Mr. Arun Mittal vs Sun Control Systems & Anr
- CitationCompany Appeal (AT) (Insolvency) No. 298 of 2022
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority, when examining a Section 9 application, must determine (i) whether there is an operational debt exceeding Rs. 1 lakh, (ii) whether the documentary evidence shows that the debt is due and payable and has not been paid, and (iii) whether a dispute existed between the parties, or a suit or arbitration was pending, before receipt of the demand notice; if any condition fails, the application must be rejected. A debt does not cease to be due and payable merely because the creditor's invoice is subject to conditions on release of payment; where an operational debt has arisen and become due and an invoice has been raised, conditions attached to payment do not alter the character of the debt or detract from its being due and payable. Where payment terms under a supply-and-installation contract are linked to installation, a creditor who has completed installation in part is entitled to payment pro rata on the completed portion, and the debtor cannot insist on completion of the entire project before any payment falls due absent an express embargo in the payment terms. A dispute that is raised only after the statutory demand notice, unsupported by prior correspondence or documentary material, does not establish the pre-existence of a dispute for the purposes of Section 9.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No. 298 of 2022 [Arising out of order dated 28.02.2022 passed by the Adjudicating Authority, National Company Law Tribunal, New Delhi, Bench-VI in (IB)- 2185/(ND)/2019]
IN THE MATTER OF:
Mr. Arun Mittal Member of the Suspended Board of Directors of Aarcity Infrastructure Pvt. Ltd. A-201 Omaxe Forest SPA, Sector 93-B, Noida - 201301. ...Appellant
Versus
1. Sun Control Systems Plot No. 88, Phase-IV, Sector-57, Kundli, Sonipat, Haryana - 131028. .... Respondent No.1
2. Mr. Arun Chadha Interim Resolution Professional 727, Brahmpuri, Meerut Uttar Pradesh - 250002. ....Respondent No.2
Present: For Appellant: Mr. Abhijeet Sinha, Mr. Kunal Godhwani, Advocate. For Respondent: Mr. Bhuvan Arora, Mr. Ramesh Gupta, Mr. Aakash Bhardwaj, Advocates for R-1. Mr. Sanjay Pal, Mr. Rishi Sood, Advocates for IRP. Mr. Parv Garg, Mr. Pawas Kulshreshtha, Mr. Piyush Hans, Advocates for Interveners (I.A. No. 2606/2022) Mr. Harsh Pratap Shahi, for itervener in I.A. No. 1697 of 2022
Company Appeal (AT) (Insolvency) No. 298 of 2022
1 JUDGMENT
[Per: Barun Mitra, Member (Technical)]
The present appeal, filed u/s 61 of the IBC Code, 2016 ('IBC' in short) by
the Appellant arises out of order dated 28.02.2022 (hereinafter referred to as
'Impugned Order') passed by the Adjudicating Authority (National Company Law
Tribunal, Delhi Bench-VI) in C.P.(IB) No. 2185(ND)/2019. By the Impugned
Order, the Adjudicating Authority admitted the Section 9 application under IBC
filed by the Operational creditor and initiated Corporate Insolvency Resolution
Process ('CIRP' in short) against the Corporate Debtor with immediate effect.
Aggrieved by this impugned order, the present appeal has been preferred by the
Corporate Debtor.
2. The brief facts of the case necessary to be noticed for deciding the appeal
are :-
(a) The Corporate Debtor, Aarcity Infrastructure Pvt. Ltd., present Appellant
issued a Work Order to Sun Control Systems, Operational Creditor/ Respondent
No. 1 to supply and install UPVC Profile of doors and windows including
toughened glasses of Tower-A (81 Units) and Tower - F (86 Units) @ Rs. 376.50/-
per sq. ft. in the Regency Park Project of the Corporate Debtor/Appellant. This
work order was issued on 10.06.2016.
Company Appeal (AT) (Insolvency) No. 298 of 2022
2
(b) The Corporate Debtor issued another work order on 05.05.2017 to supply
and install UPVC Profile of doors and windows including toughened glasses for
Tower-D (60 Units) of the above project @ Rs. 333/- per sq. ft.
(c) On 16.08.2017 another work order for additional work at Tower-A and
Tower-D was also issued.
(d) The payment terms for the work orders are as follows:-
a) 30% advance along with order;
b) 50% after delivery of material at site;
c) 15% after installation at site;
d) 5% retention after six months of completion of installation;
e) Work Contracts Tax (WCT) and Tax Deduction at Source (TDS) to be
deducted as per Rules; and
f) Service Tax to be paid extra as applicable.
(e) The details of the Purchase Orders Invoices, Debit Notes and RA bills
alongwith Invoice nos. as raised by Respondent No. 1 have been taken due note
of by the Adjudicating Authority in Para 1 (iii) of the impugned order.
(f) The present Respondent No. 1 filed an application before the
Adjudicating Authority under Section 9 of the Insolvency and Bankruptcy Code,
2016 ('IBC' in short) seeking to initiate CIRP against the Corporate Debtor on Company Appeal (AT) (Insolvency) No. 298 of 2022
3 27.08.2019. This was preceded by Statutory Demand Notice under Section 8
of IBC sent by Respondent No. 1 to the Corporate Debtor on 03.06.2019
claiming Rs. 56,38,850/-(Rupees fifty six lakh thirty eight thousand eight
hundred fifty only) as operational debt. The Corporate Debtor replied to the
Demand Notice on 10.06.2019 mentioning that more than 50% of work not
having been completed and there being defects in the execution of work,
payment for entire work cannot be demanded.
(g) The Adjudicating Authority vide impugned order dated 28.02.2022 came
to the conclusion that there being clear indication of an operational debt due
from the Corporate Debtor and the Corporate Debtor having defaulted in
making payment of the debt due and further in the absence of any pre-existing
dispute relating to the said debt, admitted the Section 9 application filed by
Respondent No. 1 and ordered initiation of CIRP.
(h) Aggrieved by the above order of the Adjudicating Authority, the Corporate
Debtor/Appellant has preferred this Appeal praying for termination of CIRP
process initiated against the Corporate Debtor.
3. The Learned Counsel for Appellant while introducing his arguments
submitted that in the present case before admitting the Section 9 application,
the Adjudicating Authority ought to have first satisfied himself that an
operational debt was actually in existence, and that the said debt had become Company Appeal (AT) (Insolvency) No. 298 of 2022
4 due and payable. Stating that examination by the Adjudicating Authority on the
dispute aspect of the debt is only of secondary importance, Learned Counsel for
the Appellant in support of his contention referred to the judgement of Hon'ble
Supreme Court in the matter of Mobilox Innovations Pvt. Ltd. Vs. Kirusa
Software Private Limited (2018) 1 SCC 353 (hereinafter referred to as
'Mobilox') Elaborating further that the scope of work order was not limited to
mere supply of UPVC profile of doors and windows alongwith toughened glasses
but also for installation of the same, he argued that as the Respondent No. 1 had
not carried out the installation work in its entirety, therefore, the payment
terms were not triggered. In the absence of installation of goods, the payment
demanded by the Respondent No. 1 under Section 8 Notice was therefore neither
due nor payable. The Learned Counsel for Appellant has contended that without
ascertaining the debt being due and payable, the Corporate Debtor has been
wrongly subjected to the rigors of CIRP.
4. It has been further submitted that against bills for Rs. 1,18,61,393/-
(Rupees one crore eighteen lakhs sixty one thousand three hundred ninety three
only) raised by the Respondent No. 1, the Appellant has already paid a sum of
Rs. 92,62,856/- (Rupees ninety two lakhs sixty two thousand eight hundred fifty
six only) which roughly accounts for 80% of the invoice amount which
corresponds with the payment terms. The remaining 20% amount of Rs.
23,72,279/- (Rupees twenty three lakhs seventy two thousand two hundred
seventy nine only) was withheld because installation work was not completed Company Appeal (AT) (Insolvency) No. 298 of 2022
5 and that the amount so withheld was in consonance with the terms of payment
which provided for 15% payment to be made after installation and 5% payment
after 06 months of installation. Further stating that the amount payable to the
Respondent No. 1 is only Rs. 2,26,258/- (Rupees two lakhs twenty six thousand
two hundred fifty eight only), it has also been added that this amount however
has neither been accepted nor demanded by Respondent No. 1 from the
Corporate Debtor/Appellant towards final settlement and hence not paid. It has
also been argued that the Adjudicating Authority should not have relied upon
the contents of an unsigned Memorandum of Understanding ('MoU' in short) as
admission of debt. Though it had been sent to the Respondent No.1 by the
Corporate Debtor, it was an outside court settlement without prejudice to the
rights of parties.
5. The Learned Counsel for Appellant vehemently objected to the outstanding
amount of Rs. 56,38,550/- (Rupees fifty six lakhs thirty eight thousand five
hundred fifty only) claimed by the Respondent No. 1 as bogus, sham and illegal.
It was pointed out that the Respondent No. 1 by his own admission had
completed installation only in 49 flats of Tower-A and 20 flats in Tower-D as
reflected at paras 8 and 12 at pages 3 and 4 of his reply and hence the amount
claimed in the Section 8 demand notice as operational debt had not became
due. It has been further pointed out that in respect of Tower-F, though the
Respondent No.1 has claimed that installation has been carried out in two flats,
no invoice has been raised. It has been also pointed out that Respondent No.1 Company Appeal (AT) (Insolvency) No. 298 of 2022
6 having admitted that the installation work could be carried out and completed
only wherever openings for installation of UPVC doors and windows were ready
indicates that installation work was not fully completed. Moreover, it has been
argued that the work order was in respect of a composite contract and the
installation amount is payable only after complete installation at the respective
towers and not flat-wise installation. Hence payment was not triggered and
therefore no debt was either due or payable. It has also been claimed that the
Corporate Debtor/Appellant had to engage third party to complete the
installation work as the same could not be completed by the Respondent No.1.
The Learned Counsel for Appellant has also contended that the Respondent No.
1 had charged price over and above what was specified in the work order.
6. Submission has also been made that the claim of Respondent No.1 that
only Rs. 83,93,717/- (Rupees eighty three lakhs ninety three thousand seven
hundred seventeen only) has been paid by the Corporate Debtor is false and
baseless as it does not take into account part payment made towards WCT and
TDS amounting Rs. 3,77,407/- (Rupees three lakhs seventy seven thousand four
hundred seven only). Explaining that further payments could not be made
because of non-reconciliation of accounts and submission of final invoices,
reliance has also been placed on judgment of this Tribunal in Amitabh Roy Vs.
Master Development Management(India)Pvt. Ltd. in Company Appeal
(AT)(Ins.) No. 274 of 2022 that default in WCT and TDS payment cannot be a
ground for invoking Section 9 of IBC.
Company Appeal (AT) (Insolvency) No. 298 of 2022
7
7. Refuting the submissions of the Appellant, the Learned Counsel for
Respondent No.1 has claimed that against total invoices raised amounting Rs.
1,18,61,078/- (Rupees One crore eighteen lakhs sixty one thousand seventy
eight only), a total of Rs. 94,88,862/- (Rupees ninety four lakhs eighty eight
thousand eight hundred sixty two only) being 80% of the work order amount had
become due and payable as material had already been delivered on site as per
payment terms. As against this, payment received was Rs. 83,93,717/- (Rupees
eighty three lakhs ninety three thousand seven hundred seventeen only) only
which accounts for only 70% of invoices raised. It has therefore been claimed
that payment of Rs. 10,95,145/- (Rupees ten lakhs ninety five thousand one
hundred forty five only) was due and payable and continues to remain unpaid.
It has been further claimed that out of the withheld amount of Rs. 23,72,215/-
(Rupees twenty three lakhs seventy two thousand two hundred fifteen only),
payment had become due and payable for Rs. 14,64,843/- (Rupees fourteen
lakhs sixty four thousand eight hundred forty three only) since 92 out of 149
flats had already been completed in Tower - A (66 units) and Tower-D (26 units)
as per admission made by Corporate Debtor/Appellant at pg. 140-142 of Appeal
Paper Book. It has been admitted that installation in respect of 2 flats in Tower-
F has been completed though invoice could not be raised. The total amount
claimed to be in debt and default is Rs. 56,38,850/- (Rupees fifty six lakhs thirty
eight thousand eight hundred fifty only) including interest upto 31.05.2019.
Company Appeal (AT) (Insolvency) No. 298 of 2022
8
8. Learned Counsel for Respondent No.1 has also stated that the claim of
Corporate Debtor/Appellant that payment of Rs. 92,62,856/- (Rupees ninety two
lakhs sixty two thousand eight hundred fifty six only) has been made is incorrect
as substantiated by bank statement at pages 62-81 in Reply Paper Book of
Respondent No. 1 indicating receipt of only Rs. 83,93,717/- (Rupees eighty three
lakhs ninety three thousand seven hundred seventeen only) thus leaving an
outstanding amount of Rs. 8,69,139/- (Rupees eight lakhs sixty nine thousand
one hundred thirty nine only). Further, it has been pointed that payments which
were made to a third party have been wrongly shown in the ledger statement of
Respondent No.1 and therefore these amounts need to be discounted. Further
deductions of Rs. 3,77,407/- (Rupees three lakhs seventy seven thousand four
hundred and seven only) made towards WCT and TDS by the
Appellant/Corporate Debtor have not actually been deposited. Pointing out a few
other instances where higher payments have been claimed while actually lesser
amount has been remitted by Corporate Debtor/Appellant, it has been submitted
that these are cases of intentional misrepresentation.
9. As regards the issue of exorbitant rate having been charged by the
Respondent No. 1, this has been rebutted as a frivolous ground since no such
dispute was raised prior to issue of demand notice. Pointing out that the
Corporate Debtor/Appellant has failed to adduce any documentary evidence to
substantiate the existence of any dispute prior to issue of demand notice, the
Learned Counsel for the Respondent No.1 relied on the ratio of the Mobilox Company Appeal (AT) (Insolvency) No. 298 of 2022
9 judgment (supra) that dispute raised should not be an assertion of fact
unsupported by evidence or a feeble legal argument.
10. The Learned Counsel for the Respondent No.1 has further contended that
the Corporate Debtor/Appellant has clearly admitted that it owes an amount of
Rs. 2,26,258/- (Rupees two lakhs twenty six thousand two hundred fifty eight
only) to the Respondent No.1 and the said amount remains unpaid and being
more than the minimum threshold of Rs. 1 lakh, default has been triggered. In
support of his contention, he referred to the judgment of the Hon'ble Apex Court
in M/s Innoventive Industries Ltd. Vs. ICICI Bank & Anr (2018)1 SCC 407
that default is defined in Section3(12) in very wide terms as meaning non-
payment of a debt once it becomes due and payable, which includes non-
payment of even part thereof or an instalment amount.
11. We have duly considered the detailed arguments and submissions
advanced by the Learned Counsel for both the parties and perused the records
carefully.
12. The short point for our consideration is whether payment to the
Operational Creditor/Respondent No. 1 as per work order is triggered in the
present case giving rise to an operational debt, and if so, whether a default has
been committed by the Corporate Debtor/Appellant in respect of payment of
such operational debt having already become due and payable and whether the
said operational debt exceeds an amount of Rs. 1 lakh and is an undisputed Company Appeal (AT) (Insolvency) No. 298 of 2022
10 debt. This examination would be in consonance with the test which has been
laid down by the Hon'ble Supreme Court in Mobilox judgment(supra) for the
Adjudicating Authority while examining an application under Section 9, the
relevant excerpts of which are as follows:-
"34. Therefore, the adjudicating authority, when
examining an application under Section 9 of the Act will have
to determine:
(i) Whether there is an "operational debt" as defined
exceeding Rs. 1 lakh? (See Section 4 of the Act)
(ii) Whether the documentary evidence furnished with
the application shows that the aforesaid debt is due and
payable and has not yet been paid? and
(iii) Whether there is existence of a dispute between the
parties or the record of the pendency of a suit or arbitration
proceeding filed before the receipt of the demand notice of
the unpaid operational debt in relation to such dispute?
If any of the aforesaid conditions is lacking, the application
would have to be rejected. Apart from the above, the
adjudicating authority must follow the mandate of Section 9,
as outlined above, and in particular the mandate of Section
9(5) of the Act, and admit or reject the application, as the case
Company Appeal (AT) (Insolvency) No. 298 of 2022
11 may be, depending upon the factors mentioned in Section
9(5) of the Act."
13. It is an admitted fact that three separate work orders were issued on
10.06.2016, 05.05.2017 and 16.08.2017 for supply and installation of UPVC
profile of doors and windows including toughened glasses on payment terms as
at para 2(d) above. Based on the said purchase orders, the Respondent No.1
raised invoices from 22.09.2015 till 28.12.2018 which have been duly recorded
by Adjudicating Authority at para 1(iii) of the impugned order. Without going
into the intricacies of minutely examining the account statements, the ledger
accounts relied upon by the appellant (at pages 143-146 of the Appeal Paper
Book) and also by the Respondent No. 1 in his written submissions before the
NCLT (at pages 178-181 of the Appeal Paper Book) has also been considered by
us alongwith other material records. It is further noted that while the Corporate
Debtor/Appellant has claimed that bills raised against these invoices amounts
to Rs. 1,18,61,393/- (Rupees one crore eighteen lakhs sixty one thousand three
hundred ninety three only) the Respondent No.1 has claimed an amount of Rs.
1,18,61,078/- (Rupees one crore eighteen lakhs sixty one thousand seventy
eight only). The variance between the two figures being nominal, we choose to
ignore the difference. We, however, find that while Corporate Debtor/Appellant
has claimed to have paid Rs. 92,62,856/- (Rupees ninety two lakhs sixty two
thousand eight hundred fifty six only), the Respondent No. 1 has claimed to
Company Appeal (AT) (Insolvency) No. 298 of 2022
12 have received only Rs. 83,93,717/- (Rupees eighty three lakhs ninety three
thousand seven hundred seventeen only). It is pertinent to note that the
Corporate Debtor/Appellant has admittedly held back an amount of Rs.
23,72,215/- (Rupees twenty three lakhs seventy two thousand two hundred
fifteen only) on the ground that 15% payment was to be released after
installation and 5% amount as defect liability to be released after 6 months.
Again, by their own admission, we note that the Corporate Debtor/Appellant
has submitted at page 141 of the Appeal Paper Book that the Respondent No.1
completed installation in 92 out of 149 flats which accounts for 62% completion
of installation work. It logically follows that Respondent No.1 was entitled to
receive 62% payment from out of the retained amount, on pro-rata basis for the
completed installations. If that be the case, then payment to the tune of Rs
14.70 lakhs had become due and payable as per payment terms and for which
invoices had also been raised. The contention of the Appellant that payment was
to be made only after full installation was completed in the respective towers
and not on flat-wise completion cannot be acceded to for the following reasons.
Firstly, it fails to explain why composite payment was not insisted upon tower-
wise for the 80% amount for material delivery and RA bills were accepted.
Secondly, from a plain reading of the payment terms, we do not find any
embargo having been placed on the Operational creditor from claiming flat-wise
payments as long as the installation was complete.
Company Appeal (AT) (Insolvency) No. 298 of 2022
13
14. Furthermore, we are in agreement with the assertion made by the Learned
Counsel for Respondent No. 1 that Corporate Debtor/Appellant has in any case
admitted that it owes an operational debt amounting Rs. 2,26,258/- (Rupees
two lakhs twenty six thousand two hundred fifty eight only) to Respondent No.1
which is yet to be paid. The explanation given by Corporate Debtor/Appellant
for not releasing this payment to Respondent No. 1 is that this amount has not
been demanded by them and that they have not agreed to accept this amount
as a final payment. To our mind, this is a lame excuse to posit a justification
to cover grounds for not having paid an admitted debt that had become due and
payable. Moreover, when the operational debt had already arisen and become
due, and invoice was also raised, in such circumstances, merely placing of
conditions prior to release of payment, does not alter the colour and character
of the operational debt and does not detract from its having become due and
payable. The above findings clearly establish that the first two conditions laid
down in the Mobilox judgment supra of operational debt exceeding Rs. 1 lakh
and having become due and payable but not yet paid is squarely met.
15. This now brings us to the third aspect as to whether there is existence of
dispute between the parties. Records reveal that no disputes were raised prior
to the issuance of statutory demand notice on 03.06.2019 under Section 8 of
the IBC. There is no exchange of correspondence raising any dispute prior to
issue of demand notice. We note that three grounds have been raised but all
post issue of demand notice. One ground is that there are defects in the work
Company Appeal (AT) (Insolvency) No. 298 of 2022
14 executed which was contained in the reply to the demand notice sent on
10.06.2019. However, it is a cryptic letter and does not flesh out any details
and therefore lacks sufficient gravitas. The second ground as cited in the same
reply dated 10.06.2019 is that 50% work is not completed but again no
supporting documents are available on record to show exchange of any
sustained correspondence with the Operational creditor having taken place in
this regard prior to issue of demand notice. The other ground raised is that of
exorbitant rates being charged by the Operational creditor but that too has also
been raised post issue of demand notice. There is nothing on record to suggest
that the Corporate Debtor/Appellant raised any such dispute before receipt of
invoices or at any period prior to the issue of demand notice. Thus even on the
third test laid down by Mobilox judgment supra we find that there is nothing
credible to substantiate the pre-existence of dispute.
16. At this stage we would also like to refer to the judgment of the Hon'ble
Apex Court in "Vidarbha Industries Power Limited Vs. Axis Bank Limited in
Civil Appeal No. 4633 of 2021 MANU/SC/0874/2022" explaining the
provisions of Sections 7 and 9 of the IBC as the precepts laid down therein are
also attracted in this case. The Hon'ble Supreme Court in the above matter
observed and held:
"76. The fact that Legislature used 'may' in Section 7(5)(a) of
the IBC but a different word, that is, 'shall' in the otherwise
almost identical provision of Section 9(5)(a) shows that 'may' and
Company Appeal (AT) (Insolvency) No. 298 of 2022
15 'shall' in the two provisions are intended to convey a different
meaning. It is apparent that Legislature intended Section 9(5)(a)
of the IBC to be mandatory and Section 7(5)(a) of the IBC to be
discretionary. An application of an Operational Creditor for
initiation of CIRP Under Section 9(2) of the IBC is mandatorily
required to be admitted if the application is complete in all
respects and in compliance of the requisites of the IBC and the
Rules and Regulations thereunder, there is no payment of the
unpaid operational debt, if notices for payment or the invoice has
been delivered to the Corporate Debtor by the Operational
Creditor and no notice of dispute has been received by the
Operational Creditor. The IBC does not countenance dishonesty
or deliberate failure to repay the dues of an operational creditor.
xxx xxx xxx
78. The Legislature has consciously differentiated between
Financial Creditors and Operational Creditors, as there is an
innate difference between Financial Creditors, in the business of
investment and financing, and Operational Creditors in the
business of supply of goods and services. Financial credit is
usually secured and of much longer duration. Such credits, which
are often long term credits, on which the operation of the
Corporate Debtor depends, cannot be equated to operational
Company Appeal (AT) (Insolvency) No. 298 of 2022
16 debts which are usually unsecured, of a shorter duration and of
lesser amount. The financial strength and nature of business of
a Financial Creditor cannot be compared with that of an
Operational Creditor, engaged in supply of goods and services.
The impact of the non-payment of admitted dues could be far more
serious on an Operational Creditor than on a financial creditor.
79. As observed above, the financial strength and nature of
business of Financial Creditors and Operational Creditors being
different, as also the tenor and terms of agreements/contracts
with financial creditors and operational creditors, the provisions in
the IBC relating to commencement of CIRP at the behest of an
Operational Creditor, whose dues are undisputed, are rigid and
inflexible. If dues are admitted as against the Operational
Creditor, the Corporate Debtor must pay the same. If it does not,
CIRP must be commenced....."
17. From the aforesaid discussion and analysis of facts and circumstances,
we are of the considered opinion that the Corporate Debtor/Appellant has
defaulted in the payment of operational debt, of an amount exceeding Rs 1 lakh,
which amount had clearly become due and payable, and further in the absence
of any pre-existing dispute, we find that no error has been committed by the
Adjudicating Authority in admitting the application under Section 9 of IBC and
initiating CIRP. We find no merit in this Appeal. Appeal is dismissed. No Costs.
Company Appeal (AT) (Insolvency) No. 298 of 2022
17 A clutch of homebuyers in Aarcity Regency Park have filed I.A. No. 2585/2022
in Company Appeal (AT)(Ins.) No. 298 of 2022 and prayed that IRP be directed
to not interfere with peaceful possession and enjoyment of property by the home
buyers and that funds collected from them for maintenance should not be
utilized for construction. The main appeal petition having been dismissed, we
are of the considered view that this Tribunal need not pass any orders on the
I.A.. With this, I.A. No. 2585 of 2022 stands disposed of, the applicant is at
liberty to file an appropriate application before the Adjudicating Authority in the
pending Company petition.
(Justice Ashok Bhushan) Chairperson
(Justice M. Satyanarayana Murthy) Member(Judicial)
(Barun Mitra) Member(Technical) Place: New Delhi Date: 20.09.2022 shashi
Company Appeal (AT) (Insolvency) No. 298 of 2022
18
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free