Indo World Infrastructure Pvt. Ltd vs Mukesh Gupta & Ors
- CitationCompany Appeal (AT) (Ins.) No. 93 of 2022
Ratio decidendi
The rule this decision rests on
An agreement to sell an immovable property does not of itself convey ownership or create any interest in or charge on the property; title passes only upon execution and registration of a conveyance deed, as required by Sections 54 and 55 of the Transfer of Property Act, 1882 and the Registration Act, 1908. Where a lease deed prohibits sub-lease or transfer of the demised plot without the lessor's prior approval, and no such approval has been obtained, an agreement to sell the plot cannot be relied upon to claim sub-lease or ownership rights, and any transfer made in contravention of such a clause is ab initio null and void. Assets owned by a third party in possession of the corporate debtor under contractual arrangements fall within the Explanation to Section 18 of the Insolvency and Bankruptcy Code, 2016 and are excluded from the assets the resolution professional must take control of; but where the agreement relied upon confers only contractual development and sale rights and not ownership, the land remains an asset of the corporate debtor, and the resolution professional is not in breach of Section 18 or Section 20 in including it in the pool of assets. Pending interlocutory applications seeking exclusion of property from the corporate insolvency resolution process, filed after the committee of creditors has approved the resolution plan, do not vitiate the approval of the resolution plan by the Adjudicating Authority under Section 31(1); the Adjudicating Authority's approval is not invalidated by the non-disposal of such applications.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
[Arising out of order dated 13.12.2021 passed by the Adjudicating Authority, National Company Law Tribunal, New Delhi in CP (IB) No. 1022/ND/2018 IN I.A. No.2871/2021]
IN THE MATTER OF:
M/s Indo World Infrastructure Private Limited 99, Patparganj, Delhi - 110 091 ...Appellant
Versus
1. Shri Mukesh Gupta Resolution Professional of M/s Rohtas Projects Ltd., Flat No.2, First Floor, F-50B, Madhu Vihar Ext., Patparganj, New Delhi - 110 092
Also at: F-L, Milap Nagar, Uttam Nagar, New Delhi - 110 059 ...Respondent No. 1
2. M/s Wing Constructions & Developers Pvt. Ltd. Successful Joint Resolution Applicant D-277, Vibhuti Khand, Gomti Nagar, Lucknow - 226 010 Uttar Pradesh ...Respondent No. 2
3. Consortium Shri Rajbir Goyat and M/s Antriksh Infrdesign Pvt. Ltd. (Now GYGY Infradesigns Pvt. Ltd.) Successful Joint Resolution Applicant Plot No. 452, 2nd Floor, Dwarka Sector-19, New Delhi - 110 078 ...Respondent No. 3
Present:
For Appellant: Mr. Kunal Tandon, Mr. Sumit Kalra, Ms. Niti Jain, Advocates For Respondents: Mr. Abhishek Anand and Mr. Prateek Kushwaha, Advocates for R-1
Company Appeal (AT) (Ins.) No.93 of 2022 1 JUDGMENT
[Per: Barun Mitra, Member (Technical)]
The present appeal, filed under Section 61 of the Insolvency and
Bankruptcy Code, 2016 ("IBC" in short) by the Appellant arises out of order
dated 13.12.2021 (hereinafter referred to as 'Impugned Order') passed by the
Adjudicating Authority (National Company Law Tribunal, New Delhi, Bench-
III) in IA No. 2871/2021 in CP(IB) No. 1022/(ND)/2018. By the Impugned
Order, the Adjudicating Authority approved the Resolution Plan of the
Corporate Debtor without disposing IA Nos. 5333/2020 and 1587/2021 filed
by the present Appellant and therefore aggrieved by the impugned order, the
present appeal has been preferred by the Appellant.
2. The brief facts of the case necessary to be noticed for deciding the
appeal are: -
M/s Rohtas Projects Limited, the Corporate Debtor was allotted a plot
of land in Sector 140, Noida in 2007 by the Noida Authority for
construction and setting up of an Information Technology Enabled
Services (IT & ITES) commercial complex. The lease deed in favour of
Corporate Debtor was executed on 22.10.2008 by which the Corporate
Debtor came to have possession of the said plot of land.
The Corporate Debtor later entered into an Agreement to Sell
("Agreement" in short) on 14.04.2015 with M/s Indo World
Infrastructure Private Limited, the present Appellant by virtue of
Company Appeal (AT) (Ins.) No.93 of 2022 2 which the Appellant got rights for construction and development of
6,00,000 sq. ft. therein (hereinafter referred to as the 'Project land').
The Appellant in turn had entered into a sub-contract with Antriksh
Real Estate Builders Private Limited on 07.11.2019 to carry out the
construction and development of the project on the said plot of land.
The Corporate Debtor got admitted for Corporate Insolvency
Resolution Process ('CIRP' in short) by the Adjudicating Authority on
30.09.2019. Subsequent to the triggering of CIRP, the Resolution
Professional, being present Respondent No.1 took over the possession
of the said plot of land of the Corporate Debtor including the 6,00,000
sq. ft. of project land. Further, on an application filed vide IA No.4689
of 2020 by the Resolution Professional/Respondent No.1 before the
Adjudicating Authority, the Adjudicating Authority on 09.11.2020 had
directed the police authorities to assist the Resolution
Professional/Respondent No.1 in taking control of the assets of the
Corporate Debtor including the project land.
The Resolution Professional/Respondent No.1 with the approval of
Committee of Creditors ("COC" in short) with 99.12% voting share
placed the Resolution Plan submitted by M/s Wing Construction and
Developers Private Limited, present Respondent No.2 and consortium
of M/s Antriksh Infradesign Private Limited and Shri Rajbir Goyat,
present Respondent No.3 before the Adjudicating Authority in IA
No.2871/2021. The Adjudicating Authority approved the Resolution
Plan in respect of the Corporate Debtor on 13.12.2021.
Company Appeal (AT) (Ins.) No.93 of 2022 3 The Appellant had also preferred two applications before the
Adjudicating Authority vide IA Nos. 5333/2020 and 1587/2021
seeking the following reliefs: -
IA No. 5333/2020:
a. pass an order recalling/modifying the order dated 09.11.2020;
b. pass an order directing the Applicant's peaceful and vacant
possession of the said property is not to be disturbed;
c. pass an order directing that no adverse action should be taken
against the Applicant's title in respect of the said property; and
d. pass any other order as this Hon'ble Tribunal may deem fit and
proper in the interest of justice, equity and good conscience;
IA No. 1587/2021:
a. directing the Resolution Professional not to make the property
bearing Plot No.2 admeasuring 20,000 sq. mtrs. situated in Sector
140, Noida as part of the assets of the Corporate Debtor;
b. directing Resolution Professional/COC to exclude the said property
bearing Plot No.2 admeasuring 20,000 sq. mtrs. situated in Sector
140, Noida from resolution plan of the Corporate Debtor;
c. directing Resolution Professional to return the possession of the
said property to the Applicant without any further delay; and
d. pass any such order(s) as may be deemed necessary.
Aggrieved by the fact that these two IAs filed by the Appellant remained
undisposed, while the Adjudicating Authority went ahead and approved the
Company Appeal (AT) (Ins.) No.93 of 2022 4 Resolution Plan of the Corporate Debtor in IA No.2871/2021, the Appellant
has preferred this appeal.
3. Making his submissions, the Learned Counsel for the Appellant claimed
that by virtue of Agreement signed between the Corporate Debtor and the
Appellant, the Appellant had acquired ownership and taken over possession
of 6,00,000 sq. ft. in the said plot for development and construction of the
project. It was further submitted that Article 13 of the Agreement gave
unfettered rights to the Appellant to sell the allotted area of 6,00,000 sq. ft.
to customers and that the Appellant had further entered into a sub-contract
with Antriksh Real Estate Builders Private Limited for construction of the
project. Hence, the dispossession of the Appellant from the project land by
the Respondent No.1/Resolution Professional was illegal.
4. The Learned Counsel for the Appellant strenuously contended that as
it enjoyed ownership of 6,00,000 sq. ft. of the project land, the said project
land could not have been included in the pool of assets of the Corporate
Debtor by the Resolution Professional. Moreover, since they were in
continuous peaceful possession of the said project land, their peaceful and
vacant possession ought not to have been disturbed. Furthermore, such a
Resolution Plan which included the said project land should not have been
approved by the Adjudicating Authority given that two IAs in respect of the
said land had been filed by the Appellant which were pending adjudication.
Company Appeal (AT) (Ins.) No.93 of 2022 5
5. Adverting attention to Explanation (a) to Section 18(1)(f) of the IBC, it
was contended that this provision specifically prohibits the Resolution
Professional to take control and custody of any asset which is owned by the
third party though under possession of the Corporate Debtor under
contractual agreements. Since the Appellant had acquired the right to
develop, construct and undertake sale of the saleable area of the said project
land by virtue of the Agreement dated 14.04.2015, it was asserted that the
Appellant had acquired substantial ownership rights over the said saleable
area. The Learned Counsel for the Appellant argued therefore that the
Corporate Debtor at the time of initiation of the insolvency proceedings
against it was not the owner of the said project land and hence the
Adjudicating Authority should not have approved the Resolution Plan in the
present form.
6. It was further pointed out by the Learned Counsel for the Appellant that
the Resolution Plan prepared by consortium of the Respondents No.2 and 3
was done in conspiracy and connivance with the Respondent No.1/Resolution
Professional. It is also alleged that there were numerous material
irregularities in the exercise of powers by the Respondent No.1/Resolution
Professional in getting the Resolution Plan approved by COC as several
important material facts were concealed. The Appellant has also questioned
the propriety of the decision of the Resolution Professional /Respondent No.1
in declaring the agreement between the Appellant and Corporate Debtor to be
Company Appeal (AT) (Ins.) No.93 of 2022 6 null and void and using this false premise to get Resolution Plan admitted by
the Adjudicating Authority.
7. Advancing his side of arguments, the Learned Counsel for the
Respondent strongly refuted the contention that the Appellant are absolute
owners of the plot by virtue of the Agreement signed with the Corporate
Debtor. It is contended that the Agreement does not grant any ownership
rights to the Appellant. The said project land was obtained from the Noida
Authority vide a lease deed dated 22.10.2008 executed between Noida
Authority as the lessor and the Corporate Debtor as the lessee. Clause 14(b)
of the Lease Deed clearly provides that sub-lease can be done by the Corporate
Debtor only with the prior approval of Noida Authority being the lessor. Thus
separation of the plot could not have been done without prior permission of
Noida Authority, and in the present case the Appellant had failed to provide
any No Objection Certificate from the Noida authority in this regard. Hence,
the Agreement executed between the Corporate Debtor and the Appellant in
the absence of any permission from Noida authority is null and void and the
Agreement cannot be the basis for the Appellant to claim ownership of the
said project land.
8. It was further submitted that by merely entering into an Agreement to
Sell does not amount to ownership of the property and that ownership of
property is transferred only upon execution of conveyance deed before the
Registrar which is amiss in the present case. Adverting attention to Sections
54 and 55 of the Transfer of Property Act, 1882 and Sections 47, 48 and 49
Company Appeal (AT) (Ins.) No.93 of 2022 7 of the Registration Act, 1908, it was submitted that the instrument which
purports to transfer title of property is required to be registered and hence the
title does not pass till registration is affected. In support of their contention,
the Learned Counsel for the Respondent placed reliance upon judgements of
Hon'ble Supreme Court in the matter of Narandas Karsondas v. S.A. Kamtam
and Anr. and Suraj Lamp and Industries Pvt. Ltd. v. State of Haryana and
Ors.
9. It was further pointed out that Clause 22 of the Agreement provides that
documents for transfer of the title will be executed after the completion of the
development on the project land by the SECOND PARTY (which is the
Appellant in the present case). Clause 22 of the Agreement was read out as
follows: -
"That it is mutually agreed between both the parties that the
necessary documents for the transfer of the title of the SECOND
PARTY will be executed in favour of the SECOND
PARTY/Assignees/Nominees of the SECOND PARTY after the
completion of the said complex and obtaining the Occupation
Certificate and expenses incurred for the same shall be borne by
the SECOND PARTY. This is however subject to the terms of Lease
Deed and applicable laws, bye-laws, rules, regulations etc of
NOIDA Authority."
Thus it was stated that the Agreement in clear terms stipulated that transfer
of the title was possible only after the completion of the said complex and after
obtaining the occupancy certificate from the concerned authority. In the
Company Appeal (AT) (Ins.) No.93 of 2022 8 present facts and circumstances, neither the Appellant was able to complete
the construction of the said project nor any occupancy certificate was granted
in favour of the Appellant and hence the Corporate Debtor continued to remain
the owner of the project land. The said plot being the asset of the Corporate
Debtor, the Respondent No.1/Resolution Professional was duty bound to take
possession of the same in terms of Section 18 of the IBC and cannot be faulted
for having included it in the pool of assets of the Corporate Debtor.
10. Emphatically asserting that pendency of IAs before the Adjudicating
Authority do not constitute sufficient grounds for preferring an appeal against
an order approving Resolution Plan, the Learned Counsel for the Respondent
pointed out that Section 61(3) of the IBC stipulates specific grounds for
preferring an appeal against an order of the Adjudicating Authority approving
a Resolution Plan under Section 31 of the IBC. Since the Appellant has failed
to show any contravention of provisions of any law or material irregularity in
the exercise of power by the Respondent No.1/Resolution Professional, it was
argued that there are no sufficient grounds for preferring an appeal in the
matter. Further, reliance was placed upon the judgment of Hon'ble Supreme
Court in the case of K. Sashidhar v. Indian Overseas Bank (2019) SCC
OnLine SC 257 to claim that the jurisdiction bestowed upon the Appellate
Authority to entertain appeals is also expressly circumscribed. It was also
categorically pointed out that the Appellant has not been able to substantiate
that the Resolution Applicant is a related party of the Corporate Debtor.
Company Appeal (AT) (Ins.) No.93 of 2022 9
11. Advancing the arguments further, it is submitted that while
adjudicating any application for approval of Resolution Plan under Section 31
of the IBC, the Adjudicating Authority is required to limit its scrutiny to
grounds as specified in Section 30(2) of the Code. None of the criteria
mentioned in Section 30(2) require disposal of all pending applications before
the Adjudicating Authority prior to passing an order for approval of the
Resolution Plan. In support of their contention, the Learned Counsel for the
Respondent pointed out the judgment of the Hon'ble Supreme Court in Pratap
Technocrats (P) Ltd. v. Monitoring Committee of Reliance Infratel Ltd.,
Civil Appeal No. 676 of 2021, wherein it has been held that the jurisdiction
of the Adjudicating Authority is confined by the provisions of Section 31(1) in
determining whether the requirements of Section 30(2) have been fulfilled in
the plan as approved by the CoC and once the requirements of the statute
have been duly fulfilled, the decisions of the Adjudicating Authority are in
conformity with law.
12. On the issue raised by the Appellant that while the IA filed by them
remained pending, the Adjudicating Authority had already adjudicated upon
2 other applications vide IA No. 1833/2021 and 4904/2021, it was pointed
out that the reliefs sought therein was for exclusion of Rohtas Presidential
Tower from the CIRP of the Corporate Debtor. Both IAs were dismissed by the
Adjudicating Authority by observing that in case they had any grievance with
respect to inclusion of their property in the assets of the Corporate Debtor
they should have raised the same at much earlier stage and not after the
approval of the Resolution Plan by the CoC. Since the prayer of the Appellant
Company Appeal (AT) (Ins.) No.93 of 2022 10 in IA Nos. 5333/2020 and 1587/2021 raised similar grounds, they were also
liable to be dismissed on the same grounds. Moreover, the Appellant not
having filed any claim in the CIRP of the Corporate Debtor before the
Resolution Professional, they do not have the locus standi to prefer any appeal
questioning the commercial wisdom of the CoC which has been accorded
paramountcy by the Hon'ble Apex Court.
13. We have duly considered the detailed arguments and submissions
advanced by the Learned Counsel for both the parties and perused the records
carefully.
14. The moot points before us for our consideration are: -
(i) whether the Agreement to Sell dated 14.04.2015 between the
Corporate Debtor and the Appellant vested ownership rights on the
Appellant in respect of the project land over which leasehold rights
had been obtained by the Corporate Debtor from Noida authority
after executing a Lease deed on 22.10.2008;
(ii) whether the Resolution Professional/Respondent No.1 by
including the project land in the pool of assets of the Corporate
Debtor had acted beyond the statutory framework of IBC; and
(iii) whether the approval of the Resolution Plan of the Corporate
Debtor by the Adjudicating Authority without deciding the two IAs
filed by the Appellant suffered from impropriety.
Company Appeal (AT) (Ins.) No.93 of 2022 11 Point No. (i)
15. The rival contentions of the two sides have been noted. According to the
Appellant, by their entering into the "Agreement to Sell" with the Corporate
Debtor and also having paid certain amounts on behalf of the Corporate
Debtor to the Noida Authority, there has taken place a transfer of ownership
of the project land from the Corporate Debtor to them. On the other hand, the
Resolution Professional/Respondent No.1 contends that mere signing of the
Agreement does not result in transfer of ownership of the asset and that even
if the Appellant had made payments to the Noida Authority, that does not
make them owner of the project land and that in respect of such payments
made, the Appellant could have filed claim before the Resolution Professional.
16. It has been contended by the Resolution Professional/Respondent No.1
that the ownership rights of the project land flows from the Lease Deed and
not from the Agreement to Sell. It has been argued that the project land was
obtained on lease by the Corporate Debtor from the Noida Authority by
executing a Lease Deed and that the terms and conditions of the Lease Deed
at Clause 14 do not permit subletting of the lease or transfer of the plot
without the prior approval of Noida Authority.
17. At this juncture we find it pertinent to extract the relevant clauses of
the Lease Deed as at pages 24-43 of the Appeal Paper Book ("APB" in short).
Relevant portions of Clauses 14 and 15 of the Lease Deed with Noida
Authority is extracted below: -
"Clause 14 (a) That the lessee shall not be permitted to transfer
the demised plot before making the unit
Company Appeal (AT) (Ins.) No.93 of 2022 12 functional and building constructed thereupon.
However at the discretion of CEO the transfer
may be permitted after making the unit
functional and building constructed thereupon
and laying transfer charges as prevailing at
that time of transfer such transfer charges shall
be paid to the lessor. The decision of Chairman
/ Chief Executive Officer for all purpose will be
final and binding on the lessee.
(b) That the lessee may be permitted to sub-lease
the part built up space for the same project in
case of IT/ITES allotment of 20000 sq. mtr. or
above after making the unit functional and
completion of minimum of 75% of total
permissible FAR subject to payment of
prevailing pro-rata transfer charges and prior
approval of lessor.
Clause 15 .....That the lessee shall not be allowed to be
rented out the allotted premises or any part
thereof. The plot cannot be transferred
before making the unit functional and all
such action done for transfer of the plot
will be deemed as null and void ab-initio."
(Emphasis supplied)
Company Appeal (AT) (Ins.) No.93 of 2022 13
18. We find that this is reinforced by the provisions contained in the
Agreement to Sell in that the Agreement unequivocally acknowledges the over-
riding provisions of the Lease Deed which find place at pages 49-66 of the
APB and the relevant excerpts are as below:
"22. That it is mutually agreed between both the
parties that the necessary documents for the transfer of
the title of the SECOND PARTY will be executed in favour
of the SECOND PARTY/Assignees/Nominees of the
SECOND PARTY after the completion of the said
complex and obtaining the Occupation Certificate
and expenses incurred for the same shall be borne by the
SECOND PARTY. This is however subject to the terms of
Lease Deed and applicable laws, bye-laws, rules,
regulations etc of NOIDA Authority.
****** ******* *******
26. That the clauses of this agreement shall not
supersede the lease agreement executed between the
FIRST PARTY and NOIDA development authority. That
both the parties and their allottees shall be bound by the
terms & condition above said lease agreement executed
between FIRST PARTY and NOIDA development authority."
(Emphasis supplied)
Company Appeal (AT) (Ins.) No.93 of 2022 14
19. The Lease Deed clauses make it abundantly clear that for any sub-lease
to be entered into by the Corporate Debtor, there were two pre-requisites to
be met. First, that the unit was to be made functional and, secondly, that the
prior approval of Noida authority being the lessor had to be obtained and that
in the absence of such permission all actions for transfer of the demised land
and thereby any claim of transfer of ownership rights will be deemed to be ab
initio null and void. We have noted that the Appellant has not staked any
claim of having completed the construction of the project. It has been brought
to record by the Respondent No. 1 in reply affidavit that the Appellant in turn
had entered into a sub-contract with Antriksh Real Estate Builders Private
Limited on 07.11.2019 to carry out the construction and development of the
project on the said plot of land and that the project land was in possession of
Antriksh Real Estate Builders Private Limited at the time of taking possession
by the Resolution Professional. This has not been denied by the Appellant
either in the submissions or during the pleadings. We also do not find on
record any prior clearance given by the Noida Authority allowing any sub-
lease of the project land by the Corporate Debtor to the Appellant. We have
therefore no hesitation to agree with the Resolution Professional/Respondent
No.1 that the Appellant cannot rely upon the Agreement to Sell to claim sub-
lease rights and ownership rights of the project land sans the No Objection
from the Lessor.
20. This brings us to the submission made by the Resolution
Professional/Respondent No.1 that mere entering into an Agreement to Sell
does not amount to ownership of the property and that ownership of property
Company Appeal (AT) (Ins.) No.93 of 2022 15 is transferred only upon execution of conveyance deed before the Registrar.
We note that reliance has been placed on the Hon'ble Supreme Court in
Narandas Karsondas v. S.A. Kamtam and Anr. (1977)3 SCC 247 wherein it
has been observed that : "A contract of sale does not of itself create any interest
in, or charge on, the property. That is expressly declared in Section 54 of the
Transfer of Property Act." Reference has also been made to the decision of the
Hon'ble Apex Court in Suraj Lamp and Industries Pvt. Ltd. v. State of
Haryana and Ors. 2012 1 SCC 656 wherein this position has been affirmed
and it has been held: "Any contract of sale (agreement to sell) which is not a
registered deed of conveyance (deed of sale) would fall short of the requirements
of Sections 54 and 55 of Transfer of Property Act and will not confer any title
nor transfer any interest in an immovable property (except to the limited right
granted under Section 53A of Transfer of Property Act). According to Transfer
of Property Act, an agreement of sale, whether with possession or without
possession, is not a conveyance. Section 54 of Transfer of Property Act enacts
that sale of immoveable property can be made only by a registered instrument
and an agreement of sale does not create any interest or charge on its subject
matter."
21. It is therefore a settled proposition of law that an Agreement to sell does
not convey a property from one person to another, either in present or even
in future. Agreement to sell is a promise of a future transfer of property
ownership which outlines the terms and conditions under which the property
will be transferred. An agreement to sell an immovable property is therefore
a bilateral contract under which the two parties, i.e. the buyer and the seller,
Company Appeal (AT) (Ins.) No.93 of 2022 16 agree to certain terms and conditions, subject to which the property in
question would be transferred by the seller to the buyer for a decided sale
consideration. It is only after such bilateral obligations are discharged that
the execution of the sale deed kicks in and it is this sale deed, which is
compulsorily registrable under the Registration Act, 1908, which upon being
registered, would transfer the right, title and interest in the property in
question on to the purchaser. In the present factual matrix, the agreement to
sell was yet to culminate into a registered sale deed and therefore not ripe for
transfer of the title of property in question from the Corporate Debtor to the
Appellant.
22. For the above reasons, we therefore hold in negative the claim of the
Appellant that upon execution of the Agreement to Sell, the ownership of the
project land stood transferred from the Corporate Debtor to the Appellant.
Point No. (ii)
23. It is the Appellant's case that in terms of the Agreement to Sell entered
between the Corporate Debtor and the Appellant, the right of ownership of the
project land stood transferred to it and the Appellant had enjoyed complete
right of possession and ownership in the said property. Only the act of
registration and transfer of the rights registered with the Noida Authority was
remaining which was to be executed on completion of construction. However,
the Resolution Professional by including the said project land in the pool of
assets of the Corporate Debtor had illegally disregarded the legal rights of the
Company Appeal (AT) (Ins.) No.93 of 2022 17 Appellant and acted contrary to the provisions contained under Section 18 of
IBC.
24. Admittedly, Section 18 enjoins upon the Resolution Professional to
collect all information relating to the assets, finances and operations of the
Corporate Debtor as well as control and custody of assets. However, the
Explanation clause therein excludes assets owned by a third party in
possession of the Corporate Debtor held under trust or under contractual
arrangements. For reasons of clarity, the relevant portions of Section 18 is
as reproduced below: -
18. Duties of interim resolution professional.- (1) The interim
resolution professional shall perform the following duties, namely:-
(a) collect all information relating to the assets, finances and
operations of the corporate debtor for determining the financial
position of the corporate debtor, including information relating to -
(i) business operations for the previous two years;
(ii) financial and operational payments for the previous two
years;
(iii) list of assets and liabilities as on the initiation date; and
(iv) such other matters as may be specified;
(b) receive and collate all the claims submitted by creditors to
him, pursuant to the public announcement made under
Sections 13 and 15;
Company Appeal (AT) (Ins.) No.93 of 2022 18
(c) constitute a committee of creditors;
(d) monitor the assets of the corporate debtor and manage its
operations until a resolution professional is appointed by the
committee of creditors;
(e) file information collected with the information utility, if
necessary; and
(f) take control and custody of any asset over which the
corporate debtor has ownership rights as recorded in the
balance sheet of the corporate debtor, or with information
utility or the depository of securities or any other registry that
records the ownership of assets including--
(i) assets over which the corporate debtor has
ownership rights which may be located in a foreign
country;
(ii) assets that may or may not be in possession of the
corporate debtor;
(iii) tangible assets, whether movable or immovable;
(iv) intangible assets including intellectual property;
(v) securities including shares held in any subsidiary
of the corporate debtor, financial instruments,
insurance policies;
Company Appeal (AT) (Ins.) No.93 of 2022 19
(vi) assets subject to the determination of ownership by
a court or authority;
(g) to perform such other duties as may be specified by the
Board.
Explanation.--For the purposes of this section, the term
"assets" shall not include the following, namely--
(a) assets owned by a third party in possession of the
corporate debtor held under trust or under contractual
arrangements including bailment;
(b) assets of any Indian or foreign subsidiary of the
corporate debtor; and
(c) such other assets as may be notified by the Central
Government in consultation with any financial sector
regulator.
25. A plain reading of Explanation clause to Section 18 makes it amply
clear that the term "assets" will not include the assets owned by a third party
in possession of the Corporate Debtor under Trust or Contractual Agreement.
Keeping in mind the facts of the present case; the clause of the Lease Deed
and the Agreement to Sell; the provisions of the Transfer of Property Act,1882
and the Registration Act,1908 as expounded in judgments of the Hon'ble Apex
Court, we have already come to the conclusion at Point No.1 above that the
instant Agreement to Sell between the Corporate Debtor and the Appellant
Company Appeal (AT) (Ins.) No.93 of 2022 20 which conferred construction, development and sale rights on the Appellant
on the project land did not confer ownership rights on the Appellant. That
being the case there are no grounds to find faults or illegality on the part of
the Resolution Professional in including the project land in the pool of assets
of the Corporate Debtor under CIRP.
26. It is incumbent upon the Resolution Professional under Section 18 of
IBC to embark upon necessary steps to take control and custody of the assets
of the Corporate Debtor and under Section 20 of IBC to protect and preserve
the value of the property of the Corporate Debtor. Thus in having included
the project land in the pool of assets of the Corporate Debtor, the Resolution
Professional cannot be held to be remiss in the performance of his duties.
27. We find no cogent grounds to agree with the Appellant's contention that
Resolution Professional had acted in a manner that transgressed the
statutory framework of IBC or that his conduct did not inspire confidence in
the credibility of the insolvency process undertaken by him.
Point No. (iii)
28. This brings us to the issue wherein the Appellant has claimed that while
other IAs relating to the CIRP of this Corporate Debtor were disposed by the
Adjudicating Authority, the IAs filed by them remained unheard which
militates against the principles of natural justice. It has also been urged that
the Adjudicating Authority ought to have first adjudicated upon the two IAs
filed by the Appellant before approving the Resolution Plan.
Company Appeal (AT) (Ins.) No.93 of 2022 21
29. We would like to begin with finding out what was the main issue raised
in IAs 1833/2021 & 4904/2021 and how the IAs were treated by the
Adjudicating Authority. In IA No. 1833/2021, the main issue raised was to
exclude the Rohtas Presidential Tower, Vibhuti Khand, Gomti Nagar,
Lucknow from the Corporate Insolvency Resolution Process of the Rohtas
Projects Limited. In IA No. 4904/2021 too, the issue raised was to exclude the
Rohtas Presidential Tower Project of the Corporate Debtor situated at Vibhuti
Khand, Gomti Nagar, Lucknow from the Corporate Insolvency Resolution
Process of the Corporate Debtor thereby excluding the same from the
Resolution Plan proposed by the Prospective Resolution Applicant. The
Adjudicating Authority while disposing the IAs had come to the following
finding:
"It is clear that the Applicants in both the IAs are aware about the
CIR Proceeding of Corporate Debtor and they were also represented
by Authorized representative during the CoC meetings. In case,
they have any grievance with respect to inclusion of their project in
the asset of Corporate Debtor, they could have raised the same at
much earlier stage and not after the approval of resolution plan by
CoC. It is also pertinent to mention that both these IAs namely, IA-
1833/2021 and 4704/2021 were filed way after the approval of
resolution plan by the CoC. Furthermore, the voting share of the
Applicants in both the IAs is much less than 1% of the total voting
percentage and Resolution Plan is approved by the CoC with
99.12% voting in favour."
Company Appeal (AT) (Ins.) No.93 of 2022 22
30. If we now look at the prayer contained in IAs 5333/2020
and1587/2020, which have been detailed at Para 2 above, the central issue
is exclusion of the project land from the CIRP thus being akin to prayer in IAs
1833/2021 and 4904/2021 which were dismissed. Thus the prayer of the
Appellant in IA Nos. 5333/2020 and 1587/2021 having raised similar
grounds, were squarely liable to be dismissed on the same grounds of having
been filed much after the approval of resolution plan by the CoC. In fact it is
also germane to note that the Resolution Professional/Respondent No. 1 has
vehemently contended that at a time when the Appellant did not file any claim
before the Resolution Professional when the Information Memorandum was
being firmed up, now at such a belated stage when CoC has already approved
the Resolution Plan, they cannot clamour that their interests have been
jeopardised. Moreover, we find that the Adjudicating Authority has noted in
the impugned order while approving the Resolution Plan submitted by M/s
Wing Constructions & Developers Private Limited and Consortium of Mr.
Rajbir Goyat & M/s. Antriksh Infradesign Private Limited that the plan was
approved by the CoC in its 15th meeting with 99.12% voting share. The
Adjudicating Authority had also noted that the resolution plan filed with the
Application met the requirements of Section 30 and 31 of IBC, 2016 and
Regulations 37, 38, 38(IA) and 39(4) of the IBBI(CIRP) Regulations, 2016; that
the provisions of Section 29A of IBC were not attracted and that the
Resolution Plan approved by the CoC does not contravene any of the
provisions of the law for the time being in force.
Company Appeal (AT) (Ins.) No.93 of 2022 23
31. We therefore hold that though the IAs 5333/2020 and 1587/2021 had
not been disposed by the Adjudicating Authority before approving the
Resolution Plan, this did not vitiate the CIRP of the Corporate Debtor.
32. In view of the above discussions, we are of the considered opinion that
there are no convincing reasons to interfere with the order of the Adjudicating
Authority approving the Resolution Plan of the Corporate Debtor under
Section 31(1) of the IBC. The appeal being devoid of merit we find no reasons
to entertain it. In the result, the appeal is dismissed. There is no order as to
costs.
[Justice Ashok Bhushan] Chairperson
[Mr. Barun Mitra] Member (Technical)
Place: New Delhi Date: 06.12.2022
PKM
Company Appeal (AT) (Ins.) No.93 of 2022 24
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free