Avil Menezes vs Tata Consulting Engineers Limited
- CitationCompany Appeal (AT) (Insolvency) No. 264 of 2024
Ratio decidendi
The rule this decision rests on
Under the IBC, a liquidator must verify claims independently on the basis of documentary evidence and cannot reject a claim merely by citing an unsubstantiated position; where the liquidator's rejection rests on a bare assertion without supporting material, the claimant is entitled to pursue its claim, and the Adjudicating Authority, on appeal under Section 42 against the liquidator's rejection under Section 40, has jurisdiction to review that rejection and direct its acceptance. Payment made by a party under compulsion of a bank guarantee invocation, where the invocation itself is unsupported by any established default on the part of that party, does not on the facts of this case operate as a waiver or estoppel barring the party from claiming refund of that amount before the liquidator.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
In the matter of: Avil Menezes Liquidator of Sunil Hitech and Engineers Limited 106, 1st Floor, Kanakia Atrium 2, Cross Road A, Behind Courtyard Marriott, Chakala, Andheri East, Mumbai City, Maharashtra - 400093 ...Appellant
Versus
Tata Consulting Engineers Limited Unit No. NB 1502 & SB 1501, Empire Tower, Thane Belapur Road, Navi Mumbai - 400708 ..... Respondent
Present :
For Appellant : Mr. J. Rajesh, Mr. Dhrupad Vaghani, Mr. J.S Khurana, Mr. Aniket Mokherjee, Advocates.
For Respondents : Mr. Saswat Pattnaik, Advocate.
JUDGMENT
(Hybrid Mode)
[Per: Barun Mitra, Member (Technical)]
The present appeal filed under Section 61 of Insolvency and Bankruptcy
Code 2016 ('IBC' in short) by the Appellant arises out of the Order dated
01.11.2023 (hereinafter referred to as 'Impugned Order') passed by the
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 1 of 15 Adjudicating Authority (National Company Law Tribunal, Mumbai Bench-I) in
in I.A.3392 of 2019 in CP (IB) 2295/MB-I/2018. By the impugned order, the
Adjudicating Authority directed the Appellant - Liquidator in the liquidation
process of the Corporate Debtor to accept the claim of the Respondent- M/s
Tata Consulting Engineers Limited relating to refund of an amount of
Rs.56,80,000/- with interest paid by them to prevent invocation of their Bank
Guarantee and an amount of Rs. 16,73,798/- for invoice dated 22.11.2017
raised by them. Aggrieved by this impugned order, the present appeal has
been preferred by the Appellant.
2. The salient facts of the case which are relevant to be noticed for
consideration of the matter are as outlined below:
On 13.01.2010, the Maharashtra State Power Generation Company Ltd
('MSPG' in short) issued a work contract in favour of Sunil Hitech
Engineers Ltd ('SHEL' in short) following which SHEL appointed Tata
Consulting Engineers Ltd ('TCEL' in short) as sub-contractor to provide
engineering services.
A Bank Guarantee ('BG' in short) for Rs.56.80 lakhs was submitted by
TCEL on dated 01.07.2010, in terms of contract between SHEL -
Corporate Debtor and TCEL - Respondent. The validity of the said bank
guarantee was extended by the Respondent from time to time upto
30.09.2018.
The Corporate Debtor was later admitted into Corporate Insolvency
Resolution Process ('CIRP' in short) in September, 2018 and the
Resolution Professional ('RP' in short) representing the Corporate Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 2 of 15 Debtor sought to invoke the BG of the Respondent on 06.03.2019.
Before the BG could be invoked, the Respondent paid the guarantee
amount equivalent of Rs.56.80 lakhs on 06.03.2019.
The Corporate Debtor was brought under liquidation proceedings on
25.06.2019. The Respondent in the liquidation process filed their claim
of Rs.79.73 lakhs before the Liquidator on 24.07.2019 which also
included refund of Rs.56.80 lakhs being the equivalent of guarantee
amount paid; Rs.16.73 lakhs towards invoice No. 171910023 raised on
22.11.2017 and Rs.15.48 lakhs against other invoices raised on
25.03.2015 and 16.02.2016.
The Liquidator/Appellant rejected the claim of the Respondent on
03.10.2019 with respect to refund of Rs.56.80 lakhs being the
equivalent of guarantee amount paid and Rs.16.73 lakhs towards
invoice No. 171910023 raised on 22.11.2017 following which the
Respondent filed I.A. No. 3392 of 2019 before the Adjudicating
Authority on 16.10.2019 for issue of directions to the Liquidator to
accept their claim.
The Adjudicating Authority allowed the prayers of the Respondent
contained in I.A. No. 3392 of 2019 on 01.11.2023.
Aggrieved by the impugned order, the present appeal has been filed.
3. The Learned Counsel for the Appellant making submissions contended
that the Corporate Debtor had been regularly making payments to the
Respondent against invoices raised by them from time to time. Subsequently,
however, the Respondent started defaulting in the discharge of its obligations
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 3 of 15 under the contract. Due to delayed submissions of drawing and design
documents by the Respondent, the entire project of MSPG got delayed which
in turn had led to invocation of BG of the Corporate Debtor by MSPG. Due to
this loss suffered by them arising on account of non-performance by the
Respondent, the RP of the Corporate Debtor, during the CIRP period, invoked
the BG of the Respondent. The Respondent made payment without making
any protest or raising any objections to the invocation of the BG. Later when
the liquidation proceedings of the Corporate Debtor commenced and the
Respondent sought refund of the BG amount of Rs.56.80 lakhs by filing a
claim, it was contended by the Learned Counsel of the Appellant that the
Liquidator rightly rejected the claims made in this respect since this amount
had been paid against the BG without raising any objections. Having made
the payment without protest, the Respondent had therefore waived their right
to seek refund from the Corporate Debtor and therefore could not have filed
their claim for the same amount before the Liquidator. It was vehemently
contended that it does not stand to reason how the Adjudicating Authority
could have directed the Appellant/Liquidator to allow this claim.
4. It is further contended that the Adjudicating Authority had exceeded its
jurisdiction under Section 42 of IBC while passing the impugned order
without appreciating the fact that BGs constitute a separate, distinct and
independent contract and hence the Adjudicating Authority did not have the
jurisdiction to grant relief with respect to such claim. Adjudicating a breach
of contract falls outside the scope of the insolvency of the Corporate Debtor
and therefore the Adjudicating Authority did not enjoy the power to decide
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 4 of 15 such contractual disputes which could only be determined by way of
arbitration as set out in the contract.
5. As regards rejection of the claim filed in respect of invoice No.
171910023 dated 22.11.2017, it was contended that the same was not
certified by MSPG and hence the Respondent was not entitled to receive the
said amount. Moreover, when the Plant handover to MSPG could not take
place, the Respondent was not entitled for payment against this invoice. The
liquidator had therefore not committed any error in rejecting the claim for
payments with regard to invoice No. 171910023 raised on 22.11.2017.
6. The Learned Counsel for the Respondent rebutting the arguments
canvassed by the Appellant submitted that TCEL had successfully fulfilled
their contractual obligations for which it raised invoices as stipulated in the
contract. Admittedly in terms of the contractual clauses, TCEL had also
provided BG amounting Rs. 56.80 lakhs which was extended from time to
time. Though payments to TCEL remained outstanding, the Corporate Debtor
proceeded to invoke the BG on 06.03.2019 without sufficient cause. While
admitting that TCEL made payment of Rs.56.80 lakhs for reversal of BG, it
was vehemently contended that the same was done under duress so as to
avoid any harm being caused to their professional image and market
reputation. Since this amount was wrongly held back by the Corporate
Debtor, the Respondent was justified in filing their claims before the
Liquidator. However, the Liquidator wrongly rejected their claim by citing that
the amount had been paid without protest. It was added that the Adjudicating
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 5 of 15 Authority rightly directed the Liquidator to accept the claim since they had
rejected the claim without proper substantiation.
7. It was further asserted that despite having provided satisfactory
services, the Corporate Debtor had failed to make payments against invoices
raised by them. The Learned Counsel for the Respondent denied that TCEL
had delayed the submission of drawing and designing documents or that they
had failed to perform the contract in time. Neither had the Corporate Debtor
ever sent any adverse communication to TCEL suggesting any deficiency in
the quality of the work output. It was also stoutly contended that the
Corporate Debtor had not cleared payment for the last invoice on 22.11.2017
which payment they were entitled to receive. Under such circumstances, it
was wrong on the part of the Liquidator to reject the claim filed by them in
respect of invoice no. 1719100023. The allegation of delayed and under-
performance being levelled now by the Liquidator to justify their rejection of
the claim of TCEL is contrived and an after-thought. Hence, the Respondent
was constrained to file the IA before the Adjudicating Authority challenging
the rejection of their claim by the Liquidator.
8. We have duly considered the arguments advanced by the Learned
Counsel for both the parties and perused the records carefully.
9. The main limbs of the Appellant's case are, firstly, that the Respondent
had failed to comply with the terms of the contract. The delayed submission
of drawings and designs documents by TCEL had affected the overall
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 6 of 15 performance of the Corporate Debtor in the main contract with MSPG leading
to invocation of their BG of Rs.83.30 crores by MSPG. Hence the Corporate
Debtor had rightly invoked the BG of the Respondent having suffered losses.
Following invocation of BG of TCEL, the reversal amount of the BG was paid
by TCEL by their own volition and not under protest. That being the case, no
right accrues to them at the liquidation stage to claim the reversed amount of
Rs.56.80 lakhs from the Liquidator. The second limb of argument is that
TCEL had raised their final invoice on 22.11.2017 bearing no. 1719100023
on the Corporate Debtor without the invoice having been certified by MSPG.
Furthermore, since the project handing over to MSPG could not be effectuated
on account of delay in the performance of TCEL, the invoice was therefore not
cleared. Both being quite inter-related, we propose to deal with them in a
conjoint manner.
10. To appreciate the issue at hand, we may first have a quick look at the
statutory role and responsibility of the Liquidator in the context of handling
of claims. However, before we start our journey of glancing at the statutes, we
must add here that it is well settled that IBC treats CIRP and the liquidation
process as two separate stages. Liquidation order signifies the end of CIRP
and the marks the beginning of the liquidation process. Proofs of claim are
required to be filed separately at both these stages. While in the resolution
phase, the submission of claims and verification thereof is with respect to
primarily determining the eligibility to be a member of the Committee of
Creditors, under the liquidation process, the verification is done with the
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 7 of 15 primary objective to determine the total amount of dues and priority thereof
to be paid out of the liquidation estate.
11. The relevant statutory provisions are as outlined below:
"35. Powers and duties of liquidator. - (1) Subject to the directions of the Adjudicating Authority, the liquidator shall have the following powers and duties, namely: -
(a) to verify claims of all the creditors;
(2) The liquidator shall have the power to consult any of the stakeholders entitled to a distribution of proceeds under section 53:
Provided that any such consultation shall not be binding on the liquidator:
Provided further that the records of any such consultation shall be made available to all other stakeholders not so consulted, in a manner specified by the Board.
38. Consolidation of claims. - (1) The liquidator shall receive or collect the claims of creditors within a period of thirty days from the date of the commencement of the liquidation process.
(2) A financial creditor may submit a claim to the liquidator by providing a record of such claim with an information utility:
Provided that where the information relating to the claim is not recorded in the information utility, the financial creditor may submit the claim in the same manner provided for the submission of claims for the operational creditor under sub-section (3).
(3) An operational creditor may submit a claim to the liquidator in such form and in such manner and along with such supporting documents required to prove the claim as may be specified by the Board. (4) A creditor who is partly a financial creditor and partly an operational creditor shall submit claims to the liquidator to the extent of his financial debt in the manner as provided in sub-section (2) and to the extent of his operational debt under sub-section (3).
(5) A creditor may withdraw or vary his claim under this section within fourteen days of its submission.
39.Verification of claims.- (1) The liquidator shall verify the claims submitted under section 38 within such time as specified by the Board.
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 8 of 15 (2) The liquidator may require any creditor or the corporate debtor or any other person to produce any other document or evidence which he thinks necessary for the purpose of verifying the whole or any part of the claim.
40. Admission or rejection of claims. - (1) The liquidator may, after verification of claims under section 39, either admit or reject the claim, in whole or in part, as the case may be:
Provided that where the liquidator rejects a claim, he shall record in writing the reasons for such rejection.
(2) The liquidator shall communicate his decision of admission or rejection of claims to the creditor and corporate debtor within seven days of such admission or rejection of claims.
41. Determination of valuation of claims. - The liquidator shall determine the value of claims admitted under section 40 in such manner as may be specified by the Board.
42. Appeal against the decision of liquidator. - A creditor may appeal to the Adjudicating Authority against the decision of the liquidator 1[accepting or] rejecting the claims within fourteen days of the receipt of
such decision."
It may not be out of place to notice the relevant provision of IBBI (Liquidation
Process) Regulations, 2016 ('Liquidation Regulations' in short) which is as
hereunder:
"23. Substantiation of claims. - The liquidator may call for such other evidence or clarification as he deems fit from a claimant for substantiating the whole or part of its claim."
12. From the above statutory scheme, it becomes clear that for the purpose
of liquidation, the liquidator has some special powers which are significantly
different from those of the RP. Under Section 36 the liquidator forms a
liquidation estate where liquidator holds all the properties of Corporate Debtor
as a fiduciary, for the benefit of the creditors. Another major function of the
liquidator is the consolidation and verification of the claims submitted to him
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 9 of 15 as has been prescribed by Section 35 of the IBC. After their appointment, the
liquidator has to issue a public announcement within 5 days from the
appointment in Form B of Schedule II of the Liquidation Regulations. The
purpose of the public announcement is to call upon the creditors and other
such persons to submit their claims in relation to the corporate debtor. After
the receipt of the claims, the liquidator shall verify those claims submitted by
the creditors and may also ask the creditors to submit any evidence in relation
to their claims for the purpose of verification. A liquidator is empowered to
either admit or reject the claims on the basis of verification. If the liquidator
rejects or admits a claim of a creditor, he has to communicate the same to the
creditor within seven days from such decision. In the liquidation process, the
liquidator has the power to reject claims raised and if a claim is rejected, a
creditor can appeal against this decision to the Adjudicating Authority. After
all the required claims have been admitted by the liquidator, he is required to
determine the value of the claims for the purpose of distribution of the assets
of the Corporate Debtor. This clearly entails the responsibility of more than
merely collating claims but verification of claims and determination of their
value.
13. Having noticed the scheme of IBC, with respect to role of the Liquidator,
we may now see how the Liquidator in the present factual matrix has handled
the claims lodged by the Respondent on 24.07.2019. The Liquidator informed
the Respondent by email on 03.10.2019 partly rejecting their claims as
follows:
"Bank Guarantee Claim of INR 56,80,000
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 10 of 15 We have perused the claim and communication with the Resolution Professional Mr. Ashish Rathi in relation to the invocation of Bank Guarantee of INR 56,80,000. In this regard, we wish to point out the email dated 6th March 2019 sent by Mr. Sachin Mishra (annexed as Page No. 127 to your claim) which clearly states that the amount paid against the bank guarantee is not under protest. Hence, in view of this, the claim of INR 56,80,000 is rejected.
Invoices dated 22.11.2017 We understand from the company that the invoice no. 1719100023 dated 22.11.2017 is not certified as the plant handover to Mahagenco did not take place. Hence in view of this, the claim for this invoice for INR 16,73,798/- is rejected.
Invoices dated 16.02.2016 and 25.03.2015 The company has accepted the invoices and paid INR 15,48,065/- against the said invoices. The same is also corroborated in your claim filed with us. In view of this, we accept your outstanding claim of INR 6,19,947/- against the above-mentioned invoices.
Summary In view of the reasons stated above, the Liquidator is admitting your claim for INR 6,19,947".
14. Aggrieved by the rejection of their claims, the Respondent filed their
grievance before the Adjudicating Authority which reversed the rejection of the
claims by the Liquidator. The principal conclusive findings contained in the
impugned order as to why the Adjudicating Authority directed the Liquidator
to accept the claims is as follows:
"5.1 We find that there are series of email communications from each side in relation to development of designs and none of such mail suggests any deficiency in the work of the Applicant, who had been forthright in modifying the design/drawings in accordance with the discussion between the parties. The Liquidator has not brought on record any substantive evidence that the invocation of Bank Guarantee by MAHAGENCO was attributable to deficiency in work on the part of the Applicant or any evidence suggesting that the Applicant failed to deliver Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 11 of 15 what it was supposed to. We feel that the action of the Resolution Professional in invoking Bank Guarantee was reaction to invocation of Corporate Debtor's Bank Guarantee by MAHAGENCO. Accordingly, we do not hesitate to hold that the Applicant is entitled to refund of Rs. 56,80,000/, being the amount of Bank Guarantee paid by it, alongwith the payment due in respect of Invoice dated 22nd November, 2017, bearing Ref. No. 1719100023."
15. Coming to our analysis, we find that no material has been placed on
record by the Appellant which shows that the Corporate Debtor had on any
earlier occasion denied making payments against the invoices raised by the
Respondent. This gives sufficient room to believe that the Corporate Debtor
was satisfied with the level of services performed by TCEL. We also find that
the Respondent had been sending repeated emails on a regular basis to the
Corporate Debtor seeking payment against various invoices including Invoice
No. 171910023. These emails dated 06.10.2017, 13.10.2017, 02.11.2017,
21.11.2017, 13.12.2017, 16.01.2018, 16.02.2018, 11.04.2018, and
08.01.2019 are available at pages 154 to 157 of Appeal Paper Book ('APB' in
short). There is nothing to show that the Corporate Debtor had disputed their
liability to pay the last invoice No. 171910023 of 22.11.2017 raised by the
Respondent. No communication appears to have been sent by the Corporate
Debtor to TCEL regarding balance or pending work. There is also substance
in the contention of the Respondent that the emails dated 14.11.2013,
02.06.2014 and 10.11.2014 referred to by the Appellant were at best in the
nature of reminder emails from the Corporate Debtor but do not indicate any
delays committed by the TCEL or any complaint being lodged against them.
No specific grievances with regard to inferior quality of work have either been
placed on record by the Corporate Debtor. The Corporate Debtor had Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 12 of 15 themselves communicated to TCEL that the project timeline of the contract
between the parties for the balance work had been extended upto 31.12.2017.
If we go by the extended timelines, the related work was completed by the
TCEL within time as the invoice was raised by them on 22.11.2017. It
therefore does not stand to reason for the Liquidator to have summarily
rejected the claim of Rs.16.73 lakhs by simply citing that the project handing
over to MSPG had not taken place. The Liquidator has clearly side-stepped
undertaking appropriate verification of the claims.
16. Coming to the issue of invocation of BG by the Corporate Debtor, it is
the case of the Respondent that having duly performed their obligations
arising out of their contract with the Corporate Debtor, and in the absence of
any claim for defect or otherwise, action on the part of the RP to invoke the
BG of Rs. 56.80 lakh was without any basis. It has also been submitted that
the Respondent wanted to avoid the spectre of invocation of their BG to protect
their market reputation and hence paid the equivalent amount. Moreover,
since this amount of Rs.56.80 lakh was paid while CIRP proceedings were
going on and moratorium was in force, the Respondent was estopped from
initiating legal proceedings to claim the said amount. The first chance that
the Respondent got to recover the BG equivalent amount which was
wrongfully retained by the Corporate Debtor was when the liquidation process
commenced and the Respondent acted accordingly.
17. It is the counter-point of the Appellant that when the Respondent had
made the payment of Rs.56.80 lakhs to the Corporate Debtor in lieu of the
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 13 of 15 BG, without any protest or reservations, they are estopped from seeking
refund of the same before the Liquidator.
18. The liquidator is required to admit or reject a claim, basis documentary
evidence. The liquidator is required to independently assess the merits of such
claims based on the documents/evidence adduced by each such creditor.
When we analyse the material on record, we notice that while sending the
initial communication to the Bank of Baroda to encash the BG, the RP had
not specified the default or non-compliance on the part of TCEL. The
communication contained a very general statement that TCEL had defaulted
under the contract and failed to comply with the terms and conditions of the
contract. There seems to be no supporting documents to substantiate that
the invocation of BG by MSPG was attributable to deficiency in work on the
part of the Respondent or failure to achieve the deliverables on their part.
Given this backdrop, we are of the considered view that the Liquidator has
tried to justify the wrongful invocation of BG by raising the feeble defence that
the BG equivalent had been paid without any demur or protest which seems
to be more of an after-thought to cover the action of the RP.
19. In such circumstances, we have no hesitation in holding that the
Respondent cannot be faulted in following the due process in filing its claim
with the Liquidator. Furthermore, in the liquidation process, if a claim is
rejected by the Liquidator, a creditor can appeal against this decision before
the Adjudicating Authority. The Adjudicating Authority enjoys complete
jurisdiction under Section 42 of the IBC to deal with the decision of the
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 14 of 15 Liquidator rejecting the claim filed by the Respondent under Section 38 of
IBC. This is in consonance with the statutory position set out under the IBC.
20. In view of the foregoing reasons, we are of the considered view that the
Adjudicating Authority after perusing all material on record has rightly come
to the conclusion while passing the impugned order that the Respondent is
entitled to refund of Rs. 56.80 lakh being the amount of BG paid by it,
alongwith the payment of Rs. 16.73 lakh due in respect of invoice dated
22.11.2017 and accordingly directed the Liquidator to accept these claims.
We find no reasons to interfere with the impugned order. The Appeal fails and
is dismissed. No costs.
[Justice Ashok Bhushan] Chairperson
[Mr. Barun Mitra] Member (Technical)
[Mr. Arun Baroka] Member (Technical)
Place: New Delhi Date: 28th May, 2024
Harleen Kaur
Company Appeal (AT) (Insolvency) No. 264 of 2024 Page 15 of 15
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free