Amarjit Singh vs Crown Abacus It Park Association
- CitationCompany Appeal (AT) (Insolvency) No.1990 of 2024
Ratio decidendi
The rule this decision rests on
The period during which an interim order of the Appellate Tribunal restrained the successful resolution applicant from transferring units under an approved resolution plan, while the approval itself was under challenge in pending appeals, may be excluded from the period allowed for implementation of that plan, where the restraint deprived the applicant of a major source of funds the plan contemplated and the applicant was otherwise taking substantial steps to implement it. An affidavit filed by the former president of the successful resolution applicant, who was personally involved in implementing the plan, is admissible to show the action taken in implementation, and is not rendered inadmissible merely because a later administrator was appointed to the association in separate proceedings. Challenges to the eligibility of the resolution applicant and to the approval of the resolution plan, raised collaterally in an appeal against an order excluding time, cannot be entertained where the approval has already been upheld in earlier appeals dismissed by the Tribunal.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
NATIONAL COMPANY LAW APPELLATE TRIBUNAL, PRINCIPAL BENCH, NEW DELHI Company Appeal (AT) (Insolvency) No.1990 of 2024 & I.A. No.7443 of 2024 Arising out of Order dated 28.08.2024 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi, Principal Bench in IA-4132/2024 in (IB)-1565(PB)/2018)
IN THE MATTER OF: Gemco Technologies Pvt. Ltd. & Ors. ...Appellants Versus Crown Abacus IT Park Association Successful Resolution Applicant of Crown Realtech Pvt. Ltd. & Anr. ...Respondents
Present: For Appellants : Mr. Gaurav Mitra, Mr. Prafful Saini, Ms. Aishwarya Modi, Advocates. For Respondents : Mr. A. Mishra, Mr. Sahil, Advocates for SRA.
With
Company Appeal (AT) (Insolvency) No.2008 of 2024 & I.A. No.7527 of 2024 Arising out of Order dated 28.08.2024 passed by the Adjudicating Authority (National Company Law Tribunal), New Delhi, Principal Bench in IA-4132/2024 in (IB)-1565(PB)/2018)
IN THE MATTER OF: Amarjit Singh (Suspended Director of Crown Realtech Pvt. Ltd.) ...Appellant Versus Crown Abacus IT Park Association Successful Resolution Applicant of Crown Realtech Pvt. Ltd. & Anr. ...Respondents
Present: For Appellants : Mr. Palash S. Singhai, Mr. Sonam Sharma, Ms. Riddhi Jain, Advocates. For Respondents : Mr. A. Mishra, Mr. Sahil, Advocates for SRA. Mr. R. K. Gupta, Mr. Swaralipi Deb Roy, Advocates for RP.
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 1 JUDGMENT
ASHOK BHUSHAN, J.
These two Appeal(s) have been filed challenging order dated
28.08.2024 passed by National Company Law Tribunal, New Delhi,
Principal Bench allowing IA No.4132 of 2024 filed by Respondent No.1 -
Successful Resolution Applicant ("SRA") for excluding the period from
12.04.2023 until 01.07.2024 from the period of implementation of the
Resolution Plan approved by NCLT vide its order dated 21.02.2023.
2. Company Appeal (AT) (Ins.) No.1990 of 2024 has been filed by 08
allottees of the Project in question and the Company Appeal (AT) (Ins.)
No.2008 of 2024 has been filed by Suspended Director of the Corporate
Debtor. Both the Appeal(s) were heard together by this Tribunal. In
Company Appeal (AT) (Ins.) No.1990 of 2024 on 14.11.2024, two weeks'
time was allowed. By another order dated 11.12.2024 SRA was allowed
two weeks' further time to file the affidavit. The SRA in both the Appeal(s)
has filed the affidavit.
3. In Company Appeal (AT) (Ins.) No.1990 of 2024, IA No. 7443 of 2024
has been filed for condonation of 12 days delay in filing of the Appeal and
in Company Appeal (AT) (Ins.) No.2008 of 2024, IA No.7527 of 2024 has
been filed praying for condonation of 11 days delay in filing the Appeal.
We found that sufficient cause being shown in IA No.7443 of 2024 and IA
No.7527 of 2024 for condoning the delay of 12 days and 11 days, the IA(s)
for delay condonation in filing of the Appeal(s) are allowed.
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 2
4. Brief background facts giving rise to these Appeal(s) are:
(i) Corporate Insolvency Resolution Process ("CIRP"), against the
Corporate Debtor - M/s Crown Realtech Pvt. Ltd. commenced
vide order dated 06.12.2019. the Corporate Debtor Company
is a real estate Company. In pursuance of the publication
issued by the IRP, 261 Financial Creditors in a class have
filed their claims; claims were also received from Financial
Creditors in other than class of creditors as well as the
Operational Creditors. The Committee of Creditors ("CoC")
was constituted by the Resolution Professional ("RP"). The
95.82% of the CoC was represented by Financial Creditors in
a class. The Resolution Plan was submitted in the CIRP by
the Association of Allottees. The eligibility criteria permitted
Association of Allottees, which consisted of at least 51% of the
Allottees forming part of CoC.
(ii) The Resolution Plan was submitted by Crown Abacus IT Park
Association, which came to be approved by the CoC in its 8 th
Meeting held on 05.12.2020 with 96.38% voting. The RP filed
an Application for approval of Resolution Plan.
(iii) In the Resolution Plan, the Resolution Applicant has
proposed to complete the construction within 12 months with
grace period of six months. The Resolution Plan contained
the details of funding and the source of fund for carrying out
the construction. Resolution Plan was objected to by the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 3 Suspended Director, Amarjit Singh, the Appellant in
Company Appeal (AT) (Ins.) No.2008 of 2024. The
Adjudicating Authority after hearing the parties, vide order
dated 21.02.2023 approved the Resolution Plan submitted by
Respondent No.1 - Association of Allottees.
(iv) Aggrieved by the order dated 21.02.2023, three Appeal(s) were
filed being Company Appeal (AT) (Ins.) No.431 of 2023 (Crown
Business Park Tower A Buyers Association, Faridabad vs.
Atul Kansal & Ors.); Company Appeal (AT) (Ins.) No.432 &
433 of 2023 (Amarjit Singh Suspended Director of Crown
Realtech Pvt. Ltd. vs. Atul Kansal & Ors.); Company Appeal
(AT) (Ins.) No.434 of 2023 (Cimco Projects Ltd. vs. Crown
Realtech Pvt. Ltd. & Ors.). Two Appeals were filed by Amarjit
Singh, Suspended Director (who is Appellant in Company
Appeal (AT) (Ins.) No.2008 of 2024); one by Crown Business
Park Tower A Buyers Association and other by Cimco Projects
Ltd., who was unsuccessful Resolution Applicant. When the
Appeal(s) came for hearing, the Appellant(s) in the above
Appeal(s) prayed for an interim order. This Tribunal passed
an interim order on 12.04.2023 directing listing of Appeal on
26.04.2023 and a direction that "Successful Resolution
Applicant shall not transfer any unit till the next date". The
interim order passed by this Tribunal continued from time to
time. The SRA has also filed an Application for vacating the
interim order, however, interim order continued till the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 4 Appeal(s) were finally decided by judgment and order of this
Tribunal dated 01.07.2024.
(v) The SRA after approval of Resolution Plan proceeded to act in
accordance with Resolution Plan and taken various steps.
However, the construction was not complete, when the
Appeal(s) were decided on 01.07.2024. After dismissal of the
Appeal(s) and vacation of interim order operating in the
Appeal(s), IA No.4132 of 2024 was filed by the SRA seeking
exclusion of period from 12.04.2023 until 01.07.2024 from
period of implementation of Resolution Plan, which
Application came for consideration before the Adjudicating
Authority and Adjudicating Authority vide order dated
28.08.2024 allowed the Application and granted exclusion of
446 days from 12.04.2023 upto 01.07.2024 from the period
of implementation of Resolution Plan.
(vi) Aggrieved by the aforesaid order these two Appeal(s) have
been filed.
5. We have heard Shri Gaurav Mitra, learned Counsel appearing for
the Appellant in Company Appeal (AT) (Ins.) No.1990 of 2024; Shri Palash
S. Singhai, learned Counsel appearing for Appellant in Company Appeal
(AT) (Ins.) No.2008 of 2024; Mr. A. Mishra and Mr. Sahil, learned Counsel
appeared for SRA; and Shri R.K. Gupta, learned Counsel appeared for RP.
6. Shri Gaurav Mitra, learned Counsel for the Appellant at the outset
submitted that affidavit filed by Salil Barar need not be considered, since
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 5 an Administrator has been appointed in the Association of Respondent
No.1 by the State Registrar of Societies, vide order dated 14.10.2024 in a
Reference Case. It is submitted that Salil Barar, who has sworn the
affidavit has no authority to file an affidavit and it is the Administrator,
who is competent to file an affidavit. Shri Gaurav Mitra further submits
that the time schedule for implementation of the Resolution Plan as
provided in Clause 8.5.1 of the Resolution Plan provides for 12 months
period for completion of construction with six months' grace period. The
SRA has not implemented the Resolution Plan within 18 months of
approval of Resolution Plan. It is submitted that reliance of the SRA on
the interim order passed by this tribunal on 12.04.2023 for not
implementing the Resolution Professional is misplaced. It is submitted
that this tribunal vide interim order dated 12.04.2023, has only
restrained the SRA for not transferring the unit, which interim order did
not provide a restraint on the SRA to implement the Resolution Plan
within the time as contemplated in the Resolution Plan. It is submitted
that as per Resolution Plan, the SRA was to infuse Rs.10 crores and
admittedly only Rs.7 crores has been infused by the SRA. It is submitted
that the timeline for implementation of the Resolution Plan was essential
for timely delivery of the units to the allottees, including the Appellant. In
the affidavit filed in this Appeal, although it is pleaded that work orders
for award of various work /contract have been issued to the tune of
Rs.18,23,04,979/-, but there are no status report regarding the extent of
construction carried out by the SRA. The SRA has been slack in carrying
out the construction and implementation of the Plan. The SRA was not
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 6 entitled for exclusion of 446 days as prayed in the Application. The
Adjudicating Authority without considering the relevant facts has granted
the exclusion. No grounds have been made out for exclusion of the time.
It was necessary for the SRA to infuse Rs.10 crores to kick start the
construction work. The SRA was to continue with the construction of
completion of incomplete towers for the delivery to the allottees.
7. The learned Counsel for the Appellant appearing in Company
Appeal (AT) (Ins.) No.2008 of 2024 also adopted the submissions
advanced by learned Counsel for the Appellant in Company Appeal (AT)
(Ins.) No.1990 of 2024. It is submitted that construction of Tower B1 was
80% complete and the Resolution Plan contemplated that Tower B-1 shall
be completed within six months from the date of approval of Resolution
Plan by the NCLT with grace period of three months. No proof has been
brought on record that 20% of Tower B-1 has been completed. The
affidavit filed by the SRA is silent about 20% construction. No status
report has been filed regarding construction. Only three quarter reports
have been submitted. Learned Counsel for the Appellant has also referred
to the order dated 09.09.2024 issued by District Registrar of Societies,
Faridabad, where the Office Bearers has been removed. Learned Counsel
for the Appellant further submits that nothing has been deposited in the
Escrow Account by the SRA.
8. Learned Counsel appearing for the Respondent submits that order
passed by Registrar of Societies has been challenged by means of Writ
Petition bearing CWP No.29016 of 2024 by the officer bearers of the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 7 Society, where Punjab and Haryana High Court has passed an order for
maintaining the status quo on 25.10.2024, which order is still continuing.
Hence, the Respondent is fully entitled to file an affidavit. It is submitted
that after approval of Resolution Plan, SRA has proceeded to implement
the Plan and various steps have been taken including obtaining renewal
of license from Directorate of Town and Country Planning, Haryana
("DTCP") by depositing a huge amount of Rs.4,36,47,450/- and
subsequent amounts. It is submitted that details of renewal and payment
made have all been stated in the affidavit. It is submitted that SRA has
also obtained environmental clearance and has also made payment to
Dakshin Haryana Vidhyut Nigam for restoration of temporary electricity
connection. The SRA engaged the services of firm i.e. Nivedita & Uday
Pande Consultants as project management consultancy firm for
completion of the Project. Substantial payment of amount of Rs.1.5
crores have also been made on 01.04.2023 to the consultant firm.
Various works including feasibility report; renewal of TCP license; co-
ordination for structural audit; no objection for height clearance from
Airports Authority of India and many substantial payments have been
made. It is submitted that as per Resolution Plan, the SRA was to receive
an amount of Rs.50 crores from the sale of units, which amount could not
be obtained on account of interim order passed by this Tribunal in
aforesaid Appeal on 12.04.2023. The submission of the Appellant that
interim order in no manner interdicted the SRA to complete the
construction is incorrect. The SRA could not sale the units or realize the
amount of Rs.50 crores, which was necessary for completion of the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 8 construction. It is submitted that Appellants in Company Appeal (AT)
(Ins.) No.1990 of 2024 were allottees, who have also not paid their
balance dues, despite communication and emails sent by the SRA. The
Appellants in Company Appeal (AT) (Ins.) No.1990 of 2024 on the one
hand have not paid their dues and on the other hand are challenging the
impugned order by which exclusion of time was allowed by the
Adjudicating Authority on insufficient ground.
9. Coming to the Company Appeal (AT) (Ins.) No.2008 of 2024, it is
submitted that the Appellant is a Suspended Director, who had
challenged the approval of Resolution Plan before this Appellate Tribunal
by filing two Appeals, which Appeals were heard and decided by this
Tribunal on 01.07.2024. The Appellant - Suspended Director has no
ground to challenge the exclusion of time. The Suspended Director has
challenged the approval of Resolution Plan and has failed. The filing of
this Appeal by Suspended Director is another attempt to create hindrance
in implementation of the Resolution Plan and handing over of the units to
the allottees.
10. We have considered the submission of learned Counsel for the
parties and perused the records.
11. IA No.4132 of 2024 was filed by SRA on 27.07.2024 after passing of
the judgment by this Tribunal on 01.07.2024. In the Application detailed
facts were pleaded by the Applicant. Reliance on the interim order dated
12.04.2023 was made. Relevant provisions of Resolution Plan regarding
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 9 source of fund etc. were made. It was further pleaded that stay on the
transfer of units, further impacted the inflow of receivables. It is useful to
extract paragraph 12, 13, and 14 of IA No.4132 of 2024, which are as
follows:
"12. That it submitted that the Clause 8.4 (Source of Funding) of the Resolution Plan talks about the proposed funding plan and this Hon'ble Tribunal while passing the order dated 21.02.2023 in IA No. 5687/2020 reproduced the proposed funding plan at page no. 20 and 21 of the said order. The proposed funding plan is mentioned herein below in tabular form.
S. No. Particulars Amount (Rs.)
1. Up front infusion by the 10,00,00,000/- Resolution Applicant (Debt)
2. Up front infusion by the 7,50,000/- Resolution Applicant in the form of Equity
3. Receivables from allottees of 34,63,62,487/-
the Tower-BI and B-2 as per the information provided by Resolution Professional
4. Sale of unsold inventory of the 50,00,00,000/-
Corporate Debtor admeasuring 1,00,000 sq. ft. @ Rs. 5,000/-
per sq.ft.
5. Allocation of 80% of total 1700 54,40,00,000/-
car parking slots @ avg. price of Rs.4,00,000/- per parking
6. Branding 6,00,00,000/-
Total 155,11,12,487/-
13. That it is pertinent to state that in the Resolution Plan, the Applicant/ SRA proposed to generate Rs.50,00,00,000/- (Rupees Fifty Crores) by selling the unsold inventory of the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 10 Corporate Debtor admeasuring 1,00,000 sq. ft. @Rs. 5,000/- per sq. ft. However, the Hon'ble Appellate Tribunal vide its order dated 12.04.2023 in Company Appeal (AT) (Ins.) No. 431, 432, 433 and 434 of 2023 restrained the Applicant/SRA from selling any unit in the project.
14. That it is submitted that the stay on transfer of units further impacted on the inflow of receivables as it aggravated apprehensions in the mind of allottees with respect to their money which they were further required to pay for implementation of the project. The allottees had cited the stay as a reason for non-payment of their dues.
12. Apart from interim order dated 12.04.2023 directions issued by
Commission for Air Quality Management in NCR has also been referred,
due to which for about one month, restriction was there in construction.
It was specifically pleaded that SRA has spent total amount of
Rs.15,46,09,945/- towards payment of CIRP cost, operational creditors
and statutory authorities etc. and work orders to the tune of
Rs.13,46,08,494/- has been awarded towards firefighting and fire doors
work, structural repair and rehabilitation of buildings, ventilation
pressurization and HVAC work and facia repairs. It is further pleaded that
it was on the basis of 9th meeting of the Monitoring Committee held on
11.07.2024, where Monitoring Committee resolve to file an Application for
exclusion. Consequently, the Application for exclusion of time was filed.
13. As noted above, when the Appeal came for consideration, we
directed the SRA to file an affidavit so as to provide details of action taken
by SRA in pursuance of the approval of Resolution Plan may be looked
into. The SRA has filed an affidavit dated 02.01.2025 in both the
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 11 Appeal(s). An objection has been raised by the Appellant to the affidavit
filed sworn by Salil Barar, the then President of SRA, who had submitted
the Resolution Plan, which was approved on 21.02.2023. Learned
Counsel for the Appellant relies on order passed on 14.10.2024 by which
order an Administrator has been appointed in the Respondent No.'1's
Society by the State Registrar of Societies, Faridabad. In the affidavit, the
SRA has referred to the order of the Punjab and Haryana High Court
dated 25.10.2024, on which date, following order was passed:
"CWP-29016-2024 SALIL BARAR AND OTHERS V/S STATE OF HARYANA AND OTHERS
PRESENT Mr. Gaurav Chopra, Sr. Advocate, with Ms. Gauri C. Kaushal, Advocate, Mr. Parvez Chugh, Advocate, and Mr. Anjaneya Mishra, Advocate, for the petitioners.
Mr. Vivek Saini, Addl. A.G. Haryana.
Mr. D.V. Sharma, Sr. Advocate, with Ms. Shivani Sharma, Advocate, for respondents No.3 to 5.
On joint request, adjourned to 11.11.2024 for arguments. Status quo, as on today, shall be maintained till the next date of hearing."
14. When this Tribunal allowed the SRA to file an affidavit in this
Appeal, the object was to find out the action taken by the SRA after the
approval of Resolution Plan, to find out as to whether the order passed by
Adjudicating Authority excluding the period need to be interfered with or
not. The order impugned was passed by the Adjudicating Authority on
28.08.2024, which order was challenged by the Appellant(s) in these
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 12 Appeal(s). According to the own case of the Appellant, it was only on
14.10.2024 that Registrar of Societies passed an order in respect of officer
bearers of the Society, which order is under challenge and under
consideration before the High Court. It is an admitted fact that Salil
Barar, who has filed an affidavit was the President of the Crown Abacus
IT Park Association, who was Successful Resolution Applicant, who was
implementing the Resolution Plan. We, thus are of the view that affidavit
of SRA with regard to action, which have taken by the SRA at the relevant
time, is relevant to be looked into and the affidavit cannot be rejected on
the ground as contended by the Appellant.
15. We also need to notice that Company Appeal (AT) (Ins.) No.1990 of
2024 has been filed by 08 allottees, whereas before the RP, claims were
filed by 261 allottees and the Resolution Plan was approved with 96.38%
vote share. In the present case, the SRA is Association of allottees, which
according to the pleadings on record consists of about 250 members.
Another Appeal (Company Appeal (AT) (Ins.) No.2008 of 2024) was filed by
Suspended Director, who had earlier filed Appeal challenging approval of
Resolution Plan, which Appeal came to be dismissed by this Tribunal by
detailed judgment, considering elaborate submissions. We further notice
from the pleadings in Company Appeal (AT) (Ins.) No.1990 of 2024 that
Appellants have raised ground in the Appeal challenging the eligibility of
SRA, including the ground that RP has manipulated the eligibility criteria
in RFRP to unreasonably favouring Respondent No.1. Further, RP
granted Respondent No.1 permissions to carry out unauthorized
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 13 modifications to its Resolution Plan and RP failed to verify Respondent
No.1 towards it eligibility to submit the Plan. These grounds have been
taken in paragraph 7 (u), (v) and (w). The Appellant also by the present
Appeal are pleading that CIRP of the Corporate Debtor should be
commenced afresh.
16. The Appellants sought to challenge the approval of the Resolution
Plan indirectly while making allegation of eligibility against SRA, which
grounds are not relevant, nor need any consideration. The challenge to
approval of Resolution Plan has been made in four Appeal(s), earlier filed
(as noted above), which has already been dismissed by this Tribunal on
01.07.2024. The submission, which has been pressed by the Appellants
that interim order passed by this Tribunal on 12.04.2023 does not give
any cause to SRA to pray for exclusion of period. The interim order,
which was passed in the earlier Appeal(s) by this Tribunal dated
12.04.2023 is as follows:
"12.04.2023: Learned Counsel for the Appellants submit that various objections to the Resolution Plan which has been approved by the Impugned Order has remained undecided and those applications have been listed subsequently after delivery of the Order.
2. Issue notice to the Respondents through Speed Post as well as Email. Requisites along with process fee, if not filed, be filed within two days. Appellant may also serve the Respondents personally within a week.
List these Appeals on 26th April, 2023. Successful Resolution Applicant shall not transfer any unit till the next date."
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 14
17. Consequent to the interim order, the SRA was unable to transfer
any units and it was deprived off the major source of fund, which was
contemplated in the Resolution Plan. The Resolution Plan, Chapter-7
dealt with funding of Plan and source of funds. Proposed Funds Plan as
contained in paragraph 7.1 is as follows:
"PROPOSED FUNDING PLAN
S. No. Particulars Amount (Rs.)
1. Up front infusion by the 10,00,00,000 Resolution Applicant
2. Up front infusion by the 7,50,000 Resolution Applicant in the form of Equity
3. Receivables from allottees of the 34,63,62,487 Tower-BI and B-2 as per the information provided by Resolution Professional
4. Sale of unsold inventory of the 50,00,00,000 Corporate Debtor admeasuring 1,00,000 sq. ft. @ Rs. 5,000/- per sq.ft.
5. Allocation of 80% of total 1700 54,40,00,000 car parking slots @ avg. price of Rs.4,00,000/- per parking
6. Branding 6,00,00,000
Total 155,11,12,487/-
18. Item at Sl. No.4 of the above 'Proposed Funding Plan' indicate that
from 'sale of unsold inventory of the Corporate Debtor' an amount of
Rs.50 crores was to be received. The interim order passed by this
Tribunal clearly prohibited the SRA to realise the aforesaid amount of
Rs.50 crores. We, thus, are not satisfied with the submission of the
Appellant that interim order passed in the Appeal(s) (as aforesaid) in no
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 15 manner have aby adverse effect on the SRA in implementing the
Resolution Plan.
19. The present is not a case where after approval of the Resolution
Plan, the Applicant has not taken any steps towards the implementation
of the Resolution Plan and has not infused any funds. It is the case of the
Appellants that although an amount of Rs.10 crores was to be infused by
the SRA. The fact that SRA has infused Rs.7 crores, is not even disputed
and it is an admitted fact. In the Application, which was filed before the
Adjudicating Authority, the SRA has given the details of various steps
taken by it towards implementation of the Plan and amount spent by the
SRA towards the implementation of the Plan. It has been pleaded in
paragraph-18 of the Application that an amount of Rs.15,46,09,545/- has
been spent by the SRA toward payment of CIRP cost, operational creditors
and statutory authorities etc. and work order awarded to the tune of
Rs.13,46,08,494/- has been issued. In the affidavit, which has been filed
in these Appeal(s), the SRA has also pleaded and brought on record
materials to indicate that for renewal of license substantial amount has
been spent by the SRA, renewal from DTCP, Haryana has been obtained,
which was further renewed and currently is now in operation till
19.03.2026. Huge amount has been spent by the SRA for obtaining the
renewal. As noted above the SRA has also submitted an application to
the State Environment Impact Assessment Authority for securing the
grant of environment clearance and amount has been deposited where on
28.05.2024, the State Environment Impact Assessment Authority has
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 16 recommended for grant of environmental clearance. Electricity
connection has been restored by Dakshin Haryana Vidyut Nigam,
Faridabad. In paragraphs 24 and 25 of the affidavit, following has been
pleaded by SRA:
"24. I say that apart from applying and securing the aforesaid requisites sanctions and permission from various authorities, the Respondent No. I has also awarded various work orders/contracts to the tune of Rs. 18,23,04,979/- The details of the same is mentioned hereinbelow in tabular form for the reference of this hon'ble Appellate Tribunal:
S. No. Particulars Amount (Rs.) 1. Structural Audit (Tower B1-B2) 20,65,000 2. Facia Repair (Tower-B1) 66,60,350 3. Lifts (Nos.6) for Tower-B1 2,30,10,000 4. HVAC & Ventilation 4,69,92,644 5. Fire and Safety alarms 3,55,55,350
6. Structural Restoration Works 5,20,60,500 (Tower B1-B2)
7. ACP Sheets for Facia (Tower B-1) 47,02,144
8. Cradle (2 Nos.) 4,54,300
9. Plumbing 1,08,04,191
Total 18,23,04,979/-
25. I say that against the said work orders/contracts, the Respondents No. I has already made the total payment of Rs.337,41,781/- until 01.07.2024. Apart from the above stated expenses, the Respondent No. l has incurred the total sum of Rs. 2,18,40,607/- on account of legal, professional, taxes and administrative charges from 12.04.2023 till 01.07.2024."
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 17
20. The present is a case where approval of Resolution Plan was
challenged before this Tribunal in four Appeal(s), in which Appeal(s),
interim order was also passed on 12.04.2023 and Appeal(s) could be
ultimately decided on 01.07.2024, rejecting the challenge to the approval
of Resolution Plan by elaborate consideration. The period, which was
sought to be excluded by the SRA is period from which interim order was
started operating against the SRA. When the approval of Resolution Plan
is challenged in the Appeal(s), and the issues remained sub-judice and
pending consideration and an interim order was also passed by this
tribunal, we do not find any error in the order of the Adjudicating
Authority, excluding the period from implementation of the Resolution
Plan, during which an interim order was operating against the SRA. As
noted above, the SRA has moved an Application in the Appeal(s) for
vacation of the interim order, which Application could not be decided and
remained pending till the dismissal of the Appeal till 01.07.2024. We,
thus, are satisfied that substantial steps were taken by the SRA to
implement the Resolution Plan and various steps were taken by the SRA
to implement the Plan as has been pleaded in the Application filed by the
SRA as well as in the affidavit in the present Appeal. We have also
noticed above that SRA is none-else than the Association of allottees,
which is representing about 250 allottees. One of the Association of the
allottees had also challenged the Resolution Plan, which Appeal was also
dismissed as noted above.
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 18
21. In view of our foregoing discussion, we do not find any error in the
order passed by the Adjudicating Authority dated 28.08.2024 excluding
the period from 12.04.2023 to 01.07.2024, during which the interim order
passed by this Tribunal in the Appeal(s) challenging the approval of
Resolution Plan was in operation. We, thus, do not find any merit in any
of the Appeal(s). Both the Appeal(s) are dismissed. There shall be no
order as to costs.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical)
[Arun Baroka] Member (Technical)
NEW DELHI
23rd January, 2025
Ashwani
Company Appeal (AT) (Ins.) Nos.1990 & 2008 of 2024 19
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free