Approval of Resolution Plan - Shreebhav Polyweaves Private Limited

National Company Law Tribunal27 September 2023

Ratio decidendi

The rule this decision rests on

Under Section 30(2) of the Insolvency and Bankruptcy Code, 2016, read with Regulation 38 of the CIRP Regulations, the Adjudicating Authority may approve a resolution plan only if it provides for payment of insolvency resolution process costs in priority to other debts; ensures that operational creditors receive not less than their liquidation entitlement under Section 53 (with payment to them in priority over financial creditors); provides for management and implementation after approval; does not contravene any law in force; and contains the statements and feasibility demonstrations required by Regulation 38(1A), (1B), (2) and (3). Where a resolution plan is approved, all claims not filed with the Resolution Professional before approval and not included in the plan stand extinguished, following the position in Ghanashyam Mishra and Sons Private Limited v. Edelweiss Asset Reconstruction Company Limited, which holds that the resolution applicant must be able to start on a clean slate free of surprise claims, including those of Central and State Governments and local authorities. The unpaid liabilities so extinguished, together with the extinguished existing share capital, are to be converted into capital reserve, and accumulated losses are set off first against that reserve; any residual carry-forward of losses under Section 79(2) of the Income Tax Act, 1961 is not granted by the Adjudicating Authority on the plan itself but must be sought by separate application, on notice to the Principal Chief Commissioner of Income Tax having jurisdiction. Reliefs and concessions sought by the resolution applicant from statutory authorities, beyond the Section 79(2) carry-forward, are not granted by the Adjudicating Authority; the successful resolution applicant must approach the concerned statutory authority, which will decide them under the relevant law in light of the intent and spirit of the Code.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

IN THE NATIONAL COMPANY LAW TRIBUNALAHMEDABADDIVISION BENCHCOURT- 1ITEM No.304IA/205(AHM)2023 in CP(IB) 385 of 2020Order under Section 54 IBC, 2016IN THE MATTER OF:Vikash Gautamchand Jain RP of ........ApplicantShreebhav Polyweaves Pvt LtdVsGMSRA Infracon Pvt ltd & Ors. … … . R e spondentsOrder delivered on 27/09/2023Coram:Shammi Khan, Hon’ble Member(J)Kaushalendra Kumar Singh, Hon’ble Member(T)PRESENT:For the Applicant :For the Respondent :ORDERThe case is fixed for pronouncement of the order.The order is pronounced in open Court vide separate sheet.KAUSHALENDRA KUMAR SINGH SHAMMI KHANMEMBER (TECHNICAL) MEMBER (JUDICIAL)

BEFORE THE NATIONAL COMPANY LAW TRIBUNAL AHMEDABAD BENCH DIVISION BENCH COURT-I IA No.205 of 2023 In CP(IB) 385 of 2020 IA No.205 of 2023 [An application under Section 30(6) of the Insolvency & Bankruptcy Code, 2016 for approval of resolution plan] Vikash Gautamchand Jain Resolution Professional of Shreebhav Polyweaves Private Limited 204,Wall Street 1, Near Gujarat College, Ellisbridge, Ahmedabad, Gujarat-380006 Applicant

Versus 1. GMSRA Infracon Private Limited Successful Resolution Applicant Having address at: Plot no. 2, Opp. S.P. Residence, Jail Road, Sirohi, Rajasthan-307001 2. Raj Radhe Finance Limited Sole Financial Creditor 47, Shyamal Row House 3/B, Nr. Shyamal Cross Roads, Satellite, Ahmedabad, Gujarat-380015 3. Sanjay Aggarwal (Member of Suspended Board of Director) 403, Brijratan Apartments, Brijwasi Estate, Opp. Umrigar School, Parle Point, Surat-395007 4. Shalini Aggarwal (Member of Suspended Board of Director) 403, Brijratan Apartments, Brijwasi Estate, Opp. Umrigar School, Parle point, Surat-395007.

IA No.205 of 2023 In CP(IB) 385 of 2020 5. Income Tax, Department, Surat Having address at: Circle 2(1)(2), Surat Gujarat-395003 Respondents

Order Pronounced on: 27/09/2023

Coram: Shammi Khan, Member (Judicial) Kaushalendra Kumar Singh, Member (Technical) Appearance: For the Applicant: Mr. Nipun Singhvi, Advocate along with Mr. Vishal J Dave and Adv. Pragati Tiwari in IA/205(AHM)2023

For the Respondent: Mr. Nilesh Udernani, Advocate in IA/205(AHM)2023. A R Gupta & Associates in CP(IB)385 of 2020 For the Income Tax Department: Ms. Pankti Shah, Advocate on behalf of Ms. Maithili D. Mehta, Advocate.

O R D E R

1. This application is filed on 06.02.2023 under Section 30(6) of Insolvency & Bankruptcy Code, 2016 by Mr. Vikash Gautamchand Jain Resolution Professional (RP) of the corporate debtor-Shreebhav Polyweaves Private Limited for approval of the Resolution Plan submitted by GMSRA Infracon Private Limited.

2. The averments made by the applicant/ resolution professional in the present application and as argued by the learned counsel are summarized as under:

(i) The corporate debtor was admitted in Corporate Insolvency Resolution Process (CIRP) on 31.08.2021. Mr. Nirav Tarkas was appointed as Insolvency Resolution Professional (IRP). On 18.09.2021

IA No.205 of 2023 In CP(IB) 385 of 2020 the IRP made a public announcement of the CIRP of the corporate debtor thereby calling upon its creditors to submit their claim with requisite proof. The Committee of Creditors (CoC) was constituted consisting of sole financial creditor- State Bank of India having 100% voting right.

(ii) The CoC resolved to replace the IRP Mr. Nirav Tarkas and to appoint Mr. Vikash Gautamchand Jain (Applicant) as Resolution Professional (RP). The same was approved by this Adjudicating Authority.

(iii) The CoC instructed the RP to publish Form G calling upon the prospective resolution applicants to submit the EoI/Resolution Plans for the corporate debtor.

(iv) The RP published Form-G on 03.05.2022 in widely circulated English as well as local language newspapers. In response thereto the he received three Resolution Plan from Novatis Fashion Private Limited & Gargi Texofeb Private Limited (in consortium); Vikash Mittal along with Himanshu Mittal; and Ashok Mehta (v) Pursuant to the approval from CoC the RP filed an application bearing I.A. No. 418 of 2022 seeking extension and exclusion of CIRP period of 207 days. The said application was allowed by this Adjudicating Authority and the RP was directed to complete the process till 31.07.2022.

(vi) The Resolution Plans as received from the prospective resolution applicants and their subsequent revised Resolution Plans were discussed in various CoC meetings. Thereafter, one of the prospective resolution applicants withdrew the resolution plan and the remaining two resolution plans were put to vote in the 9th CoC meeting held on 02.09.2022. However, all the plans were rejected by the CoC and the CoC also abstained from voting on the resolution of liquidation.

IA No.205 of 2023 In CP(IB) 385 of 2020 (vii) Meantime, the extended CIRP was about to get over on 31.07.2022, therefore, the RP filed an application (IA No.659 of 2022) for extension of CIRP by further 90 days period. However, the said application was rejected by this Adjudicating Authority since 330 days were already over.

Pursuant to the said order the RP filed an appeal against the order of this Adjudicating Authority before Hon’ble NCLAT for an extension of CIRP period by further 90 days and the said appeal was allowed vide order dated 14.10.2022 by the Hon’ble NCLAT granting 90 days extension.

(viii) Subsequently, the CoC instructed the RP to publish revised Form G calling upon the prospective resolution applicants to submit the EoI/Resolution Plans for the corporate debtor and therefore the RP published revised Form-G. In response thereto, the RP received three EOI however, only one Resolution Plan was received by the RP from GMSRA Infracon Private Limited.

(ix) The State Bank of India vide email dated 09.01.2023 informed the Applicant that they have transferred the exposure of the Corporate Debtor to Raj Radhe Finance Limited. Accordingly, in 12th CoC meeting held on 10.01.2023, the CoC was reconstituted consisting of only Raj Radhe Finance Limited as the sole Financial Creditor. Thereafter, the Resolution Plan of GMSRA Infracon Private Limited was discussed and put for vote and the same was approved by the sole CoC member. The undertaking under section 29 A is filed by the Successful Resolution Applicant.

IA No.205 of 2023 In CP(IB) 385 of 2020 (x) The resolution applicant- GMSRA Infracon Private Limited has proposed to infuse a sum of Rs.9,37,00,000/-. The details of the proposed payment to the stakeholders are as follows:

(Rs. in lakhs) SI Category of Sub- Amount Amount Amount Amount No. Stakeholder Category of claimed Admitted Provided Provided Stakeholder under the to the Plan Amount Claimed % (1) (2) (3) (4) (5) (6) (7) 1. Secured Financial (a) Creditors NA NA NA NA Creditors not having a right to vote under sub-section (2) of section 21 (b) Other NA NA NA NA than (a) above: (i) who did not vote in favour of the resolution (ii) Who 2856.06 2856.06 800.00 28.01% voted in favour of the resolution plan

Total 2856.06 2856.06 800.00 28.01% [(a)+(b)]

2. Unsecured (a) Creditors NA NA NA NA Financial not having a Creditors right to vote under sub-section (2) of section 21 (b) Other than (a) above: (i) who did NA NA NA NA not vote in favour of the resolution plan (ii) who voted in NA NA NA NA favour of the resolution plan Total NA NA NA NA [(a)+(b)] 3. Operational (a) Related NA NA NA NA Creditors Party of IA No.205 of 2023 In CP(IB) 385 of 2020 Corporate Debtor (b) Other than (a) above: (i) Government - - - - -ESI Corporation 0.25 0.23 0.05 19.72% -Employees Provident NA NA NA NA Fund Organization (ii)Workmen NA NA NA NA (iii) Employees NA NA NA NA (iv) Other NA NA NA NA Operational Creditors Total 0.25 0.23 0.05 19.72% [(a)+(b)] 4 Other debts and NA NA NA NA dues 5 Contingency Contingent NA NA 8.95 Liability 6 CIRP 26.00 7 Working Capital 100.00 8 Payment of fees 2.00 to the board Grand Total 2856.31 2856.29 937.00

IA No.205 of 2023 In CP(IB) 385 of 2020 (xi) The RP has examined the resolution plan and the compliances required. For ready reference, the compliances examined by the RP are reproduced hereunder:

IA No.205 of 2023 In CP(IB) 385 of 2020

IA No.205 of 2023 In CP(IB) 385 of 2020

IA No.205 of 2023 In CP(IB) 385 of 2020

3. The Applicant vide Purshish dated 28.02.2023 prayed to add Income Tax Department as party in the present application. Therefore, notice was issued upon Income Tax Department as well as on Suspended Management.

On issuance of notice, the Income Tax Department filed its report dated 15.03.2023, wherein it is stated that the corporate debtor has total tax demand dues with the Income Tax Department amounting to Rs.50,49,233/-. Further, it is stated that penalty proceedings are pending against the corporate debtor and it was also found that said company is a willful defaulter of remittance of the Tax. No reply is received from Suspended Management.

IA No.205 of 2023 In CP(IB) 385 of 2020 4. The present application was heard and reserved for orders on 10.05.2023. On perusal of the plan, it is observed that it seeks reliefs and concessions for carry forward of losses under the Income Tax Act and therefore, as per Section 79 (2) of the Income Tax Act, reasonable opportunity needs to be given to the Principal Commissioner of Income Tax. However, no submissions were made by the RP as to whether any notice was issued by the RP for representation of the Principal Commissioner of Income Tax. Further, it was also noted that nothing has been placed on record stating that the plan is not conditional to the sanctioning of relief and concession. Therefore, clarification was sought by this Adjudicating Authority on these points vide its order dated 17.05.2023

5. In compliance of the said order dated 17.05.2023, the RP filed an affidavit dated 08.06.2023 stating that the notice of hearing was given to Principal Commissioner of Income-tax via email as well as via post. Further, the Successful Resolution Applicant also filed an affidavit dated 09.06.2023 clarifying that, the resolution plan is not conditional to the sanctioning of reliefs and concessions by this Adjudicating Authority.

6. During the hearing held on 17.07.2023, the Income Tax Department submitted that reply with regards to carry forward of losses in accordance with section 79(2) of the Income Tax Act, 1961 has been filed and as per the latest ITR of the Corporate Debtor it has a carry forward total loss of Rs. 24,18,52,601/- and unabsorbed depreciation of Rs.7,86,34,804/- and total outstanding demand of Rs. 50,49,233/-. Keeping in view these figures this Adjudicating Authority stated that Ld. Counsel for the RP is expected to explain as to whether these figures were placed by the RP before the CoC and whether CoC considered the benefit which would accrue to SRA, if such losses were allowed on approval of the Plan. It was also noted that plan value in IA No.205 of 2023 In CP(IB) 385 of 2020 this case is merely Rs. 8.00 Cr. whereas the tax benefits on account of the losses would be more than Rs. 8.00 Crs.

7. The RP in compliance of order dated 17.07.2023 filed an affidavit dated 31.07.2023 wherein it is stated that the RP conducted 14th meeting of CoC on 27.07.2023 and apprised the CoC members about the query put forth by this Adjudicating Authority. The CoC in order to clarify said query stated that they have considered the figures of carry forward losses and the benefit that would accrue to the successful resolution applicant, if such losses were allowed on approval of resolution plan and thereafter approved the resolution plan of successful resolution applicant.

8. We heard the learned counsel for the RP and on perusal of records it is noted that the CoC approved the resolution plan of GMSRA Infracon Private Limited by 100% voting and it is not necessary for us to go into details of the commercial aspect of the plan. We proceed to examine the plan in view of sections 30(2) and 31 of the IBC r.w. Regulation 38 of the IBBI (CIRP of the Corporate Debtor Regulation, 2016). The RP has produced on record the compliance certificate in Form-H. It shows that the fair value of the assets of the corporate debtor is Rs.8,20,87,026/-whereas, the liquidation value is Rs.5,93,68,874/-. The successful resolution applicant has proposed a payment of Rs.9,37,00,000/- in the resolution plan.

9. In order to obtain the approval of the Adjudicating Authority the resolution plan should adhere to the following requirements as per Section 30(2) of the Code r.w. CIRP Regulation 38:

(i) It should provide for the payment of insolvency resolution process costs in priority to the repayment of other debts of the corporate debtor. [Section 30(2)(a)]

IA No.205 of 2023 In CP(IB) 385 of 2020 (ii) The repayment of the debts of operational creditors should not be less than the amount to be paid to such creditors in the event of liquidation of the corporate debtor under section 53 of the Code, or the amount that would have been paid to the said creditors if the amount to be distributed under the resolution plan had been distributed in accordance of section 53(1) of the Code. Moreover, the payment to the operational creditor is to be made in priority over the financial creditor; Further the repayment of the debts of dissenting financial creditors should not be less than the amount that would have been paid to such creditors in the event of liquidation of the corporate debtor under section 53 of the Code and the payment to the said dissenting financial creditor is to be made in priority to the consenting financial creditors. [Section 30(2)(b) read with CIRP Regulation 38(1)(a) & 38(1)(b)];

(iii) Provides for the management of the affairs of the corporate debtor after approval of the resolution plan. [Section 30(2)(c) read with CIRP Regulation 38(2)(b)];

(iv) The implementation and supervision of the resolution plan. [Section 30(2)(d) read with CIRP Regulation 38(2)(c)];

(v) It does not contravene any of the provisions of the law for the time being in force. [Section 30(2)(e)];

(vi) It conforms to such other requirements as may be specified by the Board. [Section 30(2)(f)]

IA No.205 of 2023 In CP(IB) 385 of 2020 Such other requirements of the resolution plan as detailed in IBBI (Resolution Process for Corporate Persons) Regulations, 2016 which are not covered above, are as under:

(a) The resolution plan should include statement as to how it has dealt with the interests of all stakeholders including financial creditors and operational creditors of the corporate debtor. [CIRP Regulation 38 (1A)]

(b) The resolution plan should include a statement giving details as to whether the resolution applicant or any of its related parties has at any time failed to implement or caused to the failure of implementation of any other resolution plan which was approved by the Adjudicating Authority. [CIRP Regulation 38 (1B)]

(c) The resolution plan should contain the term of the plan and its implementation schedule. [CIRP Regulation 38(2)(a)]

(d) The resolution plan should also demonstrate that it addresses the cause of default; is feasible and viable; has provisions for its effective implementation; has provisions for approvals required and timeline for the same. Further that the resolution applicant has the capability to implement the resolution plan. [CIRP Regulation 38(3)]

10. In view of the above provisions of the Code, the resolution plan submitted before us has been examined as follows:

IA No.205 of 2023 In CP(IB) 385 of 2020 (i) In the plan, the provision towards CIRP costs is made for Rs.26,00,000/- to be paid within 60 days from the effective date in priority to the repayment of other debts of the corporate debtor. Thereby, section 30(2)(a) has been complied with. Further, the plan provides that any excess amount of the unpaid/outstanding CIRP Costs shall be paid by resolution applicants by way of infusion of fresh fund by the Resolution Applicant and any savings in the CIRP cost shall be passed to the Resolution Applicant.

(ii) There are no dissenting financial creditors. As far as operational creditors are concerned, the operational creditors should not be paid less than the amount payable to such creditors in the event of liquidation of the corporate debtor under section 53 of the Code, or the amount that would have been paid to the said creditors if the resolution plan value had been distributed in accordance of section 53(1) of the Code. In the present case the liquidation value is Rs.5,93,68,874/-and the total admitted claim of secured financial creditors is Rs.8,00,00,000/-. As such if the said liquidation value was to be considered in the event of liquidation as a total amount to be distributed as per sec 53 then the operational creditors would have got nothing. Similarly, if the total proposed plan value is to be distributed in accordance with sec 53 then we find that the proposed plan value is Rs.9,37,00,000/-, however out of this amount the contribution towards working capital is Rs.1,00,00,000/- and if the balance amount i.e. Rs.8,37,00,000/- was to be distributed in accordance with sec 53 then after the payment of CIRP cost, payment to secured financial creditors and allocation of amount to contingent liability, Rs.5,000/- would only remain to be paid to the operational creditors. The plan proposes payment of Rs.5,000/-to the operational creditors and as such the provisions of IA No.205 of 2023 In CP(IB) 385 of 2020 section 30(2)(b) read with CIRP Regulation 38(1)(a) & 38(1)(b) are complied with.

(iii) The mechanism for management and control of the affairs of the corporate debtor after approval of the resolution plan has been provided in the resolution plan itself whereby the Monitoring Committee consists of one representative from CoC, one representative of the Resolution Applicant and Resolution Professional to supervise the Implementation of Plan. We hold that thereby provisions of Section 30(2)(c) read with CIRP Regulation 38(2)(b) are complied with.

(iv) The resolution plan contains a provision wherein, the implementation of the said plan will be supervised by the Monitoring Committee. Thereby, Section 30(2)(d) read with CIRP Regulation 38(2)(c) has been complied with.

(v) The RP has submitted that the plan does not contravene any provisions of law. We also noted that the plan does not contravene any provisions of the law for the time being in force. Thereby, Section 30(2)(e) has been complied with.

(vi) The resolution plan also conforms to other IBBI Regulations as given hereunder:

a) The resolution plan adequately deals with the interests of all stakeholders, including financial creditors and operational creditors of the corporate debtor. Thereby, the plan is in compliance with CIRP Regulation 38 (1A).

b) It is submitted that neither the resolution applicant nor any of its related parties have at any time failed to implement or contributed to the failure of implementation of any other resolution plan which was approved by the IA No.205 of 2023 In CP(IB) 385 of 2020 Adjudicating Authority. Thereby, the plan is in compliance with CIRP Regulation 38 (1B).

c) The term of the Plan is 540 days and the timeline is provided at pg. no. 249-250 of the Application. Thereby CIRP Regulation 38(2)(a) has been complied with.

d) The resolution plan addresses the cause of default; is feasible and viable; has provisions for its effective implementation; contains provisions for approvals required and the timeline for the same. Further that the resolution applicant has the capability to implement the resolution plan. Thus CIRP Regulation 38(3) has been complied with.

11. The resolution applicant GMSRA Infracon Private Limited is the Company in Construction Sector for past 14 years and is one of the fastest growing water construction and infrastructure organization. The Company has surplus resources and now wishes to enter the Textile Sector. Sources of funds is stated to be unsecured loan for relatives & associate companies/firm and internal accruals.

12. It is also noted that the resolution applicant has sought certain reliefs & concessions such as: i) To direct CBDT, Central Board of Indirect Tax, Customs, Value Added Tax Authorities, State Government Tax Authorities, to grant reliefs, exemptions, waivers from applicability, of sections of Income Tax Act, 1961. Further Corporate Debtor should be permitted to carry forward its unabsorbed business losses notwithstanding a change in shareholding of the Company pursuant to this Resolution Plan; ii) To direct GST authorities to provide credit of Rs.40,83,104/- or any such amount credited to Corporate Debtor to be continued to be available for the benefit of Resolution Applicant on approval of plan;

IA No.205 of 2023 In CP(IB) 385 of 2020 iii) Waiver with respect to all actions, proceedings or penalties under any applicable law for any dues or non-compliances and the same be permanently extinguished; etc. iv) Wavier from all past liabilities incurred and accrued prior to the commencement of CIRP. Further, the approval of the resolution plan is not conditional to the grant of reliefs & concessions sought by the resolution applicant.

13. As far as reliefs and concessions claimed by the resolution applicant with respect to the unpaid liabilities after approval of the plan and the claims not filed at all with the RP during the CIRP, the law has been well settled by the Hon'ble Supreme Court in the case of Ghanashyam Mishra and Sons Private Limited Vs. Edelweiss Asset Reconstruction Company Limited and Ors. reported in MANU/SC/0273/2021 in the following words:

86. “……..The legislative intent behind this is, to freeze all the claims so that the resolution applicant starts on a clean slate and is not flung with any surprise claims. If that is permitted, the very calculations on the basis of which the resolution applicant submits its plans, would go haywire and the plan would be unworkable.

87. We have no hesitation to say, that the word "other stakeholders" would squarely cover the Central Government, any State Government or any local authorities. The legislature, noticing that on account of obvious omission, certain tax authorities were not abiding by the mandate of I&B Code and continuing with the proceedings, has brought out the 2019 amendment so as to cure the said mischief…..”

14. In view of the above, all unpaid liabilities and claims that are not filed with the RP before the approval of the resolution plan and those which IA No.205 of 2023 In CP(IB) 385 of 2020 are not included in the said resolution plan would stand extinguished. The unpaid liabilities so extinguished together with extinguished existing share capital would be converted to “Capital Reserve”. The accumulated losses as per the balance sheet will have to be set off first against such capital reserve and the remaining losses, if any, can be considered in accordance with the provisions of section 79(2) of the Income Tax Act. For this purpose, the applicant or the successful resolution applicant can through a separate application apply before this Adjudicating Authority with a notice to the Principal Chief Commissioner of Income Tax having jurisdiction for allowing carry forward losses, if any, under the provisions of section 79(2) of the Income Tax Act.

As far as other reliefs and concessions as sought by the resolution applicant, we direct the said successful resolution applicant to approach the concerned statutory authority for those concessions and those authorities will consider the same in accordance with the relevant provisions of law keeping in view the intent and spirit of the IBC.

15. The proviso to section 31 of the Code, 2016, states that before passing any order for approval of the resolution plan, the Adjudicating Authority should also be satisfied that the resolution plan has provisions for its effective implementation. We being satisfied, approve the resolution plan submitted by GMSRA Infracon Private Limited for Corporate Debtor i.e., Shreebhav Polyweaves Private Limited and in addition to the above directions, proceed to pass the following order:

(i) Application is allowed.

(ii) The resolution plan of GMSRA Infracon Private Limited for Corporate Debtor i.e., Shreebhav Polyweaves Private Limited allowed as per Section 30(6) of the IBC, 2016.

(iii) The approved ‘Resolution Plan’ shall become effective from the date of passing of this order.

IA No.205 of 2023 In CP(IB) 385 of 2020 (iv) The order of moratorium dated 31.08.2021 passed by this Adjudicating Authority under Section 14 of I&B Code, 2016 shall cease to have effect from the date of passing of this order.

(v) The Resolution Professional shall forthwith send a copy of this Order to the participants and the Resolution Applicant(s).

(vi) The Resolution Professional shall forward all records relating to the conduct of the corporate insolvency resolution process and Resolution Plan to the Insolvency and Bankruptcy Board of India to be recorded in its database.

16. Accordingly, IA 205 of 2023 in CP(IB) 385 of 2020 is allowed and stands disposed of in terms of the above directions.

17. Urgent certified copy of this order, if applied for, to be issued to all concerned parties upon compliance with all requisite formalities.

-SD- -SD- KAUSHALENDRA KUMAR SINGH SHAMMI KHAN MEMBER (TECHNICAL) MEMBER (JUDICIAL)

Aarti/Swati-LRA

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.