Greenopolis Welfare Association vs Three C Shelters Pvt Ltd & Anr
- CitationCompany Appeal (AT) (Ins) No.891 of 2020
Ratio decidendi
The rule this decision rests on
The assignment of a debt by an Operational or Financial Creditor does not prevent it from being treated as the creditor under the Code, since the definitions in Sections 5(7) and 5(20) extend to any person to whom the debt has been legally assigned or transferred; but the same assignability does not extend to a Corporate Debtor under Section 3(8), so a defence of assignment taken by a company in its capacity as Corporate Debtor in earlier proceedings cannot be used to establish a dispute or collusion in later proceedings in which it is the Operational Creditor. A bar under Section 11(a) or (b) of the Code operates on the making of an application for initiation of the corporate insolvency resolution process; where the application was made at a time when the applicant was not undergoing CIRP and no twelve-month bar under Section 11(b) subsisted, a later revival of an earlier CIRP against the applicant does not invalidate the application already made. Where an application under Section 9 is complete, debt and default are shown and the debt is undisputed, the Adjudicating Authority's only consideration is whether operational debt is due and in default, and once the application has been allowed it has no power to review that order on unsubstantiated allegations of collusion. A project-based approach to CIRP, as laid down in an earlier decision of this Tribunal, does not require that a Corporate Debtor's insolvency be combined with that of a co-developer where no insolvency proceedings are pending against the co-developer and the claimed joint venture is unsupported by documentary material; such questions are for the Resolution Professional in the course of the CIRP.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
[Arising out of Orders dated 20.07.2020 and 17.09.2020 passed by National Company Law Tribunal, New Delhi in I.A. No.3491(ND)/2020 in/and C.P. IB-2721/ND/2019]
IN THE MATTER OF: Before NCLT Before NCLAT
Greenopolis Welfare Applicant Appellant Association (in I.A.) E-302, Anupam Apartments, East Arjun Nagar, Delhi - 110032
Vs.
1. Three C Shelters Respondent Respondent No.1 Private Limited (Corporate Debtor) C-23 Greater Kailash Enclave, Part - 1, New Delhi 110048
2. Straight Edge Applicant/ Respondent No.2 Contracts Pvt. Ltd. Operational Creditor Through the (in C.P. IB-2721/ND/2019) Interim Resolution Professional - (in CP/IB/1071/ND/2019) Sh. Ranjit Kumar Verma Ground Floor, 4, Dayanand Vihar, Main Vikas Marg, Delhi - 110092
For Appellant: Mr. Piyush Singh, Mr. Aditya Parolia, Mr. Prateek Vats and Ms. Aditi Sinha, Advocates.
For Respondent: Mr. Jayant K. Mehta, Mr. Pankaj Agarwal, Ms. Sonal Alagh, Ms. Shreya Kohli and Mr. Nikhil Jain, Advocates for R-1. Mr. Amarpal, IRP Mr. GP Madaan, Ranjeet Kumar Verma and Mr. Pranay Chitale (RP), R-2. 2
Mr. Deepak Garg, Advocate for R-2. Ms. Asmita Chaudhary, for Impleadment. Mr. Sumedha Dang and Mr. Viabhav Gaggar, for Interveners.
JUDGEMENT
(06th January, 2021) A.I.S. Cheema, J. :
1. Appellant claims to be association representing 350 home buyers
in the project Greenopolis of the Respondent No.1 - Three C Shelters Pvt.
Ltd. (Corporate Debtor). The Appeal has been filed against the admission
of Application under Section 9 of Insolvency and Bankruptcy Code, 2016
(IBC - in short) in C.P. IB-2721/ND/2019 dated 20th July, 2020
(Impugned Order No.1) (Annexure A-1 - Page 34) and against Order dated
17th September, 2020 (Page 34A - Impugned Order No.2) by which Order
I.A. No.3491 of 2020 filed by the Appellant in the Petition was dismissed.
2. Impugned Order No.1 is short Order which reads as under:-
"Heard the submissions made by the Operational Creditor as well as Corporate Debtor. Annexure A-10 which is affidavit of admission shows that on January 27, 2020, the Director of Three C Shelters Private limited. Mr. Girish Chander Joshi has confirmed that the Corporate Debtor has to pay to the Operational Creditor as per his claim. Therefore, the petition is allowed."
Impugned Order No.2 is also short Order which reads as under:-
"I.A. No. 3491/2020: Application is without any merit. Hence dismissed."
Company Appeal (AT) (Ins) No.891 of 2020 3
The above Orders have been challenged in this Appeal which was
filed on 22nd September, 2020. Due to pandemic, objection regarding
limitation of Impugned Order No.1 is ignored.
3. The Appellant claims that it is the largest Financial Creditor of
Corporate Debtor and is aggrieved by the admission Order whereby
Company Petition IB 2721(ND)/2019 was allowed "though to the relief of
the Appellant, the Petition was not admitted". It is claimed that the
admission Order is perverse and devoid of merit. Appellant claims that
Respondent No.1 - Three C Shelters Pvt. Ltd. - Corporate Debtor lured
Appellant to book units in the project which was being developed by the
Corporate Debtor and made false representations with regard to timely
possession. The Order of CP (IB) No.2721/2019 which has been admitted
by the admission Order is challenged on the ground that the Respondent
No.2 - Straight Edge Contracts Pvt. Ltd., who filed the Application under
Section 9 of IBC as Operational Creditor was itself a Corporate Debtor in
another Petition "Gupta Ji Electric Company vs. Straight Edge
Contracts Pvt. Ltd." in IB No.1071/ND/2019 (other Petition - in short).
That other Petition was admitted on 26th February, 2020. Appellant
claims that in that Petition, the Respondent No.2 who was Corporate
Debtor took contrary stand against Respondent No.1. The admission
Order of that matter dated 26th February, 2020 (Annexure A-2 - Page 35)
recorded that the present Respondent No.2 had assigned the debt which
was owed to Gupta Ji to principal employer of present Respondent No.2.
Company Appeal (AT) (Ins) No.891 of 2020 4
The Appellant thus wants to claim that Respondent No.2 was not an
Operational Creditor. It is also claimed that Respondent No.1 - Corporate
Debtor launched the Greenopolis Projects in 2011 in collaboration with
"Orris Infrastructure Pvt. Ltd." and the project was of 38 towers and
thousands of flats were to be developed by the Corporate Debtor in
conjunction with Orris Infrastructure Pvt. Ltd. It is claimed that for
fruitful CIRP (Corporate Insolvency Resolution Process), the Corporate
Debtor cannot be subjected to the CIRP process alone since the project
was being developed jointly with Orris Infrastructure. It is claimed that it
is not feasible to only subject one participant into one CIRP. According to
Appellant, there should be group insolvency of Respondent No.1 with
Oriss Infrastructure.
4. The Appellant claims that Respondent No.2 - Operational
Creditor could not have initiated insolvency proceedings against the
Corporate Debtor as there was bar under Section 11(b) of IBC. Appellant
stated that in the matter of M/s. Gupta Ji when the Appeal was filed,
matter between the Respondent No.2 and Gupta Ji was settled in
Company Appeal (AT) (Ins) No.388 of 2020. Respondent No.2 exited
rigours of CIRP only on 13th March, 2020 and thus 12 months were not
over as required by Section 11(b) of IBC.
5. The Appellant further claims and it is argued that the Impugned
Order of admission is perverse as no reasons have been recorded and it is
mechanical admission Order. The Appeal points out (para - 8(ii)) that
Company Appeal (AT) (Ins) No.891 of 2020 5
Respondent No.1 - Corporate Debtor who was under obligation to deliver
the units to the Appellant in timely manner completely failed to do so.
According to the Appellant, the Appellant had filed I.A.No.3491 of 2020 to
bring the facts to the notice of Adjudicating Authority. The Adjudicating
Authority failed to appreciate that there was collusion between the
Respondents which was highlighted in the I.A. No.3491 of 2020. The
Adjudicating Authority should have invoked Rule 11 of National
Company Law Tribunal Rules, 2016 and invoked inherent powers to
investigate the case which was made out by the Appellant. The prayer in
Appeal is to set aside both the Impugned Orders and to take action
against the Respondents. Prayer (d) states that this Tribunal should
direct initiation of CIRP on a project-wise basis as per decision of this
Tribunal in "Flat Buyers Association Winter Hills Vs. Umang Realtech
Pvt. Ltd." in Company Appeal (AT) (Ins) No.926 of 2019.
6. In the present matter, the Respondents 1 and 2 are now both
under CIRPs, both represented through different Insolvency Resolution
Professionals. There are also I.A.s 2742 and 2743 filed by Company
named "Orissa Infrastructure Pvt. Ltd." under Rule 11 of National
Company Law Appellate Tribunal Rules, 2016 seeking intervention. There
is I.A. 2605 of 2020 by one Dhruv Ranjan Verma claiming to be
representing 120 home buyers seeking intervention and claiming that the
CIRP should be continued.
Company Appeal (AT) (Ins) No.891 of 2020 6
7. Before proceeding further, it would be appropriate to make brief
reference to the developments before the present Impugned Orders and
also developments which have taken place after the Impugned Orders as
well as during pendency of this Appeal. We are making short reference
chronologically for appreciation.
Developments in short
8. The developments are as under:-
8.1 On 26th February, 2020, Application under Section 9 of IBC filed
by M/s. Gupta Ji Electric Company (Operational Creditor) was admitted
against M/s. Straight Edge Contract Pvt. Ltd. (Annexure A-2 - Page 35).
Present Respondent No.2 was Corporate Debtor in that matter which we
are referring as "earlier matter".
8.2 On 13th March, 2020, the Appeal - Company Appeal (AT) (Ins)
No.388 of 2020 filed in the earlier matter came up before this Tribunal
and the same was disposed by the Order dated 13th March, 2020
(Annexure A-3 - Page 46) and MOU between present Respondent No.2
who was Corporate Debtor in that matter with M/s. Guptaji, the
Operational Creditor in the earlier matter was recorded and the
admission Order dated 26th February, 2020 was set aside and Gupta Ji
withdrew that Application. Liberty was given to Gupta Ji and IRP
(Insolvency Resolution Professional) in that matter to approach this
Appellate Tribunal in case the Corporate Debtor in that matter (present
Company Appeal (AT) (Ins) No.891 of 2020 7
Respondent No.2) commits default in honouring the MOU. Thus at that
point of time, the CIRP had ceased to exist, in CP IB No.1071/2019.
8.3 On 20.07.2020, the present Impugned Order No.1 came to be
passed in IB 2721/ND/2019 in Application filed by M/s. Straight Edge
Contracts Pvt. Ltd. as Operational Creditor against M/s. Three C Shelters
Pvt. Ltd. which we have reproduced above. In the Cause Title, reference
has been made to Section 7 of IBC which was error apparent as the
Order refers to submissions made by Operational Creditor. (This and
other mistakes in Order Adjudicating Authority corrected later on
14.10.2020 vide Annexure R-5 filed by Respondent No.1 with Reply).
8.4 One Sumita Gogoi Hazarika and another filed I.A. No.2970/2020
in IB No.2721/2019 and there was an Order passed on 27.07.2020
(Annexure 3 colly - Reply of R-1 - Diary No.23486). The said Order shows
that, that Application was filed with reference to the present admission
Order dated 20th July, 2020 and had come up before another Bench
which observed and indicated that clarification and detailed Order was
required to be considered as submitted by the Counsel for the Applicant.
The Bench directed to place the matter before Bench which had passed
Order dated 20th July, 2020.
8.5 On 6th August, 2020, the Appellant filed I.A. 3491/2020 in
CP(IB) No.2721/2019. Copy of the Application is at Annexure A-4 - Page
57. It is stated that I.A. filed by Sumita was also similar.
Company Appeal (AT) (Ins) No.891 of 2020 8
8.6 On 17.09.2020, the I.A. No.3491/2020 filed by the Appellant
came to be dismissed as without merits. However, I.A. No.2970/2020
filed by Sumita Gogoi, which is stated to be raising similar grounds was
kept pending and came up before Adjudicating Authority on 23.09.2020,
30th September, 2020 and 7th October, 2020 (See Annexure - 3 colly of
Reply of R-1).
8.7 On 22nd September, 2020, the Appellant filed present Appeal
against both the Impugned Orders mentioned above.
8.8 On 28th September, 2020, the matter of Gupta Ji versus present
Respondent No.2 had again come up before this Appellate Tribunal. Copy
or the Order is at Annexure A-4 (Diary No.22923) of I.A. No.2547/2020
filed by the Appellant. The Order shows that in view of default and the
liberty which had been given, the Operational Creditor in that matter,
namely Gupta Ji Electric Company as well as the IRP had filed I.A.s and
Contempt Case which came up and as the cheque issued had been
dishonoured, the earlier Order of this Tribunal dated 13 th March, 2020
(Annexure A-3) were recalled and Appeal was dismissed and Impugned
Order dated 26th February, 2020 in that earlier matter was restored and
the IRP was directed to proceed with CIRP from the stage it was when
Order in Appeal was passed.
8.9 On 7th October, 2020, the I.A. No.2970/2020 filed by Sumita
Gogoi (see Annexure - 3 colly of Reply of R-1) came to be dismissed.
Company Appeal (AT) (Ins) No.891 of 2020 9
8.10 On 14th October, 2020 (see Annexure R-5 in Reply of R-1), the
Adjudicating Authority passed Orders in I.A. No.3079/2020 in IB
2721/2019 and corrected errors which had occurred in Impugned Order
No.1. The Order passed was as under:-
"IA No.3079 of 2020
IA No.3079 of 2020 is heard and the application is allowed.
By this order the typographical errors of order dated 20.07.2020 are corrected:-
(i) The word "Section 7" is replaced with "Section 9"
in the order dated 20.07.2020.
(ii) Annexure A10 which is an affidavit of admission is replaced with the words "Annexure A" to the affidavit of admission.
(iii) the detailed order/final judgement will be uploaded within next three days."
8.11. On 15th October, 2020, the Impugned Order No.1 and Impugned
Order No.2 came up for consideration before this Appellate Tribunal
when matter had come up for admission and after hearing Counsel for
the Appellant and Respondent No.1, Notice was issued and it was
directed "Meanwhile, till next date of hearing, the Impugned Orders are
stayed".
8.12 On 16th October, 2020, the Adjudicating Authority passed
detailed Order/Judgement (Annexure R-6 - Reply of R-1) recording that
vide Order dated 20th July, 2020, the Petition (2721/2019) was allowed
Company Appeal (AT) (Ins) No.891 of 2020 10
and the Order which was now being passed (on 16.10.2020) shall be read
along with the Order dated 20th July, 2020 and Order dated 14th October,
2020. This Order dated 16th October, 2020 recorded reasons with regard
to the operational debt, default and that Rajeev Baisoya duly authorized
by the Corporate Debtor had filed Affidavit on 5th March, 2020 with e-
mail dated 27th January, 2020 sent by Mr. Girish Joshi, Director of the
Corporate Debtor admitting the dues. Further consequential directions
were also issued with regard to appointment of IRP.
8.13 On 21st October, 2020, Appellant filed I.A. 2547/2019 claiming
that the stay Order dated 15th October, 2020 passed by this Tribunal was
conveyed to the staff of the Adjudicating Authority but still the detailed
Order dated 16th October, 2020 came to be passed and that the Order
dated 16th October, 2020 should be set aside. The I.A. sought action
against IRP also.
Alleged Collusion
9. We have heard Counsel for the parties. Counsel for the Appellant
has made submissions on the above lines and wants the Impugned
Orders to be set aside. The Counsel for Appellant claims that there was
collusion between the two Respondents and thus the admission Order
was bad. The Counsel claimed that Respondent No.2 is not an
Operational Creditor as Respondent No.2 had in the matter of Gupta Ji
taken defence which is contradictory to the claim made in the present
matter as Operational Creditor. Reference is made to the facts of that
Company Appeal (AT) (Ins) No.891 of 2020 11
earlier matter and it is argued that the admission Order dated 26th
February, 2020 in the earlier matter recorded that the amount which was
owed by the Respondent No.2 had been assigned to present Respondent
No.1. It is argued that this shows that present Respondent No.2 -
Operational Creditor was acting only as an intermediary.
10. We have seen the said Order dated 26th February, 2020 and the
defence which was taken by Respondent No.2 in that matter. It has to be
remembered that Respondent No.2 was Corporate Debtor in that matter.
Para - 14 of earlier Order (Annexure A-2) recorded the defence of
Respondent No.2 in earlier matter that it had entered into agreements
with "M/s. Three C Shelters Pvt. Ltd. (present Corporate Debtor) and
M/s. Three C Projects Pvt. Ltd." collectively called "principal employer".
The defence recoded in para - 14(d), in the earlier matter was that the
Corporate Debtor submitted that the debt of the Corporate Debtor had
been assigned to the principal employer of the Corporate Debtor.
The Appellant is banking on such defence recorded in earlier
matter. On such basis, collusion and fraud is alleged. We do not find any
substance in such averments made by the Appellant. Present Application
under Section 9 is undisputedly filed by the Respondent No.2 at a time
when CIRP against the Respondent No.2 had been set aside on
13.03.2020, has to be appreciated on its own facts and documents. The
definition of Financial Creditor in Section 5(7) and definition of
Operational Creditor in Section 5(20) "includes" any person to whom the
Company Appeal (AT) (Ins) No.891 of 2020 12
debt has been legally assigned or transferred. This, however, does not
apply to the definition of Corporate Debtor as found in Section 3(8).
Section 3(8) states that "Corporate Debtor" means a corporate person
who owes a debt to any person. Thus, when the definitions of Financial
Creditor and Operational Creditor are read with the definition of
Corporate Debtor, it is clear that while Financial Creditor and
Operational Creditor can assign their debt, the same is not applicable to
a Corporate Debtor. Thus no such defence can be taken to show
existence of dispute. As such, even if Respondent No.2 had taken defence
in earlier proceeding IB No.1071/2019 (where the Respondent No.2 was a
Corporate Debtor), that it had assigned its debt to principal employer,
that defence would have to be ignored. The claim of the Appellant trying
to build a case of collusion and fraud is thus not appealing to us. Even if
Respondent No.2, a Corporate Debtor had debts to pay of M/s. Guptaji, it
can have debt of its own to recover from Respondent No.1 who is another
Corporate Debtor.
CIRP against Respondent No. 1 maintainable
11. The other averment of the Appellant is that CIRP against
Respondent No.1 alone would not be feasible without joining Orris
Infrastructure Pvt. Ltd., now needs to be looked into. Although the
Appellant claims (see para - 7.4) that there should be group insolvency of
Respondent No.1 along with Orris Infrastructure, when there is no
pending CIRP against Orris Infrastructure, such claim has got no
substance. Orris Infrastructure has itself filed Application seeking
Company Appeal (AT) (Ins) No.891 of 2020 13
intervention pointing out proceedings which have taken place before
Haryana Real Estate Regulatory Authority and High Court with the
prayer that the amounts lying in Escrow Account in view of Orders of the
High Court should be used only for the construction of Greenopolis
Project. The IRP of the Corporate Debtor who has filed Reply (Diary
No.23486) has stated (Reply para - 7.8) that it is denied that the
development of the Greenopolis Project was in joint venture. IRP claims
that there is no document in support. It is the Reply of IRP that Three C
Shelters Pvt. Ltd. is the sole developer of the Greenopolis Project. Thus,
we find that the contentions raised by the Appellant are not supported by
documentary material and as regards the Intervention, Application filed
by Orris Infrastructure, and the prayer made, it would be a matter for the
IRP/RP to look into in the course of CIRP proceedings.
The Order Dated 20.07.2020 read with Order dated 16.10.2020
12. The other contention of the Appellant is that the Impugned Order
is untenable and perverse as it is without reasons. We have also
reproduced Impugned Order No.1 dated 20th July, 2020, which had
errors in it which the Adjudicating Authority corrected vide Order dated
14th October 2020 (annexure R-5 of Reply of R-1) and then subsequently,
detailed Judgements/Orders were passed on 16th October, 2020. As a
matter of fact, the Adjudicating Authority should have avoided passing
Impugned Order No.1, in the manner as it did. It would have been
appropriate and proper that the Order as passed on 16th October, 2020
should have been passed on 20th July, 2020. The Petition which had
Company Appeal (AT) (Ins) No.891 of 2020 14
been moved for initiating CIRP under Section 9 of IBC was allowed on
20th July, 2020 and when the Petition was allowed, provisions of the
Insolvency and Bankruptcy Code got attracted. Provisions require
Adjudicating Authority to pass further consequential Orders like
appointing of IRP, declaration of Moratorium, etc. It is inappropriate for
Adjudicating Authority to pass Orders as it did on 20th July, 2020 and
leave the rest in suspense till further Orders dated 16th October, 2020
were passed. Although the procedures of the Code of Civil Procedure do
not strictly apply under Section 424 of the Companies Act, 2013, still the
principles of natural justice, and other provisions of IBC required that
proper and complete Order (as was done on 16.10.2020) should have
been passed in the first instance itself. We are aware NCLT is
overburdened. Still such procedure to pass Orders, as in the present
matter, should be avoided.
13. The grievance of the Appellant appears to be that it was the
biggest Financial Creditor and instead of acting on its Application, the
Application of Respondent No.2 was admitted. Prayer - d of the Appeal
also indicates that the Appellant also wants CIRP proceedings against the
Respondent No.1 - Corporate Debtor. The IRP of Respondent No.1 has
with Diary No.24141 filed list of Company Petitions which were moved by
stakeholders including home buyers against the present Respondent
No.1 - Corporate Debtor. It is a list of 22 petitions in which it appears
that the Appellant also had filed CP No.1335 of 2019. Sumita Gogoi who
Company Appeal (AT) (Ins) No.891 of 2020 15
filed I.A. 2970/2020 in this matter was another Petitioner with CP
No.503/2019. Intervener - Dhruv Verma in I.A. 2605/2020 also wants
the CIRP to continue. Even if we set aside Impugned Order, there are
others waiting against Respondent No.1 Corporate Debtor. When
Respondent No.2 as Operational Creditor filed Petition/Application under
Section 9 of IBC, the only consideration for Adjudicating Authority was to
examine if there is operational debt due and default. It found the debt
due of Rs.29,95,91,034/- was not disputed and passed Impugned
Order 1 dated 20.07.2020 allowing the Petition. In such matter, after
Petition was allowed, the Adjudicating Authority had no power left to
review the Order dated 20.07.2020, especially so, on vague surmises of
collusion. We do not see any purpose in setting aside on technical
grounds the CIRP initiated. The Order dated 16th October, 2020 vide
which Order the Adjudicating Authority has recorded reasons thus shows
that there was material to show debt due claimed by the Respondent
No.2 - Operational Creditor and default to seek CIRP against Respondent
No.1. If the Application was complete, the same was required to be
admitted.
14. The grievance raised by the Appellant is that the detailed Orders
dated 16th October, 2020 were passed in spite of stay dated 15 th October,
2020. For this, I.A. 2547/2020 is filed which relies on Annexure A-2 to
say that the staff of the Adjudicating Authority was informed. Para - 2 of
I.A. 2547/2020, in this regard, does not disclose the name or particulars
Company Appeal (AT) (Ins) No.891 of 2020 16
of any staff member. There is no reason why the said Order was not put
on record by a proper application, if the Appellant was so interested. We
would thus not find fault with the passing of detailed Order dated 16 th
October, 2020 which was indicated by the Adjudicating Authority in its
Order dated 14th October, 2020 (Annexure R-5). The Adjudicating
Authority cured defect and we do not wish to interfere on technical
grounds, as it will serve no purpose. Record shows that both
Respondents are now under CIRP and we would trust the IRPs/RPs to
follow the law. As such, alleged collusion would be irrelevant, even
otherwise.
The alleged Bar under Section 11 of IBC
15. The other grievance of the Appellant is that on 28th September,
2020, this Tribunal set aside the Order dated 13th March, 2020 in the
matter of Gupta Ji and thus the CIRP against Respondent No.2 had been
restored. The Counsel for Appellant referred to Section 11(a) and (b) to
state that the Respondent No.2 who was itself undergoing CIRP could not
have filed Application in view of bar under Section 11 of IBC. Section 11
of IBC reads as under:-
"11. Persons not entitled to make application.--The following persons shall not be entitled to make an application to initiate corporate insolvency resolution process under this Chapter, namely:-
(a) a corporate debtor undergoing a corporate insolvency resolution process; or
Company Appeal (AT) (Ins) No.891 of 2020 17
(b) a corporate debtor having completed corporate insolvency resolution process twelve months preceding the date of making of the application; or
(c) a corporate debtor or a financial creditor who has violated any of the terms of resolution plan which was approved twelve months before the date of making of an application under this Chapter; or
(d) a corporate debtor in respect of whom a liquidation order has been made.
Explanation.--For the purpose of this section, a corporate debtor includes a corporate applicant in respect of such corporate debtor."
If the Section is perused, the incompetency attached is to
initiation. Specified person is not "entitle" to make an application. Thus,
the bar under Sub-Section (a) is for making an application when the
person who is a Corporate Debtor is undergoing Corporate Insolvency
Resolution Process. Under Sub-Clause (b), the bar is to "making an
application" by the person - Corporate Debtor having completed CIRP
twelve months preceding the date of making of the application. Based on
this, the grievance of the Appellant is that when IB 2721/2019 was filed,
twelve months had not been completed from the date of 13.03.2020 vide
which CIRP in IB 1071/2019 had been set aside. It is argued now when
the earlier CIRP has been restored, sub-clause 'a' is also attracted.
Date of filing of IB 2721/2019 is not pointed out to us. There is
no dispute, however, that it was filed after Orders dated 13.03.2020 in
Appeal, in earlier matter. It appears to us that when the IB 2721/2019
was filed, the CIRP against the Respondent No.2 had already been set
Company Appeal (AT) (Ins) No.891 of 2020 18
aside in view of the Orders of this Tribunal dated 13th March, 2020. Thus
the bar "to making the application" was not there. If subsequently on
28.09.2020, the earlier CIRP has been restored against Respondent No.2,
that would not hit the making of the application which was already
complete and even the Petition was allowed on 20.07.2020. Once the
Application in IB 2721/2019 was allowed on 20th July, 2020, (read with
continuation Order dated 16th October, 2020), management vests with
the IRP/RP and subsequent developments in another matter will not
make difference.
16. Apart from the above, it would be appropriate to refer to the
Insolvency and Bankruptcy Code (Amendment) Act of 2020 (No.1 of 2020
- Published on 13.03.2020) by which Explanation - II has been added in
Section 11 w.e.f. 28.12.2019. The same reads as under:-
"Explanation II.--For the purpose of this section, it is hereby clarified that nothing in this section shall prevent a corporate debtor referred to in clauses (a) to
(d) from initiating corporate insolvency resolution process against another corporate debtor."
Even without relying on this clarificatory Explanation - II, in the
facts of the present matter, we do not find that the Appellant can rely on
Section 11(a) or (b) to find fault with the CIRP which has already been
initiated.
17. The Appeal para - 7.10 refers to Judgement in the matter of "Flat
Buyers Association" (referred supra) of this Tribunal where it was
Company Appeal (AT) (Ins) No.891 of 2020 19
observed that CIRP should be project based as per approved plan by the
competent authority and that if the same real estate company has any
other project, that cannot be clubbed together. We do not think that this
Judgement is helpful to the Appellant in the facts of the present matter.
Order
18. There is no substance in the Appeal. The Appeal is dismissed.
Pending I.A.s and Intervention Applications are disposed.
No orders as to costs.
[Justice A.I.S. Cheema] Member (Judicial)
[V.P. Singh] Member (Technical) rs
Company Appeal (AT) (Ins) No.891 of 2020
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free