Waryam Steel Castings Pvt.Ltd vs Punjab State Power Corpn.Ltd
- SCC(2017) 8 SCC 190
- Neutral2017 INSC 487
- AIRAIR 2017 SC 3659
Ratio decidendi
The rule this decision rests on
1. After the Electricity Act, 2003 comes into force, the determination of tariff becomes a statutory exercise to be performed by the Regulatory Commission in accordance with the statutory provisions and principles laid down in the Act, and any prior governmental concession or circular issued before the Act comes into force ceases to have legal effect unless explicitly acknowledged and extended in a subsequent tariff order by the Regulatory Commission. 2. Where an industry has not complied with a mandatory direction to shift to a higher voltage supply line and consequently avoids certain costs and losses that the Board must incur, the levy of a surcharge to compensate for transmission losses, incremental line losses, transformation losses, and incidental service charges incurred by the Board is justified and proportionate. 3. The rate or quantum of surcharge imposed by the Regulatory Commission as an additional charge beyond the stipulated tariff may include a penal element to disincentivize non-compliance with voltage migration directives, and such determination by the expert Regulatory Commission will not be interfered with in judicial review unless the determination is found to be illegal, arbitrary, or ultra vires the Act. 4. Courts will not interfere with tariff fixation or revision by the Regulatory Commission on merits, as tariff determination is a specialized statutory function assigned to an expert body, and judicial intervention is limited to cases where the tariff fixation violates statutorily prescribed procedure or is so perverse and arbitrary as to be illegal.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
REPORTABLE
IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO. 7856 OF 2012
WARYAM STEEL CASTINGS PVT. LTD. …APPELLANT(S)
VERSUS
PUNJAB STATE POWER CORPORATION LTD. AND ANR. …RESPONDENT(S)
WITH
CIVIL APPEAL NO. 6269 OF 2013, CIVIL APPEAL NO. 6276 OF 2013, CIVIL APPEAL NOS. 6289-6290 OF 2013, CIVIL APPEAL NOS. 6625-6626 OF 2013 AND CIVIL APPEAL NOS. 6291-6292 OF 2013
J U D G M E N T
RANJAN GOGOI, J.
1. The appellant-companies are arc furnace
industries engaged in the manufacture of steel ingots.
The very nature of the operations carried out require
the appellants to draw heavy load of electrical power Signature Not Verified Digitally signed by VINOD LAKHINA Date: 2017.06.19
i.e. above 2500 KVA. The said connections are, 16:47:30 IST Reason:
2
accordingly, categorized as “Industrial Connections”.
2. The appellants who were all established prior to
June 1995 draw power from 11 KV High Tension Supply
Line. Electricity in the State of Punjab, where the
industrial units are located, are supplied through
different kinds of voltage supply system i.e. (i) low
tension (LT) at 440 volt – normally fed to domestic,
small power or medium supply electric connection below
100 KW; (ii) high tension (HT) at 11,000 voltage (11 KV)
to large supply industrial connections; and (iii) extra
high tension (EHT) at 66,000 voltage (66 KV) – supplied
to very big industrial consumers for whom a dedicated 66
KV line directly from sub-Station of the Board is
provided.
3. A circular dated 23rd June, 1995 was issued by
the Punjab State Electricity Board (hereinafter referred
to as “the Board”) mandating all existing as well as
prospective consumers, who had installed induction
furnace units with a load above 1500 KVA, to shift to 66 3
KVA voltage supply failing which they were required to
pay surcharge at the rate of 17.5%. All the appellants
received due notice for conversion of their voltage
supply from 11 KV to 66 KV on or before 31 st December,
1996. On receipt of such notices, the Induction Furnace
Industries Association of the State of Punjab took up
the matter with the State Government and on the advice
of the High Powered Committee constituted,
recommendations were made to the effect that all units
existing as on 23rd June, 1995 should be exempted from
the necessity of conversion to 66 KV as well as levy of
17.5% surcharge.
4. The aforesaid recommendations of the Committee
(made in its meeting held on 19th January, 1999) were
accepted by the Board and a commercial circular bearing
No.25/1999 dated 8th June, 1999 was issued to the
following effect.
“3. To resolve the issue, a Committee comprising of officers of PSEB and representatives of Public & Industry, 4
was constituted on the intervention of State Government. The committee was asked to study the grievances of Induction Furnace Industry in details and give its recommendations acceptable to both PSEB and Industry. Accordingly, the committee went into this issue in detail and has submitted the following recommendations to PSEB, which have now been accepted by the Board.
i) Board may not insist to levy 17.5% surcharge for non-conversion by the consumers as existing in 6/95 and also by those consumers who were released connections at 11 KV with an undertaking to pay 17.5% surcharge after 6/95.
ii) The 17.5% surcharge already billed and the late payment surcharge already levied w.e.f. 1.1.97 may be written back. Wherever certain consumers have deposited this surcharge, the same may be refunded through subsequent energy bills.
iii) All future connections above 1500 KVA/2500KW shall be at 66 KV only.
However, where feasibility at 11 KV has already been given before 3/97, the same need not be reviewed. (This para has been corrected vide CC No.30/99)”
5. The Electricity Act, 2003 (hereinafter referred
to as “2003 Act”) came into force with effect from 10 th
June, 2003. The object of the 2003 Act, inter alia, is
to protect the interests of consumers and rationalize 5
electricity tariff. Part VII of the 2003 Act deals with
‘tariff’. Specifically, Section 61 of the 2003 Act
contained in Part VII thereof provides that “the
Appropriate Commission” shall specify the terms and
conditions for the determination of tariff and while
doing so the Appropriate Commission shall be guided by
the principles mentioned in the said Section. Section
62 of the 2003 Act deals with determination of tariff
and is in the following terms:
“62. Determination of tariff:-(1) The Appropriate Commission shall determine the tariff in accordance with the provisions of this Act for –
(a) supply of electricity by a generating company to a distribution licensee:
Provided that the Appropriate Commission may, in case of shortage of supply of electricity, fix the minimum and maximum ceiling of tariff for sale or purchase of electricity in pursuance of an agreement, entered into between a generating company and a licensee or between licensees, for a period not exceeding one year to ensure reasonable prices of electricity;
(b) transmission of electricity ;
6 (c) wheeling of electricity;
(d) retail sale of electricity:
Provided that in case of distribution of electricity in the same area by two or more distribution licensees, the Appropriate Commission may, for promoting competition among distribution licensees, fix only maximum ceiling of tariff for retail sale of electricity.
(2) The Appropriate Commission may require a licensee or a generating company to furnish separate details, as may be specified in respect of generation, transmission and distribution for determination of tariff.
(3) The Appropriate Commission shall not, while determining the tariff under this Act, show undue preference to any consumer of electricity but may differentiate according to the consumer's load factor, power factor, voltage, total consumption of electricity during any specified period or the time at which the supply is required or the geographical position of any area, the nature of supply and the purpose for which the supply is required.
(4) No tariff or part of any tariff may ordinarily be amended, more frequently than once in any financial year, except in respect of any changes expressly permitted under the terms of 7
any fuel surcharge formula as may be specified.
(5) The Commission may require a licensee or a generating company to comply with such procedures as may be specified for calculating the expected revenues from the tariff and charges which he or it is permitted to recover.
(6) If any licensee or a generating company recovers a price or charge exceeding the tariff determined under this section, the excess amount shall be recoverable by the person who has paid such price or charge along with interest equivalent to the bank rate without prejudice to any other liability incurred by the licensee.
6. Under Section 2(4) of the 2003 Act “Appropriate
Commission” is defined in the following terms:
“Appropriate Commission” means the Central Regulatory Commission referred to in sub-section (1) of section 76 or the State Regulatory Commission referred to in section 82 or the Joint Commission referred to in section 83, as the case may be.
Section 86 of the 2003 Act defines the
functions of the “State Commission” which, inter alia,
includes determination of tariff for generation, supply, 8
transmission and wheeling of electricity, wholesale,
bulk or retail, as the case may be, within the State.
Under Section 111 of the 2003 Act an order
passed by any of the Adjudicating Authority under the
2003 Act including an order made by “the Appropriate
Commission” is appellable to the Appellate Tribunal for
Electricity constituted under Section 112 thereof.
7. Though it may not be necessary to notice in any
detail the views expressed by this Court, from time to
time, with regard to the nature of power exercised in
determining tariff under the Act of 2003, all that would
require a mention is that the said power has been
consistently held and understood by this Court to be
statutory, required to be exercised within the four
corners of the relevant provisions of the 2003 Act i.e.
Sections 62 to 64 and in accordance with the principles
laid down in Section 61 thereof.
8. Prior to coming into force of the 2003 Act with 9
effect from 10th June, 2003 the Punjab State Electricity
Regulatory Commission established under the Electricity
Regulatory Commission Act, 1998 (since repealed by the
2003 Act) had issued a tariff order for the year
2003-2004 on an application made by the Licensee Board
for determination of tariff for the said year. In the
tariff proposals, the Board, inter alia, proposed to
levy surcharge at the rate of 17.5% from Induction
Furnace Units who had not shifted to 66 KV voltage
supply and to whom exemption from payment of such
surcharge had been earlier granted by circular No.25/99
dated 8th June, 1999. In the course of the deliberations
leading to the final determination/ fixation of tariff,
the North India Induction Furnace Association was heard
in the mater and the reliance placed by the Association
on the above circular No.25/99 dated 8th June, 1999 was
taken note of along with the fact that the Board in its
reply dated 17th March, 2003 had admitted that such
exemption was allowable and that it (the Board) did not
press its proposal to levy surcharge at the rate of
17.5% from Induction Furnace Units which were in 10
operation on the relevant cut-off date i.e. 23rd June
1995.
9. After the coming into force of the 2003 Act,
for the year 2004-2005 the State Commission announced
and published its tariff order dated 30th November, 2004
which contained provisions with regard to the aforesaid
surcharge in paragraph 9.11 thereof in the following
terms:
“9.11 17.5% SURCHARGE FOR 11 KV ARC/INDUCTION FURNACE CONSUMERS
Some Industrial Consumers Associations have objected to the proposal of PSEB to levy 17.5% surcharge on induction furnace consumers catered supply at 11 KV especially when tariff has been fixed at 11 KV.
As per present policy, all Large Supply consumers except arc furnaces with contract demand exceeding 2500 KVA and upto 4000 KVA can be catered at 11 KV provided they are ready to compensate for transformation
losses, incremental line losses and service charges incurred in this regard. For this purpose, energy recorded at 11 KV is enhanced by 10% for billing purposes. For all 11
arc furnace consumers and other consumers having demand above 4000 KVA which are given supply 11 KV, surcharge @ 17.5% is leviable.
The Board in its reply has stated that the tariffs for various categories are worked out at a base voltage level for each category.
The rebate/surcharge is offered to incentivize/penalize the consumer for shifting from the base voltage to higher/lower voltage, keeping in view the additional transformation cost, transformation losses and line losses saved/incurred by the Board by such shifting. Hence the energy recorded at 11 KV is to be enhanced by 10% for consumers with demand exceeding 2500 KVA & upto 4000 KVA (except arc furnaces) to cover for transmission losses, incremental line losses and service charges. It has been further stated by the Board that surcharge @ 17.5% shall be leviable on all arc furnace consumers above 2500 KVA and other consumers with Contract Demand exceeding 4000 KVA catered supply at 11 KV. It has also been stated that surcharge @ 17.5% is levied on arc furnace consumers catered supply at 11 KV since last 30 years.
The Commission notes that Large Supply Consumers with bulk demand are required to be catered supply at 33 KV or higher voltage. Where they are allowed to avail supply at lower than permitted voltage, the 12
same involves number of costs to the Board by way of setting up sub-station and its operation and maintenance. It also involves additional line losses and transformation losses for the Board. As such, these consumers are definitely liable to pay.
The Commission, therefore, decides to uphold the version of PSEB and continue levy of surcharge.”
10. For the year 2005-2006, the Board in its
proposal took the following plea in respect of Arc
Furnace consumers:
“(ii) For Large Supply consumers except Arc Furnaces having contract demand exceeding 2500 KVA and upto 4000 KVA catered at 11 KV, the energy consumption is enhanced by 10% to cover for transformation losses, incremental line losses and service charges. 17.5% surcharge is leviable on all Arc Furnace consumers and other Large Supply consumers having contract demand above 4000 KVA and catered at 11 KV.”
11. The State Commission by its tariff order dated
14th June, 2005 for the year 2005-2006 decided as 13
follows:
“The Commission directs the Board to submit a comprehensive proposal bringing out all the aspects of the matter and the proposal should also include revenue implications. The proposal should be submitted along with next ARR for 2006-07. Meanwhile the Commission decides to continue the existing system.”
12. A similar decision was taken by the State
Commission in the tariff order dated 10th May, 2006 for
the year 2006-2007 by holding that it would be
appropriate “to continue with existing provisions of
rebates and surcharges for availing supply at different
voltages”.
13. Thereafter, it appears that on 18th May, 2006,
the North India Induction Furnace Association had moved
the State Power Corporation against the levy of
surcharge on all Arc Furnace consumers drawing
electrical power exceeding 2500 KVA on 11 KV Supply
Line. The Power Corporation on 27th June, 2006 had 14
advised the said Association to agitate the issue before
the Electricity Regulatory Commission. Accordingly, a
review petition was filed by the said Association before
the Electricity Regulatory Commission seeking review of
the tariff order of 2006-2007, which came to be
dismissed on 13th October, 2006.
14. Thereafter, it appears that the State Power
Corporation issued electricity bills for April 2007 and
had imposed surcharge on Arc Furnaces established prior
to June 1995. Challenging the same, writ Petitions were
filed by aggrieved industries before the High Court of
Punjab and Haryana. While the said writ petitions were
pending, the Regulatory Commission had passed its tariff
order dated 17th September, 2007 for the year 2007-2008
and pursuant thereto a circular bearing No.66/2007 dated
28th November, 2007 was issued seeking to recover
electricity surcharge from the concerned establishments
for the financial years 2004-2005, 2005-2006 and
2006-2007. The aforesaid subsequent events were brought
on record in the writ petitions before the High Court by 15
means of amendments thereto.
15. A learned single judge of the High Court by
order dated 27th April, 2009 dismissed the writ petitions
filed by the arc furnace industries, inter alia, on the
ground that after the 2003 Act had come into force with
effect from 10th June, 2003 fixation of tariff assumed
the character of a statutory exercise to be performed by
the Regulatory Commission on the basis of the principles
and parameters laid down in the 2003 Act. As such, the
“concession” made by the Government culminating in
circular No.25/99 dated 8th June, 1999 would cease to
have any legal effect unless specifically acknowledged
by the Regulatory Commission which the Commission had
not done. The High Court also took the view that the
circular No.25/99 dated 8th June, 1999 cannot operate as
an estoppel against the provisions of the 2003 Act and
the exercise of power thereunder by the Regulatory
Commission to determine and fix the tariff. In this
regard, the High Court also specifically took note of
the fact that the arc furnace industries i.e. the writ 16
petitioners before it had not challenged any of the
tariff orders levying or reiterating the levy of
surcharge and what was challenged before it were only
the bills levying surcharge as raised by the Board/Power
Corporation, as may be.
16. The aforesaid order of the learned single judge
of the High Court dated 27th April, 2009 was challenged
by the industries before the Division Bench of the High
Court by means of several Letter Patent Appeals. While
the aforesaid Letter Patent Appeals were pending before
the High Court another significant development took
place, namely, the issuance of the tariff order dated
8th September, 2009 for the year 2009-2010 specifically
reiterating and levying the surcharge on Induction
Furnace Units. The tariff order for the year 2009-2010
was challenged by the concerned industrial
establishments before the Appellate Tribunal for
Electricity (hereinafter referred to as “Appellate
Tribunal”). The aforesaid challenge made was answered by
the Appellate Tribunal by its order dated 16th July, 2010 17
by holding that the levy of surcharge being compensatory
in nature is fully justified. The transmission losses
and other charges that are incurred by the Board in
providing power at the required load (above 2500 KVA) to
induction furnace units from a 11KV supply line has to
be recovered from a defaulting unit (one which had not
migrated to the mandatory 66 KV supply line). However
the learned appellate Tribunal disagreed with the State
Regulatory Commission on the rate thereof i.e. 10% and
17.5% respectively for non-induction (large consumer)
and induction furnace units. The learned Appellate
Tribunal by its aforesaid order dated 16th July, 2010,
therefore, remanded the matter to the State Commission
for a fresh decision on the rate/quantum of the
surcharge leviable.
17. Though the order dated 16th July, 2010 of the
learned Appellate Tribunal was challenged before this
Court in Civil Appeal No.10889 of 2010, no interim
relief was granted to the appellants by this Court.
Consequently, on 19th January, 2011, the Punjab State 18
Electricity Regulatory Commission, on consideration of
the matter on remand, had passed its orders reducing the
surcharge from 10% and 17.5% to 7% and 10% respectively.
18. On 14th February, 2011, Civil Appeal No.10889 of
2010 filed against the order of the learned Appellate
Tribunal dated 16th July, 2010 was dismissed by this
Court thereby confirming the levy of surcharge. On 9th
September, 2011 the Division Bench of the High Court of
the Punjab and Haryana also dismissed the Letter Patent
Appeals filed by the industrial establishments. By its
Order dated 27th July, 2012 the learned Appellate
Tribunal had dismissed the appeal filed by the
industrial establishments against the order dated 19th
January, 2011 of the Regulatory Commission with regard
to the reduced rate/quantum of surcharge i.e. 7% and 10%
respectively, as already noticed.
19. It is challenging the common order of the High
Court dated 9th September, 2011 dismissing the Letters
Patent Appeals filed by the industrial establishments 19
that civil Appeal Nos.6269 of 2013, 6276 of 2013,
6289-6290 of 2013, 6291-6292 of 2013 and 6625-6626 of
2013 have been filed whereas challenging the order of
the learned Appellate Tribunal with regard to
quantum/rate of surcharge re-determined by the
Regulatory Commission Civil Appeal No.7856 of 2012 has
been filed. It is the correctness of the aforesaid two
orders that would require to be determined in the
present group of appeals.
20. Insofar as the order of the High Court
dismissing the Letter Patent Appeals filed by the
industrial establishments is concerned the matter should
not detain the Court. Not only the levy of surcharge has
been upheld by this Court by dismissal of Civil Appeal
No.10889 of 2010, though for the year 2009-2010, what
stares at the face of the record is the consistent view
taken by the Regulatory Commission in all the tariff
orders commencing from the year 2004-2005, that to
offset the transmission and all other losses and other
incidental charges incurred in enabling the Induction 20
Furnace Units to draw power at 11 KV supply without
switching over to 66 KV supply line, levy of surcharge
on such consumers is necessary. The “compromise” and
“concession” made and effected by issuing circular
No.25/99 dated 8th June, 1999 must be understood to have
come to an end with the introduction of the new
electricity regime by the 2003 Act unless extension of
the same has been explicitly made/recognized in any of
the tariff orders, which fact is conspicuously absent.
The absence of continuation of the said concession made
by the Government in respect of pre-1995 industries in
any of the tariff orders for the subsequent years i.e.
after coming into force of the Act is a conscious
decision of the Regulatory Commission with regard to the
necessity and justifiability of the levy of surcharge on
the defaulting industries. The reason for levy of
surcharge being justifiable on the touchstone of the
necessity to disincentivize the defaulting units cannot
be faulted. The exercise being statutory and being
clear and unambiguous as manifested by the tariff order,
noticed and extracted above, there will be little room 21
for taking any other view in the matter except to hold
that the High Court was fully justified in dismissing
the writ petitions. In fact, from another perspective,
it can very well be said that the issue with regard to
legality and justification for levy of surcharge stands
foreclosed by the order of this Court dated 14th
February, 2011 dismissing the Civil Appeal No.10889 of
2010 filed in the circumstances already noticed.
21. This will bring the Court to a consideration of
the other limb of the case, namely, the correctness of
the quantum/rate of surcharge as determined by the
Regulatory Commission and upheld by the learned
Appellate Tribunal.
22. The nature of the power under the Act of 2003
and the scope of interference with orders passed by the
statutory/ appellate authorities thereunder has been
dealt with by this Court in Transmission Corporation of
Andhra Pradesh Ltd. and Anr. vs. Sai Renewable Power 22
Private Ltd. and Ors.1, The view expressed in paras 36
to 40 of the report in the said case, quoted below, may
require to be specifically noticed.
“36. Fixation of tariff is, primarily, a function to be performed by the statutory authority in furtherance to the provisions of the relevant laws. We have already no- ticed that fixation of tariff is a statu- tory function as specified under the provi- sions of the Reform Act, 1998; the Elec- tricity Regulatory Commissions Act, 1998 and the Electricity Act, 2003. These func- tions are required to be performed by the expert bodies to whom the job is assigned under the law. For example, Section 62 of the Electricity Act, 2003 requires an ap- propriate Commission to determine the tar- iff in accordance with the provisions of the Act. The Regulatory Commission has been constituted and notified under the provi- sions of Section 3 read with Section 11 of the Reform Act, 1998 which in terms of Sec- tions 11(1)(c) and (e) is expected to fix the tariff as well as the terms of licence.
37. There are three different legislations in course and the Regulatory Commission has been constituted under the Reform Act, 1998 which in turn would be the Commission as contemplated under the Electricity Regula- tory Commission Act, 1998 and the Electric- ity Act, 2003. In terms of first proviso to Section 82(1) of the Electricity Act, 2003 the State Electricity Regulatory Commission established by the State Government under Section 17 of the Electricity Regulatory 1 (2011) 11 SCC 34 23
Commission Act, 1998 and the enactment specified in the Schedule shall be the State Commission for the purposes of this Act. Even in terms of Section 185(3) of the Electricity Act, 2003 the said authority would be deemed to be an appropriate Com- mission for all purposes and intent as the Reform Act, 1998 has been specifically men- tioned in Entry 3 of the Schedule to the Electricity Act, 2003. In other words, as already noticed the Regulatory Commission constituted by the said notification would be the appropriate Commission under all these Acts and is required to perform the functions as contemplated under Sections 11, 17 and 82 of the respective Acts.
38. The functions assigned to the Regula- tory Commission are wide enough to specifi- cally impose an obligation on the Regula- tory Commission to determine the tariff. The specialised performance of functions that are assigned to the Regulatory Commis- sion can hardly be assumed by any other au- thority and particularly, the courts in ex- ercise of their judicial discretion. The Tribunal constituted under the provisions of the Electricity Act, 2003, again being a specialised body, is expected to examine such issues, but this Court in exercise of its powers under Article 136 of the Consti- tution would not sit as an appellate au- thority over the formation of opinion and determination of tariff by the specialised bodies. We would prefer to leave this ques- tion open to be considered by the appropri- ate authority at the appropriate stage.
39. We do not consider it appropriate to go into the merit or demerit of determination of tariff rates in the appeals. Determina- 24
tion of tariff is a function assigned leg- islatively to a competent forum/authority. Whether it is by exercise of legislative or subordinate legislative power or a policy decision, if the Act so requires, but it generally falls in the domain of legisla- tive activity and the courts refrain from adverting into this arena.
40. We have to further examine the legality of this issue in the light of the findings that we have recorded on the issues in re- lation to jurisdiction of the Regulatory Commission to determine/review the tariff. The jurisdiction of this Court is limited in this aspect. This Court has consistently taken the view that it would not be proper for the Court to examine the fixation of tariff rates or its revision as these mat- ters are policy matters outside the preview of judicial intervention. The only explana- tion for judicial intervention in tariff fixation/revision is where the person ag- grieved can show that the tariff fixation was illegal, arbitrary or ultra vires the Act. It would be termed as illegal if statutorily prescribed procedure is not followed or it is so perverse and arbitrary that it hurts the judicial conscience of the court making it necessary for the court to intervene. Even in these cases the scope of jurisdiction is a very limited one.” (Underlining is ours)
23. In this regard, it has already been noticed
that the Regulatory Commission had, on remand, by its
order dated 19th January, 2011 reduced the rate of 25
surcharge from 10% and 17.5% respectively to 7% and 10%
respectively. The industrial establishments in the
appeals before the learned Appellate Tribunal contended
that the said rate is without justification inasmuch as
the State Regulatory Commission in its order had
unambiguously noticed that the cost to the consumers to
switch over to the 66 KV supply would correspond to a
much lower amount than what would work out on the basis
of the rate of surcharge levied, details of which are
available in paragraph 8 of the order of the State
Regulatory Commission dated 19th January, 2011. However,
a reading of the entire paragraph 8 of the said order of
the State Regulatory Commission would go to show that
the State Commission thought it proper to work out the
appropriate rate of surcharge by adding a penal element
to the cost of conversion to disincentivise the
consumers from continuing to receive supply on the 11 KV
transmission lines. It is on the aforesaid basis that
an additional input had been added to the cost of
conversion to work out the rate of surcharge as
determined in the order dated 19th January, 2011. If the 26
aforesaid is the basis for determination of the rate and
that too by the Expert Body which has been upheld by the
learned Appellate Tribunal we can find no fault with the
said exercise. In this regard we may take note of the
fact that though under the Act of 2003 “surcharge” is
not specifically defined, the said expression stands
“for an additional/extra charge … surcharge is thus a
super added charge, a charge over and above the usual or
current dues … it is in substance an addition to the
stipulated rate of tariff.” The above observations made
in the context of the provisions of the Electricity
(Supply) Act, 1948 in M/s Bisra Stone Lime Co. Ltd. vs.
Orissa State Electricity Board and Anr.2, would be
squarely applicable to the present case to dismiss all
speculations with regard to the nature of the levy
(surcharge) and the power of the Commission to impose
the same at particular rate(s) as may be determined.
24. For the aforesaid reasons, we do not find any
merit in the appeals filed against the order of the High
2 AIR 1976 SC 127 27
Court as well as the order of the learned Appellate
Tribunal. We, therefore, affirm the order of the High
Court dated 9th September, 2011 as well as the order of
the learned Appellate Tribunal dated 27th July, 2012 and
dismiss both set of appeals leaving the parties to bear
their own costs.
....................,J.
(RANJAN GOGOI)
....................,J.
(NAVIN SINHA)
NEW DELHI JUNE 19, 2017 1
ITEM NO.3 & 3.1 TO 3.5 COURT NO.2 SECTION XIV/IV
S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS
CIVIL APPEAL NO.7856 OF 2012
WARYAM STEEL CASTINGS PVT.LTD. APPELLANT (S) VERSUS PUNJAB STATE POWER CORPN.LTD AND ANR. RESPONDENT(S)
WITH
CIVIL APPEAL NO.6625-6626/2013, CIVIL APPEAL NO.6289-6290/2013, CIVIL APPEAL NO.6291-6292/2013, CIVIL APPEAL NO.6276/2013, CIVIL APPEAL NO.6269/2013
Date : 19/06/2017 These cases were called on for pronouncement of judgment today.
For parties:
Mr. Mohit D. Ram, AOR
Ms. Naresh Bakshi, AOR
Mrs. Kamaldeep Gulati, AOR
Mr. Nishant Kumar, Adv.
Ms. Shikha Ohri, Adv.
Ms. Divya Roy, AOR
Mr. Himanshu Shekhar, AOR
Mr. Nishant Kumar, Adv.
Ms. Shikha Ohri, Adv.
Ms. Sharmila Upadhyay, AOR
Mr. Subhasish Bhowmick, AOR
Hon'ble Mr. Justice Ranjan Gogoi pronounced the
judgment of the Bench comprising His Lordship and Hon'ble
Mr. Justice Navin Sinha.
2 The appeals are dismissed in terms of the signed
reportable judgment leaving the parties to bear their own
costs.
[VINOD LAKHINA] [ASHA SONI] A.R.-cum-P.S. COURT MASTER
[SIGNED REPORTABLE JUDGMENT IS PLACED ON THE FILE]
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.
Research this judgment with Miss Lucy
Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.
Try Miss Lucy free