Ramneek Goel vs Mr. Sunil Bajaj
- CitationCompany Appeal (AT) (Insolvency) No. 845 of 2023
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority may grant an extension of the CIRP period beyond the 300-day period where, in the particular circumstances, the Committee of Creditors has taken a bona fide commercial decision to re-publish Form-G in order to maximise the value of the corporate debtor, the decision being made before expiry of the period and the extension sought being for the time necessary to complete that process; such an extension is consistent with the outer limit of 330 days laid down in Essar Steel, since the case is one of exceptional circumstances where the corporate debtor is to be put back on its feet rather than sent into liquidation. The CoC's decision to re-issue Form-G is an exercise of its commercial wisdom, and the CoC retains jurisdiction to decide to re-invite resolution applications after receiving a higher offer from a fresh applicant, notwithstanding that the existing applicant's plan was under consideration; a resolution applicant whose plan has not been approved has no vested right to have its plan alone voted upon or approved. An Adjudicating Authority is not precluded from examining allegations of breach of confidentiality in the insolvency resolution process, as it has full authority to examine all issues arising out of that process; however, where the allegation is unsupported by any material showing that confidential information was disclosed, and the re-publication of Form-G gives all eligible applicants an equal opportunity, no inquiry into such allegations is called for.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No. 845 of 2023 (Arising out of Order dated 13.06.2023 passed by the Adjudicating Authority (National Company Law Tribunal), Chandigarh Bench, Chandigarh in I.A. No.326/2021 and IA No.328/2021 in CP(IB) No.406/Chd./Pb/2018)
IN THE MATTER OF: Mr. Ramneek Goel Son of Rattan Lal Goel, House 61, Sector 9, Urban Estate, Ambala City 13403 ... Appellant
Vs
1. Mr. Sunil Bajaj Son of Om Prakash Bajaj, 9, Rakhbagh, Ludhiana.
2. Resolution Professional, Nexgen Laminators Private Limited Village Farm, Bahadargarh, Patiala.
3. State Bank of India Madame Cama Road, Nariman Point, Mumbai-400021. One of its Branch at: State Bank of India, Stressed Asset Management Branch, Local Head Office, Sector 17A, Chandigarh-160017.
4. SIDBI Bank SCO 119-120, Sector 17 B Chandigarh 160017.
5. Canara Bank, Plot 1, Sector 34A, Chandigarh 160022. ... Respondents
Present:
For Appellant: Mr. Ramji Srinivasan, Sr. Advocate, Mr. Bishwajit Dubey, Ms. Radhika Dubey, Mr. Tushar Goel, Ms. Richa Parasher, Mr. Dhruv Srivastava, Ms. Namrata Saraogi, Mr. Kartik Pandey, Advocates.
Company Appeal (AT) (Insolvency) No. 845 of 2023 1 For Respondents: Mr. Sandeep Bajaj, Mr. Vipul Jai, Advocates for R-1
Mr. Abhishek Anand, Mr. Mohak Sharma, Mr. Sajal Jain, Mr. Supriyo Banerjee, Advocates for R-2.
Mr. NPS Chawla, Mr. Surekh, Ms. Kinjal Goyal, Advocates for R-3-5.
JUDGMENT
ASHOK BHUSHAN, J.
This Appeal has been filed against the order dated 13.06.2023
passed by the National Company Law Tribunal, Chandigarh Bench,
Chandigarh in IA Nos.326/2021 filed by the Resolution Professional ("RP")
praying for extension/ exclusion of 90 days for re-publication of invitation
for the Expression of Interest ("EOI") (Form-G). IA No.328/2021 was filed
by the Appellant seeking various prayers and IA No.329/2021 was filed
praying for interim relief in main application in IA No.328/2021. The
Adjudicating Authority by the impugned order dated 13.06.2023 has
allowed the IA No.326/2021 filed by the RP granting extension of 90 days.
IA No.328/2021 filed by the Appellant was rejected and IA No.329/2021
held to have rendered infructuous. The Appellant aggrieved by the order
dated 13.06.2023 has filed this Appeal.
2. Brief facts necessary to be noticed for deciding this Appeal are:
Company Appeal (AT) (Insolvency) No. 845 of 2023 2
(i) CIRP against the Corporate Debtor - Nexgen Laminators
Private Limited commenced by order dated 25.11.2019. Form-
G was issued by the RP on 08.02.2020 and 30.06.2020.
(ii) In response to Form-G published on 30.06.2020, the Appellant
submitted his EOI. The Appellant was asked by the Committee
of Creditors ("CoC")to improve the Resolution Plan. The
Appellant offered Rs.24.51 crores.
(iii) On Application filed by the RP, extension was granted by the
Adjudicating Authority of 90 days and thereafter 30 days on
15.03.2021.
(iv) With regard to Appellant's revised Resolution Plan, certain
observations were made by the SIDBI. The Meeting of the CoC
scheduled for 12.04.2021, in which, the Appellant was also
invited to participate. In the Meeting dated 12.04.2021, the
RP informed the CoC that he has received Resolution Plan from
another person Mr. Sunil Bajaj, 15 minutes prior to meeting.
In the Meeting, the Appellant was asked to up its bid. The CoC
in its 19th Meeting resolved to pass a Resolution that in order
to maximize the value of the assets of the Corporate Debtor, as
the other Resolution Plan is offering higher value, it would be
in the interest of the stakeholders to republish the Form-G and
seek more Resolution Applicants for resolution of the
Corporate Debtor. It was further noted that at least 90 days
of the CIRP period is required in event fresh Form-G is issued.
Company Appeal (AT) (Insolvency) No. 845 of 2023 3
(v) In pursuance of the Resolution passed in 19th CoC Meeting,
the RP filed an IA No.326/2021 praying for extension of 90
days period to enable the RP to publish the fresh Form-G. As
noted above IA Nos.328 and 329 of 2021 were filed by the
Appellant, making certain prayers.
(vi) All the three IAs decided by the impugned order dated
13.06.2023, against which order, this Appeal has been filed.
3. Shri Ramji Srinivasan, learned Senior Counsel assisted by Bishwajit
Dubey appearing for the Appellant submits that Adjudicating Authority
committed error in allowing the extension of time for issuance of fresh
Form-G. It is contended that 300 days were going to expire on 15.04.2021
and the extension of 90 days on the basis of request from a stranger just
two days before the expiry of the CIRP period, ought not to have been
entertained. The learned Senior Counsel for the Appellant relying on the
judgment of the Hon'ble Supreme Court in Essar Steel, Commission of
Creditors v. Satish Kumar Gupta - (2020) 8 SCC 531 contended that
extension of time beyond the outer limit of 330 days could only be granted
in exceptional circumstances. Extension sought by CoC solely based on
the reason that fifteen minutes prior to the 19th CoC, Respondent No.1 has
offered 10% more, was no ground for extension. It is submitted that
Resolution Plan can be submitted only when two pre-conditions are
satisfied, i.e., person must have applied pursuant to Form-G and should
have been part of the final list of Prospective Resolution Applicants
("PRA")and only thereafter, as per Regulation 36-B(1) request for a
Company Appeal (AT) (Insolvency) No. 845 of 2023 4 Resolution Plan can be issued by RP to such PRA appearing in the final
list. It is submitted that RP has committed breach of confidentiality and
the Application filed by the Appellant before the Adjudicating Authority
praying for inquiry regarding breach of confidentiality has wrongly been
rejected on the ground that Adjudicating Authority has only a summary
jurisdiction and such inquiry cannot be undertaken. The decision to issue
fresh Form-G is not a commercial wisdom of the CoC. The learned Counsel
for the Appellant placed reliance on some other judgments of this Tribunal
and Hon'ble Supreme Court, which shall be noted hereinafter.
4. The learned Counsel for the RP refuting the submissions of learned
Counsel for the Appellant submits that the Appellant was only a Resolution
Applicant, whose Plan was never approved by the CoC. Rather, the said
Plan was earlier rejected by the CoC and the revised Plan submitted by the
Appellant was under consideration. It is submitted that granting extension
of CIRP was well within the jurisdiction of the Adjudicating Authority. The
300 days period was coming to an end on 15.04.2021, before which CoC
passed a Resolution for issuance of fresh Form-G. Allegations made by the
Appellant against RP that RP has breached the confidentiality are baseless
and devoid of merits. The Resolution Plan, which was submitted by
Respondent No.1 was on the basis of information available in the public
domain and RP never disclosed any information to Respondent No.1. The
decision of the CoC to issue fresh Form-G was with the object to maximize
the value of the Corporate Debtor. The Appellant being sole prospective
Resolution Applicant was always trying to dominate the CoC to approve its
Company Appeal (AT) (Insolvency) No. 845 of 2023 5 Plan. The Appellant by email dated 19.12.2020 threatened to recall the
Resolution Plan, if not approved within seven days. Several objections were
raised against the Plan of the Appellant in the Meeting of the CoC, which
has been captured in the Minutes. In the 19th Meeting of the CoC, the
Appellant was asked to increase the value of the Plan, which the Appellant
refused. Further, the Appellant has given his no objection in publication
of fresh Form-G, which is noted in the Minutes. Hence, it is not open to
the Appellant to challenge the order of the Adjudicating Authority granting
extension of 90 days.
5. The learned Counsel appearing for Respondent No.1 submits that
Respondent No.1 has filed the Resolution Plan on the basis of information
available on the public domain and no confidential information was shared
by the RP with them and allegations of the Appellant was baseless and are
desperate attempts to distract this Tribunal from main issue. It is well
settled that Adjudicating Authority has discretion to extend time beyond
the CIRP period of 330 days in exceptional cases, to protect the interest of
the stakeholders by putting the Corporate Debtor back on its feet instead
of forcing the Corporate Debtor into liquidation. Respondent No.1
participated in the CIRP of Corporate Debtor by submitting its EOI on
11.01.2021 and 12.01.2021 to Respondent No.2.
6. We have considered the submission of learned Counsel for the
parties and have perused the record.
Company Appeal (AT) (Insolvency) No. 845 of 2023 6
7. Before we proceed to consider the rival submission of the parties, we
need to first notice the Minutes of the 19th CoC Meeting, where CoC
deliberated on various aspects, which were before it. The Minutes of the
19th CoC Meeting held on 12.04.2021 has brought on record as Annexure
A-18, Vol.IV to the Appeal. In Item No.19.04 with regard to revised
Resolution Plan received from the Appellant, the RP submitted before the
CoC that revised Resolution Plan was received from the Appellant. RP
further apprised the CoC about the new development that 15 minutes prior
to the CoC Meeting, the RP has received an email from Mr. Sunil Bajaj,
wherein a Resolution Plan for an amount of Rs.27.06 crores has been
submitted. There was certain difference of opinion between the CoC
Members, regarding the course of action, the RP has also informed the
Appellant that he has received the Resolution Plan from another Applicant
in which the Applicant has proposed Plan amount of Rs.27.06 Crores and
Appellant was asked to increase the Plan amount. It is recorded in the
Minutes that Appellant replied that he cannot further improve the Plan. It
is useful to extract the relevant portion of the Minutes of the 19th Meeting
of the CoC, which is to the following effect:
"Thereafter RP informed Mr. Ramneek Goel that he has received a Resolution Plan from another Applicant in which the applicant has proposed plan amount of Rs. 27.06 Cr and further asked Mr. Ramneek Goel to increase the plan amount to match with the amount proposed by Mr. Sunil Bajaj to which Mr. Ramneek Goel replied that, he cannot further improve his resolution plan amount of Rs. 24.51 Crore which is mentioned in the
Company Appeal (AT) (Insolvency) No. 845 of 2023 7 Resolution Plan submitted earlier. Mr. Ramneek Goel further asked that how plan of Mr. Sunil Bajaj can be accepted at this stage.
RP and other CoC members again requested Mr. Ramneek Goel to consider once again regarding improvement in the resolution plan amount and inform RP regarding the same by tomorrow morning to which Mr. Ramneek Goel stated that, he will not increase or modify the Plan amount but still he will confirm by tomorrow morning to RP."
8. The Minutes further records that in continuation of the 19th CoC, the
CoC Meeting was conducted on 13.04.2021, with regard to which following
was recorded:
"In continuation of the 19th CoC meeting, the CoC meeting was conducted on 13th April, 2021 in which the RP apprised the CoC members that the revised resolution plan of Mr. Ramneek Goel, has been shared with all the CoC members on dated 13.04.2021 in which the remaining two conditions of the SIDBI regarding PDC and Land in front of Gate of corporate debtor have been amended. Further the representative of Canara Bank asked RP that whether Prospective Resolution Applicant, Mr. Ramneek Goel is ready to increase the resolution plan amount to which RP replied that Mr. Ramneek Goel is not ready to increase the plan amount. RP has also explained to Mr. Ramneek Goel that there are chances that the CoC may go for issuance of new Form-G to which Mr. Ramneek Goel replied that he will not increase the plan amount further even if from-G is published again.
Company Appeal (AT) (Insolvency) No. 845 of 2023 8 Further the representative of Canara Bank asked RP to take on call Mr. Ramneek Goel. The RP once again asked Mr. Ramneek Goel in front of CoC members telephonically to increase the Plan amount as the applicant Mr. Sunil Bajaj is offering Rs. 27.06 Cr. To which Mr. Ramneek Goel replied that he is not ready to increase the plan amount. RP again explained to Mr. Ramneek Goel that there might be chances that the CoC may go for issuance of new Form-G to which Mr. Ramneek Goel replied that he will not increase the plan amount even if from-G is published again. RP asked Mr. Ramneek Goel that is he having any objection if CoC decided to publish Form-G again to which Mr. Ramneek Goel replied that he has no objection."
9. The above Minutes clearly shows that the Appellant informed the RP
that he is not ready to increase the Plan amount and he has no objection,
if CoC decides to publish Form-G again. After some deliberations on the
Agenda Items, the CoC decided to re-publish the Form-G. It is useful to
extract the following part of the Minutes:
"The matter was deliberated upon in detail and the representative of Canara Bank asked that if agenda for publication of Form-G is approved than how much time will be required in the whole process of publication of Form-G till the submission of Resolution Plan by the Prospective Resolution Applicant to which RP replied that minimum 60 to 65 days is required and after that 15 days shall required for the negotiation and minimum 10 days for the approval of the plan from the higher authorities of the Financial Creditors and in short if the
Company Appeal (AT) (Insolvency) No. 845 of 2023 9 Coe decides to go for issuance of fresh Form-G than in that case extension for at least 90 days of the CIRP period is required.
Further the representative of the Canara Bank asked RP that what commitment can be taken from Mr. Sunil Bajaj as the CoC is considering to issue fresh Form-G only because of the interest shown by Mr. Sunil Bajaj as there shall be CIRP cost for additional payment and the receipt of resolution plan amount shall be delayed by 90 days. After discussion it was decided that Mr. Sunil Bajaj be asked to deposit a DD for Rs.50 lacs with a condition that if he withdraws the resolution plan or revised the resolution plan downwards, the DD of Rs.50.00 lacs shall be forfeited.
On the ask of CoC members, RP called Mr. Sunil Bajaj telephonically in front of CoC members and explained the decision of CQC members. Mr. Sunil Bajaj requested for one day time to discuss with other directors.
In view of the above, the Committee of Creditors decided that in order to maximize the assets of the Corporate Debtor, as the other resolution plan is offering higher value, it would be in the interest of the stakeholders to republish the FORM-G and seek more resolution applicants for resolution of the Corporate Debtor."
10. The present is a case where the Resolution Plan of the Appellant was
under consideration, when RP received an email from Respondent No.1
offering Rs.27.06 crores, which information was placed by RP before the
CoC. The Appellant was asked to increase its offer, which he denied. The
Company Appeal (AT) (Insolvency) No. 845 of 2023 10 CoC decided to re-publish Form-G after due deliberations. Relevant
extracts of the Minutes have already been quoted above.
11. The present is not a case where CoC accepted the Resolution Plan of
Respondent No.1 and proceeded to examine the Resolution Plan. The CoC
took a decision to publish fresh Form-G to give an opportunity to all
including Respondent No.1 and the Appellant to submit their Plans. The
RP during his submission has submitted that in pursuance of the order of
the Adjudicating Authority dated 13.06.2023, fresh Form-G was issued on
16.06.2023 in response to which 14 EOI's have been received.
12. Now, we notice the judgments on which reliance has been placed by
learned Counsel for the Appellant. The judgment of the Hon'ble Supreme
Court on which reliance has been placed by both the parties, i.e.,
Committee of Creditors of Essar Steel India Limited v. Satish Kumar
Gupta and Ors. It was a judgment where the Hon'ble Supreme Court has
held that it is only in exceptional cases that extension of time can be
granted, the general rule being 330 days is the outer limit. Following was
observed in paragraph 127:
"127. ....Thus, while leaving the provision otherwise intact, we strike down the word "mandatorily"
as being manifestly arbitrary under Article 14 of the Constitution of India and as being an excessive and unreasonable restriction on the litigant's right to carry on business under Article 19(1)(g) of the Constitution. The effect of this declaration is that ordinarily the time taken in relation to the corporate resolution process of the
Company Appeal (AT) (Insolvency) No. 845 of 2023 11 corporate debtor must be completed within the outer limit of 330 days from the insolvency commencement date, including extensions and the time taken in legal proceedings. However, on the facts of a given case, if it can be shown to the Adjudicating Authority and/or Appellate Tribunal under the Code that only a short period is left for completion of the insolvency resolution process beyond 330 days, and that it would be in the interest of all stakeholders that the corporate debtor be put back on its feet instead of being sent into liquidation and that the time taken in legal proceedings is largely due to factors owing to which the fault cannot be ascribed to the litigants before the Adjudicating Authority and/or Appellate Tribunal, the delay or a large part thereof being attributable to the tardy process of the Adjudicating Authority and/or the Appellate Tribunal itself, it may be open in such cases for the Adjudicating Authority and/or Appellate Tribunal to extend time beyond 330 days. Likewise, even under the newly added proviso to Section 12, if by reason of all the aforesaid factors the grace period of 90 days from the date of commencement of the Amending Act of 2019 is exceeded, there again a discretion can be exercised by the Adjudicating Authority and/or Appellate Tribunal to further extend time keeping the aforesaid parameters in mind. It is only in such exceptional cases that time can be extended, the general rule being that 330 days is the outer limit within which resolution of the stressed assets of the corporate debtor must take place beyond which the corporate debtor is to be driven into liquidation."
Company Appeal (AT) (Insolvency) No. 845 of 2023 12
13. There can be no dispute to the law laid down by the Hon'ble Supreme
Court that 330 days is the maximum period provided by the Code for the
completion of CIRP. The present is a case where 300 days were expiring
on 15.04.2021 and prior to expiry of the 300 days period, a decision was
taken to re-publish Form-G. The CoC has reason to take a decision since
they received an email from Respondent No.1 offering higher value. The
objective of the IBC is to maximize the value of the Corporate Debtor and
decision taken by the CoC to re-publish Form-G cannot be faulted in the
facts of the present case. We may in this regard refer to judgment of this
Tribunal in Vistra ITCL (India) Ltd. v. torrent Investments Pvt. Ltd. &
Ors. - (2023) Scc OnLine NCLAT 110 wherein this Tribunal while deciding
the jurisdiction of CoC to re-issue RFRP held following in paragraph 60:
"60. In view of the foregoing discussions, we, thus conclude that even after completion of Challenge Mechanism under Regulation 39(1A)(b), the CoC retain its jurisdiction to negotiate with one or other Resolution Applicants, or to annul the Resolution Process and embark on to re-issue RFRP. Regulation 39(1A) cannot be read as a fetter on the powers of the CoC to discuss and deliberate and take further steps of negotiations with the Resolution Applicants, which resolutions are received after completion of Challenge Mechanism."
14. The learned Counsel for the Appellant has placed reliance on the
judgment of this Tribunal in Dwarkadhish Sakhar Karkhana Limited
v. Pankaj Joshi - Company Appeal (AT) (Insolvency) No.233 of 2021.
The judgment of this Tribunal Dwarkadhish Sakhar Karkhana Ltd. was a
Company Appeal (AT) (Insolvency) No. 845 of 2023 13 case where the order passed by the Adjudicating Authority accepting the
Expression of Interest of Dwarkadhish Sakhar Karkhana Ltd. after due
date was set-aside by the Adjudicating Authority vide order dated
01.03.2021, which order came to be challenged in the Appellate Tribunal.
The facts in the above case, as noticed in paragraph 1 to 3, which are
relevant is reproduced as below:
"1. The Adjudicating Authority (National Company Law Tribunal, Special Bench, Mumbai) by the impugned order dated 01.03.2021 allowed the Application of Gangamai Industries and Constructions Ltd. (GIACL) I.A. No. 1029 of 2020 in CP (IB) 2056/MB/2019,whereby the decision of CoC accepting the Expression of Interest (EOI) of Dwarkadhish Sakhar Karkhana Ltd. (DSKL) after due date, was set aside and deprecated the conduct of Resolution Professional (RP) Pankaj Joshi. Therefore, they have filed these Appeals assailing the order. Both the Appeals are disposed of by this common Judgment.
2. Brief facts of the case are that, on 10.10.2019 the Adjudicating Authority passed an order in CP (IB) 2156/MB/2019 filed by Canara Bank under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC), thereby initiated CIRP of the Corporate Debtor 'KGS Sugar and Infra Corporation Ltd'. Accordingly, by the admission order, moratorium in terms of Section 14 of the IBC was declared and one Mr. Balady S. Shetty was appointed as the Interim Resolution Professional (IRP). The CoC in its first meeting, appointed Mr. Balady S Shetty as Resolution Professional. Mr. Shetty published the invitation of expression on 18.01.2020, wherein the
Company Appeal (AT) (Insolvency) No. 845 of 2023 14 last date for submission of EOI was 10.02.2020 and for submission of Resolution Plan, it was 05.04.2020.
3. Pursuant to the EOI, the RP Mr. Shetty received EOIs from 14 Prospective Resolution Applicants, out of which only four including GIACL met the eligibility criteria. Subsequently, by email dated 12.03.2020, DSKL submitted its EOI to Mr. Shetty. On the same day, Mr. Shetty informed DSKL that EOI was received after last date of submissions, therefore, it cannot be considered. Thereafter, on 23.03.2020, DSKL sent an email to the CoC Members to allow DSKL to submit EOI. On
02.04.2020, DSKL sent email to Mr. Shetty requesting to make necessary information available for submissions of Resolution Plan. On 03.04.2020, Mr. Shetty placed the request of submitting EOI by DSKL before the 07thCoC Meeting. After deliberation, the CoC passed the Resolution unanimously and thereby rejected the request of DSKL for submitting EOI. Mr. Shetty has communicated the decision to DSKL on 09.04.2020."
15. In the above facts, this Tribunal took the view that after expiry of due
date, the EOI ought not to have been accepted and the decision of the CoC
to allow EOI after due date is not a commercial wisdom. The Adjudicating
Authority further took the view in that case that CoC has earlier refused to
take the EOI of DSKL, but RP accepted the EOI. This Tribunal in paragraph
39, observed following:
"39. Pankaj Joshi has suppressed the fact that he himself has overturned the decision of 7thCoC meeting and permitted DSKL to submit its EOI. Pankaj Joshi also
Company Appeal (AT) (Insolvency) No. 845 of 2023 15 misguided the CoC that 'he is not required to take express permission from the CoC to issue a request for Resolution Plan to an eligible Prospective Resolution Applicant'. This is not the position in this case the request for submission of EOI after due date was rejected by the CoC then there is no question to issue a request for resolution plan to DSKL."
16. The present is not a case that EOI from Respondent No.1 has been
received after the due date. Rather, a decision was taken to re-publish the
Form-G, giving opportunity to all including the Appellant and Respondent
No.1. Thus, the judgment of this Tribunal in Dwarkadhish Sakhar
Karkhana Ltd. is clearly distinguishable.
17. Another judgment relied on by learned Counsel for the Appellant is
judgment of this Tribunal in Committee of Creditors of Meenakshi
Energy Ltd. v. Consortium of Prudent ARC Ltd. & Vizag Minerals and
Logistics P Ltd. - Company Appeal(AT) (CH)(Insolvency) No. 166 of 2021
where order dated 24.06.2021 passed by the Adjudicating Authority was
under challenge. In the facts of the above case, after expiry of 330 days,
the Resolution Plan was accepted. The Adjudicating Authority vide order
dated 24.06.2021 directed the CoC and Resolution Applicant to only
consider the Plan received before the expiry of 330 days of CIRP period.
This Tribunal in paragraph 115, thus issued direction to consider the Plan,
which were received before the due date. The present is not a case where
Resolution Plan of Respondent No.1 is being considered, which was not
admittedly filed during the period of publication of Form-G second time.
Company Appeal (AT) (Insolvency) No. 845 of 2023 16 The decision was taken by the CoC to re-publish Form-G to give
opportunity to Respondent No.1 and all other interested person to file the
Resolution Plan. We, thus, are of the view that judgment of this Tribunal
in Committee of Creditors of Meenakshi Energy Ltd. is also clearly
distinguishable.
18. The learned Senior Counsel for the Appellant next submitted that
there was breach of confidentiality since RP has given information to
Respondent No.1 to file a Resolution Plan and the prayer of the Appellant
to conduct an inquiry with regard to confidentiality has wrongly been
rejected by the Adjudicating Authority. The prayers made in IA
No.328/2021 have been extracted in paragraph 8 of the order of the
Adjudicating Authority, which is to the following effect:
"8. The present application is filed under Section 60(5) of the Insolvency and Bankruptcy Code, 2016, by Mr. Ramneek Goel (hereinafter referred to as 'Applicant') against the respondents to issue directions for:
a) Direct Respondent No. 2 to Respondent No. 5 to produce all relevant documents before this Adjudicating Authority (including but not limited to the resolution plan of Respondent No. 1 in a sealed cover) to show how Respondent No. 1 received access to the information. b) Declare that Respondent No. 1's submission of the resolution plan is in breach of the confidentiality of information of the Corporate Debtor;
Company Appeal (AT) (Insolvency) No. 845 of 2023 17 c) Declare that Respondent No. 1 is guilty of the fraudulent practice of CIRP; d) Declare all action basis submission of resolution plan by the Respondents is void, including but not limited to publication of Form-G."
19. It is true that Adjudicating Authority has rejected the IA
No.328/2021 observing that issue of alleged breach of confidentiality
cannot be adjudicated as it has only a summary jurisdiction in the matter.
We are of the view that above observation of the Adjudicating Authority
cannot be approved. The Adjudicating Authority has full authority to
examine all issues arising out of insolvency resolution process. However,
in the facts of the present case, especially when the Appellant was asked
in the 19th Meeting of the CoC to increase its Plan value and further has
submitted that he has no objection for issuance of fresh Form-G, which is
recorded in the Minutes, the CoC decided to issue fresh Form-G for giving
opportunity to all eligible candidates including the Appellant, no exception
can be taken to the process. Respondent No.1 in his application has
categorically pleaded that he has filed Resolution Plan on the basis of
information, which are available in the public domain, hence, any inquiry
on alleged breach of confidentiality was not called for in the facts of the
present case.
20. As noted above, in pursuance of the fresh Form-G issued on
16.06.2023, 14 EOIs have been received. The Appellant was only a
Resolution Applicant and cannot have any vested right that it is his
Company Appeal (AT) (Insolvency) No. 845 of 2023 18 application alone, which should be voted and approved. The CoC has
ample jurisdiction under the IBBI Regulations, 2016.
21. As observed above, the present is not a case that Resolution Plan
submitted by Respondent No.1 by email before 15.04.2021 was considered
on merits. Rather, the CoC took a decision to issue fresh Form-G to give
opportunity to all with the object of maximizing the value of Corporate
Debtor. The Adjudicating Authority had not committed any error in
granting extension of 90 days period after expiry of 300 days to complete
the process. Exclusion of time granted by Adjudicating Authority in the
facts of the present case cannot be held to be erroneous and uncalled for.
22. In view of the foregoing discussions, we do not find any error in the
impugned order, warranting interference by this Appellate Tribunal in
exercise of its appellate jurisdiction. The Appeal is dismissed. No order as
to costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
NEW DELHI
8th August, 2023
Ashwani
Company Appeal (AT) (Insolvency) No. 845 of 2023 19
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free