Manish Jaju vs Malharshanti Enterprises & Ors
- CitationComp. App. (AT) (Ins) No. 545 of 2023
Ratio decidendi
The rule this decision rests on
A pre-existing dispute for the purposes of section 9 of the Insolvency and Bankruptcy Code is one that exists before the receipt of the operational creditor's demand notice under section 8; disputes raised only after that notice are irrelevant to determining pre-existence, so an application under section 9 that is otherwise complete must be admitted where no such prior dispute, notice of dispute, or record of pendency of suit or arbitration exists. Once a section 9 application has been admitted and the corporate insolvency resolution process initiated, and that order has been upheld by the Appellate Tribunal and the Supreme Court's withdrawal of the challenge has left it unreversed, the questions it determined, including pre-existing dispute and limitation, cannot be reopened in later proceedings and the resolution professional is bound to admit the operational creditor's claim accordingly. A resolution professional is a neutral party in the insolvency process and is not entitled to take a stand on the merits of an order against which he has filed an appeal in his personal capacity; an appeal so filed by the resolution professional on the merits is not maintainable as a matter of his role.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Comp. App. (AT) (Ins) No. 545 of 2023 & I.A. No. 1768 of 2023
(Arising out of the Order dated 16.02.2023 passed by the National Company Law Tribunal, Mumbai Bench, Court- III in IA No. 47 of 2021 in Company Petition being C.P.(IB) - 3753(MB)/2018)
IN THE MATTER OF:
Mr. Manish Jaju Resolution Professional of CAN Enterprises Pvt Ltd having his address at D 502, Neelkanth Business Park, Vidyavihar, Mumbai - 400086 (Resolution Professional of Original Corporate Debtor) ...Appellant
Versus
1. Malharshanti Enterprises Through its sole Proprietor Mr. Sunil Pande Having office at 59A/12, nigari Niwara Parishad Gen. A. K. Vaidya Mag (Film City), Road, Goregaon (West), Mumbai - 400 053 (Original Applicant /Operational Creditor) ...Respondent No. 1
2. Mr. Naresh Sevantilal Shah, Having address at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel Vile Parle (E), Mumbai - 400 057 (Suspended Director) ...Respondent No. 2
3. Charu Naresh Shah Having address at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel Vile Parle (E), Mumbai - 400 057 (Suspended Director) ...Respondent No. 3
Present
For Appellant: Mr. Gauhar Mirza, Bhumika Kapoor, Adv. -2- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
For Respondents : Mr. Anshuj Dhingra, Kartik Sethi, Shubhamngda Singh, Muskan Bagga, Adv. for R1 With
Comp. App. (AT) (Ins) No. 598 of 2023 & I.A. No. 1992 of 2023
(Arising out of the Order dated 16.02.2023 passed by the National Company Law Tribunal, Mumbai Bench, Court- III in IA No. 47 of 2021 in Company Petition being C.P.(IB) - 3753(MB)/2018)
IN THE MATTER OF:
Paton Constructions Pvt Ltd, a Company incorporated under the provisions of the Companies Act, 1956, having its registered office at A1, 1st Floor, Sagar Complex Co-Operative Housing Society Ltd, M.G. Road, Vile Parle (E), Mumbai - 400 057 ...Appellant
Versus
1. M/s Malharshanti Enterprises, Through its Sole Proprietor Mr. Sunil Pande, having his office at 59A/12, Nagari Niwara Parishad, Gen. A.K. Vaidya Marg (Film City) Road, Goregaon (W), Mumbai - 400 053. ...Respondent No. 1
2. CAN Enterprises Pvt Ltd, a company incorporated under the provisions of the Companies Act, 1956, having its registered address at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel, Vile Parle (E), Mumbai - 400 057. ...Respondent No. 2
3. Naresh Sevantilal Shah, s/o Sevantilal Shah, aged: 57 yrs, residing at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel, Vile Parle (E), Mumbai - 400 057. ...Respondent No. 3 -3- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
4. Charu Naresh Shah, w/o Naresh Shah, aged: 56 yrs, residing at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel, Vile Parle (E), Mumbai - 400 057. ...Respondent No. 4 5. Jitendrakumar Rambaran Yadav, erstwhile Interim Resolution Professional, having his address at 11, Singh House, 2nd Floor, 23 Ambalal Doshi Marg, Besides BSE Building, Fort, Mumbai - 400 001. ...Respondent No. 5 6. Manish Jaju, Resolution Professional of CAN Enterprises Pvt Ltd, having his address at D-502, Neelkanth Business Park, Vidyavihar (W), Mumbai - 400 086 ...Respondent No. 6
Present
For Appellant: Mr. Akshay Goel, Harsh Jadon, Adv.
For Respondents : Mr. Anshuj Dhingra, Kartik Sethi, Shubhamngda Singh, Muskan Bagga, Adv. for R1 With
Comp. App. (AT) (Ins) No. 600 of 2023 & I.A. No. 1996, 1997, 1999 of 2023
(Arising out of the Order dated 16.02.2023 passed by the National Company Law Tribunal, Mumbai Bench, Court- III in IA No. 47 of 2021 in Company Petition being C.P.(IB) - 3753(MB)/2018)
IN THE MATTER OF:
1. Mr. Naresh Sevantilal Shah, Having address at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel Vile Parle (E), Mumbai - 400 057 -4- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
(Suspended Director) ...Appellant No. 1
2. Charu Naresh Shah, w/o Naresh Shah, aged: 56 yrs, residing at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel, Vile Parle (E), Mumbai - 400 057. ...Appellant No. 2
Versus
1. Malharshanti Enterprises Through its sole Proprietor Mr. Sunil Pande Having office at 59A/12, nigari Niwara Parishad Gen. A. K. Vaidya Mag (Film City), Road, Goregaon (West), Mumbai - 400 053 (Original Applicant /Operational Creditor) ...Respondent No. 1
2. CAN Enterprises Pvt Ltd, a company incorporated under the provisions of the Companies Act, 1956, having its registered address at Flat No. 103, Thosar House, Hanuman X Road No. 1, Near Shiv Leela Hotel, Vile Parle (E), Mumbai - 400 057. ...Respondent No. 2
3. Jitendrakumar Rambaran Yadav, erstwhile Interim Resolution Professional, having his address at 11, Singh House, 2nd Floor, 23 Ambalal Doshi Marg, Besides BSE Building, Fort, Mumbai - 400 001. ...Respondent No. 3
4. Manish Jaju, Resolution Professional of CAN Enterprises Pvt Ltd, having his address at D-502, Neelkanth Business Park, Vidyavihar (W), Mumbai - 400 086 ...Respondent No. 4
5. Paton Constructions Pvt Ltd, a Company incorporated under the provisions of the Companies Act, 1956, -5- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
having its registered office at A1, 1st Floor, Sagar Complex Co-Operative Housing Society Ltd, M.G. Road, Vile Parle (E), Mumbai - 400 057 ...Respondent No. 5
Present
For Appellant: Ms. Anjali Sharma, Ms. Kanishka Sharma, Advocates. Mr. Neeraj Malhota, Sr. Advocate, Mr. Ashutosh Gupta, Mr. Gaurav Rana, Mr. Nimesh, Mr. Ajitesh Kumar, Advocates
For Respondents : Mr. Akshay Goel, Harsh Jadon, Adv. for R5 Mr. Anshuj Dhingra, Kartik Sethi, Shubhamngda Singh, Muskan Bagga, Adv. For R1
JUDGEMENT
(17.09.2024)
NARESH SALECHA, MEMBER (TECHNICAL)
1. These three Appeals have been filed against the common Impugned Order
dated 16.02.2023 passed by the National Company Law Tribunal, Mumbai
Bench, Court-III (in short 'Adjudicating Authority') in IA No. 47 of 2021 in
Company Petition being C.P. (IB) - 3753(MB)/2018, which was filed by
Malharshanti Enterprises Limited ('Operational Creditor') against the CAN
Enterprises Pvt. Ltd. ('Corporate Debtor').
2. In Company Appeal (AT) (Ins.) No. 545 of 2023, Mr. Manish Jaju,
Resolution Professional of the Corporate Debtor is the Appellant. The
Respondents in this appeal are Malharshanti Enterprises Limited is the Corporate -6- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Debtor (Respondent No. 1), Naresh Sevantilal Shah (Respondent No. 2) and
Charu Naresh Shah (Respondent No. 3) who are Suspended Directors of the
Corporate Debtor.
The Company Appeal bearing Company Appeal (AT) (Ins.) No. 545 of
2023 has been filed by the Mr. Manish Jaju who has challenged the Impugned
Order and has sought the following reliefs before this Appellate Tribunal
contained in Para 21 of this appeal :-
"a. That this Hon'ble Tribunal be pleased to set aside the order dated 16th February, 2023 passed in IA No. 47 of 2021 in CP No. 3753 of 2020.
b. For Costs;
c. For such further and other reliefs, as this Hon'ble Tribunal may deem fit and proper in the nature and circumstances of the case." SIC...
The Resolution Professional has challenged the Impugned Order on the merits.
3. The Company Appeal bearing Company Appeal (AT) (Ins.) No. 598 of
2023 has been filed by Paton Construction Pvt. Ltd. the Unsecured Financial
Creditor of the Corporate Debtor against the Malharshanti Enterprises Limited
who is the Operational Creditor of the Corporate Debtor and who originally filed
an application under Section 9 of the Insolvency & Bankruptcy Code, 2016 (in -7- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
short 'Code') which was admitted by the Adjudication Authority vide order dated
27.01.2020.
The Appellant stated that the based on loan agreement entered between the
Paton Construction Pvt. Ltd. and the Corporate Debtor on 20.08.2019, the
Appellant gave Rs. 1 Lakh as loan and has filed claimed for Rs. 1,05,877/- but
the Impugned Order in Para 20 has been held against the Applicant i.e., Paton
Construction Pvt. Ltd., which reads as under :-
"It is appropriate to mention here that the RP herein filed an application bearing I.A. No. 375/2021 which is also pending before this Bench for withdrawal of the CIRP order under Section 12(A) of the Code on the ground of purported settlement entered into by the Corporate Debtor with the sole COC Member, M/s Paton Construction Pvt. Ltd. who is an unsecured Financial Creditor from whom the Corporate Debtor alleged to have borrowed an amount of Rs. 1,58,077/- recently before passing CIRP order which is an ingenious idea of Respondent Nos. 2 and 3 to bring out the Corporate Debtor from the clutches of CIRP order which attained finality from a back-door entry."
(Emphasis Supplied)
4. The Applicant has also sought the following reliefs :-
"a. That this Hon'ble Tribunal be pleased to set aside the order dated 16th February, 2023 passed by the Adjudicating -8- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Authority, National Company Law Tribunal, Mumbai Bench, in IA No. 47 of 2021 in CP (IB)/ 3753 (MB)/2018. b. For Costs;
c. For such further and other reliefs, as this Hon'ble Tribunal may deem fit and proper in the nature and circumstances of the case."
5. The third Company Appeal bearing Company Appeal (AT) (Ins.) No. 600
of 2023 has been filed by Naresh Sevantilal Shah and Charu Naresh Shah who
are Suspended Directors of the Corporate Debtor against the Malharshanti
Enterprises Limited who is the ('Operational Creditor') as Respondent No. 1,
CAN Enterprises Pvt. Ltd. ('Corporate Debtor') as Respondent No. 2,
Mr. Jitendrakumar Rambaran Yadav, Erstwhile Interim Resolution Professional
of the Corporate Debtor as Respondent No. 3, Mr. Manish Jaju who is the
Resolution Professional of the Corporate Debtor as Respondent No. 4 and Paton
Construction Pvt. Ltd., the Financial Creditor as Respondent No. 5.
The Applicants in this appeal have sought following reliefs:-
"a. That this Hon'ble Tribunal be pleased to set aside the order dated 16th February, 2023 passed by the Adjudicating Authority, National Company Law Tribunal, Mumbai Bench, in IA No. 47 of 2021 in CP (IB)/ 3753 (MB)/2018. b. For Costs;
c. For such further and other reliefs, as this Hon'ble Tribunal may deem fit and proper in the nature and circumstances of the case."
-9- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
6. At this stage, from above three appeals we note that the reliefs sought in all
these three appeals i.e., by Resolution Professional, Suspended Directors of the
Corporate Debtor as well as the Unsecured Financial Creditor are exactly same.
7. Thus, it would be necessary for us to take into account the background of
the case under which the original Corporate Insolvency Resolution Process
('CIRP') was initiated by the National Company Law Tribunal, Mumbai Bench,
Court-IV in Company Petition being C.P. (IB) 3753(MB)/C-IV/2018 on
27.01.2020 under Section 9 of the Code, on application filed by Malharshanti
Enterprises Limited ('Operational Creditor') against the Corporate Debtor. The
Operational Creditor issued demand notice dated 02.12.2017 under Section 8 of
the Code which was replied by the Corporate Debtor on 13.12.2017 denying the
operational debts as well as raising issues regarding pre-existing disputes.
8. We also note that after going in detail, the Adjudicating Authority admitted
the application of Malharshanti Enterprises Limited ('Operational Creditor')
appointing Mr. Jitendrakumar Rambaran Yadav as Interim Resolution
Professional.
9. The order dated 27.01.2020 passed by National Company Law Tribunal,
Mumbai Bench, Court-IV in Company Petition being C.P. (IB) 3753(MB)/C-
IV/2018 was challenged by Naresh Sevantilal Shah who is the Suspended
Directors of the Corporate Debtor before this Appellate Tribunal in Company
Appeal (AT ) (Ins.) No. 415 of 2020 which was dismissed by this Appellate -10- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Tribunal vide judgment dated 19.01.2021 upholding the National Company Law
Tribunal, Mumbai Bench, Court-IV order dated 27.01.2020. The same was
challenged by Naresh Sevantilal Shah before the Hon'ble Supreme Court of India
vide Civil Appeal No. 822 of 2021 which was dismissed as withdrawn by the the
Hon'ble Supreme Court of India vide order dated 10.03.2021 and the following
order was passed :-
"Mr. Salman Khurshid, learned senior counsel for the appellant requests permission to withdraw this appeal to pursue other remedies.
Permission is granted.
The Civil Appeal is, accordingly, dismissed as withdrawn with aforesaid liberty."
(Emphasis Supplied)
10. Thus, we note that the case has been contested against the admission of
Section 9 application against the Corporate Debtor by Suspended Director at all
level including, this Appellate Tribunal as well as the Hon'ble Supreme Court of
India and at all places, the judgement came in favour of the Operational Creditor.
11. In this background, we will look into now challenged Impugned Order
dated 16.02.2023. The present Resolution Professional Mr. Manish Jaju rejected
the claims of Operational Creditor in totality and also admitted the claims of one
Unsecured Financial Creditor i.e., Paton Construction Pvt. Ltd. for Rs. 1,05,877/-
and changed the Constitution of Committee of Creditor ('CoC'). It is observed -11- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
that after initiation of CIRP, public announcement dated 22.02.2020 was issued
by Erstwhile IRP and Operational Creditor filed its claim along with proof on
06.03.2020 and the same was admitted.
12. From the Impugned Order, we note that Mr. Manish Jaju was appointed as
Resolution Professional by an order dated 09.06.2020 passed by Principal Bench
of NCLT in Interlocutory Application No. 1007 of 2020 replacing Erstwhile IRP
Mr. Jitendrakumar Rambaran Yadav.
Malharshanti Enterprises Limited (Operational Creditor) on 02.07.2020
filed an Interlocutory Application bearing I.A. No. 1241 of 2020 before the
Adjudicating Authority, inter-alia, challenging the composition of Paton
Construction Pvt. Ltd. as Single Member of CoC.
13. Mr. Manish Jaju, Resolution Professional, through an e-mail dated
05.07.2020 to M/s Malharshanti Enterprises Limited (Operational Creditor),
called upon to submit additional documents in support of claims which were
already admitted by the Erstwhile IRP and Malharshanti Enterprises Limited,
(Operational Creditor) replied to the Resolution Professional Mr. Manish Jaju on
13.07.2020 in response to his e-mail dated 05.07.2020 but the Resolution
Professional again issued a letter and an e-mail dated 04.09.2020 to Malharshanti
Enterprises Limited (Operational Creditor) again calling upon the Malharshanti
Enterprises Limited (Operational Creditor) to submit additional documents and
finally the Resolution Professional Mr. Manish Jaju addressed an e-mail dated -12- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
02.12.2020 to Malharshanti Enterprises Limited (Operational Creditor) that the
subject "claim document" "claim submitted by you is not accepted by Resolution
Professional", and the Resolution Professional rejected the claims of the
Operational Creditor Malharshanti Enterprises Limited (Operational Creditor)
despite clear adjudication by the Adjudicating Authority, upheld by this Appellate
Tribunal and the Hon'ble Supreme Court in favour of the Operational Creditor.
14. We note that the Adjudicating Authority has examined all contentions and
documents of various parties i.e, Malharshanti Enterprises Limited (Operational
Creditor), the Corporate Debtor, the Suspended Directors of the Corporate
Debtor, the Resolution Professional and sole Financial Creditors, while passing
the Impugned Order dated 16.02.2023.
15. We note that the issue of the pre-existing disputes raised by the Appellant
in the present appeal bearing Company Appeal (AT) (Ins.) No. 545 of 2023 had
already been examined by this Appellate tribunal in its detailed judgement dated
19.01.2021, as contained in para 29 & 31 to 37 which reads as under :-
"29.We have heard the arguments of the Learned Counsel for the parties and perused the records. The question that arises for consideration is as follows:
a) Whether there was a pre-existing dispute between the parties and weather the pre-existence of dispute shall be seen from the date of the first demand notice dated 2nd December 2017 or the second demand notice dated 23rd August, 2018?
-13- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
b) Whether the Adjudicating Authority rightly allow the petition of the Operational Creditor under section 9 of I&B Code?
30.In the case of Mobilox Innovations Pvt. Ltd. vs Kirusa Software (P) Ltd. reported at (2017) 1 SCC OnLine SC 353 the Hon'ble Supreme Court held as to what are the facts to be examined by the Adjudicating Authority while examining an application under section 9 of I&B Code which is reproduced below:
"33. The scheme under Sections 8 and 9 of the Code, appears to be that an operational creditor, as defined, may, on the occurrence of a default (i.e., on nonpayment of a debt, any part whereof has become due and payable and has not been repaid), deliver a demand notice of such unpaid operational debt or deliver the copy of an invoice demanding payment of such amount to the corporate debtor in the form set out in Rule 5 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 read with Form 3 or 4, as the case may be (Section 8(1)). Within a period of 10 days of the receipt of such demand notice or copy of invoice, the corporate debtor must bring to the notice of the operational creditor the existence of a dispute and/or the record of the pendency of a suit or arbitration proceeding filed before the receipt of such notice or invoice in relation to such dispute (Section 8(2)(a)). What is important is that the existence of the dispute and/or the suit or arbitration proceeding must -14- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
be preexisting - i.e. it must exist before the receipt of the demand notice or invoice, as the case may be......."
"34. Therefore, the adjudicating authority, when examining an application under Section 9 of the Act will have to determine:
37.Whether there is an "operational debt" as defined exceeding Rs.1 lakh?
ii. Whether the documentary evidence furnished with the application shows that the aforesaid debt is due and payable and has not yet been paid? And
iii. Whether there is existence of a dispute between the parties or the record of the pendency of a suit or arbitration proceeding filed before the receipt of the demand notice of the unpaid operational debt in relation to such dispute?
If any one of the aforesaid conditions is lacking, the application would have to be rejected.
Apart from the above, the adjudicating authority must follow the mandate of Section 9, as outlined above, and in particular the mandate of Section 9(5) of the Act, and admit or reject the application, as the case may be, depending upon the factors mentioned in Section 9(5) of the Act."
From the above decision it is clear that the existence of the dispute must be pre-existing i.e., it must exist before the receipt of the demand notice or invoice. Section 9 of the IBC makes it very clear for the Adjudicating Authority to admit -15- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
the application "if no notice of dispute is received by the Operational Creditor and there is no record of the dispute in the information utility." In the absence of any existence of a dispute between the parties or the record of the pendency of a suit or arbitration proceeding filed before the receipt of the demand notice of the unpaid 'Operational Debt'.
Consequently, the application cannot be rejected under section 9 and is required to be admitted.
31. It is apparent from the records that the Corporate Debtor had not raised any objection pertaining to the work performed by the Operational Creditor prior to the first demand notice dated 2nd December, 2017. It was on 13th December, 2017 when the Corporate Debtor responded for the first time in its reply to the notice issued by the Operational Creditor under Section 8(1) of I&B Code. We have noted that a large number of email communications has been made by the Operational Creditor and not even a single response was made by the Corporate Debtor raising such disputes.
32. The Contention of the Appellant that the relevant date for determining whether there was a pre-existing dispute was the date of second demand notice, i.e. 23rd August, 2018 and not the first demand notice dated 2nd December, 2017 as the first petition was dismissed by the Adjudicating Authority as the Petitioner Counsel had asked for withdrawal of the first petition due to incorrect claims made under first application, -16- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
with a liberty to proceed against the Corporate Debtor with a correct claim as envisaged under I&B Code.
The above Contention raised by the Appellant cannot be sustained. The Adjudicating Authority has rightly relied upon the ratio laid down by this Tribunal in the case of Dinesh Gupta vs. Hajura Singh Bhim Singh & another, Company Appeal (AT) (Insolvency) No. 99 of 2018 wherein is was held that:
"6. On hearing the parties, as we find that there was no dispute in existence prior to the 1st demand notice issued under Section 8(1) of the I&B Code and the Corporate Debtor disputed the claim about quality only after issuance of 1st demand notice, therefore, after withdrawal of 1 st application under Section 9 on technical grounds and issuance of fresh demand notice, the application under Section 9 filed by Respondent was maintainable."
33. The Appellant argued that the Adjudicating Authority misplaced its reliance on the above Judgment as in that case the first petition was dismissed on technical ground. However, in the present case, the first petition was not dismissed on technical ground but because Operational Creditor had made an incorrect claim.
This argument of the Appellant is turned down as firstly the above Judgment was mainly pointing out that there should be no dispute in existence prior to the 1 st demand notice issued under Section 8(1) of the I&B Code. The Appellant has -17- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
wrongly emphasized on the word 'technical ground' and not the ratio that was laid down under the judgment. Secondly, it is the Adjudicating Authority who shall observe whether the ground on which the first application was dismissed was a technical ground or not.
34. It is apparent from the records placed before this tribunal that Corporate Debtor have sent a legal notice on 13th March, 2018 setting out several preexisting disputes as to quality of work and delay in completion of work and also raised a counter claim against the Operational Creditor. The Corporate Debtor also sent a notice invoking arbitration on 10th April, 2018. These issues were raised after the issuance of the first demand notice. Thus there were no disputes existing prior to the issuance of first demand notice.
35. The arbitration notice was sent after the issuance of the first demand notice but prior to the issuance of second demand notice when the Operational Creditor was busy in removing the defects in its first petition. This exhibits that the intention of the Appellant behind this was to misuse the provisions under the Code and to intentionally delaying the process of law. There were no objections raised in relation to quality of work prior to the issuance of first demand notice and the work done by the Operational Creditor was in fact certified by the architect appointed by the Corporate Debtor. Moreover, the Municipal Corporation in September, 2016 issued Occupation Certificate to the Appellant. If there were any discrepancies, the appellant could not have obtained -18- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Occupation Certificate from municipality. This also shows that all the defects pointed out by the architect have been timely rectified within the appropriate time, so that the Municipal Corporation found it appropriate to issue the Occupation Certificate.
36. In the light of the above observations and the records placed before us. We are of the view that there was no dispute existing prior to the first demand notice and only disputes raised prior to the first demand notice are relevant to determine its pre-existence and disputes raised thereafter are totally irrelevant for the same. Also the arbitration was invoked after the first demand notice. Thus the Adjudicating Authority have rightly concluded that there was no dispute existing prior to the demand notice issued under section 8 of I&B Code.
37. Therefore, we are of the considered opinion that there is no reason for interference with the impugned order passed by the Adjudicating Authority. Hence Appeal is dismissed. No order as to costs."
(Emphasis Supplied)
16. The Impugned Order passed by the Adjudicating Authority vide its earlier
order dated 30.08.2021 had ordered for forensic audit of the books of account of
the Corporate Debtor of 5 financial years preceding the date of CIRP and
appointed Mr. Amarjit Chopra, past President of the Institute of Chartered -19- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Accountants of India and the relevant audit observations of the forensic audit have
been captured in the Impugned Order.
17. We would also like to take into consideration the relevant paragraphs of
the Impugned Order dated 16.02.2023 which are self explanatory and contained
in Para 16 to 24.
"16. This Bench further notes that the Resolution Professional has come to a conclusion that no amount is due and payable to the Operational Creditor in the books of accounts of the Corporate Debtor on the date of commencement of CIRP i.e. 27.01.2020 and they are barred by limitation which is not legally correct. The relevant date for computing the period of limitation if any for the claim of the Operational Creditor is the date of filing the petition and not the date of ordering CIRP. The RP can at best apply the above test of limitation for the other creditors who have directly submitted their claims after initiation of CIRP without adjudication by any legal forum and not the claims of the present Operational Creditor in this case since its claim has been already adjudicated through judicial process that attained finality. If this kind of action of the RP is upheld, it would amount to not only setting aside the order of the Adjudicating Authority but also the Appellate Authority thereby giving new dimension to CIRP process.
17. Therefore, it is very clear that the resolution professional has forgot that all the contentions of Corporate Debtor with -20- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
regard to additional works, pre-existence of disputes, limitation etc. have been rejected by the adjudicating authority and also by the Hon'ble NCLAT with their concurrent findings and the CIRP order attained finality. It is appropriate to mention here that the Corporate Debtor as a respondent in the main company petition if failed to take any plea which he might and ought to have taken, he is barred from raising that plea once again in subsequent proceedings as it is barred by the doctrine of "constructive res judicata".
The doctrine of "constructive res judicata applies to every subsequent proceedings except in cases in which the earlier matter was decided ex-parte.
18. The Respondent Nos. 2 and 3 who are the members of the suspended board have no locus once again to raise any please with regard to the merits of the claim of the Operational Creditor in view of finality of the admission order and they are not at all necessary parties to this application.
19. This Bench further observes that the Resolution Professional has miserably failed to understand that the above CIRP order was passed by the adjudicating authority after prima-facie satisfying about the existence of 'debt' and 'default' of more than Rs. 1,00,000/- as on the date of filing the Company Petition and he shall not reject such claim of the Operational Creditor in toto by ignoring the concurrent findings of the adjudicating authority and the appellate authority.
-21-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
20. It is appropriate to mention here that the RP herein filed an application bearing I.A. No. 375/2021 which is also pending before this Bench for withdrawal of the CIRP order under Section 12(A) of the Code on the ground of purported settlement entered into by the Corporate Debtor with the sole COC Member, M/s Paton Construction Pvt. Ltd. who is an unsecured Financial Creditor from whom the Corporate Debtor alleged to have borrowed an amount of Rs. 1,58,077/- recently before passing CIRP order which is an ingenious idea of Respondent Nos. 2 and 3 to bring out the Corporate Debtor from the clutches of CIRP order which attained finality from a back-door entry.
21. This bench further observes that the Resolution Professional miserably failed to understand that he can legally admit the claim of the Operational Creditor without insisting any books of accounts from the Operational Creditor in view of finality of the CIRP admission order and voluntary withdrawal of SLP before Hon'ble Supreme Court by Corporate Debtor.
22. For the aforesaid reasons viewing from any angle, this bench is of the considered opinion that the action of RP in rejecting the claim of the Operational Creditor in toto is illegal, arbitrary and does not stand to the test of legal scrutiny. This bench further observes that the RP has certainly exceeded his power by assuming super power in -22- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
this case and did not perform his duties diligently and the
conduct of RP also needs to be thoroughly investigated.
23. With the above observations, the action of the RP in rejecting the claim of Operational Creditor is set aside with a direction to him to admit the claim of Operational Creditor and complete the CIRP process as expeditiously as possible.
24. Accordingly, the above I.A. is disposed of."
(Emphasis Supplied)
18. Now we shall deal with these three appeals before us in following
discussions and go through the arguments of the parties. Since, all these three
appeals are inter connected and inter dependent and arising out of the same
common Impugned Order dated 16.02.2023, we shall dispose all three appeals in
conjoint manner by this common order.
Comp. App. (AT) (Ins) No. 545 of 2023
19. The Appellant submitted that on taking charge from the Erstwhile IRP Mr.
Jitendrakumar Rambaran Yadav, the Appellant noted that there are three claims
i.e., of Malharshanti Enterprises Limited amounting to Rs. 1,95,01,079/-; another
claim filed by Naresh Shah, Suspended Director of the Corporate Debtor for
Rs. 1,77,24,370/- and claim of Paton Construction Pvt. Ltd. amounting to
Rs. 1,05,877/- as unsecured Financial Creditor.
-23-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
20. It would be worthwhile to note the table made by the Appellant in the
present appeal in Para 5 which reads as under :-
21. From above, we note that total claims against the Corporate Debtor were
Rs. 3,73,31,326/- and the Appellant admitted of Rs. 1,78,30,247/- and the claims
of the original Operational Creditor (on whose application was initiated CIRP -24- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
against the Corporate Debtor vide order dated 21.01.2020 for Rs. 1,95,01,079/-)
was entirely rejected, whereas a fresh unsecured financial debt claim, which were
received after initiation of the CIRP, from Paton Construction Pvt. Ltd., was
admitted in full and was also declared as "Sole CoC Member" and the claim by
the Suspended Director of the Corporate Debtor of Rs. 1,77,24,370/- was also
admitted in full.
22. It is the case of the Appellant that after examining the books of the
Corporate Debtor it came to his notice that no dues were outstanding and payable
to the Malharshanti Enterprises Limited (Operational Creditor). The Appellant
further submitted that he requested for documentations from the Malharshanti
Enterprises Limited to substantiate its claims but received reply raising frivolous
issues "including unauthorised constitution of CoC" etc.
23. The Appellant further submitted that he received an e-mail dated
31.08.2020 from Arpit Shah and Co., Chartered Accountant, the Statutory
Auditors of the Corporate Debtor who allegedly stated that no debt is due and
payable to the Operational Creditor.
We observe that the need for seeking such unilateral clarification from
Chartered Accountant has not been explained by the Appellant.
24. The Appellant alleged that the Mr. Jitendrakumar Rambaran Yadav, the
Erstwhile IRP admitted the claims of Malharshanti Enterprises Limited without
verifying the same from the books of the Corporate Debtor, thus castigating role -25- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
of Erstwhile IRP Mr. Jitendrakumar Rambaran Yadav in order to justify his stand
which has been held as completely illegal by the Adjudicating Authority.
25. The Appellant also alleged that Malharshanti Enterprises Limited
(Operational Creditor), deliberately and consciously declined to provide any
documents at all to the Appellant despite several reminders and therefore, the
Appellant was constrained to reject the claims of Malharshanti Enterprises
Limited for Rs. 1,95,01,079/- as non verifiable and non substantiated claims. The
Appellant defended his action which according to him was done according to
provisions and regulations provided under the Code.
26. We note that an I.A. No. 47 of 2021 was filed by Malharshanti Enterprises
Limited against the rejection of claims and IA 1241 of 2020 challenging the
claims of Financial Creditor before the Adjudicating Authority. Similarly, the
Suspended Director also filed IA 1609 of 2020 seeking rejection of claims of
Malharshanti Enterprises Limited (Operational Creditor) before the Adjudicating
Authority.
27. The Appellant submitted that vide Order dated 30.08.2021, the
Adjudicating Authority gave direction to Malharshanti Enterprises Limited to
submit the documents and also directed the Appellant to collate the same. The
Appellant also brought out that the Adjudicating Authority had further given the
direction for forensic audit of the Corporate Debtor by Mr. Amarjit Chopra, past
President of the Institute of Chartered Accountants of India. -26-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
The Appellant stated that pursuant to the Adjudicating Authority's order
dated 30.08.2021, the Appellant received claims from the Malharshanti
Enterprises Limited vide mail dated 03.09.2021 but the Appellant still came to
conclusion that the documents were not enough to establish the claims of the
Malharshanti Enterprises Limited and therefore the Appellant rejected the claims
of the Operational Creditor vide e-mail dated 10.09.2021.
28. Concluding his remarks, the Appellant submitted that the Impugned Order
need to be rejected.
29. Per contra, the Respondent No. 1 denied all the allegations of the Appellant
labelling these as mischievous and misleading.
30. The Respondent No. 1 submitted that the Adjudicating Authority correctly
admitted his claims and ordered for CIRP against the Corporate Debtor vide order
dated 27.01.2020 which was challenged by Suspended Director of the Corporate
Debtor and this Appellate Tribunal vide order dated 19.01.2021 dismissed the
appeal upholding the correctness of the CIRP vide order dated 27.01.2020 and
rejecting all the issues raised by the Suspended Director. The Respondent No. 1
submitted that the suspended Board of Directors preferred a SLP against this
Appellate Tribunal Order dated 19.01.2021 before the Hon'ble Supreme Court of
India and the said SLP was withdrawn and therefore, under these circumstances,
the CIRP Order dated 27.01.2020 admitting section 9 petition as well as this
Appellate Tribunal's order dated 19.01.2021 attained finality. -27-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
31. The Respondent No. 1 submitted that in March, 2020, when the agenda
for first CoC meeting was circulated, it came to the knowledge of Respondent No.
1 that one Unsecured Financial Creditor i.e. Paton Construction Pvt. Ltd. was
sought to be inducted as a sole CoC Member on the basis of a paltry sum of
Rs. 1 lakh which was lent to the Corporate Debtor only on 6th September 2019
i.e. on a day just after the conclusion of oral arguments of Section 9 application
filed by the Respondent No. 1. The same was strongly objected by the
Respondent No. 1.
32. The Respondent No. 1 also stated on 3rd September 2019, the Corporate
Debtor had transferred an amount of approximately Rs. 72 lakhs to its Director
Mr. Naresh Sevantilal Shah (as per the ledger account of Corporate Debtor) as
repayment of alleged loan taken from its director by the Corporate Debtor, but on
the other hand the Corporate Debtor is claiming to have taken loan of paltry sum
of Rs. 1 Lakh in similar time frame. The Respondent No. 1 stated that this is
simple fraud being played in the CIRP proceeding by the Corporate Debtor,
Resolution Professional and Unsecured Financial Creditor.
33. The Respondent No. 1 elaborated that in the first CoC meeting conducted
on 18.03.2020, the Interim Resolution Professional admitted the claims of the
Respondent No. 1 (Operational Creditor). The IRP recorded that claims of the
Operational Creditor have been verified on the basis of supporting documents. -28-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
34. The Respondent No. 1 stated that Paton Constructions Private Limited,
Unsecured Financial Creditor for Rs. 1,05,877/- was wrongly made the Sole CoC
Member who misused its power and immediately replaced the Interim Resolution
Professional without assigning any reasons and Mr. Manish Jaju was appointed
as Resolution Professional. The Respondent No. 1 alleged that the minutes for
first CoC meeting have not been finalized.
35. The Respondent No. 1 further submitted that thereafter, the second CoC
meeting was conducted on 04.07.2020 wherein the Financial Creditor sought to
pass a resolution seeking withdrawal of CIRP against the Corporate Debtor on the
ground that the Corporate Debtor is a solvent entity.
36. The Respondent No. 1 alleged that conduct of the Resolution Professional
and the Financial Creditor as well as that of the suspended Director clearly
establish malafide intentions and therefore the Respondent no. 1 filed an IA
bearing no. 1241/2020 before the Adjudicating Authority challenging the
constitution of sole member CoC. The Respondent No. 1 alleged that in
retaliation and even before the 3rd CoC meeting could be conducted, the
Resolution Professional vide Email dated 02.12.2020 rejected the legitimate
claims of the Respondent No. 1 so that the alleged Unsecured Financial Creditor
as sole CoC member could pass a resolution to withdraw the CIRP against the
Corporate Debtor and indeed this exactly happened.
-29-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
37. The Respondent No. 1 submitted that in the third CoC meeting dated
07.12.2020, the Financial Creditor, sole CoC member contended that he does not
wish to continue with the CIRP and wants to continue its business with the
corporate debtor and therefore, the Resolution Professional filed an application
for closure of CIRP through IA 375/2021 under section 12A of the Code.
38. The Respondent No. 1 stated that consequent upon rejection of his claim,
the Respondent No. 1 moved an Application bearing no. 47/2021 before the
Adjudicating Authority against the rejection of his claim by the Resolution
Professional vide its Email dt. 02.12.2020 and the Adjudicating Authority after
recording the detailed observations allowed the said application vide the
Impugned Order dated 16.02.2023 thereby directing the Resolution Professional
to admit the claims of the Operational Creditor. The Respondent No. 1
highlighted collusion amongst the Resolution Professional, the sole CoC member
and suspended Board of Directors of the Corporate Debtor to derail CIRP and
deny the claims of the Respondent No. 1.
39. The Respondent No. 1 assailed the Resolution Professional for rejecting
his claims and who also concluded certain amount as recoverable by the
Corporate Debtor from the Respondent No.1, thus, transgressing the power and
duties of the Resolution Professional under the Code and assuming himself to be
in role of judicial forum to adjudicate upon claims and the counter-claims
contrary to the laid down law. The Respondent No. 1 emphasised that this -30- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
approach of resolution professional itself demonstrate gross misconduct being
committed by the Resolution Professional and that is why in the Impugned Order
dated 16.02.2023, the Adjudicating Authority was constrained to observe strongly
about the non-transparent conduct of the Resolution Professional with direction
to be thoroughly investigated. The Respondent No. 1 elaborated the instances
wherein the resolution professional just accepted the submissions and documents
of the Corporate Debtor 'as it is' including 'no dues certificate' created by the
chartered accountant of the corporate debtor without verification, allowed the
deductions as directed by the corporate debtor and disallowed the claims of the
operational creditor.
40. The Respondent No. 1 stated that the Erstwhile IRP had correctly admitted
the claims of the Respondent No. 1, but the appellant rejected the claims of the
operational creditor while allowing counter-claims of the Corporate Debtor and
further submitted that there was no requirement for the Corporate Debtor to seek
a miniscule loan of Rs 1 lakh from the alleged financial creditor Paton
Construction Pvt. Ltd. which was solely to oust the operational creditor.
41. The Respondent No. 1 stated that the Appellant has no locus in the present
appeal as he cannot be treated as an aggrieved person. The Respondent No. 1
emphasised that role of Resolution Professional is of neutral qua the claim of any
creditor and therefore there cannot be any interest in the matter let alone any
personal interest since he is only a creature of the Code with specific role and -31- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
obligations. The Respondent No. 1 cited judgement of the Hon'ble Supreme
Court of India in the matter of Regen Powertech (P) Ltd. v. Giriraj Enterprises
& Anr. [(2023) ibclaw.in 111 SC.] in support of this argument.
42. The Respondent No. 1 concluded his remarks stating that there was no
error in the Impugned Order and the appeal is without any merit and deserves to
be set aside with exemplary cost.
Findings
43. We note that the role of the Resolution Professional, the Appellant herein,
has been defined in the Code, inter-alia, regarding collation of claims as against
the adjudicator's role given to the liquidator qua the claims filed in the liquidation
proceedings, whereas, in the present case the Appellant has gone ahead in
deciding the claims and also decided to offset the claims by raising a counter
claims against the Operational Creditor on his own.
44. We have also noted that the prayers made in the present appeal (all
specific prayers noted earlier), nowhere the prayer has been made regarding
expunging of adverse remarks contained in the Impugned Order against the
Appellant, however, when the case was getting concluded, the Appellant
submitted that he will be satisfied if only adverse remarks are expunged and
submitted that the Appellant has made passing remarks in "facts in issues" in Para
8(a) for the same.
-32-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
45. The Appellant has defended his action in rejecting the claims of the
Operational Creditor on the basis that he did not get sufficient documentation.
However, we observe that the claims of the Operational Creditor were properly
adjudicated and admitted at the stage of initiating CIRP proceedings against the
Corporate Debtor on the basis of which Section 9 application filed by the
Operational Creditor vide order dated 27.01.2020.
46. We have already taken into consideration that Suspended Director of the
Corporate Debtor had challenged the CIRP order dated 27.01.2020 before this
Appellate Tribunal and the same was dismissed on merit after going through full
facts and law vide this Appellate Tribunals earlier order dated 19.01.2021. The
observation of this Appellate Tribunal order has been recorded in detail by us in
earlier discussions. It is worth noting that the same was challenged before the
Hon'ble Supreme Court of India by Suspended Director of the Corporate Debtor
which was dismissed as withdrawn. Thus, the CIRP order dated 27.01.2020 has
attained the finality.
47. We have already noted that the Appellant has challenged the present
appeal on the merits against the Impugned Order dated 16.02.2024. On a pointed
query by this Appellate Tribunal, the Appellant stated that the appeal has been
filed in his personal capacity. We wonder what is the locus and personal interest
of the Resolution Professional in this regard.
-33-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
48. In this connection, we note that the Hon'ble Supreme Court of India in the
matter of Regen Powertech (P) Ltd. (Supra) has given ratio decidendi that
Resolution Professional has to be neutral party and not expected to take a stand,
which is contrary in present appeal where the Appellant filed appeal on merits of
the Impugned Order and that too in his personal capacity as Resolution
Professional of Corporate Debtor. This is contrary to ruling of the Hon'ble
Supreme Court of India. The relevant para of the said judgment reads as under :-
"We are of the opinion that in view of the facts and circumstances, the Resolution Professional should not have filed the present appeals. The Resolution Professional should have maintained a neutral stand. It is for the aggrieved parties, including the Committee of Creditors of Regen Powertech Private Limited (RPPL) and Regen Infrastructure and Services Private Limited (RISPL), to take appropriate proceedings or file an appeal before this Court. Recording the aforesaid, the present appeals preferred by the Resolution Professional are dismissed as not entertained."
(Emphasis Supplied)
49. In this detailed background, we wonder as on what basis the Resolution
Professional dismissed the claims of the Operational Creditor altogether which
has gone through the entire round of litigation from the Adjudicating Authority
to this Appellate Tribunal to the Hon'ble Supreme Court of India. Prima-facie
this is much beyond his role and scope. If such approach of Resolution -34- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Professional is to be accepted then the whole process of CIRP proceedings can
get demolished.
50. It is further interesting to note that one Unsecured Financial Creditor,
namely, Paton Construction Private Limited who is supposed to have given a loan
of paltry sum of Rs. 1 Lakh knowing well that CIRP is being initiated against the
Corporate Debtor, then original IRP is removed and the present Appellant is
appointed as Resolution Professional, who in turn rejected the claims of
Operational Creditor and accepted the claims of the Unsecured Financial Creditor
and claims of promoter. This made the way for making Unsecured Financial
Creditor of Rs. 1,05,877/- as a Sole Member of the CoC and ousting the
Malharshanti Enterprises Limited the Operational Creditor out of CoC having
claim of Rs. 1,94, 62, 148/-.
51. We also note that the forensic audit conducted by i.e., Mr. Amarjit Chopra,
past President of the Institute of Chartered Accountants of India, gave clear report
regarding admitted claims of the Operational Creditor along with other
observation which have been discussed in details in the Impugned Order.
52. We observe that the Adjudicating Authority has castigated the role by the
Appellant and recorded in details how the Resolution Professional has exceeded
his role. The relevant para about the non-transparent conduct of the Resolution
Professional has already been recorded by us in our earlier discussion. -35-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
53. As regards contentions of the Appellant that there were pre-existing
disputes between Malharshanti Enterprises Limited (Operational Creditor) and
the Corporate Debtor, we note that this issue was rejected both by the
Adjudicating Authority and by this Appellate Tribunal in earlier order (already
noted above). We are amazed to note tenacity of the Resolution Professional to
assume role of the Adjudicating Authority and even role of the Appellate Tribunal
and overrule the judicial orders which attained finality after the Hon'ble Supreme
Court of India dismissed the appeal of Suspended Director/ Corporate Debtor as
withdrawn.
54. This Act of Resolution Professional is deplorable in strongest term and
need to be denounced in full force at our command. Such blatant illegal action
will defeat the noble cause of the Code.
55. We find the allegations of the Appellant that Malharshanti Enterprises
Limited (Operational Creditor) "since the very inception of the transaction has
perpetrated a systemic fraud upon the Corporate Debtor" without any substantial
basis.
56. In this background, shorn of unnecessary details, since the claims have
been adjudicated at all stages and had been admitted in full by the Erstwhile IRP
after verification of all documents, we do not need to go into these aspects again
which has attained finality at all judicial fora including the Hon'ble Supreme
Court of India.
-36-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
57. The entire sequences of events leaves much less to be desired as it become
quite clear that there seems to be conjoint action on part of the Resolution
Professional along with the Suspended Director of the Corporate Debtor and
Unsecured Financial Creditor i.e., Paton Constructions Pvt. Ltd. to derail the
process of CIRP and to deny the admitted claim of the Operational Creditor. This
is evident from fact that the Resolution Professional filed CP (IB) 3753/MB/C-
IV/2018, as per direction of single Member of CoC for closure of CIRP under
Section 12 A of the Code.
The aforementioned circumstances point out the high handedness and the
malafide intentions of the Appellant conjointly with suspended Directors of
Corporate Debtor and the Unsecured Financial Creditor.
58. We note that although the Adjudicating Authority in Impugned Order
dated 16.02.2023 in Para 22 has recorded that "the conduct of the Resolution
Professional also need to be thoroughly investigated". However, the Adjudicating
Authority did not give directions for the further course of action for the same or
direction to the IBBI. Hence, this Appellate Tribunal is required to take this to
logical conclusion as we are upholding the Impugned Order in toto. In this
background, we direct the IBBI to look into the role of the Appellant in
accordance with the law regarding conduct/ misconduct of the Appellant as the
Resolution Professional and take further necessary action as deemed fit and
warranted on the facts of the case and as per law.
-37-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
59. Looking to frivolous appeal, we further impose cost of Rs. 10 Lakhs on
the Appellant to be paid in Prime Minister's National Relief Fund within four
weeks of pronouncement of this order. The compliance for the same will be
reported to the Adjudicating Authority by the Appellant.
Comp. App. (AT) (Ins) No. 598 of 2023
60. This appeal has been filed by Paton Constructions Pvt. Ltd. who is
Unsecured Financial Creditor of the Corporate Debtor who lent Rs. 1 Lakh to the
Corporate Debtor just before the CIRP against the Corporate Debtor got initiated.
It is claim of the Appellant that he did not know about the on going proceedings
by the Respondent against the Corporate Debtor and only on publication of public
announcement by the IRP inviting claims from the Creditors on 28.01.2020, the
Appellant came to know about these developments and filed the claim of
Rs. 1,05,877/- before the IRP/ RP.
61. The Appellant is aggrieved by the Impugned Order specially as contained
in Para 20 which is against the Appellant. The Appellant submitted that being
sole member of CoC, he has 100% voting rights. The Appellant submitted that
the Resolution was passed with 100 % voting rights to replace the Erstwhile IRP
with the present Respondent No. 6. During the CoC meeting held on 18.03.2020,
the Suspended Director of the Corporate Debtor desired to continue the business -38- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
of the Corporate Debtor as going concern and he agreed for filing Section 12A
application to close CIRP of the Corporate Debtor.
62. The Appellant stated that the Respondent No. 1 filed an I.A. No. 1241 of
2020 in C.P.(IB) - 3753(MB)/2018 seeking an order setting aside the loan
transaction dated 06.09.2019 for Rs. 1 Lakh between the Appellant and the
Corporate Debtor and during hearing, the Adjudicating Authority ordered the
appointment of forensic auditor of the Corporate Debtor. The Appellant submitted
that though I.A. No. 1241 of 2020 was listed, however, the Adjudicating
Authority disposed the IA No. 47 of 2021 by way of Impugned Order dated
16.02.2023 by placing reliance of forensic audit report and gave relief beyond
sought in the pleadings concluding that the transaction between the Appellant and
the Corporate Debtor is "ingenious idea of the members of the Suspended
Director of the Corporate Debtor."
63. The Appellant submitted that he is Financial Creditor, who meets the
criteria of Rs. 1 Lakh and therefore was within his right to be sole CoC Member
with 100% voting rights. The Appellant defended the action taken by the CoC
and assailed the Impugned Order which has gone beyond jurisdiction of the
Adjudicating Authority in treating the Financial Creditor unjustly and unfairly.
64. Concluding his remarks the Appellant requested to set aside the Impugned
Order.
-39-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
65. Per contra, the Respondent No. 1 Malharshanti Enterprises Limited denied
of the allegations of the Appellant labelling these as mischievous and misleading.
The Respondent No. 1 emphasised that the Appellant has been inducted in the
CoC only to frustrate the CIRP and to deny the claims of the Respondent No. 1
herein.
66. The Respondent No. 1 also refuted the claims of the Appellant that his
claims of financial debt have been nullified in the Impugned Order. The
Respondent No. 1 elaborated that in the Impugned Order, the Respondent No. 6
has been directed to accept the claim of the Respondent No. 1 and only mentioned
regarding ingenious way of the financial debt but has not nullified the financial
debt of the Appellant.
67. The Respondent No. 1 explained that the only reason that Appellant is
here before this Appellate Tribunal is that observation of the Adjudicating
Authority in para 20 of the impugned order and that too on the basis of the
conclusions drawn by the forensic auditor in its audit report which provoked the
Appellant to such an extent that it chose to file an Appeal against the order which
only directed the Resolution Professional to accept the claims of the Respondent
No. 1. The Respondent No. 1 submitted that there is no ground available to the
Appellant to challenge the impugned order.
68. The Respondent No. 1 stated that the Corporate Debtor had entered into
a transaction in the form of an Inter-Corporate Loan Deposit (ICD)/unsecured -40- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Loan from M/s. Paton Construction Private Limited for a meagre sum of Rs. One
lakh on 06.09.2019. Interestingly this loan amount was credited to the account of
the Corporate Debtor the very next day of completion of oral arguments before
NCLT, Mumbai on 05.09.2019 only to stop the Respondent No. 1 from being sole
member of the Committee of Creditors in its capacity of being only Creditor and
by the this act, the Corporate Debtor through its purported sole Unsecured
Financial Creditor with a debt of mere Rs. 1 lakh to control the CIRP Process with
ultimate aim to reject the claims of the Operational Creditor and file Section 12
A application for close of CIRP.
69. The Respondent No. 1 stated that Appellant M/s. Paton Construction
Private Limited is merely a façade of the Corporate Debtor, who has been brought
into the scheme of things merely to oust the Respondent No. 1 from being and
comprising the sole member of CoC of the Corporate Debtor.
The Respondent No. 1 stated that the Suspended Director of the Corporate
Debtor in its Appeal no. 415/2020 before this Appellate Tribunal against the CIRP
Order, stated that it has an asset base of Rs. 7,09,41,985/- as reserves and surplus;
therefore in such circumstances it is surprising that Corporate Debtor hurriedly
availed a meagre loan of Rs. 1 Lakh from Appellant immediately on the next day
of conclusion of oral arguments before the NCLT to defraud the Operational
Creditor.
-41-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
70. The Respondent No. 1 submitted that vide email dated 14.03.2020, the
erstwhile IRP issued agenda of first CoC meeting and vide the said email, the
identity of the Appellant was recognized for the first time against which the
Respondent no. 1 vide email dated 17.03.2020 objected the Appellant's claim as
the sole CoC member. On 18.03.2020, the first CoC meeting was conducted
wherein the erstwhile IRP admitted the claims of the Respondent no. 1 and also
the Respondent no. 1 was apprised of the fact that Appellant had lent a sum of Rs
1 lakh to the Corporate Debtor on 06.09.2019. The erstwhile IRP also recorded in
the meeting that the claim of the Respondent No. 1 was verified and admitted on
the basis of the supporting documents provided by the Respondent No. 1. The
Respondent No. 1 alleged that since the Appellant became the sole member of
CoC, therefore without any reason, in the very same meeting on 18.03.2020, the
CoC passed the resolution for change of IRP and Mr Manish Jaju, the Respondent
No. 6 herein was appointed as Resolution professional.
71. The Respondent No. 1 assailed that change of IRP was sought to be done
in a haphazard manner when suddenly on 08.06.2020, the Respondent No. 1
receives an email addressed by the appellant wherein the IRP was apprised that
the application for change in the Resolution Professional under Section 22 of the
Code has been listed for emergency hearing on the very next date i.e. 09.06.2020
before the Principal Bench of the National Company Law Tribunal at New Delhi.
The Respondent No. 1 submitted that he was shocked and surprised to have -42- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
received the said e-mail dated 08.06.2020 on such short notice and was rather
awaiting finalization of minutes of the 1st CoC for inclusion of relevant objections
raised by the Respondent No. 1 against the Appellant. The Respondent No. 1
stated that the Principal bench of NCLT then passed order dated 09.06.2020
replacing the erstwhile IRP with current resolution professional. Thereafter the
second CoC meeting was conducted on 04.07.2020 wherein the Appellant sought
to pass a resolution seeking withdrawal of CIRP against the Corporate Debtor on
the ground that the Corporate Debtor is a solvent entity.
72. The Respondent No. 1 submitted that the alleged loan taken from the
Appellant by the Corporate Debtor of merely Rs. 1 Lakh was to aimed at the
Appellant to become Sole Financial Creditor which has already been challenged
by the Respondent No. 1 vide an application bearing IA No. 1241 of 2020
challenging the constitution of CoC i.e., Appellant as Sole Member of the CoC
which is pending before the Adjudicating Authority.
73. The Respondent No. 1 reiterated that the Adjudicating Authority in the
Impugned Order as not nullified the alleged loans of the Appellant otherwise even
the CoC would have been reconstituted but has only the Resolution Professional
has been directed to admit the claims of the Appellant.
74. The Respondent No. 1 further submitted that he never misused the
jurisdiction under Section 16(5) of the Code and no prejudiced would be caused
to the Appellant by the observation under Para 20 of the Impugned Order -43- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
particularly when IA 1421/ 2020 is still pending for adjudication before the
Adjudicating Authority. The Respondent No. 1 defended Para 20 which according
to him have mere observation on the basis of inconsistency drawn by the forensic
auditor in its report and also clearly in the facts of the case.
75. Concluding his arguments the Respondent No. 1 requested that the Appeal
should be dismissed with exemplary cost.
Findings
76. We note from the sequence of events that the Appellant has lent Rs. 1
Lakh when CIRP of the Corporate Debtor was almost imminent. We note that by
giving a loan of Rs. 1 Lakh, the Appellant became Unsecured Financial Creditor
and on inviting of claims from the Creditors by Erstwhile IRP, the Appellant filed
claims for Rs. 1,05,877/- which barely meets the threshold of minimum Rs. 1
Lakh prevalent at that time.
77. We put a direct query to the Appellant regarding nature of his business
and whether he has been involved in giving such loans to other parties and
particularly how many such loans were given to the Corporate Debtor prior to this
loan. The Appellant submitted that he is in a construction business and working
as Real Estate Developer and not in financial business but in given circumstances
he decided to give Rs. 1 Lakh loan to the Corporate Debtor which was legal for -44- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
him to do so. The Appellant did not give any details of loans given to other
entities or the Corporate Debtor prior to this transaction.
78. We observe that such construction companies are normally always short
of funds and keep raising the funds from the banks/ NBFC's and are not in
business to give such loans. We wonder as to why the Corporate Debtor, whose
net worth is stated to be more Rs. 7 Crores, still took loan of Rs. 1 Lakhs knowing
very well that CIRP against the Corporate Debtor is likely to happen. We could
not find any satisfactory response from the Appellant as well as the Ex-Promoters
on this account.
79. Prima facie we cannot find any fault in the finding of the Adjudicating
Authority contained in Impugned Order includings as contained in para 20 against
which the Appellant has filed this. The Impugned Order merely recorded that an
application filed under Section 12 A on the ground of purported settlement
entered between the CoC and the sole Appellant herein who is Unsecured
Financial Creditor who took a loan just before passing CIRP order is indigenous
idea of Corporate Debtor and the Promoters of Corporate Debtor to bring out the
Corporate Debtor from the clutches of CIRP which attained the finality through
back door entry.
80. We note that the forensic audit of books of accounts of the Corporate
Debtor was ordered by the Adjudicatory authority and the forensic auditor made
observations in relation to the purported loan transaction which took place -45- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
between the Appellant and the Corporate Debtor. The Appellant vide an
agreement dated 20.08.2019 had to disburse a loan of Rs 50 lakh to the Corporate
Debtor of which only Rs 1 lakh was given to the appellant on 06.09.2019 i.e., the
very next day when the oral arguments were concluded before the adjudicating
authority. The order admitting CIRP against the Corporate Debtor was passed on
27.01.2020. This was for the first and the last time that the Appellant paid money
to the Corporate Debtor. We note from the submissions that after September, 2019
till date, no further loan amount was disbursed to the Corporate Debtor. We do
not find anything which prevented the Appellant to disburse further amount under
the agreement and it is only after the claims of the operational creditor got rejected
the Appellant expressed its intention to continue the business relations with the
Corporate Debtor. Incidentally it has been brought to our notice by the
Respondent No. 1 that the alleged loan agreement was backdated and unstamped
documents.
81. It is interesting to note that value of the said transaction is of Rs. 1 Lakh
vis-à-vis the stand of solvency of the Corporate Debtor, having reserves of more
than Rs. 7 Crores and failure on the part of the corporate debtor to pay back Rs 1
lakh to Appellant when the said amount was never disputed. These circumstances
lead us to belief that the Appellant was brought into CIRP so that the committee
of creditor could comprise of only Unsecured financial creditor and the CIRP
could be stage- managed as per desires. In this context, we reiterate that the -46- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
forensic auditor in its report had observed that loan agreement was prepared on
stamp paper dated May 2019 of Rs 100 for purpose of affidavit only and not for
the purpose of obtaining loan and stamp paper was even prior to the Board
resolution. It has been brought to our notice that as per Maharashtra stamp Act,
stamp duty of 0.2% of the amount agreed in the contract gets attracted if amount
exceeds 10 lakhs which in the present case was Rs 50 lakhs, which obviously was
not paid.
82. We take into consideration that the demand notice under section 8 of the
Code was sent to the Corporate Debtor on 02.12.2017 by the Operational Creditor
whereas the said loan agreement was entered on 20.08.2019 i.e. This sequence
reveals the conduct and intentions of concerned parties.
83. After going through all the facts of the case and submissions made by the
parties as well as also going through the contentions of Resolution Professional
in appeal bearing Company Appeal (AT) (Ins.) No. 545 of 2023 (which we have
discussed at length in our earlier decisions we do not find any error in the
Impugned Order and the Appeal devoid of any merits is dismissed.
Comp. App. (AT) (Ins) No. 600 of 2023
84. This appeal has been filed by Naresh Sevantilal Shah who is Suspended
Director of the Corporate Debtor who submitted that the Corporate Debtor is
involved in the business of Real Estate Development and even on 31.03.2019, the -47- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Corporate Debtor had Rs. 7,09,41,98/- in reserve and surplus and thus is a solvent
company and should be allowed to continue as a going concern.
85. The Appellant submitted that the claims submitted by the Operational
Creditor are fraudulent claims. The Appellant stated that all claims of the
Respondent No. 1 has already been paid by the Corporate Debtor to the extent
payable.
86. The Appellant also submitted that there have been pre-existing disputes
on every issues which has not been factored into by the Adjudicating Authority
while passing the Impugned Order.
87. The Appellant also defended the action of the Resolution Professional for
setting up counter claims against the Respondent No. 1 since the Resolution
Professional was managing the affair of the Corporate Debtor and it was of
Resolution Professional duty to ensure that interest of the Corporate Debtor is
protected and in this background the Resolution Professional rightly raised the
counter claims against the Respondent No. 1.
88. The Appellant submitted that it can be nobody's case that the Respondent
No. 1 is entitled only for payment and not liable for making the payment to the
Corporate Debtor and if this is allowed this will be abuse of the process of law.
89. The Appellant gave the details of the work order, the Corporate Debtor
gave to the Respondent No. 1 with specific task and activities which should have
been completed within specific time period and the same was inclusive of all -48- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
costs. The Appellant submitted that in the work order, it was clear that time was
essence of the work and the work was to be completed by March, 2015 which the
Respondent No. 1 miserably failed to complete. Thereafter, the Corporate Debtor
and the Respondent No. 1 entered into the MoU dated 25.09.2015 where it was
agreed that the Respondent No. 1 would complete the work on or before
10.10.2015 and would be entitled only for payment of Rs. 5 Lakhs for completing
the work.
90. According to the Appellant, it is admitted fact that the Respondent No. 1
could not complete the work even withing the extended time.
91. The Appellant submitted that based on the MoU signed by both the
parties, on 25.09.2015 the Respondent No 1 was entitled to receive only Rs. 5
Lakh in full and final settlement from the Corporate Debtor and assailed the
conduct of the Respondent No. 1 who created false and record and fabricated
documents in order to demand further amount from the Corporate Debtor.
92. The Appellant reiterated that there were pre-existing disputes and MoU
was signed on 25.09.2015, thus the demand notice under Section 8 was illegal
and the same was replied accordingly.
93. The Appellant also gave the background of the appeal made before this
Appellate Tribunal which was dismissed by this Appellate Tribunal on
19.01.2021 and which was challenged before the Hon'ble Supreme Court of India
which was finally dismissed as withdrawn. The Appellant submitted that appeal -49- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
was withdrawn after getting liberty for other legal remedies and based on this
liberty granted by the Hon'ble Supreme Court of India , the present appeal has
been filed by the Appellant.
94. The Appellant submitted that the Corporate Debtor was in need of money
and as such the Corporate Debtor took a loan of Rs. 1 Lakh from Paton
Constructions Pvt. Ltd./ Respondent No. 5.
95. The Appellant submitted that although he is promoter of the Corporate
Debtor but he is also Unsecured Financial Creditor who lent the huge money to
the Corporate Debtor and therefore he has filed the claims of Rs. 1,77,24,370/-.
96. The Appellant submitted that the claim of the Respondent No. 1 for
Rs. 1,95,01,079/-, were wrongly admitted by Erstwhile IRP which was later
corrected by the current Resolution Professional/ Respondent No. 6 based on the
proper documentation and after taking into account the counter claims in favour
of the Corporate Debtor.
97. The Appellant defended change of IRP to the present RP as it was decided
by the Sole Financial Creditor in the interest of Corporate Debtor and no malafide
intention can be attributed although no detailed reasons were recorded in the
minutes of CoC for this change.
98. The Appellant also pointed out that since Section 9 application was
initiated by the Respondent No. 1 with malafide intention and the Corporate
Debtor is the solvent company, in the CoC meeting it was decided that the -50- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Corporate Debtor should be allowed to continue as a going concern and as
application under Section 12A should be filed before the Adjudicating Authority
for closure of CIRP as such there is nothing wrong in withdrawing CIRP
proceedings in accordance with laid down law.
99. The Appellant submitted that even for arguments sake even the entire
claims received by IRP were to be taken into account of Rs. 3,73,31,326/-, the
reserve and surplus of the Corporate Debtor was almost double hence it was
correct decision on part of the CoC to file an application for closure of CIRP, so
to allow the Corporate Debtor to continue as going concern in spirit of the Code.
The Appellant castigated the conduct of the Respondent No. 1 who is unnecessary
dragging the Corporate Debtor into insolvency and litigation.
100. The Appellant also defended the action of Respondent No. 6 for rejection
of claims filed by the Respondent No. 1 since the Respondent No. 1 has not given
the required documentations specifying claims of the Respondent No. 1 despite
several opportunities given to him by the Respondent No. 6.
101. The Appellant assailed the conduct of the Respondent No. 1 who has been
playing fraud on the Corporate Debtor based on fabricated documents in order to
justify his false claims. The Appellant further submitted that the Respondent
No. 1 fabricated document based on which certain payment was made by the
Corporate Debtor to the Operational Creditor and referred to cube testing reports
which are used to determine crushing strength of the concrete tubes utilised by -51- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
the Corporate Debtor in the present project and even cube test reports were found
to be fabricated.
102. The Appellant also assailed the Impugned Order which has ignored the
several vital facts including that the debt was not due and there was no default.
The Appellant also raised the issue regarding limitation which was not considered
properly by the Adjudicating Authority. The Appellant submitted that mere
judicial order regarding admission of Section 9 application does not tantamount
to admission of claims which has to go due process of law and to be followed by
the Resolution Professional in terms of the stipulated requirements.
103. The Appellant also assailed the finding of forensic auditor and relied upon
by the Adjudicating Authority as contained in the Impugned Order.
104. The Appellant submitted that there are FIRs pending before the police and
authorities filed vide FIR No. 99/2023 and 949/2023 and till finalisation of these
FIRs the claims of the Respondent No. 1 cannot be crystalized.
105. Concluding his arguments, the Appellant submitted that this appeal should
be allowed and the Impugned Order should be set aside.
106. Per contra, the Respondent No. 1 denied all the averments made by the
Appellant and accused the Appellant for misusing the process of law only to derail
the CIRP process and to frustrate the legal claims of the Respondent No. 1.
107. The Respondent No. 1 submitted that there has been absolutely non-
responsive attitude of the Corporate Debtor and further so called pre-existing -52- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
disputes were raised for the first time by the Corporate Debtor after the
Respondent No. 1 issued notice under Section 8 of the Code, which is not
permissible in terms of the Code, as well as based on catena of judgments of the
Hon'ble Supreme Court of India on this issue.
108. The Respondent No. 1 submitted that the claims of the Respondent No. 1
were rightly adjudicated by the Adjudicating which was challenged before this
Appellate Tribunal raising issues including pre-existing issues and limitation and
the same were rejected by this Appellate Tribunal after going into all details and
dismissed the appeal of the Appellant vide this Appellate Tribunal order dated
19.01.2021. The Respondent No. 1 further submitted that the Appellant even
challenged this Appellate Tribunal's order dated 19.01.2021 before the Hon'ble
Supreme Court of India which was also dismissed as withdrawn since the
Appellant knew that there was no chance of winning the appeal there.
109. The Respondent No. 1 submitted that there is hardly any ground for the
Appellant to file this appeal since all issues and claims have been adjudicated at
highest level and thus by doctrine of res-judicata the appeal is deserves to be
dismissed with cost.
110. The Respondent No. 1 also denied the averments made by the Appellant
that the Respondent No. 1 has been indulging into fabrication and forging
documents and also denied the fact that the Appellant allegedly got the RTI
information from relevant authorities regarding cube testing report and stated that -53- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
they are manipulated and fabricated by the Appellant since validity of such
information kept by the relevant authority is for 5 years.
111. The Respondent No. 1 submitted that based on these cube test report
which was accepted by the Corporate Debtor and the Corporate Debtor got the
payments from other agencies hence plea of fabricated cube testing report is only
after thought at this stage to somehow mislead this Appellate Tribunal raising
such frivolous issues regarding alleged fabrication and forgery.
112. The Respondent No. 1 reiterated the ploy of the Appellant in connivance
that the Paton Constructions Pvt. Ltd. alleged Unsecured Financial Creditor for
mere amount of Rs. 1,05,877/- and in connivance that the Resolution Professional
Manish Jaju is deny the admitted claims of the Respondent No. 1 and to take out
the Corporate Debtor from the clutches of CIRP.
113. Concluding his remarks the Respondent No. 1 requested this Appellate
Tribunal to dismiss this Appeal with exemplary cost so that such incidence are
not repeated in future.
Findings
114. After going through arguments of all parties we note that the issues raised
by the Appellant has already been dealt by the Adjudicating Authority and
subsequently by this Appellate Tribunal vide order dated 09.01.2023. We also -54- Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
note that the Appellant challenged the same before the Hon'ble Supreme Court
of India which was also dismissed as withdrawn.
115. We wonder if the judicial adjudication of the claims and issues raised by
the Appellant are decided at all floors of law i.e., NCLT, NCLAT, and Hon'ble
Supreme Court of India, how Appellant can raise the same issues again and again.
116. We also note that once the claims of the Operational Creditor have been
crystalized and admitted by the Adjudicating Authority while admitting Section
9 application of Respondent No. 1 and initiating CIRP against the Corporate
Debtor. We also find that IRP was duly appointed by the Adjudicating Authority
who collated the claims and admitted the claims of the Respondent No. 1 basis on
the documentation submitted by the Respondent No. 1. We find surprising as
how the claims of the Operational Creditor have been rejected later by the
Resolution Professional.
117. We are not inclined to go into so called issues of RTI information and FIR
raised by the Appellant as this is summary trial and claims and issue have already
been crystalized and decided upon by all judicial authorities.
118. In find the Appeal bearing Comp. App. (AT) (Ins.) No. 600 of 2023 fails
and stand dismissed. Interlocutory Applications, if any, are closed. -55-
Comp. App. (AT) (Ins.) No. 545, 598 & 600 of 2023
Summary of Findings
119. We are constrained to observe that CIRP was initiated way back on
27.01.2020 and almost after 4.5 years, the case is being dragged and CIRP has
not been concluded. This does not auger well.
120. In fine all three appeals Comp. App. (AT) (Ins.) No. 545 of 2023, Comp.
App. (AT) (Ins.) No. 598 of 2023 & Comp. App. (AT) (Ins.) No. 600 of 2023 fail
and stand dismissed. In Comp. App. (AT) (Ins.) No. 545 of 2023, we have already
given suitable directions including imposition of cost of Rs. 10 Lakhs being
frivolous appeal and further directions to IBBI to investigate the conduct of
Resolution Professional.
121. The Registry is directed to send a copy of this order to the Chairman IBBI
for necessary action and also send a copy to the Adjudicating Authority.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
[Mr. Indevar Pandey] Member (Technical)
Sim
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free