In the matter of Financial Software and Systems Private Limited
- CitationCP(IBC)/346(CHE)2025
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority, on a Section 9 application, is not to finally adjudicate the existence or merits of a dispute; it need only satisfy itself that the corporate debtor has raised a plausible pre-existing dispute which is not spurious, hypothetical or illusory, and whether the party raising it would succeed on it is outside that inquiry. Where the corporate debtor has, before receipt of the demand notice, communicated in writing a genuine dispute over the operational debt, which rests on the contractual terms governing the claim (the operational creditor's entitlement under the agreement's KPI targets, as against a contention that an annual operating plan superseded them), a pre-existing dispute exists and the application must be dismissed under the third limb of the Mobilox test.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE NATIONAL COMPANY LAW TRIBUNAL DIVISION BENCH (COURT– I) CHENNAI ATTENDANCE CUM ORDER SHEET OF THE HEARING HELD ON 11.08.2026 THROUGH VIDEO CONFERENCE CORAM: HON’BLE SHRI. SANJIV JAIN, MEMBER (JUDICIAL) HON'BLE SHRI VENKATARAMAN SUBRAMANIAM, MEMBER (TECHNICAL) Application No : Petition No : CP(IBC)/346(CHE)/2025 Name of Petitioner : Jaishankar A L & Vs Name of Respondent : Financial Software & Systems Pvt Ltd Section : 9 R/w Rule 6 of IBC, 2016 ORDER CP(IBC)/346(CHE)/2025 Present: Mr. Revanth, Ld. Counsel for the Corporate Debtor. Vide separate order pronounced in the open Court, the petition is dismissed. File be consigned to records.
-sd- -sd- [VENKATARAMAN SUBRAMANIAM] [SANJIV JAIN] MEMBER (TECHNICAL) MEMBER (JUDICIAL) MS Date: 11.08.2026
IN THE NATIONAL COMPANY LAW TRIBUNAL, DIVISION BENCH – I, CHENNAI
CP(IBC)/346(CHE)2025 [filed under Section 9 of the Insolvency and Bankruptcy Code, 2016 r/w Rule 6 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016]
In the matter of Financial Software & Systems Private Limited
Jaishankar A.L., D.701, Purva Park, Cox Town, Bengaluru-560 005 … Petitioner/Operational Creditor -Vs- Financial Software & Systems Private Limited (FSS), No. 42, Ground Floor, Saradha Apartments, 3rd Main Road, Gandhi Nagar, Adyar, Chennai-600 020 … Respondent/Corporate Debtor
Present: For Operational Creditor : Shri. Vivek Menon, Advocate For Corporate Debtor : Shri. Revanth, Advocate
CORAM : SANJIV JAIN, MEMBER (JUDICIAL) VENKATARAMAN SUBRAMANIAM, MEMBER (TECHNICAL)
Order Pronounced on 11th August, 2026
CP(IBC)/346(CHE)/2025 Jaishankar vs Financial Software & Systems Private Limited
ORDER
This petition under Section 9 of the Insolvency and Bankruptcy
Code, 2016 {“IBC”) r/w Rule 6 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 has been filed by Jaishankar A.L., (hereinafter referred to as “Petitioner/Operational Creditor” or “J.A.L.”) against Financial
Software & Systems Private Limited (hereinafter referred to as (“Respondent/Corporate Debtor” or “FSS”) for initiating Corporate
Insolvency Resolution Process (“CIRP”).
2. Part-I of the petition sets out the particulars of the Petitioner/Operational Creditor, Jaishankar A.L. He has office at D.701, Purva Park, Cox Town, Bengaluru-560 005. Part-II of the petition sets out the details of the Corporate Debtor, Financial
Software & Systems Private Limited. It was incorporated on 20.02.1991 with Authorized (Nominal) Share Capital of Rs.130.95
Crores and Paid-up Share Capital of Rs.9.62 Crores. Its Registered
Office is situated at No. 42, Ground Floor, Saradha Apartments, 3rd
Main Road, Gandhi Nagar, Adyar, Chennai-600 020 within the jurisdiction of this Tribunal. In Part-III of the petition, the Petitioner
Jaishankar vs Financial Software & Systems Private Limited has not proposed the name of any Interim Resolution Professional.
Part-IV of the petition contains the particulars of operational debt i.e.,
Rs.4,38,12,095/- and date of default as under:
Invoice details Date of Date of Amount Rs.
Invoice Default
FSS/11/2023 28.11.2023 30.11.2023 48,18,333/-
FSS/12/2023 01.03.2024 31.03.2024 4,66,290
FSS/01/2024 01.03.2024 31.03.2024 2,97,36,000
Jaishankar vs Financial Software & Systems Private Limited
Principal Amount Rs.3,50,20,623/-
Interest at 24% (p.a) from date Rs. 87,91,742/- of default + GST at 18%
Total as on 31.03.2025 Rs. 4,38,12,095/-
3. In Part V, following documents have been submitted by the petitioner to support his arguments:
a) Executive Consultant Agreement dated 14.05.2021.
b) Letter of Termination, ‘without cause’ dated 03.06.2023.
c) Invoices bearing Nos. FSS/11/2023, FSS/12/2023 & FSS/1/2024 dated 28.11.2023, 01.03.2024 & 01.03.2024.
d) Email dated 03.01.2023 stating performance targets met as of December, 2022.
Jaishankar vs Financial Software & Systems Private Limited e) Email dated 24.05.2023 confirming performance targets exceeded for Full Year 2022-23.
f) MIS Reports confirming targets exceeded.
g) Emails exchange where Operational Creditor requested payment of his legal dues (series) dated 09.07.2023,
17.07.2023, 22.07.2023, 25.08.2023, 02.10.2023, 02.03.2024,
06.04.2024, 29.04.2024, 20.06.2024 & 15.07.2024.
h) Letter coercing the Operational Creditor to give up
Performance Incentive dated 16.02.2024.
i) Order dated 14.10.2024, passed by the Hon'ble Supreme
Court in C.A. Nos. 11664-11672 of 2024 regarding enforcement of arbitral award suffered by Corporate Debtor j) Calculation sheet.
4. Brief facts
4.1. Financial Software & Systems Private Limited ( Corporate
Debtor) historically operated through two primary divisions/ verticals i.e. Cash Tech division and Pay Tech division. Jaishankar
A.L. (the Petitioner) was, engaged as the Chief Executive Officer
Jaishankar vs Financial Software & Systems Private Limited (CEO) of the Pay Tech Business Unit of FSS (Corporate Debtor)
vide Executive Consultant Agreement dated 14.05.2021.
4.2. The Agreement was for a period of 3 years which inter alia stipulated that the Operational Creditor shall meet certain Key
Performance Indicators (KPIs) for FY 2022-23 and FY 2023-24 which are more fully specified in Exhibit D annexed to the Agreement to qualify and earn Performance Incentive / Performance Bonus, along with increments based on the extent to which such KPI objectives have been exceeded. The KPIs could, with mutual consent, be modified on a yearly basis.
4.3. FSS terminated the petitioner by cancelling the Executive
Consultant Agreement ( as per Clause 11 a(ii) of the Consultant
Agreement ) with effect from June 03, 2023 and Operational
Creditor was placed on Garden Leave for a period up to 6 months i.e. up to December 03, 2023.
Jaishankar vs Financial Software & Systems Private Limited
5. Arguments on behalf of J.A.L. (Petitioner)
5.1. It is stated that the Operational Creditor was entitled to in addition to his professional fees, a Performance Bonus payable upon the achievement of certain KPI objectives.
5.2. J.A.L. raised the following invoices against FSS which have not been paid.:
Invoice No Date Nature of Amount claim claimed Rs.
FSS 11/2023 28.11.2023 Professional 40,83,333 fees for Nov 23
FSS 12/2023 01.03.2024 Professional 3,95,161 fees for Dec 23
FSS 01/2024 31.03.2024 Performance 2,97,36,000
Incentive for FY 2022-23
Jaishankar vs Financial Software & Systems Private Limited
5.3. Operational Creditor submitted that the Corporate Debtor defaulted in payment of a sum of Rs. 4,38,12,095/- as on 31.03.2025 including interest. The calculation sheet is provided as under:
5.4. It is stated that it is standard practice for the Board of Directors of the Corporate Debtor to meet before the commencement of a financial year and based on relevant economic and financial considerations and the state of the market, to set out an Annual Operating Plan (AOP) which sets forth the Jaishankar vs Financial Software & Systems Private Limited financial goals of KPIs of that particular financial year. Petitioner states that this AOP would supersede the KPI objectives stipulated in Exhibit D of the Consultant Agreement since they were mutually agreed upon and set out before the beginning of the financial year. The said exercise was carried out for FY 2022-
23 also.
5.5. It is stated that petitioner, during the course of FY 2022-23 was conscientious of performance of his duties and exceeded the expectations of the Board of Directors of the Corporate Debtors by surpassing his KPI objectives for the financial year. This was acknowledged by the Corporate Debtor vide email dated
03.01.2023 and 24.05.2023.
5.6. The AOP of FY 2022-23, as set out in the MIS Report of FSS, was:
Revenue Rs. 277.3 crore
EBITDA Rs. (-) 11.2 crore
Jaishankar vs Financial Software & Systems Private Limited
5.7. It is stated that Pay Tech division for which J.A.L. was the CEO, went above and beyond the above milestones as evidenced in the MIS reports of FSS as well as the email sent out by the Head of Finance dated 24.05.2023. It is stated in the email dated
24.05.2023 the Head of Finance of FSS admitted that the Pay
Tech Revenue for FY 2022-23 was Rs. 290.7 crore, which was a 4.8% increase against the AOP Target of Rs. 277.3 Cr; and the Pay
Tech EBITDA was Rs. 4.6 crore, which was a 141.07% increase against the AOP target loss of Rs.11.2 crore. Petitioner stated that FSS however contended that J.A.L. is not entitled to performance bonus since he did not achieve the milestones set out in Exhibit D of the Executive Consultant Agreement. A comparison of the various milestones is set out hereunder:
Category KPIs of FY KPIs as per Actual 2022-23 as per AOP for FY Achieved (Rs.) Exhibit D of 2022-23 based on mail Executive Targets (Rs.) by Head of Consultant Finance Agreement (Rs.)
Jaishankar vs Financial Software & Systems Private Limited
Revenue 675 crore 277.3 crore 290.7 crore
EBITDA 172 crore (-) 11.2 crore 4.6 crore Profit Loss
5.8. Petitioner states that it is FSS’s case that since the performance incentive payable to J.A.L. was disputed by FSS, the petition ought to be dismissed due to the existence of a dispute.
However, it is an established law that for considering a pre-existing dispute, the same must be one of substance, and that mere denials would not suffice to exempt this Tribunal from being seized of the matter.
5.9. It is stated that the issue before this Tribunal is whether or not the defence raised by FSS established a pre-existing dispute or was a moonshine defence which would not oust the jurisdiction of this Tribunal.
Jaishankar vs Financial Software & Systems Private Limited
5.10. It is trite law that modifications and amendments to terms of a contract may be made by subsequent correspondences between parties to the said contract. Since the Executive Consultant
Agreement does not specify a specific method of modifying the KPIs of J.A.L., the fixture of the AOP targets for FY 2022-23 as reflected in the MIS reports tantamounts to a modification of J.A.L.’s KPIs as per the Executive Consultant Agreement.
5.11. It is submitted that it would be unreasonable that when FSS itself in its MIS Reports specified its target revenue and EBITDA to be Rs. 277.3 crore and (-) 11.2 crore respectively, J.A.L., despite achieving those targets was denied his performance bonus since he did not achieve revenue and EBITDA of Rs. 675 crore and Rs.
172 crore respectively as per Consultant agreement. This cannot be a reasonable argument as J.A.L.’s KPIs far exceeded that of FSS’s targets which was set by FSS itself.
5.12. It is stated that by FSS’s own admission in its email dated
24.05.2023, J.A.L. not only met the AOP targets but exceeded them. This is reflected in the MIS report of FSS as well. Therefore,
Jaishankar vs Financial Software & Systems Private Limited it may be seen from the above that J.A.L. clearly met and exceeded his KPIs which were modified by FSS through the publication of the same in its MIS report and was further admitted by its Head of Finance in the email dated 24.05.2023.
5.13. It is stated that only because FSS, being fully mindful of its undisputable debt of Rs. 2,97,36,000/- that was due and payable to J.A.L. towards Performance Incentive, for FY 2022-23, FSS maliciously withheld J.A.L.’s Garden Leave as a bargaining chip and condition precedent to compel J.A.L. to issue a No Dues
Certificate. It is stated that this did not meet the requirement for a pre-existing dispute. In any case, this lone defence raised by FSS is a mere moonshine defence with no substance or merit whatsoever and is a counterblast to J.A.L.’s petition and therefore holds no water.
5.14. It is stated that FSS admitted in the letter dated 16.02.2024 issued to J.A.L. that his dues from 01.11.2022 to 03.12.2022 totalling Rs. 44,91,667/- were due and payable to him.
Furthermore, in light of the targets specified in the MIS reports of Jaishankar vs Financial Software & Systems Private Limited
FSS and the email dated 24.05.2023 sent by FSS’s Head of Finance, it can be seen that J.A.L. is eligible to receive the performance incentive since he exceeded his targets for FY 2022-
23. The total sum due to J.A.L. in respect of his performance bonus, calculated in the manner provided for in Exhibit E of the Executive Consultant Agreement, is Rs. 2,97,36,000/-. The total debt due from FSS to J.A.L., which has been admitted, therefore falls within the pecuniary jurisdiction of this Tribunal.
6. Arguments by FSS (respondent)
6.1. it is stated that J.A.L. signed Executive Consultant
Agreement dated 14.05.2021 (“the Agreement”) and was engaged as Chief Executive Officer (CEO) of the Pay Tech business unit of FSS (“Annexure A”, page 16 of FSS’s Paper book). As per the Agreement, he was entitled to a Fixed Executive Fee of Rs.
4,90,00,000 per annum and a certain performance incentive, the payment of which was expressly conditioned solely upon the achievement of pre-agreed performance metrics as detailed in Jaishankar vs Financial Software & Systems Private Limited
Exhibits D and E of the Agreement (“Annexure A”, pages 34 to 37 of Respondent’s Paper book).
6.2. On 03.06.2023, FSS exercised its right under Clause 11 (ii) of the Agreement and terminated the agreement ‘without cause’, and in accordance with Clause 11 (d) of the Agreement and J.A.L. was placed on Garden Leave for six months ending 03.12.2023 (Termination Letter is provided as “Annexure C”,
Respondent’s Paper book).
6.3. On 09.07.2023, during the garden leave, J.A.L. issued an email claiming an alleged bonus of Rs. 2,60,00,000 (Rupees Two Crores and Sixty Lakhs). In response to the said email, Mr.
Balasubramanian V, CEO-Cash Tech (who was heading the Cash
Tech and Pay Tech Business divisions) issued a response stating:
“Regarding your incentive, it is based on the consulting agreement signed by you with the company with such parameters provided and agreed by you and your performance against such parameters provided
.” (Annexure 5, page 64 of Vol. 1 Applicant’s Paper book). Hence, as early as July 2023, FSS informed in writing that the payment of Jaishankar vs Financial Software & Systems Private Limited the performance incentive would be based on the Agreement only. These facts remain undisputed. Thereafter, petitioner issued other communications in 2023 asking for performance incentive.
Pertinently, J.A.L. did not even mention AOP as a metric or that the Agreement was amended by virtue of the AOP or otherwise in such emails.
6.4. On 02.03.2024, an email was issued by J.A.L. containing baseless invoices for alleged professional fee and performance incentive, and FSS expressly rejected and disputed J.A.L.’s performance incentive and professional fee claims by email dated
06.04.2024 issued by Mr. Gautam Rohidekar, the then SVP-Legal of FSS, and provided detailed reasons for the same in the said email (“Annexure G”, page 56 of FSS’s Paper book).
6.5. It is stated that in the aforesaid email of 06.04.2024, the following explanation was also provided by the Respondent to J.A.L. for rejection / denial of claims:
i) the KPI (Measurement) set out in Exhibit D of the Agreement specifies the following targets for FY22 & FY23:
Jaishankar vs Financial Software & Systems Private Limited
Revenue— Rs. 675 Crores; EBITDA—Rs. 172 Crores (“Annexure A”, page 35 of Respondent’s Paper book), which were not achieved.
ii) And, as per Exhibit E of the Agreement if less than 100% of the KPI target is achieved, the incentive payable is 0%.
iii) It is submitted that FSS’s Pay Tech Business Division achieved Revenue of only Rs. 296.47 Crores (43.92% of KPI target) and EBITDA of only Rs. 5.38 Crores (3.13% of KPI target) in FY 2022-23 (“Annexure G”,
Respondent’s Paper book). Since the achievement was well below 100% in both the metrics, J.A.L. was entitled to nil performance incentive under the Agreement.
6.6. Thereafter on 29.04.2024, J.A.L. issued further email baselessly demanding payment of professional fee and performance incentive, without providing any reason. FSS issued an email dated 20.06.2024 denying all allegations and assertions (including allegations on payment of professional fee and performance incentive) and reiterated FSS’s justifications provided in aforesaid
Jaishankar vs Financial Software & Systems Private Limited email of 06.04.2024. (email dated 20.06.2024 is “Annexure H”, page 58-59 of Respondent’s Paper book).
6.7. It is stated that J.A.L. issued the Form 3 and 4 demand notice dated 02.05.2025 where he made vague and baseless references to the AOP and provided a computation sheet, where he deliberately omitted quoting the metrics for performance incentive under Exhibit D of the Agreement which he was bound by. The petitioner made such claims with the sole motive to unjustly enrich himself without any basis and is nothing but an afterthought. The Form 3 and 4 demand notice was also promptly denied by FSS vide response dated 13.05.2025, where pre-existing disputes as to allegations and claims of professional fee and performance incentive were also informed to J.A.L.
(Response to Form 3 and 4 is “Annexure I”, pages 60-65 of Respondent’s Paperbook).
6.8. The entire claim of J.A.L. for performance incentive rests on the assertion that the Key Performance Indicators / targets (“KPI”)
in Exhibit D of the Agreement were “modified” by the Annual
Jaishankar vs Financial Software & Systems Private Limited
Operating Plan (“AOP”) and an email dated 24.05.2023 about financial highlights of FSS. This assertion is untenable in light of Clauses 15 and 19 of the Agreement. Clause 15 reads as: “No supplement, modification, amendment or waiver of the terms of this Agreement shall be binding on the parties hereto unless executed in writing by the party to be bound thereby.” (“Annexure A”,
Respondent’s Paperbook). Further, Exhibit E provides: “The Performance Incentive is payable on a yearly basis based on achieving pre-agreed performance / business results as per the KPI (Measurement)
attached with this agreement.” (“Annexure A”,
Respondent’s Paper book). There is no Board resolution, authorised written communication or any written amendment of the Agreement which was made/executed by FSS in respect of the alleged modification of KPIs as mentioned in Exhibit D of the Agreement nor did FSS agree to such modification otherwise at any point in time.
6.9. It is submitted that targets in the AOP are entirely irrelevant in the present matter as no modification / amendment to Jaishankar vs Financial Software & Systems Private Limited
Agreement was agreed in writing by J.A.L. and FSS pursuant to the AOP or otherwise (Pages 4–7 of Respondent’s Paper book).
Hence, all the targets for J.A.L. to claim performance incentive were only comprised in Exhibits D and E of the Agreement. It is evident from aforesaid FSS’s email dated 06.04.2024 that J.A.L.
failed to meet his KPI targets as defined in the Agreement and was therefore not entitled to any performance incentive (“Annexure G”, pages 56–57 of Respondent’s Paper book). It is pertinent to state that J.A.L. did not allege / claim modification of KPI at any time before issuance of Form 3 and Form 4 dated
02.05.2025 by him, which itself shows mala fides on part of J.A.L..
Hence, reference to AOP is clearly an afterthought to coerce FSS into paying the disputed sum(s).
6.10. It is stated that, in the present case, FSS genuinely, expressly and unequivocally disputed J.A.L.’s claims of professional fee,
Performance Incentive and interest thereon well before the issuance of the Form 3 and 4 demand notice (dated 02.05.2025 by petitioner, through emails of 06.04.2024 and 20.06.2024 (Annexures G and H,
Jaishankar vs Financial Software & Systems Private Limited pages 56–60 of Respondent’s Paper book). It is submitted that FSS disputed the professional fee, and performance incentive claims through aforesaid emails dated 06.04.2024 and 20.06.2024 reiterating that J.A.L. was not entitled to professional fee (without completion of certain exit formalities) and performance incentive.
Both the aforesaid communications disputing the claims of J.A.L.
were issued more than a year prior to the issuance of Form 3 and 4 demand notice. It is well-settled law that this Tribunal must reject an application under Section 9 of the Code where notice of a dispute has been received by the Operational Creditor, or where there is a record of a dispute in the information utility.
6.11. Regarding petitioner’s alleged claim for professional fees of Rs. 52,84,623, it is submitted that the same is subject to completion of exit formalities required by FSS’s policies (which is usual in any company in the industry) and stated in FSS’s email of 06.04.2024, and such amount in any event is well below the threshold of Rs. 1,00,00,000 prescribed under Section 4 of the Code for initiation of CIRP (“Annexure G”,
Jaishankar vs Financial Software & Systems Private Limited
Respondent’s Paper book). Hence, none of J.A.L.’s claims (including interest claims) is tenable.
6.12. It is evident from the above facts that J.A.L. is requiring this Tribunal to adjudicate contested questions of contractual interpretation on merits, including whether the AOP targets supersede the KPI targets in Exhibits D and E of the Agreement in the absence of a written amendment pursuant to Clause 15 of the Agreement, and whether J.A.L. achieved his performance milestones. It is submitted that this exercise is beyond the scope of proceedings under Section 9 of the Code. The Hon’ble Supreme
Court in Mobilox Innovations Private Limited v. Kirusa
Software Private Limited (2018) 1 SCC 353 has held that the Adjudicating Authority is not expected to enter into final determination of a dispute at the admission stage of a Section 9 application. Where the dispute involves genuine questions of fact and contractual interpretation, the application must be rejected.
Jaishankar vs Financial Software & Systems Private Limited
7. Analysis and findings
7.1. Heard the Learned Counsels and perused the pleadings.
7.2. Jaishankar A.L. ( Operational Creditor) was appointed as Chief
Executive Officer of Pay Tech Division of Financial Software & Systems Private Limited ( Corporate Debtor) vide Executive
Consultant Agreement dated 14.05.2021. The agreement was for a period of three years.
7.3. FSS cancelled the Executive Consultant Agreement without cause ( as per Clause 11 a(ii) of the Consultant Agreement ) and terminated the petitioner from his role as Chief Executive Officer of Pay Tech Business Unit with effect from June 03, 2023 and Operational creditor was placed on Garden Leave for a period up to 6 months i.e. up to December 03, 2023.
7.4. The Agreement inter alia stipulated that the Operational
Creditor should meet certain Key Performance Indicators (KPIs) for FY 2022-23 and FY 2023-24 which were specified in Exhibit D annexed to the Agreement to qualify and earn Performance
Jaishankar vs Financial Software & Systems Private Limited
Incentive / Performance Bonus, along with increments based on the extent to which such KPI objectives have been exceeded.
7.5. It is the claim of the operational creditor that Corporate
Debtor has not paid the three invoices raised by the Operational
Creditor. He has given the dates of default as 30.11.2023 and 31.03.2024. Operational Creditor submitted that the Corporate
Defaulter defaulted a sum of Rs. 4,38,12,095/- as on 31.03.2025 with interest.
7.6. It is the case of Operational Creditor that the Annual
Operating Plan (AOP) set by the Board of Directors of the Corporate Debtor before the commencement of a financial year where the financial goals and KPIs of that particular financial year were set forth would supersede the KPI objectives stipulated in Exhibit D of the Executive Consultant Agreement, as they were mutually agreed upon and set out before the beginning of the financial year.
7.7. The Operational Creditor contends that for the financial year
2022-23 the Pay Tech division for which he was the CEO
Jaishankar vs Financial Software & Systems Private Limited achieved and exceeded KPI set out in Annual Operating Plan.
This was confirmed by MIS reports of FSS as well as the email sent out by the Head of Finance on 24.05.2023. Hence Operational
Creditor was eligible for professional fees and performance incentive for which he raised invoices and Corporate Debtor committed default in payment of the same. The Operational
Creditor sent the Demand Notice under IBC on 02.05.2025.
7.8. Per contra Corporate Debtor stated that Operational creditor was eligible for performance incentive only based on KRIs stipulated in Executive Consultant Agreement dated 14.05.2021 and not based on Annual Operating Plan as claimed by the Operational Creditor. It is stated that Corporate Debtor raised the objections to the invoices by emails dated:
i) 03.06.2023 signed by Mr. Rudhraapathy J. ( Director)
ii) 06.04.2024 by Mr. Gautam Rohidekar (erstwhile SVP-
Legal) and iii) 20.06.2024 by Mr. Prakash Kaliyappan (Senior Manager –
Legal) well before the demand notice dated 02.05.2025 was Jaishankar vs Financial Software & Systems Private Limited sent by Operational Creditor and hence it is pre-existing dispute.
7.9. It is stated that the demand notice dated 02.05.2025 was promptly responded on 13.05.2025 stating that the debt due was denied and there was pre-existing dispute.
7.10. In Rejoinder, it is stated by Operational Creditor that since the Executive Consultant Agreement did not specify a specific method of modifying the KPIs, the fixture of the AOP targets for FY 2022-23 as reflected in the MIS reports did tantamount to modification of Operational Creditor’s KPIs as per the Executive
Consultant Agreement and the defence raised by Corporate
Debtor was a moonshine defence.
7.11. Before proceeding further let us examine the documentary evidences available in this regard:
i) KPI parameters as per Executive Consultant Agreement:
Jaishankar vs Financial Software & Systems Private Limited ii) Comparative Chart of Key Performance Indicators ( KPI)
given by Operational Creditor based on Consultant
Agreement, Annual Operating Plan and Actuals for financial year 2022-23:
Category KPIs of FY KPIs as per Actual 2022-23 as per AOP for FY Achieved Exhibit D of 2022-23 (Rs.) Executive Targets (Rs.) Consultant Agreement (Rs.)
Jaishankar vs Financial Software & Systems Private Limited
Revenue 675 crore 277.3 crore 290.7 crore
EBITDA 172 crore (-) 11.2 crore 4.6 crore Loss Profit iii) Eligible amount of incentive as per Consultant
Agreement and the stipulation that the performance incentive is payable on a yearly basis based on achieving pre agreed performance/ business results as per the KPI (Measurement) attached with agreement:
Jaishankar vs Financial Software & Systems Private Limited iv) Extract from termination notice dated 03.06.2023
7.12. Based on the above documents, it is observed that the Operational Creditor who joined FSS as CEO of Pay Tech
Jaishankar vs Financial Software & Systems Private Limited
Division on 14.05.2021 was terminated on 03rd June 2023. The relevant period for calculation of his incentive would be Financial
Year 2022-23 as that was the full financial year on which he served the company.
7.13. The issue to be decided is:
i) whether the petitioner is eligible for incentive for FY 2022-23, ii) if so, is it based on Consultant agreement or based on AOP (Annual Operating Plan).
7.14. Petitioner states that incentive should be based on AOP, as AOP was set in the beginning of the year by the Board. He relied on the MIS report to support his case that he achieved the parameters as set in AOP.
7.15. Per contra FSS stated that KPI was based on Executive
Consultant Agreement. The Petitioner failed to achieve the Objectives and Key Results and was reluctant to work towards cash neutral Pay Tech AOP, despite board directions and failed in agreed deliverables. An extract of the e -mail dated 03.06.2023 sent by Mr.Rudraa J, Director, FSS explains the position:
Jaishankar vs Financial Software & Systems Private Limited
7.16. There were further mails sent by FSS to the petitioner on 06.04.2024 by Mr. Gautam Rohidekar (erstwhile SVP-Legal) and 20.06.2024 by Mr. Prakash Kaliyappan (Senior Manager – Legal)
stating that the petitioner was making unsustainable claims which were not maintainable.
7.17. The Company issued the letter dated 22 February 2024 to the petitioner regarding full and final payment under the Consultant
Agreement along with the release letter. In the letter, the Company stated that it would process the release of the full and final payment of Rs. 44,91,667/- to him subject to he completing his obligations under the said letter. Till date, petitioner
Jaishankar vs Financial Software & Systems Private Limited deliberately withheld from providing the signed copy of the said letter to the Company due to which this payment is pending.
7.18. It is observed that all these correspondences regarding the performance incentive between the petitioner and FSS happened well before the demand notice dated 02.05.2025 under IBC sent by Operational Creditor. FSS had made clear its stand that petitioner was not eligible for performance incentive due to non achievement of KPIs as mentioned in Executive Consultant
Agreement and the claim of the petitioner for performance incentive based on AOP is unfounded as FSS did not convey any thing in writing to the effect that incentive would be calculated on the basis of AOP.
7.19. From the above analysis and findings, it is observed that Corporate Debtor raised the dispute long before the demand notice was issued under IBC. So the tribunal is of the view that there is a pre existing dispute and the defense raised by Corporate
Debtor is not a moonshine defense.
Jaishankar vs Financial Software & Systems Private Limited
7.20. Hon’ble Supreme Court in Mobilox Innovations Pvt. Ltd. v.
Kirusa Software Pvt. Ltd., “(2017) ibclaw.in 01 SC” stated that :
25. Therefore, the adjudicating authority, when examining an application under Section 9 of the Act will have to determine: (i) Whether there is an “operational debt” as defined exceeding Rs.1 lakh? (See Section 4 of the Act) ( Rs. 1 crore now) (ii) Whether the documentary evidence furnished with the application shows that the aforesaid debt is due and payable and has not yet been paid? and (iii) Whether there is existence of a dispute between the parties or the record of the pendency of a suit or arbitration proceeding filed before the receipt of the demand notice of the unpaid operational debt in relation to such dispute? If any one of the aforesaid conditions is lacking, the application would have to be rejected. Apart from the above, the adjudicating authority must follow the mandate of Section 9, as outlined above, and in particular the mandate of Section 9(5) of the Act, and admit or reject the application, as the case may be, depending upon the factors mentioned in Section 9(5) of the Act.
7.21. Hon’ble NCLAT in Talbot& Company vs Austin
Distributers Pvt Ltd (2023) ibclaw.in 34 NCLAT held that:
Jaishankar vs Financial Software & Systems Private Limited
16. It is well settled that in Section 9 proceedings the Adjudicating Authority is not to enter into final adjudication with regard to existence of dispute between the parties regarding operational debt. What has to be looked into is whether the defence raises a dispute which needs further adjudication by a competent court. Disputes pertaining to contractual issues are not to be resolved in Section 9 proceedings. If we apply the test laid down in Mobilox by the Hon'ble Apex Court to the facts of the present case it is clear that the defence raised by the Corporate Debtor in their reply filed in Section 9 application is not illusory or moonshine. The present is neither a case where there is undisputed debt for which insolvency can be asked by the Appellant to be initiated. The Adjudicating Authority has, therefore, correctly applied the ratio of the Mobilox Judgment in dismissing the Section 9 application.
7.22. Hon’ble Supreme Court in GLS Films Industries Pvt Ltd versus Chemical Suppliers India P.Ltd. (2026) 266 Comp Cas 368:
2026 SCC Online SC 551 stated that :
21. Given the obtaining facts and the afore stated settled legal position, it was not for the National Company Law Appellate Tribunal to delve into the appellant’s dispute to decide whether it had actual merit. All that is required is for the Adjudicating
Jaishankar vs Financial Software & Systems Private Limited
Authority to satisfy itself as to the existence of a plausible pre-existing dispute, which was not spurious, hypothetical or illusory. Whether the party raising that dispute would succeed on the strength thereof is not within the ken of such inquiry.
7.23. In view of the above analysis, findings and the legal position, the Petition CP 346/CHE/2025 filed by the petitioner is dismissed.
7.24. File be consigned to record.
Sd/- Sd/- VENKATARAMAN SUBRAMANIAM SANJIV JAIN MEMBER (TECHNICAL) MEMBER (JUDICIAL)
Jaishankar vs Financial Software & Systems Private Limited
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.