Dharmesh S Jain vs Srei Equipment Finance Limited & Anr
- CitationCompany Appeal (AT) (Insolvency) No. 697 of 2022
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority's admission of a Section 7 application is not disturbed merely because the corporate debtor deposits the admitted default amount, where the corporate debtor has not shown by convincing material that it can complete its real estate projects and meet its liabilities to financial and other creditors; in such a case the CIRP is to continue and the Committee of Creditors is to be constituted to determine how the projects may be completed, with homebuyers' interests given priority. Following the Tribunal's earlier decision in Flat Buyers Association v. Umang Realtech, a corporate insolvency resolution process against a real estate company is confined to the particular project for which a plan has been approved by the competent authority, and projects at other locations with separately approved plans cannot be clubbed together or have the company's assets maximised for them; the CoC may therefore invite resolution plans project-wise or building-wise, individually, separately, or jointly, as found feasible.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No. 697 of 2022 (Arising out of Order dated 16.06.2022 passed by the Adjudicating Authority (National Company Law Tribunal), Mumbai Bench-IV in CP(IB) No.1337/MB/2020)
IN THE MATTER OF:
Dharmesh S Jain, [Suspended Director] Opposite Nirmal Nagar, L.B.S. Marg, Mulund (West), Mumbai - 400 080 .... Appellant
Vs
1. SREI Equipment Finance Limited 'Vishwakarma', 86 C, Topsia Road, Kolkata 700 046.
2. Dilipkumar Natvarlal Jagad Interim Resolution Professional of the Corporate Debtor 803/804 Ashoka Heights, Old Nagardas X Road, Opp. Saraswati Apartments, Gundavali, Andheri (East), Mumbai 400069. .... Respondents
Present: For Appellant: Mr. Ramji Srinivasan, Sr. Advocate, Mr. Kunal Vajani, Mr. Kunal Mimani, Mr. Kartikey Bhatt, Mr. Shubhang Tandon and Ms. Megha Dugar, Advocates.
For Respondents: Mr. Krishnendu Dutta, Sr. Advocate with Mr. Anirban Bhattacharya, Mr. Harshad Vyas, Mr. Ativ Patel, Mr. Darshit Dave and Mr. Dhruv Sachdeva and Mr. Rajeev Chowdhary, Advocates for R-1.
Mr. P.Vohra, Advocate
Mr. Dhaval Deshpande, Mr. Yash Jariwala, Advocates for R-2&3.
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 1 Company Appeal (AT) (Insolvency) No.698 of 2022 (Arising out of Order dated 16.06.2022 passed by the Adjudicating Authority (National Company Law Tribunal), Mumbai Bench-IV in CP(IB) No.1337/MB/2020)
IN THE MATTER OF:
1. Deepak Sudhir Keluskar 3/3, Sateri CHS, Shivkrupa Nagar, Kanjurgaon, Bhandup East, Mumbai - 400 042
2. Ankush Namdev Kamble Kamble Chawl, Kailash Nagar, Near Shiv Mandir, Road No. 28, Thane - 421 306
3. Ravi Singhal B-502, Shree Chintamani Tower, Manorama Nagar, Thane (W) - 400 607
4. Hemant Goyal 1902, Bliss, City of Joy, JSD Road, Mulund (West), Mumbai - 400 080
5. Kachru Kalu Jagtap Esquire Skytower 1202, 12th Floor, ACC Cement Road Mulund Check Naka Mulund West, Mumbai - 400 080 .... Appellant Vs 1. SREI Equipment Finance Limited 'Vishwakarma', 86 C, Topsia Road, Kolkata - 700 046 2. Dilipkumar Natvarlal Jagad Interim Resolution Professional of the Corporate Debtor 803/804 Ashoka Heights, Old Nagardas X Road, Opp. Saraswati Apartments, Gundavali, Andheri (East), Mumbai - 400 069
3. Nirmal Lifestyle (Kalyan) Private Limited Nirmal Lifestyle, Opp. Nirmal Nagar, L.B.S Marg, Mulund (West), Mumbai - 400 080 .... Respondents
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 2 Present:
For Appellant: Mr. Abhijeet Sinha, Mr. Shikhar Khare, Mr. Pranav Malhotra, Advocates. Mr. M.J. Michael, Advocate for intervenors Mr. Mayank Kshirsagar, AOR & Ms. Abha Goel
For Respondents: Mr. Krishnendu Dutta, Sr. Advocate with Mr. Anirban Bhattacharya, Mr. Harshad Vyas, Mr. Ativ Patel, Mr. Darshit Dave and Mr. Dhruv Sachdeva and Mr. Rajeev Chowdhary, Advocates for R-1.
Mr. P.Vohra, Advocate
Mr. Dhaval Deshpande, Mr. Yash Jariwala, Advocates for R-2&3.
JUDGMENT
ASHOK BHUSHAN, J.
These two Appeals have been filed against the same order dated
16.06.2022 passed by National Company Law Tribunal, Mumbai Bench-IV
in CP (IB) No.1337/MB/2020, by which Application under Section 7 filed
by Respondent No.1 - SREI Equipment Finance Limited has been admitted.
The Company Appeal (AT) (Insolvency) No. 697 of 2022 has been filed by a
Suspended Director of the Corporate Debtor - Nirmal Lifestyle (Kalyan)
Private Limited and Company Appeal (AT) (Insolvency) No. 698 of 2022 has
been filed by five Appellants, who are Homebuyers in the real estate Project
of the Corporate Debtor known as "Lifestyle City, Kalyan".
2. Brief facts of the case necessary to be noticed for deciding these
Appeals are:
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 3
(i) The Corporate Debtor is a real estate company, who has
launched several real estate Projects under the Project name
Lifestyle City, Kalyan. On 05.08.2019 a loan Agreement was
entered between Corporate Debtor and the Financial Creditor
- SREI Equipment Finance Limited. The Personal Guarantee
was executed on 05.08.2019 with the Directors. A Mortgage
Deed dated 18.09.2019 was also executed by the Corporate
Debtor. Financial Creditor disbursed an amount of
Rs.84,23,75,000/-. After six months moratorium, the loan
was required to be paid as per the terms and conditions of
Loan Agreement. The first default in repayment of the loan
occurred on 05.02.2020 and the second on 05.03.2020 and
thereafter on every month.
(ii) The Financial Creditor filed an Application under Section 7 of
the Insolvency and Bankruptcy Code, 2016 (hereinafter
referred to as the "Code") claiming an amount of
Rs.7,87,50,000/- as on 07.09.2020. The Adjudicating
Authority issued notice on Section 7 Application. The
Corporate Debtor filed a reply opposing the admission of
Section 7 Application. The Adjudicating Authority after
hearing the parties, by order dated 16.06.2022 admitted the
Application. The Adjudicating Authority took a view that for
defaults, which have occurred subsequent to 05.03.2020 are
hit by Section 10A, hence, the only amount of default for
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 4 which the Application is maintainable is default of
Rs.1,12,73,387/-. The Adjudicating Authority after finding
default which was more than threshold of Rs.1 crore,
admitted the Application.
3. We have heard Shri Ramji Srinivasan, learned Senior Counsel for
Appellant in Company Appeal (AT) (Insolvency) No. 697 of 2022; Shri
Abhijeet Sinha, learned Counsel for the Appellant in Company Appeal (AT)
(Insolvency) No. 698 of 2022; Shri Krishnendu Dutta, learned Senior
Counsel, who has appeared for Financial Creditor. We have also heard
learned Counsel for different Homebuyers, who have filed Intervention
Applications in both the Appeals.
4. Shri Ramji Srinivasan, learned Senior Counsel appearing for the
Appellant submits that the default for which Application was filed was an
imaginary default. The Corporate Debtor is a real estate company. The
Adjudicating Authority was not justified in holding that Company Petition
is complete in all respect. The objections raised by the Corporate Debtor
has not been dealt with by the Adjudicating Authority. The entire claim of
the Financial Creditor was based on insufficiently stamped documents.
The Loan Agreement was executed and stamped as per the law applicable
in the State of West Bengal, bearing stamp of Rs.100/-, which Agreement
is sought to be enforced in the State of Maharashtra, in which State, stamp
duty was required to be paid within three months. There was adequate
security interest given by the Corporate Debtor and thus, Application under
Section 7 was not required to be admitted. Shri Ramji Srinivasan, learned
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 5 Senior Counsel submits that the Appellant was also ready to make
payment of default amount of Rs.1.12 crores. It is further submitted that
Appellant had received communication from Swamih Investment Fund on
03.06.2021 in response to the request made by the Appellant to invest an
amount of Rs.250,00,00,000/- and an additional amount of
Rs.132,20,00,000/-, on receiving the above amount, Appellant shall be
able to complete the Projects.
5. Shri Abhijeet Sinha, learned Counsel appearing for the Appellants in
Company Appeal (AT) (Insolvency) No. 698 of 2022 submits that the order
passed by the Adjudicating Authority is an unreasoned order. The
Appellant - Homebuyers have filed an Application for intervention in the
Company Petition and they were also required to be heard. The order
prejudicially affects the right of the Appellants, who want the Project to be
completed and possession of the homes to be given to Homebuyers. The
learned Counsel for the Appellants relying on judgment of this Tribunal in
Flat Buyers Association vs. Umang Realtech Pvt. Ltd. - Company
Appeal (AT) (Insolvency) No.926 of 2019 submit that the Corporate
Insolvency Resolution Process ("CIRP") be confined to only to the Project
where Financial Creditor is concerned. The present is a case where reverse
insolvency resolution process as recognised by this Tribunal, should be
resorted and reverse CIRP be adopted, so that all Project be not included.
The Appellants are ready and willing to disburse the balance consideration,
which will then inevitably be used to repay the claims of the various
stakeholders including the Financial Creditor. Shri Sinha submits that in
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 6 event the CIRP is proceeded, the Homebuyers will be the great sufferer
because they will not be able to get their houses for which they have handed
over their life savings.
6. The learned Counsel appearing for Homebuyers, who have filed
Intervention Applications in these two Appeals submit that Homebuyers
anxiety is only to get the possession after due completion of the unfinished
Projects. It is submitted that in event the Corporate Debtor completes the
Projects, they have no objection in CIRP not proceeding, but suspended
Director has not come up with any concreate proposal inspite of time
allowed by this Tribunal to them to come up with a concrete proposal. The
Swamih Investment Fund, on which reliance has been placed is subject to
fulfilment of various conditions precedent and there is no surety that
Corporate Debtor will be able to obtain investment from Swamih
Investment Fund and suspended Director has not come up with any
mechanism to complete the Project. It is submitted that Company Appeal
(AT) (Insolvency) No. 698 of 2022 filed by five Homebuyers are those
Homebuyers, who are connected with the Corporate Debtor.
7. We have considered the submissions of the learned Counsel for the
parties and have perused the record.
8. In Company Appeal (AT) (Insolvency) No. 697 of 2022 notices were
issued by this Appellate Tribunal on 22.06.2022. In Company Appeal (AT)
(Insolvency) No. 698 of 2022, this Tribunal on 12.07.2022 passed an
interim order directing that till next date of hearing, the Interim Resolution
Professional ("IRP") shall not constitute the Committee of Creditors ("CoC"),
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 7 however, the Resolution Professional shall continue to function and ensure
that the Corporate Debtor continues as a going concern. In pursuance of
the interim order, the IRP has taken control over the Corporate Debtor on
18.06.2022 and had already issued publication notice for inviting claims.
The IRP has filed three Status Reports in these Appeals. The third Report
was filed on 26.09.2022, gives the details of the Corporate Debtor as on
15.09.2022. Paragraphs 5, 6 and 7 of the Status Report are as follows:
"5. The Interim Resolution Professional states and submits that pursuant to the Public Announcement made by the Interim Resolution Professional, claims from 3 Financial Creditors have been received for an amount aggregating Rs.1,930.40 Crores and the said claims are under verification as per direction of Hon'ble NCLAT as the constitution of COC was stayed.
6. The Interim Resolution Professional states and submits that pursuant to the Public Announcement made by the Interim Resolution Professional, and subsequent to the 2nd progress report, 68 claims are received from home buyers for an amount aggregating to Rs.29,43,69,469 and the said claims are under verification. Majority home buyers have suggested the name of Mr. Vithal M. Dahake IBBI/IPA-003/IP-N001117/2017- 2018/11296 as their Authorized Representative. The IRP has filed an Interlocutory Application for the appointment of Authorised Representative with Hon'ble NCLT, Mumbai bench .
7. The Interim Resolution Professional states and submits that pursuant to the Public Announcement
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 8 made by the Interim Resolution Professional, and subsequent to the 1st progress report, one claim is received from operational creditor (towards Government dues) for an amount aggregating to Rs.3,38,69,531 and the said claim is under verification. Sales Tax Department has attached bank accounts and immovable properties of CD, for which detailed reply was sent by IRP."
9. In the Status Report, the IRP has also submitted Project Status as
registered with MAHA RERA. According to the Status Report, there are
Projects, which are divided in three Zones, i.e., Kalyan Zone-1, Kalyan
Zone-2 and Kalyan Zone-3. In paragraph 9 of the Report, following has
been stated:
"9. The Interim Resolution Professional states and submits that at Vadavli, village, Taluka-Kalyan, Dist - Thane, Pin Code- 421301, the Corporate Debtor has registered 30 buildings having different names with MAHA RERA under the project name "Lifestyle City- Kalyan". The Corporate Debtor also has land parcles around project site namely at- Village ambivali, Taluka- Kalyan, Dist- Thane. The Interim Resolution Professional visited the project site and these buildings are at different stages of completion. In some of the buildings 100% Civil/ structural work is completed but further fit out work is pending. In some of the projects, only foundation work is completed."
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 9
10. Out of 30 buildings, the Corporate Debtor has received Occupation
Certificate for three buildings namely - Victory A, Victory B and Spirit A
and Corporate Debtor has applied for Occupation Certificate for six other
buildings. The Status Report also refers to various litigation, which have
been initiated against the Corporate Debtor by different Homebuyers and
other entities. All buildings are duly registered with MAHA RERA. This
Tribunal after hearing the parties on 09.11.2022 directed the Appellant to
file a response by an affidavit with regard to grievance, which was raised at
the time of hearing. On 09.11.2022, following order was passed:
"09.11.2022: We have heard Learned Counsel for the parties and Learned Counsel for the Intervener who have filed the application for intervention on behalf of the Home Buyers.
Learned Counsel for the Home Buyers have expressed apprehension that there are no facts brought on behalf of the promoters regarding the steps which are proposed to be taken by the promoter and the timelines for completion of the flats.
Mr. Krishnendu Dutta, Learned Senior Counsel appearing for the Financial Creditor who has initiated CIRP submits that the Appellant has also not dealt with the dues which is due today to the Financial Creditor. Before the next date of hearing, Learned Counsel for the Appellant is permitted to file response by an Affidavit after serving copy of the Affidavit on the Counsel for the Respondent, dealing with the grievances which have been expressed during submissions before the Court.
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 10 List these appeals for further 'hearing' on 7th December, 2022 for consideration of the Affidavit and Response of the parties thereon.
Interim order to continue."
11. An affidavit in response to order dated 09.11.2022 was filed by the
Appellant in Company Appeal (AT) (Insolvency) No. 697 of 2022 bringing
on record letter dated 03.06.2021 issued by Swamih Investment Fund. The
letter dated 03.06.2021, which has been brought on the record is a letter,
which contains 37 preconditions, which are required to be fulfilled before
any investment is made by Swamih Investment Fund. The Appellant in his
written submission has also referred to a letter dated 08.12.2022
addressed by Swamih Investment Fund informing that letter dated
03.06.2021 is valid and subsisting.
12. Now we come to the question of debt and default. The Adjudicating
Authority in the impugned order in paragraph 8 of the judgment has held
that default on or after 05.04.2020 was for an amount of Rs.1,12,73,387.
The learned Counsel for the Financial Creditor submitted that even after
the period covered by Section 10A came to an end, no payments are yet
been made to the Financial Creditor by the Corporate Debtor. It is
submitted by Financial Creditor that huge dues have been accumulated
against the Corporate Debtor as on date. In the 3rd Status Report, the IRP
has stated that in pursuance of the Public Announcement claims of
Financial Creditors have been received of Rs.1930 crores in addition to
claims of Homebuyers of Rs.29,43,69,469/-. There is no material brought
on record except to the letter of the Swamih Investment Fund dated
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 11 03.06.2021, which provided for approval of fund subject to several
conditions. The Financial Creditor submits that one of the condition was
that NOC of Financial Creditor was required to be obtained, whereas no
NOC have been obtained from Financial Creditor for the said fund.
13. Although, the Appellant has submitted that they are ready to deposit
an amount of Rs.1,12,50,000/-, which was the amount of default admitted
by the Adjudicating Authority, but we are of the view that by mere
depositing the said amount, the CIRP cannot be set aside. We are quite
conscious that in the real estate Projects, it is the Homebuyers, who are
the major sufferer. Most of the Homebuyers belong to middle income
group, who for funding their homes also takes loan from financial
institutions and suffer due to non-handover of possession by the builders.
The Project, which has been commenced by the Corporate Debtor,
consisted of large numbers of buildings, where only few have been
completed and most of them are incomplete. The Corporate Debtor has not
brought on record any convincing material to indicate that it is able to
complete the Project and also able to meet the liabilities of the Financial
Creditors and other creditors. We, thus, are satisfied that present is a case
where order initiating CIRP need no interference. Consequently, the CoC
has to be constituted to find out the ways and means to complete the
Project, so that interest of the Homebuyers be firstly fulfilled.
14. The learned Counsel for the Homebuyers has placed reliance on
judgment of this Tribunal in Company Appeal (AT) (Insolvency) No.926
of 2019 - Flat Buyers Association vs. Umang Realtech Pvt. Ltd., where
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 12 this Tribunal after considering the difficulties of the Homebuyers in a real
estate Project has observed that in real estate Project, the CIRP can be
confined to one Project as per approved Plan by the different authorities.
In paragraph 21 and 25, following have been observed:
"21. In Corporate Insolvency Resolution Process against a real estate, if allottees (Financial Creditors) or Financial Institutions/Banks (Other Financial Creditors) or Operational Creditors of one project initiated Corporate Insolvency Resolution Process against the Corporate Debtor (real estate company), it is confined to the particular project, it cannot affect any other project(s) of the same real estate company (Corporate Debtor) in other places where separate plan(s) are approved by different authorities, land and its owner may be different and mainly the allottees (financial creditors), financial institutions (financial creditors, operational creditors are different for such separate project. Therefore, all the asset of the company (Corporate Debtor) are not to be maximized. The asset of the company (Corporate Debtor
- real estate) of that particular project is to be maximized for balancing the creditors such as allottees, financial institutions and operational creditors of that particular project. Corporate Insolvency Resolution Process should be project basis, as per approved plan by the Competent Authority. Any other allottees (financial creditors) or financial institutions/ banks (other financial creditors) or operational creditors of other project cannot file a claim before the Interim Resolution Professional of other project and such claim cannot be entertained.
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 13 So, we hold that Corporate Insolvency Resolution Process against a real estate company (Corporate Debtor) is limited to a project as per approved plan by the Competent Authority and not other projects which are separate at other places for which separate plans approved. For example - in this case the Winter Hill - 77 Gurgaon Project of the 'Corporate Debtor' has been place of Corporate Insolvency Resolution Process. If the same real estate company (Corporate Debtor herein) has any other project in another town such as Delhi or Kerala or Mumbai, they cannot be clubbed together nor the asset of the Corporate Debtor (Company) for such other projects can be maximised.
25. In the light of aforesaid discussion, as we find it is very difficult to follow the process as in normal course is followed in a Corporate Insolvency Resolution Process, we are of the view, that a 'Reverse Corporate Insolvency Resolution Process' can be followed in the cases of real estate infrastructure companies in the interest of the allottees and survival of the real estate companies and to ensure completion of projects which provides employment to large number of unorganized workmen."
15. We have taken the view that CIRP of the Corporate Debtor needs to
be proceeded with. The CoC may be constituted immediately and CoC may
take a call regarding finding out ways and means to complete the Projects.
With the approval of CoC, the IRP may take steps to obtain interim finances
to complete the Project, if any. It is also open for the CoC to take a decision
to invite Resolution Plan in staggered manner, confined to Project wise/
building wise, as may be feasible and convenient, so that unfinished Project
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 14 may be completed and Homebuyers be handed over the possession without
paying any additional cost.
16. In view of the aforesaid discussions, we decide both these Appeals in
following manner:
(A) The order impugned dated 16.06.2022 passed by the
Adjudicating Authority, admitting Section 7 Application is
upheld.
(B) The IRP may constitute the CoC within one week from today
and submit a Report of the constitution of CoC to the
Adjudicating Authority.
(C) The CoC may deliberate on ways and means to complete the
unfinished Projects, either by obtaining interim finances or by
inviting Resolution Plan.
(D) It shall be open for the CoC to invite Resolution Plan on Project
wise/ building wise, individually or separately or jointly, as
may be found feasible and practical after looking into overall
facts and situation.
(E) The suspended management and employees of the Corporate
Debtor may extend their cooperation to the IRP/ Resolution
Professional in completion of the Projects.
(F) The period during which the constitution of CoC was stayed,
i.e., 12.07.2022 to till this date, is excluded from the period of
CIRP.
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 15
17. The Appeals are disposed of accordingly. Parties shall bear their own
costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
NEW DELHI
4th January, 2023
Ashwani
Company Appeal (AT) (Insolvency) Nos. 697 & 698 of 2022 16
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free