Dinesh vs The State Of Madhya Pradesh

Supreme Court15 May 2024B.R. Gavai

Ratio decidendi

The rule this decision rests on

1. Under Section 15(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, the Collector is mandatorily required to personally hear objections filed by interested persons and thereafter submit a report with his recommendations to the appropriate Government; this duty cannot be delegated to a subordinate officer unless that officer has been specially designated by the appropriate Government to perform the functions of the Collector under the Act. 2. Where a land acquisition notification is issued by the State Government for acquisition of land across a district for a public purpose, the State Government remains the appropriate Government and the District Collector cannot assume the role of appropriate Government under the proviso to Section 3(e) of the Act, which applies only where the State Government has notified a particular limited area within a district and appointed the Collector as the authority for that area. 3. The statutory procedure requiring the Collector to hear objections under Section 15(2) and forward a report to the appropriate Government for its decision under Section 15(3) is mandatory and non-compliance with this procedure vitiates the land acquisition proceedings; the right to object under Section 15 is akin to a fundamental right and cannot be treated as an empty formality. 4. The passing of a final award during the pendency of writ petitions challenging the legality of the acquisition proceedings does not render those petitions infructuous where the fundamental defect lies in non-compliance with the mandatory procedure for hearing and deciding objections under Section 15 of the Act.

Written by Miss Lucy from the judgment below, not taken from a headnote.

Judgment

As delivered

NON-REPORTABLEIN THE SUPREME COURT OF INDIACIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO(S). OF 2024(Arising out of SLP(Civil) No(s). 28410-28414 of 2023)
DINESH AND OTHERS ETC. …APPELLANT(S)
VERSUS
STATE OF MADHYA PRADESHAND OTHERS ETC. …RESPONDENT(S)
JUDGMENT
Mehta, J.
1. Leave granted.
2. The instant appeals by special leave have been filed by the
appellants herein for assailing the common final judgment and
order dated 13th October, 2023 passed by the High Court of
Madhya Pradesh, Indore Bench in a batch of writ petitions
whereby, the petitions filed by the appellants to assail the

proceedings of acquisition of the appellants’ land were dismissed.

3. The State of Madhya Pradesh published a notification dated

27th May, 2022 under Section 11 of the Right to Fair Compensation

and Transparency in Land Acquisition, Rehabilitation and

1 Resettlement Act, 2013(hereinafter being referred to as the ‘Act of

2013’) proposing to acquire lands of Village Jamodi, Tehsil

Pithampur, District Dhar, Madhya Pradesh of which appellant’s

lands also formed a part. The lands were sought to be acquired

for the purposes of establishing a Multi-Model Logistics Park under

the Bharatmala Project of the Government of India.

4. The appellants submitted their objections to respondent No.

1-Collector under Section 15 of the Act of 2013 on 1st September,

2022. However, no response was forthcoming on such objections

whereupon the appellants filed fresh objections on 23rd December,

2022 to the Collector-respondent No. 1.

5. The objections were not considered by the respondent No. 1-

Collector, but rather the same were taken up by respondent No. 2

being the Anuvibhagiya Adhikari(Revenue) Evam Bhu Arjan

Kshetra, Pithampur, District Dhar, Madhya Pradesh(hereinafter

being referred to as ‘SDO’). The appellants also submitted written

arguments on their objections on 31st December, 2022. However,

the objections filed by the appellants were rejected by the SDO by

order dated 27th February, 2023 and it was directed that the

department should publish a declaration under Section 19 of the

Act of 2013.

2

6. As a consequence, a declaration along with summary of

rehabilitation and resettlement was published on 10th March, 2023

under Section 19 of Act of 2013. Respondent No. 2-SDO published

information under Section 21 of the Act and notices were issued to

the appellants regarding the acquisition of their land by

communication dated 8th August, 2023.

7. Being aggrieved by the rejection of their objections by an

officer not having jurisdiction, the appellants and similarly

situated land owners preferred numerous writ petitions before the

Madhya Pradesh High Court seeking quashing of the afore-stated

land acquisition proceedings. The writ petitions came to be filed

on 11th September, 2023 and during the pendency thereof, a final

award came to be passed by respondent No. 2-SDO on 3rd October,

2023. The High Court, by order dated 13th October, 2023

proceeded to dismiss the writ petitions preferred by the appellants

without considering the merits by simply observing that the same

had been rendered infructuous owing to the passing of the final

award. The said order is assailed in these appeals by special leave.

8. The appellants have posed a pertinent question of law for

assailing the legality and validity of the land acquisition

proceedings and the order passed by the High Court. The said

3 question of law is reproduced hereinbelow for the sake of ready

reference: -

“Question No.4: Whether the Hon'ble High Court erred in not deciding the writ petition which specifically objected to the authority of the Respondent No.2 to hear and decide objections filed under section 15 of the Act of 2013 and direct publication of declaration and summary of Rehabilitation and Resettlement?”

9. Notice of the appeals was issued to the respondents, who

have filed their counter affidavit stating therein that the Collector

is deemed to be the “appropriate Government” under the proviso

to Section 3(e) of the Act of 2013 and that he being the appropriate

Government has got power under Section 3(g) of the Act to

designate any officer to perform the functions/exercise powers

vested with the Collector for the purpose of the land acquisition

proceedings. Taking recourse to the said provisions, the

respondents have averred at Para 11 of the counter affidavit that

respondent No. 2-SDO being the officer designated by the

appropriate Government, personally heard the land owners on the

objections filed under Section 15 of the Act and prepared a report

dated 27th February, 2013 which was forwarded to the Collector

with a recommendation that the objections deserved to be rejected

and the declaration under Section 19 of the Act may be issued.

4

10. It is also stated at Para 12 of the counter affidavit, that the

respondent No.1-Collector rejected the objections filed by the land

owners by an order dated 3rd March, 2023 and directed for the

publication of the declaration under Section 19 of the Act. Thus,

in sum and substance, the respondents have pleaded that the

Collector had powers to delegate the jurisdiction to hear the

objections to the SDO and hence, the objections filed by the land

owners were rightly heard by the said officer. It is further pleaded

that the order rejecting the writ petitions preferred by the

appellants, as having rendered infructuous since the final award

has been passed, does not warrant any interference.

11. We have given our thoughtful consideration to the

submissions advanced by the learned counsel for the parties and

have gone through the material placed on record.

12. The relevant provision being Section 15 of the Act of 2013 is

reproduced hereinbelow for the sake of ready reference: -

“15. Hearing of objections.–

(1) Any person interested in any land which has been notified under sub-section (1) of section 11, as being required or likely to be required for a public purpose, may within sixty days from the date of the publication of the preliminary notification, object to—

(a) the area and suitability of land proposed to be acquired;

(b) justification offered for public purpose;

5 (c) the findings of the Social Impact Assessment report.

(2) Every objection under sub-section (1) shall be made to the Collector in writing, and the Collector shall give the objector an opportunity of being heard in person or by any person authorised by him in this behalf or by an Advocate and shall, after hearing all such objections and after making such further inquiry, if any, as he thinks necessary, either make a report in respect of the land which has been notified under sub-section (1) of section 11, or make different reports in respect of different parcels of such land, to the appropriate Government, containing his recommendations on the objections, together with the record of the proceedings held by him along with a separate report giving therein the approximate cost of land acquisition, particulars as to the number of affected families likely to be resettled, for the decision of that Government.

(3) The decision of the appropriate Government on the objections made under sub-section (2) shall be final.”

13. A bare perusal of Sub-Section (2) of Section 15 of the Act of

2013 would indicate that the objections to the land acquisition

notification have to be submitted to the Collector who is

mandatorily required to give the objector an opportunity of being

heard in person or by any person authorised in his behalf or by an

Advocate. After hearing such objections and making such further

inquiry as may be felt necessary, the Collector is required to make

a report to the appropriate Government with his recommendations

on the objections together with the record of the proceedings held

by him along with a separate report giving therein the approximate

cost of land acquisition, particulars as to the number of affected

6 families likely to be resettled etc. for the decision of that

Government. As per Sub-Section(3) of Section 15 of the Act, the

decision of the appropriate Government on the objections made

under Sub-Section(2) shall be final.

14. The respondents have taken recourse to Section 3(g)(which

provides the definition of “Collector”) of the Act of 2013 and the

proviso under Section 3(e)(which provides the definition of the

“appropriate Government”) of the Act to contend that the Collector

of the District is deemed to be the ‘appropriate Government’. Thus,

the Collector acting as the “appropriate government” under the Act

is possessed of the authority to designate any other officer to

perform the functions/exercise powers vested in the Collector for

the purpose of the land acquisition proceedings. The relevant

statutory provisions are extracted hereinbelow for the sake of

ready reference:-

“3(g) ―Collector means the Collector of a revenue district, and includes a Deputy Commissioner and any officer specially designated by the appropriate Government to perform the functions of a Collector under this Act;

3(e) ―appropriate Government means,—

(i) in relation to acquisition of land situated within the territory of, a State, the State Government;

(ii) in relation to acquisition of land situated within a Union territory (except Puducherry), the Central Government;

7 (iii) in relation to acquisition of land situated within the Union territory of Puducherry, the Government of Union territory of Puducherry;

(iv) in relation to acquisition of land for public purpose in more than one State, the Central Government, in consultation with the concerned State Governments or Union territories; and

(v) in relation to the acquisition of land for the purpose of the Union as may be specified by notification, the Central Government:

Provided that in respect of a public purpose in a District for an area not exceeding such as may be notified by the appropriate Government, the Collector of such District shall be deemed to be the appropriate Government;”

15. By referring to this power of delegation provided under

Section 3(g), the respondents have tried to urge that the Collector

being the appropriate Government forwarded the objections under

Section 15 of the Act to the SDO vide order dated 2nd December,

2022 for exercising the delegated powers and to personally hear

and decide the said objections and thereafter to submit his report.

The SDO, in compliance of the said order heard the objections and

prepared the report dated 27th February, 2023. It was thus

contended that the impugned orders do not suffer from any

jurisdictional error.

16. We are afraid that the said interpretation which is sought to

be given by the respondents is ex facie misplaced and

misconceived. The provisions contained in Section 15 of the Act of

2013 are analogous to Section 5-A of the Land Acquisition Act, 8 1894. This Court has interpreted Section 5-A of the Land

Acquisition Act, 1894 in a catena of decisions. In the case of Om

Prakash and Another v. State of U.P. and Others1, it was held

as follows:

“21. ……….Thus, according to the aforesaid decision of this Court, inquiry under Section 5-A is not merely statutory but also has a flavour of fundamental rights under Articles 14 and 19 of the Constitution though right to property has now no longer remained a fundamental right, at least observation regarding Article 14, vis-à-vis, Section 5-A of the Land Acquisition Act would remain apposite.”

17. In the case of Union of India and Others v. Mukesh

Hans2, it was observed:

“35. At this stage, it is relevant to notice that the limited right given to an owner/person interested under Section 5-A of the Act to object to the acquisition proceedings is not an empty formality and is a substantive right, which can be taken away for good and valid reason and within the limitations prescribed under Section 17(4) of the Act. The object and importance of Section 5-A inquiry was noticed by this Court in the case of Munshi Singh v. Union of India [(1973) 2 SCC 337] wherein this Court held thus :

‘7. Section 5-A embodies a very just and wholesome principle that a person whose property is being or is intended to be acquired should have a proper and reasonable opportunity of persuading the authorities concerned that acquisition of the property belonging to that person should not be made. … The legislature has, therefore, made complete provisions for the persons interested to file objections against the proposed acquisition and for the disposal of their objections. It is only in cases of urgency that special powers have been conferred on the appropriate Government to dispense with the provisions of Section 5-A:’ ”

1 (1998) 6 SCC 1 2 (2004) 8 SCC 14

9

18. In the case of Hindustan Petroleum Corpn. Ltd. v. Darius

Shapur Chenai and Others3, this Court has held the right to

make objections under Section 5-A to be akin to a fundamental

right. The relevant paras are extracted hereinbelow: -

“6. It is not in dispute that Section 5-A of the Act confers a valuable right in favour of a person whose lands are sought to be acquired…….

9. ……..It is also not in dispute that Section 5-A of the Act confers a valuable important right and having regard to the provisions contained in Article 300-A of the Constitution it has been held to be akin to a fundamental right.

15. Section 5-A of the Act is in two parts. Upon receipt of objections, the Collector is required to make such further enquiry as he may think necessary whereupon he must submit a report to the appropriate Government in respect of the land which is the subject-matter of notification under Section 4(1) of the Act. The said report would also contain recommendations on the objections filed by the owner of the land. He is required to forward the records of the proceedings held by him together with the report. On receipt of such a report together with the records of the case, the Government is to render a decision thereupon. It is now well settled in view of a catena of decisions that the declaration made under Section 6 of the Act need not contain any reason. (See Kalumiya Karimmiya v. State of Gujarat [(1977) 1 SCC 715] and Delhi Admn. v. Gurdip Singh Uban [(2000) 7 SCC 296]).

29. The Act is an expropriatory legislation. This Court in State of M.P. v. Vishnu Prasad Sharma [(1966) 3 SCR 557] observed that in such a case the provisions of the statute should be strictly construed as it deprives a person of his land without consent. [See also Khub Chand v. State of Rajasthan [(1967) 1 SCR 120] and CCE v. Orient Fabrics (P) Ltd. [(2004) 1 SCC 597]]”

3 (2005) 7 SCC 627 10

19. This Court has interpreted Section 15(2) of the Act of 2013 in

the case of Shiv Singh and Others v. State of Himachal

Pradesh and Others4, wherein it was held as under:-

“6. Under the scheme of the Act, once the objections are filed by the affected landowners, the same are required to be decided by the Collector under Section 15(2) of the Act after affording an opportunity of being heard to the landowners, who submitted their objections and after making further inquiry, as the Collector may think necessary, he is required to submit his report to the appropriate Government for appropriate action in the acquisition in question.

7. In this case, we find that the Collector neither gave any opportunity to the appellants as contemplated under Section 15(2) of the Act and nor submitted any report as provided under Section 15(2) of the Act to the Government so as to enable the Government to take appropriate decision. In other words, we find that there is non-compliance of Section 15(2) of the Act by the Collector. In our view, it is mandatory on the part of the Collector to comply with the procedure prescribed under Section 15(2) of the Act so as to make the acquisition proceedings legal and in conformity with the provisions of the Act.”

(emphasis supplied)

20. The Collector would be deemed to be the “appropriate

Government” under the proviso to Section 3(e) of the Act of 2013

only when a land acquisition notification is issued by the

appropriate Government that is the State Government indicating

the limits of the area to be acquired for a public purpose and

appointing the Collector as the authority empowered to acquire

4 (2018) 16 SCC 270

11 that particular area of land ‘in the district’ over which the officer

holds jurisdiction. Hence, this proviso requires notification by the

State Government of a particular area within the district to be

acquired for public purpose and only for such limited area, the

Collector would be authorised by deeming fiction to act as the

appropriate Government.

21. However, a bare perusal of the land acquisition notification

dated 27th May, 2022(Annexure P-1) would make it clear that the

same came to be issued by the State Government with the objective

of acquiring lands for establishing a Multi-Model Logistics Park

under the Bharatmala Project of the Government of India. Thus,

neither was the land acquisition notification issued by the District

Collector nor was the acquisition limited to a particular district.

Hence, the District Collector could not have exercised the powers

of the appropriate Government by virtue of the proviso to Section

3(e) of the Act of 2013 which authority continued to vest in the

State Government.

22. It is also clear that in the present case, the order passed by

the SDO rejecting the objections of the appellants is being tried to

be validated on the strength of Section 3(g) of the Act of 2013 which

provides that the Collector means the Collector of Revenue District

12 and includes a Deputy Commissioner and any officer especially

designated by the appropriate Government to perform the

functions of the Collector under this Act.

23. There is no dispute that the SDO who rejected the objections

of the appellants, was never specially designated by the

appropriate Government to perform the functions of the Collector

under the Act. Rather, the SDO has been conferred powers to act

only as the Land Acquisition Officer under the land acquisition

notification.

24. The respondents have tried to project that the SDO after

personally hearing the objections of the land owners against the

proposed land acquisition under Section 15 of the Act of 2013,

prepared report dated 27th February, 2023 which was forwarded

to the Collector opining that the objections deserved to be rejected.

It is further stated that the District Collector rejected the objections

vide order dated 3rd March, 2023 and issued a direction to make

the publication under Section 19 of the Act.

25. A perusal of the order dated 3rd March, 2023 annexed with

the counter affidavit of respondent No. 3 would indicate that the

objections filed by the appellants were actually disposed by the

SDO(Revenue) and not the Collector acting as the appropriate

13 Government. Relevant paras of the said order are extracted

hereinbelow: -

“4. After the publication of the Notification, the objections received were heard as per law within the prescribed time limit. The Objectors appeared on the fixed date and while disposing of the aforesaid objections the Sub-Division Officer (Revenue) and Land Acquisition Officer, Pithampur has submitted their reports.

6. The Sub-Division Officer (Revenue) and Land Acquisition Officer, Pithampur has filed the instant matter while disposing of the objections raised therein seeking injunction under Section 19.”

26. Para 6 of the order dated 3rd March, 2023 clearly indicates

that the SDO(Revenue) had forwarded the matter to the Collector

while disposing of the objections raised therein and seeking

injunction under Section 19 of the Act.

27. Furthermore, on discussion made above, the land acquisition

notification dated 27th May, 2022 was issued by the State

Government. Hence, neither the District Collector could act as the

appropriate Government in regard to the acquisition in question

nor was he authorised to delegate the powers to the SDO. As a

matter of fact, considering the scheme of the Act of 2013 and the

law as laid down by this Court in the case of Shiv Singh(supra),

the District Collector was simply required to hold inquiry on the

objections filed under Section 15(2) of the Act and thereafter, to

14 forward the record of proceedings along with his opinion to the

State Government for its decision. The State Government is

mandated to take a decision on the objections as per Section 15(3)

of the Act. However, these mandatory requirements of the statute

were not followed in the case, and hence, the proceedings are hit

by non-compliance of Sections 15(2) and 15(3) of the Act of 2013.

28. Even if, for the sake of arguments, the SDO is treated to be

an officer authorised to hear the objections made under Section

15(2) of the Act, apparently, the final decision on such objections

would have to be taken by the appropriate Government as per

Section 15(3) of the Act which is lacking in this case.

29. The High Court while dismissing the batch of writ petitions

filed by the land owners including the appellant treated the same

as having rendered infructuous observing that the final award had

already been passed on 3rd October, 2023. It is not in dispute that

the writ petitions came to be filed on 11th September, 2023 and

thus the mere fact that the final award had been issued during

pendency of the petitions would not save the acquisition

proceedings because the hearing of the objections is a sacrosanct

act treated akin to a fundamental right as held in the case of

Hindustan Petroleum Corpn. Ltd.(supra). Thus, the non-

15 compliance of this mandatory requirement would vitiate the

acquisition.

30. Consequently, the impugned judgment dated 13th October,

2023 is hereby quashed and set aside ‘qua the appellants herein’.

As a result, the final award dated 3rd October, 2023 is declared to

be illegal and quashed ‘qua the appellants lands’.

31. The respondents-authorities are directed to consider and

decide the objections filed by the appellants under Section 15 of

the Act of 2013 as per law whereafter, further proceedings may

follow.

32. The appeals are allowed in these terms. No order as to costs.

33. Pending application(s), if any, shall stand disposed of.

.………..………………………….J. (B.R. GAVAI)

...………………………………….J. (SATISH CHANDRA SHARMA)

..…………………………………..J. (SANDEEP MEHTA) New Delhi;

May 15, 2024

16

This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.

Research this judgment with Miss Lucy

Ask what it holds, what has followed it, and what it means for your matter — in plain English, with the citations.

Try Miss Lucy free