R S Infra vs R P Infraventure Pvt. Ltd

National Company Law Appellate Tribunal18 December 2023Ashok Bhushan

Ratio decidendi

The rule this decision rests on

Under Section 8(2) of the Insolvency and Bankruptcy Code, 2016, the corporate debtor's communication of the existence of a dispute to the operational creditor is the statutory means by which a dispute is raised against a demand notice, and a dispute so communicated before the demand notice may be taken into account by the Adjudicating Authority. Where the corporate debtor has raised a plausible contention requiring further investigation, which is not a patently feeble legal argument or an assertion of facts unsupported by evidence, and which is neither spurious, mere bluster, plainly frivolous nor vexatious, a pre-existing dispute exists between the parties regarding the operational debt, and an application under Section 9 cannot be admitted on the operational creditor's claim; the Adjudicating Authority need not finally adjudicate the existence of the dispute in a Section 9 proceeding. A pre-existing dispute is established where the corporate debtor's defence concerns the quality of services rendered by the operational creditor and is supported by debit notes communicated to the operational creditor before the issue of the demand notice, as shown by the operational creditor's own response to them. Where the operational creditor's claim to payment is conditional under the work order agreement on the corporate debtor's receipt of corresponding payment from the principal employer, and no such receipt is shown, no operational debt is due and payable; and deduction of tax at source does not by itself amount to an acknowledgment of liability for the operational debt.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

NATIONAL COMPANY LAW APPELLATE TRIBUNALPRINCIPAL BENCH, NEW DELHICompany Appeal (AT) (Insolvency) No. 80 of 2023& I.A. No.331 of 2023

[Arising out of the order dated 16.11.2022 passed by the Adjudicating Authority, National Company Law Tribunal, Court-V, New Delhi in CP(IB) No. 263 (ND) of 2021]

IN THE MATTER OF:

R S Infra Partnership Firm Through its Partner, Shri Rama Kant Sharma 43/462, Radha Nagar, Vashitabad, Sikandra, Agra, Uttar Pradesh - 282 007 ...Appellant

Versus

R P Infraventure Pvt. Ltd FF-22, First Floor, Omaxe Square, Jasola Dist. Centre New Delhi - 110 044 ...Respondent

Present:

Appellant: Mr. Gaurav Varma, Advocate.

Respondent: Mr. Sumant Batra, Mr. Sanjay Bhatt, Mr. Sarthak Bhandari, Advocates for R-1/RP Mr. Ajay Garg, Advocate.

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 1 JUDGMENT

[Per: Barun Mitra, Member (Technical)]

The present appeal filed under Section 61 of Insolvency and

Bankruptcy Code, 2016 ("IBC" in short) by the Appellant arises out of the

Order dated 16.11.2022 (hereinafter referred to as "Impugned Order")

passed by the Adjudicating Authority (National Company Law Tribunal,

Court-V, New Delhi) in CP (IB) No.263 (ND)/2021. By the impugned order,

the Adjudicating Authority has dismissed the Section 9 application filed by

M/s R S Infra, present Appellant seeking initiation of Corporate Insolvency

Resolution Process ("CIRP" in short) against the Corporate Debtor-M/s R P

Infraventure Pvt. Ltd. Aggrieved by the impugned order, the present appeal

has been filed by the Appellant.

2. The Learned Counsel for the Appellant/Operational Creditor

submitted that the Agra Development Authority had awarded a contract to

HG Infra Engineering Private Limited as the main contractor which in turn

further awarded a sub-contract to the Corporate Debtor-M/s R P

Infraventure Pvt. Ltd., which is the present Respondent. For further

execution of the said sub-contract, the Corporate Debtor had engaged R S

Infra, the present Operational Creditor for the purpose of excavation, loading,

transportation, unloading of soil and issued a work order dated 01.08.2014.

The work assigned to it by the Corporate Debtor had been completed and no

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 2 objections on the quality of services rendered was raised by the Corporate

Debtor. Payments were made by the Corporate Debtor to the Operational

Creditor by way of running account. The Appellant has claimed that the

Corporate Debtor had stopped making payments after 18.04.2018. Since an

outstanding amount of Rs.1.58 crore had become due from the Corporate

Debtor, the latter was requested to discharge their liability. However, the

Corporate Debtor failed to liquidate the debt following which a Section 8

demand notice was served upon them on 30.07.2020. However, the

Corporate Debtor did not reply to the demand notice or send a notice of

dispute. Neither was the outstanding amount received from the Corporate

Debtor. Hence, the Operational Creditor thereafter filed a Section 9

application on 09.04.2021 which was erroneously rejected by the

Adjudicating Authority on 16.11.2022.

3. Refuting the submission made by the Appellant, it was submitted by

the Learned Counsel for the Respondent that no payment was due and

payable by the Corporate Debtor. It was pointed out that a Work Order

Agreement had been signed between the Corporate Debtor and the

Operational Creditor on 01.08.2014 in the context of a work order relating to

construction of a road under the Agra Development Authority. In terms of

the Clause 17 of the Agreement, payment was to be made to the Operational

Creditor within 10 days from corresponding payment having been received

by the Corporate Debtor from HG Infra. Since no payment had been received

from HG Infra, no payment had become due to the Operational Creditor.

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 3

4. Besides asserting that no debt was due and payable to the Operational

Creditor, it was also pressed that there was a dispute regarding the quality

of work done by the Operational Creditor which had resulted into non-

payment by the Agra Development Authority to HG Infra which in turn led to

non-payment by HG Infra to the Corporate Debtor. It was further pointed out

that because of the poor quality of services rendered by the Operational

Creditor, debit notes had been issued by the Corporate Debtor amounting to

Rs.1.24 crore as on 31.03.2020. It was, therefore, contended that there was

a pre-existing dispute between the parties and hence the Adjudicating

Authority had rightly rejected the Section 9 application.

5. We have duly considered the arguments advanced by the Learned

Counsel for the parties and perused the records carefully.

6. The basic issue which needs consideration is whether operational debt,

as claimed by the Operational Creditor, had become due and payable, and if

so, whether there has been any default in respect of such payment on the

part of the Corporate Debtor and whether the debt has been disputed.

7. Before dwelling on the facts of the present case, a quick glance at the

relevant statutory construct of IBC would be useful. Section 8 of the IBC

requires the Operational Creditor, on occurrence of a default by the

Corporate Debtor, to deliver a Demand Notice in respect of the outstanding

Operational Debt. Section 8(2) lays down that the Corporate Debtor within a

period of 10 days of the receipt of the Demand Notice would have to bring to

the notice of the Operational Creditor, the existence of dispute, if any. From

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 4 a plain reading of the above provisions, it is clear that the existence of dispute

and its communication to the Operational Creditor is therefore statutorily

provided for in Section 8. Post issue of demand notice by the Operational

Creditor, if the Operational Creditor does not receive payment from the

Corporate Debtor or notice of the dispute, he may file an Application under

Section 9(1) of the Code.

8. In the present case, Section 8 demand notice was admittedly issued on

30.07.2020 which however the Corporate Debtor did not reply to. It is also

an undisputed fact that in the present matter, the Operational Creditor did

not receive any payment from the Corporate Debtor after the issue of demand

notice, and, thereafter proceeded to file an application under Section 9 of IBC

on 20.05.2021. It is however noticed that in response to the Section 9

application, the Corporate Debtor filed reply affidavit thereon.

9. The Adjudicating Authority having considered the matter rejected the

Section 9 application. At this stage, it may be useful to reproduce para 13 of

the Impugned Order wherein the Adjudicating Authority has dismissed the

Section 9 application and held as follows:

"13. We have perused the averments and heard the arguments made by the applicant and the Corporate Debtor. The corporate debtor has raised objection as regards the default and claimed that no default has occurred and no amount is due and payable. Moreover, the corporate debtor has issued a debit note dated 20.07.2020 on grounds of defect in quality of services provided due to which it had to incur major losses and in terms of which an arbitration proceeding as regards the quality of services provided by the applicant due to which the payment has been withheld by

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 5 the main contractor, is pending before the Hon'ble Delhi High Court. The Corporate debtor is mainly relying on the argument upon the work order dated 01.08.2016 wherein as per clause 18 it is specifically stated that the payment shall be released by the Respondent Company within 10 (ten) days after receiving corresponding payment from the employer. Another, objection raised by the corporate debtor is with regards to the incomplete demand notice being defective and incomplete. The said objection does not sustain as the applicant has filed the relevant invoices, subsequently, as per the directions of the Bench and cured the defects. Hence, we are of the view that there is a pre-existing dispute as has been contended by the corporate debtor. It is clear that without going into the merits of the dispute, the corporate debtor has raised a plausible contention requiring further investigation which is not a patently feeble legal argument or an assertion of facts unsupported by evidence. The defense is not spurious, mere bluster, plainly frivolous or vexatious. A dispute does truly exist in fact between the parties, which may or may not ultimately succeed. In the given facts and circumstances, the applicant has failed to establish default on part of the corporate debtor in payment of operational debt. Therefore, this bench is not inclined to admit the present application. Accordingly, the present application is rejected."

10. It is the case of the Appellant/Operational Creditor that the work

assigned to it by the Corporate Debtor had been completed without any

complaints from the Corporate Debtor and payments released till

18.04.2018. Thereafter an outstanding amount of Rs.1.58 crore had become

due from the Corporate Debtor which remained unpaid. It is also the

contention of the Appellant that the Corporate Debtor had deducted TDS

which is an acknowledgment of the debt on the part of the Corporate Debtor.

No dispute was ever raised by the Corporate Debtor with regard to their

performance of work in spite of receiving a notice under Section 8 of the IBC.

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 6

11. Making rival submissions it has been the contention of the Respondent

that no payment was due and payable by the Corporate Debtor. It was

pointed out that payments to the Operational Creditor was guided in terms

of the Work Order Agreement signed between the Corporate Debtor and the

Operational Creditor on 01.08.2014 and no due had arisen in terms of Clause

17 of the Agreement. It is also pointed out that the Operational Creditor has

included security amount while claiming outstanding dues at a time when

security amount is not due and payable as per Clause 16 of the work order

agreement as placed at page 81-88 of Appeal Paper Book ("APB" in short).

The Learned Counsel for the Corporate Debtor has also contended that

merely on the basis of TDS deduction, no operational debt liability can be

fastened on the Corporate Debtor.

12. For proper appreciation of the facts at hand, we may have a look at

Clauses 17 and 18 of the Work order Agreement which is as extracted below:

"17. PAYMENT Eligible payment will be released to the PRW (Piece Rate Worker) by the Company within 10 (ten) days after receiving corresponding payment from the Employer subject to any statutory and other deductions and monies owed by the PRW to the Company including recoveries if any; cash retention, deduction of monies due to the Company towards any plant, mandatory, materials or services arranged by the Company on behalf of the PRW and damages/costs levied by the Company/ the Employer, if any. Notwithstanding any other provision contained herein to the contrary or otherwise, no payment shall be made to the PRW unless corresponding payment has been received by the Company from the Employer.

Any Payment by the Company to the PRW shall be 'on Account payment and no payment made by the Company, hereunder shall

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 7 be deemed to constitute acceptance by the Company of the Works or any part thereof.

The Company reserves its right to withhold payments due to the PRW, if the PRW has failed to perform in accordance with this Work Order and/or has failed to remedy, rectify the defects, deficiencies to the satisfaction of the Company. The Final Payment shall be subject to the Taking over Certificate for the Works.

18. CLAIMS Notice for Claims, if any, shall be submitted by the PRW within 14 (Fourteen) days of the date of occurrence of the event in accordance with Clause 3. All claims shall be substantiated with supporting documents along with the statement which shall state the amount due and payable to the PRW under this Work Order.

If the PRW does not submit its claim(s) for whatsoever reason within the above mentioned stipulated time as above, the same shall be deemed to be waived. Notwithstanding any other provision contained herein to the contrary or otherwise, no claims of the PRW shall be admitted (nor deemed to be payable) unless the Employer admits and pays the corresponding claims of the Company. Notwithstanding any other provision contained herein to the contrary or otherwise, the PRW shall not be paid any idling charges whatsoever under whatever nomenclature called. Should the Client cancel the Company's Contract in whole or in part for any reason whatsoever, the Company shall have the right likewise to cancel this Work Order and shall only pay the PRW for the actual work done up to the date of cancellation and no compensation whatsoever shall be payable to the PRW in respect of the cancelled portion of this Work Order."

13. A plain reading of the Clause 17 clearly shows that in terms of Clause

17 of the Agreement, payment was to be made to the Operational Creditor

only after corresponding payment was received by the Corporate Debtor from

HG Infra. There is nothing shown by the Operational Creditor to substantiate

that payments had been received by the Corporate Debtor and had therefore

become due for payment to them. Further, the Operational Creditor was

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 8 required to raise a notice for claims within 14 days of the date of occurrence

of event and since no such notice had been raised, it is clear that no payment

was claimed by the Operational Creditor in terms of Clause 18 of the

Agreement. Further the final payment to the Operational Creditor was

subject to a "Taking Over Certificate" for the work which certificate is also

not placed on record. We are also inclined to agree with the Corporate Debtor

that TDS deduction does not imply acknowledgment of any liability as

outstanding qua the Operational Creditor. We therefore hold that the

Adjudicating Authority committed no error in relying on these clauses of the

Work Order Agreement to come to the conclusion that the Operational

Creditor has failed to establish default on part of the Corporate Debtor in

payment of the operational debt.

14. This now brings us to the issue of the pre-existing disputes which has

been pressed hard by the Learned Counsel for the Corporate Debtor in the

context of debit notes issued by them. It was submitted that these debit notes

had been duly communicated to the Operational Creditor through WhatsApp

message on 20.07.2020 which was prior to issue of demand notice under

Section 8. Explaining the genesis of these debit notes it was submitted that

the payment from the Agra Development Authority to the main contractor,

HG Infra was withheld on account of quality dispute, which dispute had been

referred to a sole arbitrator against which an award had been obtained on

09.11.2019 which is under challenge and pending before the Hon'ble Delhi

High Court. The quality dispute had arisen, according to the Corporate

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 9 Debtor because of the poor services rendered by the Operational Creditor in

respect of the same work.

15. It has however been countered by the Learned Counsel for the

Appellant that no debit note was ever issued by the Corporate Debtor and

that these debit notes were never placed on record. It was clarified that only

a WhatsApp communication was sent by the Corporate Debtor in respect of

the debit notes. Hence, in the absence of placing on record debit notes issued

in compliance of law, the contention of the Corporate Debtor that there was

a pre-existing dispute does not stand to reason. It is also been contended

that no correspondence/material has been placed on record which shows

that the Corporate Debtor had invoked Clause 17 of the work order

agreement to deny payment to the Operational Creditor on account of quality

of work. It has also been pointed out by the Appellant that the pendency of

arbitration proceedings was between the Agra Development Authority and

the HG Infra. It does not establish that the pending litigation had any direct

correlation with the quality of work done by the Operational Creditor.

Further at no point of time, either prior to or after the issue of demand notice,

the Corporate Debtor had ever informed the Operational Creditor about the

pendency of such litigation or the quality of work done by them. In support

of their contention, reliance has been placed on the decision of this Tribunal

in the matter of Aroon Kumar Aggarwal v. M/s ABC Consultants Pvt. Ltd.

in CA (AT) (Ins.) No.409 of 2020 wherein it has been held that when the

plea of pre-existing dispute is raised in the background of a pending suit or

arbitration proceeding, the same should be related to the dispute.

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 10

16. On perusal of records, we find that the WhatsApp message of

20.07.2020 relating to debit notes from the Corporate Debtor to the

Operational Creditor has been placed at page 133 of APB. That this message

was received by them from the Corporate Debtor has not been controverted

by the Operational Creditor. Further at page 134 of APB, we find that the

Operational Creditor has sent a response to the above WhatsApp message

holding the debit note to be false and even threatened the Corporate Debtor

of legal action. This shows that they were aware of debit notes before the

issue of the Section 8 demand notice. Under such circumstances, the

Adjudicating Authority committed no error in concluding that the debit notes

issued on grounds of defect in quality of services testifies the existence of a

dispute. We must add here that reliance placed by the Learned Counsel for

the Appellant on the judgment of this Tribunal in KB Polychem (India) Ltd.

v. Rapt Industries Pvt. Ltd. in CA (AT) (Ins.) No. 396 of 2020 to show that

debit notes sent by emails are not in order is misplaced since in that case

the emails containing the debit notes were internal emails of the Corporate

Debtor which were not sent to the Operational Creditor thereby making the

facts in that case distinguishable from the present.

17. It is relevant at this juncture to refer to the guiding principles laid down

by the Hon'ble Supreme Court in Mobilox Innovations Pvt. Ltd. Vs. Kirusa

Software Private Limited (2018) 1 SCC 353 (hereinafter referred to as

'Mobilox'). Para 56 of the Mobilox judgment which is extracted as hereunder

reads as follows:

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 11 "56. Going by the aforesaid test of "existence of a dispute", it is clear that without going into the merits of the dispute, the appellant has raised a plausible contention requiring further investigation which is not a patently feeble legal argument or an assertion of facts unsupported by evidence. The defense is not spurious, mere bluster, plainly frivolous or vexatious. A dispute does truly exist in fact between the parties, which may or may not ultimately succeed, and the Appellate Tribunal was wholly incorrect in characterizing the defense as vague, got-up and motivated to evade liability."

18. On going through the submissions made by the parties and keeping in

mind the provisions of law laid down in the IBC and the Mobilox judgment

cited supra, it is amply clear that there exists a pre-existing dispute with

respect to the quality of services provided by the Operational Creditor to the

Corporate Debtor. Present is a case where it cannot be said that defence

taken by the Corporate Debtor in their reply affidavit is a moonshine defence

unsupported by any evidence. For such disputed operational debt, Section 9

proceeding under IBC cannot be initiated at the instance of the Operational

Creditor. Where operational creditor seeks to initiate insolvency process

against a Corporate Debtor, it can only be done in clear cases where no real

dispute exists between the two which is not so borne out given the facts of

the present case. It is well settled that in Section 9 proceeding, there is no

need to enter into final adjudication with regard to existence of dispute

between the parties regarding operational debt.

19. Given this backdrop, we have no reasons to disagree with the findings

of the Adjudicating Authority. Considering the overall facts and circumstance

of the present case, and in view of the foregoing discussion, we are satisfied

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 12 that the Adjudicating Authority did not commit any error in rejecting the

Section 9 Application filed by the Appellant on the ground of pre-existing

dispute. There is no merit in the Appeal. Appeal is dismissed. We however

make it clear that it will remain open to the Appellant to resort to other

remedies that may be available to it under any other law. No order as to costs.

[Justice Ashok Bhushan] Chairperson

[Barun Mitra] Member (Technical)

Place: New Delhi Date: 18.12.2023

PKM

Company Appeal (AT) (Ins.) 80 of 2023 & IA No.331 of 2023 13

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free