Team Commotrade (India) Private ... vs Rg Thermal Solution Private Limited
- CitationCompany Appeal (AT) (Insolvency) No. 2272 of 2024
Ratio decidendi
The rule this decision rests on
A dispute that is genuine and plausible, rather than spurious, hypothetical or illusory, and which existed before the demand notice, is a pre-existing dispute; where such a dispute is shown, the Section 9 application must be rejected under Section 9(5)(2)(d). Interest claimed under invoices cannot be included in the operational debt for the purpose of the Section 4 threshold unless there is a prior agreement between the corporate debtor and the operational creditor providing for such interest; unilateral imposition of interest is not enforceable for that purpose. Invoices whose payment fell due within the restricted period under Section 10A must be excluded from the default amount in determining whether a Section 9 petition is maintainable, and the Adjudicating Authority is bound to scrutinise this even where the corporate debtor has not specifically raised it. Where, after excluding disputed invoices and invoices falling within Section 10A, the remaining default amount is below the threshold of ₹1 crore prescribed under Section 4, the Section 9 petition is not maintainable.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE MATTER OF: Team Commotrade India Private Limited, Having its registered office at: No. 376, New No. 282, Chandan Complex Basement, Mint Street, Chennai - 600079 ...Appellant
Versus
M/s. RG Thermal Solution Private Limited, Having registered office at: 1-FR, FL-1C, 214 Shahid Sunil Sen, Sarani, Kolkata - 700 028 West Bengal ...Respondent
Present: For Appellant : Mr. Jayesh B. Dolia, Mr. Venkat Prabhat and Mr. Varsha N, Advocates
For Respondent : Mr. Palash S. Singhai and Mr. Harshal Sareen, Advocates
JUDGMENT
(Hybrid Mode)
[Per: Arun Baroka, Member (Technical)]
The present Appeal has been filed under Section 61(1) of the
Insolvency and Bankruptcy Code, 2016, challenging the order dated
25.06.2024 passed by the National Company Law Tribunal, Kolkata
Bench in C.P. (IB) No. 211/KB/2022, whereby the Section 9 Petition filed
by the Appellant under the Code was dismissed on the ground of existence of a pre-existing dispute. Appellant's main ground is that the
said finding is erroneous, legally untenable, and contrary to the material
on record as well as settled principles of law.
Submissions of the Appellant
2. The Appellant is Team Commotrade (India) Private Limited, a
company engaged in the business of importing and marketing
agricultural machinery and spare parts, including harvesters,
transplanters, dryers, and tractors, under the brand name "Zoomlion."
The Appellant appoints regional sub-dealers across India for distribution
and sale of its products in various States, including West Bengal. The
Respondent is a company engaged by the Appellant as a sub-dealer for
distribution and sales of harvester machineries for agricultural activities,
spare parts of such harvesters and providing after sale services to the
harvesters. The Appellant herein vide letter of Intent dated 14.09.2019
appointed the Respondent as a subdealer for the purpose of marketing
and selling Rotavator, Tractors, Dryers, Transplanters and Harvesters for
Purba Midnapur and Paschim Midnapur Districts, West Bengal. The
Respondent also issued several purchase orders. As per the Letter of
Intent, the Respondent made a security deposit of ₹10,00,000/- as a
dealer. The Respondent acted on the said Letter of Intent dated
14.09.2019 by placing purchase orders and receiving deliveries under
multiple invoices from 28.03.2019 to 09.08.2021. Against a total invoiced
value of ₹4,04,21,108/-, payments amounting to ₹2,39,31,180/- were
Company Appeal (AT) (Insolvency) No. 2272 of 2024 2 of 34 made, leaving an unpaid balance of ₹1,64,89,928/-. The same stands
admitted through balance confirmation and correspondence
acknowledging liability. The Appellant issued a FORM 3 demand notice
on 11.08.2021 and consequently filed a Section 9 Petition on 07.07.2022
and the same came to be dismissed by the Adjudicating Authority on
25.06.2024.
3. Appellants contends that the findings of the Adjudicating Authority
are based on erroneous appreciation of evidence and misapplication of
the Mobilox Judgement, necessitating interference by this Appellate
Tribunal.
4. NCLT observed that the demand notice under Section 8(1) was
issued on 11.08.2021. The Corporate Debtor gave its reply on
21.08.2021, within the ten-day period permitted by law. A rejoinder to
the reply was sent by the Appellant on 02.09.2021. In the reply to FORM-
3, the Respondent disputed the invoices, questioned the interest
calculation, and complained about termination of dealership without
notice. It also alleged that the harvesters were falsely advertised, of poor
quality, and had led to consumer litigation. The Adjudicating Authority
noted that these issues were not afterthoughts but were continuing
disputes existing prior to the demand notice. The Respondent produced
a notice from the State Consumer Disputes Redressal Commission,
Cuttack concerning defective harvesters in respect of 3rd party
Company Appeal (AT) (Insolvency) No. 2272 of 2024 3 of 34 companies who suffered an arbitral award. It produced a common letter
dated 20.01. 2020 from farmers complaining of defects and asking for
replacement. It is pertinent to note that these letters were not with respect
to the Appellant herein. It also submitted newspaper articles from 2020
reporting the farmers' agitation over defective machines.
5. NCLT also recorded that the principal manufacturer, Zoomlion
Heavy Machinery Co. Ltd., had issued a letter admitting that the
harvesters required upgradation of components. It is pertinent to mention
herein that the said Letter only states that they are upgrading the
machineries and did not at any point of time admit to have issued faulty
machineries. The Tribunal erred in taking the said letter as admission of
a pre-existing dispute and erred in assuming that the principal
manufacturer admitted to having supplied defective machineries. All
these materials, according to the Tribunal, confirmed that the dispute
regarding quality and performance of the machines pre-dated the Section
8 notice. All these defences were without any basis and without any
factual proof.
6. The Bench wrongly relied on Mobilox Innovations Pvt. Ltd. v.
Kirusa Software Pvt. Ltd. [(2017) MANU/SC/1196/2017]. The
Adjudicating Authority found that the defects pointed out by the
Corporate Debtor were genuine and supported by records. It held that
these disputes were not frivolous or an afterthought but had existed
Company Appeal (AT) (Insolvency) No. 2272 of 2024 4 of 34 before the demand notice. Therefore, the claimed amount could not be
treated as an undisputed or crystallized operational debt. It concluded
that there was a pre-existing dispute which bars admission of a petition
under Section 9 of the Code.
7. Appellant Contends that there has not been a single communication
on record to show that the Respondent complained of inferior machine
quality. In fact, the Respondent vide Email dated 17.08.2020 admitted its
liability by setting timelines to make payment. Apart from the same, the
Respondent also requested to issue new machines and spares. Similarly,
the Respondent vide its WhatsApp communication dated 19.11.2020 also
bargained the value of the machineries which shows that there was no
"pre-exiting dispute" before the demand notice was sent. If at all the
Respondent really did have disputes with regard to the machineries or
parts supplied by this Appellant, the Respondent should have raised it at
the earliest point of time and not after FORM 3 was issued by this
Appellant. It is also apposite to state that the Respondent in its Reply to
this Appeal has filed certain alleged letter from its customers. It is
pertinent to mention that even though these letters were not filed by the
Respondent before the Adjudicating Authority, there is no proof to show
that these letters were received by the Respondent at any point of time.
These letters do not have any date nor acknowledgement and some letters
are typed in English and signed in Hindi language. It is also pertinent to
note that the Respondent have also acknowledged the confirmation of Company Appeal (AT) (Insolvency) No. 2272 of 2024 5 of 34 balances and now cannot take such defence which is spurious, illusory
and nothing but a moonshine. The Hon'ble Supreme Court in Mobilox
Innovations Pvt. Ltd. v. Kirusa Software Pvt. Ltd.,
MANU/SC/1196/2017, held that a "pre-existing dispute" must be real
and plausible, not a mere assertion raised for the first time after receipt
of a demand notice. It is contended that applying these principles, the
Respondent's reply dated 21.08.2021 was the first and only instance
where defective quality was alleged, which is an afterthought and not a
genuine dispute. The Respondent has failed to explain why no such
grievance was ever communicated contemporaneously, particularly when
continuous e-mail and WhatsApp exchanges were taking place regarding
orders and pricing and acknowledgement of payment.
8. Respondent seeks to exclude Invoice No. TCIPL/GST/127 dated
09.08.2021 for ₹ 26,00,000/- on the ground that there are no delivery
challan and details like Bills of Lading, Reference No. & date is not
mentioned and claims it be a bogus invoice. Appellant contends that the
Respondent placed orders for 2 Harvesters for which the Appellant
informed the Respondent that he is invoicing the machines at ₹14.5 Lakh
each. The Respondent bargained the cost by stating that he will take both
the machines from the Appellant if the same is billed at ₹ 13 Lakh each.
The Appellant by accepting the same, billed the Appellant at ₹26,00,000/-
and a GST bill for the same was raised on 09.08.2021 and machines were
received by him. During the course of arguments, the Respondent Company Appeal (AT) (Insolvency) No. 2272 of 2024 6 of 34 contended that these machineries were not delivered to the Respondent
which is contrary to his submissions before the Hon'ble Adjudicating
Authority wherein the Respondent has accepted that he received the
machineries from the Appellant which is from the same place mentioned
in the invoice dated 09.08.2021.
9. The Respondent admits the receipt of machineries supplied by the
Appellant but did not raise any dispute with respect to the same at any
point of time. There is absolutely no communication of any machinery
supplied to the Respondent being defective until the Appellant sent a
FORM 3 Demand notice.
10. Appellant relies upon the judgment of this Appellate Tribunal in the
matter of R.A.J Krishna Construction Company Pvt Ltd., Vs Newera
Solutions Private wherein it was held that:
"12. It is also a well settled proposition of law that for a pre- existing dispute to be a ground to nullify an application under Section 9, the 6 dispute raised must be truly existing at the time of filing a reply to notice of demand as contemplated by Section 8(2) of IBC or at the time of filing the Section 9 application."
"17. The pre-existing dispute must relate to the transaction or debt that forms the basis of the Section 9 application."
(Emphasis Supplied)
11. The Respondent during the course of arguments also argued that
the Petition is barred due to the provisions of Section 10A of IBC.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 7 of 34 Appellant contends that Section 10A provides that no Petition shall be
filed for initiation of CIRP for a default occurring on or after 25.03.2020
and before 24.03.2021. However, in the present case, the default pertains
to the outstanding liability under various invoices and the last of such
invoice is dated 09.08.2021 which is after the Section 10A period and
hence the Respondent's reliance on this Section is completely
misconceived.
12. Appellant contends that the last invoice was raised on 09.08.2021
(Invoice No. TCIPL/GST/127), and payment was not made thereafter.
Even assuming earlier invoices existed, the ledger and balance
confirmation show continuing liability acknowledged as late as of March
2020, thereby creating a fresh and continuing cause of action extending
well beyond the Section 10A window. The Respondent's letter dated
17.08.2020 and subsequent correspondences admitting liability, request
further supply and payment credited, evidences that the relationship
continued even beyond the 10A window. The acknowledgment of debt and
continued non-payment after March 2021 excludes any application of
Section 10A and thus the Respondent cannot rely on this submission.
Even assuming for the sake of argument that the invoices amounting to
₹45,07,324/- fall within the ambit of Section 10A of the Insolvency and
Bankruptcy Code, 2016, the present petition would nevertheless remain
maintainable because the admitted liability crosses the threshold limit of
₹1,00,00,000/-. The last invoice was raised on 09.08.2021 and the Company Appeal (AT) (Insolvency) No. 2272 of 2024 8 of 34 Respondent defaulted in payment thereafter, i.e., well beyond the
suspension period under Section 10A. Accordingly, the Respondent's plea
that the present petition is barred by Section 10A of the Code is untenable
in fact and in law, as the default continued even after the suspension
period, the debt remains continuing and acknowledged, and the right to
initiate CIRP is therefore maintainable.
13. The contention that tax invoices are not as per the GST Act is legally
untenable, since the Respondents have accepted the receipt of machines
and spares and acknowledged the liability and did not raise existence of
a dispute till FORM 3 was issued by this Appellant. The Respondent also
raised a contention which were not part of the submissions before the
Hon'ble NCLT in his pleadings.
14. In the case of Mr. G. Ramakrishna Reddy V Manjeet Bucha &
Anr, Company Appeal(AT)(CH)(INS) No. 198 of 2021, the Hon'ble
NCLAT held that the role of the Adjudicating Authority should be limited
to establish that the debt is due, remains unpaid and the default occurred
with the minimum threshold of ₹1 Crore. (Paragraph 25)
"The Hon'ble Supreme Court of India has also held in catena of the judgments that the role of the 'Adjudicating Authority' should be limited to establish that debt is due, remains unpaid and default has occurred with minimum threshold of Rs. 1 crore, then the 'Adjudicating Authority' should admit the Section 9 application. The Apex Court has also held that their should be minimum judicial interventions."
(Emphasis supplied)
Company Appeal (AT) (Insolvency) No. 2272 of 2024 9 of 34
15. The Respondent further contended that the interest amount cannot
be clubbed with the principal for determining the quantum of operational
debt. The said contention is wholly misconceived. All the invoices raised
by the Appellant expressly stipulate that interest at the rate of 24% per
annum shall be charged for delayed payments, and the Respondent,
having accepted the goods under those invoices is deemed to have
accepted the terms in their entirety. The Respondent has made part-
payments against the some of the invoices without ever disputing the
interest clause. Having acted upon the invoices, the Respondent cannot
now be permitted to deny the applicability of interest or to assert that the
operational debt should be confined only to the principal amount. This
Appellant restricted the claim for interest only at 18% per annum, on the
defaulted claim. This Appellant relies on a Judgement of this Hon'ble
Tribunal in Prasant Agarwal Vs. Vikash Parasrampuria (Company
Appeal (AT)(INS) No. 690 of 2022) wherein the Hon'ble Tribunal has
held as follows:
"It is, therefore, clear from these facts that the total amount for maintainability of claim will include both principal debt amount as well as interest on delayed payment which was clearly stipulated in the invoice itself. It is noted that the total principal debt amount of Rs. 97,87,220/- along with interest the total debt makes total outstanding as Rs. 1,60,87,838/-. Thus, the total debt outstanding of OC is above Rs. 1 crore as per requirement of Section 4 IBC read with notification No. S.O 1205 (E) dated 24.3.2020 (Supra), and meets the criteria
Company Appeal (AT) (Insolvency) No. 2272 of 2024 10 of 34 of Rs. 1crore as per 9 Section 4 of IBC and Application is therefore maintainable in present case."
(Emphasis supplied)
16. The Respondent's letter dated 17.08.2020 specifically acknowledges
the dues payable and proposes a schedule for repayment. Further, by its
communication dated 07.11.2020, the Respondent again requested the
Appellant to continue supplies and assured payment. These
communications constitute a clear acknowledgment of liability under
Section 18 of the Limitation Act and independently demonstrate that no
dispute raised prior to the Section 8 notice.
17. In view of the above submissions, Appellant appeals to aside the
order dated 25.06.2024 in CP(IB)/211/KB/2022.
Submissions of Respondent
18. The instant Appeal as well as the Petition filed under Section 9 of
the IBC is not maintainable in view of the fact that the debt, if any, is
below the threshold of ₹1 Crore as prescribed under Section 4 of IBC.
Further, the invoices alleged to be in default are falling within the
restricted period under Section 10A of IBC. It is contended that the entire
case of Appellant is premised on letter dated 17 th August 2020 at page
483 of Appeal wherein the Respondent agreed to pay ₹1,45,00,000/- on
or before 31st March 2021 and the default in making the said payment
accrued during the 10A period, hence the petition under Section 9 of IBC
as well as the instant appeal is not maintainable. It is a trite law that even
if a defence has not been taken that the Petition is barred under Section
Company Appeal (AT) (Insolvency) No. 2272 of 2024 11 of 34 10A of IBC, it is the duty of the Adjudicating Authority to scrutinise
whether the invoices are barred by law or not and this Appellate Tribunal
has affirmed the said position of law in case of Comet Performance
Chemicals Private Ltd. vs Aarvee Denims and Exports Limited 2025
SCC Online NCLAT 53 at para 21 and also in case of Bhavit Seth vs
Madan Bajrang Lal Vaishnawa & Anr. CA (AT) (Ins.) No. 328 of 2024
at para 13-15.
19. Respondent contends that the parties herein mutually agreed for
the payment of the invoices upon the expiry of 30 days from the date of
invoice. However, Appellant as per its whims and fancies changed the
payment terms in invoices as certain invoices suggest immediate
payment, certain invoices suggest payment within 30 days and several
invoices does not indicate any payment terms. In such circumstances it
is pertinent to mention that due date of invoices is crucial to ascertain
when the same became due and payable to arrive at a default date for
triggering Section 8 and Section 9 of IBC.
20. In the instant case invoices raised during March 2020 to May 2020
which were payable after 30 days became due and payable during the
restricted/prohibited period as stipulated under Section 10A of IBC. For
the sake of brevity and convenience of this Hon'ble Tribunal a table is
reproduced hereinbelow depicting the invoices which fell due during the
restricted period:
Company Appeal (AT) (Insolvency) No. 2272 of 2024 12 of 34 Sr. No. Invoice No. Date of Due Date Amount Invoice (in Rupees)
1. GST/80 20.05.2020 20.05.2020 3,493/-
2. GST/72 20.05.2020 20.05.2020 5,65,731/-
3. GST/71 20.05.2020 20.05.2020 2,53,705/-
4. GST/55 15.05.2020 15.05.2020 616/-
5. GST/54 15.05.2020 15.05.2020 19,628/-
6. GST/20 22.04.2020 21.05.2020 59,835/-
7. GST/19 22.04.2020 21.05.2020 9,763/-
8. GST/16 21.04.2020 20.05.2020 59,386/-
9. GST/15 21.04.2020 20.05.2020 4,98,875/-
10. GST/14 21.04.2020 20.05.2020 31,632/-
11. GST/704 16.03.2020 15.04.2020 40,940/-
12. GST/703 16.03.2020 15.04.2020 83,500/-
13. GST/702 16.03.2020 15.04.2020 20,539/-
14. GST/701 13.03.2020 12.04.2020 6,272/-
15. GST/700 13.03.2020 12.04.2020 4,32,923/-
16. GST/699 13.03.2020 12.04.2020 55,572/-
17. GST/698 13.03.2020 12.04.2020 51,019/-
18. GST/697 13.03.2020 12.04.2020 94,319/-
19. GST/696 13.03.2020 12.04.2020 1,08,204/-
20. GST/695 13.03.2020 12.04.2020 81,286/-
21. GST/694 13.03.2020 12.04.2020 79,509/-
22. GST/693 13.03.2020 12.04.2020 1,12,871/-
23. GST/692 13.03.2020 12.04.2020 1,62,172/-
24. GST/691 13.03.2020 12.04.2020 58,603/-
25. GST/690 13.03.2020 12.04.2020 48,923/-
26. GST/689 13.03.2020 12.04.2020 14,499/-
27. GST/688 13.03.2020 12.04.2020 1,72,641/-
28. GST/687 13.03.2020 12.04.2020 3,27,131/-
29. GST/686 13.03.2020 12.04.2020 1,06,717/-
30. GST/685 13.03.2020 12.04.2020 1,88,912/-
31. GST/684 13.03.2020 12.04.2020 57,349/-
32. GST/683 13.03.2020 12.04.2020 32,877/-
33. GST/682 13.03.2020 12.04.2020 23,859/-
34. GST/681 16.03.2020 15.04.2020 68,131/-
35. GST/680 13.03.2020 12.04.2020 1,20,808/-
36. GST/679 13.03.2020 12.04.2020 46,596/-
37. GST/678 13.03.2020 12.04.2020 49,285/-
38. GST/677 13.03.2020 12.04.2020 51,922/-
39. GST/676 13.03.2020 12.04.2020 38,175/-
40. GST/675 13.03.2020 12.04.2020 65,922/-
41. GST/674 13.03.2020 12.04.2020 37,102/-
42. GST/673 13.03.2020 12.04.2020 1,00,650/-
43. GST/672 13.03.2020 12.04.2020 45,852/-
44. GST/671 13.03.2020 12.04.2020 19,580/-
Total 45,07,324/-
Company Appeal (AT) (Insolvency) No. 2272 of 2024 13 of 34
21. The aforementioned invoices became due and payable during the
restricted period under Section 10A of the Code and consequently no
application under Section 9 of the Code could have been filed on strength
of these aforementioned invoices. Though the parties agreed for the
payment of invoices upon the expiry of 30 days from the date of invoice,
the Appellant in most of the aforementioned invoices did not mention
contained nothing with respect to the payment terms, in absence of
which, it can be inferred that the invoices wherein no payment terms are
provided are due for the payment within the reasonable time from the
date of receipt of such invoices. Further, as per the trade practise of the
industry 30 days from the date of receipt of such invoices is to be
considered as a reasonable period for the payment. Hence, the
aforementioned invoices are hit by Section 10A of the Code, consequently,
the Petition under Section 9 would be non-maintainable. The said
position has been affirmed by this Hon'ble Appellate Tribunal in the case
of Manishaas Infratecho Solutions Pvt. Ltd. v Bhonu Hulshi Real
Estate Private Ltd. 2024 SCC Online NCLAT 822 at para 17-20 and it
was held that in case if no due date is mentioned in the invoices the same
will become due within reasonable time period i.e., 30 days.
22. Furthermore, it is relevant to note that the alleged principal amount
as claimed by the Appellant is ₹1,64,89,928/- which includes the alleged
invoice no. TCIPL/GST/127 dated 09.08.2021 for ₹ 26,00,000/- for the
purchase of alleged 2 Harvester in the month of April 2020 which the Company Appeal (AT) (Insolvency) No. 2272 of 2024 14 of 34 Respondent did not purchase and no delivery challan of the same are
annexed. Further, the submission of the Appellant that (pg 71) raises
serious question as to the sanctity of invoice no. TCIPL/GST/127 which
was raised on 09.08.2021, more than 16 months from the date of alleged
delivery.
23. It is pertinent to mention that the Appellant herein raised the
alleged GST invoice in the month of August 2021 in order to avoid the
embargo of Section 10A of IBC. As per Section 31 of GST Act, 2017 it is
incumbent upon the seller of goods to generate the GST invoice at the
time of removal of goods for supply to the recipient or delivery of goods
which has not happened in the instant case. Further, the said invoice has
been unilaterally raised by the Appellant without there being any
agreement between the parties about the price. Further, the invoice had
to be generated in April 2020, however owning to dispute between the
parties regarding the price the same was not generated which is evident
from page 485 of Appeal wherein both the parties were negotiating qua
the price till 19th November 2020, however, nothing was finalized as
Respondent informed the Appellant to keep the harvesters. Further, the
Appellant on 30th November 2020 unliterally asked the respondent to pay
₹20 Lakh without any consensus between the parties.
24. Respondent further contends that in view of the same the alleged
invoice amount should be to be deducted from the alleged principal debt
Company Appeal (AT) (Insolvency) No. 2272 of 2024 15 of 34 as claimed and also the amount which fell due during 10A period under
the Code should also be deducted:
Particular Amount in ₹
Principal Amount 1,64,89,928/-
(Invoice No. GST/127) (-26,00,000)/-
Amount which falls under Section (-45,07,324)/- (10A) Total 93,82,604/-
Hence the Petition under Section 9 of IBC is not maintainable as it is
below the threshold prescribed under Section 4 of IBC. Further,
unilateral imposition of the interest cannot be considered to cross the
threshold in the absence of mutual agreement between the parties.
25. This Appellate Tribunal in Decor Paper Mills Ltd. v Mahashakti
Plasto Pvt. Ltd. in CA (AT) (Ins.) No.2022 of 2024 has held that invoices
falling within 10A period must be excluded from default claims. Further,
the Hon'ble Supreme Court in Ramesh Kymal v Siemens Gamesa
Renewable Power (P) Ltd. (2021) 3 SCC 224 at para 27 has
categorically held that no application for initiation of CIRP can be initiated
for a default occurring on or after 25.03.2020. The Hon'ble Supreme
Court held that the expression "shall never be filed with the clear
indicator that the intent of legislature is to bar institution of any
application.
26. The Appellant with an oblique and ulterior motive to cross the
Company Appeal (AT) (Insolvency) No. 2272 of 2024 16 of 34 minimum threshold as stipulated under the IBC has included the interest
on delayed payment @ 24% per annum in the alleged default amount.
Appellant herein has unilaterally levied the interest on the delayed
payment without there being any mutual contract and agreement
between the parties. The reliance placed by the Appellant on the
boilerplate clause as mentioned in the invoice which were issued by them
are vague and cannot be held to be binding on the Respondent when the
parties acted contrary to the same. Provision in the invoice says that the
Respondent shall be liable to pay interest on the delay payment but no
period of payment has been prescribed in the invoice, therefore, it is not
known as to from which date the interest has been charged by the
Appellant. This clause in the invoice is totally vague because it does not
specify the period within which the amount was to be paid. Secondly, it
is trite law that interest will be charged as per the agreed terms whereas
no agreed terms have seen the light of the day to enable the Appellant to
claim interest as a part of debt and the same is clear from the alleged
ledger entries produced by the Appellant.
27. In view of the aforesaid factual situation read with the law laid down
by this Appellate Tribunal it is contended that unilateral inclusion of the
interest amount in the alleged default amount is unwarranted and not
permissible which has been confirmed by this Hon'ble Tribunal in Comet
Performance Chemicals Private Ltd. v Aarvee Denims and Exports
Limited 2025 SCC Online NCLAT 53.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 17 of 34
28. The Petition preferred before this Ld. Adjudicating Authority is not
maintainable as there exist pre-existing disputes between the Parties
herein. It is submitted that the Respondent deposited a security deposit
of ₹10,00,000/- (Rupees Ten Lacs Only) after the receipt of the security
deposit by the Appellant, a draft copy of a Letter of Intent (hereinafter
referred to as "LOI") was shared, however, the content of the LOI by and
large were in favour of the Appellant and was unilaterally prepared to
cater the objectives of the Appellant only and no leeway was given to the
Respondent. Hence, till date the LOI was not executed and parties were
doing business as per the mutual understanding. Further, the Appellant
had supplied 15 harvesters in total, out of the above-mentioned
harvesters supplied by the Appellant, the Respondent had supplied 13
harvesters to final consumers. That it is pertinent to state that most of
the harvesters supplied to the consumers started to have mechanical
malfunctioning after using it between 50 hours and 100 hours and post
usage of the harvesters for 500 hours, these harvesters were completely
breaking down, which has been duly considered by the Adjudicating
Authority while passing the Order dated 25.06.2024.
29. Out of these 13 harvesters sold, 6 harvesters comprising almost
50% of the harvesters sold, were returned and exchanged owing to the
continuous breakdown of the machinery, massive mechanical
malfunctioning just at the beginning of harvesting season and further out
of these 6 returns, 3 customers had in writing requested for the exchange Company Appeal (AT) (Insolvency) No. 2272 of 2024 18 of 34 of the harvesters at the earliest as the mechanical breakdown of the
harvester had occurred during the harvesting season and the crops would
be required to be harvester with a specified time period. Hence, the
Respondent had to exchange the faulty harvester with a harvester of a
different Company to accommodate the customer's urgent need and 2
harvesters remained unsold due to its poor performance.
30. For the exchanged harvesters, the Respondent had to bear
convenience cost and other administrative cost to deliver the exchanged
harvesters to the consumers. Furthermore, remaining 5 consumers to
whom the harvesters were sold had also filed complaint with the
Respondent with regard to the return of the harvesters as the harvesters
that were supplied to the consumers were also malfunctioning and
ultimately had a permanent breakdown and has become scrap and junk
and are lying with the said consumers till date with no value whatsoever.
31. Many other consumers had also lodged complaints and have filed
suits against the dealer/agents of the Operational Creditor being M/s
Bisakha Agro and its proprietor i.e., Mr. Abhimanu Bhinda in the matter
Misc. No. 238-239 of 2020 in Consumer Complaint No. 32 of 2020. It is
pertinent to note that the Respondent herein was not a party to the
aforementioned consumer complaint, the issues pointed out in said
matter substantiate its contentions regarding the quality disputes of the
goods delivered to the Corporate Debtor.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 19 of 34
32. The fact that the machines/harvesters were operating far below the
optimal levels is also clear from the fact that the principal manufacturer
and principal supplier of machines also unequivocally accepted that there
was a problem with the machine and same were being upgraded. The
Principal Manufacturer i.e., Zoomlion Heavy Machinery Co. Ltd. vide
letter dated 10.07.2019 admitted to the need for upgrading of
components of machinery, which is duly considered by the Adjudicating
Authority while dealing with the issue of pre-existing dispute in the
Petition. The machines of Zoomlion sold by the Appellant were faulty and
various consumers all across the West Bengal and Odisha raised this
issue and agitated the same before the appropriate authorities. In this
regard various newspaper articles from 2020 has covered the agitation by
the farmers and grievances of the consumers regarding the defects of the
harvesters were mentioned.
33. It is also germane to mention herein that few customers had
dumped the harvesters before the Respondent herein in name of
servicing, after the harvesters started malfunctioning followed by its
break down. Further these customers were reluctant to take back the
faulty harvesters and demanded the refund of the amount paid by them.
34. The Appellant herein intentionally dumped the spare parts of
different specifications with the Respondent herein inspite of the fact that
it was well known to the Respondent that the harvesters were remaining
Company Appeal (AT) (Insolvency) No. 2272 of 2024 20 of 34 unsold and there were return of the harvesters as well as these spare
parts would be of no use to the Respondent. It is incumbent to mention
herein that the Respondent time and again requested the Appellant to
take back the spare parts and harvesters lying with the Respondent as
these harvesters were not saleable owing to its terrible and poor
performance. However, the Appellant malafidely did not do so and the
Appellant always requested the Respondent to communicate with the
officials immediately on the phone call to resolve the issues. The
Respondent being new in the business line of Harvesters was solely
relying upon the representations and guidance of the Appellant and the
Appellant while taking the advantage of the same restrained the
Respondent from raising any written request for any issue qua the
transactions.
35. The Appellant herein has raised a frivolous ground that there was
no pre-existing dispute, alleging that the Respondent herein at no point
of time raised any dispute before the receipt of Demand Notice dated
11.08.2021. It is relevant to mention herein that as soon as the
Respondent herein started returning the Harvesters i.e., on 08.08.2021,
the Respondent verbally communicated it to the Appellant and Appellant
very mischievously issued a demand notice dated 11.08.2021 under
Section of IBC in order to avoid receipt of detailed complaints from
Respondent of the consumers qua the harvesters which were returned.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 21 of 34
36. The Respondent heavily relies on the Hon'ble Apex Court judgement
in the matter of "Mobilox Innovations Private Limited Vs. Kirusa
Software Private Limited in Civil Appeal No. 9405 of 2017" and
claims that due existence of the dispute Section 9 Petition is liable to be
dismissed.
37. In view of the same the Appeal is liable to be dismissed as the
Appellant is using the IBC as a mechanism for recovery for amount, while
the inferior quality goods of Appellant are lying with the Respondent
which the Respondent had asked the Appellant to lift from the ware
house.
Appraisal
38. We have heard the counsels of both sides and also perused the
material placed on record. We find that this Appeal was filed under
Section 61 of the Insolvency and Bankruptcy Code, 2016, challenging the
order dated 25.06.2024 passed by the National Company Law Tribunal
(NCLT), Kolkata Bench in C.P. IB No. 211/KB/2022, which dismissed the
Appellant's Section 9 Petition on the grounds of a pre-existing dispute.
39. The main issue before us is whether a preexisting dispute exists
between the Appellant claiming to be operational creditor and the
respondent basis which the Adjudicating Authority had dismissed the
Appellants' Section 9 petition.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 22 of 34
40. We note that the Appellant, Team Commotrade India Private
Limited, is a company engaged in importing and marketing agricultural
machinery under the brand "Zoomlion" through a network of sub-dealers
across India. The Respondent was appointed as a sub-dealer for the
Purba Midnapur and Paschim Midnapur districts of West Bengal via a
Letter of Intent dated 14.09.2019. Pursuant to this, the Respondent made
a security deposit of ₹10,00,000 and placed multiple purchase orders
with the Appellant between 28.03.2019 and 09.08.2021. We find that
across all transactions, a total invoiced value of ₹4,04,21,108/- was
generated, against which the Respondent paid ₹2,39,31,180/-, leaving an
unpaid balance of ₹1,64,89,928/-. On 11.08.2021, the Appellant issued
a Form 3 demand notice, subsequently filing a Section 9 Petition on
07.07.2022, which was dismissed by the Adjudicating Authority on
25.06.2024. It is to be noted that total amount of debt claimed as per Part
IV is ₹2,37,84,627.60 (Rupees Two Crore Thirty Seven Lakh Eighty Four
Thousand Six Hundred and Twenty Seven and Paisa Sixty Only) with date
of default being 09.08.2021 and this amount also includes interest at
18% p.a. from the date of invoice till realisation.
41. Now we delve into concerns raised by both parties and their over-
all impact on the dispute between them and final decision of the
Adjudicating Authority.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 23 of 34 Interest in invoices
42. While discussing the interest claimed on operational debt, the
Appellant refers points to contractual terms stipulating a 24% per annum
interest rate on delayed payments basis the invoices, which the
Respondent accepted and partially honored. The Appellant further states
that it conservatively reduced the interest rate to 18% for the petition
claim and claims that both principal and agreed interest must be
included to calculate operational debt under the IBC. The Respondent
disputes this position, contending that the interest calculation is vague,
the purported term was unilaterally imposed, and the payments' varied
which contradicts a uniform interest claim. The Respondent insists to
exclude interest from the principal debt calculation for insolvency
proceedings threshold assessment and claims unilateral inclusion of the
interest amount in the alleged default amount is unwarranted and not
permissible which has been confirmed by this Appellate Tribunal in
Comet Performance (supra) and which supports the case of the
Respondent. The relevant portion of this judgement is extracted as below:
"...
17. The Respondent relies upon Rishabh Infra Through Hari Mohan Gupta vs Versus Sadbhav Engineering Ltd [Company Appeal (AT) (Insolvency) No. 1881 of 2024] wherein it has been held that invoices with interest clauses, which were not part of the formal agreement, are unenforceable. This judgment supports the case of the Respondent.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 24 of 34
18. Accordingly, we agree with the submissions of the Respondent and also the findings of the Adjudicating Authority that no interest can be charged against the supply of goods and services for delayed payments until and unless there is an express agreement between the parties. We find justification in the claim of the Respondent that the interest claim was unilaterally imposed and lacked any contractual basis.
19. Next we look into the exclusion of Claims falling within the Section 10 A period. The invoices dated between 29.11.2019 and 07.02.2020, amounting to Rs 36,46,200/- (rupees thirty-six lakhs, forty-six thousand and two hundred only) fall within the restricted period under Section 10 A of the IBC. As such, defaults related to these invoices cannot form the basis of an Insolvency Application. Deducting this amount from the total alleged outstanding of Rs 1,36,30,679/- (rupees one crore, thirty-six lakhs, thirty thousand, six hundred and seventy-nine only) reduces the admissible claim to Rs 99,84,479/- (rupees ninety-nine lakhs, eighty-four thousand, four hundred and seventy-nine only) which remains below the statutory threshold of rupees one crore. It is to be noted that this gets further reduced on deduction of the claims of interest.
20. The Respondent has also placed his reliance on the judgment of this Tribunal in Decor Paper Mills Ltd vs Mahashakti Plasto Pvt Ltd in Company Appeal (AT) (Insolvency) No. 2022 of 2024 which establishes that invoices falling within the 10 A period must be excluded from default claims. Therefore, the Application filed by the Appellant under Section 9 is not maintainable on this count also, as the default amount is below the statutory threshold."
[Emphasis supplied]
We concur with the arguments of the Respondent to exclude interest as
was expounded by us in above judgment. Thus, we observe that until
there is a prior agreement between the CD and OC, interest cannot be Company Appeal (AT) (Insolvency) No. 2272 of 2024 25 of 34 charged by OC. Further initial interest rate claimed was 24% which was
changed to 18% - both terms done unilaterally. Therefore, we are
considering the total debt to be ₹1,64,89,928/- for further analysis of this
case and not ₹2,37,84,627.60, which includes interest.
Disputed invoice
43. Concerning the specific invoice numbered TCIPLGST127,
amounting to ₹26,00,000/- [@71 APB], the Appellant argues that this
invoice represents a negotiated and accepted supply of two harvesters,
each priced at ₹13 lakh. The Appellant maintains that the Respondent
raised no objections until the litigation stage. Challenging it, the
Respondent describes this invoice as "bogus," asserting it was
unilaterally generated in August 2021 to circumvent the Section 10A bar,
purporting delivery of goods supposedly supplied on 15 April 2020 but
without any supporting delivery documentation [@71 APB - just tax
invoice without Bill of lading etc. and no terms of delivery]. The
Respondent maintains that price negotiations for these goods were never
finalized, rendering this invoice liable to exclusion [@486, WhatsApp chat
dated 19.09.2020 confirming non-finalization and dispute]. We find this
invoice to be a disputed one and this needs to be excluded from total
claim of ₹1,64,89,928/-.
Pre-existing dispute
44. Addressing the evidence of product defects and service disputes, the
Appellant argues that no contemporaneous complaints or Company Appeal (AT) (Insolvency) No. 2272 of 2024 26 of 34 acknowledgments of defects were made by the Respondent prior to the
demand notice. The Appellant further notes that customer letters and
complaints submitted by the Respondent are undated, unauthenticated,
and were not presented during earlier proceedings before the NCLT, thus
lacking evidentiary value. On the other hand, the Respondent maintains
that many harvesters repeatedly malfunctioned, were returned or
exchanged, and rendered unusable. They assert that numerous written,
verbal, and legal grievances were raised by customers, with the Appellant
failing to address these issues or lift unsold or returned goods. This, the
Respondent insists, clearly demonstrates a genuine, ongoing dispute
before any insolvency proceedings. Further, in relation to the existence of
a pre-existing dispute, the Appellant contends there was no genuine
dispute before the Form 3 demand notice dated 11.08.2021. The
Appellant emphasizes that all communications preceding the notice,
including emails and WhatsApp exchanges, consistently acknowledged
the Respondent's liability and reflected ongoing business without any
product quality complaints. On the other hand, the Respondent claims
that the dispute originated well before the demand notice. Respondent
cites multiple malfunctions of the supplied harvesters, reports of
returned products, consumer complaints, ongoing litigations, and
acknowledgment by the principal manufacturer himself about the need
for upgrades and improvements. The Respondent asserts that these facts
evidence a bona fide, pre-existing dispute.
Company Appeal (AT) (Insolvency) No. 2272 of 2024 27 of 34
45. In this backdrop, before deciding the matter in hand, we look into
the provisions of Section 9 which is reproduced as below:
"Section 9. Application for initiation of corporate insolvency resolution process by operational creditor.
(1) ...
(2) ...
(3) ...
(4) ...
(5) The Adjudicating Authority shall, within fourteen days of the receipt of the application under sub-section (2), by an order
(i) admit the application and communicate such decision to the operational creditor and the corporate debtor if,--
(a) the application made under sub-section (2) is complete;
(b) there is no 3 [payment] of the unpaid operational debt;
(c) the invoice or notice for payment to the corporate debtor has been delivered by the operational creditor;
(d) no notice of dispute has been received by the operational creditor or there is no record of dispute in the information utility; and
(e) there is no disciplinary proceeding pending against any resolution professional proposed under sub-section (4), if any;
(ii) reject the application and communicate such decision to the operational creditor and the corporate debtor, if--
(a) the application made under sub-section (2) is incomplete;
(b) there has been 3[payment] of the unpaid operational debt;
(c) the creditor has not delivered the invoice or notice for payment to the corporate debtor;
(d) notice of dispute has been received by the operational creditor or there is a record of dispute in the information utility;"
Company Appeal (AT) (Insolvency) No. 2272 of 2024 28 of 34
46. The above provisions are very clear that if a notice of dispute has
been received by the operational creditor, then the Adjudicating
Authority will reject the application under Section 9. In this case we find
incontrovertible records that there is a dispute.
47. The Respondent heavily relies on judgement of the Hon'ble Apex
Court in the matter of "Mobilox Innovations Private Limited Vs.
Kirusa Software Private Limited in Civil Appeal No. 9405 of 2017"
wherein it has deliberated on the issue of "pre-existing dispute" in
relation to a Petition under Section 9 of the Code and observed that in
case where there is an existence of the dispute, such Section 9 Petition
is liable to be dismissed. The Hon'ble Supreme Court in Mobilox
Innovations observed as follows:
"It is clear, therefore, that once the operational creditor has filed an application, which is otherwise complete, the adjudicating authority must reject the application under Section 9(5)(2)(d) if notice of dispute has been received by the operational creditor or there is a record of dispute in the information utility. It is clear that such notice must bring to the notice of the operational creditor the "existence" of a dispute or the fact that a suit or arbitration proceeding relating to a dispute is pending between the parties. Therefore, all that the adjudicating authority is to see at this stage is whether there is a plausible contention which requires further investigation and that the "dispute" is not a patently feeble legal argument or an assertion of fact unsupported by evidence. It is important to separate the grain from the chaff and to reject a spurious defence which is mere bluster. However, in doing so, the Court does not need to be
Company Appeal (AT) (Insolvency) No. 2272 of 2024 29 of 34 satisfied that the defence is likely to succeed. The Court does not at this stage examine the merits of the dispute except to the extent indicated above. So long as a dispute truly exists in fact and is not spurious, hypothetical or illusory, the adjudicating authority has to reject the application."
[Emphasis supplied)
48. We note that the parties sharply disagree on the role of the
Adjudicating Authority, invoking the landmark Mobilox Innovations
judgment. The Appellant stresses that the NCLT's role is confined to
verifying debt existence, default, and statutory threshold compliance, and
that a dispute relied upon to deny admission must not be speculative or
an afterthought. In this case, they argue the Respondent raised quality
issues only after the demand notice, rendering the dispute nonexistent
for the purposes of the IBC proceeding. Conversely, the Respondent
submits that the NCLT properly exercised its discretion by examining the
evidence and context, finding a plausible and bona fide dispute. They
emphasize that the Insolvency law requires consideration of whether a
dispute is "plausible" rather than definitively resolved, which is satisfied
here through extensive consumer complaints, internal communications,
and manufacturer admissions.
49. In the facts and circumstances of the case we find that it is not a
moonshine defense and in a plausible dispute and is a fit case for a pre-
existing dispute, as contemplated by Section 8(2) of IBC or at the time of
filing the Section 9 application, and to be a ground to nullify an
Company Appeal (AT) (Insolvency) No. 2272 of 2024 30 of 34 application under Section 9. And we need not consider any other ground
for entertaining the Appeal. But for sake of completeness, we have delved
into other issue raised by the Appellant.
10A period invoices
50. Regarding the Section 10A bar itself, the Appellant argues it is
inapplicable to this case, as the most recent default occurred after the
COVID-19 suspension period expired in March 2021. The Appellant adds
that the Respondent continued to acknowledge and make partial
payments beyond that date. In stark contrast, the Respondent insists
that numerous invoices fell due during the Section 10A restriction
window and that the law mandates exclusion of any such invoices for
Section 9 petition maintainability. The Respondent challenges
maintainability on the ground that certain invoices totaling ₹45,07,324/-
fall within the Section 10A restricted period. According to the
Respondent, deducting this disputed amount and also the disputed
invoice of a ₹26,00,000/- invoice as was noted earlier, brings the claim
below the threshold.
51. In Comet Performance Chemicals Private Ltd. v Aarvee Denims
and Exports Limited 2025 SCC Online NCLAT 53 there was a similar
situation and this Appellate Tribunal had noted as follows:
"...
20. The Respondent has also placed his reliance on the judgment of this Tribunal in Decor Paper Mills Ltd vs Mahashakti Plasto
Company Appeal (AT) (Insolvency) No. 2272 of 2024 31 of 34 Pvt Ltd in Company Appeal (AT) (Insolvency) No. 2022 of 2024 which establishes that invoices falling within the 10 A period must be excluded from default claims. Therefore, the Application filed by the Appellant under Section 9 is not maintainable on this count also, as the default amount is below the statutory threshold.
21. Furthermore, it is to be noted that even if the dispute relating to invoices falling within 10 A period is not raised by the Respondent, as is being argued by the Appellant, it is not a bar as it is the duty of the Adjudicating Authority to scrutinise whether the invoices are barred by law or not."
[Emphasis supplied)
52. In a similar situation in this, we are therefore, inclined to agree with
above justification that invoices of 10A period should be deducted from
the total amount, which fell due during 10A period as also the disputed
amount, making the total amount to be less than threshold of ₹1 crore.
And in that case, the Petition under Section 9 of IBC becomes not
maintainable as per below mentioned calculation:
Particulars Amount in ₹
Principal Amount (without interest) 1,64,89,928/ - (Invoice No. GST/127) (as discussed earlier) (-26,00,000)/-
Amount which falls under Section (10A) (-45,07,324)/- (as discussed above)
Total 9382604/-
53. This case can be decided solely bases the dispute which arises from
disputed invoice of ₹26 lakhs as also the argument that invoices of 10A
period amounting to ₹45,07,324/- has to be excluded and is more than
Company Appeal (AT) (Insolvency) No. 2272 of 2024 32 of 34 sufficient to come to a conclusion that the Appellant doesn't meet the
threshold on top of all this if the arguments of a preexisting dispute is
considered the Appellant doesn't stand a chance to succeed under the
Code and it may pursue other legal remedies.
Conclusions
54. We conclude that even though the Appellant claims that no real,
prior dispute existed as all written evidence (emails, WhatsApp) before
demand notice confirms liability and continuing business with requests
for further supply, without raising product complaints. However, we find
the counter arguments of the Respondent to be convincing that dispute
existed much before demand notice as multiple harvesters
malfunctioned; customers returned products; complaints, suits, and
demand for replacements occurred in 2020-21; principal manufacturer
acknowledged need for upgrades. Thus, in the facts and circumstances
of the case we do not find that this is a case of moonshine defense, created
by the respondent. Dispute existed prior to the issuance of Demand
notice.
55. We also find that Debt due is ₹1,64,89,928/- after accounting for
payments and excluding interest claimed and If Section 10A invoices are
excluded, debt comes down by ₹45,07,324/-. We also note that invoice
(notably No. TCIPLGST127 for ₹ 26,00,000) is claimed to be bogus due to
missing delivery documentation claimed non-receipt of goods which
cannot be adjudicated by us under the code - which is also leading to Company Appeal (AT) (Insolvency) No. 2272 of 2024 33 of 34 pre-existing dispute. Thus, Petition is not maintainable on threshold
itself as (i) invoices totaling ₹45,07,324/- fall under Section 10A, and (ii)
₹26,00,000/- invoice is disputed, reducing actual claim below threshold.
We also find that disputes over several invoices and interest calculations,
and also claims that machines supplied were defective, and that these
quality disputes and consumer complaints predated the demand notice
all of which can be resolved outside the code.
Orders
56. There is no infirmity in the conclusions of the Adjudicating
Authority that Section 9 petition cannot be admitted on the grounds of
pre-existing dispute and on the issue of threshold. Accordingly, we
dismiss the Appeal. All related IAs are also dismissed. Appellant may
pursue other legal remedies. No orders as to costs.
[Justice N Seshasayee] Member (Judicial)
[Arun Baroka] Member (Technical) New Delhi.
November 28, 2025.
pawan
Company Appeal (AT) (Insolvency) No. 2272 of 2024 34 of 34
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.