Mls Led Ltd vs Hq Lamps And Manufacturing
- CitationComp. App. (AT) (Ins) No. 578 of 2022
Ratio decidendi
The rule this decision rests on
Where an appeal under Section 61 of the Insolvency and Bankruptcy Code, 2016 is sought to be brought after the period of limitation, the limitation period runs from the date the impugned order is pronounced, not from the date it is uploaded or the date the appellant acquires knowledge of it. An application for condonation of delay must show sufficient cause; limitation is not to be condoned on considerations of equity or on a lenient approach to the applicant. A plea for exclusion of time spent obtaining a certified copy under Section 12 of the Limitation Act, 1963, raised for the first time in a rejoinder and unsupported by the averments in the application itself, is an afterthought that cannot be accepted as establishing sufficient cause. Since the application for condonation of delay fails, the appeal is not duly constituted and is liable to be dismissed.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
1
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Comp. App. (AT) (Ins) No. 578 of 2022 & I.A. No. 1548, 1549, 1550 of 2022 IN THE MATTER OF: MLS LED Ltd. ...Appellant Versus HQ Lamps & Manufacturing Company Pvt. Ltd. ...Respondent Present: For Appellant : Mr. Abhishek Malhotra, Ms. Subhalaxmi Sen, Advocates For Respondent : Mr. Alok Dhir, Ms. Varsha Banerjee & Mr. Kanish Khetan, Advocates. ORDER
Per: Justice Rakesh Kumar Jain:
I.A. No. 1548 of 2022: This application is filed seeking condonation of
delay of 10 days in filing the present appeal.
2. In brief, the Appeal has been filed by the Unsuccessful Applicant (MLS
LED Ltd.) whose application, bearing CP (IB) No. 219/ALD/2018, filed under
Section 9 of the Insolvency and Bankruptcy Code, 2016 (in short 'Code')
against HQ Lamps and Manufacturing Company Pvt. Ltd. (Respondent herein)
has been dismissed by the Adjudicating Authority (National Company Law
Tribunal, Allahabad Bench, Prayagraj).
3. The Appeal has been filed under Section 61(1) of the Code. The relevant
averments made in the application seeking condonation of delay are as
under:-
"It is submitted that the Impugned judgment was made available to the Appellant/signed and uploaded on the website of NCLT
Comp. App. (AT) (Ins) No. 578 of 2022 2
Allahabad only on 14.03.2022. Further, since the matter dates back to 2017-18 and owing to the voluminous nature of the files in the matter, there were certain delays in finalising the draft of the appeal"
4. The Respondent has filed the reply to this application in which it is
averred that the appellant has wrongly mentioned the number of days as 10
days in the application because the impugned order was passed on
02.03.2022, last date for filing the appeal, in terms of Section 61(2) of the
Code, was 01.04.2022, the extended period of 15 days expired on 16.04.2022
whereas the appeal has been filed on 20.04.2022 i.e much beyond the period
of 30+15=45 days and in view of the decision of the Hon'ble Supreme Court,
rendered in the case of National Spot Exchange Limited Versus Anil Kohli,
Resolution Professional for Dunar Foods Limited, Civil Appeal No. 6187 of
2019, delay beyond the period of 15 days cannot be condoned and the appeal
is thus not maintainable.
5. It is further averred in the reply that in the application, the Appellant
has wrongly calculated the period of limitation from the date of uploading the
order on the website of NCLT on 14.03.2022 because the limitation is not to
be counted from the date of knowledge but from the date of passing of the
order as has been held by the Hon'ble Supreme Court in the case of V.
Nagarajan Vs. SKS Ispat & Power Ltd., (2022) 2 SCC 244.
6. It is further averred in the reply that the Appellant/Applicant even did
not apply for the certified copy of the impugned order, therefore, it is not
entitled to seek exclusion of the period from the date of pronouncement of the
order till the date of its uploading for the purpose of counting the limitation.
Comp. App. (AT) (Ins) No. 578 of 2022 3
7. It is also averred that as per the decision of the Supreme Court,
rendered in the case of Lingeswaran Etc. Vs. Thirunagalingam [Petition (s) for
Special Leave to Appeal (C) Nos. 2054-2055 of 2022] decided on 25.02.2023,
it is imperative to show sufficient cause for the purpose of condonation of
delay as it cannot be condoned on equity.
8. The Appellant/Applicant has filed the rejoinder in which it is admitted
that the operative portion of the impugned order was pronounced in open
court on 02.03.2022 but it is stated that copy of the full judgment was made
available on 14.03.2022 when it was uploaded on the website of the NCLT.
9. It is also averred that clerk of the counsel who appeared before the
Adjudicating Authority kept a regular watch on the NCLT website after
02.03.2022 in order to check as to whether the full judgment has been
uploaded on the website or not which was ultimately uploaded on 14.03.2022.
Besides this, it is also averred that the Appellant had simultaneously applied
for the certified copy through the local counsel on 02.03.2022 which was
made available on 16.03.2022. It was promptly dispatched to the main
counsel's office at New Delhi but by mistake it was sent to the Appellant's
main counsel's previous office address and thus the certified copy was
misplaced. It is also averred that the local counsel for the Appellant made
several inquiries from the Registry of the NCLT but the record of the certified
copy could not be traced as the office of the Tribunal was shifted.
10. In the backdrop of the aforesaid averments made in the pleadings,
Counsel for the Appellant/Applicant has argued that the period spent for
obtaining the certified copy from 02.03.2022 to 16.03.2022 if deducted, the
Comp. App. (AT) (Ins) No. 578 of 2022 4
appeal would be within the period of 15 days which may be considered by this
Tribunal for condonation of delay.
11. On the other hand, Counsel for the Respondent has submitted that the
Appellant, in its anxiety, has set up various stories for the purpose of seeking
condonation of delay but neither of it is believable because the only averment
made in the application is that the copy of the order was uploaded on the
website of the NCLT on 14.03.2022, therefore, the limitation has been counted
from the said date instead of pronouncement of the order dated 02.03.2022,
therefore, it is alleged in the application that there is a delay of 10 days but
when the reply was filed by the Respondent and it was pointed out that the
limitation has to be counted from 02.03.2022 in view of the decision of the
Hon'ble Supreme Court in the case of V. Nagarajan (Supra) i.e. the date of
pronouncement of the order and not the date of knowledge and since the
period of 45 days had expired on 16.04.2022 and the appeal has been filed
on 20.04.2022, therefore, the appeal was clearly beyond the period of 45 days
and not maintainable in view of the decision of the Hon'ble Supreme Court in
the case of National Spot Exchange Limited (Supra), the Appellant has
changed the story in the rejoinder alleging that the certified copy was in fact
applied on 02.03.2022 and obtained on 16.03.2022 but it has been
misplaced, therefore, the period spent for obtaining the certified copy has to
be excluded. It is further submitted that the Appellant has wrongly averred
that it could not obtain the record from the Tribunal because its office was
shifted. It is argued by the Respondent that office of the Tribunal was shifted
three years before the passing of the impugned order and hence, the story
propounded by the appellant does not inspire confidence.
Comp. App. (AT) (Ins) No. 578 of 2022 5
12. We have heard Counsel for the parties and perused the record with their
able assistance.
13. Admitted facts of this case are that the impugned order was passed on
02.03.2022 and in this regard, the Respondent has appended the cause list
of 02.03.2022 as Annexure R3 with the reply in which the present appeal has
been shown as 'for pronouncement of order, Sr. No. P1, CP No.
(IB)219/ALD/2018 for order'. It is admitted by the Appellant in the rejoinder
that the order was pronounced in their presence. In such circumstances, the
decision of the Hon'ble Supreme Court delivered in the case of V. Nagarajan
(Supra) would apply which says that limitation shall start running from the
date of order whereas the case set up by the Appellant in the application is
that since the impugned order was uploaded by the Tribunal on 14.03.2022,
therefore, the limitation shall be counted from the said date and thus there is
a delay of 10 days in filing the present appeal.
14. In order to overcome the difficulties being faced, the Appellant has
developed a new story in order to take the advantage of Section 12 of the
Limitation Act, 1963 as per which the period spent by the office in preparing
the certified copy has to be excluded from the total period of limitation and in
this regard, it is alleged that after the order was pronounced on 02.03.2022
the certified copy was applied which was made available on 16.03.2022 but it
was mistakenly sent to the previous office address of the counsel at New Delhi
and was misplaced. The Appellant has not applied for the certified copy again
for the purpose of placing it on record. The story which has now been
propounded and made a part of their rejoinder is totally unbelievable because
Comp. App. (AT) (Ins) No. 578 of 2022 6
had it been a situation as suggested, it would have been the first averment in
the application itself instead of a plea in the rejoinder.
15. Thus, in our considered opinion, story propounded in the rejoinder is a
made-up story at the instance of the Appellant which cannot be believed and
as it has been held in the case of Lingeswaran Etc. (Supra) the limitation is to
be condoned on a sufficient cause and not on equity, the Appellant cannot
take any advantage of alleging that the Court should apply soft hand for the
purpose of considering the application for condonation of delay.
16. Thus, in view of the aforesaid discussion, we hardly find any merit in
the present application, much less sufficient cause, for the purpose of
condonation of delay, therefore, the application is found devoid of any merit
and the same is hereby dismissed though without any order as to costs.
Comp. App. (AT) (Ins) No. 578 of 2022 Since, the application for condonation of delay has been dismissed by
an order of even date, therefore, the appeal is found to be not duly constituted
and the same is hereby dismissed.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
[Mr. Indevar Pandey] Member (Technical) New Delhi 23rd April, 2024
Sheetal
Comp. App. (AT) (Ins) No. 578 of 2022
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free