Ashok Kumar Bhasin vs Abb Power Products And Systems India ...
- CitationCompany Appeal (AT)(Insolvency) No. 414 of 2023
Ratio decidendi
The rule this decision rests on
A petition under Section 9 of the Insolvency and Bankruptcy Code, 2016 signed and verified by an officer under a specific power of attorney, which the Board is not shown to have restricted, is competently filed; a procedural defect that does not go to the root of the matter cannot defeat a just claim, and a power-of-attorney holder's authority to act is not vitiated for want of further Board approval where the instrument itself confers the power. The strict burden of proof under Sections 101, 102 and 106 of the Indian Evidence Act, 1872 does not apply to Section 9 proceedings, which are summary in nature and conducted on prescribed pleadings; where the corporate debtor's demand-notice reply and pleadings do not specifically deny delivery, and its conduct (raising no complaint about non-delivery before the reply, and seeking adjournment for settlement) is inconsistent with non-supply, a defence of non-delivery is treated as a dishonest or moonshine defence, and the operational creditor's categorical pleading of receipt without dispute, supported by the invoice and correspondence, establishes the debt and default. Where the operational creditor's claim of delivery is not met by a specific and credible denial in the corporate debtor's reply, the ratio of the Tribunal's earlier decision requiring unimpeachable proof of delivery does not apply, since that case involved a disputed delivery in the reply to the demand notice.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
(Arising out of Order dated 08.02.2023 passed by National Company Law Tribunal, Kolkata Bench, Court No. II in CP(IB) No. 76/KB/2021)
IN THE MATTER OF:
Ashok Kumar Bhasin, Director of the Suspended Board of Director of Sigma-C Infrastructure Private Limited presently residing at 8063, Park Villa Circle, Cupertino 95014 ...Appellant
Versus
1. ABB Power Products and Systems India Limited, A company within the meaning of the Companies Act,2013 having its registered office at 08th Floor, Brigade Opus 70/410, Kodigehalli Main Road, Bengaluru, Bangalore - 560 092
2. Mr. Ashish Giria, IRP Having its registered office at 493 C A, G T Road South, Vivek Vihar, Phase 5, BL-8, Flat-5D, 5th Floor, Howrah - 711102 ...Respondents
Appellant: Mr. Siddhartha Chatterjee, Mr. Prashant Kumar Tripathi, Ms. Ankita Upadhyay, Labony Ray, Susrea Mitra, Nahid Ahmed, Mr. Kuldip Rai, Aranya Moulick, Ms. Puja Tripathi, Advocates Respondent: Mr. R. Sudhinder, Ms. Himani Chhabra, Advocates
JUDGEMENT
ASHOK BHUSHAN, J:
1. This Appeal has been filed against the Order dated 08th February,
2023 passed by National Company Law Tribunal, Kolkata Bench, Court No. -2-
II (hereinafter referred to as "The Adjudicating Authority") admitting Section
9 Application of Insolvency and Bankruptcy Code, 2016 (hereinafter referred
to as "The Code") filed by the ABB Power Products and System India Limited,
the Respondent No.1 herein. The Appellant suspended director of the
Corporate Debtor Sigma-C Infrastructure Private Limited has filed this
Appeal challenging the admission order.
2. Brief facts of the case necessary to be noted for deciding this Appeal
are :-
(i) The Corporate Debtor Sigma-C Infrastructure Pvt. Ltd. issued
purchase order for supply of 145 KV 9-Bay DBB GIS Board required
for CESC's Princep Street Substation. Three purchase orders were
issued by the Corporate Debtor for supply of GIS Board and other
equipment as prince street substation of CESC Limited. The purchase
orders were amended from time to time, lastly amended on
25.01.2018 and 15,05,2018. In pursuance of three purchase orders,
the equipment was supplied by the Operational Creditor against the
purchase orders. The Operational Creditor has only received amount
of Rs. 81,33,600/-. Operational Creditor issued tax invoice dated 16th
May, 2018. All materials were received by 30th May, 2018.
Outstanding amount as per invoice was Rs. 7,43,21,225/-.
Operational Creditor followed for payment and issued letters dated
25.09.2018, 03.10.2018, 11.10.2018 and 12.10.2018 and lastly on
31.10.2018.
(ii) The Corporate Debtor assured for making payment however when no
payment was made, Demand Notice Under Section 8 of the Code was
Company Appeal (AT) (Insolvency) No. 414 of 2023 -3-
issued on 26.10.2020 demanding an amount of Rs. 7,32,51,745 as
principal amount with 18% interest totaling Rs. 10,10,88,798/-.
Demand Notice was not replied by the Corporate Debtor. An
application under Section 9 of the Code was filed by the Operational
Creditor on 24.02.2021.
(iii) Notices were issued by the Adjudicating Authority in the Section
9 Application to the Corporate Debtor to file its Reply. On 17th July,
2022, supplementary affidavit was filed by the Operational Creditor
bringing proof of service of Demand Notice. Operational Creditor filed
its Rejoinder to the Reply before the Adjudicating Authority. Statement
was made on behalf of the Corporate Debtor seeking adjournment on
the ground of possibility of settlement between the parties. The
Adjudicating Authority adjourned the proceedings twice subsequently
the Adjudicating Authority was informed that no settlement has been
entered between the parties. The Adjudicating Authority heard THE
parties on 02nd January, 2023 and delivered its order on 08.02.2023
admitting Section 9 Application.
(iv) Aggrieved by the Admission order, this Appeal has been filed.
3. Learned Counsel for the Appellant challenging the Order passed by
the Adjudicating Authority contends that the Adjudicating Authority has
only considered one submission as to whether the petition has been duly
signed and verified by the competent person. It is submitted that the
Adjudicating Authority has admitted the petition holding that the same was
filed by the competent person without considering any other submissions.
Learned Counsel for the Appellant submits that Appellant in the Reply has
Company Appeal (AT) (Insolvency) No. 414 of 2023 -4-
also pleaded that Operational Creditor has failed to file any document
proving delivery of the materials which fact was also noticed in the
communication by Advocate of Operational Creditor. Operational Creditor in
Section 9 Application did not file any proof of service of Section 8 Notice. The
burden of proof lies on the Operational Creditor proving delivery of goods
before any claim for payment can be considered. Operational Creditor failed
to prove the delivery of goods.
4. Learned Counsel for the Respondent refuting the submissions of
Learned Counsel for the Appellant submits that before the Adjudicating
Authority, the principal submission raised by the Appellant was that Petition
has not been duly signed and verified by the competent person hence
deserved to be rejected on this ground. It is submitted that there was no
dispute regarding delivery of goods between the parties nor at any point of
time, any such issue was raised by the Corporate Debtor and for the first
time, pleas regarding non-submission of proof of service of goods has been
raised whereas the Reply itself contains contradictory pleading. The plea of
non-delivery of goods is belied by own pleadings of the corporate debtor that
supply of the goods was defective. It is submitted that the Operational
Creditor has sent several letters requesting for payment of balance amount
and has also personally met the Corporate Debtor but at no point of time,
any communication was sent by the Corporate Debtor raising any issue
regarding non-delivery of goods. The delivery of goods was made to the
consignee i.e. CESC Limited which details of consignee is mentioned in the
tax invoice. The goods were delivered to the consignee which was utilized for
CESC Princep Substation and at no point of time, consignee CESC Limited
Company Appeal (AT) (Insolvency) No. 414 of 2023 -5-
informed the Corporate Debtor or the Operational Creditor about non-
delivery of goods and at no point of time, has complained about not supply
of goods. In the Reply filed to Section 9 Application, the Corporate Debtor
raised defence that Application was not duly signed and verified by the
competent person, no service of Section 8 Notice and no proof of delivery of
goods have been filed. There was not even clear pleading by the Corporate
Debtor that no goods were delivered by the Operational Creditor. The
defence taken by the Corporate Debtor was a dishonest defence and
moonshine defence. The Corporate Debtor has taken tax input of the invoice.
5. We have considered the submissions of Learned Counsel for the
parties and have perused the record.
6. The Adjudicating Authority in its analysis and finding, has noted the
legal preposition as to whether the Petition has been duly signed and verified
by the competent person. The said issue was analyzed and finding was
returned by the Adjudicating Authority that petition which was filed by Mr.
Debabrata Basu on behalf of the Operational Creditor who was territory
sales manager, East Zone was fully competent. Legal issue which was
noticed by the Adjudicating Authority in paragraph 9 is as follows:
"9. Legal Preposition: the only question that arose for consideration was whether this petition has been duly signed and verified by a competent person? i. As held by the Hon'ble Supreme Court in Dale and Carrington Invt. (P) Ltd. and Ors V. P.K. Prathapan & Ors. "A company is a juristic person and it acts through its Directors who are collectively referred to as the Board of Directors. An individual Director has no power to act on behalf of a company of which he is a Director unless by
Company Appeal (AT) (Insolvency) No. 414 of 2023 -6-
some resolution of the Board of Directors of the Company specific power is given to him/her. Whatever decision are taken regarding running the affairs of the company, they are taken by the Board of Directors. The Directors of companies have been variously described as agents, trustees or representatives, but one thing is certain that the Directors action behalf of a company in a fiduciary capacity and their acts and deeds have to be exercised for the benefit of the of the company. They are agents of the company to the extent they have been authorized to perform certain acts on behalf of the company. In a limited sense they are also trustees for the shareholders of the company."
ii. The Hon'ble Apex Court in United Bank of India v. Sh. Naresh Kumar and Ors. held that "procedural defects which do not go to the root of the matter should not be permitted to defeat a just cause. There is sufficient power in the Courts, under the Code of Civil Procedure, to ensure that injustice is not done to any party who has a just case. As far as possible a substantive right should not be allowed to be defeated on account of a procedural irregularity which is curable.
It cannot be disputed that a company like the appellant can sue and be sued in its own name. Under Order 6 Rule 14 of the Code of Civil Procedure a pleading is required to be signed by the party and its pleader, if any. As a company is a juristic entity it is obvious that some person has to sign the pleadings on behalf of the company. .........
As a company is a juristic entity, it can duly authorize any person to sign the plaint or the written statement on its behalf and this would be regarded as sufficient compliance with the provisions of Order 6 Rule 14 of the
Company Appeal (AT) (Insolvency) No. 414 of 2023 -7- Code of Civil Procedure. A person may be expressly authorized to sign the pleadings on behalf of the company, for example by the Board of Directors passing a resolution to that effect or by a power of attorney being executed in favour of any individual. In absence thereof and in cases where pleadings have been signed by one of it's officers a Corporation can ratify the said action of it's officer in signing the pleadings. Such ratification can be express or implied. The Court can, on the basis of the evidence on record, and after taking all the circumstances of the case, specially with regard to the conduct of the trial, come to the conclusion that the corporation had ratified the act of signing of the pleading by it's officer."
(Emphasis Added) iii. In Janki Vashdeo Bhojwani and Anr. v. Indusind Bank Ltd. & Ors., albeit in a different context, Hon'ble Apex Court overruled a judgment of the Bombay High Court in Pradeep Mohanbay v. Mignuel Carlos Dias, inter alia opining as follows:
'7. Order 3 Rule 1 and 2 Code of Civil Procedure empowers the holder of power of attorney to 'act' on behalf of the principal.' iv. Further, in A.C. Narayanan and Ors. V. State of Maharashtra and Ors. it was held by the Hon'ble Supreme Court that "whether the power of attorney holder will have the power to further delegate the functions to another person will completely depend on the terms of the general power of attorney. As a result, the authority to sub-delegate the functions must be explicitly mentioned in the general power of attorney. Otherwise, the sub- delegation will be inconsistent with the general power of attorney and thereby will be invalid in law. Nevertheless,
Company Appeal (AT) (Insolvency) No. 414 of 2023 -8-
the general power of attorney itself can be cancelled and be given to another person."
(Emphasis Added)"
7. The Adjudicating Authority noticed that specific power of attorney was
constituted in favour of Mr. Debabrata Basu to act which finding was
returned in paragraph 10.ii. which is to the following effect:
"ii. The aforesaid clause contains no rider that such authorization and sub-delegation by the Constituted Attorney has to be further approved by the Board. It is explicit therefore that in view of the powers conferred upon the constituted attorneys Mr. Poovanna C. Ammatanda, a specific power of attorney was executed by Mr. Poovanna C. Ammatanda in favor of Mr. Debabrata Basu to act as a true and lawful attorney, prima facie to represent in fact and in law the Operational Creditor."
8. The submission which has been pressed before us by the Learned
Counsel for the Appellant is that the Operational Creditor did not file any
proof of delivery of goods along with Section 9 Application where it was onus
on the Operational Creditor to bring on record the proof of delivery of goods.
Learned Counsel for the Appellant however does not raise any argument
regarding non-service of Section 8 Notice, looking to the fact that although
Operational Creditor did not file any proof of service of Section 8 notice along
with Section 9 Application but supplementary affidavit was filed before the
Adjudicating Authority bringing on record the proof of service of Section 8
Notice.
9. The Appellant having raised the issue that Operational Creditor failed
to prove delivery of goods, we need to examine the submission.
Company Appeal (AT) (Insolvency) No. 414 of 2023 -9-
10. Section 8 Notice was issued by the Operational Creditor dated
26.10.2020 where in the column "Particulars of Operational Debt", following
statement has been made in clause '(d)':
"the equipment was duly received by the Corporate Debtor from the Operational Creditor, without any dispute or demur."
11. In section 9 Application also, the Operational Creditor in the synopsis
itself stated as under:
"the equipment was duly received by the Corporate Debtor from the Operational Creditor, without any dispute or demur."
12. In Part-IV of the Application (Particulars of Operational Debt) details of
purchase orders were mentioned and further statement was made:
"the equipment was duly received by the Corporate Debtor from the Operational Creditor, without any dispute or demur."
13. As noted above, the equipment and materials were supplied by the
Operational Creditor as per purchase orders to the consignee CESC Limited.
The tax invoice has been filed along with Section 9 Application dated
16.05.2018 in which details of recipients is mentioned as name of the
Corporate Debtor and details of consignee was mentioned as CESC Limited.
It is useful to notice the aforesaid two column of the invoice. The relevant
column of the invoice is as follows:
Details of Recipient (Bill Details of Consignee To) : 2100053465 (Ship to); 2800033901
Name & Address: Name & Address: CESC SIGMA C LIMITED Generla
Company Appeal (AT) (Insolvency) No. 414 of 2023 -10-
INFRASTRUCTURE PVT Manager (Construction) LTD CESC Storage Godown, 52A, Shakeshpeare Bagkhal, Opposite to Sarani, 501&502 5th Reliance Petrol Pump, GT Floor, City & Postal Road P.S. - Rishra City & Code: Kolkata - 700017 Postal Code: Kolkata -
State Code & Name : 19- 712258 State Code & West Bengal Name : 24-Gujarat GSTIN/Unique ID: GSTIN/Unique ID:
19AASCS4639Q2Z4 19AABCC2903N1ZL PAN:AASCS4639Q PAN:AABCC2903N Contact Details: 033 Contact Details:.. 40006223/33
14. It is also relevant to notice miscellaneous text for invoice as contained
in the invoice itself which is to the following effect:
"Invoice Header : Project: Supply of 145KV 9 Bays DBB GIS Board for CESC'S Princep Street Substation Order Ref:
SCIPL/ABB/160831 dated 31.08.2018
Misc text for invoice : Due to high volume of the consignment, it is not practically feasible to transport complete consignment by a single vehicle. Therefore this consignment is transported by multiple vehicle, vehicle number has been mentioned below.
Vehicle/Trailer Number LR number
GJ 06 AV 7531 24951
Company Appeal (AT) (Insolvency) No. 414 of 2023 -11-
GJ 06 AV 3134 24952
GJ 06 AX 8948 24953
GJ 06 AZ 0399 24954
MH 46 AR 6714 24955
WB 23 E 0774 24956
Packing Details - Total Cases 28 Nos.
Loose - 16 Nos (Identification no.
Boxes - 3100072039-01 to 28.
Loose - 3100072039 - 01 to 16)"
15. We may also notice that after sending the invoice, the Operational
Creditor has written several letters to the Corporate Debtor requesting for
payment of the outstanding amount. Letter dated 25th September, 2018
which is part of Section 9 Application is as follows:
"Ref: 3100072039 Date: 25th of September, 2018 To, Sigma-C Infrastructure Pvt. Ltd.
52A, Shakespeare Sarani, Suite 501 & 502, 5th Floor, Kolkata - 700017, West Bengal, India Kind Attn: Mr. Ashok Bhasin Sub: Request for release of outstanding payment against Supply of 145 KV 9-Bay DBB Board A/C CESC Princep Street Substation.
Ref: 1) P.O No. SCIPL/ABB/160831 dated 31st August, 2016.
2) Amendment Ref. No. SCIPL/ABB/180125 dated 25th January, 2018.
Dear Sir,
Company Appeal (AT) (Insolvency) No. 414 of 2023 -12-
With reference to above Purchase Order and Amendment, we would like to draw your kind attention that an amount worth Rs. 74,321,225/- against our Invoice No. 182401001946 dated 16th May, 2018 towards 90% of the contract value along with taxes and duties has already fallen overdue for payment on 30th August, 2018.
As per the Terms of the Purchase Order 90% of the contract value along with taxes and duties is payable in 90 days and all the materials were received by you on 30th May, 2018 as per copy of receipted L/Rs enclosed.
During our follow up visits to your office we were given the assurance of payment by you latest by 20th September, 2018.
We deeply regret to note that till date you have not released out above payment which is putting us in deep financial trouble due to blockage of this huge capital.
We earnestly request you to release our overdue payment of Rs. 74,321,225/- to us immediately but not later than 28th September, 2018.
We sincerely hope that you would appreciate the gravity of the situation and do needful.
Thanking you and assuring you of our best attention at all times.
Thanking you,
Yours Faithfully
For ABB India Limited
(Jayanta Nandy)
Regional Sale Director Zone East
Enclosure :- As stated above."
Company Appeal (AT) (Insolvency) No. 414 of 2023 -13-
16. We may also notice another letter dated 3rd October, 2018 by which
Operational Creditor intimated that ABB Service Engineer's team is being
withdrawn from CESC Princep Street Substation, the copy of letter dated
03.10.2018 has been annexed with Section 9 Application which is to the
following effect:
"Ref: 3100072039 Date: 03rd of October, 2018 To, Sigma-C Infrastructure Pvt. Ltd.
52A, Shakespeare Sarani, Suite 501 & 502, 5th Floor, Kolkata - 700017, West Bengal, India Kind Attn: Mr. Ashok Bhasin Sub: Intimation of withdrawal of ABB's Service Engineer's Team from CESC Princep Street Substation.
Ref: 1) P.O No. SCIPL/ABB/160831 dated 31st August, 2016 for Supervision of Erection, Testing and Commissioning of 145 KV 9-Bay DBB GIS Board A/C CESE Princep Street Substation.
2) Amendment Ref. No. SCIPL/ABB/180202 dated 02nd February, 2018.
Dear Sir,
With reference to above Purchase Order and Amendment, we would like to draw your kind attention that we are reluctantly forced to withdraw our Service Engineer's Team from CESC, Princep Street Substation with immediate effect as you have not settled our payment worth Rs. 74,321,225/- against our Invoice No. 182401001946 dated 16th May, 2018 towards 90% of the contract value along with taxes and duties for Supply of above GIS against your Supply P.O No.
Company Appeal (AT) (Insolvency) No. 414 of 2023 -14-
SCIPL/ABB/160831 dated 31st August, 2016 and Amendment Ref. No. SCIPL/ABB/180125 dated 25 th January, 2018.
The above amount has already fallen overdue for pament on 30th August, 2018, i.e., 90 days from the date of receipted L/R.
Despite our vigorous follow up with you during our recent meeting expressing the financial trouble we are facing, you have not yet released our supply payment of Rs. 74,321,225/-.
During our follow up visits to your office we were given the assurance of payment by you latest by 20th September, 2018.
We consider this as a serious breach of contract terms and hence we are compelled to take this action.
Our Service Engineer's Team will again be mobilized at site after receipt of above supply payment.
Thanking you,
Yours Faithfully
For ABB India Limited
(Jayanta Nandy)
Regional Sales Director, Zone East"
17. The above correspondence which was at the relevant time between the
parties indicate that there was clear statement in the Letter dated
25.09.2018 that all the materials were received by 30th May, 2018 and
Corporate Debtor was informed that ABB Service Engineer's Team which
was posted at the substation is being withdrawn. It is very relevant to notice
that at no point of time prior to filing reply to Section 9 Application,
Company Appeal (AT) (Insolvency) No. 414 of 2023 -15-
corporate debtor issued any such letter or complaint informing the
Operational Creditor about non-delivery of goods. The tax invoice which was
noticed above clearly contains the details of vehicles with their numbers by
which goods were delivered. The fact is that at no point of time, the
Corporate Debtor even raised a little finger about non-delivery of goods.
18. Learned Counsel for the Operational Creditor has also submitted that
Corporate Debtor has also taken tax input credit of the tax invoice which
was submitted by the Operational Creditor at the time of hearing. The query
was put to the Learned Counsel for the Corporate Debtor as to whether
Corporate Debtor has taken tax input credit. An additional affidavit has been
filed on behalf of the Appellant dated 18th April, 2023 in which in paragraph
7, following has been stated:
"7. On 12.04.2023, during the course of argument, a question was raised whether the appellant had claimed any input tax credit in respect of the said goods. It is stated that the GST registration of the corporate debtor (in CIRP) had been cancelled suo moto effective from 31.08.2021 by the concerned authorities and accordingly, the appellant does not have any access to the records.
Under such circumstances, the appellant is not in a position to bring on record any information pertaining to input tax credit. In any event, it is stated that under the provisions of the Central Goods and Services Tax Act, 2017, if the appellant (registered person) has wrongly availed and utilized input tax credit, it shall be liable to pay interest at such rate as may be notified and the same has no bearing on delivery of goods as proof or otherwise. Copy of the relevant documents showing such cancellation is annexed hereto and marked as Annexure "B"."
Company Appeal (AT) (Insolvency) No. 414 of 2023 -16-
19. The Additional Affidavit clearly indicates that Appellant has clearly
avoided to make any statement as to whether the Appellant has taken tax
input credit of tax invoice or not. Be that as it may, all facts and relevant
circumstances, at the relevant time indicate that no issue regarding supply
of goods was raised by the Corporate Debtor from May, 2018 prior to filing of
the Reply which was filed by the Corporate Debtor in April, 2022. The fact
that at no point of time prior to filing of Reply, issue regarding delivery of
goods were raised speaks for itself.
20. We may also notice the Reply filed by the Corporate Debtor. In
paragraph 3(i) and 3(k), following have been stated:
"i) CESC Limited was the end use with respect to such work orders. Firstly, the work executed by the petitioner was defective. There was delay and default committed by the petitioner. Nothing is due and payable to the petitioner.
As such, question of payment of any interest does not and cannot arise.
k) The petitioner has relied upon purported tax invoices in the petition on account of alleged supplies made and/or alleged services rendered. The petitioner has not been able to prove that the materials as ordered under the supply contract has been supplied by the petitioner. There are no supporting documents or proof of dispatch of the consignment. In the absence of such supporting document, the purported petition cannot be admitted. The respondent denies that any material as per the purchase order placed by the respondent has been supplied by the petitioner."
21. The pleading in paragraph 3(i) states that the work executed by the
Appellant was defective and delay and default was committed itself bely the
submission of Appellant that goods and materials were never supplied. In
Company Appeal (AT) (Insolvency) No. 414 of 2023 -17-
paragraph 3(k), the Appellant has stated that Operational Creditor has not
been able to prove that as materials ordered under Supply Contract has
been supplied.
22. There is one more relevant fact which need to be noticed. When the
matter was heard before the Adjudicating Authority on 29th July, 2022,
statement was made by Learned Counsel for the Appellant that there is fair
possibility of settlement between the parties and the matter was adjourned.
Again, the Adjudicating Authority heard the parties on 29.11.2022 where the
statement of the Corporate Debtor was noticed that there is possibility of
settlement and the matter was adjourned. The Order dated 29th November,
2022 notes as follows:
"1. Learned Counsel on both sides present.
2. This is 2021 matter. Ld. Authorised Representative Mr. Arvind Kumar Mishra, CS appears and seeks time to file power of attorney on behalf of Corporate Debtor and also time to argue this matter. We see from the court proceedings already five opportunities have been granted to the Corporate Debtor to make its submissions. It is also significate to note this matter was adjourned as Corporate Debtor made a statement on 29.07.2022 and 28.10.2022 that there was possibility of settlement between the parties. Today, when the matter was taken up for hearing Ld. Professional appeared and sought for the further adjournment.
3. We feel this is a simply the dilatory tactic by the Corporate Debtor. We would have heard the Operational Creditor today and proceeded accordingly, as mentioned in the previous orders, however, in the interest of justice we grant corporate debtor last and final opportunity of addressing its argument to its authorized representative
Company Appeal (AT) (Insolvency) No. 414 of 2023 -18-
on the next date subject to payment of Rs. 50,000/- cost to be deposited in Calcutta High Court Advocates' Clerks Philanthropic Trust within one week from today. It is made clear if the cost is not paid and argument not addressed on the next date the matter shall be heard ex parte.
4. Post this matter on 02.01.2023, no further adjournment will be granted."
23. In paragraph 2 of the Order, the Adjudicating Authority has noticed
that matter was adjourned as Corporate Debtor had made a statement on
29th July, 2022 and 28th October, 2022 that there was possibility of
settlement between the parties. The above conduct of the Corporate Debtor
also militates against its plea that goods and materials were never supplied.
Had the goods and materials never supplied was a fact, how statement was
made on behalf of the Corporate Debtor that there is possibility of settlement
between the parties. The facts and circumstances which have been brought
on record clearly prove that the plea of the corporate debtor that goods and
materials were not supplied was clearly dishonest plea and moonshine
defence.
24. It is also relevant to notice that the goods were supplied to the
consignee CESC Limited and goods were used at substation of CESC Limited
where engineer's team of the Operational Creditor was posted to complete
the installation. No material on behalf of consignee has been brought by the
Corporate Debtor to indicate that at any point of time consignee on whose
substation the materials were supplied, raised an issue or complaint
regarding non-supply of goods.
25. Learned Counsel for the Appellant in support of his submission that
burden of proof was at the Operational Creditor to prove that goods and
Company Appeal (AT) (Insolvency) No. 414 of 2023 -19-
materials were supplied, has relied on two Judgements of Hon'ble Supreme
Court in (2006) 5 SCC 558, Anil Rishi Vs. Gurbaksh Singh and (2011) 12
SCC 220, Rangammal Vs. Kuppuswami & Anr.
26. Both the above judgements were considering the provisions of Section
101, 102 and 106 of the Indian Evidence Act, 1872. The observations made
by the Hon'ble Supreme Court were in context of burden of proof under the
Indian Evidence Act. Strict burden of proof under the Evidence Act can not
be applicable with regard to proceedings under the I&B Code, 2016 which
are summary proceeding where pleadings are in proforma as prescribed in
Rules and Regulations.
27. In Demand Notice as well as Section 9 Application, there was
categorical pleadings of the Operational Creditor that there is no dispute or
demur with regard to goods supplied. The statement was made due to
attending facts and circumstances when after supply of goods no issue
regarding supply or delivery was raised.
28. Learned Counsel for the Appellant has also placed reliance on a
Judgment of this Tribunal in Mascot Petrochem Private Limited Vs.
Midas Construction Company Private Limited, C.A. (AT) Ins. No. 1399
of 2019 decided on 03.02.2022, where reliance has been placed in
paragraph 10 and 11. In the above case, in paragraph 11, this Tribunal
observed as follows:
"Therefore, we feel that Appellant had to submit unimpeachable proof of delivery of goods to establish his case under Section 9 of IBC. Such evidence was also necessary since the respondent had disputed delivery of goods in his reply to the demand notice. Therefore, we
Company Appeal (AT) (Insolvency) No. 414 of 2023 -20-
are inclined to believe the claim of the Respondent that the goods were actually not delivered at the site."
29. Present is a case where Demand Notice was not even replied by the
Corporate Debtor and the plea raised in the Reply by the Corporate Debtor
regarding non-supply of goods has been held to be dishonest plea and
moonshine plea hence the judgement of this Tribunal in above case does not
come to any help to the Appellant.
30. In view of the foregoing discussions, we are satisfied that the
Adjudicating Authority did not commit any error in admitting Section 9
Application. Debt and Default being fully proved and all defences raised by
the Corporate Debtor were groundless, no error has been committed by the
Adjudicating Authority admitting Section 9 Application. We do not find any
merit in the Appeal, the Appeal is dismissed.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
New Delhi 11th May, 2023
Basant B.
Company Appeal (AT) (Insolvency) No. 414 of 2023
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free