M/S. Schlumberger Asia Services Ltd. vs Oil & National Gas Corporation Ltd.

Delhi High Court9 January 2009Mukul Mudgal · Manmohan

Ratio decidendi

The rule this decision rests on

An arbitrator's award may be set aside if it is patently illegal or acts in excess of jurisdiction, which includes awarding relief that is contrary to the plain and unambiguous language of the contract terms and beyond the matters submitted for determination. Where the express terms of a contract define a key concept and prescribe conditions for its application, an arbitrator who awards benefits under that concept without satisfying the contractual prerequisite for its invocation acts beyond jurisdiction; specifically, where demobilization charges are payable only upon return of equipment and personnel to point of origin as defined in the contract, an award of such charges when the return has admittedly not occurred is contrary to the contractual terms and liable to be set aside.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

* IN THE HIGH COURT OF DELHI AT NEW DELHI
+ FAO(OS) No. 712/2006

Reserved on : December 5th, 2008

% Date of Decision : January 9th , 2009

M/s. Schlumberger Asia Services Ltd. ..... Appellant Through: Mr.Sanjeev Puri, Senior Advocate with Mr. Arijit Mazumdar & Mr. Bhavya Sethi, Advocates

Versus

Oil & National Gas Corporation Ltd. ..... Respondent Through: Mr. B. Sen, Senior Advocate with Mr. R.G. Srivastava, Advocate

CORAM: HON'BLE MR. JUSTICE MUKUL MUDGAL HON'BLE MR. JUSTICE MANMOHAN

1. Whether the Reporters of local papers may be allowed to see the judgment? Yes. 2. To be referred to the Reporter or not? Yes. 3. Whether the judgment should be reported in the Digest? Yes.

JUDGMENT

MANMOHAN, J

1. The present appeal under Section 37 of the Arbitration and

Conciliation Act, 1996 has been filed against the judgment and order

dated September 13, 2006 passed by the learned Single Judge in OMP

No. 189/1998 by virtue of which the minority award dated May 22,

1998 has been affirmed and the majority award has been set aside.

2. Briefly stated the facts of the present appeal, according to the

appellant, are that the appellant and the respondent entered into a

FAO(OS) 712/2006 Page No. 1 of 19 contract dated March 29, 1993 for carrying out electro logging,

perforating and other wireline services. In accordance with the

contract, the appellant was to carry out the said work after mobilizing

its equipment, tools, personnel etc. The said contract commenced

from October 11, 1992 and was initially valid for a period of 24

months. By mutual consent of parties, the contract could be extended

for another period of 12 months.

3. However, during the subsistence of the contract, the

respondent released and de-hired certain equipments and tools vide

communication dated 5th March, 1993.

4. According to Mr. Sanjeev Puri, learned senior counsel for

appellant as the equipment was released/de-hired during the

subsistence of the contract, that means before the expiry date of the

contract, it was entitled to claim idling charges for the de-hired

equipment equivalent to „demobilization charge‟ as provided for in

Clause 1.3 amounting to one and a half month equipment charge. The

appellant subsequently raised invoices claiming the said amounts,

which according to learned counsel for appellant, were illegally de-

hired. The appellant‟s case is that non-payment of the invoices by the

respondent was unjustified as the equipment was released/de-hired

and had to be kept ready for use, if so required during the period of

the contract. Further according to the appellant, the respondent‟s

refusal to pay on the ground that Clause 6.3 was attracted was

untenable in law. At this juncture, it would be appropriate to refer to

FAO(OS) 712/2006 Page No. 2 of 19 relevant Clauses of the contract executed between the parties. The

said Clauses are reproduced herein below for ready reference:-

"SECTION -I : CONDITIONS OF CONTRACT

XXX XXX XXX 1.10 "MOBILIZATION" means performance by the CONTRACTOR of all those things necessary to be fully ready to begin Work at the Base and shall include the satisfying of all Work pre-requisites stipulated in the CONTRACT. Mobilization shall include, but shall not be limited to providing of all transport from point of origin to base, all Equipment(s) and materials, all Personnel to the satisfaction of government requirements, and the setting up of Equipment in a condition of full readiness to commence Work.

Equipment mobilized during the previous CONTRACT and requested immediately by Letter of Intent (LOI) on the commencement of the new CONTRACT shall be deemed to have been mobilized for the purpose of the new CONTRACT. The mobilization charges will be waived for all Equipment(s) - presently under CONTRACT to the COMMISSION.

1.11 "DEMOBILIZATION" means the removal of all things forming part of the Mobilization of the CONTRACTOR, including all temporary facilities, return of Personnel and Equipment(s) to point of origin and the clean-up and restoration of the Site as required in this CONTRACT.

XXX XXX XXX

6.3 DEMOBILIZATION

In no event shall COMMISSION be obliged to pay demobilization if the Unit on completion of

FAO(OS) 712/2006 Page No. 3 of 19 CONTRACT shall commence operations for another company in the Area of Operation.

XXX XXX XXX

6.5 TRANSPORTATION CHARGES

a) All actual costs incurred for transportation of CONTRACTOR‟s Units, Tools, Equipment, spare parts, supplies and explosives, when imported into the country for the COMMISSION‟s exclusive service, from CONTRACTOR‟s point of origin i.e Houston, Dubai, Singapore, etc. to the CONTRACTOR‟s Base in India are for the COMMISSION‟s account. These recoverable transportation costs are to be re-imbursed to the CONTRACTOR in the currency of origin or in equivalent US Dollars with no component in Indian Rupees and without withholding any taxes.

CONTRACTOR will furnish only copy of Supplier‟s invoice and/or other documentary evidence available for claiming the above costs.

XXX XXX XXX

SECTION A : SCHEDULE OF RATES

XXX XXX XXX

Demobilisation Charges When Equipment is demobilized by the

Commission, a demobilization charge equivalent to one and one half (1-1/2) month‟s Equipment rental as shown in section B of the Price List will apply. The demobilization charges will be waived for Equipment released at the end of the contract.

FAO(OS) 712/2006 Page No. 4 of 19

XXX XXX XXX

SECTION B : ORGANISATION OF EXCLUSIVE SERVICE XXX XXX XXX

1.3 DEMOBILIZATION OF EQUIPMENT

When Equipment is released by the Commission, a demobilization charge equivalent to one and one- half month‟s Equipment charge as shown under paragraphs 1.1. (a) & (b) in pages B.1 to B.3 will apply. The demobilization charges will be waived for Equipment released at the end of the contract. A minimum of one month written notice is required if the Commission wishes to demobilize Equipment before the end of the contract."

XXX XXX XXX (emphasis supplied)

5. As the respondent refused to pay, disputes arose between the

parties and in terms of the arbitration clause contained in the

contract, the appellant appointed Mr. Justice R.P. Bhatt (Retd.) and

the respondent appointed Mr. Justice Rajinder Sachar (Retd.) as their

arbitrators. Both the said arbitrators appointed Mr. Justice Avadh

Behari Rohtagi (Retd.) as the Presiding Arbitrator. The Arbitral

Tribunal by a majority award, awarded a sum of US $ 2,34,772/- along

with interest and Rs. 2 lacs as Cost. But Mr. Justice Rajinder Sachar

(Retd.) dissented from the majority award and rejected the claim of

the appellant.

FAO(OS) 712/2006 Page No. 5 of 19

6. On an Objection Petition being filed by the respondent being

OMP No. 189/1998 under Section 34 of the Arbitration and

Conciliation Act, 1996, the learned Single Judge set aside the majority

award dated May 22, 1998. The relevant reasoning of the learned

Single Judge‟s Order is reproduced herein below for ready reference:-

"15. The dispute arose out of an action of ONGC in releasing hired equipments before contract period came to an end and the contractor raising a claim for demobilization charges.

XXX XXX XXX

37. Where plain and simple language of a term in a contract is clear and it admits of no two meanings, an interpretation adopted by the arbitrator which runs in the face of the plain meaning of the words used has been held to be a case of an arbitrator acting beyond his mandate.

XXX XXX XXX

39. The reason is that an arbitrator is the creation of a contract. He cannot live outside the contract. His mandate is limited by the contract. He cannot, therefore, travel outside the contract.

XXX XXX XXX

48. The fundamental error committed by the majority arbitrators is that they have ignored the most vital principle of interpretation of contracts. The majority opinion has gone about interpreting the word „demobilization‟ in the context of the substantive clauses of the contract which contain the reciprocal obligations of the parties, ignoring that the word „demobilization‟ was defined under

FAO(OS) 712/2006 Page No. 6 of 19 clause 1.11 to mean a particular facet of what „demobilization‟ generically means. The majority lost sight of the fact that clause 1.3 dealt with entitlement to demobilization charges whereas clause 1.11 defined what demobilization meant. Clause 1.3 was a charging clause and clause 1.11 was a defining clause. The two operated in their own respective fields.

XXX XXX XXX

57. The majority award has rendered

meaningless the words „to point of origin‟ in the definition clause i.e. clause 1.11 which defines demobilization.

58. Wherever the word demobilization is used in the contract in question, it must mean demobilization as defined under Clause 1.11 of the contract.

59. Ex facie, the majority opinion has redefined the contours of the word 'demobilisation' and has rewritten the same.

60. Thus, two jurisdictional errors have been committed by the majority which amount to the majority going beyond its mandate. The first is to ignore the well recognized principle of law of construction of a contract that where parties have defined a particular word, they having created their own dictionary, the person charged with the duty to construe the contract has to adopt the particular meaning assigned by the parties to a particular word. Second error committed by the majority, which again relates to its mandate is to render redundant the words „return to point of origin‟ which words are an inherent and integral part of demobilization. The rule against redundancy has been violated.

XXX XXX XXX

FAO(OS) 712/2006 Page No. 7 of 19

69. Learned arbitrators expressing the majority opinion failed to note that demobilization requires return of equipment and personnel to 'point of origin' and in that context demobilization charges were not to compensate the contractor‟s loss of rental but was to recompense the contractor the expenses towards demobilization i.e. removing mobilized equipment and taking it back to the point of origin.

70. The minority award has applied correct principles of interpretation of contracts and has therefore reached the correct conclusions. I may note that the minority award has noted a fact ignored by the majority award, being that the equipment was brought to India with custom declarations that it would be used for execution of certain works and thereafter re-exported. The minority award has correctly noted that the contract in question was in consonance with the obligation of the contractor to take back the equipment to point of origin or if contractor used the equipment elsewhere in India for another contract, he would not be re-exporting the equipment from the shores of this country, meaning thereby the act of demobilization will not be completed.

XXX XXX XXX

72. For the reasons recorded above the petition is allowed. Impugned majority award dated 22.5.1998 published by Justice Awadh Bihari Rohatgi (Retd.) and Shri R.P. Bhatt, Sr. Adv. is set aside and the award of even date published by Justice Rajinder Sachar (Retd.) is affirmed."

(emphasis supplied)

7. Mr. Sanjeev Puri, learned senior counsel for the appellant

submitted that the approach of the learned Single Judge in the

FAO(OS) 712/2006 Page No. 8 of 19 present case was untenable in law inasmuch as the learned Single

Judge was not justified in referring to and in affirming the minority

award dated 22nd May, 1998. He submitted that the learned Single

Judge instead of considering the legality of the majority award, had

considered the minority award and after referring to it, had concluded

that the minority award had correctly applied the principles of

interpretation of the contract. He further submitted that the said

approach of the learned Single Judge was completely contrary to a

Division Bench decision of the Bombay High Court in the case of

Chowgule Brothers v. Rashtriya Chemicals and Fertilizers Ltd.

reported in 2006 (3) Arb. L.R. 457 (Bombay) (DB) wherein it has been

held that it is not permissible to look at the minority award while

considering an Objection petition seeking to set aside the majority

award.

8. Mr. Puri further submitted that the interpretation given to the

contract by the majority award could not have been re-appreciated by

the learned Single Judge as that was beyond his jurisdiction. In this

context, he relied upon the judgment of the Supreme Court in the

Case of Associated Engineering Co. v. Government of Andhra

Pradesh and another reported in AIR 1992 SC 232. FAO(OS) 712/2006 Page No. 9 of 19

9. Mr. Puri further contended that the learned Single Judge while

exercising jurisdiction under Section 34 of the Arbitration Act, 1996

could not re-appreciate the evidence or examine the correctness of

the conclusion arrived at by the arbitrator. According to him, the

matter relating to construction and interpretation of the contract fell

within the domain of the arbitrator. He further submitted that role of

the Court while examining the validity of an award is extremely

limited both under the old Arbitration Act, 1940 as well as the new

Arbitration Act, 1996. According to him, the decision of the Supreme

Court in Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd.

reported in (2003) 5 SCC 705, has no doubt interpreted the

expression „Public Policy of India‟ to include cases of patent illegality

but that does not mean that the Court while exercising powers under

Section 34 of the new Arbitration Act, 1996 sits in appeal over

findings of fact recorded by the arbitrator or interpretation placed

upon the provisions of the contract particularly when such an

interpretation is a plausible and possible one. In this context, Mr.

Puri referred to and relied upon the decisions of the Supreme Court in

Bhagawati Oxygen Ltd. v. Hindustan Copper Ltd. reported in

(2005) 6 SCC 462, Continental Construction Ltd. v. State of U.P.

reported in (2003) 8 SCC 4, Reserve Bank of India v. Peerless

General Finance and Investment Co. Ltd. and Others reported in

(1987) 1 SCC 424 and a decision of this Court in New Delhi

Apartment Group Housing Society v. Jyoti Swaroop Mittal

reported in 2007 (4) Arb. LR 565 (Delhi.).

FAO(OS) 712/2006 Page No. 10 of 19

10. Mr. B. Sen, learned senior counsel for ONGC stated that as the

respondent needed machinery to ascertain availability of oil, it

entered into a contract with the appellant. However, as oil was not

found, the appellant‟s equipment was de-hired. Mr. B. Sen referred to

the contractual provisions reproduced hereinabove to submit that

demobilization charges were to be paid only when personnel and

equipment were taken back by the appellant to its „point of origin‟, as

defined in the contract. He stated that the admitted position was that

the appellant had neither returned its personnel nor its equipment to

„point of origin‟. In fact, he submitted that Mr. Puri, during his

argument, had admitted that the appellant was not claiming

demobilization charges but idling charges. Mr. B. Sen further

referred to the issue framed by the arbitrators in their majority

award, which reads as under:-

"The short question that arises for our determination is whether the Contractor is entitled to a "demobilization charge" for equipments dehired by the Commission pursuant to clause 1.3 of Section-B Annexure-1 of the Contract dated 29.3.1993."

11. He submitted that in the present instance, the majority award

had awarded something that was not asked for and the arbitrators

had acted beyond the terms of their reference.

12. Lastly, Mr. B.Sen submitted that the issue of minority award‟s

affirmation was not relevant to the present proceedings. He

submitted that even if it is assumed that the minority award could not

FAO(OS) 712/2006 Page No. 11 of 19 have been considered and referred to by the learned Single Judge,

then also, the majority award being contrary to the contractual

provisions was liable to be set aside under Section 34 of the

Arbitration and Conciliation Act, 1996.

13. In rejoinder, Mr. Puri admitted that the appellant had not taken

back either its equipment or personnel to the „point of origin‟.

However, he pointed out that this was because the respondent had

stated that the equipment "may be re-hired as and when required".

14. In our view, the scope of interference by this Court with an

arbitrator‟s award under Section 34 of the Arbitration and

Conciliation Act, 1996 has been extensively dealt with by the Hon‟ble

Supreme Court in Oil & Natural Gas Corporation Ltd. v. Saw

Pipes Ltd. (supra). The relevant observations of the Supreme Court

in the said judgment are reproduced hereinbelow:-

"31..................Hence, in our view in addition to narrower meaning given to the term "public policy" in Renusagar's case it is required to be held that the award could be set aside if it is patently illegal. The result would be - award could be set aside if it is contrary to :

(a) fundamental policy of Indian law; or

(b) the interest of India; or

(c) justice or morality, or

(d) in addition, if it is patently illegal."

XXX XXX XXX

74. In the result, it is held that :

FAO(OS) 712/2006 Page No. 12 of 19 A. (1) The court can set aside the arbitral award under Section 34(2) of the Act if the party making the application furnishes proof that :

(i) a party was under some incapacity, or

(ii) the arbitration agreement is not valid under the law to which the parties have subjected it or, failing any indication thereon, under the law for the time being in force; or

(iii) the party making the application was not given proper notice of the appointment of an arbitrator or of the arbitral proceedings or was otherwise unable to present his case; or

(iv) the arbitral award deals with a dispute not contemplated by or not falling within the terms of the submission to arbitration, or it contains decisions on matters beyond the scope of the submission to arbitration.

(2) The court may set aside the award :

(i) (a) if the composition of the Arbitral Tribunal was not in accordance with the agreement of the parties,

(b) failing such agreement, the composition of the Arbitral Tribunal was not in accordance with Part I of the Act.

(ii) if the arbitral procedure was not in accordance with :

(a) the agreement of the parties, or

(b) failing such agreement, the arbitral procedure was not in accordance with Part I of the Act.

However, exception for setting aside the award on the ground of composition of arbitral tribunal or illegality of arbitral procedure is that the agreement should not be in conflict with the provisions of Part I of the Act from which parties cannot derogate.

FAO(OS) 712/2006 Page No. 13 of 19

(c) If the award passed by the Arbitral Tribunal is in contravention of the provisions of the Act or any other substantive law governing the parties or is against the terms of the contract.

(3) The award could be set aside if it is against the public policy of India, that is to say, if it is contrary to :

(a) fundamental policy of Indian law; or

(b) the interest of India; or

(c) justice or morality; or

(d) if it is patently illegal.

(4) It could be challenged :

(a) as provided under Section 13(5); and

(b) Section 16(6) of the Act."

(emphasis supplied)

15. The approach in Oil & Natural Gas Corporation Ltd. v. Saw

Pipes Ltd. (supra) has been upheld and followed by the Apex Court in

State of Rajasthan & Others v. Basant Nahata reported in (2005)

12 SCC 77 and Hindustan Zinc Ltd. v. Friends Coal

Carbonisation reported in (2006) 4 SCC 445.

16. In Associated Engineering Co. (supra), referred to and relied

upon by the appellant‟s counsel, the Apex Court has reiterated that an

arbitrator being a creature of the contract, cannot travel outside its

bounds. The Supreme Court emphasized that if an arbitrator acts

contrary to the contractual terms, then he commits a jurisdictional

FAO(OS) 712/2006 Page No. 14 of 19 error and his award would be liable to be set aside on the ground that

the arbitrator has acted in excess of its authority/jurisdiction. The

relevant observation of the Supreme Court in the said judgment are

reproduced hereinbelow:-

"26. The arbitrator cannot act arbitrarily, irrationally, capriciously or independently of the contract. His sole function is to arbitrate in terms of the contract. He has no power apart from what the parties have given him under the contract. If he has travelled outside the bounds of the contract, he has acted without jurisdiction. But if he has remained inside the parameters of the contract and has construed the provisions of the contract, his award cannot be interfered with unless he has given reasons for the award disclosing an error apparent on the face of it.

27. An arbitrator who acts in manifest disregard of the contract acts without jurisdiction. His authority is derived from the contract and is governed by the Arbitration Act which embodies principles derived from a specialised branch of the law of agency (see Mustill & Boyd's Commercial Arbitration, Second Edition, p. 641). He commits misconduct if by his award he decides matters excluded by the agreements (see Halsbury's Laws of England, Volume II, Fourth Edition, Para 622). A deliberate departure from contract amounts to not only manifest disregard of his authority or a misconduct on his part, but it may tantamount to a mala fide action. A conscious disregard of the law or the provisions of the contract from which he has derived his authority vitiates the award.

28. A dispute as to the jurisdiction of the arbitrator is not a dispute within the award, but one which has to be decided outside the award. An umpire or arbitrator cannot widen his jurisdiction by deciding a question not referred to him by the parties or by deciding a question otherwise than in accordance with the contract. He cannot say that he does not care what the contract says. He is bound by it. It must bear his decision. He cannot travel outside its bounds. If he exceeded his

FAO(OS) 712/2006 Page No. 15 of 19 jurisdiction by so doing, his award would be liable to be set aside. As stated by Lord Parmoor :

"......It would be impossible to allow an umpire to arrogate to himself jurisdiction over a question which on the true construction of the submission was not referred to him. An umpire cannot widen the area of his jurisdiction by holding, contrary to the fact, that the matter which he affects to decide is within the submission of the parties......"

Attorney-General for Manitoba v. Kelly, (1922) 1 AC 268, 276.

Evidence of matters not appearing on the face of the award would be admissible to decide whether the arbitrator travelled outside the bounds of the contract and thus exceeded his jurisdiction. In order to see what the jurisdiction of the arbitrator is, it is open to the Court to see what dispute was submitted to him. If that is not clear from the award, it is open to the Court to have recourse to outside sources. The Court can look at the affidavits and pleadings of parties; the Court can look at the agreement itself. Bunge & Co. v. Dewar & Webb (1921) 8 Lloyd‟s Rep 436 (KB).

29. If the arbitrator commits an error in the construction of the contract, that is an error within his jurisdiction. But if he wanders outside the contract and deals with matters not allotted to him, he commits a jurisdictional error. Such error going to his jurisdiction can be established by looking into material outside the award. Extrinsic evidence is admissible in such cases because the dispute is not something which arises under or in relation to the contract or dependent on the construction of the contract or to be determined within the award. The dispute as to jurisdiction is a matter which is outside the award or outside whatever may be said about it in the award. The ambiguity of the award can, in such cases, be resolved by admitting extrinsic evidence. The rationale of this rule is that the nature of the dispute is something which has to be determined outside and independent of what appears in the award. Such jurisdictional error needs to be proved by evidence extrinsic to the award. [See M/s. Alopi Parshad & Sons Ltd. v. Union of India,

FAO(OS) 712/2006 Page No. 16 of 19 (1960) 2 SCR 793: (AIR 1960 SC 588); Bunge & Co. v. Dewar & Webb. (1921) 8 Lloyd‟s Rep 436 (KB); Christopher Brown Ltd. v. Genossenschaft Oesterreichischer, (1954) 1 QB 8; Rex v. Fulham (1951) 2 KB 1; Falkingham v. Victorian Railways Commission, (1900) AC 452; Rex v. All Saints, Southampton (1828) 7 B & C 785; Laing, Sons & Co. Ltd. v. Eastcheap Dried Fruit Co. (1961) 1 Lloyd‟s Rep 142, 145 (QB); Dalmia Dairy Industries Ltd. v. National Bank of Pakistan, (1978) 2 Lloyd‟s Rep 223 (CA); Heyman v. Darwins Ltd. (1942) AC 356; Union of India v. Kishorilal AIR 1959 SC 1362; Renusagar Power Co. Ltd. v. General Electric Company, (1984) 4 SCC 679 : (AIR 1985 SC 1156); Jivarajbhai v. Chintamanrao AIR 1965 SC 214; Gobardhan Das v. Lachhmi Ram, AIR 1954 SC 689, 692; Thawardas v. Union of India, AIR 1955 SC 468 ; Omanhene v. Chief Obeng, AIR 1934 PC 185, 188; F.R. Absalom Ltd. v. Great Western (London) Garden Village Society Limited, (1933) AC 592 (HL) and M. Golodetz v. Schrier (1947) 80 Lloyd‟s Rep 647].

30. In the instant case, the umpire decided matters strikingly outside his jurisdiction. He outstepped, the confines of the contract. He wandered far outside the designated area. He digressed far away from the allotted task. His error arose not by misreading or misconstruing or misunderstanding the contract, but by acting in excess of what was agreed. It was an error going to the root of his jurisdiction because he asked himself the wrong question, disregarded the contract and awarded in excess of his authority. In many respects, the award flew in the face of provisions of the contract to the contrary. [See the principles stated in Anisminic Ltd. v. Foreign Compensation Commission, (1969) 2 AC 147; Pearlman v.

Keepers and Governors of Harrow School, (1979) 1 QB 56; Lee v. Showmen's Guild of Great Britain, (1952) 2 QB 329; M.L. Sethi v. R.P. Kapur, AIR 1972 SC 2379; Managing Director, J. and K. Handicrafts v. M/s. Good Luck Carpets, AIR 1990 SC 864; State of Andhra Pradesh v. R.V. Rayanim, AIR 1990 SC 626. See also Mustill & Boyd's Commercial Arbitration, Second Edition;

Halsbury's Laws of England, Fourth Edition, Vol. 2]."

(emphasis supplied)

FAO(OS) 712/2006 Page No. 17 of 19

17. Having settled the contours of the grounds on which an

arbitrator‟s award is liable to be set aside, we are of the view that in

the present case, the majority award is contrary to contractual terms

and further that the Arbitral Tribunal has not only acted in excess of

its jurisdiction but has also awarded a claim which admittedly did not

and could not arise.

18. It is apparent from the pleadings before the Arbitral Tribunal

and from the majority award that the appellant/claimant had prayed

for payment of demobilization charges only. We agree with Mr. B.

Sen‟s submission that the sine qua non for payment of mobilization

charges is return of personnel and equipment to „point of origin‟ -

which admittedly has not happened in the present case. In fact,

Mr Puri not only admitted that the goods and equipment had not been

returned to the „point of origin‟ but further that the appellant was

actually claiming „idling charges‟ equivalent to demobilization charge

as stipulated in Clause 1.3 of Section B of the contract. But we are of

the opinion that Clause 1.3 of Section B provides only a working out of

a formula as to how demobilization charges are to be calculated. The

said formula can only be applied if the concept of demobilization is

first attracted. To attract the concept of demobilization charges, the

equipment and personnel have to be returned to the „point of origin‟

i.e. Houston, Dubai, Singapore, as per Clause 6.5(a) - which

admittedly has not happened in the present instance. Thus, the issue

of application of the formula stipulated in Clause 1.3 of Section B, to

FAO(OS) 712/2006 Page No. 18 of 19 our mind, does not arise. We are further of the view that as the

appellants had not claimed idling charges, they cannot today justify

the majority award on that basis as the claim was for demobilization

charges.

19. Consequently, in our view, the majority award is contrary to the

contractual terms and the same is liable to be set aside on the ground

that the arbitrators have acted in excess of their jurisdiction. In view

of this conclusion, we are not deciding the issue as to whether the

learned Single Judge in an Objection Petition filed under Section 34 of

the Arbitration And Conciliation Act, 1996, could have referred to and

affirmed the minority award as for the purposes of the present

judgment even if the appellant‟s submission is presumed to be

correct, then also, the appeal is liable to be dismissed.

20. In view of the above, the present appeal is dismissed but with

no order as to costs.

MANMOHAN (JUDGE)

MUKUL MUDGAL (JUDGE) JANUARY 9th,2009 NG

FAO(OS) 712/2006 Page No. 19 of 19

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free