Where an inspection report is prepared by officers of an electricity board in the discharge of their official duties in accordance with law, a presumption arises in favor of the correctness of such report, and a consumer challenging the report bears the burden of rebutting it with proper and cogent evidence that the facts recorded are factually incorrect. Where a consumer Forums finds that premises which are separately registered in municipal records and taxed separately are nonetheless subject to connection-clubbing requirements, the finding must be grounded in clear reasoning addressing why the inspection report evidence indicating clubbing is justified is incorrect, rather than leaving the matter in ambiguity. Where regulations require that before determination of whether connections in different municipal plot numbers constitute "the same premises" liable to clubbing under electricity supply regulations, the forums must record specific findings on whether the physical structure, use, ownership, and intention of the consumer show unified operation designed to evade tariff provisions, with consideration of both documents predating and evidence relating to the date of inspection.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

aIN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL No. 3505 of 2007
Punjab State Electricity Board & Anr. ...Appellants
Versus
Ashwani Kumar ...Respondent
WITH
Civil Appeal No. 3506 of 2007
Punjab State Electricity Board & Anr. ...AppellantsVersus
Sudesh Mahajan ...Respondent
JUDGMENT
Swatanter Kumar, J.

1. This appeal is directed against the Order dated 21st February,

2006 passed by the National Consumer Dispute Redressal

Commission (hereinafter referred to as the `National Commission'),

New Delhi where it dismissed the review petition preferred by the

Punjab and Haryana State Electricity Board (for short `Electricity

Board') against the Order dated 16th August, 2005. One Ashwani

Kumar, respondent herein had filed a complaint before the District

Forum alleging that the electric meter bearing No. MS-32/603 was

installed in the premises owned and possessed by him in the name

of Kartari Devi and Suraj Prakash who had sold the property through

Registered Sale deed dated 28th November, 1996 (Ext.C/1) and since

the purchase of the property, he has been using the electric meter

and connection. On 2nd July, 2002, he had received a Memo from

2 the Electricity Board stating that the said connection had a

sanctioned load of 52.49 KW and it was required to be clubbed with

electric connection in the name of Janak Raj bearing electric

connection No. MS-32/580 with sanction load of 56.79 KW. Reply

was submitted by him to the Memo wherein he had stated the above

facts. It was further clarified that his property was separate and

distinct from property possessed by Sudesh Mahajan and the electric

connection in that premises was in the name of Janak Raj. They

denied the cross wiring in the property or even that the connection

was being commonly used by the parties. Thus, they contested the

demand raised by the Electricity Board to the extent of Rs.3,28,216/-.

2. Similarly, in the other case Sudesh Mahajan had filed a

complaint claiming a sale in favour of his predecessor in interest on

28th November, 1996. They denied the charges of clubbing and took

up the stand that they were independent properties wherein different

meters have been installed and as such, the demand of

Rs.4,56,025/- and Rs.3,28,261/- was not payable by any of the

consumers namely Janak Raj and Kartari Devi or persons claiming

through them. To challenge the same, complaints were filed by both

which came to be dismissed vide orders dated 2nd June, 2002 and 8th

3 September, 2003 respectively, passed by the District Forum. The

appeals were filed by the private complainants against the Electricity

Board before the State Consumer District Redressal Commission,

Punjab which came to be registered as Appeal No. 218 and 219 of

2004 respectively. Both these appeals came to be allowed by the

State Forum and the demands raised were quashed. A further

direction was issued that the amount deposited by the respondents, if

any, under the impugned demand notice, the same shall be refunded

with interest @ 9% per annum. The State Forum while referring to

the documents of sale in favour of the respondents further held that a

circular being CC No. 4 of 1997 issued by the Electricity Board on 8th

January, 1997 dealt with the subject of running of more than one

connection in the same premises. According to the circular, if there

were two connections in the same premises they were required to be

clubbed for the purposes of payment of tariff. However, the

Competent Forum in appeal found that they were two distinct

persons, owning distinct properties and were having independent

electric connections. Reliance was placed on the fact that the

properties have been numbered as 136 and 136-A separately by the

Municipal Corporation. The properties were subjected to property tax

4 separately. The result of these two distinct properties was that they

could not be termed as same premises under the relevant provisions

and therefore, the demand raised was entirely unjustified. The

Electricity Board filed appeals before the National Consumer Dispute

Redressal Commission, which were dismissed, vide Order dated 21st

February, 2006. As already stated, it is a small order and it will be

useful to refer to the same at this stage:

"Heard the Ld. Counsel for the Petitioner. As per the Municipal record, two separate buildings are there. One building admeasuring 554 sq. yards in P-136 owned jointly by Shri Suraj Prakash, Shri Ashwani Kumar, Shri Subhash Chander S/o Shri Tilak Raj and Smt. Raj Rani. Other building admeasuring 504 Sq. Yards is P-136-A owned by the same person. On record there is evidence that Ashwani Kumar is running the business in the name of Ashwani Textiles and he is the proprietor. As against them there is other textile mill known as Mahajan Handloom Industries owned by Shri Sudesh Mahajan. In this state of circumstances order passed by the State Commission cannot be said to be, in any way, erroneous. Hence, these Revision Petitions are dismissed."

3. The legality and correctness of the order passed by the

National Commission is challeged in these appeals. At the very

outset, we may notice that the electric supply regulations have been

5 framed in exercise of the powers conferred under Section 49 and

Sub Section (j) of Section 79 of the Electricity Supply Act, 1948 (for

short referred as `the Act') and other enabling provisions by the

Board. These regulations deal with different aspects, in particular,

they deal with providing of one connection in one premises and

consumer is required to give an undertaking on a non-judicial stamp

paper that no connection already exists in the premises, in which, the

connection is being applied in terms of Clause 3.1.1 of the

Regulations. Other relevant provisions which have a bearing on the

matters in controversy before us, relate to new connection in the

same premises, transfer of the premises, where there exists a

connection and the obligation on the part of the consumer to get the

connection clubbed. Now we may examine those relevant provisions

which read as under:

"3.5.2 Whenever, an existing consumer applies for a new connection in the same premises i.e. even having independent shed/unit/piece of land having separate plot no. etc., in his name, it shall normally be not allowed. Such consumer should be asked to apply for extension in existing load. However, if a new connection has been applied in the name of a new firm/company of which the existing consumer is a Director/Partner, the connection will only be allowed if the premises

6 are distinctly and physically separate/portioned so that it is not possible to utilize electricity from one premises to the other and further that in case of one of the connections having been disconnected due to default, it cannot be run from other connection by making temporary arrangement.

3.5.2.1 Where the premises in question are legally transferred, sold or leased to a new unit and appropriate entry exists in the municipal/ revenue record regarding such transfer, the consumer/applicant should furnish a copy of the registered deed for sale or lease as the case may be. An informal agreement of family partition/ lease etc. will not be acceptable.

3.5.2.2 Where the Punjab Government has allowed the registration of more than one unit/renting out of the premises for setting up industrial units in industrial plots/sheds in the Focal Points depending on the size of the plot and subject to fulfilment of some conditions laid down for the purpose, in such cases the new connection may be allowed provided such units are in the name of different persons and parts of such sheds/plots being used by different industrialists, are properly demarcated and separated from each other by making suitable partition so that it is not possible to use electricity from one unit to another and in case of one connection having been disconnected due to defaulting amount etc., the same cannot be run from other connection(s) in the adjoining industrial unit(s) by tapping some supply points.

xxx xxx xxx

7 3.5.7 Failure to get Connections Clubbed If a consumer fails to exercise option to get his connections clubbed within the stipulated date or declares that there is only one connection in his premises but later on it is detected that he is having more than one connection in one premises, he shall have to pay higher tariff and surcharge, if applicable w.e.f. 1.1.96.

4. The circular, which has been relied upon by the parties reads

as follows:

"In order to encourage the consumers to opt for clubbing of their loads and also to facilitate a smooth transition, it has been decided that all consumers may be asked to give undertaking for clubbing/conversion of two or more connections in the same premises, wherever existing by 31.1.97. Further action in various situations may be taken as under:

(a) Cases where no change of voltage level is involved;

The cost of clubbing with regard to service Mains, if any, shall be borne by the Board.

However, consumer shall be charged higher tariff wherever applicable, from the date of undertaking, which in any case shall have to be given before 31.1.97.

(a) Cases where change of voltage level is involved;

In cases requiring conversion of supply voltage from LT to 11 KV, Board shall carry out the conversion including erection of a new 11/0.4 KV transformer with allied equipment in

8 the first instance and recover the conversion cost in six equal monthly instalments from the consumer.

Note:- Where there is a transformer exclusively feeding the consumer, this may, on the option of the consumer, be sold to him as per the provisions contained in SMI-39.

In both the cases (a) and (b) above, such consumers shall be brought on higher tariff, wherever applicable and any surcharge due to voltage level shall be stopped with effect from the date of undertaking.

The above relaxation shall be applicable to the cases involving voltage level upto 11 KV.

(a) The consumers who do not exercise option by 31.1.97 or those who in the first instance declare that there is only one connection existing in their premises but later on are detected to be running more than one connection in the same premises, shall have to pay higher tariff and surcharge wherever applicable w.e.f. 1.1.96."

5. The bare reading of the above regulations and circular makes it

apparent that the aim of the Electricity Board is to provide single

connection in the premises. Not only this, it is the obligation of the

consumer, to get the connections clubbed where more than one

connection exists in the same premises. This policy is, primarily,

meant to encourage single connection as well as consumers to opt

9 for clubbing of their loads and also to facilitate a smooth

transmission. Besides this, the most important aspect is the mischief

that these provisions ought to suppress. A consumer who gets two

meters installed in his premises and in that garb receives bulk supply

instead of medium supply clearly makes an attempt to avoid payment

of higher tariff. It cannot be disputed that a consumer of a medium

supply is subjected to a lower tariff than the one receiving bulk

supply. Therefore, the intention, thus, is to avoid revenue loss to the

Board by circulating the prescribed procedure. These regulations

and circulars, thus, cannot be interpreted so as to defeat the very

object of suppressing such a mischief in the consumption of

electricity. Therefore, if the Electricity Board finds that such mischief

is being played, there is nothing in law preventing the Board from

treating it as a clubbed connection and impose such tariff and penalty

as is permissible in accordance with law. No consumer can be

permitted to defeat the spirit of the regulations and take undue

advantage of receiving electric supply through all different meters in

the same premises and with an intention to defraud the Electricity

Board of its genuine dues for supply of electricity.

10

6. Having referred to these regulations, now we may revert back

to the facts of the present case. The officers of the Electricity Board

had conducted inspection of the premises in question and prepared

an inspection report. As per the inspection report, there is only one

plot being Plot No. 136, Industrial Area-A, Ludhiana and in that Smt.

Kartari Devi is stated to be the consumer. She has a sanctioned load

of 52.49 KW and the Consumer Account No. was MS-32/603. The

other consumer is Shri Janak Raj in the same property having

Consumer Account No. MS-32/580 with a sanctioned load of 56.79

KW. In the report, it was noticed as follows:-

"6. In the connected portion of premises (Aahata) one more connection MS-32/0603 Kartar Devi is installed. The supply of which also comes to this premises and at the moment some load of that connection is found running on this side.

7. The common wall of both sides has one shutter and one Kainchi Gate. In the half portion of Kainchi Gate a wall of approximately four feet exists. As per Board instructions case of clubbing is made out action be taken."

6. This report was signed by Shakti Jaggi, a representative of the

consumer, to whom the copy of the same was given. The

Department, vide their letter written to the consumer, had stated that

11 in terms of circular No. 78 of 1995, dated 15th September, 1995 and 4

of 1997, dated 8th January, 1997, the connections were liable to be

clubbed on the basis of this inspection report and they were expected

to file reply within fifteen days from the date of issue of the notice. In

the reply submitted by the consumers, no specific objections were

filed to the effect that the inspection was conducted in a prejudicial

manner or correct facts had not been noticed and that is why the

protest was raised. In any case, it was open to the consumer to file

objections to the report at a subsequent stage. Except that, there

were two distinct properties and connections, nothing was averred in

the reply or before the Forum as to why the officers had reported the

facts in their report which justify clubbing of the connections.

Thereafter, the demands of Rs.3,28,216/- and Rs.4,56,025/-, as

stated above, were raised from these consumers. Both the reports

have been received by the consumer's representatives. The demand

notices were admittedly received by the consumer as they are the

very basis of the complaints filed by them. The circular being CC No.

4 of 1997, while referring to the scheme of the Electricity Board under

Clause (c) of the circular, made it obligatory upon the consumers to

exercise the option by 31st January, 1997 and even to those persons

12 where one connection is stated to be existing in the premises but

later on are detected to be running more than one connection and

they would have to pay higher tariff and surcharge w.e.f. 1.1.1996.

The version, put forward by the consumers, is that there were two

separate premises and they had produced certain documents before

the Forum, which persuaded them to treat these premises as

separate. All these documents were prior to the date of inspection

and it has been noticed by the Forum that the inspection reports

were signed under protest. The reports, which have been placed

before us at page Nos. 56 and 59 respectively of the paper book,

show that some protest was raised, however, no objections were filed

to show what was the protest and what exactly the consumer were

objecting to. It, certainly, required a definite finding to be recorded by

the Forum. Non-recording of such a finding has prejudicially affected

the rights of the parties.

7. The documents (Ext.C1 to Ext.C10), noticed by the State

Commission, show that the consumer had advanced the argument of

separate properties, separate ownership and separate connections.

However, there is no reason recorded as to why the evidence of the

Department i.e. the inspection report is incorrect and cannot be relied

13 upon. There is ambiguity. The District Forum, while relying upon the

report, had rejected the complaint which was reversed by the State

Forum. These are the findings of facts and they must be recorded in

a manner which would clearly establish on record the case of one

party or the other in accordance with law. The trading accounts filed

by the consumer in one of the appeals related to financial year 1991-

92, 1992-93, 1993-94 and 1996-97. On behalf of respondents,

Subhash Chander, had filed the rent receipts for the period 1st April,

2002 to 30th September, 2002. Primarily, the documents produced

by the consumers related to the period prior to the date of inspection.

The inspection of the premises was conducted on 19th June, 2002. It

was required of the consumers to establish their case for the period,

at the time of or subsequent to the date of inspection. There could

reasonably be possibility of issues being answered against the

consumers. The report prepared by the officers of the Electricity

Board is an act done in discharge of their duties and could not be

straight away reflected or disbelieved unless and until there was

definite and cogent material on record to arrive at such a finding. It is

not disputed before us that if two connections are operating in the

same premises, in that event, the concept of clubbing and

14 consequential charges and penalty would be attracted. That being

so, and particularly, where a National Commission has not adverted

to some discussion on the points raised in the appeal, the policy of

the Electricity Board and the regulations cannot be rendered otiose.

It is the obligation of every bona fide consumer to comply with the

requirements and the regulations in the circular and not to abuse the

advantage given under the policy of the Electricity Board. If there is

a prima facie record to show that the consumer had attempted to

circumvent the circular and with an intention to avoid payment of

higher tariff, two connections were being utilized in the garb of

different premises, while in fact, it was one and same premises, the

penal consequences must follow. The circular issued and the

regulations read with the provisions of the Act, clearly contemplate

imposition of penalty and such charges with effect from 1st January,

1996. There is no explanation on record as to why the date is

effective from 1st January, 1996. Even if taking the said date to be

correct then the dues, which can be recovered, are the dues payable

to the Electricity Board in accordance with law. The notice dated 2nd

July, 2002 (Ext.C/5) was issued on the basis of the inspection report.

From the record before us it will be a serious question to be

15 specifically answered by the Competent Forum, as to whether the

premises in question are two distinct and different premises or it is

one in the same (i.e. only property No. 136 or 136 and 136-A). If

these are two independent premises owned by two different persons

who are consumers of the Board in their own capacity and there is no

intention on their part to use these connections collectively and have

not violated their sanctioned load, the consequences in law will be

different. But, if there is intention to use both connections and avoid

higher tariff, the consequences will be entirely different in that case.

The inspection report is a document prepared in exercise of its

official duties by the officers of the Corporation. Once an act is done

in accordance with law, the presumption is in favour of such act or

document and not against the same. Thus, there was specific onus

upon the consumer to rebut by leading proper and cogent evidence

that the report prepared by the officers was not correct. As already

noticed, no objections were filed to the said report except some

protest, that too, without stating as to what was the specific protest

about, whether the facts recorded in the report were factually

incorrect or that the report was received under protest. As is

apparent from the reports on record, it bears two signatures of the

16 consumer/consumer's representatives, one with regard to the

preparation of report and other with regard to receiving the copy of

the report. The words `under protest' have been recorded at the

bottom of the report. This, itself indicates the ambiguity in the protest

raised by the consumers.

8. In the circumstances aforestated, we are of the considered

view that the matter requires to be remanded to the Competent

Authority in the Electricity Board to determine and record the clear

findings afresh as to whether it was a case of clubbing or not in

accordance with the provisions and observations afore-referred with

liberty to the parties to produce any further documents, if they so

desire. The authority shall pass a final order expeditiously. The fate

of the notices and consequences thereof shall be subject to the final

order that may be passed by the Competent Authority. Parties are at

liberty to challenge the order so passed in accordance with law.

9. The appeals are, therefore, disposed off with the above

direction while leaving the parties to bear their own costs.

................................J. [ DR. B.S. CHAUHAN ]

17 ....................................J. [ SWATANTER KUMAR ]

New Delhi July 8, 2010.

18

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free