The Tribunal, in exercising its power under Section 242(4) of the Companies Act, 2013, may make only such interim orders as regulate the conduct of the company's affairs upon such terms and conditions as appear to it to be just and equitable; it may not substitute its own judgment for the commercial wisdom of the Board of Directors on whether particular assets should be sold to meet the company's liabilities. Where a petition under Sections 241–242 is pending, the purpose of those provisions is to save the company from winding up and from prejudicial or oppressive conduct; that purpose is defeated if operational or financial creditors are permitted to trigger the Corporate Insolvency Resolution Process during the pendency of the petition, so the Tribunal must take into account the imminent threat of insolvency proceedings when deciding interim applications.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
(Arising out of Order dated 14th February, 2019 passed by the National Company Law Tribunal, Principal Bench, New Delhi, in C.P. No. 18(ND)/2015)
IN THE MATTER OF:
M/s. Atlas Cycles (Haryana) Ltd. & Ors. ...Appellants
Vs
Mr. Vikram Kapur & Ors. ....Respondents
Present:
For Appellants: Mr. Sudhir K. Makkar, Senior Advocate with Ms. Saumya Gupta, Advocate.
For Respondents: Dr. U.K. Chaudhary, Senior Advocate with Ms. Manisha Chaudhary, Ms. Samridhi Gogia, Mr. Sumit Malhotra and Mr. Dhruv Gupta, Advocates for R-1 & R-2.
Ms. Meenakshi Singh and Mr. Abhishek Choudhary, Advocates for R-5 to R-13
J U D G M E N T
SUDHANSU JYOTI MUKHOPADHAYA, J.
1st & 2nd Respondents Mr. Vikram Kapur and Mr. Angad Kapur filed
application before erstwhile Company Law Board in February, 2015 being
C.P No. 18 (ND)/ 2015 inter alia seeking demerger of the 'Sonepat Unit' in
light of the 'Memorandum of Understanding' ('MoU') dated 31st August,
2003 and the 'Arbitral Award' dated 1st November, 2014. The petition, on
constitution of the National Company Law Tribunal ('Tribunal' for short),
was transferred to the Principal Bench, New Delhi. 2
2. In the said petition, an application under Rule 11 of the 'National
Company Law Tribunal Rules, 2016' was filed by Applicants ('Appellants'
herein- 1st, 12th & 14th to 16th Respondents in the petition) with prayer to
grant permission to the Appellant Company- 'M/s. Atlas Cycles (Haryana)
Ltd.' to approach the consortium banks for release of title deeds in respect
of non-core assets under the charge of 'Sonepat Unit' so as to proceed with
its sale in accordance with the resolutions passed by the Board.
3. Before the Tribunal, the petitioners ('1st & 2nd Respondents' herein)
brought attention that the resolution passed by the Board of Directors on
14th December, 2017 is under challenge in C.A. No. 179(PB)/ 2018. The
said application was disposed of on 2nd August, 2018 and the Respondents
('Appellants' herein) were restrained from giving effect to the resolutions
dated 14th December, 2017 and 24th February, 2018 in the light of the
previous orders dated 24th August, 2015 and 7th September, 2015.
4. The Appellants ('Respondents' before the Tribunal) also filed C.A.
No. 511(PB)/2018 and C.A. No. 618(PB)/2018 for seeking directions
from this Tribunal to take certain urgent interim measures in the light
of the subsequent developments which was also disposed of on 3 rd
August, 2018. The said order was challenged before this Appellate
Tribunal which was disposed of vide order dated 28 th August, 2018.
5. Before the Tribunal, the Applicants ('Appellants' herein)
have asserted that grant of relief in their application is
i m p e r a t ive for a more mea ningf ul a nd pur posive i nter pr eta tion
Company Appeal (AT) No. 57 of 2019 3
of the orders passed by this Appellate Tribunal on 28 th August,
2018 & 17 th September, 2018. The reasons for filing the application
have been spelt out as noticed by the Tribunal and set out below: -
a. 'Sonepat Unit' has posted a loss of Rs. 6.63
crores for FY 2017-18.
b. Quarterly unaudited results for the quarter
ending 30.06.2018 'Sonepat Unit' - Loss of
Rs. 2.41 crores.
c. Overall financial condition of the
company has been severely impacted due to
heavy losses by 'Sonepat Unit'.
d. On instructions of the Board, Rs. 21.59
crores has been paid till 30.09.2O18 by
Sahibabad unit to avoid the account of the
company becoming NPA. Therefore
Sahibabad unit is facing a liquidity crunch.
e. The liabilities continue to mount on the
company and the company is liable to pay nearly
Rs. 32 crores to vendors due to the default of
'Sonepat unit'.
f. Owing to defaults of 'Sonepat Unit',
vendors have now restricted supply raw
materials to Sahibabad unit thereby causing a
serious situation as presently Sahibabad unit is
Company Appeal (AT) No. 57 of 2019 4
responsible for more than 90% of the total
production of the company.
g. The company has received over 80 legal
notices under the 'Negotiable Instruments
Act' on the cheques which were issued by
the Management Committee of 'Sonepat
Unit' and were returned dishonoured due to
insufficiency of funds. Some of these have
already culminated into legal cases and the
Directors of the company have been
summoned by various Courts. The liability
of these notices is to the tune of nearly Rs.
5.3 crores.
h. In the meanwhile the Respondent No. 1
company has received notices from NCLT,
Chandigarh in light of petitions being filed
under Section 9 of the Insolvency and
Bankruptcy Code by various suppliers/
vendors of 'Sonepat Unit'. The details of the
same are as follows:
i. 'M/s. Varun Auto Industries '
v. 'M/s. Atlas (Cycles)
Haryana Ltd.' being
C.P.(I.B.)No.175/Chd/Hry/2018:
Vide order dated 26.09.2018 the
Company Appeal (AT) No. 57 of 2019 5
Tribunal granted Atlas five weeks
time to file a reply and the
matter is fixed for arguments on
15.11.2018.
ii. M/s. Mahajan Tyre Company
v. M/s. Atlas (Cycles) Haryana
Ltd. being
C.P.(I.B.)No.240/Chd/Hry/2018
: Vide order dated 05.10.2018
the Tribunal granted Atlas five
six weeks time to file a reply and
the matter is fixed for arguments
on 13.12.2018.
iii. M/s. S u r i nd e r a Cycles v.
M / s . At l a s ( C y c le s ) Haryana
Ltd. being
C.P.(I.B.)No.261/Chd/Hry/2018
: Vide order dated 10.09.2018
the Tribunal issued notice on
the application filed by the
Operational Creditor and is fixed
for appearance on behalf of Atlas
on 14.12.2018.
iv. Avon Ispat - S. 8 IBC notice
received
Company Appeal (AT) No. 57 of 2019 6
v. Berger Paints - S. 8 IBC notice
received
i. Over a period of time, 'Sahibabad' and
'Sonepat Unit' have contributed a sum of
Rs.45.51 crores and Rs. 26.68 crores
respectively towards meeting outstanding
liabilities of 'Malanpur Unit', pursuant to
its closure under directions of the Board. A
communication dated 04.03.2018 was sent
to the Board by the CFO of the company
which clearly indicates that the net outflow
of funds from Sahibabad unit against such
contributions was Rs. 29.18 crores while
the net outflow of fund from 'Sonepat Unit'
towards the said contribution was only Rs.
8.25 crores.
6. The basis of the application was the resolution dated 10 th July,
2018 passed by the Board of Directors which resolved that "sanction
is hereby accorded for requesting the Consortium Bankers for release
of title documents of 'ASTI', 'Atlas Auto' and 'non -core assets' under
the charge of 'Sonepat Unit'". The list of assets in respect of which
release of title deeds is sought from the bank is as under:
i. 'Atlas Steel Tube Industries', Bawal
ii. 'Atlas Auto Industries', Rasol
Company Appeal (AT) No. 57 of 2019 7
7. Non-core assets of the company under the charge of 'Sonepat Unit'
was shown therein which includes 'Residential House', 'Bawal Factory',
'Rasoi Factory' and 'Bhind- Malanpur Factory', as detailed below:-
S/N PROPERTY'S ADDRESS AREA TYPE
1 Residential House 24-B, Model Town, 792 sq yard Sonepat
2 Residential House 102 L Sonepat 504 sq yard
3 Residential House 137-L, Model Town, 500 sq yard Sonepat
4 Residential House 110-L, Model Town, 590 sq yard Sonepat
5 Residential House 264, Model Town, 213 sq yard Sonepat
6 Residential House 216 HBC, Murthal 229.3 sq Road, SNP yard
7 Residential House A-7&8, Prem Nagar, 711.11 sq yard Sonepat
8 Residential House 115-116, Housing 573.75 sq Board Colony, Sonepat yard each flat
9 Residential House 58-L, Model Town, 564 Sonepat
10 Bawal Factory Plot No.1, Sector-V, Growth Central, Bawal - Rewari
11 Rasoi Factory Waka Village, - . Nathupur, GT Road, Sonepat
12 Bhind- Malanpur Plot No. 16-17, 21-22, Factory Industrial Area, Malanpur, Distt. Bhind
Company Appeal (AT) No. 57 of 2019 8
FURTHER RESOLVED that sanction is hereby
accorded for submission of an undertaking to the
Consortium Banks that pursuant to the release of title
deeds of ASTI, Atlas Auto and non-core assets under
the charge of Sonepat unit, a sum of Rs. 20 crores
from out of sale proceeds of ASTI shall be paid to the
Consortium Banks to reduce the exposure of the
company and the release of title deeds may be made
subject to such undertaking. Such proposal shall be
submitted under the signatures of Sb. I.D. Chugh,
Whole Time Director."
8. The Applicants ('Appellants' herein) plea before the Tribunal was
that the petitioners- non applicants ('Respondents' herein) could not
operationalize the 'Sonepat Unit' and production from the 'Sonepat
Unit' continues to be zero. It was further alleged that the petitioners
(1 st & 2 nd Respondents herein) have failed to furnish the requisite
information sought by the Board of Directors and no information has
been furnished regarding the outstanding liabilities to its suppliers.
The information is necessary to prepare the defence in the
proceedings initiated by 'Operational Creditors' under the 'Insolvency
and Bankruptcy Code, 2016' in NCLT, Chandigarh. The 'Sonepat Unit'
has not been able to clear its statutory liabilities later on liquidating
the outstanding liabilities of suppliers. The Board of Directors has
strongly felt that the only possible solution for the Respondent No. 1
company is to liquidate the non-core assets of the company so that
additional funds could be generated and be utilized to stabilize the
financial position which otherwise is getting adversely impacted. Company Appeal (AT) No. 57 of 2019 9
9. Non-applicants/Petitioners (1 st & 2 nd Respondents herein)
despite the opportunity granted, did not file any reply and their
counsel addressed the argument on the ground that the application is
not maintainable as the relief claimed has already been declined in
the earlier proceedings.
10. The Tribunal on hearing the parties observed and passed
following order:
"19. It was clarified that the order passed by this
Tribunal relating to continuity of the operations of the
orders dated 24.08.2015 & 07.09.2015 and
suspension of resolution dated 13.08.2015 and
the order of abeyance relating to resolution
dated 14.12.2017 & 24.02.2018 were to
continue till the final disposal of the company
petition. The Bench also clarified clause 3 to
observe that in default of making payment
within 30 days with regard to the cycles and
other parts, the interim order shall stand
vacated.
20. Dr. Chaudhary has rightly contended that
after passing the order on 28.08.2018 by the
Hon'ble Appellate Tribunal or clarifying the
same on 17.09.2018 not a penny has been
Company Appeal (AT) No. 57 of 2019 10
infused in the Sonepat unit to help and facilitate
it to achieve optimum level of production nor a
single cycle or parts from Sahibabad unit has
been entrusted to it for sale to service its own
territory. It is also evident that the issue like
Insolvency and Bankruptcy Code, 2016 and
apprehension of applicant- respondent No. 1
company facing the Corporate Insolvency
Resolution Process were also considered by this
Tribunal as well as by the Hon'ble Appellate
Tribunal. Moreover, in pursuance of order dated
12.10.2018 the non-core assets of Malanpur unit
is already in the process of being sold and the
sale proceeds are likely to be utilized for one
purpose or the other. It would not lie in the mouth
of the applicant- respondent No. 1 company that
they would not follow the direction issued by the
Hon'ble Appellate Tribunal by infusing funds in
the Sonepat unit and then to raise the bogie of
lack of funds and increasing liability of the
Sonepat unit. Likewise, no effort has been made
to supply the cycles or other parts manufactured
by Sahibabad unit to Sonepat unit in terms of
Company Appeal (AT) No. 57 of 2019 11
the order dated 28.08.2018/17.09.2018 passed
by the Hon'ble Appellate Tribunal. Despite this
Tribunal has shown indulgence to the parties to
argue the matter finally but the matter has been
got adjourned on one pretext or the other. In fact
applicant-respondents No. 1, 12, 14 to 16 have
jo ined h ands to d ef eat the d irections of the
Hon' ble Appellate T ribunal. By not inf using
f unds the applic an ts are pushing the
Sonepat Un it to penury and create a
situ ation to f ile an applic ation f or issuance
of direction. It is wholly unf air.Therefore, we
are not inclined to grant any interim relief at this
stage particularly when nothing has been placed
on record to show that the applicant-respondent
No. 1 company as such is unable to meet the
liability of the Operational Creditors who have
filed petitions under the Insolvency and
Bankruptcy Code, 2016.
21. Mr. R.S Sun, learned senior counsel
appearing for TDI Infratech Limited has
submitted that one property at item No. 11 of the
table may not be included as a part of the prayer
Company Appeal (AT) No. 57 of 2019 12
made in this application as TDI Infratech Limited
has acquired some interest in it. As we are
dismissing the application the request made by
Mr. Suri would not survive. We order
accordingly."
11. With the aforesaid observations, the application was dismissed
which is under challenge in this appeal.
12. For deciding the issue, it is desirable to notice the relevant
background of the case as narrated by the Appellant and detailed
below:
13. Late Rai Bahadur Janaki Dass Kapur had three sons, namely Sh.
Bishambar Dass Kapur, Sh. Jaidev Kapur and Sh. Jagdish Kapur. It
was considered expedient to split the management, ownership and
control of the companies and assets jointly owned by the family i n
three equal shares and award one share to each of the three
units/families which would thereby help in better management and
control, and further augment the business prospects of the
reconstituted units and business enterprises in the form of
'Memorandum of Understanding' dated 8 th January, 1999. The said
'Memorandum of Understanding' inter-alia provided that the assets of
the Kapur family will be divided into three baskets by the family, based
on the valuation of the Mr. K.N. Memani and the said valuation would
Company Appeal (AT) No. 57 of 2019 13
be final and binding on the parties. The said 'MOU' further stipulated
that in the event of any disputes and/or difference of opinion in any
manner, the same shall be referred to the arbitration of Justice A.M.
Ahmadi, former Chief Justice of India who was unanimously elected as
the Sole Arbitrator. Immediately after the demise of Sh. Bishambar
Dass Kapur in August 2000, some disputes arose between the family
members and the arbitration proceedings commenced.
14. On 31 st August, 2003, the Board of Directors of 'Atlas Cycles
(Haryana) Ltd.' keeping in view the adversarial litigation between the
Kapur family members, undertook restructuring of the controls and
constituted three Management Committees in respect of the three
manufacturing units, in a manner that each management committees
consisted of members from one family unit. In accordance with the
said resolution, the day to day management of the three units of Atlas
was entrusted to three management committees constituted in ter ms
of the said resolution. The Management committees were to have
autonomy of operations and were subject to overall supervision and
control by the Board of Directors. The Management Committee of
'Sonepat Unit' consisted of members from the of B.D. family Kapur
group (except for Mr. Arun Kapur and family) Management Committee
of 'Sahibabad Unit' consisted of members of Jaidev Kapur family
group and Management Committee of 'Malanpur Unit' consisted of
members of Jagdish Kapur family group.
Company Appeal (AT) No. 57 of 2019 14
15. Due to precarious financial position of 'Malanpur Unit' and
various other reasons, vide resolution dated 5 th October, 2014, the
Board of Directors resolved to close the unit and suspended all
manufacturing activity in the unit. The Board also directed that the
territories of 'Malanpur Unit' shall be divided equally and serviced by
the other two units i.e. 'Sonepat' and 'Sahibabad Unit'. It also resolved
that all the liabilities of 'Malanpur Unit' shall be met out of sale of
assets of 'Malanpur Unit'/ 'ASTI'/ 'Atlas Auto' and the deficit if any
shall be borne equally by 'Sonepat' and 'Sahibabad Unit'. It also
resolved that pending sale/ liquidation of assets of 'Malanpur Unit',
both 'Sonepat' and 'Sahibabad Unit' shall contribute a sum of Rs. 10
crores each to tide over the immediate liabilities which include
statutory dues and bank liabilities to prevent any situation of th e bank
account of the company turning 'NPA'.
16. The arbitration proceedings between the Kapur family members
culminated into an award dated 1 st November, 2014 passed by the
Hon'ble Sole Arbitrator. It is pertinent to mention that the Learned
Arbitrator, in contradiction to his previous orders, directed division of
the management, control and ownership of Appellant no. 1 Company.
17. After issuance of the arbitral award, 1 st to 3 rd Respondents
herein, filed C.S. (OS.) No.3510 of 2014 before the Hon'ble Delhi High
Court inter alia praying for a decree of permanent injunction
restraining the defendants from in any manner changing the
Management Committee of 'Sonepat Unit' and from interfering with the
Company Appeal (AT) No. 57 of 2019 15
management and control of the said Unit in light of the 'MOUs' dated
8 th January, 1999 and 31 st August, 2003 and the arbitral award dated
1 st November, 2014. A petition under Section 34 of the 'Arbitration and
Conciliation Act, 1996' was filed in January 2015 by some members of
the Kapur family against the Arbitral Award dated 1 st November, 2014,
being O.M.P. No. 30 of 2015 before the Hon'ble Delhi High Court.
18. Vide order dated 3 rd August, 2015, the Hon'ble Delhi High Court
partly allowed O.M.P. No.30 of 2015 and set aside the award of the
Arbitrator in so far as it related to 'Atlas Cycles (Haryana) Ltd.' and
public charitable Trusts. The Hon'ble High Court held that the
Arbitrator had no jurisdiction in the matters concerning Appellant No.1
or its Board. 1 st to 3 rd Respondents have filed an appeal against the
order dated 3 rd August, 2015 under Section 37 of the 'Arbitration and
Conciliation Act, 1996', being F.A.O. (OS.) No. 448/2015 and F.A.O.
(OS.) No. 459 of 2015 which is pending adjudication before the Hon'ble
Division Bench of the Delhi High Court. It is pertinent to mention that
no stay order was granted against the order dated 3 rd August, 2015."
19. It is informed that the application under Section 37 of the
'Arbitration & Conciliation Act, 1996' has also been dismissed.
20. Earlier with regard to the resolution dated 24 th February, 2018,
interim order of stay having passed by the Tribunal on 14 th March,
2018 and order was reserved in the Interlocutory Application. Number
of applications was filed by the Appellant Company and some of the
applications were filed by the 1 st & 2 nd Respondents/ Petitioners.
Company Appeal (AT) No. 57 of 2019 16
21. Vide order dated 3 rd August, 2018, the Tribunal directed in the
light of the order dared 2 nd August, 2018, it did not think fit to pass
any orders in C.A. No. 511 (PB)/ 2018 and C.A. No. 618 (PB)/ 2018
as the same showed that the Board of Appellant Company is trying to
grab the territories of the Management Committee of 'Sonepat Unit'.
22. Aggrieved by the said orders, the Appellants filed appeal before
this Appellate Tribunal being Company Appeal (AT) Nos. 260-262 of
2018. The said appeals were disposed of vide order dated 28 th August,
2018 with part modification of the order dated 2 nd August, 2018 passed
by Tribunal, Principal Bench. The said order was corrected vide order
dated 17 th September, 2018. Relevant portion of which reads as
follows:
"14. By the impugned order, the Tribunal has kept
certain resolution in abeyance and directed to
continue with the operation of the two orders dated
24th August, 2015 and 7th September, 2015. Two of
the resolutions of the Board of Directors dated 14 th
December, 2017 and 24th February, 2018 have been
kept in abeyance and the Board of Directors has been
directed to facilitate the 'Sonepat Unit' in production
to achieve the optimum level. The Applicant/Petitioner
No.1 (Respondent herein) has also been directed to
furnish all details sought by the Board of Directors of
the Company relating to fund flow from the
Government order and utilization thereof. Company Appeal (AT) No. 57 of 2019 17
15. Learned Senior Cousnel appearing on behalf of
the Appellants submits that if the Respondents are
allowed to sign the cheques, many of the cheques will
be bounced, as already bounced and it may result
into initiation of 'Corporate Insolvency Resolution
Process' against the Company.
16. Further, according to him, till the 'Sonepat Unit'
starts with its production to achieve optimum level,
the Company should be allowed to supply the
products such as cycles and its parts from other
units, which are producing in excess to their demand.
17. Though, the contesting Respondents have
taken plea that the Company has been divided into
three Companies but it is not in dispute that even now
the Company (1st Appellant) is only one. However, we
find that the Company has three units namely--
'Sonepat Limited', 'Malanpur Limited' and 'Sahibabad
Limited', which are under the administrative control of
one or other group of the same family, and have their
respective jurisdiction to sale products and they are
keeping separate accounts, unit wise.
18. The Memorandum of Understanding of the
years 1999 or 2003 has not been given full effect for Company Appeal (AT) No. 57 of 2019 18
last fifteen to eighteen years for dividing the
Company into three different Companies except the
administrative control, separation of jurisdiction for
sale of product and to keep separate accounts. For
the said reasons, no specific weightage can be given
to one or other unit except the interest of the Company
for passing order under Section 242(4). The impugned
order dated 2nd August, 2018 being in the interest of
the Company, no interference is called for. However,
in view of the submission made by the parties and in
the interest of the Company, we pass the following
order in addition to the impugned order passed by the
Tribunal.
i. The Board of Directors of the Company
while facilitating the 'Sonepat Unit' in
production to achieve optimum level may
infuse funds for 'Sonepat Unit' to the
extent it may require to achieve the
production to optimum level. If the
Company infuse any fund, it will be
entitled to get the amount back from the
'Sonepat Unit' which is under the control
of the contesting Respondents. In such
case, the contesting Respondents will
ensure that the amount infused by the Company Appeal (AT) No. 57 of 2019 19
Company in the 'Sonepat Unit' is
returned as per terms and conditions, if
any.
ii. The cheques on behalf of 'Sonepat Unit'
of the Company shall be signed by the
Authorised person/Director of the
'Sonepat Unit' along with one of the
authorised representative of the
Company. For the purpose of such
signature, the Company may either
authorise any of its representative
already posted in the 'Sonepat Unit' or
may post any of its representative to
ensure joint signatures on the cheque for
payment in favour of workmen,
employees, suppliers or raw materials,
other creditors, electricity charges, water
charges, tax etc.
iii. Till 'Sonepat Unit' achieve optimum level
of production, it will be open to the Board
of Directors of the Company to make
available the products, such as cycles
and other parts to 'Sonepat Unit' from
other units for meeting the demand and
supply in the market which is under the
Company Appeal (AT) No. 57 of 2019 20
control of 'Sonepat Unit'. 'Sonepat Unit',
in its turn, will keep an account of the
products, such as cycles and other parts
received from other units and after sale
of such products will report the same to
the Company as also the unit(s) from
which the products such as cycles and
its parts are supplied. The 'Sonepat Unit'
will not sell any product such as cycles
and its parts supplied by other units on
credit. The 'Sonepat Unit' will transfer
the amount generated from sale of
product of other units to the unit
concerned within 30 days of sale failing
which, in default the present order
passed by this Appellate Tribunal and
order passed by the National Company
Law Tribunal shall stand vacated.
iv. Appropriate adjustment in the books of
accounts should be maintained by the
'Sonepat Unit' with regard to products
received from other units and it will
communicate the month wise sale to the
Company and unit concerned.
Company Appeal (AT) No. 57 of 2019 21
v. The 'Sonepat Unit' and the contesting
Respondents who are in control of
'Sonepat Unit' will furnish all details as
may be sought for by the Board of
Directors of the Company relating to fund
flow from the Government order and
utilization thereof as has been ordered
by the Tribunal.
vi. It is needless to say that the rest part of
the order passed by the Tribunal relating
to continuity to the operation of the
orders dated 24th August, 2015 and 7th
September, 2015 and suspension of
resolution dated 13th August, 2015 and
the order of abeyance relating to
resolution dated 14th December, 2017
and 24th February, 2018 shall continue
till the final disposal of the Company
Petition.
The appeals stand disposed of with aforesaid
observations and directions."
23. Learned counsel appearing on behalf of the Appellant submitted
that the Tribunal has erroneously observed that no funds have been
infused in 'Sonepat Unit'. Firstly, in the order passed by this Appellate
Company Appeal (AT) No. 57 of 2019 22
Tribunal on 28 th August, 2018, the infusion of funds into 'Sonepat
Unit' was optional and not mandatory. Secondly, the infusion of funds
into 'Sonepat Unit' is possible only through sale of non-core assets as
the Appellant has no independent source of funds. At the instance of the
Board of Directors, the 'Sahibabad Unit' has already contributed a sum
of Rs. 32.62 Crores towards payment of outstanding liabilities of
'Sonepat Unit' between 1st December, 2017 to 31st March, 2019, out of
which, a sum of Rs. 8.92 Crores was contributed between 28 th August,
2018 to 31 st March, 2019 i.e. since the date of passing of the order
dated 28 th August, 2018 passed by this Appellate Tribunal in the earlier
appeals.
24. It is further submitted that the prayer for sale of non-core assets
acquires significance for more purposive interpretation of the directions
made by this Appellate Tribunal vide order dated 28th August, 2018.
25. It is submitted that the Tribunal erroneously observed that no
supplies were made to 'Sonepat Unit' in pursuance of the order dated 28 th
August, 2018. The Board passed a resolution dated 29 th August, 2018
directing the other unit to supply to 'Sonepat Unit'. However, the 1st
Respondent asked the bicycles to be supplied at Marginal Cost vide
communication dated 11 th September, 2018 contrary to the terms of the
order. An appropriate reply dated 12th September, 2018 was sent by the
Board of Directors and another communication dated 18th September,
2018 was sent by 'Sahibabad Unit' forwarding price lists, etc.
26. Therefore, according to the Appellant, the Tribunal erroneously
observed that no material has been placed on record to establish that the
Company Appeal (AT) No. 57 of 2019 23
Company has no funds. It is submitted that the Tribunal failed to take note
of the following facts:
a. Bank position as on 31st March, 2019.
i. Sanctioned limit - Rs. 19 crores
ii. Drawing power-- Rs. 18.54 crores
iii. Availed limits - Rs. 18.14 crores
b. All mutual funds exhausted except for a small art fund of Rs.
50 lakhs which is sub judice.
c. Payments to suppliers overdue, more than 60 days - Rs. 57
crores.
d. Position of funds as on 31 st December, 2018 can be seen from
the Letter dated 25 th January, 2019 sent by statutory
auditors stating that all mutual funds and other investments
have been redeemed by 'Sahibabad unit'.
27. Learned counsel for the Appellant submitted that the Tribunal
completely ignored the fact that A) all mutual funds and investments
available had already been liquidated; B) all bank limits were fully
exhausted; and C) no other funds available with the company to improve
the liquidity. Thus, the observation of the Tribunal that the financial
stringency was a bogey is ex facie erroneous.
28. It was submitted that the Tribunal noted the reasons and
justifications for sale of non-core assets in Para 5 of the impugned
Company Appeal (AT) No. 57 of 2019 24
order but none of the contentions raised by the Appellant and noted in
Para 5 have been dealt with in the impugned order. The Tribunal
completely erred in holding that since the non-core assets of 'Malanpur
Unit' are in the process of being sold, the sale proceeds are likely to be
utilized for one purpose or the other. The proposed utilization of the
funds to be generated through sale of the said asset has already been
placed on record.
29. It is submitted that the Appellant has provided proposed
utilization of the funds to be generated through sale of non-core assets
and sale of 'Bawal Land' and detail outstanding of the company as of
today to the vendors, as stated below:
"1. Proposed utilization of the funds to be generated through sale of non -core assets
Amount likely to be realized through the said sale of non- Rs.27crores core assets
Amount proposed to be paid to the consortium banks as Rs. 15 crores a precondition for obtaining the title deeds of the said non-core assets as the same are held by the banks as collateral security for the financial assistance extended to the company.
Payment of Rs. 15 crores to the consortium banks shall also scale down the utilized limit of the company and thus reduce the exposure of the company by Rs. 15 crores and thus reduce the liability of the company (pertaining to Sonepat unit).
Amount proposed to be utilized by the company towards Rs. 12 crores liquidation of liabilities to the vendors in a phased manner and statutory liabilities pertaining to Sonepat unit.
2. Sale of Bawal Land
The land in question was earlier utilized for 'Atlas Steel Tube Industries' which
was shut down in 2014 and was being managed by Management Committee of
Company Appeal (AT) No. 57 of 2019 25
'Malanpur Unit'. The permission for sale of the said asset was granted by the
Tribunal vide order dated 12 th August, 2018 in C.A. No. 842 (PB)/ 2018.
Proposed utilization of the sale proceeds
The amount likely to be realized through the sale of Rs.35.00 Cr said asset
Amount proposed to be paid to the Consortium Rs. 20.00 Cr bankers as a condition for release of the title deeds of the said property as the same are held by the banks as collateral security for the financial assistance extended to the company
Amount liable to be paid back to M/s. AGR Steel Rs. 13.00 Cr Strips Pvt. Ltd. towards refund of advance received by Atlas against proposed sale of said asset to M/s. AGR Steel Strips Pvt. Ltd. in 2012. AGR has a lien on the said property till the amount of advance alongwith interest is not refunded to AGR.
Brokerage Rs.0.82 Cr TDS Rs. 0.35Cr
Dues of HSIIDC, part refund to AGR Steel Strips and Rs. 2.00 Cr repayment of fixed deposits etc
The amount of Rs. 2 crores that was received as advance has already been
utilized for payment of dues of HSIIDC, part refund to AGR Steel Strips and
repayment of fixed deposits.
3. Total outstanding of the company as of today to the vendors is as under :
a. For supplies made to 'Sonepat Unit - About Rs. 25 crores
i. No. of vendors who have filed applications under IBC - 12
ii. Amount claimed by the vendors who have filed applications under IBC -
Rs. 10.39 crores
iii. No. of vendors who have filed complaints under 'Negotiable Instruments
Act' - 4
iv. Amount covered in complaints filed under 'Negotiable Instruments Act' -
About Rs. 80 lakhs
Company Appeal (AT) No. 57 of 2019 26
v. Salary, Wages, PF and other statutory liabilities pertaining to 'Sonepat
Unit' - Rs. 1.00 Crore (Approx.)
vi. Besides the legal proceedings pending under 'IBC' and 'NI Act', there are
various notices received under 'IBC', 'NI Act' and 'MSME Act' which have
still not culminated into legal proceedings and such proceedings maybe in
the pipeline. (Amount covered under such notices is in excess of Rs. 6
crores)
b. Sahibabad unit
Payments due to vendors is over Rs. 120 crores out of which payment that is
overdue beyond the 60 days normal credit period is Rs. 57 crores.
c. Malanpur unit
Payment due to vendors is around Rs. 10 crores."
30. According to counsel for the 1 st & 2nd Respondents, 'Atlas Cycle
(Haryana) Limited' is a closely held Company in the nature of a quasi-
partnership Company amongst the three groups of the Kapur family. The
'Atlas Cycles (Sonepat) Limited', 'Atlas Cycles (Malanpur) Limited' and 'Atlas
Cycles (Sahibabad) Limited' are wholly owned subsidiaries of Appellate No.1
Company. However, there is nothing on the record to suggest that 'Atlas
Cycle (Haryana) Limited' has any subsidiary company nor anything on the
record that company in the name of 'Atlas Cycles (Sonepat) Limited', 'Atlas
Cycles (Malanpur) Limited' and 'Atlas Cycles (Sahibabad) Limited' have been
registered under the Companies Act or treated to be a subsidiary of the
Appellant No.1 Company. The purpose of demerger of business pursuant to
the 'Memorandum of Understanding' has failed, as noticed in a preceding
paragraph. Pursuant to the 'Memorandum of Understanding', the Arbitration
Proceedings is initiated in which order of award was passed but was set
Company Appeal (AT) No. 57 of 2019 27
aside by the Hon'ble High Court and affirmed under Section 37 of the
'Arbitration & Conciliation Act, 1996'.
31. Therefore, the aforesaid plea taken by 1st & 2nd Respondents
('Petitioners' before the Tribunal) also cannot be accepted as they had not
filed any reply affidavit nor taken any plea that there are three separate
subsidiary Companies as discussed above. If there are three different
Companies, then Insolvency Proceeding will be initiated against one of them
such as 'Atlas Cycles (Sonepat) Limited'. However, for non-payment of dues
in absence of separate Companies, the Insolvency Proceeding will be initiated
against Appellant No.1 Company- 'Atlas Cycle (Haryana) Limited'.
32. The other plea taken by 1st & 2nd Respondents is that the Appellants
created obstacles and, therefore, the application was filed by 'Sonepat Unit'
against the Board Resolutions but from the record, we find that the
application under Sections 241-242 of the Companies Act, 2013 was filed
with prayer for demerger by 1st & 2nd Respondents in their individual
capacity (as petitioners) and not by so called 'Atlas Cycles (Sonepat) Limited'
or 'Sonepat Unit'.
33. The 1st & 2nd Respondents ('Petitioners' before the Tribunal) have
alleged obstacles created by Board of Directors, as detailed below:
(i) 'Malanpur Unit' of the Company was shut in 2014. Banks
recovered the liabilities of the 'Malanpur Unit' from the Bank
accounts of the 'Sonepat Unit' due to which the credit limits of the
'Sonepat Unit' were exhausted and the unit was left with no
Company Appeal (AT) No. 57 of 2019 28
working capital to run the operations of the unit smoothly. The
Sahibabad Unit serves all the territories of 'Malanpur Unit' and
takes all the profits despite the fact that 'Sonepat Unit' paid the
liabilities equally.
(ii) The Board of Directors has time and again passed Board
Resolutions and has suspended the financial powers of
the 'Sonepat Unit'. Vide Board Resolutions dated 6th April, 2015,
13th August, 2015, 14th December, 2017 and 24th February, 2018,
the Board of Directors suspended the financial powers of the
'Sonepat Unit' against the Order dated 7th September, 2015, vide
which the erstwhile Company Law Board suspended the Board
Resolution till the final hearing of the Petition.
(iii) The 'Sonepat Unit' is shut since March, 2018 because of the
Board Resolutions passed by the Board of Directors. The Unit was
flourishing and had successfully completed tenders received from
the Government of Gujarat to supply 1,25,000 cycles worth Rs. 32
Crores and another tender of 1,13,000 cycles of Rs. 32 Crores from
the Government of Rajasthan in the year 2017-2018.
(iv) In 2016, the 'Sonepat Unit' applied to Consortium Banks to
revise the limits which were approved by the
Banks. 'Sonepat Unit' requested the Board of Directors to pass
board Resolution approval of sanction of the revised limits by the
Banks.
Company Appeal (AT) No. 57 of 2019 29
(v) However, the Board of Directors refused and instead wrote a
letter dated 8th June, 2016 to the bankers, withdrawing the loan
applications of the 'Sonepat Unit' to choke the financial working of
the 'Sonepat Unit'. Furthermore, Board of Directors allowed
'Sahibabad Unit' to avail short term loan of 20 crores against its
non-core assets but refused to allow 'Sonepat' to avail the same.
Letters written to Board of Directors to avail bridge loan of Rs. 15
Crores but to no avail.
34. The Respondents have further taken plea that the Company Petition is
pending before the Tribunal, Principal Bench and the matter is listed for
hearing. The Company Petition will become infructuous if the Appellants are
allowed to sell non-core assets of the 'Sonepat Unit'.
35. It is submitted that the 'Sonepat Unit' is seeking for a demerger of the
Unit as per the 'Memorandum of Understanding' and 'Board Resolutions'.
Non- Core Assets of the 'Sonepat Unit' are the only assets of the Unit. The
Board of Directors was permitted to sell only the 'Bawal Unit' and the sale
proceeds were to be infused in the 'Sonepat Unit' so that the Unit starts
manufacturing again and further to repay the 'Operational Creditors'. The
Board of Directors instead of infusing the said funds in the 'Sonepat Unit'
and or repaying Rs. 11 Crores to the 'Operational Creditors' have changed
their stand before this Appellate Tribunal.
36. It is accepted that 'AGR Steel Strips Pvt Ltd.' had only advanced Rs.
6.37 crores to the Company in 2012. Since it is outstanding since the year
Company Appeal (AT) No. 57 of 2019 30
2012 and there is no urgency to pay the same and the Board of Directors
should prioritise in repaying the funds due under IBC.
37. It is stated that Non- Core Assets of the 'Sonepat Unit' includes
properties which have already been sold to the Trusts of the 'Sonepat Unit',
and the payments have been received by the Board of Directors and the
matter is currently pending before the Hon'ble Delhi High Court. It is
informed that the Board of Directors have not approached the Banks for sale
of Non- core assets and no condition has been imposed by the Bank to
adjust Rs. 15 Crores as the Tribunal dismissed the application for sale of
Non- Core assets.
38. 1st & 2nd Respondents have shown another option and taken plea that
instead of paying to 'AGR Steel Strips Pvt. Ltd.' shall utilise the sale proceeds
from 'Bawal' to repay Rs. 11 Crores to the 'Operational Creditors' under 'I&B
Code'. It is further stated that 4th Respondent made some unauthorised
withdrawals of appox. Rs. 15 Crores in his name in the year 2012-2013.
39. However, we are not inclined to decide the aforesaid question of
withdrawal of any amount of one or other person and it is not possible for
this Appellate Tribunal, at this stage, to decide the amount of sale proceeds
from 'Bawal' should be utilized for payment to the 'Operational Creditors' or
to 'AGR Steel Strips Pvt. Ltd.'.
40. 1st & 2nd Respondents ('Appellants' herein) have not denied the fact
that the 'Financial Creditors' and the 'Operational Creditors' have already
moved for 'Corporate Insolvency Resolution Process' against 'Atlas Cycle
Company Appeal (AT) No. 57 of 2019 31
(Haryana) Limited' and not against 'Atlas Cycles (Sonepat) Limited' for dues
payable by 'Sonepat Unit' to the 'Operational Creditors'. If the 'Corporate
Insolvency Resolution Process' once admitted, the Board of Directors will be
suspended and in that case not only the Appellant No.1 Company will suffer
but all the members including 1st & 2nd Respondents and in such case, the
Company Petition (preferred by 1st & 2nd Respondents) will become
infructuous.
41. In a petition under Sections 241-242 of the Companies Act, 2013
(earlier Sections 397-398 of the Companies Act, 1956), the Tribunal has
power to pass interim order in terms of sub-section (4) of Section 242, which
reads as follows:
"242. Powers of Tribunal. ─........(4) The Tribunal may,
on the application of any party to the proceeding, make
any interim order which it thinks fit for regulating the
conduct of the company's affairs upon such terms and
conditions as appear to it to be just and equitable."
42. From the aforesaid provision, it is clear that the Tribunal can
make any interim order which it thinks fit for regulating the conduct
of the company's affairs upon such terms and conditions as
appear to it to be just and equitable.
43. It is the wisdom of the Board of Directors to decide whether sale
of non-core assets ought to be made or not. It was the duty of the
Tribunal to notice that impending threat of an 'I&B Code' petition
being admitted against the Company cannot be undermined. It is not Company Appeal (AT) No. 57 of 2019 32
in dispute that there are more than ten 'I&B Code' petition s in which
the company has received notice and all petitions (except one) pertain
to the liabilities of 'Sonepat Unit' qua vendors. Interest of more than
12,000 shareholders is at stake and a perfectly solvent company
having the distinction of a market leader may be pushed to insolvency
due to a baseless dispute created by one promoter group.
44. If the Board of Directors on perusal of the record finds that
there is no money payable or receivable to pay to the 'Operational
Creditors'/ 'Financial Creditors' to save it from initiation of the
'Corporate Insolvency Resolution Process', the Tribunal or this
Appellate Tribunal cannot go into commercial wisdom and financial
matrix of the Company to decide whether a particular asset or one or
other asset is required to be sold to satisfy the liabili ties of the
company ('Atlas Cycle (Haryana) Limited') including the liabilities of
'Sonepat Unit' qua vendors. If the salvation for the company is improving
liquidity through sale of non-performing assets of the company including the
non-core assets that were proposed to be sold and servicing the territory, it
is not open for the Tribunal or this Appellate Tribunal to prohibit the
company from taking such decision i.e. from initiation of 'Corporate
Insolvency Resolution Process'.
45. From bare perusal of Section 241 if read with Section 242 of the
Companies Act, 2013, it will be clear that on an application made under
Section 241, if the Tribunal is of the opinion that company's affairs have
been or are being conducted in a manner prejudicial to the interest of the
company and that to wind up the company would unfairly prejudice
such member or members, but that otherwise the facts would justify the
Company Appeal (AT) No. 57 of 2019 33
making of a winding-up order on the ground that it was just and equitable
that the company should be wound-up, in such case, the Tribunal may, with
a view to bringing to an end the matters complained of, make such order as
it thinks fit.
46. The purpose of Section 241 read with Section 242 of the Companies
Act, 2013 is to save the company from winding up even if the company's
affairs have been or are being conducted in a manner prejudicial or
oppressive to any member or members or prejudicial to public interest. The
essence of Sections 241 & 242 will be defeated if during the pendency of the
petition, the 'Operational Creditors' or 'Financial Creditors' are allowed to
trigger 'Corporate Insolvency Resolution Process' itself. The Tribunal while
dealing with the matter failed to notice the aforesaid fact. We are of the view
that it is a fit case in which the Board of Directors should be allowed to take
its own decision as to how it will meet its end for meeting the liabilities of the
'Operational Creditors' / 'Financial Creditors' and whether the liability is of
one or other unit including 'Sonepat Unit' and we, accordingly, allow the
Board of Directors to take such decision to save the company from initiation
of the 'Corporate Insolvency Resolution Process' and not for other purpose.
47. In the result, the impugned order dated 14th February, 2019 is set
aside. The appeal is allowed with aforesaid liberty. However, if the amount is
utilized for any other purpose than meeting the liability of the 'Operational
Creditors' / 'Financial Creditors' or for revival of the 'Sonepat Unit', it will be
open to 1st & 2nd Respondents to bring the aforesaid fact to the notice of this
Appellate Tribunal for appropriate order.
Company Appeal (AT) No. 57 of 2019 34
The appeal is allowed with aforesaid observations. No costs.
[Justice S.J. Mukhopadhaya] Chairperson
[Justice Bansi Lal Bhat] Member (Judicial)
NEW DELHI
2nd July, 2019
AR
Company Appeal (AT) No. 57 of 2019
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free