Nakul Gupta vs State Bank Of India & Anr & Ors
- CitationCompany Appeal (AT) (Insolvency) No. 494 of 2024
Ratio decidendi
The rule this decision rests on
A guarantee expressed to be a continuing and irrevocable guarantee, which waives the guarantor's right to claim discharge under the Contract Act on any ground and provides that it shall not be affected by any variation of terms, is not revoked by the guarantor's resignation as a director of the principal debtor; the guarantor's resignation does not discharge him from such a guarantee. A continuing guarantee may be revoked under Section 130 of the Indian Contract Act, 1872 only as to future transactions and only by notice to the creditor; absent such notice, a guarantor cannot claim revocation of a continuing guarantee. Renewal of credit facilities on the same overall limit does not amount to a variance under Section 133 of the Indian Contract Act, 1872, and the guarantor is not discharged by such renewal. Substitution of a contract under Section 62 of the Indian Contract Act, 1872 requires the mutual consent of the parties to the new contract, and where there is no further variation or enhancement by the creditor and the guarantee continues in force, no novation arises so as to discharge the guarantor.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE MATTER OF: Nakul Gupta Erstwhile Director of Technofab Engineering Limited S-481, Greater Kailash II, ...Appellant New Delhi 110048 Versus
1. State Bank of India State Bank Bhawan, Madame Cama Road, Nariman Point, Mumbai - 400021
And Local Head Offices at: 11, Parliament Street, New Delhi-110001
And one of its Branches at: Stressed Assets Management Branch-I, at 12th Floor, Jawahar Vyapar Bhawan, STC, Building, 1 Tolstoy Marg, Janpath Road, New Delhi - 110001 ...Respondent No.1
2. Mr. Rajesh Mittal Resolution Professional IN CP (IB) 769/2022, NCLT DELHI IBBI/IPA-001/IP-P01114/2018-19/11816 C56 Ground Floor, Soami Nagar Delhi - 110017 ...Respondent No.2
Present:
For Appellant : Mr. Gaurav Mitra, Mr. Abhirup Dasgupta, Mr. Shreesh Chadha, Ms. Vagisha Tiwari, Ms. Aishwarya Modi and Mr. Joby P.V., Advocates.
For Respondent : Mr. Bheem S., Advocate for SBI. Mr. Kunwarpreet Singh, Advocate for R-2 PCS Prakul Khadi, Advocate. JUDGMENT
(Hybrid Mode)
[Per: Arun Baroka, Member (Technical)] This is an Appeal against the initiation of personal insolvency
proceedings against the Appellant - Nakul Gupta in the default and repayment
of credit facilities by Techno Fab Engineering Limited -CD in the judgment
and final order dated 27.02.2024 passed by the Ld. NCLT, New Delhi in CP
(IB) No.769/2022 whereby the Ld. NCLT admitted the application filed by
Respondent No.1 bank seeking personal insolvency resolution process against
the Appellant Nakul Gupta on the report filed by Respondent No.2 RP under
Section 99 of IBC, 2016.
Submissions of the Appellant
2. Respondent No.1- SBI has been granting various loan/credit facilities
to the Corporate Debtor from 17.04.2009. On 11.10.2017 as part of Bank of
India (hereinafter referred to as "BoI" i.e. the lead bank) consortium, credit
facilities for a total amount of ₹907/- Crore was sanctioned in favour of
Corporate Debtor by the BOI consortium with BOI being the lead bank.
3. The Respondent No.1 bank joined the BOI consortium and renewed its
credit facility for an amount of ₹17/- Crore out of the total consortium amount
of ₹907/- Crore in favour of the Corporate Debtor. These 'facilities' are
working capital facilities and do not operate like 'term loans'.
4. The facility availed by Corporate Debtor from Respondent No.1 bank as
part of BOI Consortium from 2017 was a renewal of the credit facilities which
were being availed by the Corporate Debtor.
Company Appeal (AT) (Insolvency) No. 494 of 2024 2 of 40
5. In consideration to the credit facilities granted to the Corporate Debtor
by BOI consortium, including the renewal sanctioned by Respondent No.1,
the Corporate Debtor, its then directors Arjun Gupta, Avinash Chander Gupta
and Nakul Gupta executed Working Capital Consortium Agreement, Joint
deed of hypothecation, deeds of guarantee and other contemporaneous
documents all dated 17.10.2017 favouring the BOI consortium.
6. The Appellant Nakul Gupta resigned as a director from the Corporate
Debtor on 08.03.2018 and the said fact is duly conveyed to the consortium
member by the Corporate Debtor.
7. After the Appellant resigned as a director, the credit facilities availed by
Corporate Debtor in the year 2017, which was part of the working capital
consortium agreement dated 17.10.2017 with Bank of India (BOI) (lead bank)
came up for renewal in October 2018. The lead bank, i.e. Bank of India by its
of its sanction letter dated 24.10.2018 renewed the credit facilities in favour
of the Corporate Debtor.
8. Subsequently, the Respondent No.1 bank also by way of its sanction
letter dated 01.01.2019 renewed the working capital facilities in favour of the
Corporate Debtor with effect from 14.12.2018. The security for the renewal
dated 01.01.2019 granted by the Respondent No.1 included personal
guarantee of the Appellant Nakul Gupta as well. However, the same was never
given by the Appellant, nor he ever consented for the renewal. However,
despite there being no consent/guarantee towards security given by the
Appellant, Respondent No.1 as well as the lead bank BOI renewed the
Company Appeal (AT) (Insolvency) No. 494 of 2024 3 of 40 facilities granted to the Corporate Debtor and the BOI consortium even
enhanced the total amount from ₹907/- Crore to ₹1078/- Crore.
9. Before renewing the credit facilities, with enhancement, in favour of the
Corporate Debtor, it was incumbent upon the Banks and more specifically
Respondent No.1 to take the consent of the Appellant for his guarantee. Since
the consent was not given, either the guarantee of the Appellant should have
been replaced or the credit facilities granted in favour of the Corporate Debtor
should have been recalled as the term for the previous working capital limit
had expired. However, Respondent No.1 bank renewed the credit facilities to
the tune of ₹117/- Crore in favour of the Corporate Debtor for a further period
of 1 year till 13.12.2019 and thereby with effect from 14.12.2018, it is
submitted that the Corporate Debtor had been availing credit facilities to the
tune of ₹117/- Crore from Respondent No.1 under the new contract which
was the sanction letter dated 01.01.2019 with varied terms and conditions
and not in terms of the working capital consortium agreement dated
17.10.2017. It is a matter of record that till 14.12.2018 there was no default
on the part of the Corporate Debtor and the same is also evident from the
Information Utility documents filed by the Respondent No.1 bank.
Subsequently, Corporate Debtor allegedly defaulted in its repayment and the
account turned NPA on 27.06.2019.
10. Despite the Appellant not being party to the credit facilities availed by
Corporate Debtor after 14.12.2018, to which it was in default, Respondent
No.1 initiated proceedings under IBC against the Appellant as well and filed
application under Section 95, IBC, 2016.
Company Appeal (AT) (Insolvency) No. 494 of 2024 4 of 40
11. Since with effect from 14.12.2018, credit facilities to the tune of ₹117/-
Crore granted by Respondent No.1 bank to the Corporate Debtor was under
the new renewal sanction dated 01.01.2019, Respondent No.1 bank never
disclosed the fact of renewal dated 01.01.2019 in its application filed under
Section 95 IBC, 2016. Further, the RP in its report filed under Section 99 also
did not disclose the correct facts before the adjudicating authority. Both the
bank and RP concealed this material fact from the Ld. Adjudicating Authority.
Since Appellant had left Corporate Debtor in March 2018, and the Corporate
Debtor itself was admitted into insolvency by NCLT, Delhi by way of its order
dated 02.11.2022, the Appellant didn't have any access to the documents of
the Corporate Debtor to find out about the renewal of the credit facilities
granted in favour of the Corporate Debtor after he left the Corporate Debtor.
Thus, the Appellant moved an application being I.A No.3895/ND/2023 in CP
(IB) 681/2022 seeking production of documents from the IRP of the Corporate
Debtor pertaining to the credit facility renewals granted in favour of the
Corporate Debtor. On 09.01.2024, the Ld. NCLT directed the IRP of the
Corporate Debtor to provide documents as sought by way of I.A
No.3895/2023 and listed the matter for final arguments on 16.01.2024, with
liberty to add submissions pertaining to the new documents supplied by IRP
in the Written Submissions of the Appellant. It is submitted that I.A
No.3895/2023 was finally disposed of by NCLT by way of its order dated
26.02.2024. Thus, the fact regarding the renewal of credit facilities through
sanction dated 24.10.2018 and 01.01.2019, which were concealed by
Respondent No.1 and Respondent No.2 RP from the Ld. Adjudicating
Authority were disclosed by the Appellant for the first time in his written
Company Appeal (AT) (Insolvency) No. 494 of 2024 5 of 40 submissions which were filed hurriedly within the timeline allowed by the Ld.
Tribunal.
12. For the first time, in the present appeal, in the Replies filed by
Respondents before this Appellate Tribunal, it has been admitted that the
credit facilities were renewed by Respondent No.1 bank by way of sanction
dated 01.01.2019. Despite specific and categorical admission in the replies
filed in the present appeal before this Hon'ble Appellate Tribunal, the
Respondents made an oral submission to the effect that the sanction dated
01.01.2019 was never given effect to. There is no dispute with regards to the
fact that the Sanction Letter dated 01.01.2019 was acted upon by the
Respondent No. 1 bank. The same has been admitted on Affidavit in the Reply
filed before this Hon'ble Tribunal in this Appeal. The Respondent No. 1 bank
has categorically pleaded that the letter dated 01.01.2019 was acted upon.
The oral submissions by the Respondent No. 1 bank that the letter dated
01.01.2019 was not acted upon is contrary to their own pleadings before this
Hon'ble Tribunal. Further, it is submitted that Respondent No.2 RP had also
admitted in his reply that the credit facilities were renewed by Respondent
No.1 by way of sanction dated 01.01.2019.
13. Even in the Impugned Judgment of the Ld. Adjudicating Authority
dated 27.02.2024 categorically renders a finding to the effect that a renewal
has been given effect to after 2018 and the Corporate Debtor was in default
of the credit facilities granted under the renewed sanction there has been a
renewal of sanction letters by the Respondent No. 1 bank. Thus, a specific
finding has been returned by the Ld. NCLT that the corporate debtor was in
Company Appeal (AT) (Insolvency) No. 494 of 2024 6 of 40 default for the facilities availed by it under the renewed sanction, and the
Appellant Nakul Gupta had neither consented for it, nor gave any personal
guarantee. This finding of the Ld. Adjudicating Authority in this regard, has
not been challenged by the Respondent No. 1 bank. Thus, the letter dated
01.01.2019 was an ACCEPTANCE of an OFFER made by the Corporate
Debtor- resulting in a concluded contract.
14. The Respondent No. 1 bank classified the account of the Corporate
Debtor as NPA only on 27.06.2019 and the first loan recall notice was issued
only in November 2021. It is the case of the Respondent No. 1 bank itself that
the 'DATE OF DEFAULT' was 27.06.2019 as mentioned in their Petition under
Section 95, IBC. Thus, as per the Respondent No. 1 itself, the date of
classification of NPA of the Corporate Debtor is the date of default.
Considering that this is subsequent to the renewed Sanction Letter dated
01.01.2019 having taken effect, it is submitted that the 'DEFAULT' occurred
after the discharge of the Appellant's personal guarantee to the Corporate
Debtor. The Appellant cannot be held liable for any 'DEFAULT' occurred after
discharge from his personal guarantee. As per the records submitted by the
Respondent No. 1 bank with the Information Utility (placed on record before
the Ld. Adjudicating Authority) the Corporate Debtor was not even in default
under the previous sanction letter dated 11.10.2017. The first entry of any
'amount overdue' as per the Respondent No. 1 bank itself is 22.05.2019.
Thereafter, the Corporate Debtor was deemed to be in 'default' only after
27.06.2019. Prior to 22.05.2019, as per the record submitted by the
Respondent No. 1 bank itself, there was no 'amount due' only. By that time,
Company Appeal (AT) (Insolvency) No. 494 of 2024 7 of 40 the RENEWED, REVISED and VARIED Sanction Letter dated 01.01.2019 had
been issued by the Respondent No. 1 bank and given effect to. Therefore,
there has been no DEFAULT in terms of Section 3(12), IBC until 04.07.2019
as per the record of the Information Utility submitted by the Respondent No.
1 itself. The RENEWED, REVISED and VARIED Sanction Letter dated
01.01.2019 was given effect to and the Appellant had not issued any 'Revival
Letter' for his guarantee. The Appellant stood discharged latest on 01.01.2019
upon the issuance of the RENEWED, REVISED and VARIED Sanction Letter
dated 01.01.2019 and all 'Default' of the Corporate Debtor has occurred only
thereafter as per the Respondent No. 1 bank itself. It is reiterated herein that
with effect from 14.12.2018, the credit facilities of ₹117/- Crore availed by
the Corporate Debtor from Respondent No.1 bank was under the new renewal
sanction letter dated 01.01.2019 and the said facilities were provided by
Respondent No.1 to Corporate Debtor without the knowledge and consent of
the Appellant, and hence Appellant cannot be held liable for any dues arising
thereunder. The Ld. Adjudicating Authority in the Impugned Judgment dated
27.02.2024 records that the Appellant would only be liable in case of any
'Default' in the repayment of the credit facilities prior to the RENEWED
Sanction Letter dated 01.01.2019. However, there is no finding or any sort of
adjudication on the DATE OF DEFAULT by the Corporate Debtor so as to
fasten the liability on the Appellant. As per the Respondent No. 1 bank itself,
there was no 'DEFAULT' of payment until 27.06.2019 and there was no
overdue 'DEBT' until 22.05.2019. Despite holding that there has been a
variance and renewal in the credit facilities after 2018, the Impugned
Judgment is completely silent on what the 'DATE OF DEFAULT' is in the
Company Appeal (AT) (Insolvency) No. 494 of 2024 8 of 40 present case. For this reason alone, the Impugned Judgment is bad in law
and warrants to be set aside. It is pertinent to note that the Appellant had
resigned and had completely disassociated from the Corporate Debtor by
08.03.2018. Thereafter, the lead bank of the Consortium had issued letter
dated 24.10.2018 which recorded enhancement of total credit facilities from
₹907/- Crores to ₹1075/- Crores, which was duly accepted by the Corporate
Debtor on 22.11.2018. Further, the Respondent No. 1 bank also issued a
Sanction Letter dated 01.01.2019 which contained material variances
regarding the terms and conditions and also recorded enhancement of credit
facilities. After all of this, the guarantee of the Appellant had been discharged.
It is only thereafter that the 'debt' of the Corporate Debtor became overdue
and a 'default' was committed by the Corporate Debtor.
15. The appellant cannot be held to be personal guarantor of the
corporate debtor- Technofab Engineering Limited as the deed of guarantee
dated 17.10.2017 stands varied and novated by the issuance of
subsequent sanction letter dated 24.10.2018 by the consortium and
sanction letter dated 01.01.2019. Firstly, the Deed of Guarantee dated
17.10.2017 itself did not extend to the Sanction Letter(s) dated 24.10.2018
and Sanction Letter dated 01.01.2019. The Deed of Guarantee was executed
to secure the credit facilities granted and covered under the Working Capital
Consortium Agreement dated 17th October 2017, which along with the joint
deed of hypothecation has been defined as 'said agreement of loan' in this
deed of guarantee. The same is also for credit facility of aggregate sum of
₹907/- Crores and the Deed of Guarantee dated 17.10.2017 was issued by
Company Appeal (AT) (Insolvency) No. 494 of 2024 9 of 40 the Guarantors for a sum NOT EXCEEDING ₹907/- Crores. The Working
Capital Consortium Agreement dated 17th October 2017 under Article 1
specifically states that the credit facilities granted under the Working Capital
Consortium Agreement shall be governed by the terms and conditions as set
out in the Letters of sanction of member banks of BOI Consortium including
the Letter of Sanction/Letter of arrangement dated 11.10.2017 being
CBND/AMT-II/2017-18 issued by Respondent No.1 which specifically and
categorically provided that the working capital facility is valid only upto
04.10.2018. The Sanction Letter dated 11.10.2017 issued by the Respondent
No. 1 bank was categorically the subject matter of the Deed of Guarantee. It
is submitted that there is no separate Deed of Guarantee executed by the
Appellant for any subsequent Sanction Letter apart from those defined in the
Working Capital Consortium Agreement 17.10.2017 mentioned in the Deed
of Guarantee dated 17.10.2017. Further, as stated above the previous
sanction dated 11.10.2017, which formed basis of the working capital
consortium agreement dated 17.10.2017 qua Respondent No 1 was valid only
from 05.10.2017 for a period of 12 months. Subsequently the credit facilities
were renewed by Respondent No.1 bank for an amount of ₹117/- Crore for a
further period of one year by way of its fresh contract/sanction dated
01.01.2019 with effect from 14.12.2018. Thus, for the credit facilities availed
by Corporate Debtor, as rightly held by the Ld. Adjudicating Authority, after
2018 under the renewed sanction, to which Appellant had neither consented,
nor given his guarantee, he cannot be held liable. As stated above, it is a
matter of record that there was no default under the credit facilities provided
in terms of sanction dated 11.10.2017.
Company Appeal (AT) (Insolvency) No. 494 of 2024 10 of 40
16. Secondly, there is a material variance in the terms of the Sanction
Letter dated 11.10.2017 issued by the Respondent No. 1 bank as compared
to the subsequent Sanction Letter dated 01.01.2019 issued by the
Respondent No. 1 bank. The Terms of the Letter dated 01.01.2019 are
materially different from the original sanction letter dated 11.10.2017 issued
by the Respondent No. 1 bank. Due to the fact that there were material
variances in the old sanction letter dated 11.10.2017 and new sanction letter
dated 01.01.2019 and no fresh document was executed by the Appellant as
guarantee under the new Sanction Letter dated 01.01.2019, the lead bank of
the Consortium categorically sought written renewal and revival confirmation
from the Appellant of his personal guarantee on 06.06.2020. It is undisputed
that this letter was never signed by the Appellant, rather, the Appellant had
objected to the very issuance of this letter on 26.06.2020. It is submitted that
if there had been no material variance in the terms of the new sanction letter
dated 01.01.2019, there would have been no need for the consortium of banks
to seek a 'REVIVAL LETTER' from the Appellant.
17. The impugned judgment completely misinterprets the clause on
'continuing guarantee' in the deed of guarantee dated 17.10.2017. The clause
on 'Continuing Guarantee' in the Deed of Guarantee dated 17.10.2017 does
not cover the present situation where a new, revised, renewed, varied
Sanction Letter has been issued by the Consortium of Banks vide letter dated
24.10.2018 and the Respondent No. 1 vide letter dated 01.01.2019). Firstly,
the continuing guarantee clause would NOT APPLY IN THE CASE OF
ENHANCEMENT beyond the original sum of credit facilities. Secondly, the
Company Appeal (AT) (Insolvency) No. 494 of 2024 11 of 40 continuing guarantee clause under the deed of guarantee was restricted to
the credit facilities termed as 'abovementioned credit facility'. The term
'abovementioned credit facility' has been defined under the deed of guarantee
as those credit facilities which have been granted in terms of the working
capital consortium agreement, joint deed of hypothecation dated 17.10.2017,
which were defined as 'said agreements of loan'. As stated above, Article 1 of
the Working Capital Consortium Agreement dated 17.10.2017 specifically
states that the credit facilities granted under the Working Capital Consortium
Agreement shall be governed by the terms and conditions as set out in the
Letters of sanction of member banks of BOI Consortium including the Letter
of Sanction/Letter of arrangement dated 11.10.2017 being CBND/AMT-
II/2017-18 issued by Respondent No.1. Thus, with respect to Respondent No.1
bank, the continuing guarantee as provided in the deed of guarantee was
limited to the facilities granted in terms of the sanction/renewal dated
11.10.2017 and cannot under any circumstances be extended to sanction
letters/renewals issued subsequent on its expiry. In the present case, it is
apparent that there has been an enhancement of sums from ₹907/- Crores
to ₹1075/- Crores on the basis of fresh sanction letter issued by the lead bank
of the Consortium on 24.10.2018 which recorded enhancement of total credit
facilities from ₹907/- Crores to ₹1075/- Crores, which was duly accepted by
the Corporate Debtor on 22.11.2018 and the letter dated 01.01.2019 issued
by the Respondent No. 1 bank. In addition to 'enhancement', there has also
been a 'RENEWAL' of credit facilities on completely new and varied terms by
the letter dated 01.01.2019 issued by the Respondent No. 1 bank- which is
undisputedly not covered by the Deed of Guarantee dated 17.10.2017.
Company Appeal (AT) (Insolvency) No. 494 of 2024 12 of 40 Therefore, the 'Continuing Guarantee' clause is completely inapplicable to the
present facts and circumstances. On the one hand, the Impugned Judgment
holds that the limits of the Credit Facilities were 'enhanced', while on the
other hand, the Ld. Adjudicating Authority also states that the term in the
Deed of Guarantee qua 'Continuing Guarantee' would apply. It is submitted
that these findings are completely contradictory. These findings are
completely contrary to one another and results from a complete misreading
of Clause 8 of the Deed of. The finding of 'enhancement' as adjudicated in the
Impugned Judgment is unchallenged by the Respondents. It is apparent from
a bare reading of the 'Continuing Guarantee' clause that the same only
applied for facilities being granted 'within the overall limit'. In the present
case, the Ld. Adjudicating Authority itself observed that there has been an
enhancement of the 'overall limit', whereas, contrarily, the Ld. Adjudicating
Authority has also stated that the 'Continuing Guarantee' clause would apply,
resulting in blatantly contrary findings. For this reason itself, the Impugned
Judgment warrants to be set aside.
18. The impugned judgment proceeds on mutually destructive findings
which cannot stand together in law. The Adjudicating Authority records, as a
matter of categorical fact in para 10 of the Impugned Judgment, that the
credit facilities of the Corporate Debtor were renewed and enhanced pursuant
to the sanction letter dated 24.10.2018 issued by the lead bank and the
subsequent sanction letter dated 01.01.2019 issued by Respondent No. 1.
The Impugned judgment further records that these renewed and enhanced
facilities--raising the consortium limit from ₹907/- crores to ₹1075/-crores--
Company Appeal (AT) (Insolvency) No. 494 of 2024 13 of 40 were availed by the Corporate Debtor after 2018, and that the default
occurred in respect of these renewed facilities. The Adjudicating Authority
also records that the renewed sanction expressly provided for a guarantee of
the Appellant, but that the Appellant admittedly did not sign or consent to
such guarantee. These findings are clear, unequivocal, and unchallenged by
the Respondents. Having recorded these findings, the Adjudicating Authority
nevertheless proceeds, in the very next breath, to hold that the Appellant
continues to remain liable under the original guarantee dated 17.10.2017, on
the basis that the guarantee was a "continuing guarantee" and that the
Appellant would remain liable for the "initial amount" of ₹907/- crores "which
existed prior to its variance." This reasoning is fundamentally contradictory
to the earlier finding that the default itself arose only under the renewed and
varied sanction terms of 2018-2019, to which the Appellant never consented.
The impugned order therefore simultaneously holds that (i) the default
occurred under the renewed sanction, and (ii) the Appellant is liable under
the original sanction--two conclusions that cannot coexist. The contradiction
becomes starker when the statutory framework is applied. Section 133 of the
Indian Contract Act mandates that any variance in the terms of the contract
between the principal debtor and the creditor, made without the surety's
consent, discharges the surety as to all transactions subsequent to the
variance. The Adjudicating Authority itself records that there was a variance--
indeed, a complete renewal--of the credit facilities after 2018, and that the
Appellant did not sign or consent to the renewed terms. Once this finding is
recorded, the legal consequence under Section 133 is automatic. The
Appellant stands discharged for all transactions subsequent to the variance.
Company Appeal (AT) (Insolvency) No. 494 of 2024 14 of 40 The impugned order, however, contradicts this statutory mandate by
simultaneously acknowledging the variance and yet refusing to give effect to
the discharge. The contradiction is further compounded by the fact that the
Adjudicating Authority does not render any finding whatsoever on the date of
default, despite the Respondent Bank's own pleadings that the account was
classified as NPA only on 27.06.2019. The Information Utility records placed
by the Respondent Bank show that until 22.05.2019 there was no overdue
amount, and that the first default entry appears only thereafter. By this time,
the renewed sanction letter dated 01.01.2019 had already taken effect. Thus,
even on the Respondent Bank's own case, the default occurred only under
the renewed and varied sanction terms, and not under the original sanction
of 11.10.2017 for which the Appellant had furnished the guarantee. The
impugned order, however, fails to reconcile this admitted factual position with
its conclusion fastening liability on the Appellant. The Ld. Adjudicating
Authority in the concluding lines of para 12 of the Impugned Judgment holds
that even if there is increase in the sanction limit/variance, the Guarantor
shall still be liable for 'debt' that existed prior to its variance. It is submitted
that the term 'debt' has been defined in Section 3 (11), IBC which says that
debt is a liability or obligation in respect of a claim which is DUE from any
person. It is a matter of record as per Information Utility record that prior to
the variance, there was admittedly no 'DEBT'. Without any finding of the
existence of any 'DEBT' prior to variance, held the Appellant liable, which is
unsustainable.
Company Appeal (AT) (Insolvency) No. 494 of 2024 15 of 40
19. There has been a violation of principals of natural justice by the ld.
Adjudicating authority as there has been no opportunity to be heard on the
documents concealed by the respondents before the ld. Adjudicating
authority. The Respondent No. 1 and Respondent No. 2 have categorically
admitted to the issuance and effect of the renewed sanction letter dated
01.01.2019 before this Hon'ble Tribunal. However, it is pertinent to note, that
both the Respondents were completely silent on the issuance of this letter in
their pleadings before the Ld. Adjudicating Authority. The Respondents
concealed the issuance of fresh sanction letters by the lead bank and the
Respondent No. 1 before the Ld. Adjudicating Authority. The Appellant had
to run from pillar to post to obtain the letters dated 24.10.2018 issued by
lead Bank of the Consortium of banks and letter dated 01.01.2019 issued by
the Respondent No. 1 bank. The Appellant had filed an application (IA
3895/2023) in the CIRP proceedings of the Corporate Debtor to seek copies
of these letters and other documents pertaining to issuance of fresh sanction
letters after the resignation of the Appellant from the Corporate Debtor. On
09.01.2024, the Ld. Adjudicating Authority in the present proceedings
directed the RP of the Corporate Debtor to provide the documents requested
by the Appellant. Thereafter on 16.01.2024, the Appellant sought time to
place the documents, particularly letters dated 24.10.2018 issued by lead
Bank of the Consortium of banks and letter dated 01.01.2019 issued by the
Respondent No. 1 bank on record which was denied by the Ld. Adjudicating
Authority by directing that written submissions may be filed by the Appellant.
There has been no oral hearing by the Ld. Adjudicating Authority on these
documents which form crux of the case of the Appellant herein. The
Company Appeal (AT) (Insolvency) No. 494 of 2024 16 of 40 application (IA 3895/2023) in the CIRP proceedings of the Corporate Debtor
filed by the Appellant came to be disposed of on 26.02.2024 and the very next
day, the Impugned Judgment came to be passed i.e. on 27.02.2024. It is
submitted that adjudication on the documents, particularly letters dated
24.10.2018 issued by lead Bank of the Consortium of banks and letter dated
01.01.2019 issued by the Respondent No. 1 bank is happening for the first
time at the Appellate stage without granting an opportunity to be heard to the
Appellant before the Ld. Adjudicating Authority, which is impermissible in
law.
20. In view of these contradictions, omissions, and violations, the
impugned judgement is unsustainable. The findings in para 10 and the
subsequent reasoning cannot stand together. The admitted variance and
renewal of the sanction terms, the admitted absence of consent of the
Appellant, the admitted date of default under the renewed sanction, and the
statutory mandate of Section 133 collectively establish that the Appellant
stood discharged from the guarantee prior to the occurrence of any default.
The impugned order, having failed to apply these principles consistently,
warrants interference. The denial of a fair opportunity to be heard on crucial
documents, coupled with the concealment of material facts by the
Respondents, has also resulted in a grave violation of the principles of natural
justice. Accordingly, the present case merits reconsideration and the setting
aside of the Impugned Judgment, in the interests of justice and equity.
Submissions of the Respondent-SBI
21. Primarily, the Appellant has assailed the impugned order on two
grounds. Firstly, even before classification of account of Corporate Debtor as Company Appeal (AT) (Insolvency) No. 494 of 2024 17 of 40 NPA on 27.06.2019, the Appellant had already resigned from Directorship of
the Corporate Debtor on 08.03.2018 and hence his guarantee stood revoked.
Secondly, there were variation of terms of contract after the resignation of the
Appellant from Directorship of the Corporate Debtor on 08.03.2018 since
thereafter the facilities stood enhanced by the lenders including Bank of India,
as stated by the Corporate Debtor in its letter dated 22.11.2018. Thus, the
contract stood novated and Appellant stood discharged.
22. Insofar as the claim of the Appellant of discharge in view of resignation
from Corporate Debtor is concerned, it would be appropriate to refer to the
terms of Deed of Guarantee dated 17.10.2017. A perusal of Clause Nos. 1, 3,
6 to 8, 11, 12, 14 and 19 of the principal Deed of Guarantee dated 17.10.2017
would reveal the following:
o Liability of the Guarantor was payable on demand (Clause 1).
o For the purpose of enforcement of the Guarantee, the Guarantors shall be deemed to the principal debtor (Clause 7).
o Guarantee is continuing in nature and is irrevocable. Guarantee is enforceable against the Guarantor irrespective of dispute between the Bank & borrower (Clause Nos. 8 & 11).
o Guarantee shall not be affected by any variation of terms of contract in future (Clause 3 & 14).
o Guarantee expressly waived his right to claim discharge under any provision of Contract Act on any ground (Clause 18).
o All admissions & acknowledgments of debt/balance confirmations, part payments etc. by the principal debtor shall be binding on the Guarantor (Clause 12 & 19).
Company Appeal (AT) (Insolvency) No. 494 of 2024 18 of 40
23. Under Section 129 of the Indian Contract Act, 1872 a continuing
guarantee is defined as a guarantee which, extends to a series of transactions
and the same can be revoked under Section 130 of the Act only qua the future
transactions and that is by way of notice to the creditor.
24. However, in the present case, no notice of revocation was ever issued
by the Appellant to the Creditor i.e. Respondent/SBI and the request for
release to UBI/BOI was accepted by the lenders. Therefore, in view of the
aforesaid clauses of the Deed of Guarantee, the resignation of the Appellant
from the Corporate Debtor shall not discharge him from the continuing and
irrevocable Guarantee admittedly executed by him in favour of the
Respondent Bank and other lenders. Therefore, Appellant cannot claim
revocation of the continuing guarantee under Section 130 of the Act which
mandatorily requires a notice of revocation and such revocation operates only
qua future transaction, as per Section 130 of the Act.
25. Reliance in this regard, is placed on the judgment of the Hon'ble Apex
Court passed in the case of Sita Ram Gupta vs PNB [2008 (5) SCC 711].
In the said case, the Hon'ble Apex Court in the background of similar
contractual clauses (para 4 of judgment), rejected an identical defense of
revocation and discharge of guarantee (para Nos. 5 to 7). Judgment in the
case of Sita Ram Gupta (supra) has been again cited with approval by the
Hon'ble Apex Court in the judgment of H.R. Basavraj vs. Canara Bank [2010
(2) SCC 458].
26. Insofar as the claim of the Appellant of discharge in view of variation of
Company Appeal (AT) (Insolvency) No. 494 of 2024 19 of 40 terms of contract and alleged novation is concerned, it is submitted that after
the grant of credit facility for an amount of ₹117.00 crores (constituted of
fund based facilities of ₹10.00 crores and non-fund based facilities of ₹107.00
crores) to the Corporate Debtor vide Letter of Arrangement dated
11.10.2017, there had never been any further variation or enhancement by
the Respondent/SBI. Renewal of facilities would not amount to variation. This
fact can be ascertained from the Renewal letter dated 01.01.2019 and
subsequent notices including Loan Recall and Demand Notice dated
15.11.2021 and OA No. 556 of 2022 titled "SBI vs. Technofab Engineering
Limited & Ors." filed before the DRT-I, New Delhi.
27. As per Section 133 of the Act, any variance made without the surety's
consent, in the terms of the contract between the principal-debtor and the
creditor, discharges the surety as only qua the transactions subsequent to
the variance. The surety continues to be liable for transactions effected before
such variation.
28. This position stands fortified by the recent pronouncements of this
Hon'ble Tribunal in the cases of:
o SBI Vs. Gourishankar Poddar & Anr [2024 SCC Online NCLAT 2014] - para Nos. 26, 30, 32, 36, 40 to 42 & 46-47.
o Sri Vibu Venkatsubramanian vs. State Bank of India & Anr. [Company Appeal (AT) (Insolvency) No. 1228 of 2024 dated 26.02.2026].
29. In the aforesaid facts and circumstances there being no dispute to the
grant of loan facility and execution of loan and security documents including
the guarantee deeds and the defaults by the Corporate Debtor and the failure
Company Appeal (AT) (Insolvency) No. 494 of 2024 20 of 40 of repayment also being not in dispute, the present appeal is liable to be
dismissed.
Appraisal
30. We have heard the counsels of both sides and also perused the material
placed on record.
31. The Appellant, along with his brother, Mr. Arjun Gupta, and father Mr.
Avinash Chander Gupta, were the Directors of Technofab Engineering Limited
(TEL). TEL was engaged in the business of providing engineering,
procurement, and construction services. TEL availed of credit facilities from
banks and financial institutions, which used to be renewed and extended from
time to time. On 17th October 2017, TEL was offered and accepted a total
credit limit of ₹907/- crores, comprising ₹117/- crores of fund-based facilities
and ₹792/- crores of non-fund-based facilities by a consortium of six banks,
including Respondent No. 1, that is, State Bank of India. Respondent No. 1
extended total facilities of ₹117/- crores, comprising ₹107/- crores as non-
fund-based facilities and ₹10/- crores as fund-based facilities. With respect
to the aggregate credit facility limit of ₹907/- crores from the consortium of
Banks to TEL, the appellant, along with his brother and father, namely Mr.
Arjun Gupta and Mr. Avinash Chander Gupta, on 17th October 2017 stood as
guarantors by way of a deed of guarantee.
32. The Appellant claims that it had resigned as a director from TEL on 8th
March 2018, and thereafter he was not involved in the day-to-day operations
of TEL. The Appellant also claims that TEL wrote to the United Bank of India,
Company Appeal (AT) (Insolvency) No. 494 of 2024 21 of 40 as a member of the consortium of banks, informing them of the resignation of
the Appellant from the post of Director of TEL.
33. The Appellant claims that on 24 October 2018, the consortium of banks
led by Bank of India revised the aggregate limit of credit facilities from Rs 907
crores to ₹1075/- crores. But this was done without the involvement, consent,
or knowledge of the Appellant. It is also claimed by the Appellant that on 22
November 2018, this was accepted by TEL, and TEL also reiterated that the
Appellant has resigned from the company and brought to their notice the
impact of him leaving the company. The Appellant further claims that on 21st
January 2019, TEL issued another letter to the lead bank of the consortium,
i.e., Bank of India, with regards to the resignation of the Appellant from TEL.
TEL further requested the consortium to replace the personal guarantee of
the Appellant with that of his mother, a person of equal net worth. However,
on 27th June 2019, TEL was declared as an NPA (non-performing asset) by
the Respondent No.1 that is, State Bank of India. On 31 May 2020, the
Appellant wrote a letter to the lead Bank of the Consortium, i.e., Bank of India,
regarding multiple communications of TEL regarding the revocation of his
personal guarantee on account of his dissociation with TEL from 8 March
2018 onwards. The lead member, that is, Bank of India, on 6th June 2020
wrote a communication to Mr. Arjun Gupta and the Appellant with regards to
the renewal of their personal guarantees towards credit facilities for TEL. It is
also brought to our notice that, by this time, that is, 6th June 2020, one of the
directors, that is, Mr. Avinash Chander Gupta, had passed away. Mr. Arjun
Gupta had accepted the renewal of his personal guarantee towards credit
Company Appeal (AT) (Insolvency) No. 494 of 2024 22 of 40 facilities for TEL by 26 June 2020. However, the Appellant had refused to
renew it and addressed a separate communication to Bank of India regarding
release of his personal guarantee.
34. On 13 May 2022, Respondent No.1, that is, State Bank of India, sent a
demand notice to the Appellant invoking the deed of guarantee dated 17
October 2017 on the basis of an acknowledgement by Arjun Gupta dated 19
June 2020. On 30 May 2022, the Appellant replied to R1's demand notice
dated 13 May 2022, denying any demand or invocation of personal guarantee.
On 18 November 2022, Corporate Insolvency Resolution Process proceedings
commenced against TEL, the Corporate Debtor, which was initiated by the
R1- Bank as per the orders of the NCLT, New Delhi, in CP(IB) No. 681 of 2022.
On 26.12.2022, the RP in the present proceedings submitted his
recommendations under Section 99 of the Code and vide IA No.
593/ND/2023, recommended the initiation of personal insolvency
proceedings against the Appellant. In these proceedings, the Appellant filed a
reply to the report of the RP dated 26.12.2023 denying the contents of the
report of the RP. The Appellant also filed an Application IA 3895/2023 in CP
(IB) No. 681 of 2022, seeking the production of documents pertaining to the
alteration of credit facilities by the consortium of banks vide sanction letter
dated 24 October 2018. This IA was disposed of vide order dated 26 February
2024. The judgement in the application which was filed by the RP in the
present proceedings bearing number IA No. 593/ND/2023 was pronounced
on 16 January 2021 and which is being challenged by the Appellant.
Company Appeal (AT) (Insolvency) No. 494 of 2024 23 of 40
35. The Appellant has raised the issue whether the extension of aggregate
credit facilities by the consortium of banks from ₹907 crores to ₹1,075 crore
amounts to 'variance' in terms of Section 133 of the Indian Contract Act, 1872,
or not. Appellant also claims that after the corporate debtor and the
consortium of banks had extended the revised credit facilities, there had been
a novation of contract. The Appellant also raises the issue that extension of
aggregate credit facilities without the knowledge of the Appellant would entail
the discharge of the Appellant as personal guarantor of the corporate debt.
The Appellant had not signed the renewal of the deed of guarantee, and the
Adjudicating Authority had erred in ignoring the effect of non-renewal of the
deed of guarantee by the Appellant. The Appellant claims that at the time of
providing the guarantee in October 2017, the guarantee was towards total
credit facilities of ₹907/- crore. Subsequently, the Appellant had resigned as
a Director of PEL. Later on, the credit limits were increased from ₹907/- crores
to ₹1075/- crores, which would entail a higher liability for the Appellant as a
surety. The said increase was agreed to between the consortium of banks, as
evidenced by the sanction letter dated 24.10.2018 issued by the lead bank,
State Bank of India, and the sanction letter dated 01.01.2019 by the R1 bank,
without the knowledge, consent, or involvement of the Appellant. Therefore,
this falls within the meaning of a subsequent variance to the Deed of
Guarantee under Section 133 of the Indian Contract Act, 1872. The Appellant
further claims that the deed of guarantee dated 17.10.2017 does not
contemplate the continuation of guarantee in case of increase in overall limits.
Appellant also claims that Clause 8 of the deed of the guarantee has been
incorrectly interpreted by the Adjudicating Authority. It is the claim of the
Company Appeal (AT) (Insolvency) No. 494 of 2024 24 of 40 Appellant that the Adjudicating Authority has incorrectly held that if there is
any increase in the sanction limit without the consent of the guarantor, then
also he shall still be liable for the debt which existed prior to its variance. The
Appellant also claims that when a fresh sanction letter dated 24.10.2018 was
issued, whereby the overall limits were enhanced by almost ₹168/- crores, it
would be a novation of contract as per Section 62 of the Indian Contract Act,
1872. The Appellant claims that there had been an offer and acceptance of a
new credit facility limit, which clearly amounts to a novation of contract in
which the Appellant was not privy. Moreover, after the resignation of the
Appellant from TEL - the CD as a Director, the Appellant cannot be held liable
for the personal guarantee, as there has been a novation of the contract.
Appellant claims that due to the fact that the Appellant had ceased to be
associated with TEL-CD in any capacity from 08.03.2018, which was duly
informed to the consortium of banks by the Appellant and TEL. Furthermore,
the consortium of banks enhanced the overall credit facility limit from ₹907/-
crores to ₹107/- crores for financial year 2018-19, and which was accepted
by TEL. Also, the father of the Appellant had passed away in 2019. And lastly,
after the enhancement of credit facilities, it was only Mr. Arun Gupta, another
director and brother of the Appellant, who had signed the renewal of personal
guarantees in June 2020, and not the Appellant. Therefore, in such situation,
there have been material alterations and novation leading to an abandonment
of the deed of guarantee dated 17th October 2017.
36. The Appellant also contends that the sanction letters dated 11.10.2017
and the revised sanction letter dated 01.01.2019, issued by R1-SBI, are
Company Appeal (AT) (Insolvency) No. 494 of 2024 25 of 40 markedly different in terms of their conditions. Furthermore, the sanction
letters were valid only for a period of 12 months and were required to be
renewed. The new sanction letter was never renewed by the Appellant herein.
Therefore, the terms of the sanction of the R1 bank themselves were altered,
thereby implying that the present case falls squarely within sections 62 and
63 of the Indian Contract Act 1872.
37. The Appellant also claims that the corporate debtor TEL had addressed
communications, inter alia, dated 09/02/2018, 21/11/2018, and
21/12/2013 to the consortium of banks regarding the resignation of the
appellant as a Director of TEL and release of his guarantee. The appellant had
also addressed multiple communications, dated 31.05.2020 and 26.06.2020,
to the consortium of banks regarding the release and revocation of his
guarantee. Thus, the continuing guarantee, if any, of the appellant has to be
deemed to be revoked under Section 130 of the Indian Contract Act, 1872.
38. Appellant also claims that it had not only refused to renew the
guarantee, but had also addressed a communication dated 26.06.2020 to the
consortium of banks regarding revocation and release of his personal
guarantee. Despite which the Respondent Bank had initiated frivolous
proceedings against the Appellant in relation to a non-existent personal
guarantee.
39. The Appellant has also relied on the judgment of the Hon'ble Supreme
Court in DILIP B Jiwrajka v. Union of India & Ors., WP (C) 1281 of 2021,
whereby the Hon'ble Supreme Court had directed the Adjudicating Authorities
Company Appeal (AT) (Insolvency) No. 494 of 2024 26 of 40 to deal with the objections of the personal guarantors in an independent
manner and not mechanically agree with the report of the Resolution
Professional. In the present case, there has been no independent assessment
of the objections of the Appellant, and the commencement of the personal
insolvency proceedings against the Appellant has been directed solely on the
basis of the report of the Resolution Professional.
40. Briefly speaking the Appellant argues that when a fresh sanction letter
dated 24.10.2018 was issued, whereby the overall limits were enhanced by
almost ₹168/- crores, it would be a novation of contract as per Section 62 of
the Indian Contract Act, 1872. The Appellant claims that there had been an
offer and acceptance of a new credit facility limit, which clearly amounts to a
novation of contract in which the Appellant was not privy. Moreover, after the
resignation of the Appellant from TEL - the CD as a Director, the Appellant
cannot be held liable for the personal guarantee, as there has been a novation
of the contract.
41. Since the appellant has relied extensively on the provisions of the deed
of guarantee and also Indian Contract Act 1872 relating to the provisions for
novation and revocation of the continuing guarantee and discharge of surety
due to variance in terms of the personal guarantee/contract extended by the
appellant, these provisions are being discussed separately hereinafter.
42. For the sake of convenience, we are extracting the relevant provisions
relating to Indian Contract Act 1872 herein as below:
"Section 62. Effect of novation, rescission, and alteration of contract.
Company Appeal (AT) (Insolvency) No. 494 of 2024 27 of 40 If the parties to a contract agree to substitute a new contract for it, or to rescind or alter it, the original contract, need not be performed.
129. "Continuing guarantee".--A guarantee which extends to a series of transactions, is called a "continuing guarantee".
130. Revocation of continuing guarantee.--
A continuing guarantee may at any time be revoked by the surety, as to future transactions, by notice to the creditor.
133. Discharge of surety by variance in terms of contract.-- Any variance, made without the surety's consent, in the terms of the contract between the principal debtor and the creditor, discharges the surety as to transactions subsequent to the variance.
43. First we look into the argument of the plan that it had ceased to be
associated with TEL-CD in any capacity from 08.03.2018, which was duly
informed to the consortium of banks by the Appellant and TEL. The Appellant
claims that it had resigned as a director from TEL on 8th March 2018, and
thereafter he was not involved in the day-to-day operations of TEL.
Furthermore, the consortium of banks enhanced the overall credit facility
limit from ₹907/- crores to ₹107/- crores for financial year 2018-19, and
which was accepted by TEL. The Appellant also claims that when a fresh
sanction letter dated 24.10.2018 was issued, whereby the overall limits were
enhanced by almost ₹168/- crores, it would be a novation of contract as per
Section 62 of the Indian Contract Act, 1872. The Appellant claims that there
had been an offer and acceptance of a new credit facility limit, which clearly
amounts to a novation of contract in which the Appellant was not privy.
Moreover, after the resignation of the Appellant from TEL - the CD as a
Director, the Appellant cannot be held liable for the personal guarantee, as
there has been a novation of the contract. Also, the father of the Appellant
Company Appeal (AT) (Insolvency) No. 494 of 2024 28 of 40 had passed away in 2019. And lastly, after the enhancement of credit
facilities, it was only Mr. Arun Gupta, another director and brother of the
Appellant, who had signed the renewal of personal guarantees in June 2020,
and not the Appellant. Therefore, in such situation, there have been material
alterations and novation leading to an abandonment of the deed of guarantee
dated 17th October 2017.
44. We find that such an argument of the appellant is not sustainable. As
noted by us here in separately, the Appellant had signed a deed of guarantee,
which does not stand revoked by the resignation of the Appellant from the
directorship of the corporate debtor. Furthermore, we have also noted
separately herein that there is no novation of the contract. Therefore, both
these grounds cannot be sustained. We also observe that notice u/s 13(2)
dated 17.11.2021 that the debt claimed and guarantees invoked in the same,
were only in respect to the limits granted under the documents executed on
17.10.2017 ['Schedule A' of the said notice u/s 13(2)]. Even Loan Recall Notice
dt. 15.11.2022 and Original Applicant bearing OA No. 484 of 2022, filed before
DRT-I, New Delhi don't show any reference to Renewal Sanction Letter dt.
01.01.2019.
45. We find that, with respect to the claim of the Appellant that, in view of
his resignation from CD, he is discharged, is not borne out as per the terms
of the deed of guarantee dated 17.10.2017. A plain reading of the various
clauses, particularly Clause Nos. 1, 3, 6 to 8, 11, 12, 14 and 19 of the principal
Deed of Guarantee dated 17.10.2017, would reveal that the liability of the
guarantor was payable on demand. For the purpose of enforcement of the
Company Appeal (AT) (Insolvency) No. 494 of 2024 29 of 40 guarantee, the guarantor shall be deemed to be the principal debtor.
Guarantee is continuing in nature and is irrevocable. Guarantee is
enforceable against the guarantor irrespective of dispute between the bank
and the borrower. Guarantee shall not be affected by any variation of terms
of contract in future. Guarantee expressly waived his right to claim discharge
under any provision of contract on any ground. All admissions and
acknowledgements of debt, obligation, balance confirmations, part payments
etc. by the principal debtor shall be binding on the guarantor. Thus, in view
of the provisions as contained in the deed of guarantee, the Appellant's claim
that it stands discharged in view of the resignation is not at all tenable.
46. Since clauses 3 and 8 of the Deed of Guarantee have been extensively
relied upon by both sides, we are delving into herein after.
47. The Appellant relies on clause 3 of the Deed of Guarantee which is
extracted as below:
"3. The Lead Bank shall have the fullest liberty without affecting, this Guarantee to vary the amounts of the Individual limits of the above mentioned credit facilities as may be agreed upon from time to time between the Lead Bank and the Borrower subject to the aggregate thereof not exceeding the principal sum and/or to postpone for any time or from time to time enforce or forbear to enforce any remedies or securities available to the Lead Bank AND the Guarantors shall not be released by any exercise by the Lead Bank of its liberty with reference to the matters aforesaid or any of them or by reason of time being given to the Borrower or of any other forbearance act or omission on the part of the Lead Bank or any other indulgence by the Lead Bank to the Borrower or by any other matters or things whatsoever which under the law relating to sureties would but for this provision have the effect of so releasing the Guarantors."
Company Appeal (AT) (Insolvency) No. 494 of 2024 30 of 40
48. However, from a plain reading of this clause, it is clear that only a
change within the existing overall limits of the credit facilities was
contemplated, which would not have the impact of releasing a personal
guarantor from their liability. However, in the present case, it is not where the
internal limit has been enhanced or varied within the overall limits. Thus, the
deed of guarantee itself implies that if in case there is an enhancement of
overall credit facilities, the personal guarantor would be deemed to be
discharged. The Appellant claims that in this case there has been variance,
as there has been an increase in the overall limits of almost ₹168 crores, which
materially impacts the liability of the sureties. Therefore, such variance would
necessarily be considered as material, warranting a complete discharge of the
guarantor.
49. Vehemently countering this argument Respondent SBI brings to our
notice that the renewal of Sanction Letter dt. 01.01.2019, even if assumed to
have been put in effect, did not cause any enhancement of facilities by the
SBI which continued to remain @ ₹117/- crores. Various clauses of deed of
guarantee dated 17.10.2017 including the Clause Nos. 8, 11 and 14 per which
guarantees were continuing and any modification or variation to the terms of
loan would not affect the liability of the Appellant to the extent of limits
secured under the said deed of Guarantee Deed dated 17.10.2017 i.e. ₹907/-
crores qua the consortium and ₹117/- crores qua the SBI. Even otherwise the
respondent SBI never enhanced the loan facilities thereby varying the total
liability of the Appellant against the SBI.
Company Appeal (AT) (Insolvency) No. 494 of 2024 31 of 40
50. Qua the claim of the Appellant of discharge in view of variation of terms
of contract and alleged novation, we observe that after the grant of credit
facility for an amount of ₹117/- crores (constituted of fund based facilities of
₹10.00 crores and non-fund based facilities of ₹107.00 crores) to the CD vide
Letter of Arrangement dated 11.10.2017, there had never been any further
variation or enhancement by the Respondent/SBI. We further observe that
the renewal of facilities would not amount to variation. This is clear from the
Renewal letter dated 01.01.2019 and subsequent notices including Loan
Recall and Demand Notice dt. 15.11.2021 and OA No. 556 of 2022 titled "SBI
vs. Technofab Engineering Limited & Ors." filed before the DRT-I, New
Delhi.
51. Now we briefly delve into the issue of the appellants' claim that Clause
8 of the deed of the guarantee has been incorrectly interpreted by the
Adjudicating Authority. The clause 8 is extracted as below:
"8. The Guarantee herein contained is a continuing one for all amounts advanced by the Lead Bank to the Borrower in respect of or under the abovementioned credit facilities as also for all interest, costs and other money which may from time to time become due and remain unpaid to the Lead Bank thereunder and shall not be determined or in any way be affected by any account or accounts opened or to be opened by the Lead Bank becoming nil or coming into credit at any time or from time to time or by reason of the said account or accounts being closed and fresh account or accounts being opened in respect of fresh facilities being granted within the overall limit sanctioned to the Borrower."
52. We note that Clause 8 clearly states that "the guarantee herein
contained is a continuing one for all amounts advanced by the lead bank to the
borrower in respect of or under the above-mentioned credit facilities, as also of
all interest, commission and other money which may from time to time become
Company Appeal (AT) (Insolvency) No. 494 of 2024 32 of 40 due and remain unpaid to the lead bank thereunder....". We note that the
guarantee, as in the present Deed of Guarantee, is a continuing one and
cannot be discharged by the resignation of the director from the Corporate
Debtor and the argument of the Appellant that the adjudicating authority has
incorrectly interpreted Clause 8 of the Deed of Guarantee is not sustainable.
Therefore, the argument of the Appellant that, in terms of the Deed of
Guarantee which contemplates revisions and modifications within the first
facility limit of ₹907/- crores, is entitled to a discharge of his personal
guarantee is not tenable. Thus, we do not find any infirmity in the order of
the adjudicating authority that if there is any increase in the sanction limit
without the consent of the guarantor, then also he shall still be liable for the
debt which existed prior to its variance.
53. With respect to the applicability of Section 1291 of the Indian Contract
Act, 1872, a continuing guarantee is defined as a guarantee which extends to
a series of transactions. The Appellant claims that it had resigned from the
directorship of the corporate debtor and the CD had addressed multiple
communications to the consortium of banks regarding the resignation of the
Appellant as Director of the CD and release of his guarantee. Thus, the
continuing guarantee, if any, of the Appellant has to be deemed to be revoked
under Section 130 of the Indian Contract Act, 1872. However, a plain reading
of Section 130 of the Indian Contract Act indicates that, the same can be
revoked only qua the future transactions, and that is by way of notice to the
1
129. "Continuing guarantee".--A guarantee which extends to a series of transactions, is called a "continuing guarantee".
Company Appeal (AT) (Insolvency) No. 494 of 2024 33 of 40 creditor. However, in the present case, no notice of revocation was ever issued
by the Appellant to the creditor, that is, the respondent State Bank of India
and the request for release to United Bank of India or Bank of India was
accepted by the lenders.
54. Therefore, in view of the aforesaid clauses of the Deed of Guarantee, the
resignation of the Appellant from the Corporate Debtor shall not discharge
him from the continuing and irrevocable guarantee admittedly executed by
him in favor of the Respondent Bank and other lenders. Therefore, the
Appellant cannot claim revocation of the continuing guarantee under Section
130 of the Act, which mandatorily requires a notice of revocation, and such
revocation operates only qua future transactions as per Section 130 of the
Act.
55. With reference to the argument of the Appellant that it stands
discharged in view of the variation of the terms of contract and alleged
novation2, we note that after the grant of credit facility for an amount of
₹117/- crores to the CD with a letter of arrangement dated 11.10.2017, there
had never been any further variation or enhancement by the Respondent/SBI.
Moreover, as per sanction letter dated 01.01.2019, which was renewal of
working capital, the terms of this letter were to be accepted by the
borrowers/guarantors - which was not done by the borrower or guarantor.
2 Section 62. Effect of novation, rescission, and alteration of contract.
If the parties to a contract agree to substitute a new contract for it, or to rescind or alter it, the original contract, need not be performed.
Company Appeal (AT) (Insolvency) No. 494 of 2024 34 of 40 including the Appellant. So the same was never put into effect. Thus, we agree
with the submission of the Respondent that renewal of facilities would not
amount to variation.
56. The Respondent has placed its reliance on the judgment of the
Honorable Supreme Court of India in HR Basavraj versus Canara Bank
[2010 (2) SCC 458) which has also cited the position as was in Sitaram
Gupta versus PNB [2008 (5) SCC 711]. The relevant paras 16, 17, 18, 19 of
this judgment are extracted as below:
XXX
16. On the principles of continuing guarantee, the position was cleared by a decision of this Court in Sita Ram Gupta v. Punjab National Bank whereby it was held that it was not open to a party to revoke a guarantee when he had agreed to it being a continuing one and thus would be bound by the terms and conditions of the agreement executed at the time of entering into the guarantee. In the present facts and circumstances, we, therefore, do not find any difficulty in affirming the concurrent findings of the High Court and of the trial court on the point that the agreement executed for the purpose of a continuing liability despite the variation of terms of the contract and in the absence of a specific written document by Basavaraj (since deceased) revoking the guarantee, the guarantee stands and the legal representatives of the deceased are liable to repay the loan.
17. With regard to the second issue, the learned counsel for the appellants contended that the contract between JKNP, the Bank and the guarantor Basavaraj had been substituted by a fresh contract by which LST was required to liquidate the amount outstanding. The learned counsel based this on two facts mainly. One was the transfer of the loan accounts from JKNP to LST and the other factor was the deposit of amounts by the Receivers appointed by the court in OS No. 4 of 1977 for liquidation of outstanding amounts of money indeed gives rise to substitution by a new contract. The respondents on the other hand contended that substitution of an old contract by a new one under Section 62 of the Act would require the express consent on behalf of both the parties.
Company Appeal (AT) (Insolvency) No. 494 of 2024 35 of 40
18. Now let us examine Section 62 of the Act which reads as follows: "62.
Effect of novation, rescission and alteration of contract. If the parties to a contract agree to substitute a new contract for it, or to rescind or alter it, the original contract need not be performed."
This section gives statutory form to the common law principle of novation. The basic principle behind the concept of novation is the substitution of a contract by a new one only through the consent of both the parties to the same. Such consent may be expressed as in written agreements or implied through their actions or conduct. It was defined thus by the House of Lords in Scarf v. Jardine: (AC p. 351) "... that there being a contract in existence, some new contract is substituted for it, either between the same parties (for that might be) or between different parties; the consideration mutually being the discharge of the old contract."
19. It might be useful at this juncture to turn to the decision of this Court in Lata Construction v. Dr. Rameshchandra Ramniklal Shah whereby this Court held that if the rights under the old contract were kept alive even after the second agreement and rights under the first agreement had not been rescinded, then there was no substitution of contracts and, hence, no novation.
XXX
The above judgments fully support the arguments of Respondent - SBI. From
the above judgements, we note that the principles governing the continuing
guarantee and revocation. A continuing guarantee would mean that it is not
open to a party to revoke a guarantee when he had agreed to it being a
continuing one. He would thus be bound by the terms and conditions of the
agreement executed at the time of entering into the guarantee. Novation is the
substitution of a contract by a new one only through the consent of both
parties to the same. It can happen only through the mutual consent of both
parties. Consent may be expressed, as in written agreements, or implied
through actions or conduct.
Company Appeal (AT) (Insolvency) No. 494 of 2024 36 of 40
57. We further note that, as per Section 133 of the Indian Contract Act
1872, any variance made without the surety's consent, in terms of the
contract between the principal debtor and the creditor, discharges the surety
as only qua the transactions subsequent to the variance. The surety continues
to be liable for transactions affected before such variation. Such a position
has been held in the pronouncements of this Appellate Tribunal in various
cases as noted herein under:
o SBI Vs. Guourishankar Poddar & Anr [2024 SCC Online NCLAT 2014] - para Nos. 26, 30, 32, 36, 40 to 42 & 46-47.
o Sri Vibu Venkatsubramanian vs. State Bank of India & Anr. [Company Appeal (AT) (Insolvency) No. 1228 of 2024 dt. 26.02.2026]"
58. With reference to registration of debt with NeSL (i.e. information utility)
is concerned the argument of the appellant that the amount overdue is
indicated 0.00 is misconceived. The debt registration commenced from March
2018 (after disbursement is in pursuance to loan and guarantee document
dated 17.10.2017). Till 30.04.2019 the amount overdue is indicated 0.00
since the account was either running regular or had only slipped in the
category of SMA-0 with default up to 30 days in April 2019. Thereafter the
account having slipped in the category of SMA1 & 2, the amount overdue is
indicated to be ₹2,72,00,999.00 and after NPA classification on 27.06.20219,
the defaulted amount is indicated as ₹15,61,66,989.00. Nowhere it indicates
that there was a fresh debt in pursuance to the Renewal Letter dated
01.01.2019, not guaranteed by the Appellant. Thus, the debt, as claimed by
the SBI was only emanating from the loan documents executed on
17.10.2017.
Company Appeal (AT) (Insolvency) No. 494 of 2024 37 of 40 Conclusions
59. In the facts and circumstances of the case, we find that the Appellant
has assailed the impugned order mainly on two grounds.
60. Firstly, on the claims that even before the classification of the account
of the Corporate Debtor as NPA on 26.06.2019, the Appellant had already
resigned from directorship of the CD on 08.03.2018, we are not satisfied with
the argument of the appellant that his guarantee cannot be revoked.
61. Perusal of deed of Guarantee dated 17.10.2017 signed by the appellant
would reveal the that the Liability of the Guarantor was payable on demand
(Clause 1); for the purpose of enforcement of the Guarantee, the Guarantors
shall be deemed to the principal debtor (Clause 7); Guarantee is continuing
in nature and is irrevocable; Guarantee is enforceable against the Guarantor
irrespective of dispute between the Bank & borrower (Clause Nos. 8 & 11);
Guarantee shall not be affected by any variation of terms of contract in future
(Clause 3 & 14); Guarantee expressly waived his right to claim discharge
under any provision of Contract Act on any ground (Clause 18); all admissions
& acknowledgments of debt/balance confirmations, part payments etc. by the
principal debtor shall be binding on the Guarantor (Clause 12 & 19).
62. Appellant's extensive reliance on the Indian Contract Act 1872,
particularly on the provisions relating to novation (Section 62), continuing
guarantee (Section 129), revocation of continuing guarantee (Section130) and
discharge of the guarantor (Section 133) is misplaced. Even under Section
129 of the Indian Contract Act, 1872 a continuing guarantee is defined as
Company Appeal (AT) (Insolvency) No. 494 of 2024 38 of 40 a guarantee which, extends to a series of transactions and the same can be
revoked under Section 130 of the Act only qua the future transactions.
63. On the second ground that there were variations in the terms of the
contract after the resignation of the Appellant from directorship of the CD on
08.03.2018, we do not find any novation of the contract per Section 62 of
the Indian Contract Act in 18723 as there had never been any further variation
or enhancement by the Respondent/SBI. We further conclude that the
renewal of facilities would not amount to variation. The arguments of the
appellant that since, the facilities stood enhanced by the lenders, including
Bank of India, therefore, the contract stood novated, and the Appellant stood
discharged. We find that the Appellant had signed a deed of guarantee which
does not stand revoked by the resignation of the Appellant from the
directorship of the Corporate Debtor. Therefore, both these grounds cannot
be sustained.
64. We further observe that the Respondent SBI gets full assistance from
the judgment of Hon'ble Supreme Court of India in HR Basavraj versus
Canara Bank 2010 (2) SCC 458) and Sitaram Gupta versus PNB [2008 (5)
SCC 711].
65. We also observe that the reliance placed by the appellant on the
judgment of the Honorable Supreme Court in Dilip B Jirajka (supra) is
3 Section 62. Effect of novation, rescission, and alteration of contract.
If the parties to a contract agree to substitute a new contract for it, or to rescind or alter it, the original contract, need not be performed.
Company Appeal (AT) (Insolvency) No. 494 of 2024 39 of 40 misplaced as all the objections of the personal guarantors have been noted by
the Adjudicating Authority and it has not mechanically agreed with the report
of the Resolution Professional. We do not agree with the arguments of the
Appellant that there has been no independent assessment of the objections of
the appellant and we cannot dismiss the commencement of personal
insolvency proceedings against the appellant on this ground.
Order
66. Based on the above analysis we find that there is no justification in the
arguments of the appellant and therefore we are inclined to dismiss the
appeal. Accordingly, the Appeal is dismissed. All related IAs are also
dismissed. No orders as to costs.
[Justice N Seshasayee] Member (Judicial)
[Arun Baroka] Member (Technical)
New Delhi.
July 06, 2026.
pawan
Company Appeal (AT) (Insolvency) No. 494 of 2024 40 of 40
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free