Rohit Suri vs Rajasthan Financial Corporation
- CitationCompany Appeal (AT) (Ins) No. 1123 of 2024
Ratio decidendi
The rule this decision rests on
Where a financial creditor's Section 7 petition under the Insolvency and Bankruptcy Code is challenged as time-barred, the limitation period for such a petition is extended by three years from the date of the debtor's written acknowledgment of liability, where that acknowledgment is made within the limitation period (Section 18 of the Limitation Act, 1963), so that a debtor's repeated one-time settlement proposals, the last made within three years of the petition's period expiring, keep the claim alive. The limitation period so computed is further extended by the Supreme Court's suo motu order of 10.01.2020 in Writ Petition (C) No. 3 of 2020, which excluded the period from 15.03.2020 to 28.02.2022 from the computation of limitation for filing applications and suits; a petition filed within the period so extended is not time-barred. Where the respondent has been given repeated opportunities to file a rejoinder and does not contest the facts asserted in the reply, the tribunal may take those unrebutted facts into consideration in deciding the limitation issue.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
(Arising out of the Order dated 17.05.2024 passed by the National Company Law Tribunal, Jaipur Bench in MA (IB) No. 07/JPR/2024 IN IA No. 656/JPR/2023 & CP No. (IB)-84/7/JPR/2021)
IN THE MATTER OF:
Rohit Suri (suspended director of corporate debtor) Aged about 50 years, presently residing at : 484, Nemi Sagar Colony, Vaishali Marg, Jaipur- 302021 (Rajasthan) ...Appellant Versus
1. Rajasthan Financial Corporation, An entity corporate under the provisions of the State Finance Corporation Act, 1951 Situates its office at Udyog Bhawan, Tilak Marg, Jaipur-302005 (Rajsthan) [plverma@rfc.rajasthan.gov.in] ...Respondent No. 1
2. Ms. Garima Diggiwal, Interim Resolution Professional of the corporate debtor, situates its office at 91, Moji Colony, Malviya Nagar, Jaipur-302017 (Rajasthan) [garima286@gmail.com] ...Respondent No. 2
Present For Appellants: Mr. Naresh Kumar Sejvani, Advocate.
For Respondents: Mr. Manit Moorjani & Ms. Manjeet Kaur, Advocates for R-1 Mr. Ashwani Kumar Singla, Ms. Garima Diggiwal (IRP), for R-2. Comp. App. (AT) (Ins.) No. 1123 of 2024
JUDGEMENT
( 03.04.2025)
NARESH SALECHA, MEMBER (TECHNICAL)
1. The present appeal has been filed under Section 61 of the Insolvency and
Bankruptcy Code, 2016 ('Code') by the Appellant i.e., Mr. Rohit Suri, Suspended
Director of Amay Home Services Limited (hereinafter referred to 'Corporate
Debtor') against the Impugned Order 17.05.2024 passed by the National
Company Law Tribunal, Jaipur Bench ('Adjudicating Authority') in Company
Petition bearing CP (IB) No. 84/7/JPR/2021.
2. The Rajasthan Financial Corporation (Financial Creditor) is the Respondent
No. 1 herein.
3. Ms. Garima Diggiwal, the Interim Resolution Professional (IRP), is the
Respondent No. 2 herein.
4. It is noted that Respondent No. 1 filed a Company Petition (IB) No.
84/7/JPR/2021 on 12.08.2021 alleging that during the Financial Year 2007-08,
the Corporate Debtor requested a loan facility of Rs. 10 Crores for the purpose of
purchasing land and developing a residential complex. The Respondent No. 1
submitted that on 27.11.2008, it dispersed a loan of Rs. 7.25 Crores, released in
various instalments between 01.12.2008 and 05.03.2009.
5. On failure on the part of the Corporate Debtor for repayment, the
Respondent No. 1 took physical possession of the mortgaged property under
Section 29 of State Financial Corporation Act, 1951 and later issued an auction
Page 2 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
notice for 16.06.2010. This auction notice was challenged by several
homebuyers/allottees before the Hon'ble Rajasthan High Court via writ petitions,
resulting in an ex-parte stay order on auction proceedings. It has been submitted
by the Appellants that despite directions from the Hon'ble High Court to consider
settlement proposals submitted by the Corporate Debtor on multiple occasions,
the Respondent No. 1 rejected these proposals outright without consideration and
failed to initiate any recovery proceedings within the limitation period under
applicable laws, leading to the present dispute regarding limitation in initiating
Corporate Insolvency Resolution Process ('CIRP').
6. The Appellant submitted that the Respondent No. 1 filed Company
Petition CP (IB) No. 84/7/JPR/2021 on 12.08.2021, which is barred by limitation.
The Appellant submitted that the Respondent No. 1 sought multiple extensions to
file a rejoinder on 01.06.2023, 17.07.2023, and 25.09.2023 but did not submit any
rejoinder. The Appellant submitted that during the hearing on 19.01.2024, the
Respondent No. 1 sought time to file an application under Section 5 of the
Limitation Act, 1963, which was allowed, and subsequently the Respondent No.
1 filed Miscellaneous Application No. 07/2024 seeking condonation of delay.
7. The Appellant contended that the Adjudicating Authority erroneously
condoned the delay in filing the Company Petition bearing CP (IB) No.
84/7/JPR/2021, which was filed on 12.08.2021 for a default that occurred on
13.01.2010, making it barred by limitation. Despite repeated directions from the
Adjudicating Authority, the Respondent No. 1 failed to justify the delay
Page 3 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
adequately and later sought condonation under Section 5 of the Limitation Act,
1963. The Adjudicating Authority's findings contradict legal precedents, as it
considered pending litigations as a statutory prevention and applied Section 14 of
the Limitation Act, 1963, which was not invoked by the Respondent No. 1 and
did not meet its essential criteria.
8. The Appellant submitted that the Adjudicating Authority overlooked the
Respondent No. 1's own admission in Form I (Particulars of Financial Debt) that
a legal notice under Section 30 of the State Financial Corporations Act, 1951 was
issued on 13.01.2010, and possession of the unit was taken under Section 29 of
the Act on 23.03.2010. Further, there was no documentary evidence on record to
suggest that the limitation period was extended or that the Corporate Debtor
acknowledged its liability or address the issue of limitation and as the petition in
question was filed after delay exceeding 12 years, rendering it time-barred.
9. The Appellant submitted that the Adjudicating Authority committed an
error in law while adjudicating the application for condonation of delay, by
erroneously computing the limitation period from the date of notification of the
Code provisions, contrary to established legal principles and judgments placed on
record. It is contended by the Appellant that such notification is wholly irrelevant
to condonation, as the cause of action for filing the petition unequivocally accrues
from the date of default, not the enactment of the statute.
10. The Appellant submitted that the Adjudicating Authority has erred in law
and fact by failing to appreciate that the Financial Creditor, a statutory corporation
Page 4 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
constituted under a special Act, was endowed with specific enabling powers under
Section 29 and Section 31 of the State Financial Corporation Act, 1951, to enforce
its claims following the corporate debtor's default, yet inexplicably chose to
remain dormant for over 12 years. The Appellant submitted that the Adjudicating
Authority further overlooked the material on record demonstrating that the
Financial Creditor, having issued a demand notice under Section 29, was duty-
bound to diligently pursue its remedies under Section 31 of the State Financial
Corporation Act, 1951 to recover the debt, rather than allowing the claim to
languish beyond the permissible period, rendering the present proceedings
untenable and barred by limitation.
11. The Appellant denied the fact that regarding possession of the mortgaged
property under the State Financial Corporation Act, 1951 by Respondent No. 1
and contended that the Financial Creditor merely issued a demand notice pursuant
to Section 29 of the State Financial Corporation Act, 1951, which solely outlines
the rights of the State Financial Corporation in the event of default, without any
evidence or indication of subsequent steps to enforce possession or recovery as
claimed.
12. The Appellant submitted that the Respondent No. 1 obtained possession
of the mortgaged property without adhering to due process of law, in violation of
the agreement's terms and the provisions of the State Financial Corporation Act,
1951.
Page 5 of 23
Comp. App. (AT) (Ins.) No. 1123 of 2024
13. The Appellant submitted that the Adjudicating Authority has erred by
allowing the Section 5 application on limitation, failing to appreciate the material
on record which reveals that the Respondent No. 1's claim of being statutorily
prevented due to sub-judice proceedings before the Hon'ble High Court is
untenable. The impugned order dated 17.05.2024 explicitly notes that on
07.03.2011, the Hon'ble High Court of Rajasthan granted liberty to Respondent
No. 1 to auction the property, thereby negating any basis for the Financial
Creditor to assert statutory prevention from proceeding against the Corporate
Debtor. Furthermore, despite this clear liberty, the Respondent No. 1 failed to
exercise its rights within the limitation period following 07.03.2011, and cannot
now seek refuge under the pretext of ongoing High Court proceedings, rendering
the Adjudicating Authority's findings unsustainable.
14. Concluding his arguments, the Appellant urged this Appellate Tribunal to
dismiss the Impugned Order and allow his appeal.
15. Per contra, the Respondent No. 1 denied all the averments made by the
Appellant in the present appeal.
16. The Respondent No. 1 submitted that while reiterating the averments in
Company Petition (IB) No. 84/7/JPR/2021, that the Loan Agreement between the
parties clearly stipulated a repayment mechanism for both the principal loan
amount and interest, including a six-month moratorium period applicable solely
to the principal repayment instalments, and not to the interest, which the loanee
was obligated to repay as per the agreed schedule. The Respondent No. 1 further
Page 6 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
contended that, in line with standard practice, two separate accounts were
maintained for the repayment of the principal and interest, and the Rajasthan
Financial Corporation has acted in good faith, adhering to both the provisions of
the State Financial Corporation Act, 1951, and the terms of the loan agreement.
The Respondent No. 1 submitted that the Appellant failed to raise any objection
regarding the invocation of Section 30 State Financial Corporations Act, 1951 at
the relevant time, and any grievance raised at this belated stage lacks merit.
17. The Respondent No. 1 submitted that it is a well-established principle of
law that the moratorium period applies solely to the repayment of principal
amount instalments, whereas no such moratorium extends to the repayment of
interest, which the appellant was obligated to service as per the loan agreement;
however, the appellant defaulted by failing to pay even a single interest
instalment, compelling the Respondent No. 1 to issue a notice recalling the entire
loan amount. It is the case of the Respondent No. 1 that upon the Appellant's
continued failure to repay the dues after the notice period expired, the Respondent
No. 1, in accordance with the provisions of Section 30 of the State Financial
Corporation Act, 1951, took physical possession of the mortgaged property,
which remains in its custody. The Respondent No. 1 asserted that these actions
were lawfully executed following the issuance of a legal notice, necessitated by
the appellant's persistent default, thereby justifying the Respondent No. 1's of the
mortgaged assets.
Page 7 of 23
Comp. App. (AT) (Ins.) No. 1123 of 2024
18. The Respondent No. 1 submitted that the Corporate Debtor initially
proposed a settlement vide letter dated 22.03.2011, which the Respondent No. 1
could not accept as its terms were not in its interest, followed by subsequent
settlement proposals in 2014, 2015, and 2017-18, none of which materialized into
an agreement. The Respondent No. 1 pleaded that due to a bona fide oversight,
these requests for a one-time settlement were inadvertently omitted from the
initial record of CP (IB) No. 84/7/JPR/2021 before the Adjudicating Authority;
however, the Respondent No. 1 contended that the appellant's own admission in
the appeal i.e. acknowledging multiple settlement proposals by the Corporate
Debtor effectively negates their objections to the company petition filed under
Section 7 of the IBC, 2016. The Respondent No. 1 asserted that these repeated
attempts at settlement, coupled with the appellant's failure to honour repayment
obligations, reinforce the legitimacy of Respondent No. 1's actions and the
initiation of insolvency proceedings.
19. The Respondent No. 1 submitted that the Adjudicating Authority issued
directions for filing written submissions on 04.07.2022, after notices were served
to the Corporate Debtor through regular service, paper publication, and e-notice
at its registered address, yet the Corporate Debtor failed to participate, leading to
ex-parte proceedings being initiated vide order dated 04.07.2022. Despite further
opportunities on 12.08.2022 and 06.09.2022, the Corporate Debtor remained
absent, and even after Advocate Sh. Naresh Kumar Sejwani appeared on
20.09.2022 seeking time to file a vakalatnama, no such document was submitted
Page 8 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
by 10.01.2023, reflecting the Corporate Debtor's consistent non-engagement with
the process.
20. It is further submitted by Respondent No. 1 that the written submissions,
as directed on 04.07.2022, were duly filed by the Respondent No. 1 on 12.08.2022
and it was only on that date, and not on 14.07.2022, that the Adjudicating
Authority directed a chronological date-wise event submission, which the
Respondent No. 1's counsel could not immediately furnish due to practical
difficulties. It is the case of Respondent No. 1 that the Appellant's attempt to
suggest that the Respondent No. 1 failed to address limitation despite
opportunities is misplaced, as the Adjudicating Authority, prima facie was
satisfied with the merits and limitation aspects, proceeded with notices and ex-
parte orders due to the Corporate Debtor's evasion, and subsequently sought
clarifications only after reviewing the Respondent No. 1's submissions, thus
attributing no error to the Adjudicating Authority but rather highlighting the
appellant's own lapses.
21. The Respondent No. 1 submitted that it is a settled proposition of law that
the omission of the date of default in Column-2, Part IV of Form-I constitutes, at
most, a technical defect, and does not render the petition non-maintainable,
provided such information can be discerned from other material available on
record; this defect is curable by filing an appropriate application. The Respondent
No. 1 contended that this legal position underscores the maintainability of the
petition despite the appellant's objections, as the requisite details substantiating
Page 9 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
the default are adequately disclosed elsewhere in the accompanying
documentation, thereby aligning with judicial precedents and preserving the
integrity of the proceedings before the Adjudicating Authority.
22. The Respondent No. 1 submitted that the Adjudicating Authority correctly
held that Respondent No. 1 was statutorily prevented from recovering its dues
from the Corporate Debtor due to interim orders of the Hon'ble High Courts,
which temporarily restrained direct recovery actions. However, it is emphasized
by Respondent No. 1 that such interim orders do not bar the initiation of
proceedings under the Code, as the framework of the Code operates
independently of such restrictions, enabling the corporation to pursue its remedies
despite the pendency of matters before the Hon'ble High Court.
23. It is further submitted by the Respondent No. 1 that the Adjudicating
Authority, not being subordinate to the Hon'ble High Court, was fully empowered
to admit the petition filed by the Respondent No. 1 and impose a moratorium vide
its impugned order dated 17.05.2024, unaffected by the interim orders. The
Respondent No. 1 asserted that this legal position reinforces the authority of the
IBC, 2016 framework, ensuring that the Respondent No. 1's rights to initiate
insolvency proceedings remain intact, and the Adjudicating Authority's decision
aligns with the statutory intent and judicial precedent, warranting no interference.
24. The Respondent No. 1 submitted that the Adjudicating Authority has
delivered a just and reasoned order dated 17.05.2024, aptly reflecting the facts
and circumstances of the case, wherein a notice recalling the Respondent No. 1's
Page 10 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
dues were issued to the appellant on 13.01.2010, followed by the appellant's
proposals for one-time settlement or repayment in 2011, 2014, 2015, 2016, and
2017, with the last acknowledgment of debt occurring on 16.05.2017. This
repeated acknowledgment extends the limitation period, rendering the company
petition filed by the Respondent No. 1 well within the permissible timeframe
under the law. Thus, the Respondent No. 1 asserted that the Adjudicating
Authority's decision to admit the petition is legally sound and merits no
interference.
25. The Respondent No. 1 submitted that for the purpose of calculating
limitation in the present case, the appellant's acknowledgment of its liability
under the loan agreement dated 01.12.2008, admitted up to 16.05.2017, is pivotal,
extending the limitation period of three years from that date to 15.05.2020. This
acknowledgment, stemming from the appellant's repeated proposals for
settlement, clearly establishes that the debt remained alive, and thus, the company
petition filed by the Respondent No. 1 is well within the statutory timeframe,
reinforcing the correctness of the Adjudicating Authority's impugned order dated
17.05.2024.
26. The Respondent No. 1 submitted that in the background of the nationwide
lockdown imposed on 22.03.2020 due to the COVID-19 pandemic, the Hon'ble
Supreme Court of India vide its order dated 10.01.2020 in Misc. Application No.
21/2022 in Suo Moto Writ Petition (C) No. 3/2020, extended limitation periods
expiring between 15.03.2020 and 28.02.2022, thereby ensuring that the petition
Page 11 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
remains within limitation regardless. Additionally, the Hon'ble Supreme Court of
India's consistent rulings affirm that limitation under the Code is extendible via
an application under Section 5 of the Limitation Act, 1963 further supporting the
Respondent No. 1's position that the petition was timely and lawfully admitted
by the Adjudicating Authority.
27. The Respondent No. 1 submitted that the promoters of the Corporate
Debtor submitted proposals for a one-time settlement of the Respondent No. 1's
dues in 2011, 2014, 2015, 2016, and 2017, thereby keeping the claim/debt alive,
with the last acknowledgment occurring vide letter dated 16.05.2017. The
Hon'ble Supreme Court of India in Dena Bank v. C. Shivakumar Reddy [(2021)
10 SCC 330] has held that Section 18 of the Limitation Act should not be
interpreted with pedantic rigidity in IBC proceedings, and an offer of one-time
settlement within the limitation period constitutes an acknowledgment of debt,
extending the limitation by a further three years from 16.05.2017 to 15.05.2020,
thus supporting the maintainability of the Respondent No. 1's petition.
28. The Respondent No. 1 submitted that the homebuyers, who paid booking
amounts or instalments towards homes/flats, are entitled to submit their claims to
the Resolution Professional under the IBC, 2016 framework, ensuring their
interests are addressed within the insolvency process. This mechanism provides
an adequate remedy for the homebuyers to recover their dues, thereby negating
any contention that their rights have been overlooked by the respondent's actions
in pursuing the Corporate Debtor.
Page 12 of 23
Comp. App. (AT) (Ins.) No. 1123 of 2024
29. It is further submitted by the Respondent No. 1 that the homebuyers failed
to initiate independent legal action against the appellant for any alleged fraud or
misrepresentation, and the appellant cannot now seek refuge in this argument to
evade its liability towards the dues of Respondent No. 1. Respondent No. 1
asserted that the appellant's attempt to shift responsibility onto the homebuyers'
inaction is untenable, and the Adjudicating Authority rightly focused on the
Respondent No. 1's claim, which remains unaffected by the homebuyers' separate
grievances.
30. The Respondent No. 1 submitted that Sections 29, 30, and 31 of the State
Financial Corporation Act, 1951, provide a robust mechanism for recovering
dues, with Section 29 empowering the Respondent No. 1 to take over
management or possession of the industrial concern's assets, including the right
to lease or sell mortgaged property, and Section 30 allowing a demand for
repayment before the agreed period, while Section 31 offers special enforcement
provisions against the industrial concern. In the present case, the Respondent No.
1 invoked Section 29, took possession of the mortgaged assets, and acted within
its statutory rights, thereby pursuing a lawful recovery process against the
Corporate Debtor.
31. The Respondent No. 1 submitted that the Adjudicating Authority
committed no error in holding that the Respondent No. 1 was statutorily prevented
from fully recovering its dues, as the appellant's reliance on the Hon'ble High
Court of Rajasthan's interlocutory order dated 07.03.2011 is misplaced. The
Page 13 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
Respondent No. 1 clarified that a plain reading of the order revealed that while
the Respondent No. 1 was granted limited liberty to organize auction proceedings
and invite bids for the mortgaged property, the Hon'ble High Court explicitly
prohibited finalizing any auction without its approval, thus restricting the
Respondent No. 1's ability to conclude the recovery process.
32. The Respondent No. 1 further submitted that, in compliance with the order
dated 07.03.2011, the Respondent No. 1 diligently attempted to auction the
Corporate Debtor's mortgaged assets on more than 80 occasions, yet could not
finalize the sales due to the High Court's mandate for prior approval. Respondent
No. 1 asserted that this statutory constraint justifies the finding of the
Adjudicating Authority, debunking the appellant's impression of unrestricted
liberty and affirming that the Respondent No. 1's actions were curtailed by
judicial oversight, thereby supporting the maintainability of the petition filed
under the Code in addition to extending limitation due to acknowledgement of
debts by the Appellant by way of various OTS by the Appellant and the Hon'ble
Supreme Court of India order dated 10.01.2020 extending limitation suo moto.
33. Concluding his arguments, Respondent No. 1 prayed to this Appellate
Tribunal to dismiss the Appeal with cost.
34. The Respondent No. 2 submitted that the Appellate Tribunal, vide its order
dated 03.06.2024, directed that the impugned order initiating CIRP be held in
abeyance; however, the IRP was not discharged from her duties to safeguard the
interests of the Corporate Debtor, including its property, and ensure compliance
Page 14 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
with the provisions of the Code and IBBI regulations. In adherence to the
Appellate Tribunal's directive, the IRP duly kept the CIRP process in abeyance
while continuing to fulfil her obligations by deploying security guards at the
property and personally visiting the site, which had been taken into custody at the
time of the CIRP orders, to ensure the Corporate Debtor's interests remained
protected.
35. The Respondent No. 2 submitted that the Respondent No. 1 has contributed
Rs. 2 lakhs towards the CIRP costs, as mandated by the Adjudicating Authority
in its impugned order dated 17.05.2024. Despite the limited contribution from
Respondent No. 1, the IRP has continued her responsibilities without being
relieved of her duties, thereby entitling her to her professional fees for the services
rendered. The Respondent No. 2 requested this Appellate Tribunal to recognize
the IRP's eligibility for remuneration.
Findings
36. We have already noted the facts of the case during pleadings in preceding
discussions hence we shall not repeat the same.
37. The only issue which is required to be decided in the present appeal is
regarding whether the company petition was filed by the Respondent No. 1 i.e.,
Rajasthan Financial Corporate before the Adjudicating Authority in time or was
hit by limitation.
Page 15 of 23
Comp. App. (AT) (Ins.) No. 1123 of 2024
38. The disbursal of loan and non payment of the loan is undisputed fact, hence,
we take as it is.
39. The Appellant submitted that the Company Petition No. 84/7/JPR/2021 was
filed on 12.08.2021, hence was completely debarred under Limitation Act, 1963.
On the other hand, it is the case of the Respondent No. 1 that due to pending case
before the Hon'ble High Court of Rajasthan as well as stay granted by the Hon'ble
High Court of Rajasthan, the Respondent No. 1 was statutorily prevented from
taking any legal action, hence, the Respondent No. 1 gets legal protection under
Section 5 of the Limitation Act, 1963. This was in addition with extension of
limitation by the Appellant by acknowledging the debt through its various one
time settlement ('OTS') proposals and suo moto extension of limitation due to
by the Hon'ble Supreme Court of India vide its order dated 10.01.2020.
40. It is the case of the Respondent No. 1 that the Appellant kept on making OTS
from time to time which was made on 03.05.2011, 24.11.2011, 16.09.2014,
24.02.2015, 26.05.2015, 18.06.2015, 20.05.2016, 12.05.2017 and 16.05.2017.
Thus, acknowledging debt and extending the limitation period.
41. We note that in reply to the appeal, the last OTS date was mentioned as
16.05.2017 which according to the Respondent No. 1 was acknowledgement of
the Appellant of its liability in terms of loan facility provided by the Respondent
No. 1 under loan agreement dated 01.12.2008.
42. We have already noted that the loan was sanctioned and disbursement was
made from 01.12.20018 to 05.03.2009. Thus, first OTS of the Appellant to
Page 16 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
Respondent No. 1 dated 03.05.2011 extended the limitation period. Similarly,
further OTS dated 24.11.2011 also extended the limitation period. We note that
within three years of this OTS dated 24.11.2011, the Appellant is stated to have
made another OTS on 16.09.2014 which was within three years and hence, same
extended limitation period. This was further followed by another OTS proposal
by the Appellant dated 24.02.2015 followed by various other OTS proposals by
the Appellant vide letters dated 26.05.2015, 18.06.2015, 25.05.2016, 12.05.2017
and finally dated 16.05.2017.
43. If we take the last OTS by the Appellant dated 16.05.2017 into consideration,
which signifies the acknowledgement of debt by the Appellant, the limitation
period gets extended up to 15.05.2020. Hence, the Company Petition could have
been filed by 15.05.2020, whereas the Company Petition was filed by the
Respondent No. 1 before the Adjudicating Authority on 12.08.2021.
44. Hence, we need to look into the rational for counting this period for the
purpose of limitation. We take into consideration the pleading made by the
Respondent No. 1 that the Hon'ble Supreme Court of India, taking suo moto
cognizance vide Writ Petition (C) No. 03 of 2020 for extension of limitation,
wherein the Apex Court vide its order dated 10.01.2020 exempted the period from
15.03.2020 to 28.02.2022 for the purpose of counting of limitation for filing
applications, suits, etc.
45. The facts regarding the various OTS proposals of the Appellant have been
mentioned by the Respondent No. 1 in his reply affidavit to the Appeal dated
Page 17 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
16.07.2024 which was permitted by this Appellate Tribunal in its order dated
03.06.2024 while issuing notice to the Respondent No. 1.
46. In the same order dated 03.06.2024, this Appellate Tribunal gave three
weeks time to the Appellant to file Rejoinder. The said order is reproduced as
under :-
"These appeals have been filed against the impugned orders both dated 17.05.2024.
2. The submission of the learned Counsel for the Appellant is loans were granted to two companies namely, M/s Amay Home Services Ltd. and M/s Ruby Buildestates Pvt. Ltd. in the year 2008. The loans after sanction were disbursed between the years 2008 till March, 2009. The First Demand Notice was given by the Respondent on 13.01.2010 and thereafter Respondent Corporation took physical possession of the mortgaged property on 23.03.2010. The auction of the property was also scheduled in the year 2010. But on 04.05.2010, Jaipur Bench of Hon'ble Rajasthan High Court restrained Respondent-Corporation from alienating or transferring the said property. On 12.08.2021, Company Petitions No. 84/7/JPR/2021 and 83/7/JPR/2021 were filed. The prime submission made by the learned Counsel for the Appellant is the petitions were beyond limitation having been filed even three years after coming into force of the Code in the year 2016. Further it is alleged the impugned order does not disclose sufficient cause to condone the delay under Section 5 of Limitation Act, 1963. It is alleged as per own admission of the Respondent, these Company Petitions were
Page 18 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
ought to have been filed by December, 2019 and but then Respondent-Corporation has taken benefit of orders passed by the Hon'ble Supreme Court due to Covid condition. It is thus submitted no sufficient cause is shown for not filing the petitions between January, 2019 to March, 2020 hence the impugned order(s) are challenged before us.
3. Learned Counsel for the Respondent submits so far the debt is concerned, the same is not challenged by the Appellant and on at least seventy earlier occasions the Respondent is trying to auction the mortgaged property but to no avail.
4. Issue Notice. Learned Counsel for the Respondent- Corporation may file Reply Affidavit within four weeks. Rejoinder be filed three weeks thereafter.
5. List these matters on 22nd July, 2024. Till then the operation of the impugned order qua initiation of CIRP shall remain in abeyance."
47. Another two weeks time was granted to the Appellant to file the Rejoinder
by this Appellate Tribunal vide its order dated 06.09.2024, which reproduce as
under:-
"Learned Counsel for Respondent No. 1 submits that they have already filed the Reply.
Appellant submits that Reply has not been served. Counsel for Respondent No. 1 is directed to serve the Reply to the Counsel for the Appellant within a week. Rejoinder, if any, may be filed with further two weeks.
Page 19 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
The name of Mr. Naresh Kr. Sejvani be shown as Counsel for the Appellant.
IRP has also appeared in person. List these Appeals on 18th October, 2024.
Interim Order to continue."
48. Further two weeks time was granted by this Appellate Tribunal to the
Appellant to file rejoinder affidavit vide its order dated 18.10.2024 which reads
as under :-
"Learned Counsel for the Appellant prays for and is allowed two weeks time to file the Rejoinder Affidavit. List this Appeal on 21st November, 2024."
49. Further, two weeks time was allowed to the Appellant vide this Appellate
Tribunal's order dated 21.11.2024 which reads as under ;-
"The Respondent No.1 has filed the reply. Rejoinder, if any, be filed within two weeks from today.
It is submitted some applications have been filed by Respondent No.1 but are not on record. Be placed on record. List these appeals on 09.01.2025."
50. On 09.01.2025, the Appellant requested for an adjournment on the ground
that the Senior Arguing Counsel is in some personal difficulty. Finally, the
Appellant was heard on 17.02.2025 and order was reserved.
51. We note that this Appellate Tribunal gave four specific opportunities to the
Appellant to file the rejoinder affidavit, however, the Appellant did not file any
rejoinder. On next occasion, the Appellant requested for an adjournment. Thus, Page 20 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
we note that despite of several opportunities, the Appellant did not give any
contrary facts through his reply affidavit contesting submissions made by the
Respondent No. 1 before us. Thus, we take into consideration the facts mentioned
by the Respondent No. 1 regarding OTS letters and the issue of extension of
limitation from time to time, including last OTS dated 16.05.2017 extending
limitation period upto 15.05.2020 and the Apex Court, suo moto order dated
10.01.2020 passed in Writ Petition (c) No. 03 of 2020 which extended limitation
period from 15.03.2020 to 28.02.202. The Respondent No. 1 filed Company
Petition on 12.08.2024 which was within limitation period available in the present
case. Thus, we hold that Company Petition was covered under limitation period
as discussed in preceding discussion.
52. We also note that in catena of judgments including by the Hon'ble Supreme
Court of India, it has been held that limitation is a matter of both facts and law
and it can be invoked at any stage by any of the party or any court even at an
appeal stage. We will take into consideration one of recent judgment of the
Hon'ble Supreme Court of India passed in the case of Pathapati Subba Reddy v.
LAO [(2024) SCC OnLine SC 513], where the Apex Court stipulated fundamental
principles which reads as under :-
"26. On a harmonious consideration of the provisions of the law, as aforesaid, and the law laid down by this Court, it is evident that:
Page 21 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
(i) Law of limitation is based upon public policy that there should be an end to litigation by forfeiting the right to remedy rather than the right itself;
(ii) A right or the remedy that has not been exercised or availed of for a long time must come to an end or cease to exist after a fixed period of time;
(iii) The provisions of the Limitation Act have to be construed differently, such as Section 3 has to be construed in a strict sense whereas Section 5 has to be construed liberally;
(iv) In order to advance substantial justice, though liberal approach, justice-oriented approach or cause of substantial justice may be kept in mind but the same cannot be used to defeat the substantial law of limitation contained in Section 3 of the Limitation Act;
(v) Courts are empowered to exercise discretion to condone the delay if sufficient cause had been explained, but that exercise of power is discretionary in nature and may not be exercised even if sufficient cause is established for various factors such as, where there is inordinate delay, negligence and want of due diligence;
(vi) Merely some persons obtained relief in similar matter, it does not mean that others are also entitled to the same benefit if the court is not satisfied with the cause shown for the delay in filing the appeal;
(vii) Merits of the case are not required to be considered in condoning the delay; and
(viii) Delay condonation application has to be decided on the parameters laid down for condoning the delay and condoning the delay for the reason that the conditions have been
Page 22 of 23 Comp. App. (AT) (Ins.) No. 1123 of 2024
imposed, tantamount to disregarding the statutory provision."
(Emphasis Supplied) The present case of the Respondent No. 1 gets benefits from the above
judgment.
53. In view of above analysis, we hold that the Company Petition was filed by
the Respondent No. 1 within limitation period before the Adjudicating Authority
and was not hit by limitation as alleged by the Appellant. Since, this is the only
issue involved in the present appeal, hence we do not find any merit in the appeal.
54. We also note that the Respondent No. 2 i.e., Ms. Garima Diggiwal, IRP of
Corporate Debtor has requested this Appellate Tribunal during hearing to
reimburse her fee and cost. Since, fee and the cost are within the domain of the
Adjudicating Authority, the Respondent No. 2 may file suitable application in
accordance with law for getting further relief before the Adjudicating Authority.
55. The Appeal devoid of any merit stand rejected. IA, if any, are closed. No
costs.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
[Mr. Indevar Pandey] Member (Technical) Sim
Page 23 of 23
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free