Kalyan Dombivali Municipal Corpration vs Nrc Limited
- CitationCompany Appeal (AT) (Insolvency) No. 223 of 2021
Ratio decidendi
The rule this decision rests on
Where a statutory authority, having been informed by the Resolution Professional of the commencement of the corporate insolvency resolution process, fails to submit its claim with proof within the period fixed by the public announcement, and the claim is not part of the approved resolution plan, that claim stands extinguished, since after the 2018 amendment to Regulation 12 filing a claim with proof is a condition precedent and the authority cannot plead ignorance of the process once it has been informed of it. Reliance on a decision that concerned a belatedly filed claim made under the pre-amendment Regulation 12 is misplaced, because the distinction turns on the regulatory regime in force when the public announcement was made, so that decision does not govern a case where no claim was filed under the amended regulation. Once a resolution plan is approved under Section 31(1), claims not provided for in the plan, including statutory dues owed to a State Government or local authority, stand extinguished, and no proceedings may be continued in respect of them for the period before the approval.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE MATTER OF: KALYAN DOMBIVALI MUNICIPAL CORPORATION Kalyan Mahanagarpalika Shivaji Chowk, Thane 421 301, Maharashtra ...Appellant
Versus
NRC LIMITED 67, Ground Floor, 75, Surajmal Building, Nakoda Street, Off Abdul Rehman Street, Pydhone, Mandavi, Mumbai 400 003 Maharashtra
MR. VIKAS PRAKASH GUPTA Resolution Professional of the Corporate Debtor/ Respondent, 3rd Floor, Plot No. 16B, Padmanabh Apartment, Tilak Nagar, Nagpur- 440010 Maharashtra ...Respondents
Present: For Appellant : Mr. Rahul Chitnis, Mr. Samrat K. Shinde, Advocates For Respondent : Mr. Vikram Hedge, Ms. Alvia Ahmed, Ms. Raksha Agarwal, for RP Mr. Vikram Nankani, Sr. Adv. with Mr. Mahesh Agarwal, Mr. Shivam Shukla, Ms. Geetika Sharma and Mr. Himanshu Satija, Advocates for RA
JUDGMENT
Per: Justice Rakesh Kumar Jain:
The Appellant has challenged the order dated 13.03.2020 passed by
the Adjudicating Authority (National Company Law Tribunal, Mumbai
Bench) by which an application bearing M.A. No. 2531 of 2019 filed by the
Resolution Professional (RP) under Section 30(6) and 31 of the Insolvency
and Bankruptcy Code, 2016 (in short 'Code') in CP(IB)1886/MB/2018 for
approval of the resolution plan of the Corporate Debtor has been allowed.
2 2. In brief, the Adjudicating Authority vide order dated 27.11.2018,
initiated Corporate Insolvency Resolution Process (CIRP) against the NRC
Limited (Corporate Debtor/Respondent No. 1) and appointed Vikas Prakash
Gupta (Respondent No. 2) as the Interim Resolution Professional (IRP) who
was further confirmed as the RP of the Corporate Debtor pursuant to the
resolution of the Committee of Creditors (CoC) in its second meeting held on
21.01.2019. The resolution plan submitted by the Resolution Applicant (RA)
i.e. Adani Properties Private Limited, on 10.05.2019, was approved by the
CoC with 99.88% vote share whereas 0.00% voters abstained from voting
and 0.12% voters of the CoC rejected the plan. The Respondent No. 2, by
way of an application bearing M.A. No. 2531 of 2019, submitted the
resolution plan for consideration/approval of the Adjudicating Authority,
which was approved by the members of CoC. The application i.e. 2531 of
2019 has been allowed by the impugned order dated 13.03.2020 against
which the present appeal has been preferred by the Appellant (Kalyan
Dombivali Municipal Corporation).
3. The brief facts, extracted from the memorandum of appeal are that the
town planning department of the Appellant gave permission to Respondent
No. 1 to construct a total area of18,07,826 sq. meters. The Appellant served
demand notice dated 17.01.1996 to Respondent No. 1 regarding property
tax calculated at Rs. 2,17,43,656/- per year. The Respondent No. 1
challenged the demand by filing objection dated 22.01.1996, which was
rejected. The Appellant sent a demand notice to the Respondent No. 1 after
the objection was rejected. The Respondent No. 1 challenged the said notice
by way of Municipal Suit No. 51 of 1996 and 52 of 1996 before the JMFC,
Company Appeal (AT) (Insolvency) No. 223 of 2021 3
Kalyan. Both suits were disposed of on 30.04.2001. The Appellant
challenged the decree dated 30.04.2001 by way of Civil Appeal No. 111 of
2001 before the District Court, Kalyan. Vide Judgment dated 15.07.2003
the District Court fixed the property tax amount at Rs. 1,55,94,912/- per
year and the earlier tax paid of an amount of Rs. 1,50,44,430/- by the
Respondent No. 1 was settled. The Appellant sent a fresh demand notice as
per the revised tax amount decided by the District Court which was
challenged by the Respondent No. 1 in Writ Petition No. 3379 of 2005 in
which ad-interim injunction was granted on 12.05.2005 by the High Court
with two conditions, namely, the Respondent No. 1 to deposit Rs. 77,58,04/-
within a period of two weeks and shall also deposit Rs. 2 Crores on or before
17.06.2005. The Respondent No. 1 vide receipt no. 6052 dated 25.05.2005
deposited Rs. 77,58,084/- but it is alleged that Rs. 2 Crores was not
deposited. According to the Appellant, Municipal Suit No. 51 of 1996 was
dismissed on 20.10.2005 and the amount of tax fixed by the Appellant was
confirmed. The demand notice no. 33601 dated 02.09.1996 was quashed.
The Appellant then issued a fresh demand notice. The Respondent No. 1
challenged the order dated 20.10.2005 in Writ Petition No. 8674 of 2005
praying that the appeals should proceed without Respondent No. 1 paying
the property tax but the said petition was dismissed by the High Court on
18.07.2006. The Respondent No. 1 challenged the order dated 18.07.2006
by way of SLP(C) No. 14419 of 2006 in which the Hon'ble Supreme Court on
13.11.2006, directed Respondent No. 1 to deposit a total sum of Rs. 4.5
Crore including the earlier paid amounts and directed that further no tax
will be recovered till all the Municipal Appeals are decided finally. The
Company Appeal (AT) (Insolvency) No. 223 of 2021 4
Respondent No. 1 deposited Rs. 3,72,42,000/- as the balance amount with
the Appellant vide receipt no. 74307 on 08.01.2007. It is the case of the
Appellant that since Municipal Appeal is still pending, therefore, the
Appellant has not taken any steps for recovery of the taxes in view of the
judgment dated 13.11.2006. It is averred that a meeting was called by the
Deputy Chief Minister of Maharashtra in respect of issues raised by the
workers of Respondent No. 1 in which it was decided on 12.02.2009 that the
Appellant and Respondent No. 1 shall enter into a registered agreement to
create first charge of the Appellant on the properties of the Respondent No. 1
which shall be sufficient to recover the property tax. It is also averred that in
the meeting held on 17.04.2009 with Labour Minister of Maharashtra, it was
decided that the Appellant and Respondent No. 1 shall open an escrow
account in a Nationalised Bank and the amount of Rs. 6,68,76,000/-
receivable against the property tax by the Appellant shall be deposited by
the Respondent No. 1. Further, the agreement was entered into between the
Appellant and the Respondent No. 1 on 22.04.2009 as decided in the
meeting dated 12.02.2009 and an escrow account was opened in the
Nationalised Bank. It is also averred that the Respondent No. 1 gave no
objection to the Appellant to withdraw the amount lying in the escrow
account subject to the orders of the Court in the Municipal Appeal but it is
alleged that Respondent No. 1 never deposited the agreed amount of Rs.
6,68,76,000/- in the escrow account. It is alleged that
CP(IB)1886/MB/2018 filed by the Punjab National Bank against
Respondent No. 1 was admitted on 27.11.2018 and then M.A. No. 2531 of
2019 was filed by the RP for approval of the resolution plan but the
Company Appeal (AT) (Insolvency) No. 223 of 2021 5
Appellant was not made a party either to the said application of Respondent
No. 2 nor was informed about the same.
4. In reply filed by Respondent No. 1, it is alleged that in the year 2005-
06, the Corporate Debtor/answering Respondent began incurring huge
losses and was declared a sick company by BIFR on 31.10.2008. The
Corporate Debtor declared a lock-out of its factory at Mohone, which is
continuing till the date of commencement of the CIRP. It is further averred
that CIRP of the Corporate Debtor was initiated by the Adjudicating
Authority on 27.11.2018 on the application filed by the Financial Creditor
(PNB). A CoC comprising of six financial creditors was constituted. The RP
made a public announcement on 07.12.2018 inviting claims from all the
creditors of the Corporate Debtor, including Financial and Operational
Creditors, in terms of Section 15 of the Code read with Regulation 6 of the
Insolvency and Bankruptcy Board of India (Insolvency Resolution Process
for Corporate Persons) Regulations, 2016 (in short 'Regulations'). The RP
made the public announcement in Marathi (i.e.Navshakti) as well as in
English (i.e The Free Press Journal) having wide circulation and also
published notice on the website of the Corporate Debtor. The RP sent a
letter dated 11.12.2018 to the Appellant to intimate about the appointment
of the IRP by the Adjudicating Authority. The Appellant was thus timely
informed about the proceedings. A copy of letter dated 11.12.2018 has been
attached as Annexure B with the Reply. Consequent on the public
announcement, the RP received claims from various financial and
operational creditors including four local/central government bodies and
after verification of all submitted claims, duly collated the claims and
Company Appeal (AT) (Insolvency) No. 223 of 2021 6
prepared the information memorandum (IM) on 25.03.2019 as per Section
29 r/w Regulation 36 of the Code. As per IM, the amount admitted claims of
various government agencies was approximately Rs. 2.26 Crores and at no
point of time the Appellant submitted their claim to the RP despite the
public announcement made in accordance with law and also the letter
Annexure B. It is alleged that the Appellant had the knowledge of the CIRP
proceedings and ought to have submitted their claims within the prescribed
period and cannot now after such a belated stage claim ignorance and
attempt to stall the proceedings of the resolution process.
5. In the rejoinder to the reply filed by the Respondent No. 1, the
Appellant has reiterated the averments made in the memorandum of appeal.
6. Counsel for the Appellant has submitted that though neither the
Appellant filed any claim about the pending dues of the property tax to the
RP nor any application in this regard to the Adjudicating Authority yet it is
vehemently argued that the RP was aware of the litigation between the
Appellant and CD about the property tax which was not being paid despite
notices. In this regard, he has relied upon a decision of the Hon'ble Supreme
Court in the case of State Tax Officer v. Rainbow Papers Ltd, 2022 SCC Online SC
1162to contend that it is the duty of the RP to examine the books of accounts
to form the statutory liability of the CD and on account of its failure the
resolution plan should not have been approved. It is also submitted that
information memorandum is bad in law because it does not provide the
information about the pending dues of the Financial Creditor and in this
regard, he has referred to an order dated 13.11.2006 of the Hon'ble
Supreme Court in Civil Appeal No. 14419 of 2006.
Company Appeal (AT) (Insolvency) No. 223 of 2021 7
7. On the other hand, Counsel appearing on behalf of the SRA has
submitted that the decision in the case of Rainbow Papers Ltd. (Supra) is
not applicable because the issue involved therein was about the claims not
made within the period of limitation and also submitted that information
memorandum is for the prospective resolution applicant and cannot be
applied where the resolution plan has been approved. He has further
referred to Regulation 12(2) of the Regulations to contend that there is an
amendment in the Regulation w.e.f. 04.07.2018 by which claim with proof
has been substituted whereas the application was admitted by the
Adjudicating Authority on 27.11.2018. He has argued that public
announcement was made on 07.12.2018 and the letter was sent on
11.12.2018 (Annexure -B) informing the Appellant about the appointment of
the IRP and the fact that he is in control of entire state of affairs of the
Company as on the date 05.12.2018 including the
management/properties/books of accounts/staff-employees and entire state
of affairs. He also referred to the decision of the Hon'ble Supreme Court in
the case of Ghanashyam Mishra and Sons Private Limited through the
Authorized Signatory vs. Edelweiss Asset Reconstruction Company Limited
through the Director &Ors. 2021 SCC Online SC 313 to contend that after
the expiry of the period of limitation the statutory claims cannot be
recovered.
8. Counsel appearing on behalf of the RP has argued that in terms of
Regulation 6 of Regulations, the publication was made in which it was
categorically mentioned that the statutory authority may file their claim with
Company Appeal (AT) (Insolvency) No. 223 of 2021 8
proof and has also referred to a letter dated 11.12.2018 (Annexure-B) which
has been appended with the reply of SRA.
9. In rebuttal, Counsel for the Appellant has also referred to Section 141
of the Maharashtra Municipal Corporation Act to contend that it has a first
charge whereas the RP has submitted that since no claim was made in this
regard, therefore, it was not part of the information memorandum.
10. We have heard Counsel for the parties and perused the record with
their able assistance.
11. From the resume of the aforesaid facts, it is clear that CIRP of the
Corporate Debtor was initiated on 27.11.2018 and the RP made the public
announcement, inviting the claims of all the creditors of the Corporate
Debtor by publication in Marathi (i.e.Navshakti) as well as in English (i.e
The Free Press Journal) and also published notice on the website of the
Corporate Debtor. It has also come on record that the RP sent a letter dated
11.12.2018 to the Appellant intimating about its appointment as IRP of the
Corporate Debtor and that he has taken over the charge of the entire asset
of the Corporate Debtor w.e.f.15.12.2018 but despite that the Appellant did
not choose to put up any claim before the RP whereas according to the RP
the claim received from Financial Creditors and Operational Creditors
including the Govt. bodies and authorities were duly collated and IM was
prepared on 25.03.2019 and as per IM, the claim of the various Govt.
agencies was approximately Rs. 2.26 Crores. The Appellant has not denied
the fact that he did not file any claim but its whole case is that the books of
accounts of the Corporate Debtor would have reflected the liability of the
Appellant but the RP did not examine the books of accounts and included
Company Appeal (AT) (Insolvency) No. 223 of 2021 9
the same in the IM and hence, the resolution plan is not inconformity with
the statutory requirement of the Code. The Appellant has relied upon
decision of the Hon'ble Supreme Court in the case of Rainbow Papers
Limited (Supra), which in our considered opinion it is not applicable to the
facts and circumstances of the present case.
12. In the case of Rainbow Paper Limited (Supra), the application filed by
the State Tax Officer (1) was dismissed holding that the Government cannot
claim first charge over the property of the Corporate Debtor, as Section 48 of
the Gujarat Value Added Tax, 2003 (GVAT Act) which provides for first
charge on the property of a dealer in respect of any amount payable by the
dealer on account of tax, interest, penalty etc. cannot prevail over Section 53
of the Code and thus the question which was raised in the said appeal was
as to whether the provision of the IBC and, in particular, Section 53 thereof,
overrides Section 48 of the GVAT Act? In the cited case, the State Tax Officer
filed a claim before the RP in the requisite Form B which was held to be
beyond time. The RP informed the Appellant therein that the entire claim of
the Appellant has been waived off. The resolution plan was challenged by
the Appellant therein before the Adjudicating Authority on the ground that
Govt. dues can not be waived off. The said plea was rejected by the
Adjudicating Authority as well as by the Appellate Tribunal and hence, the
matter reached the Hon'ble Supreme Court. It is pertinent to mention that
the last date for submission of claim was 05.10.2017 and it was noticed in
the said decision that till 03.07.2018 Regulation 12 of the Regulations
provided that a creditor shall submit proof of claim on or before the last date
mentioned in the public announcement whereas w.e.f 04.07.2018 the said
Company Appeal (AT) (Insolvency) No. 223 of 2021 10
regulation was amended and the proof of claim was changed to claim with
proof required to be submitted on or before the last date mentioned in the
public announcement. It was observed that under the unamended
provisions of Regulation 12(1), the Appellant therein was not required to file
any claim. Read with Regulation 10, the Appellant would only be required to
substantiate the claim by production of such material as might be called for.
It was also held therein that the Section 48 of the GVAT Act is not contrary
to or inconsistent with Section 53 or any other provisions of the IBC. Under
Section 53(1)(b)(ii), the debts owed to a secure creditor, which would include
the State under the GVAT Act, are to rank equally with other specified debts
including debts on account of workman's dues for a period of 24 months
preceding the liquidation commencement date and that the State is a
secured creditor under the GVAT Act. Section 3(30) of the Code defines
secured creditor to mean a creditor in favour of whom security interest is
credited. Such security interest could be created by operation of law. The
definition of secured creditor in the IBC does not exclude any Govt. or
Authority. It was further ordered that "as observed above, delay in filing a
clam cannot be the sole ground for rejecting the claim"
13. The aforesaid decision, solely relied upon by the Appellant is not at all
applicable to the facts arising out of the case in hand because, firstly, the
Appellant did not file any claim, whereas in the case of Rainbow Papers
Limited (Supra) the claim was filed though belatedly. Secondly, the last date
for submission of claim in the case of Rainbow was 05.10.2017 and till then
unamended provisions of Regulation 12 were in operation as per which the
creditor was to submit proof of claim whereas in the present case public
Company Appeal (AT) (Insolvency) No. 223 of 2021 11
announcement for inviting claim was made on 07.12.2018 much after the
amendment in Regulation 12 of the Regulations which now provides that a
creditor shall submit a claim with proof. Meaning thereby, after the
amendment in Regulation 12 filing of the claim has become a sine quo non.
It is pertinent to mention that being a statutory authority, it cannot feign
ignorance about the necessity to file claim after having been informed by the
RP of the CIRP proceedings vide letter dated 11.12.2018. As a matter of fact,
the Appellant is to be blamed for not initiating the steps to set up its claim
before the RP. Moreover, it has now been settled that if the claims are not
submitted to the RP and are not part of the resolution plan then the same
shall be deemed to have been extinguished. In this regard, decision of three
judge bench judgment of the Hon'ble Supreme Court in the case of
Ghanashya Mishra and Sons (Supra) may be referred to which read is as
under:
95.(i) .....once a resolution plan is duly approved by the Adjudicating Authority under sub section (1) of Section 31, the claims as provided in the resolution plan shall stand frozen and will be binding on the Corporate Debtor and its employees, members, creditors, including the Central Government, any State Government or any local authority, guarantors and other stakeholders. On the date of approval of resolution plan by the Adjudicating Authority, all such claims, which are not a part of resolution plan, shall stand extinguished and no person will be entitled to initiate or continue any proceedings in respect to a claim, which is not part of the resolution plan;
...........
(iii) Consequently all the dues including the statutory dues owed to the Central Government, any State Government or any local authority, if not part of the resolution plan, shall stand extinguished and no proceedings in respect of such dues for the period prior to the date on which the Adjudicating Authority grants its approval under Section 31 could be continued."
Company Appeal (AT) (Insolvency) No. 223 of 2021 12
14. Thus, in view of the aforesaid discussion, we do not find any merit in
this appeal for the purpose of interference and hence, the same is hereby
dismissed. No costs.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Kanthi Narahari] Member (Technical)
New Delhi
20th December, 2022
Sheetal
Company Appeal (AT) (Insolvency) No. 223 of 2021
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free