M/S Galada Power & Telecomun.Ltd. vs United India Insurnce Co.Ltd.

Supreme Court28 July 2016Dipak Misra · Rohinton Fali Nariman

Ratio decidendi

The rule this decision rests on

When an insurer appoints a surveyor to investigate an insurance claim and the surveyor submits a report assessing the loss, the insurer waives its right to rely on procedural defenses, such as breach of the duration clause, that it does not mention in its letter of repudiation. The waiver arises from the conduct of the insurer in appointing the surveyor despite being fully aware of the contractual duration requirements, coupled with the insurer's omission to reference the duration clause as a ground for rejection in its letter of repudiation. Where an insurer's letter of repudiation grounds rejection on a specific reason (here, that the claim does not fall within the scope of transit loss), the insurer cannot subsequently advance a different reason (such as breach of the duration clause for delayed intimation) that was not raised in the letter of repudiation. Parties are bound by the grounds they have stated for rejection and cannot later introduce new grounds. The surveyor's assessment of loss, conducted on behalf of the insurer and based on physical verification of the consignment, is binding evidence of the existence and quantification of the loss for purposes of adjudicating the claim, and the finding of a court that has examined the surveyor's report in detail on the merits of whether loss occurred will not be disturbed in the exercise of limited revisional jurisdiction.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

REPORTABLE

IN THE SUPREME COURT OF INDIA

CIVIL APPELLATE JURISDICTION

CIVIL APPEAL NOS. 8884-8900 OF 2010

M/s. Galada Power and Appellant(s) Telecommunication Ltd.

Versus

United India Insurance Co. Ltd. Respondent(s) and Another Etc.

JUDGMENT

Dipak Misra, J.

The appellant-complainant filed a batch of 21

complaints i.e. C.D. Nos.539 to 559 of 2000, claiming

compensation of Rs.43.59 lacs along with interest @ 18% p.a.

from the respondents, namely, United India Insurance Company

Limited and India Transport Organization, on the ground that

there had been shortage/loss of 'All Aluminium Alloy Conductor' Signature Not Verified Digitally signed by CHETAN KUMAR Date: 2016.08.22 (for short, 'AAAC') wire, which was supplied by the complainant 15:05:09 IST Reason:

to the Power Grid Corporation of India Limited (PGCIL). The

case of the complainant before the Consumer Disputes 2

Redressal Forum, Ranga Reddy District (for short, 'the District

Forum') was that between 1.3.1998 to 13.4.1998, twenty-one

trucks of AAAC wire packed in wooden drums were delivered at

stores of PGCIL at Assam. In all the trucks shortage was

noticed by PGCIL on 25th March, 1998. As there was shortage,

which is called transit-loss for which the appellant had taken a

policy from the insurer, it put forth a claim before the insurer

for Rs.35 lacs. The said claim was lodged before the insurance

company vide letter dated 3rd April, 1998.

2. On the basis of the communication made by the

appellant, the insurer appointed a surveyor who gave a report

on 1st September, 1998, assessing the loss approximately at

Rs.2 lacs in each case, thereby the amount in toto assessed by

the surveyor was approximately Rs.43 lacs. Though the

surveyor had assessed the loss and sent it to the insurance

company, the insurer vide letter dated 20th September, 1999,

repudiated the claim by stating thus:-

“Dear Sirs,

Re: Marine claim No.050202/21/26/7/18/97/ Policy No.050202/21/26/16/2101/97

On perusal of the records pertaining to the above claim, and subsequent investigation into the matter, we find that the above claim lodged by you 3

does not fall under the purview of “TRANSIT LOSS”. As such, the claim is not tenable under the terms of the policy. In view of this, we are treating your above claim as “NO CLAIM”.” [Emphasis added]

3. As the claim was not accepted, the appellant knocked

at the doors of the District Forum for grant of compensation,

but the District Forum declined to accept the claim on three

counts, namely, that there was non-joinder of necessary parties;

that the allegation of theft was not proved; and that in a

summary proceeding the factual dispute could not be decided.

4. Dissatisfied by the order passed by the District Forum,

the appellant preferred twenty-one appeals before the Andhra

Pradesh Consumer Disputes Redressal Commission (for short,

'the State Commission'). The State Commission after analysing

the materials brought on record opined that the investigator

could not be relied upon as the investigation had been

completed after six months from the date of occurrence; that the

report of the investigator could not be said to have been based

on any material worthy of verification; that since it was the

carrier who had undertaken to deliver the goods at Assam, it

was they who are responsible to give reasons as to how, when

and where the goods were transshipped and in what condition

the goods were delivered; that the length and net weight of 4

AAAC wire was mentioned on each drum and also dispatch

documents and the respondent No.2, that is, the carrier

company had issued Exhibit A-3 (lorry receipts) wherein cross

reference to the invoice and delivery challan numbers were given

which clearly established the fact that the complainant had

dispatched as per the said Exhibit; that since the persons

present at the site at the relevant point of time i.e. unloading,

were the drivers, there was no reason to disbelieve their

endorsements, specifically when the documents, viz., Exhibits

A-25 and 27 confirm the shortage on 25.04.1998 in 109 drums;

that the finding of the District Forum that the complaint was

not maintainable due to non-joinder of necessary party, that is,

PGCIL, was not correct and the complaint could not have been

dismissed on that score; that the report of the surveyor, that is,

Exhibit A-12 was based on physical verification of the

consignment of AAAC wire and hence, the repudiation of claim

by the insurer was unjustified; and that there was no inordinate

delay in intimating the claim to the insurance company. Being

of this view, the State Commission allowed the appeals preferred

by the appellant and determined the compensation

approximately at Rs.43 lacs in all the appeals. Be it noted, the

State Commission while determining the quantum, made the 5

insurer and the carrier jointly and severely liable.

5. The judgment and order passed by the State

Commission compelled the insurer and the carrier to file

independent revisions before the National Consumer Disputes

Redressal Commission, New Delhi (for short, 'the National

Commission). The revisions preferred by the carrier stood

dismissed and the same have not been challenged and,

therefore, the view expressed in the case of the carrier has

attained finality.

6. As far as the insurer is concerned, it preferred

twenty-one revisions, out of which four were dismissed by the

National Commission vide judgment and order dated 6th March,

2009, on the foundation that as they dealt with the transactions

pertaining to “open delivery”. We are not concerned with those

four revisions. As far as the seventeen revision are concerned,

the National Commission allowed them on the ground that the

intimation by the complainant to the insurer was not made

within seven days of arrival of the vehicles at the destination

mentioned in the policy. The reasoning of the National

Commission is to the following effect:-

“In this regard, the dates of delivery are important to us. As per material brought on record, the first intimation of the claim or loss was reported to the 6

petitioner insurer only on 27.3.1998 and confirmed by letter dated 3.4.98. There is no dispute that the arrival dates of the different consignments in question start from 1.3.98 onwards till 11.4.98. In the above circumstances and keeping in view the terms of the Policy, condition 5 of Inland Transit Clause, we are of the view that there was no Policy Cover in existence and the risk stood not covered after delivery of goods to the consignee. We further note that, even on practical side, not reporting the loss in time deprived the Insurer to have a first a first hand appreciation/assessment of the extent of loss, more so when, as per statement on record, against number of consignments/delivery notes it is clearly noted 'seal tempered'.

There can be no dispute that Insurance is a contract of utmost good faith. Failing to report the loss, noted at the time of receipt/delivery is a decisive and a determinate factor against the complainant. We also note with some dismay, and wonder as to why PGCIL was not made a party as it was at their warehouse in Assam that shortage/loss is alleged to have been notice. It is stated by the Ld. Counsel of the Petitioner that an effort was made before the State Commission praying for making PGCIL a party but it was declined. The whole episode leaves us with a single thought that complainant did not care for the terms of the contract and went on to compound the wrongs.

In retrospect one could only observe that at least in cases/consignment where material was found tempered, matter should have been reported to the underwriters immediately and delivery should not have been made by the complainant to the consignee till the loss had been assessed by the surveyor after perhaps asking for an open-delivery. This could have been the case of the consignee also – not making him a party should be held against the complainant.

7 In the aforementioned circumstances, we are of the view that there was no coverage of risk at the time of reporting the loss to the petitioner/insurer, hence the complainant is not entitled to any relief in terms of condition(s) of Policy as also law and other material on the subject discussed earlier and also the law laid down by this Commission in the cited judgment (supra).”

7. Being of this view, the National Commission allowed

the revision petitions and set aside the orders passed by the

State Commission.

8. We have heard Mr. Rana Mukherjee, learned senior

counsel for the appellant and Mr. Rakesh Kumar, learned

counsel for the respondent No.2. None has appeared on behalf

of the respondent No.1, the insurer.

9. It is submitted by Mr. Rana Mukherjee, learned senior

counsel that the National Commission has grossly erred by

opining that the PGCIL is a necessary party. It is his further

submission that the view expressed by the National Commission

that the claim stands defeated because of delayed intimation as

postulated in clause no. 5, of the policy is not sustainable,

inasmuch as a survey was conducted and that apart the letter

of repudiation does not refer or even remotely touch upon any of

the aspects enumerated in clause 5. Additionally, it is urged by

Mr. Mukherjee, learned senior counsel that the National 8

Commission has erroneously held that the complainant went on

compounding the wrongs, whereas the material brought on

record clearly establish that it was quite vigilant and diligent in

putting forth his claim and, in fact, its conduct shows intrinsic

faith in the insurer.

10. Mr. Rakesh Kumar, learned counsel appearing for the

respondent No.2 made an endeavour to support the order

passed by the National Commission, but, as has been stated

earlier, when the revisions preferred by the carrier have already

been dismissed and the said orders have attained finality having

not been assailed, we do not think he can be permitted to argue

to sustain the order passed by the National Commission. Be

that as it may, it really does not make any difference.

11. Clause 5 of the Policy that relates to “Duration”, reads

as follows:-

“5. Duration–. This insurance attaches from the goods leave the warehouse and/or the store at the placed name in the policy for the commencement of transit and continues during the ordinary course of transit including customary transhipment if any,

(i) until delivery to the final warehouse at the destination named in the

(ii) in respect of transit by Rail only or Rail and Road, until expiry of 7 days after arrival of the railway wagon at the final destination railway 9

station or

(iii) in respect of transit by Road only until expirty of 7 days after arrival of the vehicle at the destination town named in the policy whichever shall first occur.

N.B.1. The period of 7 days referred to abvoe shall reckoned from the midnight of the day of arrival of railway wagon at the destination railway station or

2. Transit by Rail only shall incidental transit by Road performed by Railway Authorities to or from Railway Out-Agency.”

12. The National Commission has relied upon Clause 5

and on that basis has rejected the claim by putting the blame

on the complainant. The letter of repudiation dated 20 th

September, 1999, which we have reproduced hereinbefore,

interestingly, does not whisper a single word with regard to

delay or, in fact, does not refer at all to the duration clause.

What has been stated in the letter of repudiation is that the

claim lodged by the complainant does not fall under the purview

of transit-loss because of the subsequent investigation report. It

is evincible, the insurer had taken cognizance of the

communication made by the appellant and nominated a

surveyor to verify the loss. Once the said exercise has been

undertaken, we are disposed to think that the insurer could not 10

have been allowed to take a stand that the claim is hit by the

clause pertaining to duration. In the absence of any mention in

the letter of repudiation and also from the conduct of the

insurer in appointing a surveyor, it can safely be concluded that

the insurer had waived the right which was in its favour under

the duration clause. In this regard, Mr. Mukherjee, learned

senior counsel appearing for the appellant has commended us

to a decision of High Court of Delhi in Krishna Wanti v. Life

Insurance Corporation of India1, wherein the High Court has

taken note of the fact that if the letter of repudiation did not

mention an aspect, the same could not be taken as a stand

when the matter is decided. We approve the said view.

13. In this context, we may with profit, reproduce a

passage from Halsbury Law of England, which reads as follows:-

“In Halsbury’s Laws of England, Vol. 16(2), 4th Edn., Para 907, it is stated:

“The expression ‘waiver’ may, in law, bear differ- ent meanings. The primary meaning has been said to be the abandonment of a right in such a way that the other party is entitled to plead the aban- donment by way of confession and avoidance if the right is thereafter asserted, and is either express or implied from conduct. It may arise from a party making an election, for example whether or not to exercise a contractual right… Waiver may also be by virtue of equitable or promissory estoppel; un- like waiver arising from an election, no question arises of any particular knowledge on the part of 12000 (52) DRJ (DB) 11

the person making the representation, and the estoppel may be suspensory only… Where the waiver is not express, it may be implied from con- duct which is inconsistent with the continuance of the right, without the need for writing or for con- sideration moving from, or detriment to, the party who benefits by the waiver, but mere acts of indul- gence will not amount to waiver; nor may a party benefit from the waiver unless he has altered his position in reliance on it.””

14. In Manak Lal v. Dr. Prem Chand Singhvi2, it has been

held:-

“8. … It is true that waiver cannot always and in every case be inferred merely from the failure of the party to take the objection. Waiver can be in- ferred only if and after it is shown that the party knew about the relevant facts and was aware of his right to take the objection in question. As Sir John Romilly, M.R. has observed in Vyvyan v. Vyvyan3: (Beav p. 75 : ER p. 817) ‘Waiver or acquiescence, like election, presup- poses that the person to be bound is fully cognizant of his rights, and that being so, he neglects to en- force them, or chooses one benefit instead of an- other, either, but not both, of which he might claim’.”

15. Yet again, in Krishna Bahadur v. Purna Theatre4, it

has been ruled that:-

“A right can be waived by the party for whose ben- efit certain requirements or conditions had been provided for by a statute subject to the condition that no public interest is involved therein. When- ever waiver is pleaded it is for the party pleading

2 AIR 1957 SC 425 3 (1861) 30 Beav 65 : 54 ER 813 4 (2004) 8 SCC 229 12

the same to show that an agreement waiving the right in consideration of some compromise came into being. Statutory right, however, may also be waived by his conduct.”

16. In State of Punjab v. Davinder Pal Singh Bhullar 5,

a two-Judge Bench speaking about the waiver has opined:-

“41. Waiver is an intentional relinquishment of a right. It involves conscious abandonment of an ex- isting legal right, advantage, benefit, claim or privi- lege, which except for such a waiver, a party could have enjoyed. In fact, it is an agreement not to as- sert a right. There can be no waiver unless the person who is said to have waived, is fully in- formed as to his rights and with full knowledge about the same, he intentionally abandons them. (Vide Dawsons Bank Ltd. v. Nippon Menkwa Kabushiki Kaisha6, Basheshar Nath v. CIT7, Mademsetty Satyanarayana v. G. Yelloji Rao8, As- sociated Hotels of India Ltd. v. S.B. Sardar Ranjit Singh9, Jaswantsingh Mathurasingh v. Ahmedabad Municipal Corpn.10, Sikkim Subba Associates v. State of Sikkim11 and Krishna Bahadur v. Purna Theatre.)

42. This Court in Municipal Corpn. of Greater Bom-

bay v. Dr Hakimwadi Tenants’ Assn.12 considered the issue of waiver/acquiescence by the non-par- ties to the proceedings and held: (SCC p. 65, paras 14-15) “14. In order to constitute waiver, there must be voluntary and intentional relinquishment of a right. The essence of a waiver is an estoppel and where there is no estoppel, there is no waiver. Estoppel and waiver are questions of conduct and 5 (2011) 14 SCC 770 6 AIR 1935 PC 79 7 AIR 1959 SC 149 8 AIR 1965 SC 1405 9 AIR 1968 SC 933 10 1992 Supp (1) SCC 5 11 (2001) 5 SCC 629 12 1988 Supp SCC 55 13

must necessarily be determined on the facts of each case. …

15. There is no question of estoppel, waiver or abandonment. There is no specific plea of waiver, acquiescence or estoppel, much less a plea of abandonment of right. That apart, the question of waiver really does not arise in the case. Admit- tedly, the tenants were not parties to the earlier proceedings. There is, therefore, no question of waiver of rights by Respondents 4-7 nor would this disentitle the tenants from maintaining the writ petition.””

17. In the instant case, the insurer was in custody of the

policy. It had prescribed the clause relating to duration. It was

very much aware about the stipulation made in clause 5(3) to

5(5), but despite the stipulations therein, it appointed a

surveyor. Additionally, as has been stated earlier, in the letter

of repudiation, it only stated that the claim lodged by the

insured was not falling under the purview of transit loss. Thus,

by positive action, the insurer has waived its right to advance

the plea that the claim was not entertainable because

conditions enumerated in duration clause were not satisfied. In

our considered opinion, the National Commission could not

have placed reliance on the said terms to come to the

conclusion that there was no policy cover in existence and that

the risks stood not covered after delivery of goods to the

consignee.

14

18. Coming to the merits of the claim, we find that the

surveyor had given a report that there was a loss. He had also

quantified it. The State Commission after elaborate discussion

has held as follows:-

“The surveyor also confirmed in their reports, the shortage/loss of AAAC due to pilferage during transit and estimated the loss as per Ex.A12. This shortage was also confirmed by Katigorah police as per Ex.A13 and as reiterated earlier by the Tage Over Certificate, Ex.A19. Taking into consideration that the surveyros appointed by the insurance company have completed their investigation and submitted their reports and thereafter an investigator was appointed on 16-4-1998 without any valid reasons. It is held by the National Commission in 1 (2004) CPJ 10 (NC) in Gammon India Ltd., v. New India Assurance Co. Ltd. that 'Report of first surveyor not accepted, second surveyor appointed-Appointment of second surveyor not explained – Deficiency in service proved – Report of first surveyor upheld' and the investigator in the instant case submitted his report on 28-12-1998 i.e. almost 8 months after his appointment. Taking into consideration all the above submissions, we are of the considered opinion that the appellant/complainant was able to establish that there was shortage/damage to the consignment which was given to second respondent for transportation.”

19. Though the said aspect has not been gone into by the

National Commission, yet we find, the findings recorded by the

State Commission are absolutely justified and tenable in law

being based on materials brought on record in such a situation

we do not think it appropriate that an exercise of remit should 15

be carried out asking the National Commission to have a further

look at it. In any case, the exercise of revisional jurisdiction by

the National Commission is a limited one. We may hasten to

add that to satisfy ourselves, we have perused the surveyor's

report and scrutinized the judgment and order passed by the

State Commission in this regard and we are completely satisfied

that the determination made by it is absolutely impeccable.

20. In view of the aforesaid analysis, the appeals are

allowed. The judgment and order passed by the National

Commission in the batch of appeals is set aside. We have been

apprised that 50% of the amount was deposited and the

appellant has withdrawn the said amount. The balance amount

along with interest, as directed by the State Commission, shall

be paid by the insurance company within four months from

today. There shall be no order as to costs.

.................................J. (Dipak Misra)

.................................J. (Rohinton Fali Nariman)

New Delhi;

July 28, 2016.

16

ITEM NO.107 COURT NO.4 SECTION XVII

S U P R E M E C O U R T O F I N D I A RECORD OF PROCEEDINGS

Civil Appeal Nos.8884-8900/2010

M/S GALADA POWER & TELECOMUN.LTD. Appellant(s)

VERSUS

UNITED INDIA INSURNCE CO.LTD.& ANR. Respondent(s)

(With appln. (s) for stay and office report)

Date : 28/07/2016 These appeals were called on for hearing today.

CORAM :

HON'BLE MR. JUSTICE DIPAK MISRA HON'BLE MR. JUSTICE ROHINTON FALI NARIMAN

For Appellant(s) Mr. Rana Mukherjee, Sr. Adv.

Mr. D. Bharat Kumar, Adv.

Mr. T. Bhaskar Gowtham, Adv.

Mr. Abhijit Sengupta, AOR

For Respondent(s) Mr. Rakesh Kumar, Adv.

Mr. Arun Kumar, Adv.

Mr. Bipin Kumar, Adv.

Mr. Prabhat Kaushik, Adv.

Mr. Rameshwar Prasad Goyal, AOR

Mr. M. K. Dua, AOR (N/P)

UPON hearing the counsel the Court made the following O R D E R

The appeals are allowed in terms of the signed order.

(Chetan Kumar) (H.S. Parasher) Court Master Court Master (Signed order is placed on the file)

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free