M/S Art Constructions Private Limited vs Mr. Udayraj Patwardhan & Ors
- CitationCompany Appeal (AT) (Insolvency) No. 460 of 2026
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority, in exercising its power under Section 31 of the IBC to consider an application for approval of a resolution plan already approved by the Committee of Creditors with the requisite voting share, is confined to the limited scrutiny contemplated by Section 30(2) and Section 31(1); it cannot remand the plan to the CoC for reconsideration of commercial matters absent identification of a specific contravention of law, the CIRP Regulations, or a material irregularity in the plan-approval process. Where a corporate debtor's assets are the subject of pending litigation, a Supreme Court direction permitting the CIRP to proceed, coupled with a plan that subjects the disputed asset to the outcome of that litigation, is sufficient for the CoC to deal with the asset in the plan, and the Adjudicating Authority cannot require reconsideration of that treatment on the ground of the pending litigation alone. The existence of a provisional attachment order issued by the Directorate of Enforcement after the CoC's approval of a plan does not, without more, render the plan incapable of implementation, where the Resolution Professional has kept the CoC apprised of the proceedings, the successful resolution applicant was aware of the attachment at the time of submitting its plan, and Section 32A of the IBC is engaged in respect of such provisionally attached property. A ground for remand based on a pending appellate proceeding does not survive where the appellate forum has not restrained the Adjudicating Authority from considering the plan approval application, and the Resolution Professional has given an undertaking to keep the disputed property protected. Regulatory licences issued by a planning authority do not warrant remand of an approved plan where the plan makes specific provision for the regulatory claims, including earmarked provision for renewal fees, and that provision was considered by the CoC. Where an approved plan provides for equal treatment of home-buyers who have not filed claims with those who have, the Adjudicating Authority cannot remand the plan on the ground of pending claims of such home-buyers, since reopening belated claims would be inconsistent with the principles laid down in RPS Infrastructure Ltd. v. Mukul Kumar.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
[Arising out of the Impugned Order dated 27.02.2026 passed by the Adjudicating Authority, National Company Law Tribunal, Court No. III, New Delhi in I.A. No. 1817 of 2023 in C.P. (IB) No. 1083 of 2018]
IN THE MATTER OF:
M/S ART CONSTRUCTION PVT. LTD. THROUGH MR. AKSHAY DHAWAN, AUTHORISED REPRESENTATIVE, A-61, VIVEK VIHAR-II, NEW DELHI-110095 ...Appellant(s)
Versus
1. UDAYRAJ PATWARDHAN RESOLUTION PROFESSIONAL ADEL LANDMARKS LTD B-292, CHANDRA KANTA COMPLEX, SHOP NO. 8, NEW METRO PILLAR NO. 161, NEW ASHOK NAGAR NEW DELHI- 110096 EMIAL: CA.UDAYRAJ@VIAJURE.IN
2. CLASS OF CREDITORS OF HOMEBUYERS THROUGH AUTHORIZED REPRESENTATIVE MR. INDER PAUL SINGH OBEROI IBBI/IPA-002/IP- N00518/2017-2018/11560 MVKINI LAW FIRM, 6/39, JUNGPURA (B), NEW DELHI, NATIONAL CAPITAL TERRITORY OF DELHI, 110014 EMAIL: IPSO24@GMAIL.COM
3. ASSETS CARE AND RECONSTRUCTION ENTERPRISE LTD. THROUGH ITS AUTHORIZED REPRESENTATIVE 14TH FLOOR, EROS CORPORATE TOWER NEHRU PLACE, NEW DELHI - 110019, NEW DELHI, DELHI, INDIA - 110019. EMAIL: ACRE.ARC@ACREINDIA.IN
4. INDO JATALIA HOLDINGS LIMITED THROUGH ITS AUTHORIZED REPRESENTATIVE 202/203, 76, VIJAY BLOCK, LAXMI NAGAR, DELHI - 110092 EMAIL: indojataliaholding@gmail.com 5. CFM ASSET RECONSTRUCTION PRIVATE LTD. THROUGH ITS AUTHORIZED REPRESENTATIVE BLOCK NO. A/1003, WEST GATE, NEAR YMCA CLUB, SUR NO. 835/13 S.G. HIGHWAY, MAKARBA, AHEMDABAD, GUJARAT - 380051 EMAIL: info@cfmarc.in
6. IL & FS FINANCIAL SERVICES LTD. THROUGH ITS AUTHORIZED REPRESENTATIVE 2 PLOT NO. 22, BLOCK G BANDRA KURLA COMPLEX, MUMBAI, MAHARASHTRA - 400051 EMAIL: ifinsecretarial@ilfsindia.com
7. BANK OF BARODA BARODA BHAWAN, 7TH FLOOR, R.C. DUTT ROAD, ...Respondent(s) VADODARA - 390007 EMAIL: cs.ho@bankofbaroda.bank.in Present: For Appellant : Mr. Krishnendu Datta and Mr. Abhijeet Sinha, Sr. Advocates with Ms. Manvi Jain, Ms. Astha Singh, Ms. Heena, Ms. Niharika, Advocates. For Respondents : Mr. P. Nagesh, Sr. Advocate with Mr. Sanjay Bhatt, Ms. Apoorva Chowdhury, Advocates for R1 Ms. Ruchika Darira, Advocate for R7 Mr. I.P.S Oberoi, Advocate for AR of Class of Creditor (R-2) Mr. Aditya Mishra, Advocate for R8 Mr. Kunal Godhwani, Ms. Kinjal Chadha, Advocates for R4 Ms. Shruti Munjal, Advocate for R5 Mr. Aslan Ahmed, Ms. Kheyali Singh, Advocates for R3.
JUDGMENT
(Hybrid Mode)
Per: Barun Mitra, Member (Technical)
The present appeal filed under Section 61 of Insolvency and Bankruptcy
Code 2016 ("IBC" in short) by the Appellant arises out of the Order dated
27.02.2026 (hereinafter referred to as "Impugned Order") passed by the
Adjudicating Authority (National Company Law Tribunal, New Delhi Court-III)
in I.A. No. 1817 of 2023 in C.P.(IB) No. 1083 (PB) of 2018. By the impugned
order, the Adjudicating Authority has dismissed IA No. 1817 of 2023 filed Page 2 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 before it by the Resolution Professional-Respondent No.1 and remanded the
resolution plan dated 23.06.2022 alongwith Addendum dated 23.08.2022
submitted by the Appellant-Successful Resolution Applicant ("SRA" in short)
to the Committee of Creditors ("CoC" in short) for its reconsideration.
Aggrieved by the impugned order, the Appellant-SRA has come up in appeal.
2. Coming to the brief facts of the case, the Corporate Debtor-M/s Adel
Landmarks Ltd. was admitted into CIRP on 05.12.2018. The Interim
Resolution Professional who was subsequently confirmed as the Resolution
Professional ("RP" in short) had invited EoI in Form-G. The Appellant-SRA
had also submitted their plan which underwent several rounds of
deliberations and negotiations with the CoC to be finally approved with a vote-
share of 82.66% in the 27th meeting of the CoC held on 15.09.2022. The RP
thereafter issued a Letter of Intent ("LoI" in short) in favour of the SRA who
in turn furnished the Performance Bank Guarantee on 13.12.2022. The RP-
Respondent No.1 submitted IA No. 1817 of 2023 before the Adjudicating
Authority seeking approval of the resolution plan approved by the CoC. The
Adjudicating Authority rejected the prayer contained in IA No. 1817 of 2023
and remanded the resolution plan back to the CoC for reconsideration in the
light of developments in the following five areas:
(i) treatment of projects/properties which are under attachment by virtue
of Provisional Attachment Order ("PAO" in short) dated 09.01.2026
issued by the Directorate of Enforcement ("ED" in short).
(ii) treatment of properties belonging to Mr. K.H. Khan and Mrs. Shaheda
Begum in Bangalore (hereinafter referred to as "Khan Property").
Page 3 of 18 Company Appeal (AT) (Ins) No. 460 of 2026
(iii) treatment in respect of 30 flats in Project Era Divine Court.
(iv) treatment of the licenses issued by Department of Town and Country
Planning ("DTCP" in short).
(v) reconsideration of the pending claims of home-buyers who had not
submitted their plan earlier.
Aggrieved by the above directions contained in the impugned order, the
present appeal has been preferred by the Appellant-SRA.
3. Making submissions on behalf on the Appellant, Shri Krishnendu Datta
and Shri Abhijeet Sinha, Ld. Sr. Counsels submitted that all the grounds on
which the Adjudicating Authority had remanded the resolution plan back to
the CoC for reconsideration were untenable in that they relate to matters
which have either been already considered at length by the CoC or continue
to remain pending for adjudication before some other competent fora of law
or relate to proceedings which stand protected by operation of Section 32A of
the IBC. It was vehemently contended that when the CoC had taken a well-
considered commercial decision with more than requisite majority to approve
the resolution plan of the Appellant, which plan not having been objected to
by any stake-holder including the Financial Creditors, the Adjudicating
Authority clearly transcended its jurisdiction by directing that a concluded
commercial decision by the CoC be revisited again by the CoC without
recording any specific grounds of statutory non-compliance or material
irregularity in the conduct of the CIRP process. It was also submitted that the
Adjudicating Authority passed the impugned order remanding the plan back
to the CoC almost seven years after the initiation of the CIRP of the Corporate
Page 4 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 Debtor in 2018 and almost four years after the approval of the resolution plan
by the CoC thus infusing an element of uncertainty into the resolution process
which is otherwise supposed to be a time-bound exercise. Submission was
pressed that the impugned order deserves to be set aside as it is contrary to
the settled law of impermissible interference with the commercial wisdom of
the CoC as laid down by the Hon'ble Supreme Court in K. Sashidhar Vs
Indian Overseas Bank (2019) 12 SCC 150 and Committee of Creditors of
Essar Steel India Limited Vs Satish Kumar Gupta & Ors. (2019) SCC
OnLine SC 1478.
4. Making submissions on behalf of the Resolution Professional-
Respondent No.1, Shri P. Nagesh Ld. Sr. Counsel submitted that the
resolution plan of the SRA which had been approved by the CoC with majority
vote-share was a statutorily compliant plan which has been remanded back
to the CoC for reconsideration by the Adjudicating Authority when there was
no pressing need for making any such remand. It was also submitted that the
grounds on which the plan had been remanded back to the CoC comprised of
issues which were already within the knowledge of the CoC and stood duly
considered by the CoC and hence remitting the matter back to the CoC by the
Adjudicating Authority was not only a redundant exercise but also without
authority of law. Dilating on each of the five observations made by the
Adjudicating Authority, it was submitted that the issue of Khan property
being remanded back to the CoC was totally unwarranted as the plan itself
recognised the pendency of litigation in respect of the Khan Property and the
Hon'ble Supreme Court after granting interim protection in favour of the
Page 5 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 Khans had already given directions to the RP to go ahead with the CIRP
proceedings. The CoC having taken note that the plan dealt with the Khan
Property appropriately in consonance with the directions of the Hon'ble
Supreme Court and had subjected the Khan Property to final orders of the
Hon'ble Supreme Court, the CoC had nothing further to look into in respect
of treatment of Khan property in the plan. As regards the subject property
which had come under PAO of the ED, the attachment order having been
issued subsequent to the approval of the plan by the CoC, it was contended
by the RP that this could not constitute a valid ground for remanding back of
the plan since Section 32A of the IBC protects the properties provisionally
attached by the ED and the SRA was eligible to claim benefit under Section
32A of the IBC. The third ground on which the plan had been remanded back
was with respect to 30 flats in Project Era Divine Court which was the subject
matter of IA No. 5717 of 2024 on which claims had been submitted by BPTP
Ltd. When the Adjudicating Authority had themselves dismissed IA No. 5717
of 2024 by which BPTP had objected to the plan and the RP having given an
undertaking that the said flats would remain protected and on an appeal filed
against this order by BPTP, this Appellate Tribunal had directed the
Adjudicating Authority to proceed with the plan approval application, there
was no cogent basis to make the subject property a ground for remand. The
fourth ground on which the Adjudicating Authority had remanded the
resolution plan back to the CoC were in respect of 13 licenses issued by DTCP.
However, when the resolution plan of the SRA provided treatment for DTCP
claims including fees for renewal of licenses for which provision had already
been earmarked which aspect was also considered by the CoC while approving Page 6 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 the resolution plan, it defies logic as to why the plan was remanded on this
count. The last observation made by the Adjudicating Authority for the CoC
to consider pending claim applications of home-buyers, it was pointed out
that the plan clearly provided that home-buyers who have not filed claims
shall be treated at par with the home-buyers who have filed their claims.
Hence even this was no cogent reason for the Adjudicating Authority to
remand the resolution plan to the CoC. It was also submitted that subsequent
to the passing of the impugned order, the RP had placed the impugned order
dated 27.02.2026 for consideration of the CoC in its 35th CoC meeting held
on 13.03.2026. It was further added that the CoC was also kept apprised that
an appeal had already been filed by the Appellant-SRA against the impugned
order. The CoC after due deliberations reiterated its earlier decision approving
the resolution plan while also expressing their support to the appeal preferred
by the SRA.
5. Shri IPS Oberoi, Authorised Representative on behalf of Respondent
No.2-Class of Creditors submitted that 4500 allottees who had filed their
claims as allottees constituted the largest Financial Creditor in the CoC as a
Class of Creditors. The resolution plan of the SRA had been approved by the
CoC in its 27th meeting was also approved by this Class of Creditors who
constituted the single largest constituent of the CoC with 41% vote-share. The
Class of Creditors belonging predominantly to the middle-class strata of
society and included senior citizens were looking forward to a time-bound
resolution process with the expectation of getting ownership and possession
of units. However, remanding back the plan would once again delay the
Page 7 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 resolution at a time when the home-buyers have already waited for nearly 14
years. In the absence of early approval of the resolution plan, irreparable
injury and prejudice would be caused to the creditor in class. It was therefore
urged that this Tribunal in the exercise of its appellate jurisdiction may direct
the Adjudicating Authority to consider the resolution plan alongwith its
various clarifications/addendum as submitted by the SRA in a time-bound
manner.
6. The Ld. Counsels representing the Respondent No.3-ACRE and
Respondent No.4-Indo Jatalia Holdings Ltd. assailing the impugned order also
supported the resolution plan of the SRA. It was contended that the points
on which the Adjudicating Authority has desired re-examination of the
resolution plan have already been settled or pending before the competent
forum of law or has already been adequately addressed in the plan leaving no
room for consideration. It was contended that when the resolution plan had
been exhaustively discussed in the CoC meetings and a decision was taken
by the CoC to approve the plan after taking into account the commercial
feasibility, viability and value maximisation aspect, the Adjudicating
Authority could not have returned the plan back to the CoC when there was
no material irregularity or contravention of any law.
7. We have duly considered the arguments advanced by the Learned
Counsel for the parties and perused the records carefully.
8. The short question for our consideration is whether the five grounds on
which the Adjudicating Authority had remanded the plan approved by the
Page 8 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 CoC with requisite majority was in accordance with the statutory framework
of IBC and the well settled legal precept of the commercial wisdom of the CoC.
9. To answer the above question that we have outlined for ourselves, we
need to first look at the five grounds basis which the CoC has been directed
by the Adjudicating Authority to revisit and reconsider the plan approved by
it and also examine the tenability of these grounds in the eyes of law.
10. One of the five grounds which had attracted the attention of
Adjudicating Authority was the ongoing litigation in respect of Khan
properties belonging to K.H. Khan and Shaheda Begum. From material on
record and averments made, the Khans had filed IA No. 4648 of 2020 before
the Adjudicating Authority seeking exclusion of certain parcels of land from
the Information Memorandum and CIRP of Corporate Debtor. The
Adjudicating Authority had dismissed IA No. 4648 of 2020 on 30.04.2024 but
had directed the RP on 05.06.2025 to file an affidavit to keep the Khan
Property outside the purview of the resolution plan. Accordingly, the RP had
filed three affidavits on 11.06.2025, 15.07.2025 and on 19.09.2025 in
compliance. Even when the matter had reached the portals of the Hon'ble
Supreme Court, we notice that the Hon'ble Apex Court after granting interim
protection in favour of the Khans had concurrently given directions to the RP
to go ahead with the CIRP proceedings. Thus even after the matter got agitated
at the highest judicial fora, we do not find any embargo having been placed
on the continuation of the CIRP of the Corporate Debtor at any stage. The CoC
during its deliberations also took conscious notice of the fact that the plan
not only acknowledged the pendency of litigation but had incorporated
Page 9 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 necessary safeguards by keeping the treatment of the Khan property as an
asset subject to the final outcome of the proceedings before the Hon'ble
Supreme Court. The CoC having taken note that the plan dealt with the Khan
Property appropriately in consonance with the directions of the Hon'ble
Supreme Court in that the plan had subjected the property to final orders of
the Hon'ble Supreme Court, we are of the considered view that the CoC was
not required from any angle to look further in the matter of treatment of Khan
property in the plan.
11. The next area of concern which led the Adjudicating Authority to
remand the plan back to the CoC relates to the subject property which had
come under PAO of the ED. It is the contention of the RP that the attachment
order had been issued subsequent to the approval of the plan by the CoC. It
was also emphatically asserted that the attachment was only provisional and
not final in nature as borne out from ED's own affidavit dated 02.02.2026. It
was further contended by the RP that in terms of Section 32A of the IBC, once
a Resolution Plan is approved and there is a change in management of the
Corporate Debtor, the Corporate Debtor and its properties stand protected
from prosecution and attachment for offences committed prior to the
commencement of the CIRP. Reliance was placed on the judgement of the
Hon'ble Supreme Court in Kalyani Transco v. Bhushan Power and Steel
Limited & Ors. in Civil Appeal No. 1808 of 2020 which has clearly
recognized the effect of Section 32A of the IBC in protecting the assets of the
Corporate Debtor from enforcement proceedings arising out of prior offences
once the Resolution Plan stands approved and such property is covered under
Page 10 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 the Resolution Plan approved by the Adjudicating Authority under Section 31
of the IBC. Further, it was pointed out that this Hon'ble Tribunal in Vantage
Point Asset Management Pvt. Ltd. v. Gaurav Misra, Resolution
Professional of Alchemist Infra Realty Ltd in CA(AT)(Ins.) No. 1495 of
2024 reiterated that attachments or enforcement actions in relation to prior
offences cannot impede the implementation of a Resolution Plan once the
statutory protections under the IBC are triggered. We also notice that the RP
had kept apprised the CoC of the ED proceedings. It is also the contention of
the SRA that it had submitted its plan after conducting due diligence and
after verifying all the information contained in the Information Memorandum
and it was aware that as SRA it was eligible to claim benefit under Section
32A of the IBC which provides them protection in respect of properties
provisionally attached by the ED. In this backdrop of RP having kept apprised
the CoC of the ED proceedings and that the SRA, before submitting his plan,
was also aware of the PAO on having done his share of due diligence, mere
existence of PAO cannot be seen to render the resolution plan incapable of
implementation. The Adjudicating Authority has failed to appreciate the
statutory protection provided under Section 32A of the IBC and the binding
judicial precedents governing the interplay between insolvency proceedings
and enforcement actions. We therefore fail to appreciate the concern
expressed in the impugned order of the need to remand the matter back again
to the CoC on this ground.
12. The third ground on which the Adjudicating Authority remanded back
the plan were 30 flats in Project Era Divine Court on which claims had been
Page 11 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 submitted by BPTP Ltd. On the claim made by BPTP on the 30 flats, it was
submitted by the RP that in the absence of registration of any charge on these
flats, no valid or enforceable security interest can be said to have existed on
those flats. In any case, BPTP Ltd had already filed IA No. 5717 of 2024
objecting to the plan which the Adjudicating Authority had themselves
dismissed. It was also submitted that the Adjudicating Authority while
dismissing the proceedings initiated by BPTP Ltd. on 05.06.2025 had directed
the RP to file an affidavit stating that the 30 flats of Era Divine Court Project
would be kept aside and not alienated and the SRA on the directions of the
RP had also submitted a compliance affidavit to this effect. After the
Adjudicating Authority dismissed IA No. 5717 of 2024, an appeal was also
filed by BPTP Ltd. against this order of 05.06.2025. However, this Tribunal
in its interim order dated 25.08.2025 which appears at page 1148 of Appeal
Paper Book ("APB" in short) directed the Adjudicating Authority to proceed
with consideration of the plan approval application subject to the outcome of
the appeal. In such circumstances, when the Appellate Tribunal was already
seized of the matter and did not preclude the Adjudicating Authority from
proceeding with the plan approval application, there was no cogent reason for
the Adjudicating Authority to make this as a ground to remand the resolution
plan to the CoC, more so, when the RP/SRA had already given an undertaking
that the said flats would remain protected. In this backdrop, we do not find
any cogent basis for the Adjudicating Authority in making the Project Era
Divine Court property a ground for remanding the plan back to the CoC.
Page 12 of 18 Company Appeal (AT) (Ins) No. 460 of 2026
13. The fourth ground on which the Adjudicating Authority had remanded
the resolution plan back to the CoC was in respect of 13 licenses issued by
DTCP for various housing projects being developed by the Corporate Debtor.
The DTCP had filed IA No. 1399 of 2025 in which they had sought exclusion
of certain licenses issued to wholly owned subsidiaries of the Corporate
Debtor even though the land and development rights in respect of the said
projects remained vested with the Corporate Debtor. The RP had clarified to
DTCP that the development rights in respect of land was vested in the
Corporate Debtor though the licenses were issued in the name of subsidiaries
as can be seen at page 1151 of APB. The RP had also clarified to the
Adjudicating Authority that the judgment of this Tribunal in the Granite Gate
Property Pvt. Ltd. Vs Devendra Singh in CA(AT)(Ins) No. 1479 of 2024
was not applicable to the facts of the present case since there was no Lease
Agreement or lease rentals involved in the present case. Furthermore, the
resolution plan of the SRA provided treatment for DTCP claims at Clause 29
of the resolution plan including making earmarked provision for fees for
renewal of licenses as may be seen at page 234 of APB. Thus, we are inclined
to agree with the RP that when the DTCP licences had been dealt with in the
resolution plan which aspect was also considered by the CoC while approving
the resolution plan, the plan could not have been remanded back again on
this ground.
14. On the last observation made by the Adjudicating Authority for the CoC
to consider pending claim applications, it was pointed out that the plan clearly
provided that home-buyers who have not filed claims shall be treated at par
Page 13 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 with the home-buyers who have filed their claims. In view of such explicit
provision for equitable treatment made out even for home-buyers who have
not submitted their claims in the plan, we are inclined to agree with the RP
that when the plan as approved by the CoC provided for parity of treatment
to even those who had not filed their claim, re-opening belated claims of home-
buyers at this stage would clearly run counter to the precepts of law laid down
in the judgment of the Hon'ble Supreme Court in the case of M/s RPS
Infrastructure Ltd. Vs Mukul Kumar (2023) 10 SCC 718.
15. It is the case of the Appellant-SRA that when it had satisfied the CoC of
its bonafide intent to implement the resolution plan to revive the Corporate
Debtor, the Adjudicating Authority could not have remanded the resolution
plan back to the CoC by harbouring unsubstantiated apprehensions
regarding the feasibility and viability of the plan and its implementation by
relying upon developments which had arisen either post the approval of the
plan by the CoC or had been adequately addressed by the CoC in its
deliberations. It was vehemently asserted that the Adjudicating Authority
enjoys limited powers of judicial review in terms of Section 30(2) and Section
31 of the IBC on the decision taken by the CoC in the exercise of its
commercial wisdom while evaluating and approving a plan. However, the
Adjudicating Authority in the present factual matrix by remanding the plan
for reasons other Section 30(2) and Section 31 of the IBC, it had clearly
travelled beyond the limited jurisdiction conferred upon the Adjudicating
Authority. Submission was pressed that the impugned order deserved to be
Page 14 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 set aside and the plan sent back to the Adjudicating Authority for its
consideration and approval in accordance with law.
16. It may be useful to notice that Section 30 of the IBC which deals with
submission of Resolution Plan and sub-section (6) thereto states that "the
resolution professional shall submit the Resolution Plan as approved by the
Committee of Creditors to the Adjudicating Authority". In the present case,
the RP after approval of the plan by the CoC had filed IA No. 1817 of 2023
before the Adjudicating Authority seeking approval of the Resolution Plan
under Section 31 of the IBC. Section 31 deals with approval of Resolution Plan
wherein subsection (1) provides that if the Adjudicating Authority is satisfied
that the Resolution Plan as approved by the CoC under Section 30(4) meets
the requirements as referred to in Section 30(2), it shall by order approve the
resolution plan which shall be binding on the Corporate Debtor and other
stakeholders involved in the Resolution Plan. From the material available on
record, it is an undisputed fact that the CoC has approved the plan in the
present case with 82.66% voting share. Thus, the CoC had clearly exercised
its commercial wisdom as contemplated under the law by majority voting. The
observations made by the Adjudicating Authority basis which it has remanded
the said plan back to the CoC are issues which had already been adequately
addressed either within the resolution plan or through undertakings placed
on record during various stages of the proceedings and do not attract Section
30(2) of the IBC. These five grounds relied upon by the Adjudicating Authority
for remanding the plan back to CoC cannot be said to constitute genuine
impediments which would come in the way of the consideration of the plan by
Page 15 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 the Adjudicating Authority. In this backdrop, the Adjudicating Authority
ought to have proceeded with considering the plan placed before it rather than
substitute the commercial wisdom of the CoC with its own views without
either recording any specific provision of law or CIRP Regulations which have
been contravened or without pointing out at any material irregularity in the
process of plan approval.
17. We are also guided by the judgement of the Hon'ble Supreme Court in
K. Sashidhar v. Indian Overseas Bank (2019) 12 SCC 150 and para 52
thereof is reproduced below:
"52....... Besides, the commercial wisdom of the CoC has been given paramount status without any judicial intervention, for ensuring completion of the stated processes within the timelines prescribed by the I&B Code. There is an intrinsic assumption that financial creditors are fully informed about the viability of the corporate debtor and feasibility of the proposed resolution plan. They act on the basis of thorough examination of the proposed resolution plan and assessment made by their team of experts. The opinion on the subject matter expressed by them after due deliberations in the CoC meetings through voting, as per voting shares, is a collective business decision. The legislature, consciously, has not provided any ground to challenge the "commercial wisdom" of the individual financial creditors or their collective decision before the adjudicating authority. That is made non-justiciable."
18. In the given statutory framework of IBC, there is only limited review
which can be exercised by the Adjudicating Authority without trespassing
upon the business decision of the CoC. There can be no fetters on the
commercial wisdom of CoC and the supremacy of commercial wisdom of CoC
has been reaffirmed time and again by the Hon'ble Supreme Court. When the
CoC has approved a Resolution Plan by requisite voting share after
considering its feasibility and viability, such decision of CoC cannot be
Page 16 of 18 Company Appeal (AT) (Ins) No. 460 of 2026 interfered in the exercise of judicial review either by the Adjudicating
Authority or by this Tribunal in the exercise of its appellate powers. The
legislative fiat of IBC does not equip the Adjudicating Authority to raise
general concerns about the fitness, justness or effectiveness of the plan once
it is approved by the CoC in the exercise of its commercial wisdom.
Furthermore, when the resolution plan had already been approved by the CoC
wherein the Class of Creditors who largely belonged to the middle class gentry
some of whom were aged and senior citizens who had invested their entire
savings in the project of Corporate Debtor and were now eagerly looking
forward to a time-bound resolution process and hoping to get ownership and
possession of units for which they had paid more than a decade back it goes
without saying that their hopes would be dashed to the ground if the
impugned order is allowed to prevail over the commercial wisdom of the CoC.
We do not see any cogent basis for remanding back of the plan and pushing
it into the quagmire of delay at a time when the home-buyers have already
waited for nearly 14 years for delivery of their units.
19. In result, we are of the considered view that none of the five grounds
given by the Adjudicating Authority has any substance which can be a valid
ground to not consider the application submitted by the RP for approval of
resolution plan in accordance with law. The Adjudicating Authority having
failed to point out any material irregularity or contravention of any provision
of law by the CoC in approving the plan, there was no good ground to remand
the plan back to the CoC for reconsideration.
Page 17 of 18 Company Appeal (AT) (Ins) No. 460 of 2026
20. In view of the above, we find sufficient merit in the appeal. The Appeal
is allowed. The impugned order passed by the Adjudicating Authority is set
aside and IA No. 1817 of 2023 is revived before the Adjudicating Authority for
passing of fresh order in accordance with law. On production of this order
before the Adjudicating Authority, we also request that the Adjudicating
Authority may expeditiously take up the plan for its consideration and
approval and complete the process preferably within sixty days as the CIRP
process has already dragged on for far too long. No costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical) Place: New Delhi Date : 16.04.2026 Abdul
Page 18 of 18 Company Appeal (AT) (Ins) No. 460 of 2026
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free