Committee Of Creditors Of Educomp ... vs Ebix Singapore Pte. Ltd & Anr
- CitationCompany Appeal (AT) (Insolvency) No. 203 of 2020
Ratio decidendi
The rule this decision rests on
The Adjudicating Authority, after approval of a resolution plan by the Committee of Creditors, has no jurisdiction to entertain or permit a resolution applicant's application to withdraw that plan; its power to refuse approval is confined to the grounds in Section 30(2) of the Code. The resolution applicant, having accepted the conditions of the plan and in light of Section 25(2)(h) that no change or supplementary information may be accepted after submission, is not permitted to withdraw an approved resolution plan. A dismissal of an earlier application for revaluation of the plan, which did not expressly deal with a prayer for withdrawal or refund and which the applicant omitted to make in that application, bars a later application seeking that relief, by the principle of res judicata and its constructive form under Explanation IV to Section 11 of the Code of Civil Procedure; a liberty to file a fresh application on the same cause of action cannot be granted in such circumstances and does not displace the bar. Delay in deciding the approval application, where the orders were reserved by the Adjudicating Authority, cannot be taken advantage of by a litigant, since the act of the court shall harm no person.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI Company Appeal (AT) (Insolvency) No. 203 of 2020 [Arising out of Order dated 02.01.2020 passed by the National Company Law Tribunal, Principal Bench, New Delhi in in C.A. No. 1816(PB) of 2019 in C.P.(IB) No. 101 (PB) 2017]
IN THE MATTER OF: Committee of Creditors of Educomp Solutions Ltd. ...Appellant
Versus Ebix Singapore Pte. Ltd. & Anr. ...Respondent Present: For Appellant: Mr. Arun Kathpalia, Sr. Advocate with Ms. Misha, Advocate
For Respondent: Mr. Ritin Rai, Sr. Advocate with Mr. Gautam Swarup, Advocate for R-1 Mr. Sumesh Dhawan for Promoters Mr. Abhishek Sharma and Ms. Ashly Cherian, Advocates for RP(R-2)
J U D G M E N T
Venugopal M. J
Introduction
The Appellant (Committee of Creditors of Educomp Solutions Ltd., through
State Bank of India) has focused the present appeal being aggrieved with the
impugned order dated 02.01.2020 in C.A.No.1816(PB) of 2019 in Company
Petition (IB) No. 101(PB)2017 passed by the Adjudicating Authority ('National
Company Law Tribunal') Principal Bench, New Delhi.
2. The Adjudicating Authority in the impugned order dated 2.1.2020 in C.A.
No.1816(PB) of 2018 from paragraph 23 to 30 had observed the following: -
"23. Section 30(2)(d) of the
Code mandates the Adjudicating
Authority to ensure that there are
effective means of enforcement and
implementation of the Resolution Plan.
Similarly, the proviso to sub-section (1) of
Section 31 of the Code mandates
Adjudicating Authority to ensure effective
implementation of the resolution plan.
The object in approval of the resolution
plan is to save the corporate debtor and
to put it back on its feet. An unwilling
and reluctant resolution applicant, who
has withdrawn his resolution plan,
neither can put the corporate debtor back
to its feet nor the effective
implementation of its resolution plan can
be ensured.
24. No doubt the withdrawal of the
resolution plan at this advance stage has
Company Appeal (AT) (Insolvency) No. 203 of 2020 2 caused great prejudice to the
creditors/stake holders and legal
consequences on the withdrawal of the
resolution plan shall follow as per law.
The Resolution Professional and CoC are
free to take action as per law consequent
upon withdrawal of the resolution plan
by resolution applicant including on the
issue of refund of the earnest money
deposited by the applicant.
25. Be that as it may compelling
an unwilling and reluctant resolution
applicant to implement the plan may lead
to uncertainty. The object of the Code is
to ensure that the Corporate Debtor keep
working as a going concern and to
safeguard the interest of all the stake
holders. The provisions of the Code
mandate the Adjudicating Authority to
ensure that the successful resolution
applicant starts running the business of
the Corporate Debtor afresh. Besides
Company Appeal (AT) (Insolvency) No. 203 of 2020 3 Court ought not restrict a litigant's
fundamental right to carry on business in
its way under Article 19(1)(g) of the
Constitution. Once the applicant is
unwilling and reluctant and itself has
chosen to withdraw its resolution plan, a
doubt arises as to whether the resolution
applicant has capability to implement the
said plan. Uncertainty in the
implementation of the resolution plan
cannot also be rule out.
26. In the facts the prayer for
withdrawal of resolution plan is allowed
with cost and also subject to other legal
consequences as per law.
27. It is relevant to note here that the
Corporate Insolvency Resolution Process
against the Corporate Debtor was initiated
vide order dated 30.05.2017 passed in IB-
101(PB)/2017. Under third proviso to sub-
section (3) of Section 12 of the Code the
Company Appeal (AT) (Insolvency) No. 203 of 2020 4 corporate insolvency resolution process
period has expired on 16.11.2019.
28. Ordinarily the Corporate
Insolvency Resolution Process period must
be completed with the outer time limit
provided under the Code. However, in
exceptional cases in order to achieve a
resolution and to avoid to drive the
corporate debtor into liquidation,
Adjudicating Authority (NCLT) can extend
the outer time limit provided under the
Code.
29. It is relevant to refer to the
decision of the Hon'ble Supreme Court in
Civil Appeal No. 8766-67 of 2019 in the
matter of Committee of Creditors of Essar
Steel India Limited Versus Satish Kumar
Gupta & Or. Decided on 15th November
2019, where it was inter-alia held that:
"Thus, while leaving the
provision otherwise intact, we strike down
the word "mandatorily" as being manifestly
Company Appeal (AT) (Insolvency) No. 203 of 2020 5 arbitrary under Article 14 of the
Constitution of India and as being an
excessive and unreasonable restriction on
the litigant's right to carry on business
under Article 19(1)(g) of the Constitution.
The effect of this declaration is that
ordinarily the time taken in relation to the
corporate resolution process of the
corporate debtor must be completed within
the outer limit of 330 days from the
insolvency commencement date, including
extensions and the time taken in legal
proceedings. However, on the facts of a
given case, if it can be shown to the
Adjudicating Authority and/or Appellate
Tribunal under the Code that only a short
period is left for completion of the
insolvency resolution process beyond 330
days, and that it would be in the interest of
all stakeholders that the corporate debtor
be put back on its feet instead of being sent
into liquidation and that the time taken in
legal proceedings is largely due to factors
Company Appeal (AT) (Insolvency) No. 203 of 2020 6 owing to which the fault cannot be ascribed
to the litigants before the Adjudicating
Authority and/or Appellate Tribunal, the
delay or a large part thereof being
attributable to the tardy process of the
Adjudicating Authority and/or the
Appellate Tribunal itself, it may be open in
such cases for the Adjudicating Authority
and/or Appellate 132 Tribunal to extend
time beyond 330 days.
Likewise, even under the newly added
proviso to Section 12, if by reason of all the
aforesaid factors the grace period of 90 days
from the date of commencement of the
Amending Act of 2019 is exceeded, there
again a discretion can be exercised by the
Adjudicating Authority and/or Appellate
Tribunal to further extend time keeping the
aforesaid parameters in mind. It is only in
such exceptional cases that time can be
extended, the general rule being that 330
days is the outer limit within which
resolution of the stressed assets of the Company Appeal (AT) (Insolvency) No. 203 of 2020 7 corporate debtor must take place beyond
which the corporate debtor is to be driven
into liquidation."(emphasis given).
30. In the facts the Corporate
Insolvency Resolution Process period in the
present case is further extended by 90 days
from 16.11.2019. The Resolution
Professional and the members of Committee
of Creditors are directed to expedite the
possibility of achieving resolution of the
stressed assets of the corporate debtor
within the extended period."
and partly allowed the application in the aforesaid terms with cost of Rs. one
lakh to be paid by the 1st Respondent/Applicant in the corpus of the 'Corporate
Debtor'.
3. Challenging the validity, propriety and legality of the Impugned Order
dated 02.01.2020 passed by the Adjudicating Authority, the Learned Counsel for
the Appellant contends that the impugned order was passed in erroneous
exercise of jurisdiction by the Adjudicating Authority.
4. According to the Appellant, the Adjudicating Authority by means of the
Impugned Order had allowed the 1st Respondent / 'Successful Resolution
Applicant' to withdraw its 'Resolution Plan' (approved 'Resolution Plan') which
Company Appeal (AT) (Insolvency) No. 203 of 2020 8 was approved by a majority of 75.36% of the 'Committee of Creditors' and
pending approval before the Authority as per Section 31 of the 'I&B' Code.
Moreover, the 'Resolution Professional' of the 'Corporate Debtor' and the
'Committee of Creditors' were directed to expedite the possibility of achieving
Insolvency Resolution of the 'Corporate Debtor' within the extended period of 90
days from 16.11.2019, although the order was passed only on 2nd January,
2020.
Appellant's Submissions
5. The Learned Counsel for the Appellant submits that the Adjudicating
Authority being a creature of statute (under IBC) is bound within the four corners
of statute and cannot travel beyond its jurisdiction prescribed under the statute
and in support of the same refers to the decisions B. Himmatlal Agrawal v.
Competition Commission of India and ors. 2018 17 SCC page 421 and
Gujarat Urja Vikas Nigam Limited v. Solar Semiconductor Power Company
(India) Private Limited and Ors. (2017)16 SCC 498. Therefore, the stand of
the Appellant is that the Adjudicating Authority had wrongly allowed the plea of
withdrawal of 'Resolution Plan' beyond its jurisdiction.
6. The Learned Counsel for the Appellant comes out with a plea that it is within
the exclusive ambit of the 'Committee of Creditors' to examine and determine the
feasibility and viability of the approved 'Resolution Plan' and the Impugned Order
is an erroneous one because of the reason that the Adjudicating Authority could
not permit a 1st Respondent / 'Resolution Applicant' to withdraw from the
Company Appeal (AT) (Insolvency) No. 203 of 2020 9 commitment made before the 'Committee of Creditors' which had crystallized
into a concluded contract.
7. The plea of the Appellant is that the reasoning of the Adjudicating
Authority in the Impugned Order about the impracticability to implement a plan
by an unwilling 'Resolution Applicant' has conferred sanctity to an unlawful
conduct of the 1st Respondent and also defeated the objective of the Code.
8. The Learned Counsel for the Appellant to lend support to its contention
that an 'Adjudicating Authority' is not to encroach upon the majority decision of
the 'Committee of Creditors' except for the grounds specified under sub-section
(a) to (e) of Section 30(2) of the 'I&B' Code relies on the judgement of the Hon'ble
Supreme Court in the case of 'Committee of Creditors' of 'Essar Steel Ltd.'
Vs. 'Satish Kumar Gupta and Ors.' (Civil Appeal No. 8766-67 of 1999 dated
15.11.2019) and the decision of the Hon'ble Supreme Court in 'K.Sashidhar'
Vs. 'Indian Overseas Bank' reported in 2019(3) Scale Page 6.
9. The Learned Counsel for the Appellant comes out with an argument that the
request for a 'Resolution Plan' prepared as per Section 25(2)(h) of the 'I&B' Code
clearly mentioned that 'no change or supplemental information to the 'Resolution
Plan' shall be accepted after the 'Resolution Plan' submission date and in this
regard the Learned Counsel for the Appellant refers to Clause 1.13.5 of the
'RFRP'.
10. It is represented on behalf of the Appellant that Clauses 1.8.4 of the 'RFRP'
as well as Clause 1.10(1) clearly stipulated that a 'Resolution Plan' is irrevocable
Company Appeal (AT) (Insolvency) No. 203 of 2020 10 and a 'Successful Resolution Applicant' was not permitted to withdraw the
'Approved Resolution Plan'.
11. Yet another contention of the Appellant is that the 1st Respondent /
'Successful Resolution Applicant' had discussed, and consented to a 'Resolution
Plan' after accepting the conditions is not to be allowed to withdraw a mutually
consented 'Resolution Plan' and withdraw from a legally binding Plan based on
the plea of delay, which was not in the hands of 'Committee of Creditors' at all.
12. The Learned Counsel for the Appellant submits that to claim the validity
of the 'Approved Resolution Plan' was only six months is misplaced, as the said
period of six months in clause 1.8.3 of 'RFRP' is the minimum validity period
and in fact Clause 7 of the Approved Resolution Plan when read in the context
of 'RFRP' (of which it was required to be compliant) is only a reference to the
'Resolution Plan' being valid for six months for acceptance of the 'Committee of
Creditors'.
13. The Learned Counsel for the Appellant contends that the 1st Respondent
/ 'Successful Resolution Applicant' in accordance with 'RFRP' had conducted its
own due diligence and appraisal of the 'Corporate Debtor' and after receipt of full
information relating to the affairs of the 'Corporate Debtor' had submitted its
'Resolution Plan' to the 'Committee of Creditor' which was after extensive
negotiations approved by 75.36% majority. Also that it is the stand of the
Appellant that the 1st Respondent / 'Successful Resolution Applicant' continues
to be interested in the 'Corporate Debtor', as is evident from the letter sent by it
Company Appeal (AT) (Insolvency) No. 203 of 2020 11 on 1.6.2020, having seen interest in the 'Corporate Debtor' and emphasizing
that the software licences granted by the 'Corporate Debtor' have become more
relevant in the current circumstances where online education appears to be only
viable medium of education.
14. The Learned Counsel for the Appellant submits that the reliance placed on
the side of 1st Respondent / 'Successful Resolution Applicant' in regard to the
applications filed by Creditors seeking investigations is misconceived because of
the reason that said applications were filed in May, 2018 and the said
applications were disposed of on 9.8.2018(viz. before the orders were reserved
on the approval application).
15. The Learned Counsel for the Appellant brings it to the notice of this
Tribunal that Section 32A of the 'I&B' Code grants immunity to a 'Resolution
Applicant' from any offences committed by the 'Corporate Debtor' prior to the
commencement of CIRP and provides certainty to the 'Successful Resolution
Applicant', that the assets of the 'Corporate Debtor' has represented would be
available in the same manner as at the time of submission of a 'Resolution Plan',
which was recognized in the judgement of this Tribunal in 'JSW Steel Limited'
Vs. 'Mahender Kumar Khandelwal and Anr.' (vide Company Appeal
(AT)(Ins.) No. 957 of 2019). Hence, because of the protection granted u/s 32A
of the Code, the withdrawal of 'Resolution Plan' by the 'Successful Resolution
Applicant' citing SFIO Investigation into the affairs of 'Corporate Debtor' is an
incorrect one and in this connection on behalf of the Appellant a reference was
Company Appeal (AT) (Insolvency) No. 203 of 2020 12 made to the order dated 16.03.2020 of Delhi High Court in W.P. (CRL.) 3037/2019 'Tata Steel BSL Limited' and Ors. Vs. 'Union of India and Ors.'
16. The Learned Counsel for the Appellant points out that the reliance placed
by the 'Successful Resolution Applicant' in regard to the judgement of this
Tribunal in 'Tarini Steel Company Pvt. Ltd.' Vs. 'Trinity Auto Components
Ltd.'(Company Appeal (AT)(Ins.) 75/2018) is not correct because of the reason
that the said judgement had allowed withdrawal of the Plan owing to the onerous
modifications set forth by the Adjudicating Authority itself, thereby altering the
basis of the 'Approved Resolution Plan' therein. Likewise, the reliance placed by
the 1st Respondent / 'Successful Resolution Applicant' in respect of the order of
'Satya Narain Malu' Vs. 'SBM Paper Mills' in MA 1396/2018, 827/2018,
1142/2018 and 828/2018 in CP(IB)-1362(MB)/2017 is an erroneous one, as
in the given case, the withdrawal of the 'Resolution Plan' was allowed on account
of settlement plan submitted by the 'Corporate Debtor' therein, had offered better
value to the creditors of the 'Corporate Debtor'.
17. Continuing further, the Learned Counsel for the Appellant points out that
the reliance placed by the 'Successful Resolution Applicant' on the judgement of
CIRP process of 'Metalyst Forging Ltd.' (Company Appeal
(AT)(Ins.)1276/2019) is of no significance, since in the said case the finding was
in regard to the inadequacy of information in the 'Information Memorandum'
whereas in the present case, no such finding was recorded by the Adjudicating
Authority.
Company Appeal (AT) (Insolvency) No. 203 of 2020 13
18. The Learned Counsel for the Appellant contends that the Adjudicating
Authority firstly had allowed the withdrawal of the 'Approved Resolution Plan'
and later granted only 42 days, when the Insolvency and Bankruptcy Board of
India(Insolvency Resolution Process for Corporate Persons) Regulations, 2016
envisages a minimum period of 105 days to complete the entire process,
demoralizes the interests of 'Committee of Creditors' and other stakeholders of
the 'Corporate Debtor' but also places the 'Corporate Debtor' at the brim of
liquidation.
19. The Learned Counsel for the Appellant submits that upon the 'Approved
Resolution Plan' being put to vote, 74.16% of 'Committee of Creditors' voted in
favour of the 'Approved Resolution Plan'. Later, the 'Chhatisgarh State
Electricity Board Gratuity and Pension Trust' and 'Chhatisgarh State
Electricity Board Provident Fund Trust'(collectively CSEB)(having a vote
share of 1.195%) vide e.mail dated 23.3.2018 requested its vote to be treated as
'yes' for having not participated in lieu of a technical error.
20. On behalf of the Appellant, it is brought to the notice of this Tribunal that
as the voting share in favour of the 'Approved Resolution Plan' would be 75.36%,
the 'Resolution Professional' filed an application CA No. 165(PB)2018 before the
Adjudicating Authority seeking directions among other things on the future
course of action to be adopted and on 28.2.2018, the Adjudicating Authority had
directed the 'Resolution Professional' to file an approval application and the issue
Company Appeal (AT) (Insolvency) No. 203 of 2020 14 regarding the votes received late shall be considered along with the approval
application.
21. The Learned Counsel for the Appellant contends that in view of the law
laid down by this Tribunal in 'Jyoti Structures Ltd.' (Company Appeal)
(AT)(Ins.) No. 461/2018 and upheld by the Hon'ble Supreme Court in Civil
Appeal No. 3434-3436 of 2019 as per order dated 15.04.2019. The e.mail
from 'CSEB' intimating the 'Resolution Professional' in regard to the technical
mal-function and non-recording of its affirmative vote, having been received
earlier to the lapse of 270 days period (i.e. 27.2.2018) and hence, the said plea
is not to be countenanced in the eye of Law.
23. The Learned Counsel for the Appellant contends that the grounds raised
by the 'Successful Resolution Applicant' in CA 1816(PB) of 2019 (withdrawal
application) were raised already and rejected in CA 1252(PB) of 2019 in CP(IB)No.
101(PB) of 2017 (dismissed application) as per order dated 10.07.2019. Further,
once the matter whether on a question of fact or question of Law was decided
between the two parties in one suit or proceeding and the decision is final neither
party will be allowed in future to canvass the said matter again and refers to the
decisions (i) Nagabhushanammal v. C. Chandikeshwaralingam (2016) 4 SCC
434 (ii) Hope Plantations Ltd. v. Taluk Land Board, Peermade and Anr.
(1999) 5SCC 590; and (iii) Satyadhyan Ghosal and Ors. v. Smt. Deorajin Debi
and Anr. AIR 1960 SC 941. When the Adjudicating Authority had rejected the
Company Appeal (AT) (Insolvency) No. 203 of 2020 15 aforesaid pleas and reliefs raised by the 'Successful Resolution Applicant' in the
dismissed application, the withdrawal application' was barred by 'Res Judicata'.
24. The Learned Counsel for the Appellant submits that the plea of the
'Successful Resolution Applicant' and the finding rendered by the Adjudicating
Authority that the prayer for 'withdrawal' was not considered while disposing of
CA 1252(PB)/2019 is in the teeth of the very principle of 'Res Judicata' as
elucidated by various Courts which held that the relief must be deemed to have
been denied for what was claimed but not granted necessarily gets denied in
judicial or quasi-judicial proceedings as per decision 'State Bank of India' Vs.
'Ram Chandra Dubey', (2001) 1 SCC Page 73, reiterated in the decision of
Hon'ble Supreme Court A.P.S.R.T.C. and Ors. Vs. 'B.S. David Paul', (2006)
2 SCC page 282.
25. The Learned Counsel for the Appellant points out that Rule 11 of the
'National Company Law Appellate Rules, 2016' has recognised the inherent
powers in regard to the matters relating to the court for meeting the ends of
justice.
26. The Learned Counsel for the Appellant relies on the decision of Hon'ble
Supreme Court in 'Arcelor Mittal India Pvt. Ltd.' Vs. 'Satish Kumar Gupta'
(2019)2 SCC page 1 at special page wherein at paragraph 86 it is observed
'that the act of the Court shall harm no man'.
27. The Learned Counsel for the Appellant refers to the decision of the Hon'ble
Supreme Court 'Swiss Ribbon' Vs. 'Union of India'; (2019)4 SCC at page 17
Company Appeal (AT) (Insolvency) No. 203 of 2020 16 wherein at paragraph 11 and 12 it is observed that the intent of the Code is
to ensure revival and continuation of the 'Corporate Debtor' as a going concern
and Liquidation is to be only a last resort.
28. The Learned Counsel for the Appellant cites the order of High Court of
Delhi dated 16.3.2020 in WP (Crl.)3037/2019 and Crl. MA 39126/2019 'Tata
Steel BSL Ltd.' and Ors. Vs. 'Union of India and Ors.' wherein at paragraph
6 (by referring to Section 32A(1 of IBC as inserted by the Amendment Act) had
clearly observed that from the express language of the aforesaid provision that a
'Corporate Debtor' would not be liable for any offence committed prior to the
commencement of CIRP and the 'Corporate Debtor' would not be prosecuted if a
'Resolution Plan' was approved by the Adjudicating Authority.
29. The Learned Counsel for the Appellant refers to the order dated
13.03.2020 in WP (Crl.) 712/2020 MA Nos. 5449 and 5450 of 2020 wherein by
relying on Section 32A(1 of IBC)the Writ Petition was allowed because of the fact
that there was no dispute that 'Resolution Plan' was approved by the
Adjudicating Authority and the impugned order dated 16.8.2019 and the
impugned summons dated 21.8.19 were set aside and the impugned complaint
(CC No. 770/2019) against the Petitioner therein was also set aside and further
it was clarified that this order would not affect the prosecution of the erstwhile
promoter or any of the officers who may be directly responsible for committing
the offences in relation to the affairs of the petitioner company.
1st Respondent's Contentions
Company Appeal (AT) (Insolvency) No. 203 of 2020 17
30. Per Contra it is the submission of Learned Counsel for 1st Respondent /
'Resolution Applicant' that the doctrine of 'Res Judicata' or Constructive 'Res
Judicata' has no applicability to the facts of the instant case and its application
to deny a 'Resolution Applicant' is right to withdraw a 'Resolution Plan' after the
expiry of its validity period would result in denial of justice for the
undermentioned reasons:-
a) CA 1252/2019 was filed to seek
information regarding the financial
condition of the Corporate Debtor given the
long lapse of time since the submission of
the Resolution Plan and upon receipt of that
information, to seek (if necessary)
revaluation of the Plan.
b) In the light of law laid down in Deccan
Value case, the Adjudicating Authority
dismissed the application CA 1252/2019
on 10.07.2019 as no ground for revaluation
was made out. Further, the Adjudicating
Authority in CA 1252/2019 had restricted
adjudication to issues concerning the non-
grant of information and material sought by
the Resolution Applicant and hence, the
Company Appeal (AT) (Insolvency) No. 203 of 2020 18 consequent relief of 'revaluation of the Plan'
are indeed 'withdrawal' thereof was not
dealt with.
c) The cause of action for CA No.
1816/2019 was completely different, as it
was premised on an acceptance of the
unavailability of information, and on account
of various factors including the erosion of
commercial substratum of the 'Corporate
Debtor' sought withdrawal of the 'Resolution
Plan' simpliciter.
d) No reasons were furnished and there was
no bar for the 'Resolution Applicant' later
exercising his right and entitlement to
withdraw the 'Resolution Plan' on the basis
that its validity had expired and he was no
longer interested in pursuing the same.
e) The Adjudicating Authority had not
consciously adjudicated the issue of
'withdrawal of 'Resolution Plan' filed by the 1st
Respondent which is evident from the order
dated 10.07.2019 in CA 1252 of 2019 and
Company Appeal (AT) (Insolvency) No. 203 of 2020 19 confirmed by the express findings of the
Adjudicating Authority in the impugned order.
f) The order dated 10.07.2019 in CA
1252/2019(disentitling the 'Resolution Applicant'
to financial information of the 'Corporate Debtor')
cannot act as a bar to the 'Resolution Applicant'
in exercising its right to withdraw the plan (after
the expiry of its validity period), the 'Resolution
Applicant' filed CA 1816/2019 which was
allowed by the impugned order.
g) There is no infirmity in the impugned order
which appreciates that there was no conscious
adjudication of the principal issue that arises in
the present proceedings viz. the right of a
'Resolution Applicant' to withdraw its 'Resolution
Plan' after the expiry of its validity and that the
disposal of CA 1252 of 2019 would not act as a
bar in filing CA 1816/2019 on the principle of
'Res Judicata' or constructive 'Res Judicata'.
31. The Learned Counsel for the 1st Respondent contends that the 'withdrawal
of 'Resolution Plan' was legally permissible as per the terms of the documents
governing the CIRP of the 'Corporate Debtor' and also under the Code. In this
Company Appeal (AT) (Insolvency) No. 203 of 2020 20 connection, the plea of the 1st Respondent is that the contractual stipulations
forming the basis of the 'Resolution Plan' read with the scheme of the code allow
for withdrawal of the 'Resolution Plan' prior to the approval of the Adjudicating
Authority, upon lapse of stipulated time frame. Moreover, the 'Resolution Plan'
was rendered commercially unviable on account of lapse of substantial time and
severe and inordinate delays in the 'Corporate Insolvency Resolution Process'
qua the 'Corporate Debtor'.
32. The Learned Counsel for the 1st Respondent points out that severe mis-
management and gross financial irregularities and fraud in the affairs of
'Corporate Debtor' during the period from (2014-2018) was subsequently
uncovered combined with regulatory and criminal investigations into the
financial affairs of the 'Corporate Debtor'.
33. The Learned Counsel for the Respondent emphatically takes a plea that
the 'RFRP' issued by the 'Committee of Creditors' inviting prospective applicants
to submit 'Resolution Plan' is similar to the request for proposal or invitation to
tender and the 'Resolution Plans' submitted by the Applicants in response to
such invitation or 'offers' / 'proposal' comparable to tenders. In this regard, the
learned Counsel for the 1st Respondent adverts to Clause 1.1.5 of 'RFRP' which
reads as under:-
"The intent of this RFRP is to request
Resolution Plan(s) from Resolution Applicant(s)
who may willing to submit a resolution plan for
Company Appeal (AT) (Insolvency) No. 203 of 2020 21 the Company in accordance with the terms of
this RFRP, the IB Code and other Applicable
Law".
34. The Learned Counsel for the 1st Respondent refers to Clause 1 of the
covering letter for submission of 'Resolution Plan' (format 1, Annexure III to the
RFRP) which runs as follows: -
"We, the undersigned Resolution Applicant
having read and examined in detail the RFRP
and the Information Memorandum, set out the
offer and the related information in relation to the
resolution of Educomp Solutions Ltd."
35. In pith and substance, the stand of the 1st Respondent is that 'RFRP' issued
by the Appellant is an invitation to offer' and that the 'Resolution Plan' is an
'offer' submitted by the 1st Respondent pursuant to the 'RFRP' in short such an
offer being a qualified one, it binds the offer or / promise or i.e. the 'Resolution
Applicant' only when such an offer is accepted as per its term.
36. The other contention advanced on behalf of the 1st Respondent is that the
covering letter for submission of 'Resolution Plan' explicitly points out that all
the terms and conditions of the 'Resolution Plan' would be valid for acceptance
for a period of six months from the date of submission of the Plan and as such
the 'Resolution Plan' submitted by the 1st Respondent is to be a qualified offer,
which is not open for an acceptance for an indefinite period. Also that when
Company Appeal (AT) (Insolvency) No. 203 of 2020 22 there was a delay of several months in the approval of 'Resolution Plan' the 1st
Respondent is at liberty to withdraw from 'RFRP' after completion of six months
from the date of submission of 'Resolution Plan' as per decision of Hon'ble
Supreme Court 'Riya Travel & Tours (India)(P) Ltd. v. C.U. Chengapa,(2001)
9 SCC 512.
37. The Learned Counsel for the 1st Respondent refers to Clause 1.1.6 of
'RFRP' which visualises that the 'Resolution Plan' submitted by the 'Resolution
Applicant' would be binding on all the parties (specifically including the
'Resolution Applicant') only upon the approval of the Adjudicating Authority in
terms of Section 30(6) of the Code. It is the contention of the 1st Respondent
that when such approval is yet to be granted, in view of which, even as per terms
of 'RFRP' the 'Resolution Plan' cannot be said to be binding on the 'Resolution
Applicant' merely upon approval by the 'Committee of Creditors'.
38. The Learned Counsel for the 1st Respondent submits that even from clause
1.10(1) of 'RFRP' the 'Resolution Plan' shall be binding on the 'Resolution
Applicant' only upon the approval of the Adjudicating Authority and it is only
from such point that the 'Resolution Applicant' would not be permitted to
withdraw the 'Resolution Plan'. Therefore, it is quite clear that the 'Application
for Withdrawal' filed by the 'Resolution Applicant' was earlier to the stage of
approval by the 'Adjudicating Authority' u/s 30(6) of the 'I&B' Code.
39. The Learned Counsel for the 1st Respondent takes a stand that the
'Corporate Debtor' was admitted into insolvency on 30.5.2017 by the
Company Appeal (AT) (Insolvency) No. 203 of 2020 23 Adjudicating Authority and that on 13.11.2017 the 'Corporate Insolvency
Resolution Process' was extended by 90 days till 24.2.2018 because of the reason
that there was no significant progress in 'CIRP'. Apart from that, a request for
'Resolution Plans' was issued by the Appellant on 05.12.2017 and pursuant to
the 'RFRP', the 'Resolution Plan' was submitted by the 1st Respondent on
19.02.2018(as amended on 21.2.2018). Further, as the statutory period was
coming to an end on 24.2.2018, at the time of hearing before the Adjudicating
Authority on 27.2.2018, the 'CIRP' qua the 'Corporate Debtor' was extended by
the Adjudicating Authority with a direction to the 'Resolution Professional' to
continue to discharge all its functions as 'Resolution Professional' under the code
till further orders. Later, on 7.3.2018, an application was filed by the 'Resolution
Professional' before the Adjudicating Authority for approval of 'Resolution Plan'.
40. The Learned Counsel for the 1st Respondent brings it to the notice of this
Tribunal that on 2.7.2018 the 'Resolution Applicant' addressed a letter to the
'Resolution Professional' noting that the validity of the 'Resolution Plan' as
expiring in August and that it would be Perforced to among other things,
withdraw the 'Resolution Plan' on account of complete erosion of the commercial
substratum of the 'Corporate Debtor'. However, no reply was received by the 1st
Respondent to the said letter which points out the fact that after August, 2018,
the 'Resolution Applicant' was at full liberty to withdraw its plan and upon such
withdrawal, it would follow that such plan would be not capable of being
implemented. Moreover, after lapse of more than 18 months from the date of
submission of 'Resolution Plan' viz. 19.2.2018 and 27 months from the CIRP Company Appeal (AT) (Insolvency) No. 203 of 2020 24 commencement date, the application for its approval was still pending before the
Adjudicating Authority on 10.09.2019 when the application for withdrawal of the
Plan filed by the 1st Respondent culminated in the impugned order.
41. It is represented on behalf of the 1st Respondent that erosion of
commercial considerations underlying the 'Resolution Plan' / 'offer'/constitutes
sufficient basis for withdrawal of the 'Resolution Plan' and in this connection,
on behalf of the 1st Respondent, reliance is placed of the judgement rendered by
this Tribunal in 'Tarini Steel Company Pvt. Ltd.' V. 'Trinity Auto Company
Ltd. and another' reported in 2018 SCC online NCLAT page 650.
42. The Learned Counsel for the 1st Respondent points out that subsequent to
the submission of 'Resolution Plan', reports of fraud and mis-management of the
affairs of 'Corporate Debtor' related to the period from 2014-2018 emerged and
in a meeting convened on 13.8.2018, the Appellant passed a Resolution with
77.85% for an appointment of an independent agency to conduct a special
investigation audit of the 'Corporate Debtor'. As a matter of fact, the said
Resolution was in pursuance of the orders of the Adjudicating Authority which
took note of the allegations against the 'Corporate Debtor' and directed the
'Resolution Professional' to file an application to that effect and the 'Special Audit'
is yet to be conducted.
43. The Learned Counsel for the 1st Respondent submits that the 'Resolution
Applicant' later discovered the initiation of investigations by Serious Fraud
Investigation office which too led the Resolution Applicant to believe that the
Company Appeal (AT) (Insolvency) No. 203 of 2020 25 affairs of the 'Corporate Debtor' were being severely mis-managed and were
exposed to criminal investigations. Under these identical circumstances, the
'Resolution Plan' was permitted to be withdrawn as it was held to be
commercially unworkable as per order dated 7.2.2020 in CA
(AT)(Ins.)1276/2019, 'Committee of Creditors' of 'Metalyst Forging Ltd.' V.
'Deccan Value Investors L.P. and ors.'. Further that this Tribunal affirmed
the decision of the Adjudicating Authority in 'Deccan Value Investors L.P. and
'DVI PE (Mauritius) Ltd.' Vs. 'Deutsche Bank AG' reported in 2019 SCC
online NCLT page 731.
44. The Learned Counsel for the 1st Respondent submits that an 'Adjudicating
Authority' is to independently satisfy itself that in terms of Section 30(2)(d) there
are adequate provisions for 'implementation and supervision of the 'Resolution
Plan' and this position is well supported by the decisions of Hon'ble Supreme
Court 'K.Shashidhar' V. 'Indian Oil Corporation' 2019 SCC online 257
para 42 and the 'Committee of Creditors' of 'Essar Steel' V. 'Satish Kumar
Gupta and Ors.' 2019 SCC online 1478 at para no. 47.
45. The Learned Counsel for the 1st Respondent takes a plea that it is well
within the powers of the Adjudicating Authority and also this Tribunal to
withhold approval to the Plan and / or allow the withdrawal thereof as per
'Inherent powers'.
46. In regard to the plea of 'Res Judicata', the Learned Counsel for the 1st
Respondent contends that the 'Resolution Applicant' could not have sought
Company Appeal (AT) (Insolvency) No. 203 of 2020 26 withdrawal of the 'Resolution Plan' in CA 1252/2019 without having been
provided with a information and material sought and in view of this aspect
alone, the applicability of the doctrine of 'Res Judicata' or constructive 'Res
Judicata' ought to be ruled out. In fact, the relief prayed for in C.A. 1252/2019
clearly shows that the 'Resolution Applicant' was seeking information and details
relating to the various events and sought to ascertain the financial position of
the 'Corporate Debtor'. As a matter of fact, only consequent upon being provided
with such information and material, that the 'Resolution Applicant' also sought
leave to suitably revaluate and revise the 'Resolution Plan'. Therefore, it is clear
that de hors being provided with the said material, the relief of 'Revaluation' or
revision of the 'Resolution Plan' does not arise at all. When the antecedent relief
(of being provided with the financial information) is not granted, the question of
granting the subsequent relief cannot arise.
47. The Learned Counsel for the 1st Respondent submits that the cause of
action leading to CA No. 1816 of 2019 and the relief sought therein were wholly
indifferent. Indeed, the Adjudicating Authority had denied the requests of the
Appellant to seek information and details relating to the affairs of the 'Corporate
Debtor' and having accepted the said order and given up the right to such
information and material, the 'Resolution Applicant' therefore, merely sought
withdrawal of the 'Resolution Plan' simpliciter.
48. The Learned Counsel for the 1st Respondent refers to the decision of
Hon'ble Supreme Court in 'Escorts Firms Ltd.' V. 'Commissioner Kumaon
Company Appeal (AT) (Insolvency) No. 203 of 2020 27 Division, Nainital, U.P. and Ors., (2004) 4 SCC page 281 at special page
305 wherein it is observed as under: -
"51. Res Judicata is a plea available in
civil proceedings in accordance with
section 11 of the Code of Civil Procedure.
It is a doctrine applied to give finality to
'lis' in original or appellate proceedings.
The doctrine in substance means that an
issue or a point decided and attaining
finality should not be allowed to be
reopened and re-agitated twice over. The
literal meaning of res is 'everything that
may form an object of rights and includes
an object, subject matter or status' and
res judicata literally means: 'matter
adjudged: a thing judicially acted upon or
decided; a thing or matter settled by
judgement'. Section 11 of CPC engrafts
this doctrine with a purpose that a 'final
judgement rendered by a court of
competent jurisdiction on merits is
conclusive as to the rights of the parties
and their privies, and, as to them, Company Appeal (AT) (Insolvency) No. 203 of 2020 28 constitutes an absolute bar to a
subsequent action involving the same
claim, demand or cause of action."
49. The Learned Counsel for the 1st Respondent points out that in the decision
of Hon'ble Supreme Court 'S.Labbai' v. 'Hanifa' AIR 1976 SC 1569 wherein
one of the essential requirements for applicability of the doctrine of 'Res Judicata'
is observed that "The matter directly and substantially in issue in the subsequent
suit must have been heard and finally decided by the court in the first suit....."
50. The Learned Counsel for the 1st Respondent relies on the decision of Hon'ble
Supreme Court 'Kaushik Cooperative Building Society' v. N.Parvathamma
(2017) 13 SCC 138' whereby and whereunder it is observed as follows:-
"To constitute matter resjudicata, the
conditions to be proved are that the litigating
parties are the same, that the subject matter
is also identical and the matter has been
finally decided between the parties by a court
of competed jurisdiction".
51. The Learned Counsel for the 1st Respondent contends that there was no
conscious adjudication on merits of the issues arising in C.A. 1816/2019 in the
earlier order dated 10.9.2019 arising out of CA 1252/2019 and in fact the order
dated 10.9.2019 is not a 'reasoned order' with a view to attract the application of
the doctrine of 'Res Judicata'.
Company Appeal (AT) (Insolvency) No. 203 of 2020 29
52. The Learned Counsel for the 1st Respondent cites the following Supreme
Court decisions: -
i) In the decision Daryo v. State of UP (1962) 1 SCR 574, 591 wherein it is
observed as under: -
"26....If a Writ Petition is dismissed
in limine and an order is pronounced in
that behalf, whether or not the dismissal
would constitute a bar would depend
upon the nature of the order. If the order
is on merits it would be a bar; if the order
shows that the dismissal was for the
reason that the petitioner was guilty of
laches or that he had an alternative
remedy then such dismissal cannot be
treated as creating a bar of res judicata.
It is true that, prima facie, dismissal in
limine even without passing a speaking
order in that behalf may strongly suggest
that the court took the view that there
was no substance in the petition at all;
but in the absence of a speaking order it
would not be easy to decide what factors
Company Appeal (AT) (Insolvency) No. 203 of 2020 30 weighed in the mind of the court and that
make it difficult and unsafe to hold such
a summary dismissal on merits and as
such constitutes a bar of res judicata
against a similar petition filed under
Article 32, because in such a case there
has been no decision on the merits by the
Court..."
ii) In Erach Boman Khavar v. Tukaram Shridhar Bhat (2013) 15 SCC 655
it is held as follows: -
"39. From the aforesaid authorities it is clear
as crystal that to attract the doctrine of res
judicata it must be manifest that there has
been a conscious adjudication of an issue. A
plea of res judicata cannot be taken aid of
unless there is an expression of an opinion on
the merits.
50. The principles stated in Arjun Singh,
Satyadhyan Ghosal and the other authorities
clearly spell out that the principle of res judicata
operates at the successive stages in the same
litigation but, the basic foundation of res
Company Appeal (AT) (Insolvency) No. 203 of 2020 31 judicata rests on delineation of merits and it
has atleast an expression of an opinion for
rejection of an application. As is evident, there
has been no advertence on merits and further
the learned company judge had guardedly
stated two facets, namely, "not necessary to
grant the present Judge's summons" and
"liberty to the applicant to apply if necessary".
On the seemly reading of the order we have no
shadow of doubt that the same not have been
treated to have operated as res judicata as has
been held by the Division Bench. Therefore, the
irresistible conclusion is that the Division Bench
had fallen into serious error in dislodging the
order leave by the learned Company Judge to
file a fresh suit."
iii) In Ferro Alloys Corpn.Ltd. & Anr. V. Union of India (1999) 4 SCC 149 it
is observed as follows: -
"24. It is obvious that in the
aforesaid proceedings no issue arose for
consideration as to whether ....Consequently
whatever observations might have been made by
Company Appeal (AT) (Insolvency) No. 203 of 2020 32 this Court while dealing with Issue 4, cannot be
said to be an express decision on the vexed
question as to whether the assessment of the
need for chrome ore, so far as the appellant is
concerned.. It is therefore difficult to agree with
the contention of the learned Senior Counsel for
the respondents that such an issue was
expressly adjudicated upon by this court in the
aforesaid decision and the findings thereon,
therefore, could not be made the subject matter
of fresh proceedings between the parties. Not
only were the contesting parties not heard on the
issue but also there was no final decision thereon
inter se these parties...."
iv) and the observations in Daryo v. State of UP (1962) 1 SCR 574, 591 were
supported by the decision of Hon'ble Supreme Court in Kunhayammed v. State of
Kerala (2000) 6 SCC at page 359.
v) In Ajay Arjun Singh v. Sharadendu Tiwari and Ors. 2016 6 SCC 576 it is
observed and held that 'a vague, cryptic and casual order in former proceeding
containing finding that was neither directly in issue nor properly examined cannot
amount to 'Res Judicata'.
Company Appeal (AT) (Insolvency) No. 203 of 2020 33
53. The Learned Counsel for the 1st Respondent points that Section 74 of the 'I&B'
Code which prescribes punishment for breaching the terms of moratorium order or
'Resolution Plan' u/s 14 is inapplicable to the facts of the instant case and in this
connection relies on the decision Ashok Paper Kamgar Union V. Dharam Godha,
(2003) 11 SCC page 1 wherein it is held that 'in order to constitute contempt the
order of the court must be of such a nature which is capable of execution by the
person charged in normal circumstances. It should not require any extraordinary
effort nor should be dependent either wholly or in part, upon any act or omission of
a third party for its compliance. This has to be judged having regard to the facts
and circumstances of each case.
54. Also the Learned Counsel for the 1st Respondent refers to the decision
Chhotey Lal V. L.Chaukilal Alias Hari Shankar 1952 SCC wherein at para 5 it is
among other things observed that what is material is the existence of the intention
not to pay the demanded arrears and not the reason or motive for that intention.
55. The Learned Counsel for the 1st Respondent seeks in aid of the decision of
Hon'ble Supreme Court S.Sundaram Pillai V. Pattabiraman (1985) 1 SCC at page
591 at special page 606 wherein at paragraph 26 it is observed as under:-
...." a consensus of the meaning of
the words willful defaults appears to indicate
that default in order to be willful must be
intentional, deliberate, calculated and
conscious, with full knowledge of legal
Company Appeal (AT) (Insolvency) No. 203 of 2020 34 consequences flowing therefrom. Taking for
instances, where a tenant commits default after
default despite oral demands or reminders and
fails to pay the rent without any just or lawful
cause, or it cannot be said that he is not guilty
of willful default because such a course of
conduct manifestly amounts to willful default
as contemplated either by the act or by other
Acts."
2nd Respondent's Pleas
56. The Learned Counsel for the 2nd Respondent submits that three
'Financial Creditors' of the 'Corporate Debtor' filed applications seeking a
Special Investigation Audit / Investigation into the affairs / certain
transactions entered into prior to the 'CIRP' and that 'Financial Creditor' and
'COC' Members had filed CA 358/2018(IFC applications) on 3.5.2018, Axis
Bank ('Financial Creditor'/COC Member) filed CA 448(PB) of 2018 on
31.5.2018 and State Bank of India preferred CA 639(PB) of 2018 around July,
2018 seeking investigation of the affairs / transactions of the 'Corporate
Debtor' with respect to the statements / irregularities in the affairs of
'Corporate Debtor' in its Annual Accounts on the basis of certain articles /
Media Reports published in a publication 'the Wire'.
Company Appeal (AT) (Insolvency) No. 203 of 2020 35
57. According to the 2nd Respondent the aforesaid applications along with
the plan approval application were heard by the 'Adjudicating Authority' and
that the 'Resolution Professional' was directed to convene COC meeting to
discuss about these applications and pursuant to the directions in terms of the
order dated 9.8.2018, the 13th COC meeting of the 'Corporate Debtor' took place
on 13.8.2018 and a 'Resolution' for conducting special investigation audit of
the 'Corporate Debtor' by an independent agency was approved by the
'Committee of Creditors' by voting share of 77.85%. Also, it was resolved that
an application would be filed by the 'Resolution Professional' seeking consent
/ order of the Adjudicating Authority to conduct the 'Special Investigation
Audit'.
58. The Learned Counsel for the 2nd Respondent points out that the
'Resolution Professional' filed CA 793(PB) of 2018 Investigation Audit Application
in view of the order dated 28.2.2018 and in accordance with the resolutions
passed in 13th 'Committee of Creditors' meeting, seeking directions to carry out
the investigation audit of the 'Corporate Debtor'. As a matter of fact, at this point
of time, the 1st Respondent / 'Resolution Applicant' was participated in the
proceeding in the matter and was aware of all directions issued by the
Adjudicating Authority in respect of these applications.
59. The Learned Counsel for the 2nd Respondent brings to the notice of this
Tribunal that on 4.10.2018 the Adjudicating Authority had directed the
'Resolution Professional' to file an affidavit in relation to the transactions carried
Company Appeal (AT) (Insolvency) No. 203 of 2020 36 out by the 'Corporate Debtor' as per section 43,45,50 and 66 of the 'I&B' Code.
Hence, the 'Resolution Professional' filed a short affidavit dated 8.,10.2018
pertaining to a Transaction Audit' conducted by BDO u/s 43,45,50 and 66 of the
Code, on 6.12.2016. In fact, by means of the said affidavit, the 'Resolution
Professional' mentioned that on the basis of Books of Accounts and other relevant
materials, no transactions in his opinion were found which required to be avoided
or were fraudulent in terms of Section 43, 45 and 60 of the Code.
60. The Learned Counsel for the 2nd Respondent contends that the 'investigation
audit application' was heard on numerous dates and finally orders were reserved
in the said audit application. However, in this application no orders came to be
passed by the Adjudicating Authority as the approval application (CA 195/2018)
itself was heard and reserved for orders on 10.1.2019. Therefore, in the absence
of any direction under the investigation audit application by the Adjudicating
Authority, the investigative audit was not conducted. In this connection, the
Learned Counsel for the 2nd Respondent submits that in the first withdrawal
application the 1st Respondent / 'Resolution Applicant' among other things sought
a relief to direct the 'Resolution Professional' to supply a copy of Special
Investigation Audit to it forthwith and when no audit was conducted, the question
of not providing the report as contended by the 1st Respondent / 'Resolution
Applicant' does not arise.
61. On behalf of the 2nd Respondent, it is brought to the notice of this Tribunal
that the Central Bureau of Investigation had conducted search at the Corporate
Company Appeal (AT) (Insolvency) No. 203 of 2020 37 Office of the 'Corporate Debtor' on 11.2.2020 and that the said search was
conducted on the basis of 'First Information Report' lodged by the State Bank of
India on 10.2.2020 on its behalf and various 'Consortium Banks'. Also, that the
CBI team took numerous documents from the Corporate Office of the 'Corporate
Debtor' and that the list of documents' taken by the Central Bureau of
Investigation was circulated to the members by way of email dated 29.3.2020 prior
to the holding of 16th COC meeting dated 30.3.2020.
62. The Learned Counsel for the 2nd Respondent points out that later on
numerous occasions the CBI team had visited the corporate office of the 'Corporate
Debtor' and remained there for 15 days and requisitioned the customer
agreements relating to financial year 2011-2012 and an intimation of search
conducted by the Central Bureau of Investigation as well as list of documents
provided to CBI was shared with the COC through email dates 17.2.2020 and
19.2.2020 and later on 29.3.2020.
63. The Learned Counsel for the 2nd Respondent points out that the 'Ministry of
Corporate Affairs' through its order No. 32/2018/SFIO/CL-II dated 01.08.2018
had ordered an investigation into the affairs of 'Corporate Debtor' by the Serious
Fraud Investigation Office and that the 'Resolution Professional' visited the SFIO
office on 25.9.2018 for internal discussions and the 1st communication
requisitioning documents / information was received from the said office by the
'Resolution Professional' during October, 2018 and that various documents /
information were duly provided to the said office based on requisition and further
Company Appeal (AT) (Insolvency) No. 203 of 2020 38 is being provided to them as and when required and that the last communication
received from SFIO was around 22.6.2020. Added further, presently the CBI and
SFIO proceedings are pending and continuing.
64. Evaluation
Before the Adjudicating Authority in CA 1252/2019 in (IB) 101(PB) of 2017
the 1st Respondent / Applicant had prayed the undermentioned reliefs: -
(i) Direct that the Ld. 'Resolution Professional' a
copy of the Special Investigation Audit to the
Resolution Applicant forthwith;
(ii) Direct that the Ld. Resolution Professional
supply a copy of the Certificates under Section
43,45,50 and 66 of the Insolvency and
Bankruptcy Code, 2016 to the Resolution
Professional forthwith;
(iii) Withhold approval of the Resolution Plan
sanctioned by the Committee of Creditors of
the Corporate Debtor, as filed before this
Hon'ble Tribunal on 11.04.2018, pending
detailed consideration of the same by the
Resolution Applicant;
(iv) Grant the Resolution Applicant sufficient
time to re-evaluate its proposals contained
Company Appeal (AT) (Insolvency) No. 203 of 2020 39 in the Resolution Plan, and also to suitably
revise/modify and/or withdraw its
Resolution Plan;
(v) Pass any other order(s), and/or any other
consequential reliefs as deemed fit and
proper by this Hon'ble Tribunal in the facts
and circumstances of the case.
65. The Adjudicating Authority on 10.7.2019 had observed that "this is
an application filed by one 'Ebix Singapore Pvt. Ltd.' seeking re-
valuation of the Resolution Plan submitted by it before the Resolution
Professional" and dismissed CA No. 1252(PB)/2019 stating that there was no
ground for considering the prayer sought in the application was made out.
66. Again, the 1st Respondent / 'Resolution Applicant' filed CA No. 1310
of 2019 and sought the following reliefs:-
i. Allow the Resolution Applicant to
withdraw the Resolution Plan dated 19.02.2018
(along with the Addendum/Financial Proposal
dated 21.02.2019) submitted by it, and as
approved by the Committee of Creditors;
ii. Direct the Ld. Resolution
Professional and/or Educomp Solutions
Limited and the Committee of Creditors to
Company Appeal (AT) (Insolvency) No. 203 of 2020 40 refund the Earnest Money Deposit of Rs.
2,00,00,000/- furnished by the Resolution
Applicant in respect of the Resolution Plan;
iii. Withhold approval of the Resolution Plan
sanctioned by the Committee of Creditors of
the Corporate Debtor, as filed before this
Hon'ble Tribunal on 07.03.2018 and recorded
vide order dated 11.04.2018, pending detailed
consideration of the same by the Resolution
Applicant;
iv. Pass any other order(s), and/ or any other
consequential reliefs as deemed fit and proper
by this Hon'ble Tribunal in the facts and
circumstances of the case.
67. The Adjudicating Authority in CA 1310(PB)/2019 on 5.9.2019 had
observed the following: -
"In para 'B(xii)' under the caption 'facts of the
case', the following averments have been made
"xii. That the present Applicant had also filed
an Application dated 05.07.2019 bearing
PB/1A/1252/2019 under Section 60(5) of the
Company Appeal (AT) (Insolvency) No. 203 of 2020 41 Code, seeking revision/revaluation of the
Resolution Plan. However, the same was
dismissed by this Hon'ble Tribunal and during the
course of hearing in the said Application, this
Hon'ble Court put it to the Resolution Applicant to
withdraw the Resolution Plan by way of a
separate Application. The present Application for
withdrawal of the Resolution Plan is being made
in pursuance of the same. Copy of Application
dated 05.07.2019 bearing PB/IA/1252/2019
under Section 60(5) of the Code, seeking
revision/revaluation of the Resolution Plan is
annexed hereto as Annexure 4."
The italic portion of the aforesaid para
shows that the prayer for withdrawal of the
Resolution Plan has been made inter alia on the
suggestion of the Court which is neither reflected
in the order nor is born out from any record. Such
an averments imputing to the Court something
which has never been said is condemnable. The
cause of action cannot be based on any such
things."
Company Appeal (AT) (Insolvency) No. 203 of 2020 42 and accordingly dismissed the application with liberty to the Applicant to file
fresh one on the same cause of action, if so advised.
68. The 1st Respondent / 'Resolution Applicant' filed yet another CA
1816/2019 before the Adjudicating Authority and sought the following reliefs: -
i. Allow the Resolution Applicant to
withdraw the Resolution Plan dated 19.02.2018
(along with the Addendum/Financial Proposal
dated 21.02.2019) submitted by it, and as
approved by the Committee of Creditors;
ii. Direct the Ld. Resolution
Professional and/or Educomp Solutions
Limited and the Committee of Creditors to
refund the Earnest Money Deposit of Rs.
2,00,00,000/- furnished by the Resolution
Applicant in respect of the Resolution Plan;
iii. Withhold approval of the Resolution Plan
sanctioned by the Committee of Creditors of
the Corporate Debtor, as filed before this
Hon'ble Tribunal on 07.03.2018 and recorded
vide order dated 11.04.2018, pending detailed
consideration of the same by the Resolution
Applicant;
Company Appeal (AT) (Insolvency) No. 203 of 2020 43 iv. Pass any other order(s), and/ or any other
consequential reliefs as deemed fit and proper
by this Hon'ble Tribunal in the facts and
circumstances of the case.
69. It is the plea of the 1st Respondent / 'Resolution Applicant' in CA No. 1252
of 2019 that it is to be furnished with full details as to the financial position of
the 'Corporate Debtor' and also information as to various illegal and fraudulent
transactions conducted by it and the failure to furnish the necessary details
amounts to a denial of material information, which is in negation of Section 29
of the 'I&B' Code. Furthermore, the 1st Respondent would have to take on
extreme financial positions on the basis of 'Resolution Plan' and substantial
changes in the financial position of the 'Corporate Debtor' would in law and in
equity deserve reconsideration. Moreover, to protect the interests of
shareholders, the copy of the special investigation audit may be made available
to the 'Resolution Applicant'. That apart, the 'Resolution Professional' prayed
for the supply of certificates u/s 43,45,50 and 66 of the 'I&B' Code to the
'Resolution Professional' forthwith.
70. It comes to be known that no audit was conducted in respect of the (i) relief
prayed for by the 1st Respondent /'Resolution Applicant' in CA 1252/2019 and
as such it is held by this Tribunal that the question of non-supply of the copy of
Special Investigation Audit would not arise on any count.
Company Appeal (AT) (Insolvency) No. 203 of 2020 44
71. In regard to the (ii) relief prayed for by the 1st Respondent /'Resolution
Applicant' in CA 1252/2019 that the 'Resolution Professional' may be directed
to supply with a copy of certificates Under Sections 43,45,50 and 66 of the 'I&B'
Code to the 'Resolution Applicant', it is brought to the notice of this Tribunal on
behalf of the 2nd Respondent/'Resolution Professional' that a short affidavit was
filed by the 'Resolution Professional' dated 8.10.2018 relating to 'transaction
audit' conducted by BDO as per Sections 43,45,50 and 66 of the 'I&B' Code on
6.12.2016 and through the said affidavit, the 'Resolution Professional'
mentioned that on the basis of books of accounts and other relevant material no
transactions in his opinion were found which needed to be avoided or were
fraudulent as per Sections 43,45,50 and 66 of the 'I&B' Code. Indeed, there may
not be any embargo for the 1st Respondent/'Resolution Applicant' to obtain a
copy of the aforesaid short affidavit directly from the Learned Counsel from the
2nd Respondent /'Resolution Professional' and to subjectively satisfy itself in this
regard.
72. However, the Adjudicating Authority while passing the order of dismissing
the application in CA No. 1252(PB)/2019 dated 10.7.2019 had not specifically
dealt with the aspect of supply of copy of certificates under Sections 43,45,50
and 66 of the 'I&B' Code. Likewise, the (iii)(rd) relief withholding of approval of
'Resolution Plan' sanctioned by the 'Committee of Creditors' of 'Corporate Debtor'
was also not expressly adverted to by the Adjudicating Authority at the time of
dismissing the CA No.1252(PB)/2019. To put it precisely, the Adjudicating
Authority while dismissing CA No.1252(PB)/2019 on 10.7.2019 had merely Company Appeal (AT) (Insolvency) No. 203 of 2020 45 mentioned about the ivth relief prayed for by 1st Respondent /'Resolution
Applicant' viz. the revaluation of the 'Resolution Plan' submitted by it before the
'Resolution Professional' but not granted the said relief but merely mentioned
that "no ground for considering the prayer sought in the application is made out"
by passing a speaking order but merely mentioned, no ground for considering
the prayer sought in the application is made out and the said application was
dismissed as such.
73. It is relevant to point out that the relief of withholding of 'approval of
Resolution Plan' made in CA No.1252(PB)/2019 was again claimed by the 1st
Respondent /'Resolution Applicant' in CA No.1310/2019 as iiird relief. The relief
prayed for in CA 1310/2019 by the 1st Respondent/'Resolution Applicant' to
allow him to withdraw the 'Resolution Plan' dated 19.2.2018 etc. was not claimed
in CA 1252 of 2019 similarly, the iind relief in CA 1310 of 2019 claiming refund
of earnest money deposit of Rs. 2/- crores from the 'Resolution Professional'
and/or 'Educomp Solutions Ltd.' furnished by the 'Resolution Applicant' in
respect of 'Resolution Plan' was not claimed in CA 1252 of 2019.
74. It is evident that the Adjudicating Authority while dismissing the CA No.
1310(PB)/2019 on 5.9.2019 with certain observations made against the 1st
Respondent had granted to it, to file fresh one on the same cause of action, if so
advised and resting on the said liberty, the 1st Respondent/Applicant had filed
yet another CA 1816 of 2019 wherein the impugned order was passed by the
Adjudicating Authority on 2.1.2020.
Company Appeal (AT) (Insolvency) No. 203 of 2020 46 Res Judicata
75. In regard to the principle of 'Res Judicata' it is to be pointed out that the
said principle is a prohibition against the Court / Tribunal. An inter-party order
passed by a competent Tribunal binds them even if it is an erroneous one. If an
order is passed in a given proceedings and the same became final, then in Law,
it would be binding at a later stage of the proceeding, in the considered opinion
of this Tribunal. 'Res Judicata' prohibits an 'inquiry' at the very threshold and
bar the trial of a suit or a given proceeding.
76. The Rule of constructive 'Res Judicata' is enshrined in explanation iv of
Section 11 of the Civil Procedure Code. In fact, the doctrine of 'Res Judicata'
applies to all judicial proceedings and equally to all quasi-judicial proceedings
before Tribunals. When any matter might and ought to have been raised as a
ground of defence in an earlier proceeding but that was not made, then in Law
to avoid plurality of litigations and to bring about finality in it, such matter was
deemed to have been constructively in issue and as such is taken as
'determined'.
77. In the decision 'Ram Kirpal' V. 'Rup Kurai(1883)11 I.A. 37 the privy
Council held that an interlocutory judgement in a suit is binding upon the
parties in every proceeding in that suit.
78. Further, a party is to claim all the reliefs as available at the time of filing
of an 'Application'. Any intentional omission bars the 'Second Application'.
Also, that if a party is aware of his / its claim and omitted to sue for it, it will be
Company Appeal (AT) (Insolvency) No. 203 of 2020 47 precluded from suing for it again, even though the said omission is an
involuntary or an accidental one, as opined by this Tribunal.
79. It is to be pertinently pointed out that if a relief is claimed in a suit but is
not expressly granted in the 'Decree', it will be deemed to have been refused, and
the matter in respect of which the relief is claimed will be 'Res Judicata', as per
decision 'Rock Tyres Chandigarh' V. 'Ajit Jain' AIR 1998 P&H at page 202.
80. In regard to the aspect of 'cause of action' it means that all essential fact
constituting the right and its infringement. A second claim petition raising
issues which could have been raised in the first claimed petition and which were
relatable to the cause of action' is barred as per decision of Hon'ble Supreme
Court 'K.V. George, Secretary to Govt.', Trivandrum reported in AIR 1990
SC page 53.
81. In the instant case, the 1st Respondent / 'Resolution Applicant' had
omitted to claim the relief No. (i) and (ii) viz. to permit him to withdraw the
'Resolution Plan' dated 19.2.2018 and the claim of seeking refund of earnest
money deposit of Rs. 2/- crores furnished by it in respect of the 'Resolution Plan'
in CA 1252 of 2019 and as such it is precluded from suing for it (by way of filing
CA 1310/2019) even though such omission may be either an intentional or
accidental or involuntary one.
82. Although the iiird relief of withholding of approval of 'Resolution Plan'
sanctioned by the 'Committee of Creditors' is very same one claimed in CA No.
1252 of 2019 is the very same one as iiird relief in CA 1310/2019 and
Company Appeal (AT) (Insolvency) No. 203 of 2020 48 notwithstanding the fact the same was not dealt with in CA 1252 of 2019 order
dated 10.7.2019, in view of the dismissal of said CA 1252(PB)/2019 by the
Adjudicating Authority and the said order which had attained finality and more
so in the absence of any 'Appeal' being filed against the said order, then the
dismissal order of CA 1252 of 2019 order dated 10.7.2019 binds the 1st
Respondent/'Resolution Applicant' as an 'Inter-se' party.
83. In so far as the plea of the 1st Respondent / 'Resolution Applicant' that it
was constrained to file CA 1310(PB)/2019 based on the suggestion of the
Adjudicating Authority and in the absence of same not being borne out from any
record or neither reflected in the order passed in CA1252/2019 dated 10.7.2019,
it was not open to the 1st Respondent to file CA 1310(PB)/2019 and the
Adjudicating Authority had observed that the 'cause of action' could not be
based on such things and dismissed the CA 1310(PB)/2019 granting liberty to
the 1st Respondent / 'Resolution Applicant' to file fresh one on the same cause
of action, if so advised.
84. Coming to the aspect of the plea of the 1st Respondent / 'Resolution
Applicant' that it filed CA 1816/2019 before the Adjudicating Authority only
based on the liberty being granted to it to file the same on same 'cause of action',
if so advised, as per order dated 10.7.2019 in CA 1310(PB)/2019, this Tribunal
pertinently points out that the Adjudicating Authority in the particular
circumstances of the present case has no power to grant /reserve liberty to
bring a fresh application and hence, the subsequent application filed by the 1st
Company Appeal (AT) (Insolvency) No. 203 of 2020 49 Respondent /'Resolution Applicant is barred by the principle of 'Res Judicata'
notwithstanding the liberty to file fresh one.
85. At this juncture, it is worth to recall and recollect that decision in 'Watson'
V. 'Collector of Rajshahye' reported in (1869)12 MIA 160, 12 WR 43 PC
wherein the former suit was dismissed for the plaintiff's failure to produce
evidence but a direction was given that a plaintiff could institute a fresh
proceeding as if no suit was brought but it was held that the subsequent suit
was barred by 'Res Judicata' for the reservation was of no effect.
86. In CA 1816/2019 the 1st Respondent / 'Resolution Applicant' had stated
that the 'Corporate Insolvency Resolution Process' against the 'Corporate Debtor'
had far exceeded the statutory time line by more than 17 months and that since
the financial considerations underlying the 'Resolution Plan' were no longer
justifiable to it and that apart it is extremely concerned with the investigation
that was conducted by the SFIO into the affairs of the Company, the 'Resolution
Plan' ought to be allowed to be withdrawn by it.
87. Although the Adjudicating Authority in the impugned order in CA
1816(PB)2018 in Company Petition No. (IB)-101(PB)/2017 dated 2.1.2020 at
paragraph 11 had observed that 'while dismissing CA No. 1252(PB)/2019 the
prayer for withdrawal of 'Resolution Plan' was neither considered nor was ever
dealt with. The issue of withdrawal of 'Resolution Plan' by the Applicant has
never been considered consciously on merit and / or adjudicated upon in CA No.
1252(PB)/2019 and proceeded to mention that 'doctrine of constructing 'Res
Company Appeal (AT) (Insolvency) No. 203 of 2020 50 Judicata' does not apply to the issues/points, or any 'lis' between the parties
that was not decided previously and despite been pleaded was not considered by
court/Tribunal and expressly dealt with in the order so passed etc., this Tribunal
is of the considered view that these observations are not legally tenable because
of the latent and patent fact that the grounds raised by the 1st Respondent /
'Successful Resolution Applicant' in CA 1816(PB)2018 (withdrawal application)
were projected earlier and rejected in CA No. 1252(PB)/2019 through an order
dated 10.7.2019. Furthermore, the plea of the 1st Respondent / 'Successful
Resolution Applicant' and the finding of the Adjudicating Authority that the
prayer for withdrawal was not considered while disposing of CA No.
1252(PB)/2019 is quite in tune with the very principle of 'Res Judicata' which
means that the reliefs should be deemed to have been denied when what were
claimed being 'not granted' which unerringly points out that they were denied or
refused by the Adjudicating Authority. Even an order / decision of a competent
Court/Tribunal on a point of Law operates as 'Res Judicata'. The principle of
'Res Judicata' is that cause of action for second proceeding merged in first
proceeding does not survive any more. In reality, 'Res Judicata' precludes a
party from averring the same thing in 'successive litigations'. As such, the
contra view taken by the Adjudicating Authority that the doctrine of constructive
'Res Judicata' does not apply to the issues/points or any 'lis' between the parties
that was not decided previously etc. is negatived by this Tribunal. Per contra,
unhesitatingly this Tribunal holds that the withdrawal application CA
Company Appeal (AT) (Insolvency) No. 203 of 2020 51 1816(PB)2019 is barred by the principles of 'Res Judicata' / Constructive 'Res
Judicata'.
Withdrawal of Resolution Plan
88. In regard to the plea of 'withdrawal of Resolution Plan' made in CA
1816/2019 before the Adjudicating Authority, the 1st Respondent / 'Resolution
Applicant' had averred that the 'Insolvency Resolution Process' in regard to the
Company commenced on the date of the admission of petition u/s 9 of the Code
on 30.5.2017 and the statutory period of limitation for completion of proceedings
under the 'I&B' Code viz. 180 days lapsed on 30.11.2017 and further 90 days
period was extended as per Section 12 of the Code, which came to an end of
30.01.2017. As a matter of fact, the statutory permitted period of 270 days for
completion of 'Corporate Insolvency Resolution Process' had expired and more
than 24 months had passed since that date.
89. According to the 1st Respondent / 'Resolution Applicant' the
financial/commercial considerations underlying the 'Resolution Plan' are no
longer viable to it and that the financial position and profile of the 'Corporate
Debtor' may have altered and / or deteriorated significantly and further that the
Special Investigating Audit of the Company between 2014 and 30.1.2018 was
subsequently never conducted, the 'Resolution Plan' ought to be permitted to be
withdrawn by it and that the Adjudicating Authority based on the facts of the
case had allowed the prayer for withdrawal of 'Resolution Plan' with cost etc. and
the said impugned order in CA 1816(PB) of 2019 is valid and justifiable one.
Company Appeal (AT) (Insolvency) No. 203 of 2020 52
90. In response, it is the stand of the Appellant that the reliance placed by the
1st Respondent / 'Resolution Applicant' in respect of clause 1.8.3 of 'RFRP' read
along with Clause 7 of the 'Approved Resolution Plan' to claim the validity of the
'Approved Resolution Plan' was only six months is an incorrect one because of
the reason the said six months period in clause 1.8.3 of 'RFRP' is the minimum
validity period. Further, Clause 7 of the 'Approved Resolution Plan' read in the
context of 'RFRP' is only a reference to the 'Resolution Plan' being valid for six
months for acceptance of the 'Committee of Creditors' and in short post
'Committee of Creditors' approval the 'Resolution Plan' is a statutory binding
contract only conditional to the approval of Adjudicating Authority which can be
refused only on account of non-compliance of the conditions mentioned in
Section 30(2) of the Code which is conspicuously absent in the present case.
Therefore, it is submitted on behalf of the Appellant that the 1st Respondent /
'Resolution Applicant' is bound by the 'Approved Resolution Plan' duly accepted
by the 'Committee of Creditors'. On behalf of the Appellant, a reliance is placed
upon the judgement of this Tribunal in Apollo Jyoti LIC and Ors. v. Jyoti
Structures Ltd. Company Appeal (AT)(Ins.) No. 461/2018 dated 19.03.2019
wherein it is observed that the 'Committee of Creditor' is empowered to change
its decision on rejection of 'Resolution Plan' but within 270 days.
91. The aim of 'Resolution' is for maximization of the value of Assets of the
'Corporate Debtor' and thereby for all creditors. The 'I&B' code defines
'Resolution Plan' as a plan for insolvency resolution of the 'Corporate Debtor' as
a going concern. It is to be remembered that no one is either buying or selling
Company Appeal (AT) (Insolvency) No. 203 of 2020 53 the 'Corporate Debtor' through 'Resolution Plan'. A 'Resolution Applicant' may
furnish a 'Resolution Plan' to the 'Resolution Professional' who is then to examine
the said plan to see that it conforms to the requirements of Section 30(2) of the
Code. If the plan satisfies the such requirements, the plan is to be placed before
the 'Committee of Creditors' for its approval u/s 30(3) and can be approved by
the 'Committee of Creditors' by a court of not less than 66% under Sub-Section
(4).
92. After the approval of the 'Resolution Plan' it is to be submitted to the
'Adjudicating Authority' under Section 31 of the Code. The Adjudicating
Authority at this juncture, is to apply its judicial mind to the 'Resolution Plan'
so presented and after being subjectively satisfied that the plan meets or does
not meet the requirements mentioned in Section 34 of the Code may either
approve or reject such plan.
93. Be it noted, that subsequent to the approval of 'Resolution Plan' by an
Adjudicating Authority an application may be filed before the Adjudicating
Authority by a person in-charge of the management or control of the Business
and operations of the 'Corporate Debtor' for an order seeking the assistance of
the local district administration in implementing the terms of a 'Resolution Plan'.
94. Although the 1st Respondent/'Resolution Applicant' had taken a plea in
that it is not bound by the 'Resolution Plan' submitted by it and is at liberty to
withdraw from the 'RFRP' after the completion of six months from the date of
submission of the 'Resolution Plan', this court holds that the Adjudicating
Authority after approval of the 'Resolution Plan' by the 'Committee of Creditors'
Company Appeal (AT) (Insolvency) No. 203 of 2020 54 had no jurisdiction to entertain or to permit the withdrawal application filed by
the 1st Respondent/'Resolution Applicant'.
95. In the instant case, notwithstanding the fact only upon the approval of the
'Adjudicating Authority' the 'Resolution Plan' of the 'Resolution Applicant' would
be binding on all the parties and further that the application for withdrawal was
filed by the 1st Respondent/'Resolution Applicant' was filed earlier to the stage
of 'Approval' by the 'Adjudicating Authority' yet this Court comes to an cocksure
conclusion that the 'Adjudicating Authority', in law cannot enter into the arena
of the majority decision of the 'Committee of Creditors' other than the grounds
mentioned in Section 32(a to e) of the 'I&B' Code. Moreover, after due
deliberations, when the 1st Respondent/'Resolution Applicant' had accepted the
conditions of the 'Resolution Plan' especially keeping in mind the ingredients of
Section 25(2)(h) of the 'Code' to the effect that 'no change or supplementary
information to the 'Resolution Plan' shall be accepted after the submission date
of 'Resolution Plan' then it is not open to the 1st Respondent/'Resolution
Applicant' to take a 'topsy turvy' stance and is not to be allowed to withdraw
the approved 'Resolution Plan'.
96. Coming to the aspect of there being a delay in completion of 'Corporate
Insolvency Resolution Process' of the 'Corporate Debtor' i.e. after lapse of more
than 18 months from the date of submission of the 'Resolution Plan' (i.e.
19.2.2018) and 27 months from the 'Corporate Insolvency Resolution Process'
commencement date the application for its approval was still pending before the
Adjudicating Authority on 10.09.2019, when the application for withdrawal of
Company Appeal (AT) (Insolvency) No. 203 of 2020 55 plan was filed culminating in the impugned order, it is to be relevantly pointed
out by this Tribunal that when the orders on the approval application were
reserved by the Adjudicating Authority then such delay cannot be taken
advantage of by a litigant because of the fact that 'Actus curiae neminem
gravabit' i.e. the act of Court shall harm no person which is embedded in
jurisprudence( vide Jang Singh V. Brij Lal, 1964) 2 SCR page 146 at special
page 149. 97. The 2nd Respondent had clearly pointed out before this
Tribunal that no special investigation audit was conducted and, therefore, the
1st Respondent/'Resolution Applicant' cannot have a grievance that the
'Resolution Professional' had not supplied it a copy of the said Audit Report.
Further, the CBI and SFIO proceedings initiated against the 'Corporate Debtor'
are pending and hence, and in any event Section 32A of the 'I&B' Code grants
immunity to the 1st Respondent/'Resolution Applicant' in respect of the offences
committed by the 'Corporate Debtor' before the start of 'CIRP'. Also, that it
specifies that the assets of the 'Corporate Debtor' as represented will be available
in the right manner as at the time of furnishing of 'Resolution Plan'. When that
be the fact situation, the 1st Respondent/'Resolution Applicant' taking an
umbrage of pending 'SFIO investigation' of the affairs of 'Corporate Debtor' or the
CBI investigation to file CA 1816(PB) of 2019 (withdrawal application) is
unworthy of acceptance.
98. It must be borne in mind that the 1st Respondent/'Resolution Applicant'
even after the expiry of six months had proceeded with the approval of the
'Resolution Plan' and the fact of the matter is that the 'Resolution Plan' is to be
Company Appeal (AT) (Insolvency) No. 203 of 2020 56 valid for six months, for acceptance of 'Committee of Creditors', is certainly not
a favourable circumstance in favour of the 1st Respondent / 'Resolution
Applicant'. During the period from August, 2018 till January 2019 when the
orders were reserved by the 'Adjudicating Authority' on the approval application,
the 1st Respondent/'Resolution Applicant' took part and, therefore, by any
stretch of imagination, it cannot be said that the validity of the 'approved plan'
was only six months period and such plea is not well founded.
Result
99. Be that as it may, on a careful consideration of respective contentions,
taking note of qualitative and quantitative upshot and keeping in mind the facts
and circumstance of the instant case which float on the surface, this Tribunal
comes to an irresistible conclusion that the views arrived at by the Adjudicating
Authority in CA No.1816(PB)/2019 in C.P.(IB)No. 101 (PB) 2017 to the effect
(i)that doctrine of 'Res Judicata' does not apply to the present case (ii) in granting
the relief of withdrawal of 'Resolution Plan' with costs and resultantly allowing
the aforesaid CA No. 1816(PB)/2019 in C.P.(IB)No. 101 (PB) 2017 partly
specifying the terms therein with costs of Rs. 1 lakh to be paid by the 1st
Respondent/'Resolution Applicant' are clearly unsustainable in law and
accordingly, they are set aside in furtherance of substantial cause of justice.
Resultantly, the present Appeal succeeds.
In fine, the present Appeal is allowed with no costs. The impugned order
dated 02.01.2020 in CA No. 1816(PB)/2019 in C.P.(IB)No. 101 (PB) 2017 is set
aside for the reasons ascribed in this Appeal by this Tribunal. The CA No.
Company Appeal (AT) (Insolvency) No. 203 of 2020 57 1816(PB)/2019 is dismissed. I.A. No. 531/2020(seeking exemption to file clear
copy etc.) is closed.
[Justice Venugopal. M] Member (Judicial)
[Kanthi Narahari] Member (Technical)
NEW DELHI
29th July, 2020
ss
Company Appeal (AT) (Insolvency) No. 203 of 2020 58
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free