Pvr Inox Ltd vs Airports Authority Of India
- Citation2025 SCC OnLine Mad 12074
Ratio decidendi
The rule this decision rests on
1. Where a statutory instrument contains no express prohibition against a particular activity, and contains a residuary clause permitting "any other activity" in the best commercial interests of the authority, the authority possesses discretion to grant permission for that activity within airport premises located in unrestricted zones outside the secured area, notwithstanding that the activity is not specifically enumerated in the statutory functions. 2. A sub-license agreement that is expressly made co-terminus with a principal development agreement automatically terminates upon termination of the principal agreement, and a sub-licensee cannot claim rights superior to or extending beyond those of the principal licensee. 3. Where a sub-licensee has no privity of contract with a public authority, the sub-licensee cannot assert a legitimate expectation against that authority to honour obligations undertaken by the intermediate licensor, even where the public authority has exercised discretion to assume the role of the intermediate licensor upon termination of the principal agreement. 4. Upon termination of a principal development agreement, a public authority that assumes the role of the principal licensor is not obligated to negotiate with sub-licensees or to continue their licenses; discretion to permit continuation exists, but cannot be compelled by the sub-licensee, and the exercise of such discretion must be based on the authority's reasoned opinion regarding the onerous nature of the obligations involved. 5. The doctrine of promissory estoppel is not applicable where the representations or conduct relied upon emanate from an intermediate licensor rather than the public authority itself, and a sub-licensee who fails to exercise due diligence in reviewing contractual terms governing its relationship with the intermediate licensor cannot invoke promissory estoppel against the public authority. 6. An exercise of discretionary power by a public authority, though not subject to compulsion, remains subject to judicial review to ensure the discretion has been exercised on articulated grounds referable to statutory authority and with rational consistency in the treatment of similarly situated persons or activities; an unreasoned or inconsistently applied discretionary decision may constitute an infraction of Article 14 of the Constitution.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
____________ W.P. Nos.22968-23060/2025
IN THE HIGH COURT OF JUDICATURE AT MADRAS
Reserved on Pronounced on 14.11.2025 09.12.2025
CORAM
THE HONOURABLE MR. JUSTICE M.DHANDAPANI
W.P. NOS. 22968 & 23060 OF 2025 AND W.M.P. NOS. 25805, 25806, 25808, 25904, 25906, 25907 & 30459 OF 2025
PVR INOX Ltd. Rep. by its Authorised Signatory Mr. Ayappan K 4th Floor, Building No.9A DLF Cyber City, Phase OOO Gurgaon 122 002, Haryana Also at No.25, Mamatha Complex 5th Floor, Whites Road Royapettah, Chennai 600 014 Tamil Nadu. .. Petitioner in WP 22968/2025
Y.Jayant Kartik Zonal Head – Chennai PVR INOX Ltd. 25, Mamatha Complex 5th Floor, Whites Road Royapettah, Chennai 600 014 Tamil Nadu. .. Petitioner in WP 23060/2025
- Vs -
1. Airports Authority of India Rajiv Gandhi Bhawan Safdarjung Airport
1
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
New Delhi 110 003.
2. Meenambakkam Realty Private ltd. No.617, New No.418, Bharat Kumar Bhavan Anna Salai, Chennai 600 006. Also at Olympia Techpark Chennai Pvt. Ltd. 1, SIDCO Industrial Estate, Guindy Chennai 600 032, Tamil Nadu.
3. Union of India Through Ministry of Civil Aviation Rajiv Gandhi Bhawan Block B Jorbagh, Safdarjung Airport Area New Delhi 110 003. .. Respondents in both WPs
W.P. No.22968 of 2025 filed under Article 226 of the Constitution of India
praying this Court to issue a writ of certiorarified mandamus to call for the
records of the respondent No.1 relating to the Letter AAMC/C.MLCP/2022/606
dated 20 June 2025 issued by the respondent No.1, set aside the same and
consequentially direct the respondent No.1 to permit the petitioner No.1 to
continue its business operations in the MLCP Complex in terms of the
Development Agreement and the Sub-License Deed.
W.P. No.23060 of 2025 filed under Article 226 of the Constitution of India
praying this Court to issue a writ of certiorarified mandamus to call for the
records of the respondent No.1 relating to the Letter dated 20 June 2025 issued
by the respondent No.1, quash the same and consequentially direct the
respondent No.1 to permit PVR Inox Limited to continue its business operations
2
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
in the MLCP Complex, in terms of the Development Agreement and the Sub-
License Deed.
For Petitioner : Mr. P.S.Raman, SC, for M/s.Arva Merchant in WP No.22968/2025 Mr.Sathish Parasaran, SC, for M/s.Arva Merchant in WP No.23060/2025
For Respondent : Mr.AR.L.Sundaresan, ASG Assisted by Mr.Ramaswamy Meyyappan for R-1 in both WPs Mr.Abhishek Jenasenan for R-2 in both WPs No Representation for R-3
COMMON ORDER
Aggrieved by the impugned letter in and by which the 1 st respondent had
called upon the petitioner for closure of its lawful operation of its multiplex in the
Multi-Level Car Parking Complex (for short ‘MLCP’) at Chennai Airport, the
present writ petitions have been filed.
2. The formation of a MLCP Complex in the Chennai Airport was
conceived, developed and executed in which various activities, including a
multiplex containing a cinema hall was sought to be developed, which was
approved by resulting in the construction of a cinema hall, which had the
3
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
approval of the 1st respondent on the basis of the Development Agreement dated
20.6.2018 entered into with the 2 nd respondent. However, later in point of time,
the 1st respondent vide its impugned letter had taken a position that the
operation of a cinema hall cannot be given effect to as the said operation is not a
permissible activity under the Airports Authority of India Act, 1994 (for short ‘AAI
Act’), which according to the petitioner is in clear derogation of the 1 st
respondent’s contractual obligations and also the directions passed by this Court
ordering maintenance of status quo. Further, the writ is maintainable as it does
not arise from any private contractual dispute, nor is it contingent upon the
enforcement of rights under the Development Agreement between the 1 st and
2nd respondents; rather the gravamen of the challenge lies in the arbitrariness
and unconstitutionality of the conduct of the 1 st respondent, which is in violation
of Articles 14 and 19 (1) (g) of the Constitution, as the said act of running a
cinema hall has been expressly permitted by the 1 st respondent and that it is not
an isolated act, but a consistent affirmative conduct by the 1 st respondent giving
rise to a legitimate expectation showcasing that the petitioner would be entitled
to operate the cinema halls lawfully and the sudden issuance of the impugned
letter is not only in breach of the petitioner’s legitimate expectation, but it
against the doctrine of promissory estoppel.
4
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
3. The case of the petitioners as averred before this Court is as under :-
Request for Proposal (for short ‘RFP’) along with Notice Inviting Tender
(for short ‘NIT’) was issued inviting bids for the development of a MLCP facility on
Design, Build, Operate and Maintain basis (for short ‘DBOM’) with integrated
commercial infrastructure at the Chennai Airport. The project was not merely
confined to creation of a structured parking facility, but was also planned to
include commercial complex within the car parking blocks so as to elevate the
overall passenger experience to international standards. In the RFP, the list of
permissible activities was expansively given, more particularly in relation to
passenger amenities and prohibited activities did not attract cinema halls.
4. Pursuant to the NIT, on the 2 nd respondent coming out successful,
Development Agreement was duly executed between the 1 st respondent and the
2nd respondent. Under the terms of the said Development Agreement, the 2 nd
respondent was granted comprehensive rights to design, construct, operate and
maintain the MLCP facility with integrated commercial space with the premises
of the Chennai Airport on a construction-cum-license to operate and maintain
basis for the contractual term. The Development Agreement specifically
5
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
envisaged the entitled of the 2nd respondent to develop and carry out commercial
activities within the MLCP complex as part of the integrated commercial
development, which constituted an essential and inseparable element of the
project design. The contract period of the said Development Agrement was for a
period of 15 years and the said agreement also allowed the 2 nd respondent to
sub-license its rights to third parties.
5. In furtherance to the Development Agreement, respondents 1 and 2
committed various acts that led the petitioners to invest and commit substantial
time and resource for the development of a multiplex in the MLCP complex at the
Chennai Airport, which would be evident from the acts of respondents 1 and 2, as
could be enumerated in the subsequent paragraphs.
6. The 1st respondent actively obtained environmental clearance in respect
of the MLCP for establishment of a ‘Cinema Multiplex’ by allocating specific area
and the said environment clearance was granted by the Ministry of Environment,
forest and Climate Change on 21.12.2018. therefore, as early as on 21.12.2018,
the 1st respondent was fully aware of the proposal of establishment of a cinema
6
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
multiplex within the MLCP complex and had been proactively participating in
securing the requisite statutory approvals.
7. Further, in February, 2019 and 01.01.2021, architectural plans and
construction drawings for the MLCP project was approved by the 1 st respondent,
which explicitly provided for the establishment of a cinema hall located in the
East Block of the MLCP Complex.
8. Pursuant to the sanction of the revised plan and in compliance with the
contractual obligation to procure all permits under Article 5.1.5 of the
Development Agreement, the 1st respondent addressed communication dated
20.07.2021 to the Commissioner of Police, Chennai, requesting the issuance of a
location No Objection Certificate in respect of proposed five screen cinema hall
within the integrated MLCP complex. Further, the urgency in processing the
application has also been highlighted by the 1 st respondent by pointing out that
the cinema hall facility was conceived as an integral element of the development
of the Chennai Airport in line with the world class standards.
7
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
9. Based on the 1st respondent’s proposal seeking issuance of location No
Objection Certificate for the cinema multiplex to the Commissioner of Police, the
2nd respondent also submitted an application seeking grant of NOC on 24.8.2021.
10. Pursuant to the approval by the 1 st respondent and the application
made for statutory and regulatory permits, the 2 nd respondent entered into
negotiation with the petitioner for grant of sub-license for cinema space with the
MLCP and the independent engineer appointed by the 1 st respondent, issued
communication to the 2nd respondent confirming its approval of the draft license
agreement between the petitioner and the 2 nd respondent and directed the 2nd
respondent to submit the executed copy of the agreement to the 1 st respondent.
11. Upon obtainment of approvals from the 1 st respondent, in exercise
rights conferred upon the 2nd respondent under the Development Agreement,
the petitioner entered into a sub-licence deed dated 15.11.2022 with the 2 nd
respondent for the purpose of operating a cinema multiplex within the MLCP
complex at the Chennai Airport.
8
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
12. On the basis of the sub-license deed, permission was granted to the
petitioner with exclusive rights to establish, manage, operate and maintain a
multiplex with five screens within the demarcated area of MLCP complex and the
tenure of the sub-license was fixed at 13.5 years in line with the terms set forth in
the overarching Development Agreement. Further, the sub-license deed was
executed with the full knowledge and express understanding that the 2 nd
respondent had been lawfully vested with the right to undertake and implement
commercial operations, including, cinema exhibition, within the MLCP complex.
13. Consequent upon the grant of location NOC, the petitioner applied for
licence in Form ‘C’ under Rules 41 and 42 of the Tamil Nadu Cinemas (Regulation)
Rules, 1957, which was granted to the petitioner on 31.1.2023 pursuant to which,
the petitioner commenced operations on 1.2.2023 in the East Block of MLCP
Complex at Chennai Airport.
14. The multiplex operations commenced in accordance with the terms of
the sub-license deed and continued uninterrupted generating revenue for all the
stakeholders, including respondents 1 and 2, through the integrated commercial
9
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
development model under the Development Agreement and the sub-license
deed.
15. Out of blue came the order of the 1 st respondent on 21.7.2023,
through its letter, unilaterally and without prior notice or opportunity of hearing,
directing the 2nd respondent to close the cinema hall operations with immediate
effect on the ground alleged that the operation of cinema hall within the airport
premises was not permissible under the AAI Act. The said order challenged the
very foundation of the commercial arrangement in operation which is with the
knowledge and acquiescence of the 1st respondent for a considerable period.
16. Aggrieved by the arbitrary act of the 1 st respondent contained in the
letter dated 21.7.2023, the 2 nd respondent, in exercise of its rights under the
arbitration clause contained in the Development Agreement filed O.M.P. (I)
(COMM) No.229/2023 before the High Court of Delhi u/s 9 of the Arbitration and
Conciliation Act, 1996 on 24.7.2023, in and by which urgent interim direction of
stay of operation of the letter of the 1st respondent dated 21.7.2023 wherein
immediate closure of the cinema hall was directed, was sought for pending
constitution of Arbitral Tribunal and to restrain the 1 st respondent from taking
10
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
any steps to stop the operation of the cinema hall within the confines of MLCP
complex of the Chennai Airport and the High Court of Delhi, vide its order dated
2.8.2023, and its subsequent order dated 7.8.2023, passed an order directing
maintenance of status quo and restraining the 1st respondent from acting upon or
giving effect to its letter dated 21.7.2023 till the next date of hearing.
17. Invoking the arbitration clause contained in 38.3 of the Development
Agreement, the 2nd respondent had the Arbitral Tribunal constituted as per the
procedure laid in the Development Agreement and in consonance with the
provisions of the Arbitration and Conciliation Act, 1996, to adjudicate the
disputes subsisting between respondents 2 and 1. Thereafter, the application
before the Delhi High Court was converted into an application for interim relief
u/s 17 of the Arbitration and Conciliation Act before the Arbitral Tribunal.
18. The petitioner was not appraised of any of the developments either by
respondents 1 or 2 and the knowledge of the brewing conflict involving public
interest, in which the rights and the sub-license deed of the petitioner were
involved came to its knowledge only through public sources and media reports
and, therefore, to protect its business interests, the petitioner issued a letter to
11
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the 2nd respondent about the nature and extent of the implication of the dispute
with the 1st respondent and sought clarification on the steps that have been
taken to resolve them. It was all along the stand of the 2 nd respondent that all
clearances, approvals and sanctions were obtained for running a multiplex
cinema in the MLCP complex and, therefore, the petitioner called upon the 2 nd
respondent to ensure that all steps are taken so that no hindrance, obstruction or
interference is caused with regard to the operation of the multiplex in
accordance with the terms and conditions.
19. Vide the communication dated 25.11.2023 of the 2 nd respondent to the
petitioner, the petitioner was put on notice about the grant of stay of the
operation of the letter of the 1st respondent dated 21.7.2023. However, by a
letter dated 15.5.2025, the 2nd respondent intimated the petitioner that the
Development Agreement dated 20.6.2018 between respondents 1 and 2 stood
terminated and as a consequence thereof, the 2 nd respondent informed the
petitioner that the 1st respondent would take over complete control and
management of the entire MLCP complex, including the multiplex with effect
from 30.5.2025 and that post the said take over by the 1 st respondent, all
12
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
matters, issues, rights and obligations pertaining to the sub-license deed would
be handled directly by the 1st respondent.
20. Apprehending threat to the sub-licence deed, the petitioner addressed
the 2nd respondent seeking complete disclosure vide its letter dated 22.5.2025,
but the 2nd respondent’s letter was evasive, incomplete and failed to address the
petitioner’s legitimate business concerns and failed to provide any information
with regard to the Development Agreement and the 2 nd respondent resiled itself
under the garb of confidentiality obligations and did not reveal material
information, which were relevant to the petitioner’s contractual rights and
legitimate business interests.
21. Since proper information was not forthcoming from the 2 nd respondent
inspite of repeated communications by the petitioner, vide its letter dated
29.5.2025, the petitioner addressed the 1st respondent on the termination of the
Development Agreement and pointing out the knowledge of the petitioner about
the 1st respondent stepping into the shoes of the 2 nd respondent to take over
complete control of the MLCP complex and informed the 1 st respondent that the
petitioner is fully committed to continuing its operations at the MLCP complex
13
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
and sought a personal one-to-on interaction with the 1 st respondent to discuss
the course of moving forward.
22. Inspite of the petitioner’s request for transparency, the 2 nd respondent
did not provide any details with regard to the Development Agreement and hid
behind Article 39 of the Development Agreement relating to the confidentiality
obligations and also Section 42-A of the Arbitration and Conciliation Act and
pleaded its difficulty to share specific information as sought for by the petitioner.
23. Vide e-mail dated 10.6.2025, to the shock of the petitioner, the Arbitral
Tribunal vacated the interim order dated 7.2.2024, which had been protecting
the cinema operations by way of interim stay of the letter of the 1 st respondent
dated 21.7.2023 calling on the 2nd respondent to immediately cease operation of
all five cinema halls in the multiplex operated by the petitioner. The vacation of
the interim order left the petitioner without any clarity on the status and fate of
the multiplex operations at the MLCP complex and apprehended that the 1 st
respondent would attempt to interfere with the peaceful operation of the
multiplex.
14
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
24. Apprehending threat of closure of its business operations based on the
contractual rights under the sub-license deed, the petitioner along with one of
the shareholders filed W.P. Nos.21208/2025 seeking a direction to restrain the 1 st
respondent from interfering with the petitioner’s rights under the sub-license
and vide order dated 16.6.2025, this Court directed the 1 st respondent to
maintain status quo in relation to the running of the cinema halls in the MLCP
complex and directed the 1st respondent to take a decision on the request made
by the petitioner for continuation of its business operations vide letter dated
29.5.2025.
25. However, inspite of the above order, vide communication dated
20.6.2025, the 1st respondent issued the impugned letter to the petitioner
rejecting the representation stating that operation of cinema halls in MLCP
complex cannot be permitted, thereby, ignoring to exercise its obligations under
the Development Agreement. As per the Development Agreement, the 1 st
respondent was obliged to allow continuation of the operations of the multiplex,
but has taken an erroneous position that the surrender provisions under the
Development Agreement in the case of cinema hall cannot be given effect to
since operation of the same is not permissible under the AAI Act. The impugned
15
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
communication of the 1st respondent is not only in derogation of its contractual
obligations, but also against the spirit of the directions issued by this Court vide
its order dated 16.6.2025.
26. Since the vacation of the interim order by the Arbitral Tribunal and the
communication of the 1st respondent to cease operation of the cinema hall as is
being contrary to the provisions of the AAI Act, closure of the multiplex in the
MLCP is necessary and surrender provisions under the Development Agreement
also does not permit operation of the cinema hall under the AAI Act and,
therefore, the prayer for continuation of the cinema hall by the petitioner was
rejected.
27. Since the impugned order had robbed the right of the petitioner, which
crystallised in the sub-licence deed, which had the express knowledge and
approval of the 1st respondent, the same cannot be interdicted by a unilateral
impugned letter without any legal foundation and rational justification and the
belated operations that the operation of cinema hall is impermissible under the
AAI Act and is inconsistent with the prior conduct of the 1 st respondent and
contrary to the terms of the Development Agreement and since it infringes on
16
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the petitioner’s fundamental rights under Articles 14 and 19 (1)(g) and
extinguishes a lawful, ongoing commercial operation without following the due
process of law, the same is manifestly arbitrary, discriminatory and perverse and
the said is liable to be interfered and praying so, the present writ petitions have
been filed.
CONTENTIONS OF THE PETITIONERS :
I) Writ Petition is maintainable :
28. Learned senior counsel appearing for the respective petitioners
submitted that the present dispute is not a private contractual dispute under the
sub-license deed, but it is a larger challenge to the conduct of the 1 st respondent
culminating in the impugned letter being issued, which is arbitrary, unreasonable
and violative of Articles 14 and 19 (1)(g) of the Constitution. The arbitrariness of
a public authority’s conduct can only be tested before a writ court, especially
where it involves the powers and duties of the 1st respondent.
29. It is the further submission of the learned senior counsel that the past
representation and acts of the 1 st respondent operate as promissory estoppel, as
the said acts allowed the petitioner to alter its position by relying upon the same.
Therefore, there arises a legitimate expectation for the petitioner which cannot 17
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
be arbitrarily disrupted by the impugned letter. It is the further submission of the
learned senior counsel that the act of the 1 st respondent is a clear discrimination
against the petitioner, as other similarly placed commercial/retail outlets in the
MLCP complex have been permitted to run the outlets and the reasoning for
rejecting the petitioner by placing reliance upon Section 12 of the AAI Act is
wholly erroneous.
30. It is the specific submission of the learned senior counsel that there is
no explicit prohibition for the running of a cinema multiplex in the MLCP complex
and, therefore, the rejection of permission, that too after the 1 st respondent has
taken all the steps to obtain the clearance for establishment of the multiplex
clearly shows that the entire action of the 1 st respondent is only with a mala fide
intent and for reasons best known to it and, therefore, in the absence of
prohibition, the rejection of the 1 st respondent by placing reliance on Section 12
of the AAI Act is wholly perverse, impermissible and erroneous.
31. Learned senior counsel for the petitioner further submitted that it has
been the consistent view of the courts that where there is violation of
fundamental rights, even in the event of existence of contractual remedies, writ
18
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
proceedings could be maintained against the State. It is the submission of the
learned senior counsel that a public body even in respect of its dealing with a
tenant, must act in public interest and infraction of that duty is amenable to
examination either in a civil suit or even under the writ jurisdiction. In this
regard, reliance was placed on the decision of the Apex Court in Dwarkadas
Marfatia & Sons. – Vs – Port of Bombay (1989 (3) SCC 293).
32. It is further pointed out by the learned senior counsel that the
respondents have not question the writ petitions on the question of
maintainability.
II) Operation of Multiplex is permissible under AAI Act
33. It is the submission of the learned senior counsel that the rejection of
AAI is predicated upon Section 12 of the AAI Act, which provision, according to
the 1st respondent, prohibits the operation of Aerohub. This submission,
according to the learned senior counsel is untenable, as Aerohub does not fall
within the definition of ‘Airport’ u/ 2 (b) of the AAI Act as there is no express bar
or prohibition for running a multiplex u/s 12 of the AAI Act.
19
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
34. It is the further submission of the learned senior counsel that Section
12 only applies to an ‘airport’, which only includes the buildings and land that are
utilised for the performance of aeronautical activities and none of the
‘aeronautical services’ as defined u/s 2 (a) of the Airports Economic Regulatory
Authority of India Act, 2008 are performed in the MLCP Complex.
35. It is the further submission of the learned senior counsel that even the
1st respondent has not treated Aerohub as an ‘Airport’ as would be evident from
the AERA Tariff Order dated 7.9.2021, which covers all aeronautical and non-
aeronautical activities within an airport. The 1 st respondent has specifically
excluded the Aerohub/MLCP from the purview of non-aeronautical services in
the Airport. Inspite of the existence of MLCP in the Tariff Order, there is a
significant omission of MLCP as the 1 st respondent has not disclosed all revenue
generating non-aeronautical activities in the airport during the determination of
tariff. Therefore, Aerohub does not fall under the definition of ‘Airport’ for the
purpose of AAI Act and further it is the admitted stand of the parties that the
Aerohub is located outside the restricted security area of the airport.
20
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
36. It is the further submission of the learned senior counsel that AAI Act
does not prohibit the establishment or operation of a cinema theatre within the
‘airport’ and Section 12 (1) vests the 1 st respondent with overarching statutory
mandate to manage the airports, civil enclaves and aeronautical communication
stations efficiently. Section 12 (3) specifies the functions which the 1 st
respondent may undertake without prejudice to the generality of its powers u/s
12 (1) , which makes it clear that the list, which is provides is only illustrative and
not exhaustive.
37. It is the further submission of the learned senior counsel that even
otherwise to the exclusion of specifics in clause (f) of Section 12 (3), clause (r) of
Section 12 (3) provides the residuary provision, which confers the authority on
the 1st respondent to undertake “any other activity at the airports and the civil
enclaves in the best commercial interests of the Authority; including the cargo
handling, setting up of joint ventures for discharge of any function assigned to the
authority”. Such being the case, there being no express prohibition u/s 12, the
rejection order passed by the 1st respondent adverting to Section 12 (1) is grossly
erroneous.
21
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
38. It is the further submission of the learned senior counsel that the
restriction of clause (r) by invoking the interpretation noscitur a sociis is grossly
erroneous, as the term including used is one of extension and not limitation and,
therefore, wide latitude is afforded to the 1 st respondent to include various types
of activities as there is no common genus or shared category uniting ‘cargo
handling’ and ‘joint ventures for discharge of any function’ and the legal maxim
aforesaid cannot be invoked.
39. It is the further submission of the learned senior counsel that if the
interpretation adopted by the 1st respondent is allowed, then it would render all
the retail outlets impermissible u/s 12. It is the submission of the learned senior
counsel that it is an admitted fact that airports, including the Chennai Airport,
throughout the country, have various retail outlets for clothing, beauty products,
pharmacies, electronic goods, toys, etc., all of which would fall foul if the
interpretation as given to Section 12 by the respondent is accepted.
40. It is the further submission of the learned senior counsel that the
provisions of the AAI Act should be read harmoniously in the evolving context of
the international air travel, more particularly when all the major international
22
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
airports routinely house cinema multiplexes and entertainment complex, which is
towards revenue generation and a commercially imperative venture to benefit
the spiralling travelling cost that is incurred by the passengers.
41. It is therefore the submission of the learned senior counsel that the
restrictive interpretation given only to cinema multiplex, as not having been
specifically spelt out u/s 12 of the AAI Act and, therefore, it is not permissible
would render many other such entities, which are operating in the airport
premises liable to be closed, but the restrictive interpretation is given only to the
petitioner and not to other establishments and, therefore, it is a clear case of
vindictive targeting against the petitioner and in the absence of any specific
prohibition u/s 12 of the AAI Act, the rejection order passed by the 1 st respondent
cannot stand the test of legal scrutiny.
III) Doctrine of Promissory Estoppel
42. It is the submission of the learned senior counsel that the clause 1.31
of the sub-licence deed pertains to the term of the sub-licence, which specifies
that the said term is locked with the term of agreement between respondents 1
and 2 and, therefore, before the completion of the said term, the 1 st respondent
23
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
cannot terminate the sub-license with the petitioner. It is the submission of the
learned senior counsel that this lock-in structure was adopted to ensure long
term contractual relationship between the parties, so that the petitioner can
make sustained investments and realise the commercial benefits, which not only
accrues to the petitioner but also to the respondents and that such benefits
accrue only over an extended period of stable operation and, therefore, to realise
the same, the petitioner has no other option, but to seek continuance of the
operations of the multiplex.
43. It is the further submission of the learned senior counsel that the
multiplex is situated within a commercial complex outside the security hold area,
which serves both the airport users and others and contributes to non-
aeronautical revenue, which is well within the framework of the AAI Act and,
therefore, the stand of the respondent that there is no estoppel against law is
wholly misconceived.
43. The conduct of the 1st respondent is clear, deliberate and endorsing
the activity of the petitioner, towards establishment of the cinema multiplex
would be evident from the fact that concerted efforts were taken by the 1 st
24
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
respondent to obtain multiple approval plans for MLCP complex, which included
the multiplex. Formal approval of the sub-licence deed to be entered into
between the petitioner and the 2 nd respondent was approved by the 1 st
respondent. Further, the 2nd respondent took active participation in obtaining
environmental and construction clearances and its tacit approval would also
stand revealed through the affirmative acts including promotional tweets and
public press releases as also the continued receipt and enjoyment of financial
benefits arising out of the multiplex, including acceptance of license fees under
the sub-licence deed. Further, the 1 st respondent having derived substantial
financial benefits from the continued operation of the multiplex, cannot resile
itself from its obligations.
44. It is the further submission of the learned senior counsel that Sections
24 and 56 of the Indian Contract Act are not applicable to the case on hand. It is
the further submission of the learned senior counsel that the doctrine of
promissory estoppel would stand squarely attracted to the present case, as laid
down by the Apex Court in the case of SPIC – Vs – Electricity Inspector (2007 (5)
SCC 447), wherein it has been laid down that the representations made by public
25
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
bodies being clear, unambiguous and acted upon by third parties, necessarily
operates as estoppel to bind the authority to its prior stance.
45. It is the further submission of the learned senior counsel that there is
no basis for alleging that the multiplex causes traffic congestion or impedes
airport access. On the contrary, the counter affidavit filed by the 2 nd respondent
confirms, based on real-time traffic management software, the availability of
adequate parking and smooth vehicular flow. It is the further submission of the
learned senior counsel that the rejection order is silent on parking issues and,
therefore, the 1st respondent cannot improve its case through the counter
affidavit.
46. It is the further submission of the learned senior counsel that there is
clear exclusion of MLCP from the confines of Airport, as would be evident from
the Determination of Aeronautical Tariff for Chennai International Airport in
which accounts for revenue is taken only upto the MLCP link bridge and there is a
conscious exclusion of revenue generated from MLCP complex, which clearly
demonstrates that the 1st respondent did not consider the MLCP complex to fall
within the definition of Airport u/s 2 of AAI Act and, therefore, the 1 st respondent
26
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
is estopped to claim, on the basis of its consistent stand, that MLCP complex
forms part of the Airport or that it is regulated u/s 12 of the AAI Act, as the 1 st
respondent cannot approbate and reprobate. Therefore, the impugned letter of
rejection suffers from arbitrariness and perversity.
IV) AAI cannot expand the scope of reasons beyond Section 12 as offered in the impugned letter
47. It is the submission of the learned senior counsel that it has been the
consistent stand of the 1st respondent that the closure of the cinema halls is
based on the prohibition contained u/s 12 of the AAI Act and at no point of time,
either in the letter dated 21.7.2023 issued to the 2 nd respondent or in the
impugned letter dated 20.6.2025, the 1st respondent has asserted that the
petitioner cannot continue operations to to any discretionary power under the
Development Agreement.
48. It is the further submission of the learned senior counsel that the letter
dated 21.7.2023 of the 1st respondent to the 2nd respondent, in clear and
unambiguous terms spells out that the competent authority has decided to close
cinema hall (PVR 5 screens) with immediate effect as running of cinema hall is not
permissible under the AAI Act and the impugned letter simply reiterates the said
27
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
reason and in fact, in the impugned letter, the 1 st respondent has expressly stated
that it is not acting under Article 42 of the Development Agreement, which
relates to the surrender provisions, wherein the 1 st respondent has spelt out that
the surrender provisions under the Development Agreement in the case of
cinema hall cannot be given effect to since the operation of the same is not
permissible under the AAI Act. Therefore, all along, the rejection of the 1 st
respondent is based on Section 12 of the AAI Act, which, according to the 1 st
respondent prohibits the running of cinema hall and, therefore, the 1 st
respondent is precluded from invoking Article 42 of the Development Agreement.
V) R-1 cannot rely on termination of Development Agreement or its clauses to evade its obligations
49. It is the submission of the learned senior counsel that when the 1 st
respondent has challenged the termination of the Development Agreement in
the arbitral proceedings, it cannot simultaneously treat the termination as final
and binding solely to dislodge the petitioner. Further, it is submitted that the
termination arose from the breaches committed by the 1 st respondent and,
therefore, the 1st respondent cannot rely on its own default to contend that the
petitioner’s rights under the sub-licence deed stand extinguished on the
termination of the Development Agreement.
28
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
50. It is the further submission of the learned senior counsel that the order
dated 9.6.2025 records the stand of the 1st respondent that it is willing to take
over all the project facilities, but submits that the order dated 30.9.2025 between
the respondents 1 and 2 has no bearing in the present case, as the petitioner is
not a party to the arbitration and stands on a fundamentally different legal
footing from the other sub-licensees as the closure of the multiplex stems from
the unilateral rejection letter dated 21.7.2023 invoking Section 12 of the AAI Act
and, therefore, the legality of the impugned closure must be tested solely on
public law principles governing the 1 st respondent’s statutory actions and the
arbitral order would have no relevance to the present case.
51. It is the further submission of the learned senior counsel that the
foundation of the dispute is the letter dated 21.7.2023, which is issued much
prior to the termination of the Development Agreement.
52. It is the further submission of the learned senior counsel that Article
42.2 of the Development Agreement casts an obligation upon the 1 st respondent
to step into the shoes of the Concessionaire upon termination and to assume all
29
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
rights and obligations including those validly executed sub-licensing
arrangements. The only exception carved out under Article 42.2 is for “onerous”
contracts. Therefore, the 1 st respondent must act fairly and with constitutional
conscience and that Article 5.2.4 has to be read with Article 41 for a holistic
reading of the Development Agreement.
53. It is the further submission of the learned senior counsel that the sub-
licence deed is not onerous nor is it the stand of the 1 st respondent that it is
onerous as the said sub-licence deed was expressly approved by the 1 st
respondent and such being the case, the exception carved out under clause 42.2
would not be available to the 1st respondent.
54. It is the further submission of the learned senior counsel that the
invocation of Section 210 of the Indian Contract Act is misplaced as the said
provision governs the termination of a sub-agent’s authority upon the revocation
of the principal agent’s authority. However, in the present case, the petitioner is
neither a sub-agent nor is acting under delegated agency, but is governed by the
sub-licence under a contractual licence, which bears no resemblance to any agent
u/s 210 of the Contract Act.
30
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
55. It is the further submission of the learned senior counsel that the 1 st
respondent having issued the letter dated 21.7.2023 directing closure of the
cinema halls, now cannot contend that the petitioner’s remedy is purely
contractual in nature and that if at all, it should seek damages from the 2 nd
respondent. The tortuous interference of the 1 st respondent directing arbitrary
closure of the cinema hall and shifting the responsibility to the 2 nd respondent is
only an attempt to wriggle out of its liability and the said stand is impermissible
and arbitrary.
56. In fine, it is the submission of the learned senior counsel that the act of
the 1st respondent in ordering closure by resorting to the provisions of Section 12
of the AAI Act is grossly misconstrued as there is no prohibition to run a multiplex
in an area, which is not within the confines of an airport, as the area where the
multiplex is situate is not an airport as defined u/s 2 of the AAI Act. Further, the
contractual terms does not cloth the 1 st respondent with power to cancel the
sub-licence deed, as it steps into the shoes of the 2 nd respondent upon the
termination of the Development Agreement and, therefore, the 1 st respondent is
31
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
bound to honour the sub-licence deed entered into between the 2 nd respondent
and the petitioner and, therefore, prays for allowing the present petition.
57. In support of the aforesaid submissions, learned senior counsel placed
reliance on the following decisions :-
i) Sivanandan C.T. – Vs – High Court of Kerala (2024 (3) SCC
799);
ii) Mihan India Ltd. – Vs – GMR Airports Ltd. (2022 (19) SCC
69);
iii) D.K.Trivedi & Sons. – Vs – State of Gujarat & Ors. (1987 (Supp) SCC 20);
iv) Naresh Agarwal – Vs – Institute of Chartered Accountants of India & Ors. (AIR 2024 SC 1139);
v) International Airport AI Officers Association – Vs – Union of India (2005 SCC OnLine Del 950);
vi) R (Fox) – Vs – Secretary of State for Education (2015 EWHC 3404);
vii) Manuelsons Hotels (P) Ltd. – Vs – State of Kerala (2016 (6) SCC 766);
viii)SPIC – Vs – Electricity Inspector (2007 (5) SCC 447);
ix) State of Punjab – Vs – Nestle India Ltd. (2004 (6) SCC 465);
x) CIDCO of Maharashtra – Vs – Shishir Realty Pvt. Ltd. (2022 (16) SCC 527);
xi) Mohinder Singh Gill – Vs – Chief Election Commissioner (1978 (1) SCC 405);
32 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
xii) Greater Kailash Part II Welfare Association & Ors. – VS – DLF Universal Ltd. & Ors. (2007 (6) SCC 448); and
xiii)Dwarkadas Marfatia & Sons. – Vs – Port of Bombay (1989 (3) SCC 293)
58. Per contra, learned Addl. Solicitor General appearing for the 1 st
respondent prefaced his submissions under the following heads :-
I) Whether the writ petitions are maintainable
a) No Privity of Contract
59. It is submitted by the learned Addl. Solicitor General that there is no
jural relationship between the 1st respondent and the petitioner and the
derivation of rights of the petitioner is only from the sub-license agreement to
which the 1st respondent is not a party. The contractual relationship in the
present case is only between the 1 st and 2nd respondents through the
Development Agreement and between the 2nd respondent and the petitioner
through the sub-licence deed and the 1 st respondent not being a party to the sub-
license deed, there is no contractual relationship and any claim by the petitioner
could at best be made only against the 2 nd respondent and not against the
petitioner as there is no privity of contract nor consensus ad idem between the
parties.
33
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
60. It is the further submission of the learned Addl. Solicitor General that
the 2nd respondent opted to terminate the Development Agreement by giving
notice of intent to terminate the Development Agreement under Article 31.2.2
vide letter dated 28.2.2025 and the subsequent letter of termination under
Article 31.2.2 vide letter dated 31.3.2025 and as a consequence thereof, the 1 st
respondent, under Article 42.2 is vested with the discretion to decide the
continuance of the sub-licence agreement, if any, entered by the 2 nd respondent
with the third parties on mutually negotiable terms and conditions and in such
circumstances, the petitioner cannot misuse the jurisdiction of this Court to
enforce a consensus between the petitioner and the 1 st respondent.
b) Proxy Litigation
61. It is the submission of the learned Addl. Solicitor General that these
petitions deserve to be dismissed in limine as the concerned dispute is purely a
commercial/contractual dispute and the recourse available to the petitioners are
only against the 2nd respondent based on the sub-licence deed in a suit for
damages for relief to indemnify the losses and damages. Further, it is submitted
that on independent arbitration between the 2 nd and 1st respondents under the
Development Agreement, the issues pertaining to the sub-licensees were
agitated before the learned Arbitrator by the 2 nd respondent and the petitioner
34
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
having complete knowledge of the proceedings and pleadings made by the 2 nd
respondent, has approached this Court under its extraordinary jurisdiction,
through the instant petition, which is nothing but a proxy litigation as what could
not be achieved by the 2nd respondent before the Arbitrator is sought to be
achieved through the petitioner in the present petitions.
c) Not a State Function under Article 12 of the Constitution
62. It is the further submission of the learned Addl. Solicitor General that
the function of the 1st respondent entering into a commercial contract, by no
means, could be categorized as a State function and the contention advanced in
this regard is untenable and in such circumstances, the writ petitions at the
instance of the petitioners are not maintainable.
d) Alternate Relief Available
63. It is the submission of the learned Addl. Solicitor General that the
petitioner has an alternative remedy available against the 2 nd respondent under
the sub-license agreement, and particularly referencing clause 16, learned Addl.
Solicitor General submits that it contains an Arbitration clause, which could be
enforced in respect of any dispute or controversy or claim arising out of or in
connection with the sub-licence agreement, including question regarding its
existence, validity, construction and/or interpretation of termination.
35
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
64. It is the further submission of the learned Addl. Solicitor General that it
is settled principle of law that when an alternative remedy exists, particularly in
the form of arbitration, agreed to between the parties voluntarily, the jurisdiction
of this Court under Article 226 cannot be invoked. The issue of legality and
consequences of termination, including rights of the parties under the sub-
licence deed, being adjudicated by the Arbitral Tribunal, the petitioner cannot
maintain a parallel proceeding before this Court on the very same subject and,
therefore, the writ petition is not maintainable.
II) Whether subsidiary agreement co-terminus with the principal agreement survive post termination of principal agreement
65. Learned Addl. Solicitor General submitted that the power of the 2 nd
respondent to enter into a contract flows from the power granted vide clause 3.1
of the Development to sub-license its function to parties, which is a creature of
contract. Therefore, in accordance with Article 3.1.2.h, any sub-license
agreement entered into by the 2nd respondent with any third party would be on a
co-terminus basis to the parent agreement, viz., Development Agreement. The
existence of the sub-license is subject to the existence of the Development
Agreement, which grants the 2nd respondent power to license its activity to third
36
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
parties. In the light of the termination of the Development Agreement, the sub-
licensee cannot claim a better right than the licensee with the principal licence.
66. It is the further submission of the learned Addl. Solicitor General that
subsequent to the termination of the Development Agreement under Article 31,
Article 42 comes into operation, on a perusal of which it could be discerned that
the surrender provision will come into operation at the option of the 1 st
respondent. It is further submitted that Article 42.2.b casts an obligation on the
Developer, viz., 2nd respondent, to incorporate the devolution of rights of the 1 st
respondent and with a specific obligation on the parties to such contracts to
enter into novation agreement with the 1st respondent upon exercise of option
by the 1st respondent with respect to the sub-license agreement entered into
with third parties. It is the submission of the learned Addl. Solicitor General that
the option is with the 1st respondent to enter into novation agreement with the
third parties. It is pointed out that no such clause is available in the subsidiary co-
terminus sub-lease agreement entered between the 2 nd respondent and the
petitioner and, therefore, action, if any, by the petitioner, would be only against
the 2nd respondent for not duly notifying the petitioner and cannot be against the
1st respondent.
37
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
67. It is the further submission of the learned Addl. Solicitor General that
the 1st respondent is vested with discretion under Article 42.2 to allow or decline
any sub-licensee, including the petitioner to continue operation upon mutually
negotiable terms and, therefore, the discretion vested in the 1 st respondent to
enter into a commercial contract cannot be forced upon them by way of a writ by
rewriting a new commercial contract at the terms and conditions of the
petitioner under the guise of promissory estoppel.
68. It is the further submission of the learned Addl. Solicitor General that
there was no privity of contract between the petitioner and the 1 st respondent
and a contract, in which the terms and conditions have to be mutually discussed
and agreed between the parties, cannot be thrust upon the 1 st respondent
through the present writ petition. It is further submitted that the petitioner
cannot feign ignorance that it did not have any knowledge about the discretion
vested with the 1st respondent under Article 42.2 with regard to allowing or
prohibiting a particular activity, which could be evidenced from the letter dated
15.5.2025 written by the 2nd respondent to the petitioner as also the e-mail dated
23.5.2025 in which the 2nd respondent had reproduced the relevant extracts from
38
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the Development Agreement and had asked the petitioner to negotiate with the
1st respondent, which in turn resulted in the communication of the petitioner
dated 29.05.2025 seeking negotiations at the hands of the 1 st respondent for
running the cinema multiplex. Therefore, it is the submission of the learned Addl.
Solicitor General that it is clear that the petitioner was well aware of the
procedure and the discretion vested with the 1 st respondent with regard to any
negotiation and that the petitioner knew very well that it is not a walk in the park
for it to seek for license, which has prompted it to file the petitions. It is
therefore the submission of the learned Addl. Solicitor General that the above
sequence would establish that it is not termination of the petitioner, but rather it
is the rejection of the petitioner’s request for negotiation, which is on the basis of
the express discretion provided under Article 42.2 of the Development
Agreement.
69. It is the further submission of the learned Addl. Solicitor General that
the termination of the main agent would result in consequential termination of
the sub-agency as per Section 210 of the Indian Contracts Act and, therefore, the
rejection of the case of the petitioner was rightly done so. It is further submitted
that even otherwise, Section 24 provides that when the object of the contract or
39
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
any part thereof is unlawful, the contract is void and an agreement to do an
impossible act is also void u/s 56 of the Contract Act. Therefore, operating the
cinema multiplex within the premises of the 1 st respondent being not permitted
within the framework of AAI Act, it cannot be permitted to be continued.
III) Whether the area covering MLCP is included within the definition of ‘Airport’ u/s 2 (B) of AAI Act and whether the functioning of a cinema multiplex is a permissible activity within the functions of the authority
70. It is the submission of the learned Addl. Solicitor General that the area
covering MLCP is included within the definition of ‘Airport’ under Section 2 (b) of
the AAI Act.
71. It is submitted that the definition of airport includes passenger
facilities and the idea for a multi level car park was formulated as a passenger
facility for the passengers and the visitors to park their vehicles. The contention
of the petitioners to consider only the security hold area or restricted area as
airport within the definition u/s 2 (b) is wholly misconceived and untenable.
40
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
72. It is the further submission of the learned Addl. Solicitor General that
restricting the definition of airport only to the security hold area would lead to a
chaotic situation as construing the AAI Act as a whole, the legislature never
meant to limit the operation of definition of airport only to the restricted area.
It is further submitted that any area appertaining to the security hold area, which
provides facilities to the passenger, including area to enter the premises, area to
board, arrival area, restrooms and other facilities located outside the security
hold/restricted area, which facilitates the passengers would come within the
meaning of ‘Airport’ u/s 2 (b) of the AAI Act.
73. It is further submitted that without admitting for the sake of argument
that MLCP is not considered as part of the area within the definition of Airport
u/s 2 (b), the question before this Court is not whether MLCP is an airport or not;
rather the question is whether running a cinema multiplex is a permissible
function for the authority undue/s 12 of the AAI Act, which for the submissions
made above, is not a permissible activity u/s 12 of the AAI Act.
74. It is further submitted that the functions of the authority u/s 12 of the
AAI Act encompasses such other activities as establishing schools/institutions u/s
41
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
12 (3)(d), constructing residential buildings for employees u/s 12 (3)(e) and
provide such transport facilities u/s 12 (3)(e) and, therefore, the functions of the
authority is not limited to geographical bounds of the airport u/s 2 (b) of the AAI
Act.
75. It is further submitted that as a corollary, the authority is confined to
the express functions provided u/s 12 of the AAI Act regardless of whether it is
within the airport or otherwise as Section 12 of the AAI Act does not contemplate
running of an entertainment multiplex within the functions of the authority and,
therefore, running the cinema multiplex is not a permissible activity within the
functions of the 1st respondent as provided for u/s 12 of the AAI Act.
76. It is further submitted that the MLCP complex was developed within
the operational boundary of the airport for facilitating passenger amenities and it
cannot be treated as a standalone entity or a non-aeronautical land exempt from
the purview of AAI Act. It is further submitted that Section 12-A clearly identifies
the area appertaining thereto and in this case the complex in such area
appertaining thereto and the entire lands are contiguous and there is no
difference or that it is not an external area as described by the petitioner and,
42
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
therefore, it would fall within the ambit of the definition of ‘Airport’ u/s 2 (b) of
the AAI Act.
77. It is further submitted that any leasing activity should not affect the
main services such as air traffic service, security, etc., as also the safe operation
of the airport. However, operation of the cinema multiplex within the MLCP
complex would introduce significant public ingress and egress, more particularly
non-passengers, which would undermine the operational efficiency and security
at the airport premises.
78. It is further submitted that the petitioner on the one hand cannot
argue that MLCP is not an airport and on the other hand take recourse to Section
12 (3 (r), which specifically deals with any other activity at the airport. It is
further submitted that the interpretation given by the petitioner to the words
used in Section 12 (3)(r) is erroneous as the meaning of the general words used in
the section is influenced by the context in which it is used. Therefore, the best
commercial interest used in Section 12 (3)(r) cannot be widely interpreted to
include operation of a cinema multiplex for purely commercial purposes which
43
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
has no relation to the function of the authority towards passenger facilities and
the airbase.
IV) Whether there can be any estoppel against a statute
79. It is the submission of the learned Addl. Solicitor General that there
can be no estoppel against a statute. Further, a plea of legitimate expectation
based on past practice can only be taken by someone, who has dealings or
negotiations with a public authority and a total stranger to the authority cannot
invoke the same by claiming that the authority has a duty to act fairly. When it
involves the safety and security of the passenger as also the premises, it is the
duty of the authority to act in a prudent manner and it cannot be claimed as a
matter of routine.
80. In this regard, learned Addl. Solicitor General placed reliance on the
decision of the Apex Court in Union of India – Vs – Godfrey Philips India Ltd. (Air
1986 SC 806), wherein the Apex Court held that any alleged promise claimed by
the petitioner does not constitute a promissory estoppel as promissory estoppel
cannot be used to compel government or a public authority to carry out a
representation or a promise, which is contrary to law or which is outside the
44
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
authority or power of the Government or the concerned officer or public
authority.
81. Placing reliance on the decision of the Apex Court in Tinku – Vs – State
of Haryana (C.A. No.8540/2024) it is submitted that no direction can be issued
mandating the State to perpetuate any illegality or irregularity committed in
favour of a person, an individual or even a group of individuals, which is contrary
to the policy or instructions and the Court cannot ignore the law nor can it
overlook the same to confer a right or a claim that does not have a legal sanction
and equity cannot be extended, that too negative to confer a benefit or
advantage without legal basis or justification.
82. In fine it is the submission of the learned Addl. Solicitor General that
the writ petition is not maintainable, as the petitioner is a mere sub-licensee and
the main Development Agreement, which forms the basis for entering into the
sub-license having been terminated by the 2 nd respondent, there is no privity of
contract between the petitioner and the 1 st respondent and any claim that the
petitioner may have would be only against the 2 nd respondent and the petitioner
cannot evoke the sympathy of this court to perpetuate an illegality or irregularity,
45
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
which does not have the authority of law, more so when the clauses in the
Development Agreement has granted full discretion to the 1 st respondent to
decide whether sub-licenses could be continued or not and this Court cannot
compel the 1st respondent to enter into a license with the petitioner and the
particular activity carried out by the petitioner not being within the purview of
Section 12 of the AAI Act, rightly, the 1 st respondent had directed closure and,
thereafter, upon termination of the Development Agreement rejected the
representation of the petitioner for negotiation for running the cinema multiplex,
which is in consonance with the provisions of the AAI Act and, therefore, no
interference is warranted with the order impugned herein and, accordingly, prays
for dismissal of the petitions.
83. In support of the aforesaid contentions, learned Addl. Solicitor General
placed reliance on the following decisions :-
i) Union of India – Vs – Godfrey Philips India Ltd. (1985 (4) SCC 369 :: AIR 1986 SC 806);
ii) Tinku – Vs – State of Haryana & Ors. (2024 SCC OnLine SC 3292);
iii) Army Welfare Education Society – Vs – Sunil Kumar Sharma (2025 SCC OnLine SC 1683);
iv) Joshi Technologies International Inc. – Vs – Union of India & Ors. (2025 (7) SCC 728);
46 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
v) Raunaq International Ltd. – Vs – IVR Constructions Ltd. & Ors. (1999 (2) SCC 492);
vi) TATA Cellular – Vs – Union of India (1994 (6) SCC 651);
vii) Satya Prakash Gupta & Ors. – Vs – NDMC (2017 SCC OnLine Del 7814);
viii)A.Baldwin & Co. Ltd. – Vs – Magnetic Car Co. Ltd. (1925) 42 RPC 454);
ix) Dunlop Tyre Co. – Vs – Selfridge (1915 AC 847); and
x) State of West Bengal – VS – Anwar Ali (AIR 1952 SC 75)
84. Learned counsel appearing for the 2 nd respondent, while submitted
that the mere termination of the Development Agreement by the 2 nd respondent
would not be a bar for the 1st respondent to consider the case of the petitioner
for running the multiplex, further sailed along with the submissions advanced by
the learned senior counsel for the petitioners.
85. It was further submitted by the learned counsel for the 2 nd respondent
that the stand of the 1 st respondent that there is no privity of contract cannot be
attracted to the present case, as there exists an exception to the doctrine of
privity of contract in cases involving a sub-licensee. In the present case, not only
the sub-licensee but also the act to be perpetrated by the sub-licensee must be
approved by the 1st respondent. The 1st respondent had taken all the steps for
47
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the clearance of the activity of the petitioner by securing environmental
clearance and also No Objection Certificate from the Commissioner of Police and
had given its approval for the activity of the petitioner, which had enabled the 2 nd
respondent to grant the sub-license to the petitioner. It is therefore the
submission of the learned counsel that the 1 st respondent having accepted the
sub-licensee, the notice issued by the 1 st respondent to close the cinema
multiplex constitutes a violation of the terms and conditions.
86. It is the further submission of the learned counsel that the termination
of the Development Agreement by the 2 nd respondent was mainly due to the
multiple violations that was perpetrated by the 1 st respondent, for which
arbitration proceedings was taken up.
87. It is the further submission of the learned counsel that the permission
for operation of a cinema multiplex under Section 12 of the AAI Act is a residuary
power, which has been utilized by the 1 st respondent to grant permission for
running the cinema multiplex within the MLCP complex and having granted the
said permission, the 1st respondent cannot retract from its position by claiming
48
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
refuge under the termination, which termination has nothing to do with the sub-
license granted to the petitioner.
88. This Court gave its careful consideration to the erudite submissions
advanced by the learned senior counsel and learned counsel appearing for the
parties and perused the materials and the relevant provisions of law as also the
decisions to which the attention of this Court was drawn.
89. The following issues that arise for consideration in the present writ
petitions are :-
i) Whether the cinema multiplex run by the petitioner is
situated within the confines of ‘Airport’ as defined u/s
2 (b) of the AAI Act.
ii) Whether there is any express prohibition for running a
cinema multiplex u/s 12 of the AAI Act.
iii) Whether the termination of the Development
Agreement by the 2nd respondent would result in
automatic termination of the sub-license entered into
between the petitioner and the 2nd respondent and in
49
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
such a scenario whether the 1 st respondent is bound to
negotiate with the petitioner for continuance of the
activity inspite of the fact that there is no privity of
contract between the petitioner and the 1 st
respondent.
iv) Whether, is it mandatory that upon termination of the
Development Agreement, stepping into the shoes of
the 2nd respondent, the 1st respondent is required to
negotiate with the sub-licensees for grant of license to
carry on the activities as per the terms of the
Development Agreement and failure to do so would
attract the doctrine of promissory estoppel against the
1st respondent.
v) When Article 42 of the Development Agreement
provides for negotiations between the sub-licensee
and the 1st respondent upon termination of the
contract by the 2nd respondent, whether the surrender
provisions under Article 42 of the Development
Agreement would cloth the 1st respondent with
50
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
unbridled power to reject any type of activity for which
sub-license has been entered into by the 2 nd
respondent notwithstanding the activities contained in
Section 12 r/w Section 2 (b) of the AAI Act.
90. Before proceeding to analyse the issues that have been framed for
consideration, the contentions have been advanced on the legality of the
rejection on the basis of Section 12 (3) r/w 2 (b) of the AAI Act and also on the
doctrine of promissory estoppel and legitimate expectation. Insofar as the issue
relating to the legality of rejection on the basis of Section 12 (3) r/w 2 (b) of the
AAI Act, the relevant provisions are to be tested on the basis of the language
employed to find out if there is ambiguity, which alone will warrant looking into
the law on the subject.
91. Though very many decisions have been pressed into service by the
learned senior counsel appearing on either side, though arguments were
advanced on very many facets of law, the two main grounds on which the issues
are to be tested are on the doctrine of promissory estoppel and legitimate
expectations and to this end, this Court will advert to such of those decisions,
51
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
which alone are required to be looked into to render a finding on the aforesaid
issues.
92. In Godfrey Philips case (supra), on the doctrine of promissory estoppel,
the Apex Court analysed the various decisions on the subject and held as under :-
“9. Now the doctrine of promissory estoppel is well established in the administrative law of India. It represents a principle evolved by equity to avoid injustice and, though commonly named promissory estoppel, it is neither in the realm of contract nor in the realm of estoppel. The basis of this doctrine is the interposition of equity which has always, true to its form, stepped in to mitigate the rigour of strict law. This doctrine, though of ancient vintage, was rescued from obscurity by the decision of Mr Justice Denning as he then was, in his celebrated judgment in Central London Property Trust Ltd. v. High Trees House Ltd. [(1956) 1 All ER 256] The true principle of promissory estoppel is that where one party has by his word or conduct made to the other a clear and unequivocal promise or representation which is intended to create legal relations or effect a legal relationship to arise in the future, knowing or intending that it would be acted upon by the other party to whom the promise or representation is made and it is in fact so acted upon by the other party, the promise or representation would be binding on the party making it and he would not be entitled to go back upon it, if it would be inequitable to allow him to do so, having regard to the 52
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
dealings which have taken place between the parties. It has often been said in England that the doctrine of promissory estoppel cannot itself be the basis of an action: it can only be a shield and not a sword: but the law in India has gone far ahead of the narrow position adopted in England and as a result of the decision of this Court in Motilal Padampat Sugar Mills v. State of U.P. [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 :
(1979) 2 SCR 641] it is now well settled that the doctrine of promissory estoppel is not limited in its application only to defence but it can also found a cause of action. The decision of this Court in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] contains an exhaustive discussion of the doctrine of promissory estoppel and we find ourselves wholly in agreement with the various parameters of this doctrine outlined in that decision.
10. More importantly, it is necessary to point out that the decision in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] marks a significant development in the law relating to the doctrine of promissory estoppel. The principal question debated in that case was as to whether and if so, to what extent, is the doctrine of promissory estoppel applicable against the Government. It was contended on behalf of the State of Uttar Pradesh that the plea of promissory estoppel is not available against the exercise of executive functions of the State, for the State cannot bind itself, so as to fetter its future executive action. This contention was sought to be supported by relying on the observations of Rowlatt, J, in an early decision in Rederiaktiebolaget 53
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Amphitrite v. Rex [(1921) 3 KB 500] . But this Court observed in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] that what Rowlatt, J. said in that case did not represent the correct law on the subject and pointed out that the doctrine of executive necessity propounded by Rowlatt, J. was disapproved by Denning, J. as he then was, in Robertson v. Minister of Pensions [(1949) 1 KB 227] . Denning, J. categorically expressed the view in Robertson case [(1949) 1 KB 227] that the Crown cannot escape its obligation under the doctrine of promissory estoppel “by praying in aid the doctrine of executive necessity”. This Court also in Union of India v. Indo-Afghan Agencies Ltd. [AIR 1968 SC 718 : (1968) 2 SCR 366 : (1968) 2 SCJ 889] exploded the doctrine of executive necessity. Shah, J. speaking on behalf of the Court negatived the argument urged on behalf of the Government that “it is not competent for the Government to fetter its future executive action which may necessarily be determined by the needs of the community when the question arises and no promise or undertaking can be held to be binding on the Government so as to hamper its freedom of executive action” and observed at p. 376 of the Report:
“We are unable to accede to the contention that the executive necessity releases the Government from honouring its solemn promises relying on which citizens have acted to their detriment. Under our constitutional set-up no person may be deprived of his right or liberty except in due course of and by authority of law; if a member of the executive seeks to deprive a citizen of 54
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
his right or liberty otherwise than in exercise of power derived from the law — common or statute — the courts will be competent to and indeed would be bound to, protect the rights of the aggrieved citizen.” The learned Judge also after examining the decisions cited before him summed up the position in the following words:
“Under our jurisprudence the Government is not exempt from liability to carry out the representation made by it as to its future conduct and it cannot on some undefined and undisclosed ground of necessity or expediency fail to carry out the promise solemnly made by it, nor claim to be the judge of its own obligation to the citizen on an ex parte appraisement of the circumstances in which the obligation has arisen.” The defence of executive necessity was thus clearly negatived by this Court and it was pointed out that it did not release the Government from its obligation to honour the promise made by it, if the citizen, acting in reliance on the promise, had altered his position. The doctrine of promissory estoppel was in such a case applicable against the Government and it could not be defeated by invoking the defence of executive necessity. This Court in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] also negatived the argument that if the Government were held bound by every representation made by it regarding its intention, the result would be that the Government would be bound by a contractual obligation even though no formal contract in the manner required by Article 299 of the 55
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Constitution was executed. It was held by this Court that a party who has, acting in reliance on a promise or representation made by the Government, altered his position, is entitled to enforce the promise or the representation against the Government, even though the promise or representation is not in the form of a formal contract as required by Article 299 and that article does not militate against the applicability of the doctrine of promissory estoppel against the Government.
11. The resultant position was summarised by this Court in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] in the following words: (SCC p. 442, para 24) “The law may, therefore, now be taken to be settled as a result of this decision that where the Government makes a promise knowing or intending that it would be acted on by the promisee and, in fact, the promisee, acting in reliance on it, alters his position, the Government would be held bound by the promise and the promise would be enforceable against the Government at the instance of the promisee, notwithstanding that there is no consideration for the promise and the promise is not recorded in the form of a formal contract as required by Article 299 of the Constitution. It is elementary that in a republic governed by the rule of law, no one, howsoever high or low, is above the law. Everyone is subject to the law as fully and completely as any other and the Government is no exception. It is indeed the pride of constitutional 56
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
democracy and rule of law that the Government stands on the same footing as a private individual so far as the obligation of the law is concerned: the former is equally bound as the latter. It is indeed difficult to see on what principle can a Government, committed to the rule of law, claim immunity from the doctrine of promissory estoppel. Can the Government say that it is under no obligation to act in a manner that is fair and just or that it is not bound by the considerations of “honesty and good faith”? Why should the government not be held to a high “standard of rectangular rectitude while dealing with its citizens”? There was a time when the doctrine of executive necessity was regarded as sufficient justification for the Government to repudiate even its contractual obligations; but, let it be said to the eternal glory of this Court, this doctrine was emphatically negatived in the Indo-Afghan Agencies case [AIR 1968 SC 718 : (1968) 2 SCR 366 : (1968) 2 SCJ 889] and the supremacy of the rule of law was established. It was laid down by this Court that the Government cannot claim to be immune from the applicability of the rule of promissory estoppel and repudiate a promise made by it on the ground that such promise may fetter its future executive action.” The doctrine of promissory estoppel as explained above was also held to be applicable against public authorities as pointed out in Motilal Sugar Mills case [(1979) 2 SCC 409 :
1979 SCC (Tax) 144 : (1979) 2 SCR 641] . This Court in Motilal 57
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 :
(1979) 2 SCR 641] quoted with approval the observations of Shah, J. in Century Spinning and Manufacturing Co.
Ltd. v. Ulhasnagar Municipal Council [(1970) 1 SCC 582 : AIR 1971 SC 1021 : (1970) 3 SCR 854] where the learned Judge said: (SCC pp. 586-87, paras 11 and 12) “Public bodies are as much bound as private individuals to carry out representations of facts and promises made by them, relying on which other persons have altered their position to their prejudice.
*** If our nascent democracy is to thrive different standards of conduct for the people and the public bodies cannot ordinarily be permitted. A public body is, in our judgment, not exempt from liability to carry out its obligation arising out of representations made by it relying upon which a citizen has altered his position to his prejudice.” The Court refused to make a distinction between a private individual and a public body so far as the doctrine of promissory estoppel is concerned.
12. There can therefore be no doubt that the doctrine of promissory estoppel is applicable against the Government in the exercise of its governmental, public or executive functions and the doctrine of executive necessity or freedom of future executive action cannot be invoked to defeat the applicability of the doctrine of promissory estoppel. We must concede that the subsequent decision of this Court in Jit Ram v. State of 58
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Haryana [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] takes a slightly different view and holds that the doctrine of promissory estoppel is not available against the exercise of executive functions of the State and the State cannot be prevented from exercising its functions under the law. This decision also expresses its disagreement with the observations made in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] that the doctrine of promissory estoppel cannot be defeated by invoking the defence of executive necessity, suggesting by necessary implication that the doctrine of executive necessity is available to the Government to escape its obligation under the doctrine of promissory estoppel. We find it difficult to understand how a Bench of two Judges in Jit Ram case [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] could possibly overturn or disagree with what was said by another Bench of two Judges in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] . If the Bench of two Judges in Jit Ram case [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] found themselves unable to agree with the law laid down in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] , they could have referred Jit Ram case [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] to a larger Bench, but we do not think it was right on their part to express their disagreement with the enunciation of the law by a coordinate Bench of the same Court in Motilal Sugar Mills [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] . We have carefully considered both the decisions 59
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] and Jit Ram case [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] and we are clearly of the view that what has been laid down in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] represents the correct law in regard to the doctrine of promissory estoppel and we express our disagreement with the observations in Jit Ram case [(1981) 1 SCC 11 : AIR 1980 SC 1285 : (1980) 3 SCR 689] to the extent that they conflict with the statement of the law in Motilal Sugar Mills case [(1979) 2 SCC 409 : 1979 SCC (Tax) 144 : (1979) 2 SCR 641] and introduce reservations cutting down the full width and amplitude of the propositions of law laid down in that case.”
93. On the very same issue of promissory estoppel, the Supreme Court in
Manuelsons case (supra), held as under :-
20. The above statement, based on various earlier English authorities, correctly encapsulates the law of promissory estoppel with one difference—under our law, as has been seen hereinabove, promissory estoppel can be the basis of an independent cause of action in which detriment does not need to be proved. It is enough that a party has acted upon the representation made. The importance of the Australian case is only to reiterate two fundamental concepts relating to the doctrine of promissory estoppel—one, that the central principle of the doctrine is that the law will not permit an
60
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
unconscionable departure by one party from the subject-
matter of an assumption which has been adopted by the other party as the basis of a course of conduct which would affect the other party if the assumption be not adhered to. The assumption may be of fact or law, present or future. And two, that the relief that may be given on the facts of a given case is flexible enough to remedy injustice wherever it is found. And this would include the relief of acting on the basis that a future assumption either as to fact or law will be deemed to have taken place so as to afford relief to the wronged party.”
94. On the issue of legitimate expectation, the Constitution Bench of the
Apex Court in Sivanandan case (supra) has propounded the following ratio :-
“44. In a constitutional system rooted in the rule of law, the discretion available with public authorities is confined within clearly defined limits. The primary principle underpinning the concept of rule of law is consistency and predictability in decision-making. A decision of a public authority taken without any basis in principle or rule is unpredictable and is, therefore, arbitrary and antithetical to the rule of law. [S.G. Jaisinghani v. Union of India, 1967 SCC OnLine SC 6] The rule of law promotes fairness by stabilising the expectations of citizens from public authorities. This was also considered in a recent decision of this Court in SEBI v. Sunil Krishna Khaitan [SEBI v. Sunil Krishna Khaitan, (2023) 2 SCC 643] , wherein it was observed that regularity and
61
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
predictability are hallmarks of good regulation and governance. [SEBI v. Sunil Krishna Khaitan, (2023) 2 SCC 643] This Court held that certainty and consistency are important facets of fairness in action and non-arbitrariness : (Sunil Krishna Khaitan case [SEBI v. Sunil Krishna Khaitan, (2023) 2 SCC 643] , SCC pp. 678-79, para 59) “59. … Any good regulatory system must promote and adhere to principle of certainty and consistency, providing assurance to the individual as to the consequence of transactions forming part of his daily affairs. [Union of India v. Raghubir Singh, (1989) 2 SCC
754. Also see, The Nature of the Judicial Process, Benjamin N. Cardozo, p. 33:“I am not to mar the symmetry of the legal structure by the introduction of inconsistencies and irrelevancies and artificial exceptions unless for some sufficient reason, which will commonly be some consideration of history or custom or policy or justice. Lacking such a reason, I must be logical just as I must be impartial, and upon like grounds. It will not do to decide the same question one way between one set of litigants and the opposite way between another.”(emphasis supplied)] … This does not mean that the regulator/authorities cannot deviate from the past practice, albeit any such deviation or change must be predicated on greater public interest or harm. This is the mandate of Article 14 of the Constitution of India which requires fairness in action by the State, and non-arbitrariness in essence and 62
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
substance. Therefore, to examine the question of inconsistency, the analysis is to ascertain the need and functional value of the change, as consistency is a matter of operational effectiveness.” (emphasis supplied)
45. The underlying basis for the application of the doctrine of legitimate expectation has expanded and evolved to include the principles of good administration. Since citizens repose their trust in the State, the actions and policies of the State give rise to legitimate expectations that the State will adhere to its assurance or past practice by acting in a consistent, transparent, and predictable manner. The principles of good administration require that the decisions of public authorities must withstand the test of consistency, transparency, and predictability to avoid being regarded as arbitrary and therefore violative of Article 14.”
95. Though arguments have been advanced on the maintainability of the
writ petitions, with the 1st respondent claiming it to be not maintainable, as it
involves contractual clauses, which could be very well settled before the Arbitral
Tribunal, that too between the 2nd respondent and the petitioner as there is no
privity of contract between the petitioner and the 1 st respondent, however, it is
countered by the petitioner by submitting that even in contractual matters, writ
remedies are available and it is not totally barred and, therefore, these petitions
63
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
could be maintained. However, this Court is not inclined to enter into the said
aspect of maintainability for the simple reason that the main issue relates to the
prohibitory nature of the activity on the basis of Section 12 (3) of the AAI Act and
on that basis the writ petitions could be very well entertained by this Court.
Therefore, this Court is not addressing the issue of maintainability in contractual
matters, suffice to say that the law with regard to writ remedies in contractual
matters is settled by various decisions.
Issue Nos. 1 & 2 :
i) Whether the cinema multiplex run by the petitioner is situated within the confines of ‘Airport’ as defined u/s 2
(b) of the AAI Act.
ii) Whether there is any express prohibition for running a cinema multiplex u/s 12 of the AAI Act.
96. Issue Nos.1 and 2 sail together and deals with the type of activities that
could be permitted u/s 12, which, according to the 1st respondent, prohibits the
activity undertaken by the petitioner, and, therefore, is impermissible and cannot
be allowed under the Act and, therefore, they are taken up together for
consideration.
64
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
97. The main plank on which the activity of the petitioner is rejected by
the 2nd respondent is by holding it to be a prohibitory activity undertaken within
the precincts of the Airport as defined u/s 2 (b) and further it is not a passenger
facility and, therefore, it cannot be permitted as only activities, which are in the
interests of the passenger are permissible within the Airport, while it is argued to
the contra by the petitioners that such facilities are mainly provided keeping in
mind the passengers, who could utilise the same in the event of delay in
departure of their aircraft due to unforeseen circumstances and also for visitors,
who accompany the passengers or who are residing nearby the Airport. To
substantiate the respective stand, the petitioner and the 1 st respondent rely on
Sections 2 (b) and 12 (3) of the AAI Act, showcasing it to be favouring them,
which, it is claimed by the petitioner formed the basis for rejection of the
petitioner’s representation. The relevant provisions contained in clauses (a), (f),
(j) and (r) of Section 12 (3) of the AAI Act, which are very material for deciding the
aforesaid issue Nos.1 and 2 are quoted hereunder :-
“12. Functions of the Authority – * * * * * * * (3) Without prejudice to the generality of the provisions contained in sub-sections (1) and (2), the authority may –
65
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
(a) plan, develop, construct and maintain runways, taxiways, aprons and terminals and ancillary buildings at the airports and civil enclaves.
* * * * * * *
(f) establish and maintain hotels, restaurants and restrooms at or near the airports;
* * * * * * *
(j) regulate and control the plying of vehicles and the entry and exit of passengers and visitors, in the airports and civil enclaves with due regard to the security and protocol functions of the Government of India.
* * * * * * *
(r) any other activity at the airports and the civil enclaves in the best commercial interests of the Authority including cargo handling, setting up of joint ventures for the discharge of any function assigned to the Authority.”
98. Clauses (a) of sub-section (3) of Section 12 relates to the power of the
Authority to plan, develop, construct and maintain runways, taxiways, aprons
and terminals and ancillary buildings at the airports and civil enclaves, while
clause (f) provides for the establishment and maintenance of hotels, restaurants
and restrooms at or near the airports; clause (j) provides power to the authority
to regulate and control the plying of vehicles, the entry and exit of passengers
and visitors in the airports and civil enclaves and clause (r) provides for
66
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
performing any other activity at the airports and the civil enclaves in the best
commercial interests of the Authority.
99. Holistically looking at the clauses supra, all the said clauses use the
terminology ‘Airport’ and all the facilities that are provided for passengers at the
airport would fall within the sweep of the term ‘Airport’. In this backdrop, it is for
the Court to determine as to what are all the areas that would form part of the
Airport, as according to the 1 st respondent, irrespective of the security cover of
the area, any area appertaining to the security hold area which provides facilities
to the passenger, including area to enter the premises, area to board, arrival
area, restrooms and other facilities located outside the security hold
area/restricted area which facilitates the passengers would come within the
meaning of ‘Airport’ u/s 2 (b) as restricting the meaning of the Airport to security
hold area would lead to a chaotic situation.
100. The definition of ‘Airport’ is provided for u/s 2 (b) of AAI Act, which
runs thus :-
“2. Definitions : - In this Act, unless the context otherwise requires – * * * * * * *
67
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
(b) “airport” means a landing and taking off area for aircrafts, usually with runways and aircraft maintenance and passenger facilities and includes aerodrome as defined in clause (2) of section 2 of the Aircraft Act, 1934 (22 of 1934).”
101. Any landing and taking off area for aircrafts together with runways,
aircraft maintenance space, passenger facilities and including aerodrome would
come with the ambit of the term ‘Airport’ as it evident from the above provision.
102. In the light of the definition of the term ‘Airport’ u/s 2 (b) coupled
with the functions of the Authority u/s 12 (3) of the AAI Act, it becomes
imperative for this Court to find out the expansiveness of the term ‘Airport’,
which alone would form the basis to decide the nature of activities that would fall
within the realm of Section 12 (3) of the AAI Act.
103. According to the learned Addl. Solicitor General, the expansiveness of
the term ‘Airport’ would include both the restricted area, which is the secured
zone as also the unrestricted zone, which is the outer periphery and all such
areas would come within the term ‘airport’ as defined u/s 2 (b) and, therefore,
the cinema multiplex activity being not an activity spelt out u/s 12, would be a
prohibited activity, which cannot be permitted.
68
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
104. There could be no quarrel with the fact that screening of cinema is
not an activity, which is specifically spelt out u/s 12. So also, there are many
activities, which, as pointed out by the petitioner, not being disputed by the 1 st
respondent, have been permitted to be carried on in the outer
periphery/unrestricted zone, which have also not been spelt out u/s 12 and,
therefore, singling out cinema activity alone as an impermissible one since it has
not been specifically spelt out u/s 12 cannot be accepted.
105. Necessarily ‘Airport’ is an expansive term, but the list of activities,
which are to be performed are captured in a nutshell in the definition of ‘airport’,
which gives an understanding as to the activities that could be permitted. It is to
be pointed out that where there is no explicit prohibition, permission could be
granted and if there is an explicit prohibition, no permission could be granted.
Therefore, necessarily, the definition of ‘Airport’ has to be looked at with a larger
lens, as it takes within its fold restricted and unrestricted zones.
106. The nature of activities that are to be carried on with the definition of
‘airport’ are activities, which are performed within the restricted zone, which
69
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
specifically relates to landing and taking off areas for aircrafts, the runways, the
area of aircraft maintenance and passenger facilities, including aerodrome as
defined under clause (2) of Section 2 of the Aircraft Act, 1934.
107. Even from a bare perusal of the definition of ‘Airport’ it clearly shows
that the activities, which are brought within its ambit are secured activities.
Barring the landing and taking off areas and runways and aerodrome, the only
other activity relates to passenger facilities, which is permitted within the airport,
more particularly the restricted zone, as the activities, that are spelt out u/s 2 (b)
relates to activities, which are performed within the restricted zone. Therefore,
the facilities, which are provided for the passengers, as codified u/s 2 (b) are
exclusively for the passengers and are not for any other persons, including the
visitors and, therefore, the said facilities could be provided only in the security
zone.
108. However, clauses (f), (g) and (r) of Section 12 (3) are also claimed to
be activities, which fall within the functions of the 1 st respondent, which are
provided in the airport. But the said activities could not be said to be activities
falling within the restricted zone, as the said activities, which are permitted are
70
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
outside the security zone, viz., unrestricted area. In this regard, useful reference
can be had to Section 28-A of the Act, falling under Chapter V-A, which deals with
the eviction of unauthorised occupants, etc., of airport premises. Clause (a) of
Section 28-A defines ‘airport premises’, which takes within its fold the following :-
“28-A. Definitions. – In this Chapter, unless the context otherwise requires, -
(a) “airport premises means any premises –
(i) Belonging to airport;
(ii) Taken on lease for the purposes of airport;
(iii) Acquired for the Authority under the provisions of the Land Acquisition Act, 1894, or any other corresponding law for the time being in force.
Explanation. – For the removal of doubts, it is hereby declared that for the purposes of this clause, “airport” includes private airport.”
109. From the definition of “airport premises” u/s 28-A (a), it is clear that
any portion which belongs to the airport would stand attracted under the
aforesaid term. Therefore, the unrestricted zone, where the cinema multiplex of
the petitioner as also the other activities, which have been permitted by the 1 st
respondent are being carried out, will fall within Section 28-A (a), as it would
relate to premises, which is not only within the vicinity or adjoining the airport,
but also any other premises, which is held by the 1 st respondent and belongs to 71
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the 1st respondent. Therefore, technically, the said portion though not airport as
defined u/s 2 (b), but it is the airport premises, as defined u/s 28-A (a) and,
necessarily would be within the control of the 1st respondent.
110. Therefore, the unrestricted zone adjoining the airport would squarely
fall u/s 28-A (a) of the AAI Act as it would be the premises belonging to the
airport and would be part of the airport, though would not stand covered by the
term ‘airport’ as defined u/s 2 (b) of the AAI Act, as only activities of a restricted
nature and for specific purposes could be taken up within the security zone of the
airport, as provided u/s 2 (b) and not all and sundry purposes, which would be in
the commercial interests of the airport.
111. Further, the above view of this Court also finds strength from clause
(f) of Section 12, which deals with the regulation and control of plying of vehicles
and entry and exit of passengers and visitors in the airports and civil enclaves.
Therefore, any place which is used both by the passengers and visitors of which
regulation and control is with the 1st respondent, the same would only fall within
the unrestricted zone, as visitors are not permissible within the restricted zone.
However, it is to be recognized without a semblance of doubt that regulation and
72
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
control with regard to plying of vehicles and entry and exit of passengers and
visitors would be purely within the realm of the 1 st respondent, which is purely
for security purposes, but in an unrestricted zone.
112. From the above, it could safely be concluded that the place where the
cinema multiplex of the petitioner is established would fall u/s 28-A (a) of the AAI
Act which will be in an unrestricted zone and would not be within the term
‘airport’ as defined u/s 2 (b) of the AAI Act, which would only attract activities,
that are permissible within the restricted zone.
113. In this backdrop, this Court has to now consider whether the
unrestricted zone in which the cinema multiplex is located could be said to be a
prohibited activity.
114. Clause (f) of Section 12 (3) relates to establishment and maintenance
of hotels, restaurants and restrooms at or near the airports. If really a facility
provided by the 1st respondent is relatable only to passengers, then clause (f)
would not have taken within its fold the establishment and maintenance of
hotels, restaurants and restrooms near the airport; rather, it would have
73
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
confined itself to the provision of facilities at the airport/inside the airport. The
necessity for establishment and maintenance of hotels, restaurants and
restrooms near the airport could only be inferred to be for the purpose of visitors
who come to pick-up and drop the passengers, who could utilise the said
facilities, inclusive of it being used by the passengers, before entering into the
restricted area, where facilities are provided as per Section 2 (b). Therefore, it
could be said without a semblance of contradiction that the provision of facilities
to the visitors, including passengers could only be visualised outside the airport,
more particularly in the airport premises and even areas adjoining the airport and
such places would not fall within the confines of the definition of ‘Airport’.
115. True it is that establishment and maintenance of hotels, restaurants
and restrooms at or near the airport alone is provided for in Section 12, but there
is no express prohibition with regard to any particular activity. In this regard,
reference can be had to clause (r) of Section 12 (3), which relates to “any other
activity at the airports and the civil enclaves in the best commercial interests of
the Authority, including cargo handling, setting up joint ventures for the discharge
of any function assigned to the Authority”.
74
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
116. It is to be pointed out that where there is no express and explicit
prohibition, it is within the realm of the authority to grant permission for the
running of a particular activity, but when there is an express and explicit
prohibition, the authority is denuded of any power to grant any permission.
117. It is the specific case of the petitioner and one which is not disputed
by the 1st respondent that various other retail outlets, such as matrimonial
agency, clothing, beauty products, electronic goods, pharmacy, etc., are granted
permission to function in and around the cinema multiplex, though as per Section
12 of the AAI Act, there is no specific provision which permits these activities and
such being the case, the running of cinema multiplex cannot be singled out by the
1st respondent to say that it is not spelt out u/s 12 (3) and, therefore, it is a
prohibited activity.
118. It is not disputed by the 1 st respondent that retail outlets, such as
matrimonial agency, clothing, beauty products, electronic goods, pharmacy, etc.,
have been granted permission and are functioning within the airport premises,
more particularly, in the unrestricted zone, where it could be accessed by the
passengers as also by the visitors and other general public. There is no
75
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
prescription u/s 12 with regard to permitting the aforesaid activities and,
therefore, the contention of the 1st respondent that there is no explicit
permission granted u/s 12 (3) for running the cinema multiplex, would have to be
construed as a prohibition, does not deserve acceptance.
119. In this regard, even a bare perusal of clause (r) to Section 12 (3)
provides for carrying on “any other activity at the airports and the civil enclaves in
the best commercial interests of the authority” which could very well take within
its fold a cinema multiplex, as it is not only a viable option in the best commercial
interests of the authority but also commercial interest in the interests of the
passengers, as the commercial benefit derived from such activity could be passed
on to the passengers from out of the income generated by the said commercial
activity.
120. In the present case, the amount generated by way of sub-license fee
from the running of the cinema multiplex together with the car parking facilities,
which yield more money from the visitors and general public, who visit the
cinema multiplex and also the other outlets for shopping purposes, definitely add
to the income of the authority, which could be passed on to the passengers. Only
76
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
in the said backdrop, clause (r) has specifically prescribed the taking up of any
other activity at the airports and the civil enclaves in the best commercial
interests of the authority, which otherwise would not have formed part of the
provision u/s 12 (3). Therefore, the non-spelling out of the particular activity,
viz., cinema multiplex cannot be held that there is a prohibition for running the
said activity within the airport premises and, therefore, no permission could be
granted is against the spirit of the provisions of the AAI Act.
121. Moreover, in the present case, the activity of the petitioner, viz.,
cinema multiplex, is not within the restricted area of the airport, as defined u/s 2
(b); rather, it is in the unrestricted zone of the airport premises, where there is no
express prohibition and, therefore, it is well within the powers of the 1 st
respondent to grant permission for running the cinema multiplex.
122. When the provisions in the AAI Act, more particularly, Sections 2 (b),
12 (3) and 28-A are clear and unambiguous and clearly spell out the areas of
airport, which fall under the restricted zone and the other areas of the airport
premises, which fall under the unrestricted zone, then it is very much within the
power of the 1st respondent to grant permission.
77
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
123. In this backdrop, it could very well be concluded that the cinema
multiplex, which is run by the petitioner, though is situated within the airport
premises, but definitely it is not within the definition of ‘airport’ as defined u/s 2
(b), but would only fall u/s 28-A (a) of the AAI Act. Therefore, necessarily, the
cinema multiplex cannot be held to be situated within the restricted area of an
‘Airport’ as defined u/s 2 (b) and further, there is no express prohibition u/s 12
(3) of the AAI Act for running of a cinema multiplex within the airport premises,
as the said cinema multiplex is not situated within the confines of ‘Airport’ as
defined u/s 2 (b) of the AAI Act. Issue Nos.1 & 2 are accordingly answered
against the 1st respondent.
Issue Nos.3, 4 & 5 :
i) Whether the termination of the Development Agreement by the 2nd respondent would result in automatic termination of the sub-license entered into between the petitioner and the 2nd respondent and in such a scenario whether the 1st respondent is bound to negotiate with the petitioner for continuance of the activity insptie of the fact that there is no privity of contract between the petitioner and the 1st respondent.
78 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
ii) Whether, is it mandatory that upon termination of the Development Agreement, stepping into the shoes of the 2nd respondent, the 1st respondent is required to negotiate with the sub-licensees for grant of license to carry on the activities as per the terms of the Development Agreement and failure to do so would attract the doctrine of promissory estoppel against the 1st respondent.
iii) When Article 42 of the Development Agreement provides for negotiations between the sub-licensee and the 1 st respondent upon termination of the contract by the 2 nd respondent, whether the surrender provisions under Article 42 of the Development Agreement would cloth the 1st respondent with unbridled power to reject any type of activity for which sub-license has been entered into by the 2nd respondent notwithstanding the activities contained in Section 12 r/w Section 2 (b) of the AAI Act.
124. As all the three issues relate to the interpretation of the contractual
terms and its applicability for continuance of the petitioner as a sub-licensee,
they are taken up together for appreciation.
125. To address the aforesaid issues, it is necessary to refer to the various
clauses in the Development Agreement, Sub-License Deed, the respective
communications that have emanated between respondents 1, 2 and the
petitioner as also the communications between the various statutory authorities, 79
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
which have a bearing on deciding the issues and, therefore, it becomes
imperative for this Court to look into the various provisions and communications,
which have been referred to, to find out whether the action of the 1 st respondent
directing the 2nd respondent to close the cinema multiplex is sustainable.
126. At the time of submission of the bid document, in Annexure’A’, which
pertains to ‘Design Proposal’, there is clear spell out of the design by the 2 nd
respondent, that is proposed, which, provided for a cinema multiplex. Therefore,
it is evident that even at the earliest stage, there is a clear prescription in the bid
that there would be a cinema multiplex at site, which could be easily accessed
from the GST Road and, therefore, the proposed commercial development has
potential to attract even resident population within 5-10 km radius. The aforesaid
proposal design and bid was accepted by the 1 st respondent, which is not in
dispute. The design proposal submitted by the 2 nd respondent is quoted
hereunder for reference :-
“Design Proposal The design being presented envisages a retail & cinema multiplex component of approximately 220,000 sft with a large F&B component as well as a 30,000 sft transit hotel facility. The retail occupancy will be positioned to serve the needs of arriving and departing passengers as well as to serve as a
80
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
community mall/multiplex for residential localities situated in the vicinity of the airport complex.” (Emphasis Supplied)
127. It is further clear from the records that not only the bid envisaged the
proposal for putting up a cinema multiplex, but that it is also to be made
accessible to the passengers, visitors and general public. The above position
conclusively establishes the findings of this Court that even at the nascent stage,
it was the stand of the 1st respondent that there is no prohibition for the
establishment of a cinema multiplex, but what is necessary is only permission
with regard to having the said activity, though, for reasons best known, after the
establishment of the cinema multiplex, the 1 st respondent took a ‘U’ turn and
held that the cinema multiplex is a prohibited activity. Further, the usage of the
cinema multiplex by outsiders, more particularly, the residents of the locality
residing within 5 to 10 Kms., radius, would also clearly show that the
establishment of the said activity is outside the restricted periphery of the
airport, but within the airport premises.
128. The petitioner had drawn the attention of this Court to clause 3.1.4 of
the Development Agreement, which provides for the 2 nd respondent to enter into
81
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
sub-licensing agreements for commercial purposes and the present sub-license
agreement entered into between the petitioner and the 2 nd respondents falls
squarely within the said clause, and for better appreciation, the said clause is
quoted hereunder :-
“3.1.4 In consideration of the DEVELOPER achieving the COD in accordance with the provisions hereof, the Authority hereby agrees to allow signing of sublicensing agreements between the DEVELOPER and the end users for the use of the commercial area on terms and conditions, no greater in scope than those granted to the DEVELOPER under this Agreement. The built up areas in the commercial area shall be available for relevant commercial uses by way of sublicensing agreements between the DEVELOPER and a Third Party. Such sublicensing agreements shall be executed any time after COD and the DEVELOPER shall submit a certified true copy of such sublicensing agreement (s) to the Authority within 7 (seven) days of its execution.
a) The Sublicensing Agreements shall be for a maximum period of 15 (fifteen) years from the Appointed Date, whether executed on such date or prior to such date, and the term of the Sublicensing Agreements shall be renewable at the sole discretion of the DEVELOPER provided the tenure of any Sublicensing Agreement by way of original agreement or by process of renewal shall not exceed 15 (fifteen) years from the Appointed Date and such tenure shall be co-terminus with the Agreement.
82 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
b) The DEVELOPER and the persons claiming through or under it shall indemnify and keep indemnified the Authority, its employees, agents and advisors from and against any claim, liability, cost, suit or legal proceeding and attorney costs arising in any manner from the construction, implementation and use of the MLCP facility or any part thereof, including the soundness of any design, civil or engineering or other works, structural strength, construction quality, workmanship etc. thereof or the marketing, allotment and licensing of the built up areas in the Commercial Facility, or the demanding, charging, collection, retention and appropriation of premium or any other payments in respect thereof or the execution of Sublicensing Agreements.” (Emphasis Supplied)
129. Conditions Precedent in Article 4 of which sub-clause (c) of clause
4.1.2 provides for approval of the design, provides as under :-
“c) Constituted a design approval committee to review the concept design for the Project Facilities submitted by the DEVELOPER, and subject to satisfaction, approve the same.”
130. It is not in dispute that the design for the MLCP complex along with
the cinema multiplex had received the assent of the approval committee
whereupon the Development Agreement had been come to be executed. There
is no quarrel with the said fact by the 1st respondent.
83 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
131. Obligations relating to project agreements to be entered into by the
2nd respondent/Developer with third parties with regard to grant of sub-licenses
or sub-contracts, is provided under clause 5.2 and sub-clauses 5.2.2 and 5.2.4,
which are material, more particularly with regard to the continuance of
relationship upon termination or suspension, is quoted hereunder :-
“5.2.2 The DEVELOPER shall submit to the Authority the drafts of all the Project Agreements including a template for license etc. of any built-up area in the Project to a Third Party, or any amendments or replacements thereto for its review and comments, and the Authority shall have the right, but not the obligation, to undertake such review and provide its comments and approval, to the DEVELOPER within 30 (thirty) days of the receipt of such drafts. The DEVELOPER shall execute such Project Agreements only after approval by the Authority. Within 07 (seven) days of execution of any Project Agreement or amendment thereto, the DEVELOPER shall submit to the Authority a true copy thereof, duly attested by a director of the DEVELOPER, for its record. For the avoidance of doubt, it is agreed that the review and comments hereunder shall be limited to ensuring compliance with the terms of this Agreement. It is further agreed that any failure or omission of the Authority to review and/or comment hereunder shall not be construed or deemed as acceptance of any such agreement or document by the Authority. No review and/ or observation
84
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
of the Authority and/or its failure to review and/or convey its observations on any document shall relieve the DEVELOPER of its obligations and liabilities under this Agreement in any manner nor shall the Authority be liable for the same in any manner whatsoever.
* * * * * * * 52.4 The DEVELOPER shall procure that each of the Project Agreements expressly contain provisions that entitle the Authority to step into such agreement in substitution of the DEVELOPER in the event of Termination or Suspension (the "Covenant"). For the avoidance of doubt, it is expressly agreed that in the event the Authority does not exercise such rights of substitution, the Project Agreements shall cease to be in force and effect on the Surrender Date without any liability whatsoever on the Authority and the Covenant shall expressly provide for such eventuality. The DEVELOPER expressly agrees to expressly include the Covenant in all its Project Agreements and undertakes that it shall, in respect of each of the Project Agreements, procure and deliver to the Authority an acknowledgment and undertaking, in a form acceptable to the Authority, from the counter party(s) of each of the Project Agreements, where under such counter party(s) shall acknowledge and accept the Covenant and undertake to be bound by the same and not to seek any relief or remedy whatsoever from the Authority in the event of Termination or Suspension.” (Emphasis Supplied)
85
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
132. Based on the aforesaid provisions, the sub-license agreements have
been entered into which is also the basis for the agreement between the
petitioner and the 2nd respondent, which, it is not disputed, has met with the
approval of the 1st respondent, through its independent engineer. On the basis of
the provisions in the Development Agreement, the 1 st respondent has also taken
efforts for obtainment of No Objection Certificate from the Commissioner of
Police by the 2nd respondent as also for Environment Clearance Certificate upon
change in scope of the work for inclusion of the cinema multiplex, which,
according to the petitioners clearly denote that permission has been granted by
the 1st respondent for establishment of a cinema multiplex and, therefore, they
cannot turn back now and claim that cinema multiplex is a prohibited activity
under the AAI Act and cannot restrain the petitioner from operating the cinema
multiplex. For the sake of clarity, the letter dated 20.7.2021, addressed by the 1 st
respondent to the Commissioner of Police requesting for early consideration of
No Objection Certificate is quoted hereunder :-
“Dear Sir, SUB:- Location NOC Request for 5 Screen Cinema at integrated MLCP Building located at Chennai Airport. We herewith bring in to your kind notice that as a part of Modernization of Chennai Airport Plan we have entered in to an PPP agreement bearing agreement number AAI/BD/MLCP-
86 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Chennai/2018-19/01 dated 20th June 2018 with M/s Meenambakkam Realty Pvt Ltd for Development of Multi Level Car Parking with Integrated Commercial on DBOM Basis at Chennal Airport - Tamil Nadu on Blended Financing Model. As a part of this overall development - there are two Multi Level Car Parking Buildings on either flank of the existing Airport Metro Stations - East MLCP Building & West MLCP Building. Since the overall project is integrated with commercial development in the East MLCP building there is a 5 screen multiplex planned and designed. We are herewith enclosing the sanctioned plan copy of the overall development wherein the Multiplex portion is also covered.
We request your office to kindly grant us an NOC (No Objection Certificate) for this location as Location NOC so that we can go ahead with this project. We are in the process of creating a world class facility at Chennai Airport and your early turnaround response on this will be highly appreciated.
133. Insofar as environment clearance is concerned, environment
clearance was granted vide order dated 25.10.2019, on the basis of the online
proposal of the 1st respondent, in and by which, the clearance was granted by
way of amendment for the establishment of a cinema multiplex in an extent of
40,016 sft. (3,717.61 sqm).
87
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
134. From the aforesaid documents, it would be evident that the 1 st
respondent had, all along, been inclined to permit the activity of cinema
multiplex in the design and towards such permission, the 1 st respondent had
taken all steps for obtaining the statutory clearances. However, the crucial fact
that requires to be noted here is that during such time, the Development
Agreement between the 1st and 2nd respondent was very much in existence.
However, during the continuance of the Development Agreement, after
establishment of the cinema multiplex by the petitioner, the 1 st respondent had
pressed upon the 2nd respondent to close the cinema multiplex, as according to
the 1st respondent the running of the cinema hall is not permitted under the AAI
Act.
135. In this regard, the attention of this Court was drawn to the
communication addressed by the 1st respondent to the 2nd respondent in which a
veiled attempt is made by the 1st respondent to cite that the cinema hall is to be
closed with immediate effect as running of the cinema hall is not permissible
under the AAI Act. In fact, there is a conspicuous absence in the said
communication with regard to the relevant provision under which the cinema
88
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
multiplex activity is not permissible. For the sake of convenience, the said
communication dated 21.07.2023 is quoted hereunder :-
“Sir, It has been decided by Competent Authority to close the Cinema Hall (PVRs 5 Screens) with immediate effect as running of Cinema Hall is not permissible under the AAI Act. In view of the above, you are requested to close the running of Cinema Hall (PVRs 5 Screens) with immediate effect and ensure the compliance.”
136. The said communication of the 1 st respondent to the 2nd respondent
was informed to the petitioner through the communication of the 2 nd respondent
dated 25.11.2023, wherein, the 2nd respondent has taken the following stand :-
“Dear Sir, We are in receipt of your letter dated 07.11.2023, and we are grateful to you for reaching out to us with your concerns and thoughts about MRPL's dispute with Airport Authority of India. It is true that we received a written communication from AAI on 21-July-2023, requesting us to close the Cinema Halls.
We were astonished to receive such unilateral communication from AAl without citing any cogent reasons for making such demand. It is pertinent to note that the decision to have a Cinema Hall as a part of Multilevel Car Parking (MLCP) with integrated commercial was not our unilateral decision. From the stage of Bid itself the Cinema Hall was an
89
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
integral part of the integrated commercial plan for MCLP. Also the Cinema Hall was part and parcel of Bid documents which were submitted by MRPL to AAI. Aerohub itself was envisaged as a retail and Cinema Multiplex, including a food court for serving the needs of passengers and local residents and all our negotiations and subsequent execution of project was with a clear understanding that Cinema Hall is the quintessential part of the complex and the License agreement with AAI and MRPL was executed with this understanding.
* * * * * * * The status Quo order is continuing till date and from the merits of this matter we are confident that we will prevail in the Arbitration. As mentioned in Paragraphs 2 to 5 of your notice you The status Quo order is continuing till date, and from the merits of this matter we are confident have mentioned about the Sub License Deed dated 15th November 2022 entered between yourself and MRPL for operating the Cinema Halls for a period of 13.5 years. The stipulations of the Sub License deed and all its recitals, terms, representations, warranties etc., are mutually binding on the parties and for the sake of brevity we do not wish to reiterate the same in this reply. All our rights as a Sub Licensor for the aforesaid Sub License Deed dated 15.11.2022 is flowing from the Development Agreement entered by MRPL and AAI, dated 18th June 2018, under which we have the right to develop and operate the MLCP Project and integrated commercial, for the duration of the Development Agreement.
90 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
As mentioned in paragraph 6 of your letter we agree that you have invested money and effort to realize the shared goal of the project and stated in the preceding paragraph AAl has granted us rights to Develop and operate the MLCP as per the Development Agreement and all our representations and deliverables are based on back to back rights provided to us by AAI. It is pertinent to mention that all necessary sanctions and approvals from AAl and other authorities have been procured for operating the MLCP with integrated commercial activity.”
137. Pursuant to the aforesaid communication, there have been multiple
communications between the petitioner and the 2nd respondent, including the 2nd
respondent informing the petitioner of its act of terminating the Development
Agreement and called upon the petitioner to implore the option of continuance
of the cinema complex by interacting with the 1 st respondent, as the 1st
respondent has taken over the MLCP complex on the basis of the provisions in
the Development Agreement.
138. Though the Development Agreement provides all those clauses,
however, the main bone of contention of the 1 st respondent rests on sub-clause
(h) of clause 3.1.2 of the Development Agreement, which relates to Project Rights
and the said provision is quoted hereunder :-
91
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
“3.1 Grant of Project Rights * * * * * * *
h) Sub-license/enter into O&M contract/franchise arrangement in respect of the Built up Area of the Project Facilities by entering into appropriate contractual arrangements co-terminus with the Agreement through a transparent mechanism on terms and conditions decided on arm’s length basis and subject to the provisions of this Agreement, provided however that :
DEVELOPER shall not part with, create any Encumbrance on the whole or any part of the Project Site to any person in any form or under any arrangement, device or method. This is an essential condition of this Agreement, the breach of which shall constitute a DEVELOPER Default that shall entitle the Authority to terminate this Agreement in accordance with the provisions hereof; and ii. the DEVELOPER shall establish fair, reasonable and objective criteria for the grant of such sub-license of Project Facilities. Further, in granting and in determining whether or not to grant any sub-license of the Project Facilities to any person or entity and in determining whether to amend waive, terminate or extend any such rights the DEVELOPER shall consistently comply and apply such criteria.” (Emphasis Supplied)
92
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
139. The above provision reveals that the sub-license granted to the
petitioner is co-terminus with the contractual arrangement, viz., the
Development Agreement and the survival of the sub-license is only till the
Development Agreement survives. Therefore, once the Development Agreement
stands terminated by the 2nd respondent, it is contended that the petitioner will
have no separate legs to stand.
140. The said proposition as advanced on behalf of the 1 st respondent
definitely merits acceptance for the simple reason that the term ‘co-terminus’
means “having the same boundaries, scope, or duration”. Therefore, so long as
the Development Agreement survives and during its term, the sub-license deed
entered into between the petitioner and the 2 nd respondent would also survive
and any severance of the Development Agreement would lead to the automatic
severance of the sub-license deed, as the sub-license deed cannot have a better
scope or duration than the original Development Agreement.
141. Further, clause 12.2 of the sub-license deed provides that in the
event of the cinema operating licenses not being renewed or being cancelled for
reasons not attributable to the sub-licensee, necessary precautions and measures
93
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
safeguarding the interests of the sub-licensee have been provided and, therefore,
the course open to the sub-licensee is to seek for remedy under clause 12.2. So
also clause 13.2 and 13.6 of the sub-licence agreement safeguards the interests
of the sub-licensee and, therefore, the sub-licensee cannot have grievance with
regard to the termination on the sole ground that it is not able to derive any
profit from out of the activity for which the sub-license had been granted. From
the above, not only inference, but even a finding can be rendered that in case of
cancellation/termination of sub-license, necessary safeguards have been
provided to the petitioner.
142. It is further borne out by record that the 2 nd respondent had informed
about its decision to terminate the Development Agreement with the 1 st
respondent, which termination has also been informed to the petitioner by
pointing out that the 1st respondent will take over the entire MLCP complex with
effect from 30.05.2025 and post the said takeover, all matters pertaining to the
license agreement of the petitioner, including administration and future course
would be handled by the 1st respondent. The relevant portion of the said letter
dated 15.5.2025 is quoted hereunder :-
“We write to inform you that the said Development Agreement with AAI dated 20.06.2018 now stands terminated.
94 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Consequently, AAI shall take over the entire MLCP Complex with effect from 30.05.2025. Post the said takeover, all matters pertaining to your license arrangement, including its administration and future course, shall be handled directly by AAI.”
143. The reply of the petitioner dated 22.05.2025, is more intriguing in
which the position of the petitioner, further to the termination of the
Development Agreement, was even noted by the petitioner, pointing out as to
how the right of the petitioner to operate the multiplex under the sub-license
deed would continue in an unfettered and unhindered manner. The relevant
portions of the said communication is quoted hereunder :-
“8. It is also pertinent to mention that the said Letter does not provide any assurance as to how PVR INOX's right to operate the multiplex under the Sub-License Deed would continue in an unfettered and unhindered manner when you are obligated under the terms of the Sub-License Deed to ensure that the rights accrued in our favour under the Sub- License Deed are not disturbed and/or alienated in any manner. Therefore, you are called upon to clarify on this aspect, failing which we will be inter alia constrained to initiate appropriate legal proceedings in order to protect our rights and interests. You will appreciate that we will suffer irreparable harm and injury if our rights are trampled upon in an illegal and arbitrary manner. We will suffer immeasurable 95
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
damages on account of loss of capital expenditure, loss of revenue, loss of profits, loss of goodwill and reputation and other incidental and ancillary losses. We reserve our right to quantify such losses at the relevant stage.
* * * * * * *
11. Please also note that this letter is without prejudice to rights available to PVR INOX under law. In case we are compelled to institute any proceedings against you in relation to the Sub-License Deed or otherwise, you shall solely be liable for all the costs and expenses incurred by us, including legal costs. All rights are reserved.” (Emphasis Supplied)
144. By the aforesaid letter, while the petitioner has sought for details
with regard to the Development Agreement and the details of the termination,
however, as already aforesaid, vide e-mail dated 23.5.2025, the 2 nd respondent
had expressed its reservation to inform the grounds of termination as it is bound
by the confidentiality obligations. In the said communication, the 2 nd respondent
has pointed finger against the petitioner with regard to absence of due diligence
on its part to the Development Agreement and the sub-license deed, which is
material and the said portion of the communication is quoted hereunder :-
“7. We would also like to reiterate that, prior to the execution of the Sub-License Deed, a copy of the Development Agreement was duly shared with PVRF. It is under 96
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
understanding that PVR independently undertook a comprehensive review and due diligence of the said agreement. The Sub-License Deed itself expressly records that it was executed pursuant to 3.1.1 of the Development Agreement, which confers upon MRPL the authority to grant sub-licenses for specific components of the project, including the multiplex area. Such authority, however, is expressly made subject to the terms and conditions stipulated therein, including the provision that all sub-licenses are co-terminus with the Development Agreement.
8. Further, Article 31.4(e) of the Development Agreement grants AAI the discretion to determine whether it wishes to assume MRPL's interest in any sub-license. However, Article 42.1(c) qualifies this discretion, stating that AAI shall not be required to assume contracts that, in its sole opinion, are unreasonably onerous and would have been deemed so at the time of execution.
* * * * * * *
10. Additionally, Article 42.2 of the Development Agreement expressly provides that AAI may, at its discretion, permit sub-licensees to continue on mutually acceptable terms
- a provision that offers both flexibility and a framework for continuity.” (Emphasis Supplied)
145. From the above communications between the petitioner and the 2 nd
respondent, it is clear beyond a shadow of doubt that the nuances in the sub- 97
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
license agreement, more pertinent in relation to the Development Agreement
between the 1st and 2nd respondent, inclusive of the co-terminus nature of the
sub-license deed was very much within the knowledge of both the petitioner and
the 2nd respondent which was to have been independently assessed by the
petitioner by exercising due diligence. In fact, it is admitted by both the
petitioner and the 2nd respondent that the right of continuance of a sub-license
entered into with a sub-licensee with the 2 nd respondent is subject to the
discretion of the 1st respondent and that the continuance is not a matter of right.
146. It is also to be pointed out that the petitioner has canvassed the plea
of legitimate expectation by stating that it had accepted to the terms for grant of
sub-license on the assurance of the 2 nd respondent and, therefore, having
incurred huge sums of money in the establishment of the cinema multiplex, it
cannot be caught of-guard with the order of rejection not to continue its
operation. However, it is to be noted that the petitioner can, at best, have a
legitimate expectation against the 2nd respondent, but that it cannot expect the
same yardstick to be made applicable to the 1 st respondent in the absence of any
contract between the petitioner and the 1 st respondent. Therefore, the plea of
98
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
legitimate expectation advanced on behalf of the petitioner does not merit
acceptance.
147. Further, it would be evident from the orders of the Delhi High Court
in the Section 9 application, which was later referred to the Tribunal, the Tribunal
has passed an order on 9.6.2025 in which the 1 st respondent has given its
intention to take over all project facilities, clear of any encumbrance with good
title in favour of AAI on 30.06.2025, and had further requested the Tribunal that
the interim order dated 7.2.2024 with regard to cinema multiplex, which was
granted at the instance of the 2nd respondent be lifted for which the 2nd
respondent did not have any opposition and, accordingly, the interim order was
vacated. Therefore, even the 2nd respondent had acknowledged the right of
discretion of the 1st respondent with regard to continuance of the cinema
multiplex.
148. Pursuant to vacating the order of stay by the Arbitral Tribunal, the
petitioner had filed W.P. No.21208/2025 before this Court seeking direction to
the 1st respondent herein to consider the representation of the petitioner dated
29.5.2025 for continuance of the cinema multiplex in which an order had come to
99
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
be passed on 16.06.2025, wherein, learned Judge of this Court had made a clear
recording that the Tribunal had lifted the order of stay upon being appraised that
the Development Agreement had been terminated and in the said scenario, on
the prayer of the petitioner, direction was issued to the 1 st respondent to
consider the representation of the petitioner, which had resulted in the order of
rejection.
149. From the above, it would be clearly evident that the order directing
to close the cinema hall was issued only to the 2 nd respondent by the 1st
respondent and there was no explicit order of termination passed by the 1 st
respondent. The petitioner was visited with the rejection order only on the basis
of the directions issued in W.P. No.21208/2025, as the 1 st respondent was very
clear of its position that it cannot pass any direct orders terminating the sub-
license of the petitioner since there was no privity of contract between the
petitioner and the 1st respondent. Therefore, the said order of rejection, though
would be termination for all purposes, but cannot be construed to be an order of
termination directly passed by the 1st respondent against the petitioner, but it
could at best be said to be an order of rejection passed on the directions issued
by this Court. The letter dated 29.5.2025 addressed by the petitioner to the 1 st
100
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
respondent would stand testimony to the above finding of this Court and the
relevant portion of the same is quoted hereunder :-
“We hope this letter finds you well. We write to you with regard to the recent communication by MRPL, informing us that the Development Agreement executed between AAI and MRPL stands terminated. In addition to this, MRPL, has also informed us that AA1 shall be taking over the integrated retail cum shopping and entertainment centre ("Aerohub") in the Multi-Level Car Parking Complex at Chennai International Airport ("MLCP Complex") with effect from 30 May 2025. We also understand that post the takeover, you shall decide all the matters pertaining to the Sub-License Deed dated 15 November 2022 executed between us and MRPL ("Sub-License Deed"). Naturally, this came as quite a surprise to us, and we are keen to protect the rights granted to us under the Sub- License Deed.” (Emphasis Supplied)
150. From the above, it is evident that even the petitioner has
acknowledged the fact that there was no contractual obligation between the
petitioner and the 1st respondent and everything rested on the Development
Agreement, which, upon being terminated, necessarily, any contractual rights
and obligations have to be worked out by the petitioner with the 1 st respondent,
which could only be in terms with clause 42.2 of the Development Agreement.
101
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
Therefore, not only the 1st respondent was conscious of its contractual position,
but equally the petitioner was also conscious of its position to the effect that
there was no privity of contract between the petitioner and the 1 st respondent,
which fact was also highlighted by the 2nd respondent in its letter addressed to
the petitioner.
151. In the aforesaid position, the whole case is predicated upon Clause 42
of the Development Agreement, which deals with surrender provisions, on which
much reliance is placed by the petitioner to contend that unless the conditions
imposed are onerous, the 1 st respondent cannot divest the petitioner of its rights
with regard to running of the cinema multiplex, which has been granted under
the sub-license and necessarily the 1 st respondent has to grant sub-license to the
petitioner by stepping into the shoes of the 2 nd respondent. For better
appreciation, Clause 42 of the Development Agreement is quoted hereunder :-
“ARTICLE 42: SURRENDER PROVISIONS 42.1 Upon termination of this Agreement and consequent obligation/right of Authority to acquire the Project Assets under ARTICLE 31 and ARTICLE 41 at nil value without the Authority required to pay any amount to the DEVELOPER. The DEVELOPER shall ensure that on the Surrender Date all the rights/interest of DEVELOPER in:
* * * * * * * 102
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
b) the rights and obligations under or pursuant to all contracts relatable to the Projects Assets and other arrangements entered into in accordance with the provisions of this Agreement between DEVELOPER and any third party shall (in consideration of Authority's assumption of the obligations under or pursuant to the contracts and other arrangements), at the option of Authority, be vested in Authority or its nominee, clear of any Encumbrance and with good title. The DEVELOPER shall ensure such rights of Authority are incorporated in all contracts between DEVELOPER and third party(ies) with a specific obligation on the parties to such contracts to enter into novation agreement with Authority upon exercise of its option by Authority; and
c) Notwithstanding anything contained in Article 42.1(a) and (b), prior to any surrender of the Project Assets, Authority shall have the right to conduct a due diligence of the contracts and agreements, the rights and obligations of which it is assuming and shall not be bound to assume the rights and obligations of contracts that, in the sole opinion of Authority are unreasonably onerous, and would be considered onerous at the time that the contracts were entered into. In relation to all such contracts that are not surrendered to Authority, no third entity, including the counter-party of such contract shall have any right, license title, interest, benefit, claim or demand against or over any Project Assets and such Project Assets shall be surrendered to Authority or its nominee, clear of any Encumbrance and with good title.
103 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
42.2 The Authority at its own discretion may allow the sub- licensees/tenants/and users to continue on mutually negotiable terms and conditions.” (Emphasis Supplied)
152. No doubt, Clause 42.1 provides in the event of there being a
termination/surrender of the Development Agreement by the 2 nd respondent, in
which event the 1st respondent will step into the shoes of the 2 nd respondent and
take over all the activities, the sub-licences would be considered by the 1 st
respondent on the basis of its onerous nature. Therefore, what is material to be
looked into for the continuance/discontinuance of the sub-licence is the onerous
nature of the rights and obligations, however, the same comes with a catch, in
that, such onerous nature of the said rights and obligations should be so, in the
considered opinion of the authority/1st respondent. Therefore, to this end, to
find out the onerous nature of the activity, discretion has been vested in the
authority to decide the onerous nature of the rights and obligations so as to
safeguard its position.
153. It is to be noted here that what is onerous for one may not be
onerous for the other and only in that backdrop, the Development Agreement
has provided for the clause that it is on the basis of formation of opinion of the 104
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
authority which alone will be the factor in making an act onerous. This would be
evident from clause (c) of Article 42.1 of the Development Agreement which
mandates that “prior to any surrender of the Project Assets, Authority shall have
the right to conduct a due diligence of the contracts and agreements, the rights
and obligations of which it is assuming and shall not be bound to assume the
rights and obligations of contracts that, in the sole opinion of Authority are
unreasonably onerous”.
154. Further, clause 42.2 of the Development Agreement provides that the
“Authority at its own discretion may allow the sub-licensees/tenants/and users to
continue on mutually negotiable terms and conditions”.
155. The 1st respondent had called upon the 2nd respondent to stop
operation of the cinema multiplex even prior to the termination of the
Development Agreement. Upon termination of the Development Agreement, the
right accrues to the 1st respondent to find out the onerous nature of the activity.
However, the 1st respondent refrained from passing any order of termination, till
a direction was issued by this Court to pass orders on the representation, as the
105
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
1st respondent was clear in its mind that there was no privity of contract with the
petitioner.
156. Therefore, it is clear that based on clause 42.1 (c) of the Development
Agreement, the onerous nature of the activity had resulted in the invocation of
the discretion by the 1st respondent to reject the representation of the petitioner
on the directions of this Court, which is on the basis of formation of opinion of
the authority on consideration of various factors, including the activity of a sub-
licensee.
157. Section 12 of the AAI Act has not spelt out the different types of
activities that could be undertaken in the airport/airport premises; rather it has,
through clause (r) of Section 12 (3), left it to the discretion of the 1 st respondent
to permit carrying on such activities that are in the best commercial interests of
the authority. Clause 42 has been coined in such a manner in the Development
Agreement only for the purpose of safeguarding the interests of the 1 st
respondent, keeping in mind the benefits that could be provided to the
passenger by securing the commercial interests of the authority, which would
ultimately flow to the passengers.
106
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
158. It is to be pointed out, at the risk of repetition, that clause 5.2.4
enjoins upon the 2nd respondent to make provisions in the Project Agreements
that entitle the Authority to step into such agreement in substitution of the
Developer in the event of termination or suspension and that the Developer
expressly undertakes to procure and deliver to the Authority an
acknowledgement and undertaking in a form acceptable to the authority from
the counter party(s) of each of the Project Agreements where the counter
party(s) acknowledge and accept the covenant and undertake to be bound by the
same and not to seek for any relief or remedy whatsoever from the Authority in
the event of Termination or Suspension.
159. The aforesaid clause provides that the counter party(s) are to submit
an undertaking to the aforesaid effect as provided under clause 5.2.4 and the
petitioner, being a counter party, necessarily would be bound by clause 5.2.4,
with regard to the obligations relating to the project agreements entered into by
the 2nd respondent and, therefore, reading clause 5.2.2 holistically with clause
5.2.4, the only inference that could be drawn is that the petitioner having
accepted the condition, which has been laid in the Development Agreement and
107
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
had entered into the sub-license deed, is bound by the undertaking given in this
regard and, therefore, cannot now come out and claim that the rights and
obligations claimed as onerous by the 1st respondent are not onerous and,
therefore, the 1st respondent is bound by its obligations to resort to clause 42.2
and give sub-license to the petitioner by stepping into the role of the 2 nd
respondent.
160. On a conjoint and harmonious reading of all the aforesaid provisions
in the Development Agreement and the sub-license deed, it could safely be
concluded that upon termination of the Development Agreement, any sub-
licenses granted by the 2nd respondent drawing power from the Development
Agreement would cease to continue and necessarily, the 1 st respondent would
take over the activities of the MLCP complex by stepping into the shoes of the 2 nd
respondent and in such a backdrop, all the sub-licensees would have to fall under
clause 42.2 of the Development Agreement to negotiate with the 1 st respondent
for continuance of the activity on the basis of the sub-license by entering into a
fresh contract/license with the 1 st respondent on mutually agreed terms and it
cannot be on the basis of the sub-license entered into with the 2 nd respondent
108
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
and further the onerous nature of the activity will be purely within the opinion of
the 1st respondent and not otherwise.
161. When the 2nd respondent has terminated the Development
Agreement with the 1st respondent and the 1st respondent has shown its
inclination to discontinue the cinema halls, the petitioner cannot try to prevail
upon the 1st respondent to honour the commitment of the 2 nd respondent in
terms of the sub-license agreement, as there is no privity of contract between
the petitioner and the 1st respondent and as per clause 42.2 of the Development
Agreement, and it is purely the discretion of the 1 st respondent to allow the sub-
licensees/tenants/users to continue occupation on mutually negotiable and
agreed terms and conditions upon forming an opinion that such an activity for
which sub-license is granted is not onerous.
162. Though the plea of promissory estoppel has been advanced on behalf
of the petitioner, it is to be pointed out that no promise has been made by the 1 st
respondent to the petitioner and reasonable expectation of any act by the
petitioner can only be against the 2 nd respondent as the sub-license deed has
been entered into between the petitioner and the 2 nd respondent. Such being
109
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
the case, the petitioner having not exercised due diligence as provided under
clauses 12.2, 13.2, 13.6 of the sub-license deed, cannot plead promissory
estoppel as against the 1st respondent and the petitioner has to work out its
remedy only against the 2nd respondent.
163. Further, as already held by this Court, there is no prohibition u/s 12 of
the AAI Act for running cinema halls in the airport premises, more specifically in
the unrestricted area and only to that end, clause (r) of Section 12 (3) provides
power to the 1st respondent to permit any other activity to be undertaken at the
airports in the best commercial interests of the Authority. Therefore, in the
absence of prohibition for running cinema halls, it is well within the domain of
the 1st respondent to grant permission for carrying on the said activity, which will
be on the basis of exercise of discretion by the 1 st respondent and cannot be as a
matter of routine or at the instance of the petitioner or any particular party.
Therefore, to that extent, this Court is of the considered view that the discretion
granted to the 1st respondent, which has been exercised cannot be questioned by
the petitioner, though the activity carried on by the petitioner is not a prohibited
activity within the ambit of Section 12 of the AAI Act.
110
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
164. For the reasons aforesaid -
i) On issue No.3, this Court holds that there is no privity
of contract between the 1st respondent and the
petitioner and the termination of the Development
Agreement by the 2nd respondent would result in
automatic termination of the sub-license entered into
between the petitioner and the 2nd respondent and the
1st respondent cannot be forced to negotiate with the
petitioner either under the terms of the Development
Agreement or under the terms of the sub-license deed
and the petitioner cannot have any legitimate
expectation against the 1st respondent to honour the
sub-license.
ii) On issue No.4, this Court holds that upon termination
of the Development Agreement, while the 1 st
respondent steps into the shoes of the 2nd respondent
for the takeover of the MLCP Complex and all the
associated activities, however, discretion is vested
with the 1st respondent for the purpose of negotiating
111
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
with the sub-licensees for grant of license to carry on
the activities and the 1st respondent cannot be forced
to negotiate with the sub-licensees for granting sub-
license. Further, the doctrine of promissory estoppel is
not applicable to the facts of the present case
iii) On issue No.5, this Court holds that though Article 42
of the Development Agreement provides for
negotiations between the sub-licensee and the 1 st
respondent upon termination of the Development
Agreement by the 2nd respondent, discretion is vested
with the 1st respondent to enter into negotiation and
no direction can be given to the 1 st respondent inspite
of the fact that the activity of the petitioner is not
prohibited u/s 12 r/w 2 (b) of the AAI Act.
Issue Nos. 3, 4 and 5 are answered accordingly in favour of the 1 st
respondent and against the petitioner.
165. However, would the exercise of the said discretion, not be interfered
with or looked into by this Court, sitting under Article 226 of the Constitution,
112
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
irrespective of the answer to the issues framed above, is the larger question that
falls before this Court, as necessarily, the interests of the petitioner and other
sub-licensees, similarly place like the petitioner requires to be looked into.
166. This Court has already held that there is no prohibition for running a
cinema multiplex in the airport premises, which is within the unrestricted area.
Needless to say that permission for establishing the said activity has to be
granted by the 1st respondent, which, in the present case, though has been
granted initially, has been rejected at a later point of time, which has led to the
present writ petitions.
167. This Court has already held that discretion is vested with the 1 st
respondent/Authority to grant permission for establishing any other activity at
the airports in the best commercial interests of the Authority beyond the specific
activities that have been spelt out in Section 12 (3) in the absence of any
prohibition and such being the case, there can be no embargo for the 1 st
respondent to permit the activity of the petitioner.
113
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
168. It has been the consistent view of the Courts that there should be
equality and rational assessment while permitting activities and in this backdrop,
1st respondent has to satisfy this Court that it treats the various activities as equal
and when rejecting a particular activity as not permissible, necessarily, a
semblance of reason requires to be given by the 1 st respondent, which is very
much necessary, as an unreasoned order cannot be allowed to prevail.
Therefore, the discretion vested on the 1 st respondent will necessarily call for a
reasoned order to show the manner in which the discretion has been exercised,
which in the present case is predicated upon the provisions of the AAI Act, which
has been answered against the 1st respondent by this Court in issue Nos. 1 and 2.
169. Coming to the broader spectrum of the case, the MLCP Complex was
designed, constructed and put into operation by the 1 st respondent, keeping in
mind the flowing international passenger activity at the Chennai Airport. The
design of the complex is mainly to cater to the passenger activity, which includes
international passengers and at the same time targeting commercial interests,
which would minimise the monetary load on the passengers as the commercial
activities returning monetary dividends would off-set the load on the passengers
by way of lesser ticket costs and other operational costs. The MLCP Complex has
114
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
been designed with this objective in mind, by putting into operation Section 12
(3)(r) of the AAI Act, which vests control on the 1 st respondent to permit any
activity in the commercial interests of the Authority. Therefore, as already held,
there is no embargo on the 1st respondent to permit activities, which are
commercial in nature and are in the best interests of the authority, so long as it is
not prohibited.
170. It is the case of the 1 st respondent that the activity of the petitioner is
not a permitted activity under the AAI Act, which has already been negatived by
this Court. However, what needs to be determined is as to why the particular
activity is sought to be curtailed by the 1 st respondent, to which the only answer
given on behalf of the 1st respondent is that it relates to security and that it is
within the definition of ‘Airport’ and, therefore, not permitted. It is to be pointed
out that when the area in which the cinema multiplex is located is accessible to
visitors, who accompany the passengers and the various other facilities, which
are operational therein, are being used by visitors and other persons, who are
residents of the locality, the stand of the 1 st respondent in not permitting the said
activity, the reason for such rejection really comes into focus before this Court.
115
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
171. It is to be pointed out that in many of the major international airports
throughout the world there is functioning of cinema multiplex even inside the
secured area in addition to cinema multiplex outside the security zone. Though
cinema multiplex inside the security area could be accessed only by passengers,
however, the cinema multiplex outside the security zone are available for access
by all the persons, including visitors and other persons, who live in close
proximity to the airports. Such activities are permitted only to off-set the travel
costs as would otherwise be imposed on the passenger. As already stated above,
no worthwhile reason other than the provisions of AAI Act not permitting the
establishment of cinema halls has been provided by the 1 st respondent to
negative the claim of the petitioner for continued operation of the cinema halls
inside the MLCP Complex. This could definitely be said to be an infraction of
Article 14, which guarantees equality, but in the present case, the discretion has
been vested with the 1st respondent for permitting the said activity on formation
of opinion by the 1st respondent, which has been accepted to by the petitioner.
172. However, security issue is one of the issues projected by the learned
Addl. Solicitor General. But what should not be lost sight of the fact is that the
cinema multiplex, in the case on hand, is outside the security zone. To a pointed
116
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
query by this Court as to whether across the airports all over India, whether
functioning of cinema multiplex is barred or not permitted, it is submitted that as
on date, no permission has been granted, though it is stated that there are many
proposals in the loop seeking for approval to establish such cinema halls. It is
also to be noted that there are many airports in the country, which are run by
private players to which also AAI Act is applicable and the Explanation to Section
28-A takes within its fold private airports as well and in which airports as well the
1st respondent wields power. In such a scenario, the operating cost of the private
airports would be of such huge proportions, that viable commercial interests
would have to be roped in by AAI so as to off-set the burden that would
otherwise have to be shouldered by the passenger on account of operating costs.
One such viable option is the operation of a cinema multiplex, which, as in the
present case, is operational outside the secured zone, which can be accessed by
visitors, who come to receive the passengers and also by passengers, who come
before hand and who would want to spend their time in leisure without walking
out of the airport. In such a scenario, cinema multiplex, such as the petitioner,
would be beneficial to passengers, which would also fall within the passenger
facility, as provided u/s 2 (b) of the AAI Act.
117
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
173. Though security, safety and other concerns are projected by AAI,
however, there is no prohibition under the AAI Act, more particularly Section 12
(3) and, therefore, if AAI is reluctant to permit operation of cinema multiplex
within the airport premises, inspite of the absence of an express prohibition u/s
12 (3), then necessarily, the matter has to be decided at the higher echelons of
the Government as it is only a policy decision which would be necessary so as to
avoid further litigations. Further, when the matter is placed for consideration of
the Government, then many other aspects including the operation of such
facilities in other countries could be taken into consideration before the
Government evolves a policy decision. Therefore, the just and reasonable course
with regard to addressing the issue would be to direct the 1 st respondent to
address the Government for taking a policy decision with regard to permitting
establishment of cinema multiplex like the petitioner in the airport/airport
premises, viz., in the secured as well as unsecured zone, in the interest of the
passenger and the public at large, keeping in mind the spiralling travelling cost of
the passengers, which could be off-set from out of the monetary yield that would
be derived from the commercial ventures that are allowed to operate in the
airport/airport premises.
118
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
174. In such view of the matter, while the writ petitions are disposed of by
answering the issues as stated in paragraph Nos.123 and 164 of this order, this
Court, on a holistic consideration of the entire issue, is inclined to pass the
following further order :-
i) The 1st respondent is directed to place the issue with
regard to establishment of cinema multiplex within the
secured/unsecured zone of the airport/airport premises
before the Ministry of Civil Aviation, Government of India,
with due emphasis on Section 12 (3) within a period of
four weeks from the date of receipt of a copy of this order
so as to enable the Ministry of Civil Aviation, Government
of India to take a policy decision on this aspect;
ii) On such issue being placed before it, the Ministry of Civil
Aviation, Government of India, is directed to consider the
same and take a policy decision on the issue with regard
to permitting of cinema multiplex within the
secured/unsecured zone of the airport/airport premises
as expeditiously as possible;
119 https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
iii) Till such time a policy decision is taken with regard to
operation of cinema multiplex within the
secured/unsecured zone of the airport/airport premises
by the Ministry of Civil Aviation, Government of India, as
directed above, the order of status quo granted by this
Court in favour of the petitioners shall continue;
iv) If the Ministry of Civil Aviation takes a policy decision to
permit the establishment of cinema multiplex within the
secured/unsecured zone of the airport/airport premises,
then the 1st respondent shall follow Clause 42.2 of the
Development Agreement and shall negotiate with the
petitioners for entering into a sub-license to run the
cinema multiplex in the MLCP Complex;
v) If the Ministry of Civil Aviation takes a policy decision not
to permit the establishment of cinema multiplex in the
airport/airport premises, the petitioners are granted
liberty to work out their remedy against the 2 nd
respondent and the 2nd respondent is granted liberty to
work out its remedy in accordance with law on the basis
120
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
of the sub-license deed and the Development Agreement
as against the 1st respondent;
vi) Registry is directed to mark a copy of this order to the
Secretary, Ministry of Civil Aviation, Government of India,
New Delhi for information and necessary action.
vii) Consequently, connected miscellaneous petitions are
closed. There shall be no order as to costs.
09.12.2025 Index : Yes / No GLN
To
1. The Secretary Ministry of Civil Aviation Government of India New Delhi.
2. The Director Airports Authority of India Rajiv Gandhi Bhawan Safdarjung Airport New Delhi 110 003.
121
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm ) ____________ W.P. Nos.22968-23060/2025
M.DHANDAPANI, J.
GLN
PRE-DELIVERY ORDER IN W.P. NOS.22968 & 23060 OF 2025
Pronounced on 09.12.2025
122
https://www.mhc.tn.gov.in/judis ( Uploaded on: 09/12/2025 08:42:54 pm )
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free