A dispute under Section 8(2) of the IBC, in relation to the transaction on which an operational creditor's application is founded, must be shown by the corporate debtor to exist as at the date of the demand notice. Correspondence that concerns a different purchase order, or is not referred to in the reply to the statutory notice, does not establish a dispute in relation to that transaction. Lab reports prepared by the corporate debtor's own laboratory and never communicated to the operational creditor cannot be relied upon to show that the goods supplied were non-conforming. A suit for damages filed after receipt of the statutory notice cannot be treated as the existence of a pre-existing dispute under Section 8(2)(a). A pronouncement of an order beyond the period prescribed by Rule 150 of the NCLT Rules 2016 and the guidelines in Anil Rai does not, by itself, render the order liable to be set aside where the order is otherwise sound and no prejudice is shown. Failure to publish the cause list in advance under Rule 89 of the NCLT Rules 2016 is an irregularity rather than an illegality where the party was not thereby denied access to the order.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
1
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT)(Ins.) No. 546 of 2020 IN THE MATTER OF: Rajratan Babulal Agarwal Gokul- Flat No. 4, Geet Gopal Apartment, Opposite Laxmi Process Ichalkaranji - 416115 Dist. Kolhapur, Maharashtra. Office 10/868, Koik, Building, Vardhaman Chowk, Shahpur Road, Ichalkaranji, Dist. Kolhapur, 416115 Maharashtra. ...Appellant Vs. 1.Solartex India Pvt. Ltd. & Ors. Having Its registered office at: 105, 1st Floor, Raghuvir Textile Mall, Aai Mata Road, Dhumbhal, Parvat Patia Surat, 395010. ...Respondent No. 1 2. Honest Derivatives Pvt. Ltd. Having its registered office at: E-43, Second Floor, Sumel Business Park, Near New Cloth Market, Outside Raipur Gate, Ahmadabad. 380002 Factory Gate No. 50, Maldabadi,
Company Appeal (AT)(Ins.) No. 546 of 2020 2
Tal, Jamner, Dsit. Jalgaon, Maharashtra. ... Respondent No. 2
3. Kailash T Shah Interim Resolution Professional for Honest Derivatives Pvt. Ltd. 505, 21st Century Business Centre, Near World Trade, Ring Road, Surat 395002 ... Respondent No. 3 Present: For Appellant: Mr, Mr. Ritin Rai, Sr. Advocate, Anish Agarwal Mr. Mayur Khandeparkar, Mr. Tejas Agarwal, Ms. Vanshika Gupta, Advocates For Respondent: Mr. Pavan Godiawala, Advocate for R1 Mr. Vishnu Shankar, Advocate for R2 & R3
JUDGMENT
Jarat Kumar Jain, J:
The Appellant 'Raj Ratan Babulal Agarwal', Ex-Director of Honest
Derivatives Pvt. Ltd. (Corporate Debtor/ Respondent No. 2) filed this Appeal
against the order dated 28.05.2020 passed by Adjudicating Authority
(National Company Law Tribunal, Ahmedabad Bench, Ahmedabad) in CP(IB)
393/9/NCLT/AHM/2018 whereby the application filed by Solartex India Pvt.
Ltd. (Operational Creditor/ Respondent No. 1) under Section 9 of the
Insolvency and Bankruptcy Code, 2016 (hereinafter referred to as 'IBC') was
admitted and Corporate Insolvency Resolution Process (hereinafter referred
toas 'CIRP') was initiated against the Corporate Debtor. Mr. Kailash T Shah
Company Appeal (AT)(Ins.) No. 546 of 2020 3
(Respondent No. 3) was appointed as the Interim Resolution Professional
(IRP).
2. In this Judgment the parties are referred in their original status i.e.
Honest Derivatives Pvt. Ltd. as Corporate Debtor and Solartex India Pvt. Ltd.
as Operational Creditor.
3. Brief facts of this Appeal are that Corporate Debtor (Respondent No. 2)
placed an order for supply of 500 MT Indonesian Coal vide their purchase
order No. HDPL/16-17/586 dated 27.10.2016. Pursuant to this order the
Operational Creditor, Solartex India Pvt. Ltd has supplied the required
quantity of coal as per specifications to the Corporate Debtor's factory at
Jamner District, Jalgaon, Maharashtra and issued 20 invoices from
28.10.2016 to 02.11.2016 for a total amounting to Rs. 15,73,279/-. The
Corporate Debtor has not made any payment for supply of goods against the
aforesaid invoices. As per the terms of the agreement, the Corporate Debtor
is also liable to pay interest @ 30% p.a. from the date of default till date of
actual payment. The Corporate Debtor is liable to pay the principal amount
15,73,279 plus interest amounting to Rs. 5,84,421.38 up to 31.01.2018, the
total of which amounts to Rs. 21,97,700.38/-. The Corporate Debtor failed to
pay the dues; therefore, the Operational Creditor issued a demand notice on
05.02.2018, which was delivered to Corporate Debtor on 08.02.2018. The
Operational Creditor received a reply to the notice from the Corporate Debtor
on 19.02.2018 which expressed complete denial of Operational Debt. Instead,
Company Appeal (AT)(Ins.) No. 546 of 2020 4
the Corporate Debtor demanded an amount of Rs. 4,44,17,438/- towards
damage and loss caused to them. Therefore, the Operational Creditor on
30.07.2018 filed an Application under Section 9 of the IBC against the
Corporate Debtor.
4. The Corporate Debtor resisted the application on the ground that the
quality and quantity of the coal received by them was not as per the
specifications contained in the purchase order. Further, the quality of coal
was tested by the Corporate Debtor only upon receipt and usage. Upon finding
out the inferior quality of coal, the Corporate Debtor immediately sent e-mails
(dated 30.10.2016 and 03.11.2016) to the Operational Creditor. The
Operational Creditor in its email dated 04.11.2016 admitted that the moisture
content in the coal is not as per specifications. The Corporate Debtor had to
suffer loss. Therefore, the Corporate Debtor filed a suit on 26.03.2018 against
the Operational Creditor inter alia seeking damages and losses suffered under
the said purchase order.
5. The Adjudicating Authority after hearing Ld. Counsel for the parties
held that the Corporate Debtor has failed to establish pre-existing dispute.
Admittedly the default has occurred on 10.11.2016 which is above Rs. 1 lakh.
A statutory notice has been duly served. Thus, the Adjudicating Authority
admitted the application under section 9 of the IBC and appointed Shri
Kailash T Shah as the IRP and declared a moratorium, for the purposes
referred to in Section 14 of the IBC.
Company Appeal (AT)(Ins.) No. 546 of 2020 5
6. Being aggrieved with the said order, the Ex-Director of the Corporate
Debtor has filed this Appeal.
7. Ld. Counsel for the Appellant submitted that Ld. Adjudicating
Authority failed to consider the documents filed in support of the pre-existing
dispute. The Corporate Debtor vide its e-mail dated 30.10.2016 as well as its
e-mail dated 03.11.2016 informed the Operational Creditor that the supplied
coal was about 4000 Gross Calorific Value (GCV) whereas the Purchase Order
was for 5,400 GCV and the coal had a high moisture content. This fact was
also admitted by the Operational Creditor in its letter dated 04.11.2016. It is
also submitted that various lab test reports clearly show that the coal
supplied was of a substantially poor quality and not as per purchase order.
In support of this argument, the Appellant has filed e-mails dated 30.10.2016,
03.11.2016, 04.11.2016 and an analysis report of raw material by Central
Testing Laboratory and the reply to the notice.
8. Ld. Counsel for the Appellant further submitted that the both Members
of Adjudicating Authority (Mr. Harihar Prakash Chaturvedi and Prashanta
Kr. Mohanty) were transferred with immediate effect vide separate orders
dated 12.05.2020 and 30.04.2020. They have passed the impugned order on
28.05.2020 which is in contravention to Rule 152 of the NCLT Rules 2016. It
was pointed out that the impugned order was passed more than six months
after being reserved, which violates Rule 150 of the NCLT Rules, 2016 which
mandates that the orders have to be passed within 30 days of such order
Company Appeal (AT)(Ins.) No. 546 of 2020 6
being reserved. Hon'ble Supreme Court in the case of Anil Rai Vs. State of
Bihar (2001) 7 SCC 318 laid down guidelines regarding the pronouncement
of judgments which shall be followed by all concerned. As per the guidelines,
after conclusion of the arguments in civil matters the judgment must be
pronounced within a period of two months. However, it was submitted that
in the present case, the impugned order has been pronounced after six
months from the date of conclusion of the arguments. Therefore, on this
ground, the impugned order is liable to be set aside.
9. Ld. Counsel for the Appellant further submitted that as per Rule 89 of
the NCLT Rules, 2016, the registry is required to publish the cause list for the
next day in advance, however, in the present case, the cause list for
pronouncement of the impugned order was published on the same day i.e. on
28.05.2020 and may even have been issued after pronouncement of the order,
therefore, there is a clear violation of Rule 89 of the NCLT Rules, 2016. This
has caused prejudice to the Appellant as the Appellant did not get an
opportunity to claim rehearing which is a substantive right of the Appellant.
10. On the other hand, Ld. Counsel for the Respondent No. 1/Operational
Creditor submitted that there is no pre-existing dispute. Shri. Tradco Deesan
Pvt. Ltd. (STDPL), the sister concern of the Corporate Debtor has sent an e-
mail dated 30.10.2016 to the group concern of the Operational Creditor which
was a separate transaction and the Corporate Debtor tried to interlink the
transactions only to mislead this Appellate Tribunal. So far as the lab reports
Company Appeal (AT)(Ins.) No. 546 of 2020 7
are concerned, it was submitted that these false reports are unilaterally
prepared to create evidence. There is no sanctity of such reports which are
admittedly not delivered to the Operational Creditor. It is further submitted
that e-mail dated 03.11.2016 was received by the Operational Creditor.
Immediately thereafter, the Operational Creditor sent a reply on 04.11.2016
which is self-explanatory and the Operational Creditor stopped the supply of
coal. The supply of coal till 02.11.2016 was as per specifications of the
Corporate Debtor and the Corporate Debtor has upon consuming the goods
tried to create a false dispute. It is also submitted that after sending the e-
mail dated 03.11.2016, the Corporate Debtor has neither issued any debt
note nor sent any reminder that huge loss has been sustained by them. After
receiving the statutory notice, a false suit claiming damages Rs. 03 Crores
has been filed. Admittedly, the suit is filed after receiving the statutory notice,
therefore, as per Section 8 (2) (a) of IBC, the suit was not pending before the
receipt of statutory notice, therefore, it is not a pre-existing dispute. Reliance
was placed on a judgment rendered by the Hon'ble Supreme Court in the case
of Mobilox Innovations Pvt. Ltd. Vs. Kirusa Software Pvt. Ltd. (2018) 1 SCC
353 wherein it was held that the dispute should not be patently feeble legal
argument or an assertion of unsupported by evidence. The dispute is purely
spurious hypothetical and illusory. Therefore, Ld. Adjudicating Authority has
rightly rejected the plea of the pre-existing dispute and admitted the
application.
Company Appeal (AT)(Ins.) No. 546 of 2020 8
11. Ld. Counsel for the Respondent No. 1 further submitted that it is true
that both the Members of the Adjudicating Authority were under transferred
however, due to the COVID-19 pandemic, they could not travel and take
charge of another bench. Hence, the matters which were already heard, in
those matters orders were pronounced. The matters were getting listed for
pronouncement of order, hence, there is no violation of any Rule. The
Appellant does not have merits in the Appeal, therefore, he has raised such
baseless issues.
12. It is further submitted that the Appellant has no locus to prefer the
appeal independently without any authority. Thus, the appeal is liable to be
dismissed with cost.
13. After hearing ld. Counsel for the parties, we have minutely examined
the record and considered the submissions.
14. Following issues arise for our consideration.
(i) Whether there is any pre-existing dispute?
(ii) Whether the impugned order is passed in contravention of Rule 152, Rule
150 and Rule 89 of the NCLT Rules 2016?
Issue No. (i)
Company Appeal (AT)(Ins.) No. 546 of 2020 9
15. Ld. Counsel for the Appellant argued that there was a pre-existing
dispute as defined in Section 5(6) r/w Section 8 (2) (a) of the IBC. For this
purpose, he placed reliance on following documents:
(a) Email dated 30.10.2016
(b) Email dated 03.11.2016
(c) Email dated 04.11.2016
(d) Analysis Report of raw material by Central Testing Laboratory
(e) Reply to statutory notice
(f) Civil Suit for damages filed against Operational Creditor.
16. We are considering the documents one by one. The e-mail dated
30.10.2016 reads as under:-
"Sun, Oct 30, 2016 At 12:50PM
Dear sir, With reference to 5400 gcv imp coal supply to (Stdpl) dhule and (Hdpl) Jamner, following issues are to be shared For dhule plant: high moisture and powder percentage is to be found, already discussed to you.
For Jamner Plant: recently supply include high level of powder percentage and moisture too.
Kindly consider the issues and please make us assure about quality of coal should not be down the level.
Its difficult to run the plant smoothly that's down the production efficiency. Pics attached for your reference"
17. Ld. Counsel for the Respondent No. 1/Operational Creditor submitted
that this e-mail was sent by Shri Tradco Deesan Pvt. Ltd. (STDPL), the sister
Company Appeal (AT)(Ins.) No. 546 of 2020 10
concern of Corporate Debtor to Group Concern of the Operational Creditor
and has nothing to do with the transaction in question.
18. In order to appreciate the arguments, it is useful to refer to Para 7.11
of the reply affidavit filed by Mr. Vinod P. Chaturvedi before the Adjudicating
Authority (Annexure A-10 Pg. 121).
"7.11 Immediately thereafter by an email dated 30th October, 2016 STDPL informed the Applicant that the coal supplied and delivered by the Applicant was not in accordance with the specifications prescribed under the said PO and the Purchase Order dated 11th October, 2016 and that the use of such coal caused production losses to the Respondent and STDPL. Hereto annexed and marked as Exhibit "c" is a copy of the said email dated 30th October, 2016."
19. With the above admission in the affidavit, it is apparent that on
30.10.2016, STDPL, a sister concern of the Corporate Debtor has sent an e-
mail to Group Concern of the Operational Creditor in regard to the Purchase
Order dated 11.10.2016 whereas, the present claim is in regard to the
Purchase Order dated 27.10.2016. It is also to be seen that there is no
reference of this e-mail in the reply to the statutory notice. In the said e-mail
it is not mentioned that it is in relation to the Purchase Order dated
27.10.2016. In the subsequent e-mail dated 03.11.2016, there is no reference
to the earlier e-mail dated 30.10.2016. In such circumstances, we are of the
view that the e-mail dated 30.10.2016 is not related to the transaction in
question.
20. Now we have considered the email dated 03.11.2016 which reads as
under: -
Company Appeal (AT)(Ins.) No. 546 of 2020 11
"Date 03.11.2016 Kind Attn: Mr. Samirji Sub: - Inferior/poor quality of Indonesian Coal. Dear Sir, We have placed an order for 500 MT Indonesian Coal to you vide our P.O. No. HDPL/2016-17/586 dated 27.10.2016 for 5400 GCV and Moisture condition is 38-40%. But, on receiving the coal we found that GVC less than 4000 and size of coal is 0mm 50% and maximum size is 5mm to 6 mm only and moisture is 48-50%. It seems if we receive such type of coal we are facing the cleaning problem of boiler and due to that nozzle bent and boiler become damaged. This will occur heavy production loses. Hence, please stop delivery of the material/coal and advise us what to do this loss. If any more losses occurred due to poor/inferior quality of coal, we may debit the same amount in your account which may please be noted.
Thanking you, Yours faithfully, For Honest Derivatives Pvt. Ltd.
Ravi Jajodia Vice President (Operation)"
21. The Operational Creditor has sent reply through e-mail dated
04.11.2016 which reads as under: -
"Fri, November 4, 2016 at 4:45AM Dear Sir, It is not possible that the coal is off 4000 GCV, secondly from port it is possible that moisture can go upto 42 percent but not above that also because at port they are putting water on the coal as per GPCB guidelines of pollution.
So please take a note regarding this. We have immediately stopped the delivery, but please inform your transporter. Regards, Samir Agarwal Rawalwasia Group 104, Raghuvir Textile Mall, Bh. DR World, I mata chock Poona Khubhariya Road, Surat - India - 395010 M - + 91-9824102989, + 9374538264 O- +91- 261-2705000"
22. Upon a bare reading of e-mail dated 03.11.2016, it is clear that the
Corporate Debtor stated that the supplied coal is not as per specification and
Company Appeal (AT)(Ins.) No. 546 of 2020 12
due to that nozzle bent and boiler has become damaged which would lead to
heavy production losses. Hence, it was requested that delivery of the coal be
stopped. It is also mentioned that if more losses occurred due to poor/inferior
quality of coal they may debit the same amount in the account of Operational
Creditor. The Operational Creditor has sent a reply through e-mail dated
04.11.2016 and immediately stopped the delivery of coal. Thereafter,
Corporate Debtor has neither issued any debit note nor has returned the
supplied coal but consumed the same. It means that after receiving the e-
mail dated 04.11.2016 the Corporate Debtor was satisfied and kept quiet for
about 15 months. It is only when they received a statutory notice that they
filed a Civil Suit against the Operational Creditor.
23. With the aforesaid discussion, it cannot be held that there was any
dispute in regard to the transaction in question. It seems that in order to
avoid the liability, the Corporate Debtor through its reply to notice, tried to
impress that there was a pre-existing dispute.
24. The Corporate Debtor has filed some analysis reports of raw material of
Central Testing Laboratory (Pg. 65-84 Appeal Paper Book). These reports were
never sent to the Operational Creditor and these reports are prepared by the
Corporate Debtor's testing laboratory. Therefore, these reports cannot be
considered to demonstrate that the supplied coal was not as per purchase
order.
Company Appeal (AT)(Ins.) No. 546 of 2020 13
25. It is an admitted fact that the Corporate Debtor has received the
statutory notice on 08.02.2018. Pursuant to the said notice, they sent the
reply to notice on 17.02.2018. Thereafter, the Corporate Debtor filed a Civil
Suit for damages against the Operational Creditor on 26.03.2018. Section 8
(2) of IBC reads as under: -
"existence of a dispute, if any, or record of the pendency of the suit or Arbitration proceedings filed before the receipt of such notice or invoice in relation to such dispute"
26. In the present case, the Civil Suit has been filed after receipt of
statutory notice, therefore, such Civil Suit cannot be treated as existence of
dispute.
27. Thus, we are of the view that the Corporate Debtor has failed to prove
any pre-existing dispute in regard to transaction in question.
Issue No. (ii)
28. It is an admitted fact that the NCLT Bench, Ahmedabad consisted of
Shri H. P. Chaturvedi Member (Judicial) and Shri Prashanta Kr. Mohanty
Member (Technical) who heard the application and reserved for orders on
20.11.2019. Thereafter, the parties have filed their written submission on
06.01.2020 and the impugned order was pronounced by the same Bench on
28.05.2020. Meanwhile, vide order dated 12.05.2020 and 30.04.2020 these
members have been transferred. However, due to lockdown they were unable
to join their new place of posting. Since the members were physically present
at Ahmedabad. Therefore, in public interest vide order dated 21.05.2020, a
Company Appeal (AT)(Ins.) No. 546 of 2020 14
special Bench was constituted to pronounce the orders reserved by the
erstwhile Bench as per Section 419 (3) of the Companies Act, 2013 for the
period of 22.05.2020 to 29.05.2020. Thus, it cannot be said that the members
have pronounced the impugned order in contravention of Rule 152 of the
NCLT Rules, 2016.
29. Rule 150 of the NCLT Rules, 2016 provides that "the Tribunal, after
hearing the Applicant and Respondent, shall make and pronounce an order
either at once or, as soon as, thereafter, as may be practicable but not later
than thirty days from the final hearing." Hon'ble Supreme Court in the case of
Anil Rai (Supra) while dealing with a Criminal Appeal framed detailed
guidelines regarding expeditious pronounce of judgments. It was held that in
Civil matters, the judgment must be pronounced within two months of the
close of hearing of the case. It is true that in the present case, the parties
have submitted written submissions on 06.01.2020, however, the impugned
order was pronounced on 28.05.2020 i.e. after about five months from the
conclusion of arguments which is against the aforesaid rule as well as
guidelines laid down by the Hon'ble Supreme Court.
30. We are of the view that only on this count the impugned order cannot
be set aside which is otherwise flawless.
31. Rule 89 of the NCLT Rules, 2016 provides that "the registry shall
prepare and publish the cause list for the next working day". Ld. Counsel for
Company Appeal (AT)(Ins.) No. 546 of 2020 15
the Appellant raised a plea that the cause list for pronouncement for the
impugned order was not published in advance and may even have been
published after pronouncement of the order. He has placed on record the
additional cause list dated 28.05.2020 (Pg. 215 of Appeal Paper Book) which
is in regard to pronouncement of impugned order. The cause list for
pronouncement of the impugned order was published on the same day i.e.
28.05.2020. It may be an irregularity but not an illegality. It is not the case
of the Appellant that he could not access the order on 28.05.2020.
32. With the aforesaid, we are of the view that the Appellant has failed to
establish that there was a pre-existing dispute and in pronouncing the
impugned order, the Adjudicating Authority committed any illegality. We find
no merits in this Appeal. Thus, the Appeal is dismissed. However, no order as
to costs.
[Justice Jarat Kumar Jain] Member (Judicial)
[Kanthi Narahari] Member (Technical)
New Delhi 27th May, 2021.
sc
Company Appeal (AT)(Ins.) No. 546 of 2020
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free