Hannu Steel Private Limited vs Rathi Powertech Global Private Limited
- CitationCompany Appeal (AT) (Ins.) No. 124 of 2026
Ratio decidendi
The rule this decision rests on
Where a party's reply has been closed for non-compliance with a time-bound direction, the appellate forum must ask whether the defence sought to be raised is prima facie substantial and not sham or frivolous, and whether the party was denied an effective opportunity to present it; where it is, and where no irreparable prejudice would be caused to the opposite party, the closure order cannot be sustained and a final opportunity to file reply, on conditions and within a time-bound schedule, should be granted, since procedural laws facilitate adjudication and unless gross negligence, mala fides or abuse of process is established the court should lean towards adjudication on merits. Delay in filing an appeal under the Code may be condoned under the proviso to Section 61(2) upon a showing of sufficient cause, which is to be construed liberally where the delay is attributable to lapses of counsel rather than deliberate conduct of the litigant and the delay is short and within the statutory outer limit. A litigant's vigilance obligation regarding proceedings does not extend to continuous supervision of every procedural step taken by counsel; a litigant who engaged counsel and remained interested in contesting, and who acted promptly on learning of a default, is not disentitled to relief merely because of counsel's default.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
(Arising out of order dated 08.12.2025 passed by the National Company Law Tribunal, Delhi Bench-IV in CP (IB) No. 567/ND/2025)
IN THE MATTER OF:
Hannu Steels Private Limited Through its Authorized Signatory 505, Second Floor, FIE, Patparganj Industrial Area, Delhi-110092 ....Appellant Versus
Rathi Powertech Global Private Limited 24/lA, Mohan Cooperative Industrial Estate, Mathura Road, New Delhi-110044 ....Respondent
Present:
For Appellant: Mr. Manan Batra, Mr. Abhishek Chhabra and Mr. Arun Bhattacharya, Advocates.
For Respondents: Mr. Karan Gandhi, Advocate.
J U D G M EN T (06th July, 2026)
INDEVAR PANDEY, MEMBER (T)
The present Appeal arose out of the order dated 08.12.2025 passed
by the Adjudicating Authority (National Company Law Tribunal, New
Delhi Bench-IV), in C.P.(IB) No.567/ND/2025. M/s Hannu Steels Pvt. Ltd., the Appellant herein is the Corporate Debtor, which is aggrieved by
the impugned order dated 08.12.2025 passed by Adjudicating Authority
in (C.P.(IB) No.567/ND/2025, whereby the Right to file reply of the
Appellant in the said proceedings was closed.
2. Brief facts of the case necessary to decide this Appeal are as under:
(i) The Appellant and Rathi Powertech Pvt. Ltd./Respondent
and Operational Creditor entered into a License User Agreement
dated 01.03.2022, under which the Respondent, which is the owner
of the trademark "POWERTECH" for manufacture and marketing of
TMT Bars, granted the Appellant, a licence to use the said
trademark for a monthly licence fee of Rs.23,00,000/- plus
applicable GST. The tenure of the agreement was for one year.
(ii) Clause 20 of the Agreement entitled the Appellant to
terminate the arrangement by giving three months' advance written
notice in the event of breach, non-feasibility, non-viability or any
other unforeseen reason, while continuing payment of royalty
during the notice period.
(iii) Prior to expiry of the original term, the parties executed an
Addendum dated 28.02.2023 extending the Agreement till
28.02.2025 and enhancing the monthly royalty/licence fee to
Rs.30,00,000/- plus applicable GST. All other terms and conditions
of the original Agreement remained unchanged.
Page 2 of 22
Company Appeal (AT) (Ins.) No. 124 of 2026
(iv) On 03.06.2024, the Commission for Air Quality Management
(CAQM), NCR and Adjoining Areas, directed closure of the
Appellant's manufacturing unit under Section 12(2)(xi) of the
Commission for Air Quality Management in National Capital Region
and Adjoining Areas Act, 2021. Consequent to the closure order,
the Appellant issued a termination notice dated 10.06.2024
invoking Clause 20 of the Agreement and intimating its intention to
terminate the Agreement after expiry of the stipulated three-month
notice period, i.e., with effect from 10.09.2024.
(v) The Respondent, however, alleged default in payment of
royalty/licence fee for part of September, 2024 and for the period
October, 2024 to February, 2025, and consequently filed an
application under Section 9 of the Insolvency and Bankruptcy
Code, 2016 (hereinafter referred to as "Code") being CP (IB) No.
567/ND/2025 before the Adjudicating Authority claiming
operational debt arising from unpaid licence fee.
(vi) The Company Petition was filed on 19.10.2025 and registered
on 29.10.2025. On 31.10.2025, the Adjudicating Authority noted
the non-filing of an affidavit under Section 63 of the Bharatiya
Sakshya Adhiniyam, 2023 regarding service of demand notice
under Section 8 of the Code and adjourned the matter. On
19.11.2025, a proxy counsel appeared on behalf of the Appellant
and accepted notice. The Adjudicating Authority granted one week's
Page 3 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 time to the Appellant to file its reply and listed the matter on
08.12.2025.
(vii) On 08.12.2025, the next date of hearing the Adjudicating
Authority declined the request for adjournment made by the proxy
counsel and closed the Appellant's right to file reply, as no reply
was filed by the Appellant by that time.
(viii) Thereafter, the Appellant engaged new counsel who appeared
before the Adjudicating Authority on 05.01.2026 and sought an
opportunity to place the Appellant's defence on record. However,
the Adjudicating Authority, noting that the right to file reply had
already been closed and no written submissions had been filed,
declined the request and reserved orders in the Company Petition.
(ix) Aggrieved by the impugned order dated 08.12.2025 closing
its right to file reply and contending that such closure resulted in
denial of a reasonable opportunity of hearing due to the negligence
of its previous counsel, the Appellant has preferred the present
Appeal.
Submissions of Appellant
3. Ld. Counsel for Appellant submits that the present Appeal has been
filed with a delay of only seven (7) days beyond the prescribed period of
limitation and the same falls well within the condonable period of fifteen
(15) days contemplated under the proviso to Section 61(2) of the Code.
Page 4 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026
4. He submits that the Appellant was prevented by sufficient cause
from filing the Appeal within the initial period of thirty days. The Appellant
came to know of the impugned order dated 08.12.2025 only on
26.12.2025 while independently checking the website of the Adjudicating
Authority after repeated attempts to contact its erstwhile counsel failed.
5. He further submits that the previous counsel neither informed the
Appellant about the passing of the impugned order nor disclosed that the
Appellant's right to file reply had already been closed by the Adjudicating
Authority. The Appellant was under the bona fide impression that the
matter was listed on 05.01.2026 and that its reply could still be filed.
6. Ld. Counsel submits that immediately upon acquiring knowledge
of the impugned order, the Appellant engaged the present counsel.
However, owing to the intervening winter vacations and the non-
availability of the present counsel, who was travelling during that period,
the Appeal could not be filed earlier. Appellant contended that the delay
is neither deliberate nor intentional and no prejudice would be caused to
the Respondent if the delay is condoned, whereas refusal to condone the
delay would deprive the Appellant of its valuable statutory right of appeal.
7. Appellant placed Reliance on the judgment of the Hon'ble Supreme
Court in Ramchandra Dallaram Choudhary v. Adani Infrastructure
& Developers Pvt. Ltd., Civil Appeal No. 5106 of 2025, wherein the
Court held that the expression "sufficient cause" deserves liberal
construction, particularly where the delay has occurred due to lapses on
Page 5 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 the part of counsel and where adjudication on merits would advance the
cause of justice.
8. Appellant further placed reliance on the decisions in Rafiq & Anr.
v. Munshilal & Anr. (Civil Appeal No. 1415 of 1981) and Dwarika
Prasad (Dead) through LRs v. Prithvi Raj Singh (SLP Civil No. 11259
of 2024), wherein the Hon'ble Supreme Court reiterated that a litigant
ought not to suffer for the fault, negligence or default of his advocate and
that disputes should ordinarily be decided on merits rather than on
technicalities.
9. Regarding the main matter in the appeal about delay in filing the
reply to Section 9 petition, Ld. Counsel submits that the Appellant had
acted diligently throughout the proceedings. All relevant documents,
instructions and material necessary for filing a reply to the Section 9
application had been supplied to the erstwhile counsel well in advance.
10. He submits that despite clear instructions from the Appellant, the
previous counsel failed to file the reply within the time granted by the
Adjudicating Authority and further failed to communicate the
consequences arising from the order dated 08.12.2025. The Appellant
cannot be penalised for acts and omissions attributable solely to its
counsel, particularly when there is no allegation that the Appellant itself
was negligent, careless or lacking in diligence. The principles of natural
justice require that a party be afforded a reasonable opportunity to place
its defence on record before any adverse order affecting its rights is
passed. Ld. Counsel contends that closure of the right to file reply has
Page 6 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 effectively deprived the Appellant of an opportunity to contest the Section
9 proceedings on merits and to place before the Adjudicating Authority
material facts which go to the root of the alleged operational debt.
11. Ld. Counsel submits that the parties had entered into a License
User Agreement dated 01.03.2022, subsequently extended by an
Addendum dated 28.02.2023. Under Clause 20 of the Agreement, the
Appellant possessed a contractual right to terminate the arrangement
upon issuance of a three months' prior notice in writing. After closure of
the Appellant's manufacturing unit pursuant to the order dated
03.06.2024 issued by the Commission for Air Quality Management
(CAQM), the Appellant invoked Clause 20 and issued a termination notice
dated 10.06.2024. He further submits that upon expiry of the three
months' notice period on 10.09.2024 and payment of all amounts payable
during such notice period, no further royalty or licence fee remained due
and payable.
12. He submitted that the Respondent has failed to disclose the
termination notice before the Adjudicating Authority and has raised its
claim on the basis of alleged dues for a period subsequent to the effective
termination of the Agreement.
13. It is further submitted that the Section 9 application is founded
merely upon proforma invoices and not upon final tax invoices, thereby
giving rise to serious disputes requiring adjudication. These issues
constitute substantial and bona fide disputes which deserve
Page 7 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 consideration by the Adjudicating Authority and cannot be shut out
without permitting the Appellant to place its defence on record.
14. Ld. Counsel submits that no irreversible prejudice would be caused
to the Respondent, if the Appellant is granted a final opportunity to file
its reply subject to appropriate conditions. Conversely, refusal to restore
the Appellant's right would result in serious civil consequences and may
culminate in admission of a Section 9 application without consideration
of the Appellant's defence.
15. Closing his submissions, Ld. Counsel submits that the impugned
order dated 08.12.2025 deserves to be set aside and the Appellant be
granted one effective opportunity to file its reply before the Adjudicating
Authority within a time frame fixed by this Appellate Tribunal.
Submissions of Respondent
16. Ld. Counsel submits that the only issue arising for consideration
in the present Appeal is whether the order dated 08.12.2025 passed by
the Adjudicating Authority, whereby the Appellant's right to file reply in
CP (IB) No. 567/ND/2025 was closed, suffers from any legal infirmity
warranting interference by this Appellate Tribunal.
17. He submits that the present Appeal does not arise out of any
adjudication on the merits of the claim of the Operational Creditor nor
does it concern the maintainability of the Section 9 Application.
Consequently, the various factual assertions and substantive defences
sought to be raised by the Appellant relating to the alleged termination of
Page 8 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 the License User Agreement, existence of disputes, liability to pay royalty,
validity of invoices and other contractual issues are wholly extraneous to
the controversy involved in the present Appeal.
18. It is submitted that such issues were never adjudicated by the
Adjudicating Authority and cannot be permitted to be introduced for the
first time in the present appellate proceedings. The scope of the Appeal
cannot be enlarged beyond the challenge to the procedural order dated
08.12.2025.
19. Ld. Counsel submits that the Appellant was duly served with the
Company Petition and had complete knowledge of the proceedings before
the Adjudicating Authority. On 19.11.2025, the Appellant entered
appearance through counsel, accepted notice and acknowledged receipt
of the petition. The Adjudicating Authority, in the interest of justice,
granted one week's time to file a reply.
20. Ld. Counsel submits that despite the specific judicial direction
contained in the order dated 19.11.2025, no reply whatsoever was filed
by the Appellant within the period granted by the Adjudicating Authority.
On the next date of hearing, i.e., 08.12.2025, the Appellant again
appeared through counsel and merely sought an adjournment without
assigning any sufficient or cogent reason explaining non-compliance of
the earlier order.
21. Respondent reiterated that neither any draft reply was placed on
record nor any application seeking extension of time was filed. No
Page 9 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 exceptional circumstances were disclosed before the Adjudicating
Authority which could justify the Appellant's failure to comply with the
order dated 19.11.2025. He submits that the Adjudicating Authority was
therefore fully justified in exercising its discretion and closing the
Appellant's right to file reply.
22. It is further submitted that even after the order dated 08.12.2025
was passed, the Appellant failed to take any legally recognized step for
seeking recall or modification of the said order. The Adjudicating
Authority had simultaneously directed both parties to file written
submissions within one week. The Appellant admittedly failed to comply
even with the said direction.
23. Ld. Counsel contends that if the Appellant was genuinely aggrieved
by closure of its right to file reply, it ought to have filed a formal
application seeking recall, modification or reconsideration of the order
dated 08.12.2025. Instead, the Appellant merely sought an oral
indulgence on 05.01.2026 without filing any application supported by
affidavit or documentary material, such oral mention cannot substitute a
properly instituted legal proceeding and the Adjudicating Authority
rightly declined to entertain the same.
24. He submits that the entire case of the Appellant rests upon an
attempt to shift the blame upon its erstwhile counsel. No documentary
material has been placed on record to substantiate the allegation that the
previous counsel failed to communicate the orders passed by the
Adjudicating Authority or that repeated efforts were made to contact him.
Page 10 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 No emails, letters, messages, call records, instructions, engagement
documents or any contemporaneous correspondence have been produced
by the Appellant in support of its allegations.
25. It is further submitted that the Appellant's own pleadings reveal
that all documents required for preparation of the reply were already
available with the Appellant and its counsel. The Appellant was therefore
fully aware of the proceedings and cannot now plead ignorance of events
occurring before the Adjudicating Authority. The explanation furnished
by the Appellant is self-serving, unsupported by evidence and lacks bona
fides.
26. He submits that even the present Appeal has not been filed within
the prescribed period and an application seeking condonation of delay of
seven days has been preferred. Condonation of delay under Section 61(2)
of the Insolvency and Bankruptcy Code is not automatic and can be
granted only upon proof of "sufficient cause".
27. Ld. Counsel submits that the Appellant has failed to establish any
sufficient cause explaining either its conduct before the Adjudicating
Authority or the delay in filing the present Appeal. The explanation
regarding non-availability of counsel during winter vacations is vague and
unsupported by any material particulars. It is further argued that the
conduct of the Appellant must be assessed cumulatively. The repeated
defaults before the Adjudicating Authority coupled with the delayed filing
of the present Appeal demonstrate a consistent pattern of negligence and
lack of diligence.
Page 11 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026
28. Ld. Counsel submits that the settled position of law is that a litigant
cannot avoid the consequences of its own inaction merely by attributing
fault to its advocate. Reliance is placed on the judgment of the Hon'ble
Supreme Court in Salil Dutta v. T.M. & M.C. (P) Ltd., (1993) 2 SCC
185, wherein it was held that an advocate acts as an agent of the litigant
and that there is no absolute rule permitting a party to disown its
advocate and seek relief. Reliance is also placed on the judgment of the
Hon'ble Supreme Court in Rajneesh Kumar v. Ved Prakash, 2024 SCC
OnLine SC 3380, wherein it was observed that litigants have an
independent obligation to remain vigilant regarding proceedings affecting
their rights and cannot routinely seek condonation by alleging negligence
on the part of counsel.
29. He further submits that the Appellant is a private limited company
managed by commercial entities and cannot be equated with an illiterate
or uninformed litigant. Such a commercial entity is expected to diligently
monitor proceedings and ensure compliance with judicial directions.
Reliance is further placed on the decision of the Delhi High Court in
Moddus Media Private Ltd. v. Scone Exhibition Pvt. Ltd. 2017 SCC
OnLine Del 8491, wherein it was held that a litigant cannot go into deep
slumber after engaging a lawyer and subsequently seek to shift the entire
blame upon the advocate.
30. Ld. Counsel also relies upon the decision of this Appellate Tribunal
in R Mall Developers Pvt. Ltd. v. Lemon Chilli Veg Gourmet Foods
LLP, Company Appeal (AT) (Insolvency) No. 527 & 528 of 2025,
Page 12 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 wherein it was held that a litigant cannot create a smoke-screen by
attributing all defaults to counsel and must demonstrate its own diligence
in pursuing the proceedings.
31. Ld. Counsel submits that the impugned order is a procedural order
passed in exercise of judicial discretion after the Appellant repeatedly
failed to comply with directions issued by the Adjudicating Authority. No
perversity, illegality, jurisdictional error or violation of principles of
natural justice is demonstrated in the impugned order. On the contrary,
the record establishes that adequate opportunity was granted to the
Appellant and that the consequences ultimately visited upon it were a
direct result of its own failure to act diligently.
32. Ld. Counsel further submits that permitting restoration of the right
to file reply in such circumstances would encourage non-compliance and
frustrate the objective of expeditious adjudication under the Insolvency
and Bankruptcy Code, 2016.
33. Ld. Counsel placed reliance on the decision of this Appellate
Tribunal in SCB Steels Pvt. Ltd. vs ---- Company Appeal (AT)
(Insolvency) No.1210 of 2025, wherein interference was declined where
the consequences complained of arose due to the party's own deliberate
negligence and non-compliance with judicial directions.
Page 13 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 Analysis and Findings
34. We have heard Ld. Counsels appearing for the Appellant and
Learned Counsel appearing for the Respondent and have carefully
perused the material available on record.
35. We first take up the prayer seeking condonation of delay. The
impugned order was passed on 08.12.2025. The present Appeal has been
filed beyond the prescribed period of thirty days by a delay of seven days.
The delay admittedly falls within the outer limit of fifteen days
contemplated under the proviso to Section 61(2) of the Code.
36. The Appellant has explained that the impugned order was never
communicated by its erstwhile counsel. According to the Appellant,
despite repeated attempts to contact the counsel, no information
regarding the proceedings was furnished. It is the case of the Appellant
that it became aware of the impugned order, only on 26.12.2025 after
independently verifying the status of the matter from the website of the
Adjudicating Authority. Immediately thereafter, steps were taken to
engage present counsel and initiate appellate proceedings.
37. The Respondent has opposed the application on the ground that
the explanation is vague and unsupported by documentary evidence and
that the Appellant has demonstrated a pattern of negligence both before
the Adjudicating Authority and before this Appellate Tribunal.
38. The expression "sufficient cause" occurring in limitation statutes
has repeatedly received liberal interpretation from the Hon'ble Supreme
Page 14 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 Court where refusal to condone delay would result in denial of
adjudication on merits. The Hon'ble Supreme Court In Ramchandra
Dallaram Choudhary v. Adani Infrastructure & Developers Pvt. Ltd.,
Civil Appeal No.5106 of 2025, reiterated that the expression "sufficient
cause" should receive a justice-oriented interpretation and courts must
examine whether refusal to condone delay would defeat substantial
justice, particularly where the delay is attributable to lapses on the part
of legal representatives and not deliberate conduct of the litigant.
39. Having regard to the explanation furnished by the Appellant and
considering that the delay is only of seven days and falls within the
condonable period prescribed by statute, we are satisfied that sufficient
cause has been shown. Accordingly, the delay of seven days in filing the
Appeal deserves to be condoned and is hereby condoned.
40. We now take up the matter under consideration in the present
Appeal, which arises from an interlocutory procedural order, whereby the
Adjudicating Authority closed the Appellant's right to file reply in the
pending proceedings Section 9 of Code.
41. The record indicates that notice was accepted on behalf of the
Appellant on 19.11.2025. One week's time was granted to file a Reply. It
is also not disputed that no Reply came to be filed before the next date of
hearing i.e. 08.12.2025. The Adjudicating Authority, finding that the
Reply had not been filed despite opportunity, closed the right of the
Appellant to file Reply.
Page 15 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026
42. It is well settled that regulation of proceedings and case
management ordinarily fall within the procedural discretion of the
Adjudicating Authority and such discretion should not be lightly
interfered with by an appellate forum. However, the exercise of such
discretion must always remain consistent with the principles of natural
justice and the requirement of affording parties a fair and meaningful
opportunity to present their case.
43. We are in agreement with the Respondent that the merits of the
underlying contractual disputes are not required to be adjudicated in the
present Appeal. Nevertheless, while examining whether denial of
opportunity has caused prejudice warranting appellate interference, it
becomes necessary to ascertain whether the defence sought to be raised
is prima facie substantial and deserving of consideration, without
expressing any opinion on its ultimate merits.
44. Insolvency proceedings under the Code carry serious civil
consequences upon admission of an application under Section 9,
including commencement of the corporate insolvency resolution process,
declaration of moratorium and displacement of the management of the
Corporate Debtor. It is therefore imperative that a party is not denied an
effective opportunity to place its defence before such consequences ensue.
45. The Appellant has consistently maintained that all documents and
necessary instructions had been supplied to its erstwhile counsel and
that the failure to file the reply was solely attributable to the negligence
of the counsel. The Respondent, on the other hand, contends that these
Page 16 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 allegations are unsupported by documentary evidence and do not
constitute sufficient cause.
46. While the Respondent is correct in contending that mere allegations
against counsel cannot, by themselves, justify restoration of procedural
rights, the issue cannot be decided solely on that basis. Courts are
required to balance two equally important considerations; first, the
judicial proceedings must be conducted with diligence and discipline, and
secondly, that substantive justice should not be defeated merely on
account of procedural lapses where no irreparable prejudice is caused to
the opposite party.
47. In Rafiq & Anr. v. Munshilal & Anr., (1981) 2 SCC 788, the
Hon'ble Supreme Court observed that a litigant who has done everything
expected of him should not be penalized for the default of his advocate.
The Court famously observed that the judicial system should not permit
a party to suffer merely because of the mistake of his counsel. The same
principle was reiterated recently in Dwarika Prasad (Dead) through LRs
v. Prithvi Raj Singh, SLP (Civil) No.11259 of 2024, wherein the Hon'ble
Supreme Court emphasized that adjudication on merits should ordinarily
prevail over technicalities and procedural defaults, unless mala fides or
deliberate negligence are established.
48. The Respondent has relied upon the judgment of Hon'ble Supreme
Court in Salil Dutta v. T.M. & M.C. (P) Ltd., (1993) 2 SCC 185. In this
case, the Hon'ble Supreme Court held that there is no absolute
proposition that every mistake of counsel must necessarily result in relief
Page 17 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 being granted to the litigant. The Court observed that an advocate acts as
an agent of the party and, therefore, in appropriate circumstances, the
acts of the advocate may bind the litigant. However, the said judgment
does not lay down an inflexible rule that relief can never be granted where
counsel is negligent. On the contrary, the decision recognizes that each
case must be examined on its own facts and that courts retain discretion
to prevent injustice.
49. The Respondent has also relied upon the judgment of Hon'ble
Supreme Court in Rajneesh Kumar v. Ved Prakash, 2024 SCC OnLine
SC 3380. The said decision reiterates the principle that litigants have an
obligation to remain vigilant and cannot entirely absolve themselves of
responsibility by blaming their advocates. We agree with the said
proposition. However, vigilance expected from a litigant cannot be
elevated into a standard of continuous supervision of every procedural
step taken by counsel. The doctrine of diligence cannot be stretched to
such an extent that substantive rights are defeated despite the existence
of bona fide explanations.
50. Lastly, the Respondent has relied upon the judgment of the Delhi
High Court in Moddus Media Private Ltd. v. Scone Exhibition Pvt.
Ltd., 2017 SCC OnLine Del 8491. In the said case, the Court observed
that a litigant cannot engage a lawyer and thereafter completely abandon
responsibility for the litigation. The proposition is unexceptionable.
However, the present case concerns a single procedural default resulting
in closure of the right to file reply in insolvency proceedings carries
Page 18 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 serious consequences, which may include initiation of CIRP Proceedings
against the appellant.
51. We further note that the Appellant has not remained absent from
the proceedings altogether. Appearance had been entered before the
Adjudicating Authority. Subsequently, a new counsel also appeared
before the Adjudicating Authority on 05.01.2026 seeking an opportunity
to place the defence on record. These circumstances indicate that the
Appellant was interested in contesting the proceedings and had not
abandoned the litigation.
52. The Respondent's reliance upon the decision of this Appellate
Tribunal in R Mall Developers Pvt. Ltd. v. Lemon Chilli Veg Gourmet
Foods LLP, Company Appeal (AT) (Insolvency) Nos.527 & 528 of
2025. The said judgment emphasizes that a litigant cannot create a
smoke-screen by merely blaming counsel and must demonstrate its own
diligence. On the contrary, we note that appellant has been very prompt
in follow-up action whenever any delay on the part of his counsel has
come to his notice. The appellant himself checked the status of the case
from the NCLT portal and took follow-up action. Therefore, the reliance
on the aforesaid case by the respondent does not support his case.
53. The Respondent has lastly relied upon the decision of this Appellate
Tribunal in SCB Steels Pvt. Ltd. vs ---- Company Appeal (AT)
(Insolvency) No.1210 of 2025. The said decision turned upon facts
where the Tribunal found deliberate negligence and repeated non-
compliance attributable to the party itself. The facts of the present case
Page 19 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 do not disclose any such conduct. We are therefore unable to hold that
the ratio of the said decision operates as a bar to grant of relief in the
present matter.
54. The defence sought to be raised by the Appellant cannot, at least
prima facie, be characterised as sham or frivolous. The Appellant asserts
that the License User Agreement stood validly terminated in accordance
with its contractual terms and that no royalty remained payable
thereafter, apart from raising disputes regarding the invoices forming the
basis of the Operational Creditor's claim.
55. We clarify that we express no opinion whatsoever on the merits of
these contentions. Their correctness shall be examined independently by
the Adjudicating Authority. However, the very existence of such a defence
reinforces the necessity of affording the Corporate Debtor an opportunity
to place its reply on record before the matter is finally adjudicated.
56. Any inconvenience occasioned by the delay can be adequately
compensated by costs. On the contrary, if the impugned order is allowed
to stand, the Section 9 application may proceed to adjudication without
consideration of the defence sought to be raised by the Corporate Debtor.
Such a course would not advance the cause of justice.
57. The objective of the Code is undoubtedly expeditious resolution.
However, such expeditious resolution cannot be at the cost of fairness
and natural justice. Speed of adjudication and observance of natural
justice are complementary and not conflicting objectives. The principles
Page 20 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 of natural justice require that before serious civil consequences ensue, a
party should ordinarily be afforded a meaningful opportunity to present
its defence as the doctrine of audi alteram partem remains embedded in
insolvency jurisprudence.
58. It is a settled principle that procedural laws are intended to
facilitate adjudication and not to obstruct it. The Supreme Court has
consistently held that unless gross negligence, mala fides or abuse of
process are established, courts should ordinarily lean in favour of
adjudication on merits. Applying the aforesaid principles to the facts of
the present case, we are of the considered opinion that the interests of
justice require that the Appellant be afforded one final opportunity to
place its Reply on record.
59. We are also of the view that no irreversible prejudice would be
caused to the Operational Creditor, if one final opportunity is granted to
the Corporate Debtor to place its reply on record.
60. We are, accordingly, of the view that the order dated 08.12.2025
closing the right of the Appellant to file Reply cannot be sustained and
deserves to be set aside.
61. The Appellant is entitled to one final opportunity to file its Reply
before the Adjudicating Authority subject to appropriate conditions and
within a time-bound schedule so that the objective of expeditious
insolvency adjudication is not defeated. The Adjudicating Authority shall
thereafter consider the matter on merits and in accordance with law
Page 21 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026 without being influenced by any observations contained in this
Judgment. We clarify that all rights and contentions of the parties on
merits remain open for adjudication before the Adjudicating Authority.
62. Accordingly, the Appeal is allowed. Pending IA's, if any, are closed.
Parties to bear their own costs.
[Justice N. Seshasayee] Member (Judicial)
[Indevar Pandey] Member (Technical)
Place: New Delhi Harleen
Page 22 of 22 Company Appeal (AT) (Ins.) No. 124 of 2026
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free