Chandan Mishra (Suspended Director Of ... vs Shapoorji Palloni And Co. Pvt Ltd And Anr
- CitationComp. App. (AT) (Ins) No. 1185 of 2022
Ratio decidendi
The rule this decision rests on
The existence of a pre-existing dispute under Section 5(6) and Section 9 of the Insolvency and Bankruptcy Code must be assessed as of the date of the demand notice; a dispute raised for the first time after the demand notice, in reply to it, cannot defeat an operational creditor's application where no quality, quantity or other substantial objection to the work was raised before that date. A dispute must satisfy the Mobilox test: the corporate debtor must raise a plausible contention requiring further investigation that is not a patently feeble legal argument, an unsupported assertion of fact, spurious, plainly frivolous or vexatious; complaints of delay or slow progress during performance, which were ultimately resolved and not reflected as objections in any communication before the demand notice, do not meet that test. A completion certificate issued by the corporate debtor without caveat or qualification as to quality, quantity or progress of work, and not subsequently disputed within the defect liability period, is relevant to whether a pre-existing dispute exists, and the corporate debtor may be estopped from raising such a dispute. The pendency of an arbitration or Section 34 challenge to an award is relevant to a pre-existing dispute only where the debt arises from the award; where the operational debt is founded on unpaid invoices and the arbitration was commenced after the demand notice, it does not bar admission of a Section 9 application. Adjudicating authorities at the admission stage conduct summary proceedings and need not undertake a full trial of the evidence; they must determine only whether the dispute is substantial and bona fide.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
Comp. App. (AT) (Ins) No. 1185 of 2022 & I.A. No. 4477 of 2022 & 1780, 2830, 4382, 4384, 4541 of 2023
(Arising out of the Order dated 19.09.2022 passed by the National Company Law Tribunal, New Delhi Bench- IV in C.P. (IB) No. 2561/(ND)/2019 2019)
IN THE MATTER OF:
JEEVAGAN NARAYANA SWAMI NADAR (SUSPENDED DIRECTOR OF SINNAR THERMAL POWER LTD.) S/0 NARANA SWAMI PALANIAPPAN NADAR, RESIDING AT N 135 FF, MAYFIELD GARDENS, N BLOCK, SECTOR 51, GURUGRAM, HARYANA EMAIL : jeevagan1950@gmail.com [In Place of Chandan Mishra, Original Appellant herein (Since Deceased)]. ...Appellant
Versus
1. SHAPOORJI PALLONJI & CO. PVT. LTD. HAVING ITS REGISTERED OFFICE AT: 70 NAGINDAS MASTER ROAD, FORT, MUMBAI, MAHARASHTRA 400023 THROUGH ITS AUTHORISED SIGNATORY ...Respondent No. 1
2. ADARSH SHARMA (INTERIM RESOLUTION PROFESSIONAL OF SINNAR THERMAL POWER LTD.) J-6A, KAILASH COLONY, NEW DELHI 110048 EMAIL: adarsh@adarshca.com ...Respondent No. 2
Present
For Appellant: Mr. Palash Singhai, Mr. Karant Batura & Mr. Jayant Chawla, Advocates. -2- Comp. App. (AT) (Ins.) No. 1185 of 2022
For Respondents: Mr. Abhijeet Sinha, Mr. Mayank Mishra, Mr. Chirag sharma, Mr. Sudiksha Saini, Mr. Shikhar Misra, Advocates. Mr. Mr. S. Niranjan Reddy, Sr. Advocate along with Ms. Shally Bhasin, Mr. Prateek Gupta, Mr. Udbhav Nanda, Mr. Aayush Kapoor, Mr. Utkarsh Singh, Mr. Abhishek Anand, Mr. Karan Kohli & Mr. Sajal Jain, for IRP. Mr. Ramakant Rai, Mr. Varun Tikmani, Mr. Saptarshi Chatterjee, Mr. Aditya Pandey & Ms. Drishti Kaushik, for Intervenor (REC Ltd.)
JUDGEMENT
(19 .01.2024)
NARESH SALECHA, MEMBER (TECHNICAL)
1. The present Appeal i.e., Company Appeal (AT) (Insolvency) No. 1185 of
2022 was filed by Mr. Chandan Mishra, Suspended Director of Sinnar Thermal
Power Ltd. (in short 'Corporate Debtor') under Section 61 of the Insolvency
& Bankruptcy Code, 2016 (in short 'Code') being aggrieved by the Impugned
Order dated 19.09.2022 in C.P. (IB) No. 2561/(ND)/ 2019 passed by the
National Company Law Tribunal, New Delhi Bench- IV (in short
'Adjudicating Authority') whereby the Adjudicating Authority admitted the
Corporate Insolvency Resolution Process (in short 'CIRP') filed under Section
9 of the Code by M/s Shapoorji Pallonji & Co. Private Limited who is the
Operational Creditor and Respondent No. 1 herein.
-3-
Comp. App. (AT) (Ins.) No. 1185 of 2022
2. Mr. Chandan Mishra expired on 22.11.2022 and Mr. Jeevagan Narayana
Swami Nadar moved an application for change name as the Appellant which
was allowed by this Appellate Tribunal.
3. Mr. Adarsh Sharma is the Respondent No. 2 herein, was appointed as
Interim Resolution Professional (in short 'IRP') of the Corporate Debtor.
4. Heard, the Counsel for the Parties and perused the record made available
including the cited judgements.
5. The Corporate Debtor is the company incorporated on 03.01.2007 for the
purpose of setting up of 1350 (5×270) MW Nasik Thermal Power Project
located at Sinnar SEZ Nashik, whereas the Respondent No. 1 is the Operational
Creditor to the Corporate Debtor to whom the Corporate Debtor awarded
contract Civil & Structural Box on 28.05.2010 for setting boiler and generator (
in short 'BTG') for an amount of Rs.180 Crores.
6. It has been brought out that the total contract was enhanced from time to
time and was increased to Rs. 224.13 Crores.
7. The Corporate Debtor also issued another work order to the Respondent
No. 1 dated 22.11.2012 for amount of Rs. 12.56 Crores for various items under
OBTG and both the combined contracts/ work orders i.e., OBG and OBTG will
be referred hereinafter as "contracts".
8. It has been submitted that the Respondent No. 1 issued 77 running
accounts bill (in short 'RABs') along with Final bill for BTG and issued -4- Comp. App. (AT) (Ins.) No. 1185 of 2022
19 RABs along with final bill for OBTG. The total combined work done by
Respondent No. 1 is stated to be of Rs. 208.33 Crores against which the
Corporate Debtor made the payment of Rs. 146.14 Crores leaving Rs. 62.19
Crores as outstanding balance.
9. For seeking payment of outstanding dues from the Corporate Debtor
amounting to Rs. 62.19 Crores, the Respondent No. 1 issued demand notice
under Section 8 of the Code on 16.08.2019 which was replied by the Corporate
Debtor on 29.08.2019 denying the averments made in the demand notice.
10. It has been brought out that in meanwhile, the Respondent No. 1 filed a
petition under Section 9 of the Arbitration and Conciliation Act, 1996 (in short
'Arbitration Act') bearing number O.M.P. (Comm.) No. 262 of 2019 on
16.08.2019 before Hon'ble High Court of Delhi, who gave a stay on revocation
of bank guarantee by the Corporate Debtor in favour of Respondent No. 1 on
20.08.2019.
11. It has been submitted that the Respondent No. 1 filed an application
under Section 9 of the Code before the Adjudicating Authority which was
admitted on 19.09.2022. The Appellant submitted that he filed detailed counter
affidavit on 13.12.2019, disputing the Respondent No. 1 and bringing out the
pre-existing disputes between the Corporate Debtors and the Respondent No. 1.
12. The Appellant submitted that pending application before the Adjudicating
Authority, the Respondent No. 1 filed an application bearing C.A. No. 503 of -5- Comp. App. (AT) (Ins.) No. 1185 of 2022
2019 to bring on record work completion certificate 09.05.2019 issued by the
Corporate Debtor with reference to BTG work as additional document which
was dismissed by the Adjudicating Authority vide order dated 17.01.2022.
13. It has also been brought out that on 23.09.2019, the Respondent No. 1
issued notice to the Corporate Debtor invoking arbitration under Section 21 of
the Arbitration Act. The Arbitral Tribunal was constituted on 24.11.2019 to
adjudicate upon the claims and counter claims in the matter of Shapoorji
Pallonji and Company Private Limited Vs. Sinnar Thermal Power Limited. The
final arbitration award was passed on 22.04.2022.
14. It is the case of the Appellant that Arbitral Tribunal award was challenged
by him before Hon'ble High Court of Delhi under Section 34 of Arbitration Act
being O.M.P. (Comm.) No. 324 of 2024 which is still pending. The Appellant
submitted that in view of the pendency of the challenged Arbitral Tribunal's
Award, the averment made by the Respondent No. 1 regarding their claims
allowed by the Arbitral Tribunal should not be given undue reliance and
weightage.
15. The Appellant gave reference to the judgements of Hon'ble Supreme
Court of India in the matter of K. Kishan Vs. Vijay Nirman Company Private
Limited, [(2018) 17 SCC 662]. The Appellant also relied upon the judgement
of this Appellate Tribunal in the matter of M/s Annapurna Infrastructure Pvt.
Ltd. vs. M/s Soril Infra Resources Ltd. in Company Appeal (AT) (Insolvency) -6- Comp. App. (AT) (Ins.) No. 1185 of 2022
No. 32 of 2017. The Appellant also referred to several judgements in support of
his averments i.e., Umesh Saraf Vs. Tech India Engineers Pv.t Ltd. passed by
this Appellate Tribunal bearing Company Appeal (AT) (Insolvency) No. 548 of
2020, Karpara Project Engineering Private Limited Vs. BGR Energy Systems
Ltd. in Company Appeal (AT) (Insolvency) No. 622 of 2018, M/s. Raunaq EPC
International Ltd. Vs. M/s. Hiranmaye Energy Ltd. in Company Appeal (AT)
(Insolvency) No. 439 of 2020, Major (Retd.) Inder Singh Rekhi Vs. Delhi
Development Authority [(1988) 2 SCC 338] and Sundaram Finance Ltd. Vs.
NEPC India Ltd. [(1999) 2 SCC 479].
16. It is the case of the Appellant and that his appeal should be allowed
primarily on the following grounds :-
a) There have been pre-existing disputes between the parties.
b) The Adjudicating Authority erred in assuming that the Corporate
Debtor has not filed any application under Section 34 of the
Arbitration Act, challenging the Arbitral Award dated 22.04.2022.
c) The completion certificate dated 09.05.2019 relied upon by the
Adjudicating Authority was dismissed earlier by the Adjudicating
Authority vide order dated 17.01.2020.
17. The Appellant alleged that the Respondent No. 1 has been indulging in
forum shopping by way of raising the same/ similar references before different -7- Comp. App. (AT) (Ins.) No. 1185 of 2022
judicial/ legal fora including the Adjudicating Authority, this Appellate
Tribunal, the Arbitral Tribunal and Hon'ble High Court of Delhi.
18. It is the case of the Appellant and that IBC should not be allowed for
recovery mechanism and the Impugned Order should be set aside for the errors
committed by the Adjudicating Authority both on law and on the facts.
19. Concluding his arguments, the Appellant pleaded that the power plant of
the Corporate Debtor can be revived and he should be given adequate
opportunity by dismissing the Impugned Order.
20. Per Contra, the Respondent No. 1 refuted all the averments made by the
Appellant treating these to be as misleading, mischievous, frivolous and without
any substantial basis.
21. At the outset, the Respondent No. 1 submitted that the Impugned Order
has been passed by the Adjudicating Authority after detailed consideration and
after going into all details of facts and law.
22. The Respondent No. 1 refuted the allegations made by the Appellant that
the Respondent No. 1 concealed the fact regarding arbitration proceeding
pending before the Hon'ble High Court of Delhi.
23. The Respondent No. 1 gave full background of the case, including the
awarded work through legally binding contracts on account of the Corporate
Debtor executed by them and chequered history of pending payments. -8-
Comp. App. (AT) (Ins.) No. 1185 of 2022
24. It is the case of the Respondent No. 1 that out of total cumulative work
done worth Rs. 208.33 Crores, the Appellant paid only Rs. 146.14 Crores and
thereby leaving outstanding dues of Rs. 62.19 Crores. The Respondent No. 1
submitted that he gave all the opportunities to the Corporate Debtor to settle the
dues but the Corporate Debtor miserably failed to meet its obligation according
to the contracts and therefore, the Respondent No. 1 was compelled to issue
demand notice under Section 8 of the Code on 16.08.2019 which was replied by
the Corporate Debtor on 29.08.2019. It is the case of the Respondent No. 1 that
in their reply, nowhere the Corporate Debtor could link any documents or any
evidence of any pre-existing disputes w.r.t. the contracts prior to issue of
demand notice by him to Corporate Debtor on 16.08.2019. The Respondent No.
1 stated that the bogus plea of pre-existing disputes was tried to be created by
the Corporate Debtor in order to avoid payments to be paid to Respondent No.
1. The Respondent No. 1 submitted that the Corporate Debtor tried to raise the
issues which were not relevant for the execution of the work or regarding
quantity or quality of the work executed and completed by the Respondent No.
1.
25. The Respondent No. 1 also denied alleged slow progress work levelled by
the Corporate Debtor. The Respondent No. 1 further referred to counter claims
made by the Corporate Debtor only in response to the demand notice which are -9- Comp. App. (AT) (Ins.) No. 1185 of 2022
without any basis and was done by the Corporate Debtor only to derail the
entire CIRP process.
26. The Respondent No. 1 strongly objected to the allegations made by the
Appellant regarding non- admission of completion certificate dated 09.05.2019
issued by the Appellant. In this connection, the Respondent No. 1
submitted that the Adjudicating Authority rejected C.A. No. 503 of 2019 which
was made with a request to place additional document, only on the ground that
this document was not legible. The Respondent No.1 alleged that the Appellant
concealed the fact before this Appellate Tribunal that the work completion
certificate dated 09.05.2019 was indeed on record, since it was annexed with the
Rejoinder filed by the Respondent No. 1 before the Adjudicating Authority and
the same was duly considered by the Adjudicating Authority correctly in the
Impugned Order.
27. The Respondent No. 1 also refuted the fact that the Corporate Debtor is
financially viable and stated that the Corporate Debtor could not even pay their
share of fee to the Arbitral Tribunal in the arbitral proceeding.
28. The case of the Respondent No. 1 is that in terms of Clause 21.6.2 of
Special Conditions of Contract (in short 'SCC') an 'Engineer-in-Charge' was to
be nominated by the Corporate Debtor as owner and in terms of Clause 21.62 of
General Conditions of contract (in short 'GCC') any difference or dispute
regarding any items of schedule of work was to be referred to 'Engineer-in- -10-
Comp. App. (AT) (Ins.) No. 1185 of 2022
Charge' appointed by the Corporate Debtor. The Respondent No. 1 strongly
pleaded that during the entire duration of contract or even during the 'Defect
Liability Period' (in short 'DLP') or even prior to issue of demand 8 notice, the
Appellant never raised any dispute and so-called issue being raised in response
to the demand notice No. 8 are only with ulterior motives.
29. It is further the case of the Respondent No. 1 that in reply to demand
notice dated 29.08.2019, the Corporate Debtor admitted that the entire work was
done by the Respondent No. 1 and did not raise any issue regarding quality or
quantity of services provided under the contracts.
30. The Respondent No. 1 submitted that only in response to his petition
before the Hon'ble High Court of Delhi filed under Section 9 of the Arbitration
Act, the Corporate Debtor raised alleged pre-existing disputes in order to
illegally encash PBG of the Respondent No. 1 of Rs. 9 Crores.
31. The Respondent No. 1 submitted that the very fact that unqualified work
completion certificate was issued by the Corporate Debtor as on 09.05.2019 to
the Respondent No. 1, indicate that entire work was completed without any
grievances and therefore at this stage such plea of pre-existing disputes should
not be allowed.
32. The Respondent No. 1 submitted that even after issue of the completion
work certificate dated 09.05.2019, one year elapsed i.e., period relating to DLP -11- Comp. App. (AT) (Ins.) No. 1185 of 2022
and the Corporate Debtor did not raise any dispute even during this extended
period as the work was completed by 31.03.2018 itself.
33. The Respondent No. 1 stated that allegation of the Corporate Debtor
regarding alleged forum shopping by the Respondent No. 1, is nothing but false
and stated that he was compelled to approach the Hon'ble High Court of Delhi
under Section 9 of the Arbitration Act to protect illegal encashment of PBG by
the Corporate Debtor. The Corporate Debtor failed to return PBG of the
Respondent No. 1 despite several reminders and incidentally the Hon'ble High
Court of Delhi gave the verdict in the favour of Respondent No. 1.
34. The Respondent No. 1 submitted that the judgment cited by the Appellant
specifically of K. Kishan (Supra) is not applicable since that case was based on
Arbitral award which is not the case herein. The Respondent No. 1 amplified
that in the matter of K. Kishan (Supra), the demand notice under Section 8 of
the Code was issued by the Operational Creditor on the basis of final award
delivered by the Arbitral Tribunal in favour of the Operational Creditor,
whereas in the present case the Respondent No. 1 filed the application under
Section 9 of the Code based on unpaid invoices and therefore, the same has got
no relevance in the present case.
35. The Respondent No. 1 reiterated that the Corporate Debtor is not
financial sustainable entity and as per annual financial statements of the
Corporate Debtor for the financial year 2021, the company incurred heavy loss -12- Comp. App. (AT) (Ins.) No. 1185 of 2022
of Rs. 1761 Crores and the company had accumulated loss from operation
amounting to Rs. 7,176 Crores which resulted in complete erosion of the net
worth of the Corporate Debtor. The Financial statement of the year 2020-21
also reveal that the total outstanding loans not paid by the Corporate Debtor was
of Rs. 1413 Crores payable to banks and Rs. 5,688 Crores payable to the
financial institutions.
36. The Respondent No. 1 also submitted that all the assets owned by the
Corporate Debtor are mortgaged with the bank and therefore the revival of the
Corporate Debtor is practically impossible.
37. Concluding his arguments, the Respondent No. 1 requested this Appellate
Tribunal to dismiss this Appeal with exemplary costs.
Finding
38. From the above averments, the following issues emerges :-
a) Whether there were any pre-existing disputes between the parties prior to
the issue of demand notice issued under Section 8 of the Code by the
Respondent No. 1 to the Corporate Debtor on 16.08.2019.
b) Whether the arbitration case pending before the Hon'ble High Court of
Delhi has any impact on Section 9 application under the Code by the
Respondent No. 1 which is subject matter of the present appeal before
this Appellate Tribunal.
-13- Comp. App. (AT) (Ins.) No. 1185 of 2022
c) Whether, the work completion certificate dated 09.05.2019 was rightly
relied upon by the Adjudicating Authority.
39. These issues and other issues raised in the appeal are inter-connected and
inter- dependent and hence we shall deal all the relevant issues conjointly in the
following discussions.
40. We will go through some of cited judgments by the Appellant which
reads as under :-
a) K. Kishan v. Vijay Nirman Co. (P) Ltd., (2018) 17 SCC 662
b) M/s Annapurna Infrastructure Pvt. Ltd. vs. M/s Soril Infra Resources
Ltd. in Company Appeal (AT) (Insolvency) No. 32 of 2017.
41. The first case is of K. Kishan v. Vijay Nirman Co. (P) Ltd., which reads
as under :-
"27. We repeat with emphasis that under our Code, insofar as an operational debt is concerned, all that has to be seen is whether the said debt can be said to be disputed, and we have no doubt in stating that the filing of a Section 34 petition against an arbitral award shows that a pre-existing dispute which culminates at the first stage of the proceedings in an award, continues even after the award, at least till the final adjudicatory process under Sections 34 and 37 has taken place."
(Emphasis Supplied) -14- Comp. App. (AT) (Ins.) No. 1185 of 2022
In this connection we will like to take into consideration the background
of the case which has been captured in initial paras. This judgment was passed
by Hon'ble Supreme Court of India in the matter of K. Kishan Vs. Vijay
Nirman Company Private Limited [(2018) 17 SCC 662], which reads as under
:-
"M/s Vijay Nirman Company Pvt. Ltd. (the respondent) entered into a subcontract agreement with one M/s Ksheerabad Constructions Pvt. Ltd. (KCPL) on 1-2-2008, to undertake 50% of Section 2 work of "Construction and widening of the existing two-lane highway to four lanes on NH 67 at km 190000 to km 218215 admeasuring a total of 28.215 km for and on behalf of KCPL." Apart from this Agreement, a separate agreement of the same date was entered into between the said KCPL and one M/s SDM Projects Pvt. Ltd., Bangalore, as a result of which, a tripartite memorandum of understanding was entered into on 9-5-2008 between KCPL, M/s SDM Projects Pvt. Ltd. and the respondent.
During the course of the project, disputes and differences arose between the parties and the same were referred to an Arbitral Tribunal, which delivered its award on 21-1-2017. One of the claims that was allowed by the said award was in favour of the respondent for a sum of Rs 1,71,98,302 which arises out of certain interim payment certificates. Another claim that was allowed related to higher rates of payment in -15- Comp. App. (AT) (Ins.) No. 1185 of 2022
which a sum of Rs 13,56,98,624 was awarded. Three cross- claims that were made by the respondent were rejected. A notice dated 6-2-2017 was sent by the respondent to KCPL to pay an amount of Rs 1,79,00,166. This notice was stated to be a notice under Section 8 of the Code. Within 10 days, by a letter dated 16-2-2017, KCPL disputed the invoice that was referred to in the said notice, stating that the said amount was, in fact, the subject-matter of an arbitration proceeding, and as per KCPL's accounts, the respondent was liable to pay larger amounts to them. After the notice and reply, on 20-4-2017, a Section 34 petition was filed by KCPL under the Arbitration and Conciliation Act, 1996 (the A&C Act) challenging the aforesaid award. This petition was filed within the period of limitation set down in Section 34(3) of the A&C Act. It is only thereafter that a petition was filed under Section 9 of the Insolvency and Bankruptcy Code, 2016 (the Code), on 14-7-2017.
The issue involved in this appeal was whether the Insolvency and Bankruptcy Code, 2016 can be invoked in respect of an operational debt where an arbitral award has been passed against the operational debtor, but which has not yet been finally adjudicated upon?"
(Emphasis supplied)
Thus, we find that above cited case is based on fact that the Demand
Notice was based on the Arbitral Tribunal which was challenged under Section -16- Comp. App. (AT) (Ins.) No. 1185 of 2022
34 of the Arbitration Act unlike in the present appeal where the Demand notice
and Section 9 is on the basis of unpaid invoices.
We will refer to another cited judgment of Hon'ble Supreme Court of
India in the matter of M/s Annapurna Infrastructure Pvt. Ltd. vs. M/s Soril
Infra Resources Ltd., which reads as under :-
"26. Under Sec. 36 of the Arbitration Act, an arbitral award is executable as decree but it can be enforced only after the time for filing the application under Sec 34 has expired and no application is made or such application having been made has been rejected That means, the arbitral award reaches finality after expiry of enforceable time under Sec. 34 and/or if application under Section 34 is filed and rejected"
(Emphasis Supplied)
The above cited case referred to the situation where decree based on
Arbitral Award could have been executed only after the time for filing Section
34 has expired. In the present appeal Section 9 was not filed based on the
Arbitral Award as discussed earlier was pressed for unpaid invoices after
completion of work for which completion certificate was issued by the
Corporate Debtor.
-17-
Comp. App. (AT) (Ins.) No. 1185 of 2022
42. We also note another judgements passed by Hon'ble Supreme Court in
the matter of Union of India Vs. Cipla Ltd., [(2017) 5 SCC 262] in this regard
which reads as under :-
"155...The decisions referred to clearly lay down the principle that the Court is required to adopt a functional test vis-à-vis the litigation and the litigant. What has to be seen is whether there is any functional similarity in the proceedings between one court and another or whether there is some sort of subterfuge on the part of a litigant. It is this functional test that will determine whether a litigant is indulging in forum shopping or not"
(Emphasis Supplied)
43. As regard allegation above forum shopping by the Respondent No. 1
(discussed earlier), we note that judgment in the matter of Parsoli Motors
Works Pvt. Ltd. Vs. BMW India Pvt. Ltd. [(2023) ibclaw.in 02 HC] give
suitable explanation passed by the Hon'ble High Court of Delhi in para 47,
which reads a under :-
"47. In this context, it may be observed that it is not a case where there are no arbitrable disputes. The parties may have approached NCLT or other Forums but the scope of adjudication before each of these Fora is independent and merely because the petitioner had approached Competition Commission of India or is a corporate debtor in the proceedings before the NCLT, cannot be held to be a bar to raise the disputes for adjudication by way of arbitration."
-18- Comp. App. (AT) (Ins.) No. 1185 of 2022
(Emphasis Supplied)
44. We also take note of the part IV of demand notice dated 16.08.2019
issued under Section 8 of the Code by the Respondent No. 1 to the Corporate
Debtor. In part IV, the Respondent No. 1 specifically asked for pendency of any
suit or arbitration proceedings in relation to any pre-existing disputes before the
receipt of any demand notice dated 16.08.2019. However, in the reply dated
29.08.2019 no specific reference of any pending arbitration case or suit, has
been given and reference were given only to their alleged deficiency of services
address to the Respondent No. 1 in their correspondence made earlier especially
with regard to alleged slow progress by the Respondent No. 1.
45. We further note from the said part IV of application that the Respondent
No. 1 specifically brought to the notice of their petition filed before the Hon'ble
High Court of Delhi vide petition number O.M.P. (Comm.) No. 262 of 2019
under Section 9 of the Arbitration Act. As such we do not find any force in the
arguments of the Appellant that the Respondent No. 1 concealed the fact
regarding arbitration before the Adjudicating Authority.
46. During averments before us, the Respondent No. 1 submitted that the
entire work was completed on 31.03.2018 and there was a clause regarding
DLP. We note that Clause 13 of SCC contained the clause of DLP which reads
as under :-
-19-
Comp. App. (AT) (Ins.) No. 1185 of 2022
"Defect liability period applicable for this contract is 12 months from the date of completion of work as per certificate of 'Engineering -in-charge'.
Since, the work was completed on 31.03.2018, the DLP period could
have been upto 31.03.2019. After this date, the Respondent No. 1 became
entitled to get back his to PBG given to the Corporate Debtor. We note from
the averments that the Respondent No. 1 has been requesting the Corporate
Debtor to return his PBG but the Corporate Debtor instead of returning was
insisting to extend the same and the Respondent No. 1 was apprehensive that
the PBG might be illegally encashed by the Corporate Debtor. In order to
protect such action by the Corporate Debtor, the Respondent No. 1 moved the
petition under Section 9 of the Arbitration Act before the Hon'ble High Court of
Delhi and stay of invocation of PBG was granted on 20.08.2019.
We find merits in the arguments of the Respondent No. 1 that after the
DLP Period was over on 31.03.2019 and for non-returning of PBG by the
Corporate Debtor, the Respondent No. 1 had to move petition before the
Hon'ble High Court of Delhi as independent contractual remedy and this cannot
be termed as forum shopping.
47. As regards, the financial viability of the Corporate Debtor, we have
carefully noted averment made by the Respondent No. 1 that the Corporate
Debtor could not pay fee even to the Arbitral Tribunal. In this connection we -20- Comp. App. (AT) (Ins.) No. 1185 of 2022
referred to the minutes of Arbitral Tribunal held on 20.04.2021 in part 2 which
reads as under :-
"15. The consequence of the above is that the Respondent's counter claim cannot be proceeded with. The Tribunal has fixed hearing for 9 days (18 sessions) in the month of May, 2021 and therefore, the Tribunal grants one more opportunity to the respondent to deposit with the Tribunal its outstanding share of fee in terms of Procedural Order No. 1 and Procedural Order No. 3 by 05.04.2021 failing which the proceedings relating to Respondent's counter claim shall stand terminated. The matter shall then proceed only in relation to Claimant's claim.
16. In the event of Respondent not depositing its share of fee as noted above by 05.04.2021, the Claimants are directed to deposit the entire Reading fee and fee for writing Order in terms of Procedural Order no. 1 and 3 on or before 30.04.2021."
(Emphasis Supplied)
48. Now we will take up the issue regarding pre-existing disputes between
the parties prior to issue of demand notice under Section 8 of the Code on
16.08.2019. Dispute is not mere denial and dispute should be in accordance
with the Section 5(6) of the Code.
-21-
Comp. App. (AT) (Ins.) No. 1185 of 2022
49. It has been the case of the Respondent No. 1 that alleged pre-existing
dispute were raised for the first time by the Corporate Debtor in his reply to
petition filed under Section 9 of the Arbitration Act before the Hon'ble High
Court of Delhi. Since, the Corporate Debtor raised issues regarding contractual
breaches and disputes, the Respondent No. 1 also had to issue notice invoking
arbitration in compliance with the terms of contract regarding raising of
disputes and had to move a suitable application under the Arbitration Act.
We note that the Arbitral Tribunal comprising of Justice R.M. Lodha,
Former Chief Justice of India, Presiding Arbitrator, Jusitce C.K. Prasad, Former
Judge, Supreme Court of India, Co-Arbitrator and Justice A.K. Sikri, Former
Judge, Supreme Court of India, Co-Arbitrator was constituted and the Appellate
Tribunal heard the parties and examined the documents from time to time and
finally passed the final award on 22.04.2022 under which, the Corporate Debtor
herein was asked to pay Rs. 62.19 Crores as claimed by the Respondent No. 1
herein before the Arbitral Tribunal. The Arbitral Tribunal also awarded a cost
of Rs. 3 Crores in favour of the Respondent No. 1 to be paid by the Corporate
Debtor. We also note that in the earlier Interim Order dated 29.07.2020 prayer
of the Respondent No. 1 was accepted w.r.t. return of performance bank
guarantee by the Corporate Debtor by the Arbitral Tribunal. -22-
Comp. App. (AT) (Ins.) No. 1185 of 2022
50. It may also be observed that a suit for arbitration process taken up
subsequent to demand notice filed under Section 9 of the Code this cannot be
and should not be considered as existence of dispute and therefore, the plea of
the Appellant that the arbitration proceedings which has been challenged by the
Appellant before the Hon'ble High Court of Delhi and therefore, the Section 9
should not be entertained, is devoid of any legal basis.
51. At this stage, we would like to observe that in the Section 7 (5) (a) of the
Code the word 'may' has been used 7(5)(a) as contrast to the word 'shall' in
Section 9 (5) (a) which clearly indicates legislative intention i.e., discretion has
been given to the Adjudicating Authority in case of Section 7 application
whereas Section 9 application no such description has been given. The
application filed by the Operational Creditor for initiation of CIRP is required to
be admitted by the Adjudicating Authority, if the application is complete in all
respect. What is to be proved is that there is non-payment of unpaid operational
debt without any pre-existing disputes. It may be pointed out that financial debt
is usually secured and backed by due documentation whereas the operational
debts are usually unsecured and for shorter period. Thus, the Adjudicating
Authority is required to admit the CIRP application under Section 9(2), if the
application is complete and there is no payment of unpaid operational debt,
invoices have been delivered, no notice of disputes has been -23- Comp. App. (AT) (Ins.) No. 1185 of 2022
received by the Operational Creditor or there is no record of dispute in the
information utility.
52. Other cited judgements of the Appellant are not found helping the cause
of the Appellant. We will also like to refer here the landmark judgement of
Hon'ble Supreme Court of India caring issue of Pre-existing disputes under the
Code. In Mobilox Innovations P. Ltd. vs. Kirusa Software (P) Ltd. [(2018) 1
SCC 353]. The Hon'ble Supreme Court of India has stipulated the following
test for existence of dispute :-
a) Whether the Corporate Debtor has raised a plausible contention
requiring further investigation which is not a patently feeble legal
argument or an assertion of facts unsupported by evidence;
b) Whether the defence is not spurious, mere bluster, plainly frivolous or
vexatious;
c) A dispute, if it truly exists in fact between the parties, which may or
may not ultimately succeed.
53. From the various averments of the parties, we note that prior to issue of
demand notice, no formal letter has been written by the Corporate Debtor to the
Respondent No. 1 regarding raising any specific disputes on aspect of quality
and quantity of work executed under the contracts. In this connection, we have
taken note of reply dated 29.08.2019 filed by the Corporate Debtor to demand
notice. From the said reply, it seems that the Corporate Debtor has referred to -24- Comp. App. (AT) (Ins.) No. 1185 of 2022
various communications and Minutes of Meeting (in short 'MoM'), wherein the
Corporate Debtor is stated to have raised the issues regarding slow progress of
work, non-mobilisation of adequate manpower etc. In fact, the Corporate
Debtor in demand notice 8 has referred to several e-mails and letters regarding
their concerns about slow progress of work and thereby invoking clause 33 of
GCC for termination of contract which, however was withdrawn and original
contract was reinstated.
54. We will refer to detailed discussion in the Impugned Order on the aspect
of pre-existing dispute which are reproduced as under :-
"6. On the other hand, the corporate debtor filed a detailed reply submitting that there were pre-existing disputes between the parties as the petition under Section 9 of the Arbitration and Conciliation Act 1996 was pending between the parties before the Hon'ble High Court of Delhi and the Arbitrator was duly appointed. Further, it is submitted that letter of charge dated 26.02.2010, for the Construction of BTG Civil and Structural Work for the Project does not pertain to Respondent as the same is signed and acknowledged by "Elena Power and Infrastructure Limited". Therefore, the said documents do not pertain to Corporate Debtor and there is no privity of contract between the Operational Creditor and the Corporate Debtor.
7. Further, it is submitted that BTG contract also contains an arbitration clause and as per that, parties were to settle -25- Comp. App. (AT) (Ins.) No. 1185 of 2022
the same by mutual agreement. It is also submitted that though the Respondent/ Corporate Debtor made the appropriate and corresponding payments, however, the applicant miserably failed to complete the assigned scope of work on various occasions and the Corporate Debtor and its representative & associates repeatedly informed the applicant thereby bringing to its notice the delay caused by Operational Creditor in completion of the assigned work as per the agreement including various other quality issues. This can be verified from the various correspondence mode through e-mails and vide e-mail dated 02.05.2016, the Corporate Debtor had brought to the notice of the Operational Creditor that the following significant checks were pending and were to be completed i.e.
a) Grid wise Column Alignment First & Second part (verticality)
b) Span and diagonal between column.
c) Alignment of skirt girder & verticality of stub column.
8. Sufficient time was provided to them, even adequate and qualified erection welders were not deployed at the elevated structure, there was lot of compromise with the quality of the work by the Operational Creditor, as there were various defects in the same. It is also submitted that vide MoM dated 01.11.2014 the Corporate Debtor expressed its concern over the nonavailability of 250 MT Crane, which the Operational Creditor have to provide in the month of Oct 2014 and the Corporate Debtor also asked the Operational -26- Comp. App. (AT) (Ins.) No. 1185 of 2022
Creditor to provide the completion programmer in line with the requirement of the Corporate Debtor, but no further progress was made. Subsequently, vide MoM dated 12.
11.20 14, the Corporate Debtor has expressed his concern on shortage of manpower, especially structural manpower and accordingly, the Operational Creditor was asked to immediate argumentation to meet the target dates.
Therefore, vide MoM dated 18.12.2014, 22.12.2014 & 29.012.2014 the Corporate Debtor expressed its serious concern over the poor supervision at the project and repetitive failure on the part of the Operational Creditor for the weekly execution of works completion targets commitments. Vide MoM dated 06.01.2015 the same concern were expressed to the Operational Creditor and this get on repeated the expressed on 03.03.2016, 31.03.2016, 02.04.2016, 07.04.2016, 14.04.2016, 21.04.2016, 05.05.2016, 11.05.2016, 19.05.2016, 26.05.2016, 02.06.2016, 09.06.2016, 17.06.2016, 23.06.2016, 30.06.2016, 07.07.2016, 19.07.2016, 04.08.2016, 11.08.2016, 18.08.2016, 27.08.2016, 01.09.2016, 07.09.2016, 22.09.2016, 01.10.2016, 13.10.2016, 27.10.2016, 03.11.2016, 10.11.2016, 01.12.2016, 08.12.2016, 22.12.2016, 01.01.2017, 12.01.2017, 16.02.2017, 23.02.2017, 09.03.2017, 23.03.2017, 13.04.2017, 04.05.2017, 11.05.2017, 25.05.2017, 08.06.2017. Thus, there were constant delay and deficiency of services on the part of the Operational Creditor in completing the project site and the Corporate -27- Comp. App. (AT) (Ins.) No. 1185 of 2022
Debtor was constrained to issue e-mail on 22.01.2016, however, the Operational Creditor vide e-mail dated 23.01.2016 denied their liability and requested the Corporate Debtor to withdraw their termination requests, even after repeated representations and assurance to provide best services by the Operational Creditor, the Operational Creditor still lacked in completing the work of the Corporate Debtor. The Corporate Debtor vide e-mail dated 22.02.2016 had brought to the notice of the Operational Creditor that the mobilization of manpower and machineries till date was not enough to cater the required work pace to achieve the agreed work completion plan. It is further submitted, vide letter dated 27.07.2017, the present director stated that the work of waterproofing as guaranteed was done, but there was leakage from the roofs of various building, at the project site. Hence, the work done by the Operational Creditor was of poor quality and in violation of the contract.
13. From the aforesaid decision, it is clear that the existence of 'Dispute' must be 'pre-existing' i.e. it must exist before the receipt of the demand notice or invoice. If it comes to the notice of the Adjudicating Authority that the 'operational debt' is exceeding Rs. 1 lakh and the Application shows that the aforesaid debt is due and payable and has not been paid, in such case , in absence of any existence of a 'Dispute' between the parties or the record of the pendency of a suit or arbitration proceeding filed before the receipt of the demand notice of the unpaid 'operational debt', the -28- Comp. App. (AT) (Ins.) No. 1185 of 2022
Application under Section 9 cannot be rejected and is required to be admitted.
14. On a cojoint reading of the provision envisaged under Section 9 of the Code, 2016 and the Mobilox Innovations (Supra), we are of the considered opinion that it is a settled preposition that the adjudicating authority must follow the mandate of Section 9, as outlined above, and in particular the mandate of Section 9(5) of the Act, and admit or reject the application, as the case may be, depending upon the factors mentioned in Section 9(5) of the Act.
15. Adverting to factual matrix of the present case, we are satisfied that present petition is complete as per the provisions of Code, 2016 read with rules made thereunder, outstanding operational debt claimed in part IV of Forrn-5 of the petition is above the pecuniary threshold limit as envisaged under Section 4 of the Code, 2016 and duly supported by Agreement dated 28.05.2010 and addendums thereto, Running Account Bills and other ancillary documents, therefore, the requirements as envisaged under Section 9(5)(i)(a), 9(5)(i)((b) and 9(5)(i)((c) of the Code, 2016 are satisfied.
16. The only issue this Adjudicating Authority have to determine is whether there is existence of a dispute between the parties or the record of the pendency of a suit or arbitration proceeding filed before the receipt of the demand notice of the unpaid operational debt in relation to such dispute?
-29-
Comp. App. (AT) (Ins.) No. 1185 of 2022
17. It is apparent from the records that the corporate debtor had rwt raised any substantial objection or dispute pertaining to the work performed by the Operational Creditor prior to the issuance of the demand notice dated 16.08.2019. It was on 29.08.2019 when the corporate debtor had responded for the first time in its reply dated 29.08.2019 to the demand notice issued by the Operational Creditor under Section 8(1) of I&B Code raising dispute making reference to its own communications to establish that there is deficiency of services and the works were incomplete by the applicant, consequent of which that alleged operational debt is disputed.
18. As a preface to our analysis, we observe that the concerns raised by the corporate debtor in the communications referred by the corporate debtor in its reply were addressed by the applicant to the full satisfaction of the corporate debtor, resultant to which the corporate debtor had issued completion certificate dated 09.05.2019 to the applicant. It is pertinent to note here that by then the Defect Liability Period of 12 months had already expired. Further, call period of two months beyond the expiry of the Defect Liability Period was also over without raising any dispute by the corporate debtor regarding any defects in work completed by the applicant. This evidently proves that if there were any discrepancies, the applicant could not have obtained Work Completion Certificate from the corporate debtor with a remark that the applicant performance was found satisfactory to the best of their -30- Comp. App. (AT) (Ins.) No. 1185 of 2022
knowledge. This also shows that all the defects, if any, pointed out by the corporate debtor have been timely rectified within the appropriate time, so that the corporate debtor found it appropriate to issue the Work Completion Certificate, otherwise, the corporate debtor would not have issued an incorrect certificate. Therefore, the corporate debtor is estopped from raising the plea of the pre-existing dispute between the parties. The work completion certificate dated 09.05.2019 is as below:-
(Emphasis Supplied)
55. We note that the Adjudicating Authority has taken all efforts to go into
every detail of the reply of the Corporate Debtor including reference to their -31- Comp. App. (AT) (Ins.) No. 1185 of 2022
various e-mails, other correspondences regarding slow progress of work, etc.,
and only after detailed analysis, the Adjudicating Authority came to conclusion
that the Corporate Debtor has not raised any substantial objection or dispute
pertaining to work performance by the Operational Creditor prior to issuance of
demand notice dated 16.08.2019.
56. In Civil contract for construction of certain civil facilities like in the
present case of BTG and OBTG contracts, what is to be seen is that the work
has been completed and there has been no issues regarding quality or quantity
of the services. Mere allegations regarding less mobilisation of manpower or
regarding delay during the contract which was ultimately completed to the
satisfaction of the Corporate Debtor for which the completion certificate,
without any caveat or qualifications or conditions was issued to the Financial
Creditor, such allegations may not fall in the definition of dispute under Section
5(6) of the Code and also will not meet the test as stipulated by the Hon'ble
Supreme Court of India in the Mobilox Innovations P. Ltd. (Supra).
57. It may also be kept in view that the Adjudicating Authority is conducting
summary proceedings and is not expected to go in detailed scrutiny of evidence.
The Adjudicating Authority should look into whether the dispute tantamount to
be substantial, genuine and bona-fide and not spurious, speculative, illusory or
misconceived. The Adjudicating Authority at the stage of admission of CIRP is
not expected to hold a full trial in the matter and it must be decided whether the -32- Comp. App. (AT) (Ins.) No. 1185 of 2022
ground appears to be substantial. However, it is also a settled law that if such
operational debt are bona-fide disputed on substantial ground, the Adjudicating
Authority ought to dismiss the petition and such parties are required to seek
other alternative legal recourse.
58. It is pertinent to note that both GCC and SCC provided for specific clause
regarding "Engineer-In-Charge" whose job was to look into matter of dispute
raised and the same was appointed by the Corporate Debtor as owner of the
project. We have noted from the averments, that no such dispute was ever
referred to such Engineer-In-Charge. This fact also goes against the cause of
the Appellant, who has taken the plea of pre-existing dispute and it is felt that
when such specific provision did exist in the contracts, the Corporate Debtor
should have raised pre-existing dispute relating to quality of the services if any,
which is not found in the present appeal. Hence, we are not inclined to agree to
the plea above pre-existing dispute made by the Appellant.
59. At this stage, we would also like to refer to the various communications
relating to termination of contract by the Corporate Debtor, reply of the
Respondent No. 1 as Operational Creditor and final withdrawal letter of
termination by the Corporate Debtor. These letters will be helpful in looking to
the aspect of pre-existing disputes which can be covered under section 5(6) of
the Code as well as under Section 9 of the Code or otherwise. -33-
Comp. App. (AT) (Ins.) No. 1185 of 2022
60. These communication/ letters pertaining to termination letter,
correspondence exchanged and final termination withdrawal letter by the
Corporate Debtor, which reads as under :-
-34-
Comp. App. (AT) (Ins.) No. 1185 of 2022 -35- Comp. App. (AT) (Ins.) No. 1185 of 2022 -36- Comp. App. (AT) (Ins.) No. 1185 of 2022 -37- Comp. App. (AT) (Ins.) No. 1185 of 2022 -38- Comp. App. (AT) (Ins.) No. 1185 of 2022 -39- Comp. App. (AT) (Ins.) No. 1185 of 2022
61. From the letter dated 22.01.2016 written by the Corporate Debtor to the
Respondent No. 1, it is seen that letter was written on "mobilisation work" w.r.t.
progress of the work and nowhere any other aspect of disputes have been
mentioned. In the response to the same, the Respondent No. 1 replied the
Corporate Debtor vide e-mail dated 23.01.2016, refuting the content and
indicating action taken to mobilise resources and further raised the issue
regarding pending payments to be released by the Corporate Debtor to the
Respondent No. 1. This was followed with the communication from the
Corporate Debtor on 23.01.2016, giving outcome of discussion with the
Respondent No. 1 relating to payment to be made by the Corporate Debtor and
mobilisation of manpower and tools and plants to be made available by the
Respondent No. 1. The content of the letter was confirmed by the Respondent
No. 1 vide their letter dated 25.01.2016 and finally the Corporate Debtor
withdrew the termination letter. Thus, we find from above correspondence that
the issue was regarding release of payment by the Corporate Debtor and in turn
mobilisation of resources especially manpower and tools and plant by the
Respondent No. 1 for which the termination letter was issued and subsequently
withdrawn.
Thus, we do not find any issue raised by the Corporate Debtor regarding
quality or quantity of services resulting into pre-exiting disputes hence, on the
contention of the Appellant that the work was terminated indicates pre-existing -40- Comp. App. (AT) (Ins.) No. 1185 of 2022
disputes, we do not find much substance to this argument of the Appellant. In
fact, the termination letter was withdrawal by the Corporate Debtor and original
contract was restored.
62. In view of detailed discussions this Appellate Tribunal do not find any
error in the finding of the Adjudicating Authority on the aspect of pre-existing
dispute.
63. Yet another issue which has been raised by the Appellant is regarding
admissibility of the completion certificate issued dated 09.05.2019 by the
Corporate Debtor to the Respondent No. 1. The Appellant has taken two-fold
argument i.e., the completion certificate was not formerly part of the original
pleadings before the Adjudicating Authority and the Respondent No. 1 tried
to get it included by filing CA No. 503 of 2019 seeking permission from the
Adjudicating Authority to file additional document of the completion certificate
dated 09.05.2019, which was rejected by the Adjudicating Authority.
Second argument of the Appellant is that the completion certificate was
issued with Caveat that this was being issued at the request of the Respondent
No. 1, therefore, cannot be relied upon.
64. In this connection, we would like to refer to the completion certificate
issued by the Corporate Debtor to the Respondent No. 1 which reads as under :- -41-
Comp. App. (AT) (Ins.) No. 1185 of 2022 -42- Comp. App. (AT) (Ins.) No. 1185 of 2022
65. For this issue, we observe that the Adjudicating Authority has recorded
following while dismissing the CA No. 503 of 2019
ORDER "CA No. 503/2019 is an application filed by the Operational Creditor, seeking to place on record the additional documents which is to be placed on record and relied upon by the Operational Creditor and Page No. 6 is supposed to be work completion certificate. The original documents annexed with the typed copy is not readable/legible at all. In view of the same, CA No. 503/2019 is dismissed...
(Emphasis supplied)
66. Thus, it seems that the CA No. 503 of 2019 was dismissed since this was
not readable/ legible. As regard, other argument the completion certificate
dated 09.05.2019 was issued to the Respondent No. 1 based on their request for
participating in tenders in public and private sector, PSUs or any other private
organisations and therefore, this should be treated as Caveat and should not be
relied upon. In this connection, on a pointed query by this Appellate Tribunal
put to the Appellant, the genuineness and issuance of the work completion
certificate was not denied by the Appellant. We note that the Corporate Debtor
has issued completion certificate on 09.05.2019 prior to issue to demand notice
on 16.08.2019 stating that the Respondent No. 1 has completed the contract and
their performance was found satisfactory.
-43-
Comp. App. (AT) (Ins.) No. 1185 of 2022
We find that the completion certificate was unqualified and without
raising any issue regarding quality or quantity or progress of the work by the
Respondent No. 1. Merely the fact that the certificate was issued at the request
of the Corporate Debtor, the existence and validity and impact of the same
cannot be denied at this stage by the Corporate Debtor. Thus, the work
completion certificate was rightly taken into consideration by the Adjudicating
Authority in their analysis and we do not find any error on the same.
67. We are conscious of the fact that completion of project in time along with
requisite quality is the heart of the contract management. It can be no one's
case that extra-ordinary delay which changes viability of the project can be
simply brushed aside and should not be taken into consideration while deciding
Section 9 application under the Code by the Adjudicating Authority. However,
we need to acknowledge the fact in commercial world, occasional delay may
happen and may be attributable to both parties. In instant case, we have seen
that the Corporate Debtor raised issues regarding slow progress and less
mobilisation of manpower, tools and plants whereas in reply to the Corporate
Debtor, the Respondent No. 1 has been categorically stated that due payment in
order to mobilise resources at site has not been paid by the Corporate Debtor.
Hence, what is to be seen here whether delay was on account of only one party
and whether such delay effected the project. We also need to factor into
consideration if finally, project was completed to satisfaction of the Corporate -44- Comp. App. (AT) (Ins.) No. 1185 of 2022
Debtor and whether the same was accepted by the Corporate Debtor without
any caveats and qualification. In the instant appeal we note carefully that the
Corporate Debtor issued the completion certificate (already discussed in
detailed by us earlier) without any reservation and to full satisfaction to the
Corporate Debtor. In such background, the alleged delay during course of
execution of contracts, cannot be treated as an issue which may adversely affect
rights of the Operational Creditor under Section 9 of the Code. We clarify
position on delay/ slow progress during contract period accordingly.
68. After detailed analysis, we do not find any error in the Impugned Order.
69. In fine, the appeal, devoid of any merit, stand dismissed. No Costs.
Interlocutory Application(s), if any are Closed.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
Sim
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free