Deepak Modi vs Shalfeyo Industries Private Limited ...
- CitationCOMPANY APPEAL (AT)(INSOLVENCY) NO.1019 OF 2022
Ratio decidendi
The rule this decision rests on
A genuine pre-existing dispute, to defeat an application under Section 9 of the Insolvency and Bankruptcy Code, 2016, must be a real and plausible dispute about the existence or amount of the operational debt; a bare or moonshine plea does not suffice. Where the corporate debtor has accepted delivery of the goods without raising any objection at the time of unloading and has consumed them, a later assertion of quality defects does not constitute a pre-existing dispute, and the Adjudicating Authority is entitled to admit the Section 9 application on the basis of the undisputed outstanding debt.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Bankruptcy Code, 2016 (hereinafter referred to as 'Code') has been
preferred against an order dated 16.08.2022 passed by the
Adjudicating Authority, National Company Law Tribunal, Jaipur
Bench, Jaipur (hereinafter referred to as Adjudicating Authority).
By the said order the Learned Adjudicating Authority has admitted
an application filed under Section 9 of the Code by Operational
Creditor who is Respondent No.2 in the present appeal. In sum
and substance by the impugned order after admitting application
filed under Section 9 of the code, Corporate Insolvency Resolution
Process (CIRP) was initiated against Respondent No.1 (Corporate
Debtor).
Company Appeal (AT)(Ins) No.1019 of 2022 3
2. The appellant is the suspended director and shareholder of
Respondent No.1 (Corporate Debtor) namely M/s Shalfeyo
Industries Private Ltd which was earlier M/s Adelante Exim India
Private Ltd. The Respondent No.2, 'Operational Creditor'
approached the Adjudicating Authority by filing an application
under Section 9 of the Code read with Rule 6 of the Insolvency and
Bankruptcy (Application to Adjudicating Authority) Rules, 2016.
The said case was registered as CP No.(IB)-79/9/JPR/2020. After
filing of the case notices were issued by the Adjudicating Authority
and thereafter the Corporate Debtor appeared and filed its
response.
3. The applicant, Operational Creditor, alleged in the
application that Corporate Debtor had placed purchase orders for
supply of granite stone and six invoices were raised for total
amount of Rs. 14,78,420/- (Rupees Fourteen lakhs seventy eight
thousand four hundred twenty only). The details of invoices, post
dated cheques (PDC) alongwith the payment as well as
presentation/dishonour of cheques can be examined on the basis
of following tabulation:-
Sr. Invoice No. Invoice Date Bill Amount Date of Date of
No. PDC dishonour
Company Appeal (AT)(Ins) No.1019 of 2022 4
1 PI/01/19-20 21.09.2019 Rs.82,793/- - -
2 PI/03/19-20 27.09.2019 Rs.39,333/- - -
3 PI/04/19-20 13.10.2019 Rs.3,51,553/- 14.12.2019 19.12.2019
4 PI/07/19-20 25.10.2019 Rs.1,98,733/- 25.12.2019 04.01.2020
5 PI/10/19-20 16.11.2019 Rs.2,77,160/- 16.01.2020 18.01.2020
6 PI/12/19-20 05.12.2019 Rs.5,28,668/- 04.02.2020 25.02.2020
Total Rs.14,78,420/-
4. However, out of aforesaid claims some payments were made
but non-payment of operational dues to an amount of
Rs.11,95,447/- (Rupees Eleven lakhs ninety five thousand four
hundred forty seven only) was existing on the date of the filing of
the application. The Corporate Debtor entered appearance before
the Adjudicating Authority and filed its reply and primarily raised
a plea that there was pre-existing dispute between the parties. It
was asserted that one M/s SGB Infra Ltd had allotted work to
Corporate Debtor to complete the flooring work with the specified
quality of material at Jaipur International Airport. The said work
order was issued with certain terms and conditions particularly to
supply the granite slabs supposed to be in the range of 16 mm to
18 mm. A plea was taken that instead of supply by the Operational
Creditor of granite slabs in the range of 16 mm to 18 mm, granite
slabs supplied were of 15 mm to 15.5 mm thickness and this was Company Appeal (AT)(Ins) No.1019 of 2022 5
the reason subsequently SGB Infra Ltd vide its letter dated
16.12.2019 asked the Corporate Debtor for removal of the flooring
on account of aforesaid differences. Besides raising disputes,
certain objections were also raised in respect of proposed IRP
Namely Mr. Vikas Rajwarsi. However, since before the
Adjudicating Authority the said proposed IRP by filing an IA had
shown his difficulty to proceed and as such the said issue had
become infructuous. The Corporate Debtor in its reply had stated
as follows:-
"b. In pursuance to the above work order, the Corporate
Debtor vide work orders dated 04.10.2019 and
18.10.2019 placed an order for granite slabs with the
Applicant. At the first round of inspection by SBL Infra
Limited on 15.12.2019, there was deficiency found in
the goods in the material quality and it was observed
that the granite was of 15 mm to 15.5 mm whereas as
per the specification of work orders, it was supposed to
be of range of 16 mm to 18 mm. Thereafter, SGB Infra
Ltd vide letter dated 16.12.2019 requested removal of
the flooring on account of aforementioned difference.
Company Appeal (AT)(Ins) No.1019 of 2022 6
c. The Corporate Debtor duly communicated to aforesaid
issues to the Operational Creditor and parallelly wrote
to his banker to stop payment of cheques issued to the
Applicant. However, the applicant unloaded the further
material at the site despite clear instructions of return
back given to his lorry drivers and the personnel but they
refrained to take back the same. It is also pertinent to
mention that even the staff of the Applicant himself had
clearly given in writing that they are unloading the
material as per instructions and directions of his boss.
d. The Corporate Debtor has further submitted that
Annexure-E of the Application annexed to show the
receipt of quality check of goods, is actually not the
receipts of quality checks rather the pages from the
diaries of guard/custodian who maintains the details of
loading and unloading stock. Further the applicant has
only annexed pages running from 51 to 53 only and
conveniently suppressed page No.54 and 55 of the said
diary which contains the details of the deficient goods
and the statement of lorry driver who mentions that the
product is 14.5-15 mm and all these goods will be
Company Appeal (AT)(Ins) No.1019 of 2022 7
changed. Further it is submitted that the applicant has
also suppressed the reply dated 07.01.2020 to its
statutory notices issued under the Negotiable
Instruments Act, 1881 wherein the issue of the quality of
goods were raised categorically.
5. After filing of the reply by the Corporate Debtor the
Operational creditor also filed a detailed rejoinder. The
Operational Creditor further raised an issue that in reply the
Corporate Debtor had brought on record certain forged documents
and as such an application under section 340 of Cr PC 1973 was
also preferred. In rejoinder, as has been noticed by the
Adjudicating Authority, following stand was taken by the
Operational Creditor:-
"The Applicant has submitted that the Corporate Debtor
has forged and fabricated the diary pages which have
been annexed with the Reply. The aforesaid act
amounts to perjury for which a separate application has
been referred by the Application under Section 340 of the
Code of Criminal Procedure, 1973. It has been submitted
that the document at page 48 of the Reply is forged and
fabricated document as the noting which has been
Company Appeal (AT)(Ins) No.1019 of 2022 8
mentioned by the Corporate Debtor in the para has been
written by it subsequent to the signatures of Mr. Ratul
Singhal and Mr. Ravinder, only to fabricate the said
document. The entire material mentioned at Pg No.55 of
the diary was unloaded and accepted by the Corporate
Debtor without any demur. The alleged remark has been
made only to save the Corporate Debtor from making the
payment to the Operational Creditor and to create a
camouflage of the dispute between the parties.'
6. The Adjudicating Authority minutely examined the issue and
discussed the same in detail in following manner:-
"10.The main issue present before us is regarding the
amount due by the Corporate Debtor to the Operational
Creditor. The undisputed fact in the matter is that the
Applicant had supplied the goods and raised as many
as six invoices the details of which have been mentioned
para IV of the application. The payment against invoice
dated 21.09.2019 and 27.09.2019 amounting to Rs.
82,973/- and Rs. 39,333/- respectively are not a matter
of dispute as the Applicant itself has stated that the
amount of these invoices has duly been paid with
Company Appeal (AT)(Ins) No.1019 of 2022 9
respect to the invoices dated 13.10.2019 an amount of
Rs. 1,90.886/- (3,51,553 i.e. the bill amount (-) 1,60,667
i.e. the balance amount apportioned towards the third
bill). Hence, the total amount of debt defaulted from the
4 invoices is Rs. 11,95,447/-. It is seen from the records
produced before us that the 4 post-dated cheques dated
14.12.2019, 25.12.2019, 16.01.2020 & 04.02.2020
were all presented in the bank for clearance but for the
cheque dated 14.12.2019, 25.12.2019 & 04.02.2020 the
payment was stopped by the drawer. Whereas for the
cheque dated 16.01.2020, the cheque was returned with
the endorsement of funds insufficient. The said goods
were admittedly delivered to the Corporate Debtor.
11. It is seen from Annexure E-5 of the application that
the goods were duly supplied to the Corporate Debtor.
The Corporate Debtor has raised the point that there was
an existence of a dispute to the quality of goods that was
supplied by the Operational Creditor. The Corporate
Debtor has submitted that the material provided by the
Applicant was not as per the specified purchase order
i.e. the granite was of 15 mm to 15.5 mm whereas as per
Company Appeal (AT)(Ins) No.1019 of 2022 10
the specification of work orders it was supposed to be a
range of 16 mm to 18 mm. The Corporate Debtor has
submitted that the inspection report dated 16.12.2019
whereby it was directed to remove the flooring which is
in city side porch area at on cost.
12. The Corporate Debtor has annexed a series of emails
exchanged between the parties as Annexure I of the
application. The Corporate Debtor vide mail dated
16.12.2019 has informed the Operational Creditor
regarding the low quality of material and further
informed that the management has decided to stop all
payment on immediate basis. In reply to the said email
the Applicant herein stated that the material was
dispatched as per the specifications laid down in the
purchase order and further there was no prior intimation
regarding the non-desirable quality of the material. In
the said reply, it was also stated that all the material
has been consumed without any complain with respect
to the quality. Thereafter, another mail was referred to
by the Corporate Debtor whereby it has been stated that
the Corporate Debtor had rejected the complete truck
Company Appeal (AT)(Ins) No.1019 of 2022 11
load on 15.12.2019. In the said email only the
Operational Creditor was requested to replace the
material within 5 days or accept the debit note.
13. It is seen that only after this inspection report was
given to the Corporate Debtor the Corporate Debtor
stopped payment of the post-dated cheques dated
14.12.2019, 25.12.2019 & 04.02.2020. It appears that
it is only after the inspection report was given to the
Corporate Debtor, the Corporate Debtor mailed the
Operational Creditor regarding the quality of goods.
There is no document on record which can show that the
issue regarding the quality of goods was raised before
the said date. These goods have been consumed by the
Corporate Debtor in the project undertaken as mentioned
above. Further, in the mail annexed at page 46 of the
application the Corporate Debtor has stated that all the
goods supplied were destroyed in front of the
Operational Creditor representative Mr. Sher Singh.
Thereafter, the demand notice dated 27.12.2019 in
compliance with Section 8 of the Code was issued. The
said notice was replied to vide letter dated 07.01.2020.
Company Appeal (AT)(Ins) No.1019 of 2022 12
In the said reply the Corporate Debtor has stated that
the goods were jointly inspected by the parties.
14. Hence, in our view, there was no dispute raised at
the time of delivery of goods when the inspection was
required to be carried out. It is only after the Inspection
Report was provided to the Corporate Debtor, that the
Corporate Debtor raised issues regarding the quality of
goods delivered. There exists a clear debt as the
Corporate Debtor has consumed the goods and
therefore, is under an obligation to pay the Operational
Creditor with respect to the goods consumed. It is evident
from the reasons stated hereabove that Corporate Debtor
has clearly defaulted in payment of debt due to the
Operational Creditor.
16. Therefore, in the present matter at hand, there is a
clear debt, repayment of which has been defaulted by
the Corporate Debtor and there appears to be no pre-
existing dispute between the parties. Any allusion to
such dispute appears to be confirmed.
Company Appeal (AT)(Ins) No.1019 of 2022 13
17. Under sub-section (4) of Section 9 of the Code, the
Operational Creditor may propose the name of a
Resolution Professional to be appointed as Interim
Resolution Professional (IRP) but it is not obliged to do
so. In the instant case, the Operational Creditor had
proposed an IRP although the proposed IRP has
withdrawn its consent before this Tribunal. Hence, this
bench can appoint the RP from the pool of RPs
empanelled with the IBBI.
18. In view of this Mr. Umang Jain, duly registered with
the Insolvency and Bankruptcy Board of India, with
Registration No. IBBI/IPA-001/IP-P01959/2020-
2021/13105 (email:caumangjain @gmail.com: mobile
No.+91 9351846668, is hereby appointed as the IRP.
The IRP is directed to take all such steps as are required
under the statute, inter alia in terms of Sections 15, 17,
18, 19, 20 and 21 of the Code and transact proceedings
with utmost dedication, honesty and strictly in
accordance with the provisions of the Code, and Rules
and Regulation thereunder."
Company Appeal (AT)(Ins) No.1019 of 2022 14
7. The present appeal has been preferred by the Corporate
Debtor against the order of the Adjudicating Authority. While
pressing the appeal, Mr. Abhijeet Sinha, learned counsel for the
appellant had drawn our attention to different pages and
paragraphs of the impugned order particularly page 27a, 27b, 27d,
27j, 27k. He tried to justify that there was admittedly pre-existing
dispute which was required to be noticed by the Adjudicating
Authority but incorrectly appreciated and rejected the plea of the
Corporate Debtor regarding pre-existing dispute. Shri Sinha has
also drawn our attention to purchase order at Page 46, invoice at
page 48. He has specifically drawn our attention to Page 147 of
the Memo of Appeal i.e. an Inspection Report dated 16.12.2019.
By way of referring to aforesaid document Shri Sinha has argued
that long back on 16.12.2019 M/s SGB Infra Ltd after conducting
inspection had directed the Corporate Debtor for removal of granite
flooring because of quality issue. The Corporate Debtor was
informed that the material fitting done by him was found not as
per specification standard. He has also placed reliance on the
judgement of Hon'ble Supreme Court in Rajratan Babulal Agarwal
Vs Solartex India Pvt Ltd & Ors (2023) 1 SCC 115. He submitted
that in view of law settled on the point that in case of establishment
Company Appeal (AT)(Ins) No.1019 of 2022 15
of pre-existing dispute before issuance of notice under Section 8 of
the Code or even before the Adjudicating Authority the correct
approach which was to be adopted by the Adjudicating Authority
was to reject the application filed under Section 9 of the Code by
the Operational Creditor/Respondent No.2.
8. In the present appeal detailed reply has also been filed by the
Respondent No.2/Operational Creditor. It has been categorically
stated in the reply that the Operational Creditor had supplied
material to the Corporate Debtor in respect of which Operational
Creditor also raised six invoices to the tune of Rs.14,78,420/- and
till initiation of CIRP an amount of Rs.11,95,447/- was outstanding
whereas no dispute with regard to quality of goods was raised by
the Corporate Debtor. However, he refused to make payment
resulting in initiation of CIRP against the Corporate Debtor. It is
further case of the Respondent No.2/Operational Creditor that
whatever material were supplied by him were accepted by the
Corporate Debtor without any dispute and this was the reason that
the Corporate Debtor utilised entire granite slabs supplied by the
Operational Creditor and since, it appears that the work was not
executed in appropriate manner SGB Infra Ltd had asked the
Corporate Debtor for removal of floor from the premises of the
Company Appeal (AT)(Ins) No.1019 of 2022 16
Airport Authority, Jaipur. In para 5 of the reply it has been
indicated as if the Corporate Debtor has made some forgery in
record in respect of unloading of the material. We propose to
reproduce para 5 of the reply as follows:-
"5. That the contents of Para No. 7.4 of the Appeal are vehemently denied. It is submitted that the corporate debtor while submitting response to the insolvency application before the Ld. NCLT. Jaipur Bench has submitted forged and fabricated documents being Page No.55 which is a part of an Annexure-3 of the Reply to the Company Petition. A bare perusal of the Page No.55 as annexed alongwith the reply to the company petition gives an impression that material which has been unloaded by the operational creditor in the premises of the corporate debtor has been returned with the remark "2000........ माल 14-1/2-15 mm है । यह पूरा माल बदला जायेगा। पार्टी के कहने से अनलोड िं ग . Whereas the fact of the matter is that the aforesaid remark has been added subsequent to the signature made by Shri Ratul Singhal (Partner of the Operational Creditor) and Mr. Ravindra (Employee of the Corporate Debtor). The said fact can be corroborated from the photograph which was taken by the Operational Creditor from its Mobile after signing the said page and given back to the employee of the corporate debtor. It is submitted that a bare perusal of the said photograph would reveal that no such remark was made at Page No.55 of the diary when the material was unloaded and the said remark has been made only after the filing of the petition in a manner that the space existing between the signature of Mr. Ravinder and description of the material has been used with a malafide intention to create a dispute about the quality of the material supplied to the corporate debtor. When the aforesaid forgery and fabrication came to the notice of the respondent no.2, an application under section 340
Company Appeal (AT)(Ins) No.1019 of 2022 17 Cr.PC was filed before the NCLT, Jaipur Bench and the same is pending for adjudication. Copy of the application filed by the respondent no.2 before the NCLT, Jaipur Bench is being enclosed and marked as Annexure R- 2/1."
9. Mr. Amol Vyas, learned counsel for Respondent No.2
submitted that since outstanding debt was not being cleared by the
Corporate Debtor and first postdated cheque for an amount of
Rs.3,51,553/- stood dishonoured on 19.12.2019. The Operational
Creditor issued demand notice under Section 8 of the Code on
27.12.2019. Even after issuance of demand notice three cheques
i.e. an amount of Rs.1,98,073/-, 2,77,160/- and 5,28,668/- stood
dishonoured on 4.1.2020, 18.1.2020 and 25.2.2020 respectively.
Learned counsel for Respondent No.2 has argued that though there
was no plausible pre-existing dispute, the Corporate Debtor with a
view to get the application filed under Section 9 of the code, rejected
has taken as an unsustainable plea that too by forging certain
documents as if there was a dispute. Learned Counsel for
Respondent No.2 has also drawn our attention to a communication
made by Operational Creditor to the Corporate Debtor which was
in reply to mail dated 16.12.2019 sent by the Corporate Debtor
regarding quality of material. He submits that the said reply which
is at running page 74 of the Memo of Appeal itself reflects that the
Company Appeal (AT)(Ins) No.1019 of 2022 18
Corporate Debtor had raised frivolous and concocted story
regarding the quality. We may propose to reproduce the
communication sent on behalf of the Operational Creditor to
Corporate Debtor which is at page 74 as follows:-
Mr. Deepak Medi, Director ADELANTE EXIM INDIA PRIVATE LIMITED G846, ROAD NO. 14. VISHWAKARMA INDUSTRIAL AREA JAIPUR-302013 PHONE NO. 6141-4915096 MOBILE NO. 491- 3166815551 EMAIL ID: INFO@ADELANTEGLOBAL.COM
Subject: REPLY OF YOUR MAIL, RECEIVED DATED 1642.2619 REGARDING QUALITY OF MATERIAL Dear Mr. Deepak,
With respect to your mail received on 16.12.2019 regarding the quality of material supplied by in which you have allegedly raised a frivolous, concocted story regarding the low quality of material in order to save yourself from clutches of nonpayment of our dues. We have dispatched the materials per the specifications specified laid down in the said purchase order issued by you, and after getting approval quality check from your side that the material is as per your desired quality. Also, there is no previous intimation to us from your side that the material is not of desirable quality. Even if the material is not of your desired quality you have consumed all the material supplied and there was no complaint raised by you with respect to quality of the material supplied earlier. It seems that it is nothing but a delay tactic adopted by you to dodge away from your liabilities of payment.
I was your duty to convey the same before consumption of all material but there is no communication/no letter/no email with respect to any complaint with
Company Appeal (AT)(Ins) No.1019 of 2022 19
respect to material So if there was any issue regarding quality of material it was your duty to convey/inform to us on the mom day of supply when each slab quantity was inspected and measured. Hence it is proved beyond any doubt that you are deliberately withholding payment for the reason best known to you before due date of cheque died 13.12.2019 of payment/presenting the cheque to the bank, Hence, contention given by you for quality of material is false and frivolous and it's all a fabricated story presented to withhold my payment
Hence, you are requested to repay the unpaid debt as mentioned in the ledger account enclosed, You have also stopped one of our cheque, despite balance in your account which is very unethical practice of business depicting your deliberate intension withholding our payment. Please note that all advance cheque given against our material bills and interest by your goodself will be deposited in time & if dishonored appropriate action will be taken in due course. Thanks and Regards
For Prime Impex Stones
Akul Singhal
Partner
Contact No.9928092694"
10. Learned counsel for the Respondent No.2 has also drawn our
attention to Page 25 and 26 of its reply to show that even the
Corporate Debtor by making interpolation/forgery had brought a
document before the Adjudicating Authority as if after unloading
it was stated for replacing the materials. By way of drawing our
attention to Page 25 and 26 it was argued that Page 26 was
Company Appeal (AT)(Ins) No.1019 of 2022 20
genuine one in respect of receipt of materials whereas page 25 is
the same document but subsequently interpolation was made as
if the slabs were between 14 ½ and 15 mm. We may not do better
than to reproduce both the documents by scanning as follows:
Company Appeal (AT)(Ins) No.1019 of 2022 21
Company Appeal (AT)(Ins) No.1019 of 2022 22
11. Accordingly it has been argued that after filing of the reply
before the Adjudicating Authority a separate application under
Section 340 of Cr PC was also filed making allegation of bringing
and using forged documents in a court proceeding. In sum and
substance it has been argued that there was no plausible pre-
existing dispute and as such learned Adjudicating Authority has
rightly rejected the plea of Corporate Debtor and initiated CIRP.
12. Mr. Pushpendra Singh Bhadoriya, learned counsel for R1
supports the impugned order.
13. Besides hearing learned counsel for the parties we have
perused the entire material available on record. It is not in
dispute that on the date of filing of application under Section 9 of
the Code by the Operational Creditor there were outstanding debt
amounting to Rs.11,95,447/- (Rupees Eleven lakhs Ninety Five
thousand four hundred forty seven only) against the Corporate
Debtor. Only objection in respect of pre-existing dispute which
was asserted by the Corporate Debtor was thoroughly examined
and satisfied by the Adjudicating Authority. It is true that under
the provisions of Code if Adjudicating Authority is satisfied with
pre existing dispute at the time of entertaining an application filed
under Section 9 of the Code there is no reason to initiate the same
Company Appeal (AT)(Ins) No.1019 of 2022 23
or admit the application. However, law is settled on the point that
there must be pure pre-existing dispute. Meaning thereby that
genuine pre-existing dispute must exist in rejecting an application
Section 9 of the code. In the present case it is reflected from
inspection report of SGB Infra Ltd dated 16.12.2019 which is at
page 147 that the Corporate Debtor was asked by the SGB Infra
Ltd to remove the flooring. This fact is itself enough to draw an
inference that the Corporate Debtor had accepted the delivery of
granite slabs made by the Operational Creditor without raising
any dispute or objection. Otherwise the Corporation Debtor
would have rejected the entire materials at the time of unloading
of the same. However, it is clear that the granite slabs supplied
by the Operational Creditor were utilised by the Corporate Debtor
and had placed the same in the premises of Airport Authority of
Jaipur. There may be plausible reasons for SGB Infra Ltd to ask
the Corporate Debtor to remove the flooring but fact remains that
the Corporate Debtor had accepted the granite slabs supplied by
the Operational Creditor without raising any dispute or objection.
On this score itself we are of the opinion that such plea of the
Corporate Debtor regarding dispute can be termed as moon shine
defence. On this plea there is no reason to accept as if there was
Company Appeal (AT)(Ins) No.1019 of 2022 24
pre-existing dispute in between the Operational Creditor and
Corporate Debtor. Besides this the Operational Creditor before
the Adjudicating Authority has already taken a plea that he has
filed an application under section 340 of Cr PC in respect of
placing and using a document by committing forgery and
interpolation and as such we do not find any ground to interfere
with the impugned order nor we find any defect in the said
impugned order. Accordingly the appeal having no merit is fit to
be rejected and it is dismissed without cost.
(Justice Rakesh Kumar) Member (Judicial)
(Dr. Alok Srivastava) Member (Technical) bm
Company Appeal (AT)(Ins) No.1019 of 2022
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free