New Okhla Industrial Development ... vs Mr. Manohar Lal Vij & Anr. & Ors
- CitationCompany Appeal (AT) (Insolvency) No. 691 of 2024
Ratio decidendi
The rule this decision rests on
A Resolution Professional, in verifying a claim under the CIRP Regulations, is empowered to call for such evidence or clarification as he deems fit from a creditor for substantiating the whole or part of its claim, and a creditor cannot resist that information-seeking by contending that the Resolution Professional is confined to admission and verification and may not adjudicate; seeking additional information to verify a claim is not an adjudicatory function. A claim for additional farmers' compensation which the creditor has not substantiated with the basis for the outstanding sum, the percentage of land and share attributable to the corporate debtor, the compensation paid and the date of payment, may properly be left unadmitted by the Resolution Professional. Time extension charges must be computed up to the insolvency commencement date rather than a later date, and a Resolution Professional who recomputes the claim accordingly and corrects arithmetic errors in the creditor's calculation acts within his verification function in not admitting the excess amount.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE MATTER OF: New Okhla Industrial Development Authority Main Administrative Building Sector 6, Noida, Uttar Pradesh - 201 301 ...Appellant
Versus
1. Manohar Lal Vij Resolution Professional of Logix City Developers Pvt. Ltd. 3rd Floor, 8/28 Abdul Aziz Road, Karol Bagh, New Delhi-110005 ...Respondent No.1
2. Gedpec Infratech Limited 7A Floor, Tower B, Plot No. 8, Noida One, Block B, Sector 62, Noida - 201 307 ...Respondent No.2
Present: For Appellant : Mr. Rachit Mittal, Mr. Kanishk Raj, Mr. Abhishek Sinha and Ms. Srishti Agarwaal, Advocates
For Respondent : Mr. Vishal Hirawat and Mr. Abhishek Devgan, Advocates
JUDGMENT
(Hybrid Mode)
[Per: Arun Baroka, Member (Technical)] The present appeal is filed under Section 61(1) of Insolvency and
Bankruptcy Code, 2016 ("Code") by the Appellant namely, New Okhla
Industrial Development Authority against the order dated 05.03.2024 of the Hon'ble National Company Law Tribunal, New Delhi, Bench-III in
Interlocutory Application No. 6075 of 2023 in CP(IB) No. 440 (ND)/2021.
2. The Appellant seeks to set aside the order in the above-mentioned IA
No. 6075/2023 and also to direct Respondent No.1 i.e. RP to admit the claim
of the Appellant to the tune of Rs.6,07,74,76,966/-.
Submissions of the Appellant - NOIDA
3. Appeal has been filed on behalf of the New Okhla Industrial
Development Authority (hereinafter referred to as 'Appellant') against the
order dated 05.03.2024 (hereinafter referred to as 'Impugned Order') of the
Hon'ble National Company Law Tribunal, New Delhi, Bench III in
Interlocutory Application bearing IA No. 6075 of 2023 in CP (IB) No. 440
(ND)/2021 (hereinafter referred to as 'Application'). The Appellant was the
Applicant in the aforesaid Application.
4. Appellant contends that the NCLT passed the impugned order on the
assumption that the aforesaid application was filed by the
Appellant/Applicant for non-compliance of the order dated 18.10.2023.
However, it is contended that the Respondent No.1 admitted only a portion of
appellant's claim, particularly excluding additional farmer compensation and
time extension charges. Thus, the aforesaid application was vis à vis the
admissibility and quantum of Appellant's claims as the secured operational
creditor in the CIRP of the Corporate Debtor.
Company Appeal (AT) (Insolvency) No. 691 of 2024 2 of 30
5. Appellant contends that on 08.06.2011, a Lease Deed was executed in
the favour of the Corporate Debtor by the Appellant for Plot No. GH-02, Sector
143, Noida admeasuring a total area of 1,00,080.98 sq. mtrs.
6. Further, on 21.10.2011, the Hon'ble High Court of Judicature at
Allahabad, in the case of Gajraj & Ors. v. State of U.P. & Ors., rendered a
judgment through a full bench, granting an additional 64.7% compensation
to the farmers, with the liberty given to the Appellant herein to recover the
same from the allottees. This judgment was subsequently upheld by the
Hon'ble Supreme Court in Savitri Devi v. State of U.P., reported in (2015)
7 SCC 21. Thereafter, in terms of the aforementioned judgment of the Hon'ble
Allahabad High Court, certain office orders dated 20.12.2013, 04.04.2014,
14.07.2014 and 04.08.2014 were issued by the Appellant to the Corporate
Debtor. Office order dated 14.07.2014 categorically mentions that the
enhanced compensation would be recovered from the allottees of the
concerned land.
7. The Appellant vide letter dated 22.05.2017 informed the Corporate
Debtor about the 64.7% additional compensation paid to farmers and also
informed the Corporate Debtor to deposit an amount of Rs. 2,93,97,586.90
within 30 days of the issuance of the issuance of letter. [Note: This was for
full one lakh sq. mtr. of leased land]
8. Furthermore, on 30.10.2018, out of the entire leased area of
1,00,080.98 sq. mtrs. allocated to the Corporate Debtor, the Appellant
executed a sub-lease deed for 13,961 sq. mtrs. in favor of M/s Docile
Company Appeal (AT) (Insolvency) No. 691 of 2024 3 of 30 Buildtech Private Limited, leaving 86,119.98 sq. mtrs. with the Corporate
Debtor. While permission for sub-division was granted to the Corporate
Debtor's subsidiaries, M/s. Docile Buildtech Pvt. Ltd. and M/s. Arable
Builders Pvt. Ltd., the sub-lease deed was executed only in favor of M/s.
Docile Buildtech Pvt. Ltd. The permission to sub-divide the land for M/s.
Arable Builders Pvt. Ltd. was revoked due to the Corporate Debtor's failure to
meet certain conditions. Consequently, the area intended for sublease to M/s.
Arable Builders Pvt. Ltd. was never sub-leased and remains leased to the
Corporate Debtor.
9. The Corporate Insolvency Resolution Process ("CIRP") qua the
Corporate Debtor commenced vide an order dated 17.08.2022. The Appellant
filed its claim on 01.09.2022 under Form 'B' as an Operational Creditor for
an amount of Rs. 6,07,74,76,966/-, supported by all necessary documents,
including detailed calculations. However, the Respondent No.1 - RP vide email
dated 03.09.2022 provisionally admitted the claim of the Appellant only to the
tune of Rs. 5,13,97,26,617/-. In the claim calculation sheet, no reasons were
attributed with respect to farmer's compensation or time extension charges.
10. Appellant further claims that despite receiving all the relevant
documents, including calculation sheets, through various emails dated
23.03.2023, 01.04.2023, 12.04.2023, and 21.04.2023, Respondent No.1 - RP
failed to admit the entire claimed amount, admitting only 600,92,77,327 out
of the total claim submitted, initially reasoning that the farmer's
compensation clause was not part of the lease deed. However, after the
Hon'ble NCLT, by order dated 18.10.2023 in IA No. 2972 of 2023, directed
Company Appeal (AT) (Insolvency) No. 691 of 2024 4 of 30 Respondent No. 1 to admit the claim based on judicial pronouncements.
Respondent No. 1 then shifted its position and began demanding documents
that fall beyond the scope of the current CIRP. This refusal to admit the
aforesaid claims is in direct contravention of Section 25(2)(e) of the IBC, which
mandates the RP to collect and verify all claims against the Corporate Debtor.
The subsequent demand for additional documents, despite the NCLT's clear
direction vide order dated 18.10.2023, is unjustified and exceeds the RP's
authority under the IBC.
11. Appellant further contends that the Respondent No. 1 had already been
provided with a copy of the order in the Gajraj judgment (supra) and the
required calculations as requested in the initial emails. Nevertheless,
Respondent No. 1, despite receiving all necessary documents and
calculations, has failed to admit certain amounts under the heads of time
extension charges and additional farmers' compensation, which constitutes a
dereliction of the duties entrusted to the RP.
12. Subsequently, the Appellant filed an application bearing the IA No.
6075 of 2023 before NCLT, seeking admission of entire claim for a tune of Rs.
6,07,74,76,966/-. However, the Hon'ble NCLT vide Impugned Order dated
05.03.2024 observed that the Respondent No.1 has complied with the order
dated 18.10.2023 and disposed of the aforementioned Application. Aggrieved
by this decision, the instant appeal has been preferred by the Appellant before
this Hon'ble Court.
Company Appeal (AT) (Insolvency) No. 691 of 2024 5 of 30
13. Appellant contends that the Resolution Professional's duty extends to
admitting and verifying claims but does not encompass adjudicating them. In
the instant case, the exclusion of substantial portions of the Appellant's claim,
specifically Rs. 6,81,99,639/- out of the total claim amount of
Rs.6,07,74,76,966/-, undermines the Appellant's rights as a secured creditor.
Furthermore, NCLT's impugned order reflects a misinterpretation of the facts
and law, particularly the binding nature of the judicial orders regarding the
land acquisition and related compensation passed by Hon'ble Supreme Court
and Hon'ble Allahabad High Court. The aforesaid impugned order fails to
recognize the statutory and contractual obligations of the Corporate Debtor
towards the Appellant. Additionally, the legal obligations under the lease deed
and subsequent orders are clear and unequivocal, warranting the full
admission of the Appellant's claims. It is also pertinent to note that the
Hon'ble NCLT, vide its order dated 18.10.2023 in IA No. 2792 of 2023,
acknowledged the correctness of the Appellant's time extension calculations.
Further, the documents provided for farmer's compensation was also deemed
sufficient, thereafter, Hon'ble NCLT directed Respondent No. 1 for full
admission of the Appellant's claims.
14. The NCLT has failed to enforce its own order dated 18.10.2023, which
directed the RP to admit the entire claim sought by the Appellant. Despite this
order, the RP continued to demand unnecessary documentation from the
Appellant. Furthermore, the RP's refusal to admit the Appellant's claim
violates the terms of the lease deed and disregards binding judicial
precedents. The Respondent No.1 does not have the authority to override
Company Appeal (AT) (Insolvency) No. 691 of 2024 6 of 30 these terms or to adjudicate claims, as its role is strictly limited to verification
under the IBC. Thus, this brazen abuse of law and conduct by the Respondent
No.1 is in direct violation of the order dated 18.10.2023 passed by the Hon'ble
NCLT which undermines the integrity of the judicial process.
15. The Respondent No.1's refusal to properly verify the Appellant's claim,
despite being provided with all relevant documents, demonstrates a failure to
apply judicial mind as required under Regulation 13 of the IBBI (Insolvency
Resolution Process for Corporate Persons) Regulations, 2016. This failure has
resulted in significant prejudice to the Appellant's position as a secured
creditor.
16. Furthermore, NCLT has failed to consider the binding judgment in
Gajraj (supra). Respondent No. 1's refusal to admit approximately Rs. 7 crores
of the Appellant's claim blatantly disregard the Appellant's rights under these
binding judicial precedents, thereby undermining the Appellant's position as
a secured creditor. Notably, the Hon'ble NCLT's omission to consider the
material facts and evidence presented by the Appellant has led to an
erroneous decision, unsupported by evidence or records, and fails to
adequately recognize the Appellant's legal and factual standing.
17. The Appellant contends that the Corporate Debtor was informed the
corporate debtor about the 64.7% additional compensation paid to the
farmers and also raised the demand to the tune of Rs.2,93,97,586.90 as share
of additional compensation vide letter dated 22.05.2017 and the same has not
been disputed by the Corporate Debtor up to the date of commencement of
Company Appeal (AT) (Insolvency) No. 691 of 2024 7 of 30 CIRP. Now the Resolution Professional, on one pretext or the other is trying
to reject and has rejected the claim qua the farmer's compensation.
18. Appellant further claims that the second claim qua the time extension
has already been clarified vide letter dated 01.11.2023 mentioning that the
time extension charges up to 17.08.2022 comes to Rs.47,34,10,209.88, which
initially was Rs.47,73,81,468/- (calculated up to 07.09.2022). Whereas, the
Resolution Professional has admitted an amount of Rs.46,82,53,478/-
instead of Rs.47,34,10,209.88, leaving unadmitted amount qua time
extension of Rs.51,56,731.88. Therefore, the total unadmitted amount which
includes unadmitted claim amount and unadmitted time extension amount
is Rs.6,42,28,380.88 [Rs.5,90,71,649 + 51,56,731.88].
19. In light of the foregoing submissions, the Appellant prays that the
appeal of the appellant may be allowed and Resolution Professional may be
directed to admit the unadmitted claim amount of Rs.6,42,28,380.88.
Submissions of the Respondent No. 1 - RP
20. The Appellant, NOIDA, had filed claim for Rs. 6,07,74,76,966/- in the
CIRP of the Corporate Debtor. Respondent No.1 - RP, verified the aforesaid
claim submitted by Appellant and provisionally admitted the claim to the tune
of Rs. 5,13,97,26,671/- and informed the Appellant vide email dated
03.09.2022.
21. Subsequently, Appellant filed an Application before Ld. NCLT seeking
directions for admission of part of the claim filed by Appellant, which was
rejected by the Respondent for non-submission of sufficient
Company Appeal (AT) (Insolvency) No. 691 of 2024 8 of 30 documents/clarifications. Some additional documents were annexed with the
application to substantiate its claim. Ld. NCLT vide Order dated 18.10.2023
directed the Answering Respondent to examine all the issues and take
appropriate decision in accordance with law.
22. Consequent to the Order dated 18.10.2023 passed by the Ld. NCLT,
Respondent No. 1 - RP vide email dated 31.10.2023 apprised Appellant
regarding the Order passed by Ld. NCLT and sought certain clarifications/
details for admitting the remaining portion of the claim. Subsequently,
Respondent No. 1 - RP admitted the claim of Appellant to the extent of
Rs.600,92,77,327/- and apprised the Appellant vide email dated 06.11.2023.
23. Thereafter, Appellant filed another IA No. 6075/2023 before the Ld.
NCLT seeking directions for admission of remaining claim amount, i.e.
Rs.6,81,99,639/-. The Ld. NCLT vide Order dated 05.03.2024 disposed of the
IA filed by Appellant and noted that there is no non-compliance of the Order
dated 18.10.2023.
24. Present Appeal has been preferred by the Appellant, seeking admission
of entire claim of Appellant to the tune of Rs. 6,07,74,76,966/-. It is apposite
to note that Appellant in its revised calculation has itself reduced the claim
towards time extension charges by Rs.39,71,258.12, thus reducing the
claimed amount to Rs. 6,07,35,05,708/-, yet in the present Appeal, Appellant
has sought for admission of claim of Rs. 607,74,76,966/-.
25. As a background it is to be noted that Appellant, by way of registered
lease deed dated 08.06.2011 leased out Plot No. GH-02, Sector 43, Noida,
Company Appeal (AT) (Insolvency) No. 691 of 2024 9 of 30 admeasuring 1,00,080.98 sq. mtr. in favour of Corporate Debtor, for a period
of 90 years commencing from 08.06.2011, against the consideration agreed
between the parties, for development of group housing project on the leased
land. Thereafter, a tripartite sub-lease deed dated 30.10.2018 was executed
between Corporate Debtor, Appellant and Docile Buildtech Private Limited,
and the Land admeasuring 13,961 sq. mtr. was sub-leased in favour of Docile
Buildtech Private Limited. Further, the net liability towards Appellant, as on
the date of sub-lease deed, was divided between the Corporate Debtor and
Docile Buildtech Private Limited in proportion to the land area leased/sub-
leased to the respective parties. Accordingly, liability of Corporate Debtor is
only limited to 86,119.98 sq. mtr. of land.
26. The Appellant's claim comprises of six distinct components. Of these,
four components have been fully admitted, whereas the claims relating to
farmers' compensation and time extension charges remain contested.
27. Initially, the Appellant in its claim had computed farmers'
compensation for 100080.98 Sq. Mtr., despite the fact that the claim of
Corporate Debtor was limited to only 86,119.98 Sq. Mtr. of land. The claimed
amount towards farmers' compensation was for Rs. 5,90,71,649/-.
Subsequently, Appellant provided another calculation sheet for farmers'
compensation, wherein land area has been simply changed from 100080.90
Sq. Mtr. to 86,119.98 Sq. Mtr. without any claim to the amount of claim. In
both the calculation sheets submitted by the Appellant regarding farmer's
compensation, the initial amount due is shown as Rs. 2,93,97,587/- as on
22.06.2017. Accordingly, for substantiation of claim the Respondent vide
Company Appeal (AT) (Insolvency) No. 691 of 2024 10 of 30 email dated 31.11.2023 sought following details to authenticate amount of
Rs. 29397587 and accrued interest thereon:
a. Total additional compensation paid
b. Total area for which compensation paid
c. Total percentage of land belonging to Corporate Debtor out
of total land
d. % Share of Corporate Debtor in the compensation
e. Date of payment of compensation (to check interest
calculation).
28. Till date the Appellant has not provided any of the aforementioned
details and hence, the claim towards farmers' compensation remains
unsubstantiated and hence, has not been admitted.
29. The time extension charges are to be computed at the specified rate on
the allotment rate. Allotment of land admeasuring 100,080.98 sq. mtr. was
made at Rs. 235,69,07,079/-. Subsequently, land admeasuring 13,961 sq.
mtr. was sub-leased and only 86,119.98 sq. mtr. of land remains to be leased
to the Corporate Debtor. Thus, the proportionate allotment rate for 86,119.98
sq. mtr. is computed to be Rs. 202,81,25,529 [235,69,07,079 x
86,119.98/100,080.981].
30. The Appellant initially claimed an amount of Rs. 47,73,81,468/-
towards time extension charges, out of which Rs. 46,82,53,478/- was
admitted. Subsequently, the Appellant itself reduced the claim to
Rs.47,34,10,209.88, reflecting a reduction of Rs. 39,71,258.12 due to an
Company Appeal (AT) (Insolvency) No. 691 of 2024 11 of 30 incorrect calculation. However, in the present Appeal, the Appellant has
arbitrarily reverted to the original claim of Rs. 47,73,81,468/-contradicting
its own prior admissions of wrong calculation. It is noteworthy that the
reduced admission of claim by the Answering Respondent is solely
attributable to the Appellant's erroneous mathematical calculation.
31. Initially, Appellant computed the time extension charges of Rs.
47,73,81,468/- till 07.09.2022 whereas the CIRP commencement date was
17.08.2022. The same was also observed by the Ld. NCLT in its Order dated
18.10.2023.
32. Consequently, Appellant submitted revised calculation sheet for claim
of Rs. 47,34,10,209.88 computed till CIRP Commencement date i.e.
17.08.2022. Appellant while computing the time extension charges for 5th
year has made some mathematical error and derived amount of
Rs.3,65,91,251.58, whereas the correct amount would be Rs. 3,11,16,446/-
[Rs. 202,81,25,529*70*8/100*365]. Hence, the difference is admitted and
claimed amount.
Analysis and Evaluation
33. We have heard both sides and also perused the material placed on
record.
34. We note that the Appellant-NOIDA, by way of registered lease deed
dated 08.06.2011, leased out Plot No.GH-02, Sector 43, Noida, admeasuring
1,00,080.98 sq. mtr. in favour of Corporate Debtor-Logic City for a period of
90 years commencing from 08.06.2011, against the between the parties, for
Company Appeal (AT) (Insolvency) No. 691 of 2024 12 of 30 development of a group housing project on the leased land. Subsequently, in
the year 2013, the Corporate Debtor by way of joint development agreement
transferred development rights for 13,961 sq. mtr. of land to Saha lnfratech
Private Limited and for 12,486.08 Sq. mtr. of land to Dream Procon Private
Limited. Hence, only 73,633.90 Sq. mtr. of land was being developed by the
Corporate Debtor and remaining portion of land was being developed by Saha
Infratech and Procon respectively. Details regarding development of land as
per records is as extracted below:
35. Thereafter, in the year 2018, Corporate Debtor had approached
Appellant and requested to sub-divide the Land. Later, request of Corporate
Debtor was accepted and Appellant vide letter dated 07.06.2018 approved the
sub-division of Land in the following manner:
Company Appeal (AT) (Insolvency) No. 691 of 2024 13 of 30
36. It was also brought to our notice by the RP that all of the three developer
companies are presently under CIRP. Further RP brings to our that a tripartite
sub-lease deed dated 30.10.2018 was executed between Corporate Debtor,
Appellant and Docile Buildtech Private Limited for transferring Land
admeasuring 13,961 sq. mtr. in favour of Docile Builtech Private Limited.
Further, as per terms of sub lease deed, net liability of the corporate debtor
towards said portion of land, payable to Appellant, as on the date of sub-lease
deed, was also transferred to Docile Buildtech Private Limited. Pertinently, the
land sub-divided in favour of Arable Builders Private Limited was not sub-
leased and hence, that portion of land, i.e. 12,486.08 sq. mtr. of land, even
though being developed by some other company is still in the name of
Corporate Debtor. Hence, as on date the land is divided as under:
37. In view of the above, we agree with the arguments of the RP, accepted
by the AA, that the liability of Corporate Debtor is only limited to 86,119.98
sq. mtr. of land subject to the assumption that NOIDA has not filed/shall not
claim any amount from Dream Procon Private Limited (under CIRP) for the
land admeasuring 12,486.08 sq. mtr. which is being developed by Dream
Procon Private Limited.
38. We find that initially the Appellant had filed claim of about Rs. 607.75
crores (approx.) in the CIRP in the Corporate Debtor. The RP provisionally
Company Appeal (AT) (Insolvency) No. 691 of 2024 14 of 30 admitted the claim to the tune of about Rs. 514/- Crores and informed the
Appellant vide email dated 03.09.2022. The claim submitted by the Appellant
comprised of the following components:
a. Instalments along with interest
b. Re-scheduled instalments along with interest
c. Lease rent dues along with interest
d. 64.7% Farmers Compensation along with interest
e. Time Extension Charges
f. Water & Sewer Charges
39. Subsequently, RP verified the aforesaid claim submitted by Appellant
and provisionally admitted the claim to the tune of Rs. 5,13,97,26,671/- and
informed the Appellant vide email dated 03.09.2022. Answering Respondent
had also shared excel sheet to show how the claim of the Appellant was
calculated and admitted. The following components of the claim were not
admitted or reduced amount was admitted:
o 64.7% Farmers Compensation along with interest
o Time Extension Charges
o Water & Sewage Charges
o Installment & Reschedulement charges
40. We note that the claim of Appellant was admitted on 03.09.2022 and
the Appellant neither raised any objection nor challenged the decision of
Answering Respondent until 23.03.2023. Thereafter, multiple emails were
exchanged relating to non-substantiation of unadmitted portion of claim as
Company Appeal (AT) (Insolvency) No. 691 of 2024 15 of 30 Appellant failed to provide requisite clarification/documents, necessary for
verification and admission of balance claim amount.
41. Subsequently, on 16.05.2023, 9 months after the commencement of
CIRP, Appellant filed IA No. 2792/2023 before the Ld. NCLT seeking directions
against the Answering Respondent herein to admit the claim of Appellant to
the tune of Rs. 6,07,74,76,966. The Adjudicating Authority vide its order
dated 18.10.2023 directed the RP to examine all the issues and take
appropriate decision in accordance with law. Consequently, the Respondent
No.1 - RP sought certain clarifications / details for admitting the remaining
portion of the claim. Basis the reply, the RP admitted the claim of the
Appellant to the extent of Rs.601 Crores (approx.) and apprised the Appellant
vide email dated 06.11.2023. The heads under which the claim amount was
admitted / not admitted have been reproduced hereunder for convenience of
this Hon'ble Tribunal:
Company Appeal (AT) (Insolvency) No. 691 of 2024 16 of 30
42. RP brings to our notice that the claim towards farmers' compensation
was not admitted as Appellant had failed to submit necessary clarifications/
documents to substantiate its claim amount. Further the time extension
charges were reduced as the Appellant had claimed extension charges upto
07.09.2022, whereas the CIRP Commencement date is 17.08.2022 and
accordingly, proportionate claim was admitted.
43. Thereafter, the Appellant filed another IA No. 6075/2023 before NCLT
seeking directions for admission of the remaining claim amount of
Rs.6,81,99,639/-. However, NCLT vide order dated 05.03.2024 disposed of
the IA filed by the Appellant and noted that there is no non-compliance of the
order dated 18.10.2023.
44. In the present appeal, we note that the Appellant is seeking admission
of the entire claim amount of Rs.6,07,74,76,966/-. To find out the merits of
this claim, we now look into the two major issues -one relating to non-
admission of claim towards farmers' compensation and the other relating to
extension of time, which are the main issues raised by the Appellant in this
appeal.
45. With respect to the reasons for non-admission of claim towards farmer's
compensation we find that the Appellant had claimed Rs. 5,90,71,649/-
towards farmers' compensation. As per the initial calculation sheet submitted
by Appellant, the said amount had been calculated for entire 100080.98 Sq.
mtr. of land, whereas, the Corporate Debtor's liability was limited for
86,119.98 sq. mtr. of land only. Subsequently, the Appellant submitted
Company Appeal (AT) (Insolvency) No. 691 of 2024 17 of 30 another calculation sheet for farmers' compensation. wherein the land area
has been simply changed from 100080.98 Sq. mtr. to 86,119.98 sq. mtr.
without any change in the amount of.
46. We also find that both the calculation sheet for the farmer's
compensation, indicate an outstanding amount of Rs. 2,93,97,587/- as of
June 22, 2017. Subsequently, interest at a rate of 14% has been computed
on this sum. However, we find that the Appellant has not provided any
document to explain the basis for arriving at the figure of Rs. 2,93,97,587/-.
We find that the resolution professional had requested the appellant vide
emails dated October 31, 2023, November 21, 2023, and a reminder email on
November 25, 2023, yet the Appellant has failed to substantiate the farmer's
compensation claim.
47. The Appellant claims that the resolution professional cannot adjudicate
over the claims. It relies upon various judicial pronouncements that the
adjudicatory power does not lie with the resolution professional. In the
present matter, the RP has gone beyond the powers so envisaged for him and
has, despite being provided with requisite documents and explanations, failed
to verify the total amount of the claim of the Appellant as was filed by it. We
find that a Resolution Professional is empowered to seek evidence or
clarifications as he deems fit from a creditor for substantiating the whole or
part of its claim as per Regulation 10 of the CIRP regulations governing the
insolvency of corporate persons. Therefore, the Appellant cannot question the
information being sought by the Resolution Professional and cannot claim
that the Resolution Professional has not done its duty. The argument
Company Appeal (AT) (Insolvency) No. 691 of 2024 18 of 30 canvassed by the NOIDA that the resolution professional's duty is only
extended to the admission and verification of the claims but does not
encompass adjudication of the claims. In the facts and circumstances of the
case, we do not find that the resolution professional was adjudicating the
claims. It was only seeking additional information to verify the claims, and
such an argument of the applicant is therefore unsustainable and rejected.
48. The Appellant has placed its reliance on the following judicial
pronouncements in support of the aforementioned contention of the
Appellant:
XXX o Swiss Ribbons Pvt. Ltd. vs. Union of India (2019) 4 SCC 17 (Para No. 88 to 91) Resolution professional has no adjudicatory powers
88. It is clear from a reading of the Code as well as the Regulations that the resolution professional has no adjudicatory powers. Section 18 of the Code lays down the duties of an interim resolution professional as follows:
"18. Duties of interim resolution professional.--(1) The interim resolution professional shall perform the following duties, namely--
(a) collect all information relating to the assets, finances and operations of the corporate debtor for determining the financial position of the corporate debtor, including information relating to--
(i) business operations for the previous two years;
(ii) financial and operational payments for the previous two years;
(iii) list of assets and liabilities as on the initiation date; and
(iv) such other matters as may be specified;
(b) receive and collate all the claims submitted by creditors to him, pursuant to the public announcement made under Sections 13 and 15;
(c) constitute a Committee of Creditors;
(d) monitor the assets of the corporate debtor and manage its operations until a resolution professional is appointed by the Committee of Creditors;
Company Appeal (AT) (Insolvency) No. 691 of 2024 19 of 30
(e) file information collected with the information utility, if necessary; and
(f) take control and custody of any asset over which the corporate debtor has ownership rights as recorded in the balance sheet of the corporate debtor, or with information utility or the depository of securities or any other registry that records the ownership of assets including--
(i) assets over which the corporate debtor has ownership rights which may be located in a foreign country;
(ii) assets that may or may not be in possession of the corporate debtor;
(iii) tangible assets, whether movable or immovable;
(iv) intangible assets including intellectual property;
(v) securities including shares held in any subsidiary of the corporate debtor, financial instruments, insurance policies;
(vi) assets subject to the determination of ownership by a court or authority;
(g) to perform such other duties as may be specified by the Board.
Explanation.--For the purposes of this section, the term "assets" shall not include the following, namely--
(a) assets owned by a third party in possession of the corporate debtor held under trust or under contractual arrangements including bailment;
(b) assets of any Indian or foreign subsidiary of the corporate debtor; and
(c) such other assets as may be notified by the Central Government in consultation with any financial sector regulator."
89. Under the CIRP Regulations, the resolution professional has to vet and verify claims made, and ultimately, determine the amount of each claim as follows:
"10. Substantiation of claims.--The interim resolution professional or the resolution professional, as the case may be, may call for such other evidence or clarification as he deems fit from a creditor for substantiating the whole or part of its claim.
* * *
12. Submission of proof of claims.--(1) Subject to sub-regulation (2), a creditor shall submit claim with proof on or before the last date mentioned in the public announcement.
Company Appeal (AT) (Insolvency) No. 691 of 2024 20 of 30 (2) A creditor, who fails to submit claim with proof within the time stipulated in the public announcement, may submit the claim with proof to the interim resolution professional or the resolution professional, as the case may be, on or before the ninetieth day of the insolvency commencement date.
(3) Where the creditor in sub-regulation (2) is a financial creditor under Regulation 8, it shall be included in the committee from the date of admission of such claim:
Provided that such inclusion shall not affect the validity of any decision taken by the committee prior to such inclusion.
13. Verification of claims.--(1) The interim resolution professional or the resolution professional, as the case may be, shall verify every claim, as on the insolvency commencement date, within seven days from the last date of the receipt of the claims, and thereupon maintain a list of creditors containing names of creditors along with the amount claimed by them, the amount of their claims admitted and the security interest, if any, in respect of such claims, and update it.
(2) The list of creditors shall be--
(a) available for inspection by the persons who submitted proofs of claim;
(b) available for inspection by members, partners, Directors and guarantors of the corporate debtor;
(c) displayed on the website, if any, of the corporate debtor;
(d) filed with the adjudicating authority; and
(e) presented at the first meeting of the committee.
14. Determination of amount of claim.--(1) Where the amount claimed by a creditor is not precise due to any contingency or other reason, the interim resolution professional or the resolution professional, as the case may be, shall make the best estimate of the amount of the claim based on the information available with him. (2) The interim resolution professional or the resolution professional, as the case may be, shall revise the amounts of claims admitted, including the estimates of claims made under sub- regulation (1), as soon as may be practicable, when he comes across additional information warranting such revision." It is clear from a reading of these Regulations that the resolution professional is given administrative as opposed to quasi-judicial powers. In fact, even when the resolution professional is to make a
Company Appeal (AT) (Insolvency) No. 691 of 2024 21 of 30 "determination" under Regulation 35-A, he is only to apply to the adjudicating authority for appropriate relief based on the determination made as follows:
"35-A. Preferential and other transactions.--(1) On or before the seventy-fifth day of the insolvency commencement date, the resolution professional shall form an opinion whether the corporate debtor has been subjected to any transaction covered under Sections 43, 45, 50 or 66.
(2) Where the resolution professional is of the opinion that the corporate debtor has been subjected to any transactions covered under Sections 43, 45, 50 or 66, he shall make a determination on or before the one hundred and fifteenth day of the insolvency commencement date, under intimation to the Board. (3) Where the resolution professional makes a determination under sub-regulation (2), he shall apply to the adjudicating authority for appropriate relief on or before the one hundred and thirty-fifth day of the insolvency commencement date."
90. As opposed to this, the liquidator, in liquidation proceedings under the Code, has to consolidate and verify the claims, and either admit or reject such claims under Sections 38 to 40 of the Code. Sections 41 and 42, by way of contrast between the powers of the liquidator and that of the resolution professional, are set out hereinbelow:
"41. Determination of valuation of claims.--The liquidator shall determine the value of claims admitted under Section 40 in such manner as may be specified by the Board.
42. Appeal against the decision of liquidator.--A creditor may appeal to the adjudicating authority against the decision of the liquidator accepting or rejecting the claims within fourteen days of the receipt of such decision."
It is clear from these sections that when the liquidator "determines" the value of claims admitted under Section 40, such determination is a "decision", which is quasi-judicial in nature, and which can be appealed against to the adjudicating authority under Section 42 of the Code.
91. Unlike the liquidator, the resolution professional cannot act in a number of matters without the approval of the Committee of Creditors under Section 28 of the Code, which can, by a two-thirds majority, replace one resolution professional with another, in case they are unhappy with his performance. Thus, the resolution professional is really a facilitator of the resolution process, whose administrative Company Appeal (AT) (Insolvency) No. 691 of 2024 22 of 30 functions are overseen by the Committee of Creditors and by the adjudicating authority.
o Anuj Jain, IRP of Jaypee Infratech Ltd. vs. Axis Bank Ltd. (2020) 8 SCC 401 (Para No. 53.2)
53.2. In the relevant part, the Court found that NCLAT had fallen in grave error in reading para 77 in Swiss Ribbons dehors the earlier paragraphs. In that context this Court said: (Essar Steel case, SCC pp. 605-06, paras 88-89) "88. By reading para 77 dehors the earlier paragraphs, the Appellate Tribunal has fallen into grave error. Para 76 clearly refers to the UNCITRAL Legislative Guide which makes it clear beyond any doubt that equitable treatment is only of similarly situated creditors. This being so, the observation in para 77 cannot be read to mean that financial and operational creditors must be paid the same amounts in any resolution plan before it can pass muster. On the contrary, para 77 itself makes it clear that there is a difference in payment of the debts of financial and operational creditors, operational creditors having to receive a minimum payment, being not less than liquidation value, which does not apply to financial creditors. The amended Regulation 38 set out in para 77 again does not lead to the conclusion that financial and operational creditors, or secured and unsecured creditors, must be paid the same amounts, percentage wise, under the resolution plan before it can pass muster. Fair and equitable dealing of operational creditors' rights under the said regulation involves the resolution plan stating as to how it has dealt with the interests of operational creditors, which is not the same thing as saying that they must be paid the same amount of their debt proportionately. Also, the fact that the operational creditors are given priority in payment over all financial creditors does not lead to the conclusion that such payment must necessarily be the same recovery percentage as financial creditors. So long as the provisions of the Code and the Regulations have been met, it is the commercial wisdom of the requisite majority of the Committee of Creditors which is to negotiate and accept a resolution plan, which may involve differential payment to different classes of creditors, together with negotiating with a prospective resolution applicant for better or different terms which may also involve differences in distribution of amounts between different classes of creditors.
89. Indeed, by vesting the Committee of Creditors with the discretion of accepting resolution plans only with financial creditors, operational creditors having no vote, the Code itself differentiates between the two types of creditors for the reasons given above. Further, as has been reflected in Swiss Ribbons, most financial creditors are secured creditors, whose security interests must be protected in order that they do not go ahead and realise their security in legal proceedings, but
Company Appeal (AT) (Insolvency) No. 691 of 2024 23 of 30 instead are incentivised to act within the framework of the Code as persons who will resolve stressed assets and bring a corporate debtor back to its feet. Shri Sibal's argument that the expression "secured creditor" does not find mention in Chapter II of the Code, which deals with the resolution process, and is only found in Chapter III, which deals with liquidation, is for the reason that secured creditors as a class are subsumed in the class of financial creditors, as has been held in Swiss Ribbons. Indeed, Regulation 13(1) of the 2016 Regulations mandates that when the resolution professional verifies claims, the security interest of secured creditors is also looked at and gets taken care of."
o GNOIDA Vs. Prabhjit Singh Soni (Civil Appeal No. 7590-7591 of 2023) (Para No. 21 to 22)
Greater Noida Industrial Development Authority v. Prabhjit Singh Soni, 2024 INSC 102 (Civil Appeal Nos. 7590-7591 of 2023; pp. 14-15 of the judgment)
21. Once a claim is submitted with proof under any of the Regulations (i.e., Regulations 7, 8, 8-A, 9 and 9-A), the IRP or the RP, as the case may be, as per Regulation 13, has to verify the claim, as on the insolvency commencement date, and thereupon maintain a list of creditors containing names of creditors along with the amount claimed by them, the amount of their claims admitted and the security interest, if any, in respect of such claims, and update it in terms of Regulation 12 A.
22. As it could be noticed from the CIRP Regulations, 2016, on submission of a claim with proof, the IRP or the RP, as the case may be, has to verify the claim and prepare a list of creditors containing names of creditors along with the amount claimed by them and security interest, if any, the logical conclusion derivable from the provisions analysed above would be that the Form in which a claim is to be submitted under the CIRP Regulations 2016 is directory and not mandatory. What is important is, the claim must be supported by proof. XXX
49. In the facts and circumstances of the case, we do not find that these
judgments are of any assistance to the Appellant, as the resolution
professional was well within its rights to seek additional evidence in support
of the claim and was not doing an adjudication of the claims.
Company Appeal (AT) (Insolvency) No. 691 of 2024 24 of 30
50. Now we look into the reasons for accepting the claim amounting to
Rs.46,82,53,478/- against the asserted sum of Rs 47,73,81,468/- for time
extension charges. The Appellant computed time extension charges up to
September 7, 2022, despite the commencement date of the CIRP being August
17, 2022. This this has been noted by the adjudicating authority in its order
dated 18.10.2023 and notes that "There is no dispute that the Applicant has
calculated the time extension charges up to 07.09.2022 even though the CIRP
commenced on 17.08.2022." Therefore, the resolution professionals'
justification in accepting the reduced amount of at a value of Rs.
46,82,53,478/- as of August 17, 2022, on a proportional basis instead of the
claimed amount of Rs. 47,73,81,468/- as of September 7, 2022 is fully
justified, and the appellants' calculation cannot be accepted.
51. We find that the Respondent No.1 - RP had sought additional
information from the Appellant to justify latter's claims for the farmer's
compensation for the full land of about 1,00,080.98 sq. mtrs. Despite the fact
that the land with the Corporate Debtor was limited to only 86,119.98 sq.
mtrs., the claimed amount by the Appellant towards farmer's compensation
was Rs.5,90,71,649/- for full land. Later on, Appellant provided another
calculation sheet for farmer's compensation wherein the land area was
reduced from 1,00,080.90 sq. mtrs to 86,119.98 sq. mtrs. but without any
change in the total amount of claim. The appellant claims that no charge
pertaining to land dedicated to M/s Docile was ever charged by the appellant
from the Corporate Debtor.
Company Appeal (AT) (Insolvency) No. 691 of 2024 25 of 30
52. However, we note that the farmer's compensation Rs.2,93,97,587/-
remained same in the initial calculation sheet as well as in the revised
calculation sheet. We note that the Appellant has not provided sufficient
evidence to explain the basis for arriving at the figure of Rs. 2,93,97,587,
which was an outstanding amount as of June 22, 2017 with respect to the
farmers' compensation. We note that for substantiation of the claim, the
Resolution Professional sought the following details to authenticate the
amount of Rs. 2,93,97,587 and accrued interest thereon:
o Total additional compensation paid o Total area for which compensation was paid o Total percentage of land belonging to the corporate debtor out of the total land o Percentage share of the Corporate Debtor in the compensation o The date of payment of compensation to check the interest calculation period
However, till date, the Appellant has not provided any of the
aforementioned details. Rightly, the claim towards former's compensation
remains unsubstantiated, and the Resolution Professional was right in not
admitting it.
53. We have gone through the calculations provided by the Appellant as
well as the Respondent No.1 - RP, gone into the justification provided by the
both sides and I have also looked into the material placed on record.
54. We find that the Respondent No.1 - RP was justified in asking some
additional information which was sought by it and which is noted as below:
Company Appeal (AT) (Insolvency) No. 691 of 2024 26 of 30 "a. Total additional compensation paid b. Total area for which compensation paid c. Total percentage of land belonging to Corporate Debtor out of total land d. % Share of Corporate Debtor in the compensation e. Date of payment of compensation (to check interest calculation)."
55. Therefore, we find that the farmers compensation remained
unsubstantiated and Respondent No.1 - RP cannot be faulted in not admitting
the claim as presented by the Appellant.
56. With respect to time extension charges, we note that the total allotment
charges for the land was Rs.235,69,07,079/- for the land of 100,080.98 sq.
mtrs. Once land of about 13,961 sq. mtrs. was taken away from the Corporate
Debtor only 86,119.98 sq. mtrs. of land remained available on lease with the
Corporate Debtor. Therefore, the proportionate allotment rate for 86,119.98
sq. mtrs. was correctly computed by Respondent No.1 - RP to the extent of
Rs. 202,81,25,539/- (235,69,07,079*86,119.98/1,00,080.98).
57. We further note that the Appellant had initially claimed an amount of
Rs.47,73,81,468/- towards time extension charges, out of which
46,82,53,478/- was admitted. Subsequently, the Appellant reduced the claim
to Rs.47,34,10,209.88 reflecting a reduction of Rs.39,71,258.12 due to an
incorrect calculation. But we note that the present appeal still claims the
original amount of Rs.47,73,81,468/-.
58. The Appellant computed the time extension charges of Rs.
Rs.47,73,81,468/- till 07.09.2022, but it did not account for the insolvency
commencement date of 17.08.2022. Accordingly, the RP had recalculated this
Company Appeal (AT) (Insolvency) No. 691 of 2024 27 of 30 amount and the amount works out to be Rs.47,34,10,209.88, which was
computed till the insolvency commencement date i.e. 17.08.2022.
59. Furthermore, we also notice that Respondent No.1 - RP had also
brought to the notice of the Appellant about incorrect calculation with respect
to the 5th year, which has been brought on record, which is calculated as
follows:
"Instead of 365,91,251.58 the correct amount should be Rs.31116446 (202,81,25,529*70*8/100*365)."
60. Appellants' claims that Respondent No.1 - RP had contravened Section
25(2)(e) of the Code, which mandates the RP to collect and verify all claims
against the Corporate Debtor and it should not have sought additional
documents. We have gone through the provisions of the Code and the
Regulations and it clearly provides that the RP has to maintain and update
list of claims and while doing so can seek additional documents and
clarifications, is a part of its duty. This cannot be considered as an
adjudicatory function.
61. The Adjudicating Authority while dismissing the appeal noted as
follows:
XXX
6. The Applicant filed its claim for Rs. 6,07,74,76,966/-. and the respondent, verified and admitted the claim to the tune of Rs.
600,92,77,327/- and informed the Applicant. Accordingly, being aggrieved the Applicant has filed the instant application for admission of remaining portion of the claim, i.e., Rs. 6,81,99,639/- and for non-compliance of the Order dated 18.10.2023.
Company Appeal (AT) (Insolvency) No. 691 of 2024 28 of 30
7. Pursuant to the Order passed in IA No. 2972 of 2023 dated 18.10.2023, the Resolution Professional has re-considered the claim of the Applicant as directed by this Adjudicating Authority arrived at the amount of Rs. 6,00,92,77,327/- based on the documents made available by the Applicant.
8. We do not consider that there is any non-compliance of the Order dated 18.10.2023 passed in IA No. 2972/2023. The Application (IA- 6075/2023) is disposed of accordingly.
XXX
62. We also note that the resolution applicant in its resolution plan for the
Corporate Debtor has provided as under:
"Similarly, if admitted claim amount of Noida is revised upward by resolution professional after submission of this plan, Noida shall be paid proposed amount of rupees 20 crores as proposed in this plan and there shall be no additional burden on resolution applicant"
63. Moreover, we note from the material placed on record that Noida was
aware about the submissions made by the resolution applicant in the
resolution plan regarding the claims of Noida and this was noted by Noida in
its rejoinder filed in IA 4907/2023 wherein it has averted as under:
"It may be noted that total value of the resolution plan is only Rs 363.24 crores, out of which the applicant (NOIDA) is being paid only rupees 20 crores, out of the total verified amount of rupees 513,97,26,613 as full and final settlement and will not revise even if this honorable tribunal considers and directs the resolution professional to verify total claimed amount of rupees 607,74,76,966"
Company Appeal (AT) (Insolvency) No. 691 of 2024 29 of 30
64. In the above facts and circumstances and after going through the
material placed on record, we do not find any infirmity in the actions of the
Resolution Professional, who was well within its rights to seek additional
information and Appellant provided limited information, which did not help
the Resolution Professional to accept their claims to the fullest extent as
claimed by the Appellant.
Order
65. Basis the facts placed before it, the Adjudicating Authority has rightly
dismissed the Appeal. We also do not find infirmity in the orders of the
Adjudicating Authority. Accordingly, the Appeal is dismissed and all related
IAs are also disposed of. No orders as to costs.
[Justice N Seshasayee] Member (Judicial)
[Arun Baroka] Member (Technical) New Delhi.
June 30, 2026.
pawan
Company Appeal (AT) (Insolvency) No. 691 of 2024 30 of 30
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free