Rita Malhotra & Anr vs Orris Infrastructure Private Limited
- CitationCompany Appeal (AT) (Insolvency) No. 484 of 2024
Ratio decidendi
The rule this decision rests on
Where a person holds a commercial space or unit in a real estate project under an assured-return (MAR) arrangement, that person remains an "allottee" within the meaning of Section 2(d) of the Real Estate (Regulation and Development) Act, 2016, and, by Explanation (ii) to Section 5(8)(f) of the Insolvency and Bankruptcy Code, 2016, is therefore an allottee for the purposes of the IBC, notwithstanding that the right to assured returns arises under a separate agreement distinct from the allotment. An allottee who files an application under Section 7 of the IBC as a financial creditor is bound by the second proviso to Section 7(1), so that such an application must be filed jointly by not less than one hundred allottees under the same real estate project or not less than ten percent of the total number of such allottees, whichever is less; an application by such allottees that fails this threshold is not maintainable. The status of an allottee is not displaced merely because the allottee belongs to an assured-return class of creditors within the project, and no artificial distinction between assured-return investors and allottees simpliciter is recognised for the purpose of avoiding the threshold in the second proviso to Section 7(1).
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
[Arising out of order dated 19.09.2023 passed by the Adjudicating Authority, National Company Law Tribunal, New Delhi in CP (IB) No. 234(PB)/2019]
In the matter of:
Rita Malhotra W/o Mr. Sunil Malhotra R/o E-34, Second Floor, Lajpat Nagar-II, New Delhi- 110024 Mobile: 9818708769 E-mail: malhotra.rajat@gmail.com
Bina Chopra W/o Lalit Kumar Chopra, R/o 461, Pocket -C SFS Flats, Sheikh Sarai, Phase I, New Delhi-110017, Mobile: 9310170038 E-mail: lalitkchopra@gmail.com ...Appellants/Financial Creditors
Versus
ORRIS INFRASTRUCTURE PVT. LTD. Through its Director /Authorized Representative J-10/5, DLF phase II, M.G. Road, Gurgaon, Haryana
Registered Office: RZ-D-5, Mahavir Enclave New Delhi 110045 ...Respondent/Corporate Debtor Present :
For Appellant: Mr. Rajat Malhotra, Mr. Sunil Malhotra, Madhu K. Singh, Ms. Priya Mishra, Mr. Amit Agnihotri, Advocates. 2
For Respondents: Mr. P. Nagesh, Sr. Advocate with Ms. Ranjana Roy Gawai, Mr. Shikher Upadhayay, Mr. Prateek Gupta, Mr. Akshay Sharma, Mr. Pervinder, Advocates.
JUDGMENT
[Per: Barun Mitra, Member (Technical)]
The present appeal filed under Section 61 of Insolvency and
Bankruptcy Code 2016 ('IBC' in short) by the Appellant arises out of the
Order dated 19.09.2023 (hereinafter referred to as 'Impugned Order')
passed by the Adjudicating Authority (National Company Law Tribunal,
Principal Bench, New Delhi) in C.P.(IB)234(PB)/2019. By the Impugned
Order, the Adjudicating Authority dismissed the Section 7 application filed
by the Appellants for initiating Corporate Insolvency Resolution Process
('CIRP' in short) against M/s Orris Infrastructure Pvt Ltd - Corporate
Debtor. Aggrieved by this impugned order, the present appeal has been
preferred by the Appellants.
2. We have heard Shri Rajat Malhotra, Learned Advocate appearing on
behalf of the Appellants and Shri P. Nagesh, Learned Sr. Advocate
representing the Respondent.
3. The Learned Counsel for the Appellants while making his
submissions submitted that the Corporate Debtor - Orris Infrastructures
Pvt Ltd was developing a commercial building/complex known as Floreal
Tower, Gurgaon. The Corporate Debtor had entered into an Agreement with
the Appellants on 24.04.2010 (hereinafter referred to as 'MOU') for
providing Monthly Assured Return ('MAR' in short). Clauses 2, 4, 5 and 6
Company Appeal (AT) (Insolvency) No. 484 of 2024 3
of the MOU dated 24.04.2010 stipulated that MAR would continue to be
paid by the Corporate Debtor for 36 months after the completion of the
building or till the office space was leased out on completion, whichever is
earlier, by the Corporate Debtor.
4. Further submission was made that the Corporate Debtor having not
completed the project applied for renewal of License issued by the Town and
Country Planning Department. The License had been renewed up to
13.11.2024 until final completion. Furthermore, it was submitted that
though an Occupancy Certificate dated 16.08.2017 was placed before the
Adjudicating Authority by the Corporate Debtor, the Occupancy Certificate
cannot be viewed as Completion Certificate of the building. In any case, the
liability for payment of MAR was up to 36 months from the date of
Occupancy Certificate which was not complied to by the Corporate Debtor.
5. It was pointed out that the Appellant had paid the entire
consideration amount of Rs.29.98 lakhs and thus had discharged their part
of the obligation. It is also contended that neither the building is completed
nor the office space leased out till date by the Corporate Debtor. However,
the Corporate Debtor failed to make the payments as per MAR following
which notices for default were issued on 09.01.2018 and 12.02.2018. Since
payments were still not forthcoming, Section 7 application was filed before
the Adjudicating Authority on 01.06.2018 but subsequently withdrawn
following a Settlement Deed entered into by both parties on 09.07.2018. As
the post-dated cheques issued in pursuance to the above Settlement Deed
of 09.07.2018 were dishonoured, a fresh Section 7 application was filed.
Company Appeal (AT) (Insolvency) No. 484 of 2024 4
Again, the matter was amicably settled between the two parties following a
Settlement Deed dated 06.03.2019. The Section 7 application was disposed
of by the Adjudicating Authority on 07.03.2019 with the liberty to revive the
petition in case of default. Due to further default, notice was issued on
10.12.1019 and the Section 7 application was again revived. The Corporate
Debtor thereafter handed over two bank drafts in the name of the
Appellants with a view to settle all payments due and payable by them
under the MOU dated 24.04.2010. It was submitted that these two bank
drafts were not encashed by the Appellants since the amount contained in
the bank drafts were not the complete amount of financial debt due and
payable by the Corporate Debtor. It was vehemently contended that the
Section 7 application was filed by the Appellants for the debt which had
accumulated and continued to accumulate under MAR Plan.
6. It is also submitted that the present application has been filed by the
Appellants not in their capacity as allottees of the Floreal Tower project but
predicated on the MOU dated 24.04.2010 and that the Appellants are
claiming the sum not paid by them as allottees but for the amount which
has become due and payable on account of MAR. Emphatically asserting
that MAR Plan was entirely independent of the terms of allotment, it was
stated that the investment arrangement was distinct from an allotment
simpliciter. The Appellants have relied on the judgment of this Tribunal in
Nikhil Mehta and Sons Vs. AMR Infrastructure Ltd in CA(AT)(Ins) No.
07 of 2017 wherein it was held that a recipient under an identical assured
return investment scheme is a Financial Creditor in terms of the said
Company Appeal (AT) (Insolvency) No. 484 of 2024 5
agreement and not as allottees. It was articulated that the moment there is
an assured return clause, and the Corporate Debtor defaults to make good
the due that arises out of the said clause, a Section 7 application can be
filed dehors the capacity of the Financial Creditor as an allottee.
7. Making rival submissions, the Learned Counsel for the Respondent
while admitting that the two parties had entered into an MOU dated
24.04.2010 and Space Buyers Agreement (SBA) dated 26.04.2010, stated
that MAR was payable by them to the Appellants up to 36 months after
completion of the building or till the office space was put on lease,
whichever was earlier. Since the Occupation Certificate was received on
16.08.2017, thus, in terms of the MOU, the obligation to pay MAR was only
till 16.07.2020. This amount had already been paid till June, 2019 and for
the remaining period up to July, 2020, the Corporate Debtor had already
handed over demand drafts to the Appellants amounting Rs. 8.03 lakhs.
Despite having received the complete amount, the Appellants have
unlawfully claimed that the obligation of the Corporate Debtor is still
continuing. The terms of the MOU being definitive and conclusive in
nature, and the Corporate Debtor having complied thereto, there is no
obligation to be further discharged by the Corporate Debtor. The demand
of further amounts by the Appellants is not in conformity with the MOU
clauses and is only a ploy to arm-twist the Corporate Debtor with a mala
fide intention.
8. It is also the contention of the Respondent that the IBC is not a
recovery legislation and that the judgment of the Hon'ble Supreme Court in
Company Appeal (AT) (Insolvency) No. 484 of 2024 6
Mobilox Innovation Pvt Ltd Vs Kirusa Software Pvt Ltd (2018) 1 SCC
353 clearly held that IBC is not intended to be a substitute to a recovery
forum. It was also contended that Section 65 of IBC expressly bars
initiation of CIRP on fraudulent and malicious grounds and present is a
case where the Appellants have clearly tried to trigger the initiation of CIRP
of the Corporate Debtor for their unjust enrichment. The Appellants despite
having received the Demand draft which liquidated their entire outstanding
debts, did not deliberately encash the same with mala fide intention to
extort more money from the Corporate Debtor.
9. It was vehemently contended that during the pendency of the present
Section 7 application before the Adjudicating Authority, the IBC came to be
amended on 13.03.2020 with effect from 28.12.2019 by virtue of which
recourse under Section 7 could be availed by financial creditors who are
allottees numbering not less than 100 of such financial creditors or 10% of
the allottees, whichever is less, in a real estate project. This amendment
was subsequently upheld by the Hon'ble Supreme Court in Manish Kumar
Vs UOI 2021 SCC Online SC 30. In terms of the judgment of the Hon'ble
Supreme Court in Manish Kumar supra, the Appellants were required to
modify their Section 7 application within the stipulated time frame given to
conform to the second proviso of amended Section 7. Having not done so,
the petition is liable to be dismissed as not maintainable.
10. We have heard both the parties and perused the records carefully.
The primary and foremost issue for our consideration is whether the
present Section 7 application filed by the Appellants is maintainable or not
Company Appeal (AT) (Insolvency) No. 484 of 2024 7
in view of the threshold introduced by Amendment Act 1 of 2020 of the IBC
which expressly provides that a Section 7 application is required to be filed
jointly by not less than 100 allottees under the same real estate project or
not less than 10% of the total number of allottees, whichever is less.
11. It is the case of the Appellants that their Section 7 application is not
hit by the above-mentioned amendment by Act 1 of 2020 of the IBC since
they had not approached the Adjudicating Authority as allottees. The
present application has not been filed for default by real estate developer
under terms of allotment but for reasons of default under an independent
and separate agreement executed between the two parties for MAR. The
present petition is maintainable dehors the allotment as the cause of action
arises due to the default under the MOU of 24.04.2010 and not from the
terms of allotment. Hence, the petition is not impacted by the judgment of
the Hon'ble Apex Court in Manish Kumar supra and is maintainable
without need of any modification. It is also the contention of the Appellants
that the Corporate Debtor have repeatedly breached the Settlement Deed
which clearly reflects their misconduct and that they are trying to wriggle
out of their undertaking by taking refuge under the amendment of Section
7 of the IBC which amounts to abuse of process of law.
12. Repelling the above arguments of the Appellant, the Learned Counsel
for the Respondent vehemently contended that the present petition is not
maintainable in the light of amendment to Section 7 of the IBC which
expressly provides that for financial creditors who are allottees, a Section 7
application can be filed against the Corporate Debtor jointly by not less than
Company Appeal (AT) (Insolvency) No. 484 of 2024 8
100 of such allottees under the same real estate project or not less than
10% of the total number of such allottees under the same real estate project.
It was submitted that there are 504 units in the Floreal Project of which
366 allottees fell under the category of Assured Returns Class of Creditors
and that the Appellants constitute joint allottees of one single unit therein.
Hence, the Appellants do not meet either the threshold level of 100 allottees
or more than 10% of the total allottees under the same real estate project.
Hence, the Section 7 application is not maintainable in the present facts of
the case. Moreover, in terms of the judgment of the Hon'ble Supreme Court
in Manish Kumar supra, the Appellants were required to modify their
Section 7 application within the stipulated time frame given under the
relevant provision of amended Section 7. Having not done so, the petition
is liable to be dismissed.
13. Before we proceed to test the correctness of the impugned order
against the weight of rival submissions, it would be useful to have a look at
the statutory provision as inserted by Act 1 of 2020 in Section 7 of IBC
which is reproduced hereunder for ready reference:
"7. Initiation of corporate insolvency resolution process by financial creditor.
(1) A financial creditor either by itself or jointly with other financial creditors, or any other person on behalf of the financial creditor, as may be notified by the Central Government may file an application for initiating corporate insolvency resolution process against a corporate debtor before the Adjudicating Authority when a default has occurred.
Provided that..............
Provided further that for financial creditors who are allottees under a real estate project, an application for initiating corporate insolvency
Company Appeal (AT) (Insolvency) No. 484 of 2024 9
resolution process against the corporate debtor shall be filed jointly by not less than one hundred of such allottees under the same real estate project or not less than ten percent of the total number of such allottees under the same real estate project, whichever is less:
Provided also that where an application for initiating the corporate insolvency resolution process against a corporate debtor has been filed by a financial creditor referred to in the first or second provisos and has not been admitted by the Adjudicating Authority before the commencement of the Insolvency and Bankruptcy Code (Amendment) Act 2020, such application shall be modified to comply with the requirements of the first or second provisos as the case may be within thirty days of the commencement of the said Act, failing which the application shall be deemed to be withdrawn before its admission."
14. The second proviso to Section 7(1) of the IBC refers to financial
creditors who are 'allottees' under a real estate project. As such 'allottees'
are not defined in the statutory construct of IBC. However, in terms of
Explanation (ii) to Section 5(8)(f) of IBC, the definitions of 'allottee' and 'real
estate project' is to be derived from Real Estate (Regulation and
Development) Act, 2016 ('RERA' in short) which is as under:
"2. Definitions. - In this Act, unless the context otherwise requires, - ...........
(d) "allottee" in relation to a real estate project, means the person to whom a plot, apartment or building, as the case may be, has been allotted, sold (whether as freehold or leasehold) or otherwise transferred by the promoter, and includes the person who subsequently acquires the said allotment through sale, transfer or otherwise but does not include a person to whom such plot, apartment or building as the case may be, is given on rent; (zn) "real estate project" means the development of a building or a building consisting of apartments, or converting an existing building or a part thereof into apartments, or the development of land into plots or apartments, as the case may be, for the purpose of selling all or some of the said apartments or plots or building, as the case may be, and includes the common areas, the development works, all improvements and structures thereon, and all easement, rights and appurtenances belonging thereto;"
Company Appeal (AT) (Insolvency) No. 484 of 2024 10
15. We however find that the Appellants while assailing the impugned
order have claimed that their cause of action arises not from their status as
allottees but their rights accrue from MAR Plan which is a separate and
independent agreement from that of an allotment. It is their case that the
present application has been filed by the Appellants not in their capacity as
allottees but emanates from the MOU dated 24.04.2010 which provided for
an MRP Plan entirely independent of the terms of allotment. The Appellants
have submitted that they are claiming from the Corporate Debtor not the
sum paid by them for allotment but an amount which has become due and
payable on account of MAR Plan. It has therefore been contended that only
if they had approached the Adjudicating Authority as an 'allottee' as defined
under RERA, the threshold provided under the second proviso to Section
7(1) would have been applicable. Submission was also pressed that this
distinction between an assured return investor and an allottee simpliciter
involved in a real estate transaction is not artificial as these two types of
investors in real estate projects are not of the same genus. In support of
their contention that this investment arrangement is distinct from an
allotment simpliciter, the Appellants have relied on the judgment of this
Tribunal in Nikhil Mehta supra.
16. Coming to our analysis and findings, we are of the considered view
that on a plain reading of the provisions contained in the definition clause
under RERA Act as outlined at preceding para 14 supra, a commercial
space/unit allottee is covered under the purview of 'allottee' under RERA
Company Appeal (AT) (Insolvency) No. 484 of 2024 11
Act. By virtue of Explanation (ii) to Section 5(8)(f) of IBC, the same
interpretation is to be adopted for an 'allottee' under IBC.
17. Extending this interpretation, we notice that the Adjudicating
Authority has correctly held that even a commercial space or unit allotted
to Assured Returns Class of Creditors is also covered in the ambit of an
'allottee'. After taking notice of the judgement of this Tribunal in Nikhil
Mehta supra, the Adjudicating Authority has also correctly noted that this
judgement has nowhere observed that assured returns class of creditors in
a particular project do not come under the definition of 'allottees'. The
Adjudicating Authority has further held that in the facts of the present case,
as per affidavit of the Corporate Debtor, the total number of allotted units
in the Floreal Tower is 504 and 366 allottees therein fall under the Assured
Returns Class of Creditors. Since the present Appellants happen to be part
of the Assured Returns Class of Creditors, they continue to belong to the
substratum of 'allottees' and therefore continue to be governed by the
threshold limit prescribed under second proviso to Section 7(1) of IBC. This
threshold criterion was also made applicable even in respect of all Section
7 applications filed before the amendment and given two months period for
modifying their petition accordingly. Since the present application was filed
before the IBC Amendment Act 1 of 2020 had come into effect, consequently
upon the amendment, as financial creditors who are allottees under a real
estate project, the Appellants were required to meet the threshold criteria
of not being less than 100 such creditors in the same class or not being less
than 10% of the total number of creditors in the same class, whichever is
Company Appeal (AT) (Insolvency) No. 484 of 2024 12
less, to qualify to file Section 7 application against the Corporate Debtor.
This parameter has clearly not been complied with thereby making the
Section 7 application non-maintainable.
18. We also find force in the contention of the Learned Counsel for the
Respondent that this matter has also been covered by a judgement of this
Tribunal in Rahul Gyanchandani Vs Parsvnath Landmark Developers
Pvt Ltd in CA (AT) (Ins) No. 309 of 2024 wherein it has been held that
Homebuyers are 'allottees' within the meaning of the IBC and as a Financial
Creditor, when they file an application, they are required to comply to the
requirements of second proviso to Section 7(1) of IBC. The above judgment
of this Tribunal has been passed in the light of the judgment of the Hon'ble
Supreme Court in Vishal Chelani & Ors. vs. Debashis Nanda in Civil
Appeal No.3806 of 2023 and the relevant excerpts are as reproduced
hereunder:
"17. The Hon'ble Supreme Court after noticing the amendment of 2018 in sub-section 8(f) of Section 5, laid down following in paragraph- 6, which is as follows:
"6. It is thus evident that with the introduction of the explanation home buyers and allottees of real estate projects were included in the class of "financial creditors" - because financial debt is owed to them. On a plain reading of Section 5 (8)(f) no distinction is per se made out between different classes of financial creditors for the purposes of drawing a resolution plan. Consequently, the reasoning of the Mumbai Bench of NCLT "Mr. Natwar Agrawal(HUF)" is correct in the opinion of this Court."
18. The view of RP was disapproved by the Hon'ble Supreme Court and it was held that when underlying claim of an aggrieved party specifically in the form of a Court order or decree, that does not alter or
Company Appeal (AT) (Insolvency) No. 484 of 2024 13
disturb the status of the converted party. Following was held in paragraphs 8 and 9 of the judgment:
"8. The Resolution Professional's view appears to be that once an allottee seeks remedies under RERA, and opts for return of money in terms of the order made in her favour, it is not open for her to be treated in the class of home buyer. This Court is unpersuaded by the submission. It is only home buyers that can approach and seek remedies under RERA - no others. In such circumstances, to treat a particular segment of that class differently for the purposes of another enactment, on the ground that one or some of them had elected to take back the deposits together with such interest as ordered by the competent authority, would be highly inequitable. As held in Natwar Agarwal (HUF) (Supra) by the Mumbai Bench of National Company Law Tribunal the underlying claim of an aggrieved party is crystallized in the form of a Court order or decree. That does not alter or disturb the status of the concerned party - in the present case of allottees as financial creditors. Furthermore, Section 238 of the IBC contains a non obstante clause which gives overriding effect to its provisions. Consequently its provisions acquire primacy, and cannot be read as subordinate to the RERA Act. In any case, the distinction made by the R.P. is artificial; it amounts to "hyper classification" and falls afoul of Article 14. Such an interpretation cannot therefore, be countenanced.
9. In view of the foregoing reasons, the impugned order is hereby set aside; the appellants are declared as financial creditors within the meaning of Section 5(8)(f) (Explanation) and entitled to be treated as such along with other home buyers/financial creditors for the purposes of the resolution plan which is awaiting final decision before the adjudicating authority.
The appeal is allowed in the above terms."
19. We are therefore of the considered view that the Appellants cannot
be said to go out of the definition of 'allottees' merely because they are part
of MAR plan or that they should be treated in a different category wherein
they are not required to comply with second proviso to Section 7(1). The
Company Appeal (AT) (Insolvency) No. 484 of 2024 14
Adjudicating Authority has correctly held that the Appellants continue to
hold the status of 'allottees' and having filed Section 7 Application, they
are mandatorily required to comply with second proviso to Section 7(1) of
IBC. We are not persuaded to accept the artificial distinction sought to be
claimed by the Appellants with regard to their status as distinct from
Financial Creditors in a class. There is no merit in the Appeal. The Appeal
is dismissed. No order as to costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
[Arun Baroka] Member (Technical)
Place: New Delhi Date: 02.07.2024 Ashok Kumar
Company Appeal (AT) (Insolvency) No. 484 of 2024
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free