Committee Of Creditors Of Metalyst ... vs Consortium Of Deccan Value Investors Lp ...
- CitationCompany Appeal (AT) (Insolvency) No. 1276 of 2019
Ratio decidendi
The rule this decision rests on
A resolution applicant may seek withdrawal of its resolution plan before the Adjudicating Authority, and an application under Section 60(5) of the Insolvency and Bankruptcy Code, 2016 is not barred merely because the plan has been approved by the Committee of Creditors, since Section 60(5) confers jurisdiction over applications by or against the corporate debtor and over questions of fact or law arising out of the insolvency resolution process. The Adjudicating Authority, in considering approval under Section 31, is confined to the requirements of Section 30(2); it may reject a resolution plan that is not viable or feasible or that contravenes the Code, and a plan whose underlying production-capacity and asset representations are shown to be materially inaccurate fails that test and is liable to rejection under Section 30(2)(e). The Insolvency and Bankruptcy Code does not empower the Adjudicating Authority to compel specific performance of a resolution plan by an unwilling resolution applicant.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL NEW DELHI Company Appeal (AT) (Insolvency) No. 1276 of 2019 [ arising out of Order dated 27th September, 2019 by NCLT, Mumbai Bench, Mumbai in CP No. (IB) - 1555 (IB)/MB/2017 ]
IN THE MATTER OF: Committee of Creditors of Metalyst Forging Ltd., Through State Bank of India, State Bank of India, Stressed Asset Management Brach I, 12th Floor, Jawahar Vyapar Bhawan, 1, Tolstoy Marg, New Delhi - 110 001 ...Appellant
Versus 1. Deccan Value Investors LP, 850, New Burton Road, Suite 201, Dover, Delaware 19904 USA.
2. DVI PE (Mauritius) Ltd., SGG, Mauritius, 33, Edith Cavel Street, Port Louis - 11324.
3. Resolution Professional of Metalyst Forgings Limited, EY Restructuring LLP, Golf View Corporate Tower B, Sector - 42, Gurugram (Haryana) 122002. ...Respondents
Present: For Appellant: Mr. Arun Kathpalia, Senior Advocate with Mr. Siddhant Kant, Ms. Misha, Mr. Nikhil Mathur, Mr. Kauser Hussain, Advocates for Appellant - 'Committee of Creditors'
For Respondents: Dr. U.K. Choudhary, Senior Advocate with Mr. Mahesh Agarwal, Mr. Rajeev Kumar, Mr. Rohan Dakshini, Ms. Akansha Saxena and Dhruv Gupta, Advocates for Respondent Nos.1 and 2.
Mr. Abhinav Vashisht, Senior Advocate with Ms. Anannya Ghosha and Mr. Brian Moses, Advocates for RP. 2
With
Company Appeal (AT) (Insolvency) No. 1281 of 2019
[ arising out of Order dated 27th September, 2019 by NCLT, Mumbai Bench, Mumbai in M.A. No. 1272/2018 & M.A. No. 956/2018 in CP No. (IB) - 1555 (IB)/MB/2017 ]
IN THE MATTER OF: 1. Deccan Value Investors L.P., 850, New Burton Road, Suite 201, Dover, Delaware 19904, USA
2. DVI PE (Mauritius) Ltd., SGG Mauritius, 33, Edith Cavell Street, Port Louis 11324. ...Appellants
Versus
1. Mr. Dinkar Venkatasubramanian, Resolution Profession of Metalyst Forgings Ltd., Gate No. 614, Village Kurulikhed, Pune - 410 501.
2. State Bank of India, State Bank Bhavan, Madame Cama Road, Nariman Point, Mumbai - 400 021. ...Respondents
Present: For Appellant: Dr. U.K. Choudhary, Senior Advocate with Mr. Mahesh Agarwal, Mr. Rajeev Kumar, Mr. Rohan Dakshini, Ms. Akansha Saxena and Mr. Dhruv Gupta, Advocates.
For Respondents: Mr. Arun Kathpalia, Senior Advocate with Mr. Siddhant Kant, Ms. Misha, Mr. Nikhil Mathur Gupta, Advocates for 'Committee of Creditors'
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 3
Mr. Abhinav Vashisht, Senior Advocate with Ms. Anannya Ghosha and Mr. Brian Moses, Advocates for RP.
JUDGMENT
SUDHANSU JYOTI MUKHOPADHAYA, J.
In the 'Corporate Insolvency Resolution Process' of Metalyst Forgings
Ltd. (Corporate Debtor) the Resolution Plan submitted on 13th April, 2018 by
'Deccan Value Investors LLP' and 'DVI PE (Mauritius) Limited' was approved
by the 'Committee of Creditors' on 28th August, 2018.
2. The Resolution Professional placed the 'Resolution Plan' before the
Adjudicating Authority (National Company Law Tribunal), Mumbai Bench,
Mumbai for its approval under Section 31 of the 'Insolvency and Bankruptcy
Code, 2016' ('I&B Code', for short).
3. In the meantime, the 'Resolution Professional' vide its letter dated 15th
October, 2018, called upon the 'Deccan Value Investors LLP' ('Deccan', for
short) to submit the performance guarantee. In reply to such demand of
Performance Guarantee, Deccan, vide its letter dated 17th October, 2018
conveyed its decision to withdraw the Resolution Plan and filed for approval
by the Adjudicating Authority.
4. Miscellaneous Application No. 956 of 2018 was filed by the Resolution
Professional for approval of the 'Resolution Plan' of Deccan. In the said case,
the Deccan also moved an application under Section 60(5) of the 'I&B Code'
in MA No. 1272/2018 for withdrawal of the plan.
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 4
5. The Adjudicating Authority taking into consideration the fact and
circumstances of the case by impugned order dated 27th September, 2019
refused to approve the resolution plan of Deccan and directed the Resolution
Professional/Committee of Creditors for inviting the fresh bid (Plans) within a
period of 21 days.
6. The Adjudicating Authority while passing such order observed that the
'Resolution Applicant' - Deccan will not be entitled to refund of the amount of
the bid bond guarantee in case fresh bid of Resolution Applicant (Deccan) is
not accepted. The Resolution Applicant did not participate in the 1st Bid
process.
7. The Committee of Creditors have challenged the order dated 27th
September, 2019, as the approval of the 'Resolution Plan' of the Deccan has
been rejected.
8. The Resolution Applicant (Deccan) has also challenged the order dated
27th September, 2019 so far it relates to clarification that the 'Resolution
Applicant (Deccan) will not be entitled to get refund of forfeiture of 'Bid Bond
Guarantee' in a case of fresh bid of Resolution Applicant is not accepted or
Resolution Applicant did not participate in fresh bidding process.
9. During the hearing of the Appeal, this Appellate Tribunal by order dated
18th November, 2019 observed that it will be open to the 'Committee of
Creditors' to go through the other 'Resolution Plan(s) and approve the same
as observed by the Adjudicating Authority. On 6th December, 2019
opportunity was given to the 'Deccan Value Investor LP' and 'DVI PE
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 5
(Mauritius) Ltd.' (Appellants) to settle the matter and bring the same to the
notice of this Appellate Tribunal.
10. The Assistant General Manager of the State Bank of India, Member of
the 'Committee of Creditors' in its affidavit has informed that the Appellant
(Deccan) sought meeting to discuss the settlement by way of e-mail dated 10th
December, 2019. The Appellant (Deccan) by another e mail dated 11th
December, 2019 provided an offer to the Respondent. It was tabled before the
'Committee of Creditors' in its 26th Meeting held on 12th December, 2019 and
after a detailed deliberation of the same, the 'Committee of Creditors' deemed
the offer placed by the Deccan as not viable and feasible. Accordingly the
offer was rejected.
11. Learned counsel for the 'Committee of Creditors' submitted that the
impugned order dated 27th September, 2019 passed by the Adjudicating
Authority is an erroneous exercise of such powers vested under the 'I&B
Code'.
STAND OF THE COMMITTEE OF CREDITORS
12. Learned counsel for the 'Committee of Creditors' submitted that the
Adjudicating Authority's powers with respect to an application filed under
Section 31 of the 'I&B Code' are circumscribed by Section 30(2) of the 'I&B
Code' and, therefore, besides the jurisdiction to either approve a 'resolution
plan' which passes the muster of the limited prescriptions prescribed under
Section 30(2) or reject a resolution plan on any of the grounds elucidated in
sub-section (a) to (e) of Section 30(2) of the 'I&B Code', the Adjudicating
Authority has no jurisdiction for entertaining / allowing an application for the
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 6
withdrawal of a resolution plan subsequent to approval of the resolution plan
by the 'Committee of Creditors'.
13. He further submits that the impugned order is also erroneous insofar
as it treads on exclusive domain of the 'Committee of Creditors' to examine
and decide on the feasibility and viability of the 'approved resolution plan'.
14. He also submits that it is a settled position of law that the Adjudicating
Authority being a creature of a statute (such as under the 'I&B Code') is bound
within the four corners of the said statue and cannot exercise its jurisdiction
beyond/outside the scope prescribed under the statute. Accordingly, it was
impermissible for the Adjudicating Authority to allow the withdrawal of the
resolution plan beyond its jurisdiction prescribed under the 'I&B Code' or
return a finding on feasibility or viability of a resolution plan. He also relied
upon the judgment of the Hon'ble Supreme Court in the case of 'Committee
of Creditors of Essar Steel Limited v. Satish Kumar Gupta & Ors.'
wherein the argument of a right being available under Section 60(5) of the
'I&B Code' to challenge the decision of the 'Committee of Creditors' to approve
a resolution plan was rejected on account of Section 60(5)(a) which only refers
to an application by or against the 'Corporate Debtor' and not by the
Successful Resolution Applicant; Section 60(5) is non-obstante only with
respect to "any other law" and not the 'I&B Code' itself and Section 60(5)(c)
is a residuary jurisdiction vested in the Adjudicating Authority to decide on
the question of law or fact with respect to the 'corporate insolvency resolution
process' and the said residual jurisdiction does not in any manner impact the
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 7
jurisdiction of the Adjudicating Authority under section 30(2) of the 'I&B
Code'.
STAND OF THE RESOLUTION APPLICANT - 'Deccan Value Investors LP'
15. On 'Deccan Value Investors LP' efforts to renegotiate with the
'Committee of Creditors' having failed, Deccan filed M.A. No. 1272 of 2018
seeking inter alia to withdraw its resolution plan. The Deccan also filed its
reply opposing C.A. No. 956 of 2018 filed by the 3rd Respondent, setting out
its case for withdrawal and raising the following issues of facts :
(i) The report furnished by the Resolution Professional in the 'Virtual
Data Room' (VDR) showed the realistic capacity to be 2.10 lac
MTPA. Consequently, the plan assumed 1.10 lac MTPA
production in the first year and increases thereafter. Admittedly
the production capacity of Metalyst is only approximately 45,000
MTPA;
(ii) The 2016 MM Report showing figures of production capacity was
made available in the VDR in response to Deccan's request for
any information on production capacity - Deccan was unaware
that the said Report even existed;
(iii) It was informed subsequently that the 12,500 ton press which
was a critical component of the resolution plan could not be
installed on Metalyst's land and needed to be installed on the land
of sister concern (undergoing CIRP);
(iv) Metalyst's historical financials were inaccurate and presented a
false picture of its operations and turnover;
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 8
(v) Reports of a transaction audit and a forensic audit revealed that
practically 39% of the sales in the review period had been made
to related parties and huge write-offs had been done during the
three year period of January 2014 to December 2016;
(vi) The Resolution Professional asserts that he only provided the
information available with him and could not be expected to verify
it. He also asserts that Deccan should have done its own due
diligence. The said submission is misplaced as the information
available with Deccan was only that on the VDR, which the
resolution applicants were entitled to rely upon. There was no
public source of information that would enable Deccan to
ascertain production capacity.
16. He further submits that under Section 60(5) of the 'I&B Code', the
Adjudicating Authority is required to consider the questions of fact raised i.e.
whether Deccan has been misled in the course of the 'Corporate Insolvency
Resolution Process', and whether the 'Corporate Insolvency Resolution
Process' had been vitiated by misrepresentation and / or mutual mistake.
The M.A. No. 1272 of 2018 filed by the Deccan was maintainable.
17. The data and material on record and the foregoing submissions clearly
show that the production capacity of the 'Corporate Debtor' and the feasibility
of the resolution plan was not accurately represented on record at the time of
'Committee of Creditors' accorded its approval to the plan; further, a critical
part of the resolution plan viz. the 12,500 ton Press was subsequently
revealed to be unavailable.
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 9
18. On the merits, Deccan successfully established that the 'Resolution
Plan' was not capable of implementation, and thus, justified their withdrawal
of the same. It is submitted that the Hon'ble Supreme Court also in the
'Corporate Insolvency Resolution Process' of 'Amtek Auto Ltd.' and by order
dated 24th September, 2019 has allowed the 'successful resolution applicant'
to withdraw its plan prior to its approval.
RELEVANT FACTS & LAW
19. The 'Resolution Professional' allowed the Deccan and other resolution
applicants to access the bid containing (i) Audited Financial Statements of the
'Corporate Debtor' for the Financial Years 2015-16 and 2016-17; and (ii)
Projections, as per the 'Corporate Debtor's' Head Office Model V.24-vdr.
However, there was no break up between the trading revenue and the
manufacturing revenue in the HO Model as uploaded in the VDR.
20. The Resolution Professional thereafter uploaded the report dated 30th
September, 2016 prepared by technical experts Mott MacDonald India ("2016
MM Report), which represented the net realistic production capacity of the
Corporate Debtor's Plant as 210,747 Metric Tonnes Per Annum (MTPA), on
the basis of their technical due diligence, of the different plants based on their
'Plate Capacity' and 'Net Realistic Capacity'.
21. '2016 MM Report' was the single most important, direct and relevant
source of information regarding the Corporate Debtor's production capacity,
prepared by the technical experts on the basis of the Corporate Debtor's
proprietary and confidential data provided to these experts. The Resolution
Applicant was not given access to the data underlying the 2016 MM Report.
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 10
22. Representatives of Deccan conducted various meeting with the
Resolution Professional and visited various plant sites of the Corporate
Debtor. It is alleged that Deccan came to know material and contradictory
information regarding production capabilities of the Corporate Debtor which
has the material impact on the viability of the resolution plan.
23. In the aforesaid background, the 'Resolution Professional' vide letter
dated 15th October, 2018 called upon Deccan to submit the guarantee and in
reply, the Deccan intimated vide letter dated 17th October, 2018 conveyed its
decision to withdraw the Resolution Plan and filed for approval by the
Adjudicating Authority.
24. As per Section 30(6), the 'Resolution Professional' is required to submit
the plan as approved by the 'Committee of Creditors' to the Adjudicating
Authority.
25. Section 31 relates to approval of the 'resolution plan' as under:
"31. Approval of resolution plan.
(1) If the Adjudicating Authority is satisfied that the
resolution plan as approved by the committee of
creditors under sub-section (4) of section 30 meets
the requirements as referred to in sub-section (2)
of section 30, it shall by order approve the
resolution plan which shall be binding on the
corporate debtor and its employees, members,
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 11
creditors, guarantors and other stakeholders
involved in the resolution plan.
[Provided that the Adjudicating Authority shall,
before passing an order for approval of resolution
plan under this sub-section, satisfy that the
resolution plan has provisions for its effective
implementation.]
(2) Where the Adjudicating Authority is satisfied that
the resolution plan does not confirm to the
requirements referred to in sub-section (1), it may,
by an order, reject the resolution plan.
(3) After the order of approval under sub-section (1),-
(a) the moratorium order passed by the
Adjudicating Authority under section 14
shall cease to have effect; and
(b) the resolution professional shall forward all
records relating to the conduct of the
corporate insolvency resolution process and
the resolution plan to the Board to be
recorded on its database.
[(4) The resolution applicant shall, pursuant to the
resolution plan approved under sub-section
(1), obtain the necessary approval required
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 12
under any law for the time being in force
within a period of one year from the date of
approval of the resolution plan by the
Adjudicating Authority under sub-section
(1) or within such period as provided for in
such law, whichever is later.]
Provided that where the resolution plan
contains a provision for combination, as
referred to in Section 5 of the Competition
Act, 2002 (12 of 2013), the resolution
applicant shall obtain the approval of the
Competition Commission of India under
that Act prior to the approval of such
resolution plan by the committee of
creditors]
26. The aforesaid provision makes it clear that the Adjudicating Authority,
if it is satisfied that the resolution plan as approved by the 'Committee of
Creditors' meets the requirements as referred to in sub-section (2) of Section
30, then only will approve the resolution plan. Where the Adjudicating
Authority is satisfied that the resolution plan does not confirm the
requirements of Section 30(2), by an order reject the 'resolution plan'.
27. Section 60(5) empowers the Adjudicating Authority (National Company
Law Tribunal) to dispose of all the matters as under :
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 13
"60. (1) The Adjudicating Authority, in relation to
insolvency resolution and liquidation for corporate
persons including corporate debtors and personal
guarantors thereof shall be the National Company
Law Tribunal having territorial jurisdiction over
the place where the registered office of the
corporate person is located.
(2) Without prejudice to sub-section (1) and
notwithstanding anything to the contrary
contained in this Code, where a corporate
insolvency resolution process or liquidation
proceeding of a corporate debtor is pending before
a National Company Law Tribunal, an application
relating to the insolvency resolution or bankruptcy
of a personal guarantor of such corporate debtor
shall be filed before such National Company Law
Tribunal.
(3) An insolvency resolution process or bankruptcy
proceeding of a personal guarantor of the
corporate debtor pending in any court or tribunal
shall stand transferred to the Adjudicating
Authority dealing with insolvency resolution
process or liquidation proceeding of such
corporate debtor.
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 14
(4) The National Company Law Tribunal shall be
vested with all the powers of the Debt Recovery
Tribunal as contemplated under Part III of this
Code for the purpose of sub-section (2).
(5) Notwithstanding anything to the contrary
contained in any other law for the time being in
force, the National Company Law Tribunal shall
have jurisdiction to entertain or dispose of-- (a)
any application or proceeding by or against the
corporate debtor or corporate person; (b) any claim
made by or against the corporate debtor or
corporate person, including claims by or against
any of its subsidiaries situated in India; and (c)
any question of priorities or any question of law
or facts, arising out of or in relation to the
insolvency resolution or liquidation proceedings of
the corporate debtor or corporate person under
this Code."
28. It is evident that the application under Section 60(5) of the 'I&B Code'
can be entertained by the Adjudicating Authority (National Company Law
Tribunal) both on the question of facts and law or in relation to the insolvency
resolution or liquidation proceedings of the 'Corporate Debtor'.
29. In the present case, they cannot raise the question of fact mixed with
question of law relating to resolution process. During the 'Corporate
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 15
Insolvency Resolution Process' period, the question of law involved is that in
the facts and circumstances, the approval of the 'resolution plan' will be futile
or not. If the allegation as raised by Deccan relating to net realistic capacity
of the 'Corporate Debtor' has been wrongly shown in the 'Information-
Memorandum'.
30. In 'Tata Steel Limited vs. Liberty House Group Pte. Ltd. & Ors.' -
'Company Appeal (AT) (Insolvency) No. 198 of 2018', this Appellate Tribunal
held :
"30. Further, according to him, a 'Resolution Applicant'
cannot challenge a decision of the 'Committee of
Creditors' at any stage, till the Adjudicating Authority
approves the 'Resolution Plan' under Section 31
...............
40. In this background, while we hold that this
appeal preferred by 'Tata Steel Limited' is premature,
uncalled for, in absence of any final decision taken by
the Adjudicating Authority under Section 31, this
appeal is not maintainable."
In 'Arcelor Mittal India Private Limited v. Satish Kumar Gupta & Ors.
(Civil Appeal Nos. 9402 - 9405 of 2018 etc.), the Hon'ble Supreme Court has
held:
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 16
"75. What has now to be determined is whether any
challenge can be made at various stages of the
corporate insolvency resolution process. Suppose a
resolution plan is turned down at the threshold by a
Resolution Professional under Section 30(2). At this
stage is it open to the concerned resolution applicant to
challenge the Resolution Professional's rejection? It is
settled law that a statute is designed to be workable,
and the interpretation thereof should be designed to
make it so workable........."
76. Given the timeline referred to above, and given
the fact that a resolution applicant has no vested right
that his resolution plan be considered, it is clear that
no challenge can be preferred to the Adjudicating
Authority at this stage. A writ petition under Article
226 filed before a High Court would also be turned
down on the ground that no right, much less a
fundamental right, is affected at this stage. This is also
made clear by the first proviso to Section 30(4), whereby
a Resolution Professional may only invite fresh
resolution plans if no other resolution plan has passed
muster.
xxx xxx xxx
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 17
79. Take the next stage under Section 30. A
Resolution Professional has presented a resolution plan
to the Committee of Creditors for its approval, but the
Committee of Creditors does not approve such plan after
considering its feasibility and viability, as the requisite
vote of not less than 66% of the voting share of the
financial creditors is not obtained. As has been
mentioned hereinabove, the first proviso to Section 30(4)
furnishes the answer, which is that all that can happen
at this stage is to require the Resolution Professional to
invite a fresh resolution plan within the time limits
specified where no other resolution plan is available
with him. It is clear that at this stage again no
application before the Adjudicating Authority could be
entertained as there is no vested right or fundamental
right in the resolution applicant to have its resolution
plan approved, and as no adjudication has yet taken
place.
81. If, on the other hand, a resolution plan has been
approved by the Committee of Creditors, and has
passed muster before the Adjudicating Authority, this
determination can be challenged before the Appellate
Authority under Section 61, and may further be
challenged before the Supreme Court under Section 62,
if there is a question of law arising out of such order,
within the time specified in Section 62. Section 64 also
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 18
makes it clear that the timelines that are to be adhered
to by the NCLT and NCLAT are of great importance, and
that reasons must be recorded by either the NCLT or
NCLAT if the matter is not disposed of within the time
limit specified. Section 60(5), when it speaks of the
NCLT having jurisdiction to entertain or dispose of any
application or proceeding by or against the corporate
debtor or corporate person, does not invest the NCLT
with the jurisdiction to interfere at an applicant's behest
at a stage before the quasi-judicial determination made
by the Adjudicating Authority. The non-obstante clause
in Section 60(5) is designed for a different purpose: to
ensure that the NCLT alone has jurisdiction when it
comes to applications and proceedings by or against a
corporate debtor covered by the Code, making it clear
that no other forum has jurisdiction to entertain or
dispose of such applications or proceedings."
31. On the realistic and actual basis of technical production of the capacity
of the 'Corporate Debtor', the 'Deccan' brought to the notice of the
Adjudicating Authority that the present plan was unviable or unfeasible or
unimplementable.
32. 'Deccan' has pointed out the discrepancy between the representations
made by the Resolution Professional on which Deccan formulated its
Resolution Plan and the actual undisputed production capacity of the
Corporate Debtor as under :
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 19
Corporate Debtor's Production Capacity [in MTPA]
Represented by the Projected by the Actual position Resolution Professional Applicants in Deccan in the 2016 MM Report Resolution Plan 210,747 110,000 Approx. Maximum 66,000
33. It was shown by Deccan that the financial and technical documents
and data in relation to the Corporate Debtor was discrepant and false, as the
Financial Statements for the Financial Years 2015-16 and 2016-17 and the
Provisional Financial Statements for the period April 2017 to December 2017
were provided in the VDR for the Resolution Applicants for undertaking their
due diligence. But these statements, as per the Resolution Professional and
the 'Committee of Creditors', are discrepant, unreliable and contain false
information since they are being subjected to the transaction and forensic
audit. Therefore, any reliance upon these statements is said to have vitiated
Deccan's Resolution Plan.
34. The Adjudicating Authority noticed that the income tax returns of the
company for the Financial Year 2015-16 and Financial Year 2016-17 do not
indicate trading operations. The audited financial statements of the
Corporate Debtor also, do not indicate any trading operations at all. The
Corporate Debtor was represented as a primarily manufacturing company to
the Bidders. However, as per the claims made by the Resolution Professional,
based upon the document purporting to be the "relevant excerpt of the details
of historical revenues provided to the Resolution Applicant in the "Metalyst
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 20
HO Model" under the tab Historical Financial", the obvious implications would
be that almost 70% of the revenue of the Corporate Debtor would come from
trading, and not from manufacturing, which would mean that the Corporate
Debtor's business has been misrepresented to bidder as a primarily
manufacturing company, and the size and scale of the purported revenues
from manufacturing were also misrepresented.
35. It was further noticed by the Adjudicating Authority that the meeting
held on 5th September, 2018, and, thereafter, by way of the resolution
Professional's letter dated 23rd October, 2018 it was informed that the 12.500
ton Press that was proposed to be installed as part of Deccan's Resolution
Plan, would only be installed on-premises owned by a third-party, Clover
Forgings and Machining Pvt. Ltd. ("Clover") and that is not possible to install
the 12.5k ton Press at the Aurangabad plant of the Corporate Debtor. It was
also pointed out that insolvency resolution proceedings had been admitted in
respect of Clover, by way of an Order dated 4th December, 2018 of the National
Company Law Tribunal, New Delhi Bench.
36. The Adjudicating Authority noticed the Report of the Bankruptcy Law
Reforms Committee, November 2015 which envisaged the role of the
Resolution Professionals an agent of the Adjudicating Authority. The relevant
clauses of the said report are:
"58. Clause 4.4 set out certain mandates for the
Resolution Professional, including that the Insolvency
Professional will treat the assets of the debtor with
honesty and transparency. The BLRC Report
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 21
recommends that the Resolution Professional must
provide the Information Memorandum to the entity
(based on which solution can be offered to resolve
insolvency). Further, the Information Memorandum
put out by the Resolution Professional must be with
a "degree of completeness" of the information that
the Resolution Professional is willing to certify
(Clause 5.3.2).
59. The Clause 5.3.2 regarding the role of the
Resolution Professional provides that :
"The first phase of the IRP is completed when the
creditor's committee is formed, and the window to
submit claims is closed. The creditor's committee
can apply to the Adjudicator to appoint a new RP
to replace the interim RP. The RP must be chosen
by a majority vote in the creditor's committee for
the Adjudicator to accept the application.
.............................................
The RP becomes the manager of the negotiation
between the debtor and the creditors in
assessing the viability of the entity. In this role,
she has the responsibility of managing all
information so that debtors and creditors are
equally informed about the business in the
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 22
negotiations. Finally, she is responsible for inviting
and collecting proposals of solutions to keep the
entity going. In this role, she is responsible for
managing the process through which to invite
proposals from the overall financial market, rather
than just the creditors and debtor. The Committee
discussed that this could include other potential
market participants, such as other financial
institutions, asset reconstruction companies,
foreign financiers, strategic investors, other firms
and minority shareholders in the entity. Part of the
task of the RP is to ensure as much equality of
information about the entity to all participants in
the negotiations as is possible.
Thus, the RP needs to ensure several features in the
IRP, giving priority to the need to preserve time
value and equality in negotiations in the process:
1. The RP must provide the most updated
information about the entity as
accurately as is reasonably possible to
this range of solution providers. In order
to do this, the RP has to be able to verify
claims to liabilities as well as the assets
disclosed by the entity. The RP has the
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 23
power to appoint whatever outside
resources that she may require in order
to carry out this task, including
accounting and consulting services.
2. The information collected on the entity is
used to compile an information
memorandum, which is signed off by the
debtor and the creditor's committee,
based on which solutions can be offered to
resolve the insolvency. In order for the
market to provide solutions to keep the entity
as a going concern, the information
memorandum must be made available to
potential financiers within a reasonable period
of time from her appointment to the IPR. If the
information is not comprehensive, the RP must
put out the information memorandum with a
degree of completeness of the information that
she is willing to certify. For example, as part
of the information memorandum, the RP must
clearly state the expected shortfall in the
coverage of the liabilities and assets of the
entity presented in the information
memorandum. Here, the asset and liabilities
include those that the RP can ascertain and
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 24
verify from the accounts of the entity, the
records in the information system, the
liabilities submitted at the start of the IPR, or
any other source as may be specified by the
Regulator
3. Once the information memorandum is created,
the RP must make sure that it is readily
available to whoever is interest to bid a solution
for the IPR. She has to inform the market (a)
that she is the RP in charge of this case, (b)
about a transparent mechanism through which
interested third parties can access the
information memorandum, (c) about the time
frame within which possible solutions must be
presented and (d) with a channel through
which solutions can be submitted for
evaluation. The Code does not specify details
of the manner or the mechanism in which this
should be done, but rather emphasises that it
must be done in a time-bound manner and that
it is accessible to all possible interested parties.
Finally, the RP is responsible for calling the
creditors committee to evaluate the submitted
proposals. She has a role to play in discussing and
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 25
ranking the proposals in terms of how to maximise
enterprise value. As a first stage filter, she must
ensure that all the proposals have clarity on how
the IRP costs and the liabilities of the operational
creditors will be treated and that all parts of the
proposed solutions are consistent with the relevant
laws and regulations. But she must leave the
choice of final solution to selection by the majority
vote from the creditors Committee".
37. In the aforesaid background, the Adjudicating Authority held that the
'Resolution Professional' was duty bound to provide the list updated
information about the entity as accurately as is reasonably feasible and
possible to the range of solution providers. In 'Mobilox Innovations (P) Ltd.
vs. Kirusa Software (P) Ltd.' - (2018) 1 SCC 353' while tracing the
background of the I&B Code, referred to the "Legislative Guide on Insolvency
Law of the United Nations Commission on International Trade Law" and the
following pertinent provisions/clauses thereof:
"11. An insolvency law should be transparent and
predictable. This will enable potential lenders and
creditors to understand how insolvency proceedings
operate and to assess the risk associated with their
position as a creditor in the event of insolvency. This
will promote stability in commercial relations and
foster lending and investment at lower risk
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 26
premiums. Transparency and predictability will also
enable creditors to clarify priorities, prevent disputes
by providing a backdrop against which relative rights
and risks can be assessed and help define the limits
of any discretion. Unpredictable application of the
insolvency law has the potential to undermine not
only the confidence of all participants in insolvency
proceedings, but also their willingness to make credit
and other investment decisions prior to insolvency.
As far as possible, an insolvency law should clearly
indicate all provisions of other laws that may affect
the conduct of the insolvency proceedings (e.g. labour
law; commercial and contract law; tax law; laws
affecting foreign exchange, netting and set-off and
debt for equity swaps; and even family and
matrimonial law).
12. An insolvency law should ensure that adequate
information is available in respect of the debtor's
situation, providing incentives to encourage the
debtor to reveal its positions and, where appropriate,
sanctions for failure to do so. The availability of this
information will enable those responsible for
administering and supervising insolvency
proceedings (courts or administrative agencies, the
insolvency representative) and creditors to assess
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 27
the financial situation of the debtor and determine
the most appropriate solution."
38. The Adjudicating Authority observed that the Resolution Professional's
disassociation with the '2016 MM Report', in fact, constitutes an acceptance
of the position that the '2016 MM Report' and the contents thereof are
misleading and unreliable. Having made it available on VDR is contrary to
the Resolution Professional's obligations under the I&B Code and the
Regulations thereunder. The Adjudicating Authority further observed that :
"The Applicants were entitled to rely on the data
provided in the VDR and to proceed on the basis that
the said data was accurate in its representation of the
Corporate Debtor, especially since the Applicants
were only afforded a 2-2.5 hour walk-through site
visit at the plants of the Corporate Debtor prior to
submission of the resolution plan. The said site visit
in no manner would enable the Applicants to assess
the technical capacity of the Corporate Debtor
correctly, and this visit does not give/afford any basis
to the Resolution Professional and the CoC to assert
that there was either full knowledge or awareness on
the part of the Applicants, considering that the
Resolution Professional himself states that even a six
month period was insufficient to conduct due
diligence."
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 28
39. In the aforesaid background, the Adjudicating Authority (National
Company Law Tribunal), Mumbai Bench rightly observed that the 'Insolvency
and Bankruptcy Code' do not confer any power and jurisdiction on the
Adjudicating Authority to compel specific performance of a plan by an
unwilling resolution applicant.
40. In absence of fact that there was any procedural infirmity and having
not proceeded in the manner as was required, we hold that the plan approved
was violative of Section 30(2)(e) of the 'I&B Code', having contravened the
provisions of the 'I&B Code'.
41. For the said reasons, the plan approved by the 'Committee of Creditors'
under sub-section (4) of Section 30 of the 'I&B Code' and rejected by the
Adjudicating Authority in terms of Section 31(2), no interference is called for.
42. Insofar as refund of forfeiture of the Bid Bond Guarantee is concerned,
this Appellate Tribunal is not inclined to grant any relief to the 'Deccan'. On
18th November, 2019, the 'Committee of Creditors' was allowed to go through
the other resolution plans and approve the same. As observed by the
Adjudicating Authority subsequently on 6th December, 2019, the 'Deccan' was
also allowed to settle the claim. After having received all the information
including '2016 MM Report' relating to net realistic volume production from
the existing facility of the 'Corporate Debtor', having submitted the plan,
which is not viable and feasible.
43. Non-availability of 12,500 ton press which is a critical component of the
resolution plan could not be installed on Metalyst's land and needed to be
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019 29
installed at the land of the sister concern, which is an undergoing 'corporate
insolvency resolution process'.
44. Further, during the pendency, 'Committee of Creditors' is allowed to go
through the other 'resolution plans'. No further time is allowed if it has
approved one or other plan, which may be brought to the notice of the
Adjudicating Authority for appropriate orders.
45. For the aforesaid reasons we are not inclined to interfere with the
impugned order dated 27th September, 2019 passed by the Adjudicating
Authority.
Both the appeals are dismissed. No costs.
[Justice S.J. Mukhopadhaya] Chairperson
[Justice Bansi Lal Bhat] Member (Judicial)
[Justice Venugopal M.] Member (Judicial)
New Delhi
7th February, 2020
/ns/
Company Appeal (AT) (Insolvency) Nos. 1276 & 1281 of 2019
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free