Ajr Infra And Tolling Ltd vs Sutanu Sinha Resolution Professional ...
- CitationCompany Appeal (AT) (Insolvency) No.920 of 2022
Ratio decidendi
The rule this decision rests on
A resolution plan that conditions its implementation on the successful resolution applicant's unfettered right to withdraw or modify the plan after approval by the Committee of Creditors is inherently unviable under Regulation 38(3) of the CIRP Regulations, 2016; such withdrawal or modification clauses are unenforceable, and the binding character of an approved plan on the resolution applicant cannot remain at its discretion once the CoC has approved it. Conditions precedent that are regulatory or contractual in nature, such as the grantor's approval of a change in ownership under the concession agreement, which the CoC considered while approving the plan, do not by themselves render a plan conditional in a manner that vitiates its approval, particularly where the plan has since been implemented and the requisite approvals obtained. The question of the viability and feasibility of a resolution plan, and the adequacy of the financial proposal, is a matter within the commercial wisdom of the Committee of Creditors and cannot be reopened by the appellate authority on the ground that the plan was unviable. Allegations of fraud or collusion in the conduct of the CIRP must be supported by materials and specific pleadings; bare allegations without such support cannot found a conclusion of fraud or collusion. A resolution plan satisfies the requirement of Regulation 38(3)(a) where the plan itself identifies the causes of the corporate debtor's default, even if the plan does not separately spell out a remedy beyond doing so.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
[Arising out of order dated 10.05.2022 passed by the Adjudicating Authority (National Company Law Tribunal), Principal Bench, New Delhi in I.A. No. 1538 of 2021 in C.P. (IB) 1504 (PB)/2019]
IN THE MATTER OF:
AJR Infra and Tolling Ltd. (formerly Gammon Infrastructure Projects Ltd.) 3rd Floor, Hamilton House J. N. Heredia Marg, Ballard Estate Mumbai - 400038. ...Appellant
Vs.
1. Sutanu Sinha Resolution Professional Patna Highway Projects Ltd. Floor No. 4, Duck Back House, 41, Shakespeare Sarani, Kolkata - 700017.
2. Committee of Creditors Patna Highway Projects Ltd. Floor No. 4, Duck Back House, 41, Shakespeare Sarani, Kolkata - 700017.
3. Silver Point Luxembourg Platform S.A.R.L. 11-13 Boulevard de la Foire, Luxembourg, L- 1528. ...Respondents
Present:
For Appellant: Mr. Amit Saxena, Sr. Advocate, Mr. Saurabh Suman Sinha, Mr. Varad Nath, Ms. Archi Agarwal, Ms. Rishbha Shivhare, Advocates.
For Respondents: Mr. Krishnendu Datta, Sr. Advocate with Ms. Pooja Mahajan, Ms. Mahima Singh, Ms. Mehak Nayak, Advocates for R-1(RP).
Cont'd.../ -2-
Mr. Ramji Srinivasan, Sr. Advocate with Mr. Abhijeet Sinha, Mr. Samar Bansal, Mr. Vedant Kapur, Ms. Namrata, Ms. Shruti, Advocates for R-2(CoC).
Mr. Arun Kathpalia, Sr. Advocate with Mr. Prateek Kumar, Ms. Raveena Rai, Mr. Rohit Ghosh, Advocates for R-3(SRA).
JUDGMENT
ASHOK BHUSHAN, J.
This Appeal has been filed against order dated 10.05.2022 passed by the
Adjudicating Authority (National Company Law Tribunal), Principal Bench,
New Delhi allowing I.A. No. 1538 of 2021 filed by the Resolution Professional
for approval of the Resolution Plan. The Appellant - Promoter of the Corporate
Debtor, M/s Patna Highway Projects Ltd. has come up in this Appeal
challenging the order of the Adjudicating Authority approving the Resolution
Plan. Brief facts of the case are:
i. National Highways Authority of India (NHAI) issued Tender Notice
for upgradation of Hazipur-Muzaffarpur Section of NH-77 to four
lane dual carriageway. The NHAI issued Letter of Acceptance in
favour of the Appellant on 18.11.2019. A Special Purpose Vehicle
namely M/s Patna Highway Projects Ltd. (Corporate Debtor) was
incorporated to carry on the project.
Company Appeal (AT) Insolvency No. 920 of 2022 -3-
ii. A Concession Agreement dated 24.02.2010 was executed by NHAI
in favour of the Corporate Debtor. In due course, a Common
Loan Agreement, Escrow Agreement and Substitution Agreement
were also executed.
iii. NHAI declared Provisional Certificate of Completion on
01.09.2016. Annuities were released, which according to
Appellant, were appropriated by lenders.
iv. On account of default committed by the Corporate Debtor, CIRP
was initiated on application filed by the Corporation Bank, by
order dated 03.01.2020.
v. Appellant has given proposal for accepting Resolution Plan,
which was not accepted by the CoC. In the CIRP process
Resolution Plan submitted by Respondent No.3 - Silver Point
Luxembourg Platform S.A.R.L. was accepted by the CoC. CoC
approved the Resolution Plan with 97.95% voting share in the
CoC meeting dated 12.03.2021.
vi. The Resolution Professional filed I.A. No. 1538 of 2021 for
approval of the Resolution Plan which has been approved by the
impugned order dated 10.05.2022. The Appellant, the erstwhile
Promoter of the Corporate Debtor has filed this Appeal
challenging the order dated 10.05.2022.
2. We have heard Shri Amit Saxena, learned Senior Counsel for the
Appellant and Shri Arun Kathpalia, learned Senior Counsel for the Successful
Company Appeal (AT) Insolvency No. 920 of 2022 -4-
Resolution Applicant. Shri Ramji Srinivasan, learned Senior Counsel has
appeared for the Committee of Creditors and Shri Krishnendu Datta, learned
Senior Counsel appeared for Respondent No.1.
3. Learned counsel for the Appellant challenging the order of the
Adjudicating Authority submits that the Adjudicating Authority committed
error in approving the conditional Resolution Plan. It is submitted that
objection was raise by the Appellant. The Resolution Plan being conditional
could not have been approved. A conditional plan whose implementation can
be withdrawn by the Resolution Applicant is inherently unviable and such
plan does not merit acceptance. The Adjudicating Authority did not
adjudicate on the above issue and ignoring the fact that the plan is conditional
has granted its approval. Submission raised by the Appellant urging ground
of fraud and collusion has also not been adverted to while approving the
Resolution Plan. The Adjudicating Authority has to satisfy itself that the
Resolution Plan meets the criterial prescribed under Section 30(2). The
Approved Resolution Plan does not fulfil the mandatory requirements as
prescribed under Regulation 38(3) of the Regulations, 2016. The Resolution
Applicant, as per the plan, has not infused any money and only on the basis
of annuity received the plan is sought to be implemented. Financial proposal
which was given by the Resolution Applicant was not required to be accepted
since the Resolution Applicant was to run the Corporate Debtor on the basis
of amount received by the Corporate Debtor without infusing any fund of its
own.
Company Appeal (AT) Insolvency No. 920 of 2022 -5-
4. Learned counsel appearing for the Respondent No.1, Resolution
Professional has opposed the submission of learned counsel for the Appellant
and submits that the Resolution Plan has been approved by the Committee of
Creditors in its commercial wisdom which is paramount and non-justiciable.
Appellant has failed to show any legal infirmity or non-compliance of Section
30(2) of the Code. There is no ground under Section 61(3) warranting any
interference with the impugned order of the Adjudicating Authority. The
alleged conditionality as contended by the Appellant was not a condition
imposed by the Successful Resolution Applicant to wriggle out of their
obligation to be performed under the Resolution Plan. Clause 3.5.1 of the
Concession Agreement specifically requires NHAI approval for change in
ownership/ control of the Corporate Debtor. Committee of Creditors have
considered such aspects while approving the Resolution Plan. There is no
provision or requirement of procuring upfront approval of the NHAI for change
in ownership even before approval of the plan. NHAI by letter dated
20.12.2022 has granted its in-principle approval for transfer of 100% change
in ownership of the Corporate Debtor in favour of SRA. Allegation that there
was any collusion or fraud are baseless and without any material. There being
no cogent grounds in support of Appeal, this Appeal is nothing but an attempt
to scuttle the resolution and revival of the Corporate Debtor. It is submitted
that Resolution Plan has already been implemented, the Resolution
Professional has demitted office and the Corporate Debtor is now under the
management and control of the Successful Resolution Applicant.
Company Appeal (AT) Insolvency No. 920 of 2022 -6-
5. We have considered the submissions of learned counsel for the
parties and perused the record.
6. The principal submission which has been advanced by learned
counsel for the Appellant is alleged conditionality of the plan. It is submitted
that in view of the judgment of Hon'ble Supreme Court in "Ebix Singapore
Pvt. Ltd. vs. Committee of Creditors of Educomp Solutions Ltd., (2022)
2 SCC 401", no conditional plan can be approved. To appreciate the
submission of learned counsel for the Appellant, it is necessary to notice the
effective part of the Resolution Plan which is said to be conditional plan. The
impugned order has referred to Para 2.1 Schedule 2 of the Resolution Plan.
Schedule 2 contains the implementation provision and in the Schedule 2 Para
2 deals with Regulatory and other approvals and conditions precedent to the
implementation of the Plan. Para 2.1 is as follows:
"2.1 Notwithstanding anything contained in this Plan, performance of the obligations under the Plan is subject to the prior completion (unless waived in writing by the Resolution Applicant) of the conditions set out immediately below, to the satisfaction of the Resolution Applicant, between the date of submission of the Plan by the Resolution Professional to the NCLT in accordance with Section 30(6) of the Code and the Long Stop Date. If the conditions set forth in this Paragraph (B) 2 (except the condition set forth in Paragraph (B) 2.1.1) are not met to the satisfaction of the Resolution Applicant
Company Appeal (AT) Insolvency No. 920 of 2022 -7-
by the Long Stop Date, this Plan shall cease to have any effect and shall not bind the Resolution Applicant, the Committee of Creditors, the Resolution Professional or any other Person notwithstanding anything to the contrary contained in the Plan.
Accordingly, in case of any breach, non- fulfilment, changes or modifications to any of the foregoing, the Resolution Applicant shall be entitled to seek suitable modifications or withdraw the Plan, and such modification or withdrawal shall not result in any claim or liability on the Resolution Applicant (including in the Information Memorandum, RFRP, EOI, Invitations or supporting documents submitted along with the Plan (the terms of which shall be amended).
Thereafter, the Resolution Applicant shall have no obligations whatsoever under this Plan or otherwise to any Person, including having no obligation with respect to any bid bond guarantee, earnest money deposit guarantee, performance guarantee, letter of intent or any other obligation and each such guarantee shall be promptly returned to the Resolution Applicant
7. Clause 2.1.3 deals with the unconditional consent and
acknowledgement of the NHAI. Clause 2.3.1 is as follows:
2.1.3 The Corporate Debtor shall have obtained the irrevocable and unconditional consent
Company Appeal (AT) Insolvency No. 920 of 2022 -8-
and acknowledgement of the NHAI, substantially in form set out in Schedule 7 (Form of Consent Letter) hereto, subject to any modification acceptable to the Resolution Applicant, in respect of:
(a) the terms of this plan, including change in shareholding and control of the Corporate Debtor pursuant to the steps set out in Paragraphs (A) 1, (A) 2 and A (5) of this Schedule 2 (implementation Provisions);
(b) modification to the financing documents (including security therein) of the Corporate Debtor pursuant to the restructuring of the Reconstituted Debt in accordance with Schedule 5 (Restructured Terms of the Reconstituted Debt);
(c) continued effectiveness of the Concession Agreement (including unconditional revocation and irrevocable waiver of all past and existing defaults, penalties, among others, relating to the Corporate Debtor); and
(d) execution of a Supplementary Agreement-2021 to the Concession Agreement on the terms and conditions as set out in Schedule 6 (Key Terms of
Company Appeal (AT) Insolvency No. 920 of 2022 -9-
the Supplementary Agreement 2021) hereto.
8. The various clauses under Clause 2 of Schedule 2 are clauses which
are towards the implementation of the plan which is clear from the heading
of the Schedule 2 itself.
9. Hon'ble Supreme Court in the 'Ebix Singapore' (supra), on which
much reliance has been placed by learned counsel for the Appellant, in Para
167 has laid down following:
"167. Regulation 38(3) mandates that a Resolution Plan be feasible, viable and implementable with specific timelines. A Resolution Plan whose implementation can be withdrawn at the behest of the successful Resolution Applicant, is inherently unviable, since open-ended clauses on modifications/ withdrawal would mean that the Plan could fail at an undefined stage, be uncertain, including after approval by the Adjudicating Authority. It is inconsistent to postulate, on the one hand, that no withdrawal or modification is permitted after the approval by the Adjudicating Authority under Section 31, irrespective of the terms of the Resolution Plan; and on the other hand, to argue that the terms of the Resolution Plan relating to withdrawal or modification must be respected, in spite of the CoC's approval, but prior to the approval by the Adjudicating Authority. The former position follows from the intent, object and purpose of the IBC and from Section 31, and the latter is disavowed by the IBC's structure and objective. The IBC does not envisage a dichotomy in the binding
Company Appeal (AT) Insolvency No. 920 of 2022 -10-
character of the Resolution Plan in relation to a Resolution Applicant between the stage of approval by the CoC and the approval of the Adjudicating Authority. The binding nature of a Resolution Plan on a Resolution Applicant, who is the proponent of the Plan which has been accepted by the CoC cannot remain indeterminate at the discretion of the Resolution Applicant. The negotiations between the Resolution Applicant and the CoC are brought to an end after the CoC's approval. The only conditionality that remains is the approval of the Adjudicating Authority, which has a limited jurisdiction to confirm or deny the legal validity of the Resolution Plan in terms of Section 30 (2) of the IBC. If the requirements of Section 30(2) are satisfied, the Adjudicating Authority shall confirm the Plan approved by the CoC under Section 31(1) of the IBC."
10. In "Ebix Singapore", Hon'ble Supreme Court was considering
question as to whether Resolution Applicant after approval of the plan by
Committee of Creditors can withdraw/ modify Resolution Plan. It was held
that a Resolution Plan whose implementation can be withdrawn at the behest
of the Successful Resolution Applicant, is inherently unviable. The Hon'ble
Supreme Court laid down that no condition in the Resolution Plan permitting
withdrawal by Resolution Applicant is valid. In view of the law laid down by
Hon'ble Supreme Court, after approval of the Committee of Creditors,
Resolution Applicant can neither withdraw nor modify the Resolution Plan.
11. When we look into the facts of the present case, the condition which
are contained to the effect that Resolution Applicant can seek suitable
Company Appeal (AT) Insolvency No. 920 of 2022 -11-
modification or withdraw plan are conditions which are unenforceable on
account of law declared by the Hon'ble Supreme Court in "Ebix Singapore"
(Supra). The facts of the present case as detailed in the Reply filed by
Respondent No.3 as well as Resolution Professional indicate that plan has
been implemented and all necessary approvals including the approval by
NHAI has been received for carrying out the plan. After implementation of the
plan, we are of the view that the submissions of learned counsel for the
Appellant that Resolution Plan was conditional plan and could not have been
approved, does not furnish any ground to interfere with the impugned order,
at this stage. NHAI approval was set out as a condition precedent to takeover
the Corporate Debtor since it was provided in Clause 5.3.1 of the Concession
Agreement, as noted above. The Corporate Debtor was set up as a special
purpose company for operating this concession and it is necessary to ensure
compliance of the Concession Agreement and get a clearance from NHAI
before takeover. All such aspects were duly considered by the Committee of
Creditors while approving the Resolution Plan. Moreover, the law declared by
the Hon'ble Supreme Court in "Ebix Singapore" made categorical that no
Resolution Applicant can be allowed to withdraw their plan and in facts of the
present case, Resolution Applicant has never come up with any case,
application or request to withdraw from the Resolution Plan. On the
submission as pressed by learned counsel for the Appellant, we are not
inclined to interfere with the approval of the Resolution Plan.
12. Submission of learned counsel for the Appellant that financial
proposal given by the Successful Resolution Applicant was unviable and
Company Appeal (AT) Insolvency No. 920 of 2022 -12-
Successful Resolution Applicant was handed over the Corporate Debtor
without infusing any finance of its own and Successful Resolution Applicant
was to run the Corporate Debtor from the money received by the Corporate
Debtor, we are of the view that acceptance of the plan of Successful Resolution
Applicant was in the commercial wisdom of the Committee of Creditors. The
question of viability and feasibility of the plan was the question which was
considered by the Committee of Creditors while approving the plan. The
Appellant's submission that plan was not viable and feasible and proposal
was not adequate, cannot be allowed to be raised. The issue is fully covered
by the judgment of the Hon'ble Supreme Court in "K. Sashidhar vs. Indian
Overseas Bank and Ors. - (2019) 12 SCC 150".
13. The submission of learned counsel for the Appellant that there was
collusion between the Resolution Professional and the Successful Resolution
Applicant also does not merit any acceptance. Fraud and collusion is very
easy to allege but difficult to prove. No such materials have been brought on
the record nor there are any specific pleadings on basis of which any
conclusion can be drawn that there was any fraud and collusion in the
conduct of the CIRP. Learned counsel for the Respondent is right in his
submission that this Appeal is nothing but an attempt to derail the resolution
and revival of the Corporate Debtor.
14. Present is a case where Form G was issued and time to submit the
plan was extended time to time. There were two Resolution Plans which were
duly considered by the Committee of Creditors. The submission of the
Appellant that mandatory requirements as prescribed under Regulation 38(3)
Company Appeal (AT) Insolvency No. 920 of 2022 -13-
of the Regulations, 2016 has not been satisfied since there are no reasons
given regarding cause of default. Regulation 38(3) provides as follows:
"38(3) [A resolution plan shall demonstrate that -
(a) it addresses the cause of default;
(b) it is feasible and viable;
(c) it has provisions for its effective implementation;
(d) it has provisions for approvals required and the timeline for the same; and
(e) the resolution applicant has the capability to implement the resolution plan.]"
15. Learned counsel for the Respondent has submitted that the
Resolution Plan provides for reasons for default. In this context, Clause 10.3
of the Resolution Plan deals with Cause of default by the Corporate Debtor.
Para 10.3 of the Resolution Plan is as follows:
"10.3 Causes for default by the Corporate Debtor
The defaults committed by the Corporate Debtor have, in the opinion of the Resolution Applicant, arisen on account of: (i) delays in construction due to: (a) the non-availability of right of way, (b) hindrances from locals to the Corporate Debtor, and (c) delay in permission from railways, which led to an increase in construction costs; (ii) delays/lapses in collection of Annuity payments to the Corporate Debtor which resulted in an inability to service the debt out of the cash flows; and (iii) lack of
Company Appeal (AT) Insolvency No. 920 of 2022 -14-
any intent on the part of / support from the Promoter Group."
16. The submission of learned counsel for the Appellant that
mandatory requirement under Regulation 38 is not fulfilled, is not correct and
the plan gives causes of default, hence, the above mandatory requirement
under the plan is fulfilled.
17. We, thus, do not find any substance in any of the submission of
learned counsel for the Appellant to interfere with the impugned order dated
10.05.2022. There is no merit in the Appeal. Appeal is dismissed.
[Justice Ashok Bhushan] Chairperson
[Barun Mitra] Member (Technical) NEW DELHI
25th May, 2023
Archana
Company Appeal (AT) Insolvency No. 920 of 2022
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free