the replaced batteries were faulty and were like "garbage".
The Appellant never denied the exchange of these chats. We also notice that
the Appellant had recognised the need to replace the batteries though they
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 11 of 17 also tried to slip in issues relating to additional costs etc. Further when we
see the Rejoinder Reply of the Appellant to the Section 9 application, we find
that the Operational Creditor took a contrary stand and stated that they had
never apologized for supply of faulty battery but that they had only expressed
their concern as a gesture to retain the Corporate Debtor as their customer.
It was also their contention that necessary remedial measures had been taken
by them and that the complaint stood closed. We also find that the Appellant
had thus tried to impart a new dimension and perspective to their email and
WhatsApp messages which was different from how the messages were
contemporaneously understood by the Corporate Debtor at the time when
these messages were exchanged. All this when seen cumulatively together
display a clear sign of pre-existing dispute between the two parties. Given this
scenario, the reliance placed on Naresh Choudhary judgement supra by
the Appellant is misplaced since in the present case, the facts are
distinguishable in that the Corporate Debtor had not acknowledged any
outstanding debt while sending the WhatsApp messages articulating
disputes.
17. Thus, to return our findings, we are of the view that by no stretch of
imagination can the regular exchange of these WhatsApp chats on the quality
of battery supplied and the replacement modalities of defective batteries can
be treated as mere routine business communications lacking the flavour of
pre-existing dispute.
18. We find that the Corporate Debtor has also raked up the issue that the
Appellant had given a warranty policy of 3 years vide email dated 22.04.2021
which had been breached by the Appellant. We find the email conveying the
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 12 of 17 "Warranty of 3* years 750-800 lifecycles" at page 680 of APB. When we look
at this Warranty document, we notice that Clause 2 provided warranty against
all manufacturing defects in material and workmanship of the batteries. The
warranty was to start from the date of the billing and it is the contention of
the Corporate Debtor that only on the basis of the said warranty that they
began to place orders for batteries. It is pertinent to notice that the warranty
document also pre-dates the issue of Demand Notice. At page 808 of APB, we
also notice that the Respondent had messaged the Appellant to follow the
warranty terms which had been "mutually decided" to which the Appellant
had given an affirmation to surely follow the terms of the warranty proposal.
It is equally pertinent to note that that the Appellant has not controverted the
email or the WhatsApp chats on the warranty document. However, it has been
subsequently contended by the Appellant that this warranty document was
only a draft proposal which was yet to be formally signed and accepted by
both the sides and hence placing any reliance on the same is misplaced.
Without getting into finding out as to whether the warranty was actually
executed or not, we nevertheless would like to observe that the applicability
of the warranty had become a bone of contention between the two parties and
this by itself goes into the root of the matter as a pre-existing dispute.
19. It is also contended by the Corporate Debtor that the Appellant also
undertook by way of a duly signed and stamped Indemnity Bond dated
27.08.2022 that the Appellant would be liable for all repairs/replacement of
the defective batteries already supplied, under supply and to be supplied in
the future as well and that the Appellant shall compensate the Respondent
for any losses caused due to the faulty batteries supplied by the Appellant.
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 13 of 17 The relevant clauses of the Indemnity Bond as placed at page 70 of APB are
as extracted below:
WHEREAS, Indemnifier has assured Indemnified that the batteries (for electric vehicle) so already supplied and still being supplied and to be supplied in the future by Indemnifier were/are/ will be of good quality and there are no issues in the said batteries. That, believing the above representations and assurances of the Indemnifier, the Indemnified has purchased and continues to purchase the batteries so supplied by the Indemnifier and has further sold and continues to sell the said batteries along with its E-Vehicles(battery-operated).
2. That, the Indemnifier agrees and undertakes that, in case the end customer/dealer/distributor of the Indemnified approach the Indemnified in regard to any repair of faults/defects, fire issues, exchange, replacement etc, of the said batteries within the warranty period of 39 months from the date of sale of batteries by the Indemnified to its end-customers/dealers/distributors etc, then, in that case, the Indemnifier shall be solely responsible for the repair of faults/defects, fire issues, exchange, replacement etc of the said batteries and the Indemnifier shall keep the Indemnified absolutely indemnified in the events above and the Indemnified shall have absolutely no liability towards any person. KLB/Indemnified shall return the said faulty batteries to the Indemnifier by raising an Invoice on the Indemnifier and the Indemnifier shall be bound to honour the said Invoice/s and shall buy back the said faulty batteries from KLB/Indemnified within 24 hours of receipt of such Invoice from the Indemnified. The Indemnifier agrees and undertakes to repair the said returned batteries or in case of irreparable faults, the Indemnifier undertakes to replace the said batteries with new batteries, in either case keeping KLB indemnified, against any claims in regard to the said batteries. The Indemnifier shall and undertakes to bear the losses/damages etc in case of any fire issues in the batteries and to provide necessary requisite servicing/service in regards to the said batteries.
(Emphasis supplied)
20. From a plain reading of the above clauses of the Indemnity Bond, it is
clear that that the Appellant would be liable for all repairs/replacement of the
batteries for a warranty period of 39 months from the date of invoice including
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 14 of 17 the batteries already sold. Nothing has been placed on record by the Appellant
to establish that the indemnity bond was not signed by them. Nothing on
record shows that any steps were taken by the Appellant to
contemporaneously seek cancellation of the indemnity bond. However, in
their Rejoinder Reply to the Section 9 application it has been belatedly
contended that indemnity bond was signed under coercion and duress that
further payments would not be released until the Appellant had signed the
bond. When the signing of the indemnity bond by the Appellant as such is not
disputed, for the Appellant to subsequently contend that this was signed
under intimidation and not out of free-will is a matter that would clearly
require deeper investigation and trial which is clearly beyond the scope of
summary proceedings under IBC. Hence the Adjudicating Authority did not
commit any error in holding the indemnity bond to be another ground of pre-
existing dispute and factoring the same in rejecting the Section 9 application.
21. At this stage, we may refer to paragraph 51 of the judgment of the
Hon'ble Supreme Court in Mobilox judgment supra wherein it has been held
that Adjudicating Authority while rejecting a Section 9 application has to only
notice whether there is a dispute pending between the parties which dispute
warrants further investigation. In paragraph 51, the following was laid down:
"51. It is clear, therefore, that once the operational creditor has filed an application, which is otherwise complete, the adjudicating authority must reject the application under Section 9(5)(2)(d) if notice of dispute has been received by the operational creditor or there is a record of dispute in the information utility. It is clear that such notice must bring to the notice of the operational creditor the "existence" of a dispute or the fact that a suit or arbitration proceeding relating to a dispute is pending between the parties. Therefore, all that the adjudicating authority is to see at this stage is whether there is a plausible
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 15 of 17 contention which requires further investigation and that the "dispute"
is not a patently feeble legal argument or an assertion of fact unsupported by evidence. It is important to separate the grain from the chaff and to reject a spurious defence which is mere bluster. However, in doing so, the Court does not need to be satisfied that the defence is likely to succeed. The Court does not at this stage examine the merits of the dispute except to the extent indicated above. So long as a dispute truly exists in fact and is not spurious, hypothetical or illusory, the adjudicating authority has to reject the application."
22. It is well settled that in Section 9 proceedings, the Adjudicating
Authority is not supposed to enter into final adjudication with regard to
existence of dispute between the parties regarding operational debt. What has
to be looked into is whether the defence raises a dispute which needs further
adjudication by a competent court. Disputes pertaining to contractual issues
are not to be resolved in Section 9 proceedings. On hearing both the parties
and perusing the documents/materials placed on record, we are satisfied that
the Adjudicating Authority did not commit any error in finding the defence
raised by the Corporate Debtor not to be one in the nature of being a patently
feeble legal argument or being a hypothetical assertion unsupported by
evidence.
23. The Adjudicating Authority therefore did not commit any error rejecting
the Section 9 application after noticing the voluminous exchange of chat and
email communications between the Corporate Debtor and Operational
Creditor spread over a long period of time on the supply of defective goods,
which clearly establishes that there were serious differences between them in
the nature of real pre-existing disputes. If we apply the test laid down in
Mobilox judgement supra to the facts of the present case it is clear that the
defence raised by the Corporate Debtor in their reply filed in Section 9
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 16 of 17 application is not illusory or moonshine. For such disputed operational debt,
Section 9 proceeding under IBC cannot be initiated at the instance of the
Operational Creditor.
24. For the foregoing reasons, we are of the considered view that the
Adjudicating Authority has rightly dismissed the application of the Appellant
filed under Section 9 of IBC. We are satisfied that the impugned order does
not warrant any interference. We however make it clear that in the event the
Appellant seeks remedy before any other appropriate forum, it shall be open
for the Appellant to do so in accordance with law. There is no merit in the
Appeal. The Appeal is dismissed. No order as to costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
Place: New Delhi Date: 07.08.2025
Abdul/Harleen
Company Appeal (AT) (Insolvency) No. 1102 of 2025 Page 17 of 17
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free