Alcon Laboratories (India) Private ... vs Emco Tech Equipments Private Limited
- CitationComp. App. (AT) (Ins) No. 215 of 2023
Ratio decidendi
The rule this decision rests on
A pre-existing dispute for the purposes of Section 9 of the Insolvency and Bankruptcy Code, 2016 must be a real and substantiated dispute; a dispute that is spurious, hypothetical or illusory, or that consists of a bald assertion or patently feeble assertion of fact unsupported by evidence, does not bar admission of an operational creditor's application, and the adjudicating authority cannot accept such assertions as truth in the absence of supporting material. Where the corporate debtor's asserted dispute (a claimed excess payment) is raised for the first time after dishonour of a cheque, is unsupported by any account or evidence even prima facie, and is contradicted by the corporate debtor's own prior acknowledgements of debt in reconciliation statements and correspondence, the application under Section 9 must be admitted, and the adjudicating authority's dismissal on the basis of such unsubstantiated assertions is erroneous.
Written by Miss Lucy from the judgment below, not taken from a headnote.
Judgment
As delivered
IN THE MATTER OF: Alcon Laboratories (India) Pvt. Ltd. ...Appellant
Versus
Emco Tech Equipments Pvt. Ltd. ...Respondent Present: For Appellants : Mr. Krishnendu Datta, Sr. Adv., with Mr. Vaijayant Paliwal, Mr. Nihil Mathur, Advocates For Respondent : Mr. Roshan Santhalia, Mr. Puja Jakhar, Advocate
JUDGMENT
Per: Justice Rakesh Kumar Jain:
This appeal is directed against the order dated 03.01.2023, passed by
the Adjudicating Authority (National Company Law Tribunal, Court No. III,
New Delhi) by which an application bearing C.P. (IB)/278/ND/2022 filed by
the Appellant (Operational Creditor) under Section 9 of the Insolvency and
Bankruptcy Code, 2016 (In short 'Code') r/w Rule 6 of the Insolvency and
Bankruptcy (Application to Adjudicating Authority) Rules, 2016 (in short
'Rules') against the Respondent (Corporate Debtor) has been dismissed.
2. Before filing the application under Section 9 of the Code, the Appellant
sent a demand notice dated 30.07.2021 under Section 8 of the Code, calling
upon the Respondent to pay the operational debt of Rs. 10,87,79,899/-.
This notice was replied by the Respondent on 18.08.2021, denying its
liability but reserved its right to recover the amount of Rs. 3,25,00,000/- on
account of alleged excess payment having been made.
3. It is the case of the Appellant that since there were some
typographical errors in the demand notice dated 30.07.2021, therefore, the
Comp. App. (AT) (Ins) No. 215 of 2023 2
Appellant served a fresh statutory demand notice dated 25.01.2022 under
Section 8 of the Code, calling upon the Respondent to pay the operational
debt of Rs. 12,66,14,411/-. This notice was also replied by the Respondent.
4. As per the Appellant, it entered into an agreement dated 18.08.2014
with the Respondent for sale of imported products and equipment on a non-
exclusive basis for the onward supply/distribution of the products and
equipments to the customers. There was another agreement entered into
between the parties on 30.03.2019. On the basis of the agreement, the
Respondent issued various purchase orders to the Appellant for supply
which were duly complied with and invoices were raised periodically from
09.05.2019 to 07.05.2021 but the Respondent failed to pay the outstanding
invoices from June, 2018 onwards despite several emails exchanged
between the parties.
5. In the defence, the Respondent alleged that it sent an email dated
26.04.2021 to the Appellant, requesting for the reconciliation of the
accounts but it was not provided rather the Appellant sent an email dated
21.05.2021, demanding a sum of Rs. 8.66 Crores. It is also the case of the
Respondent that the cheque drawn by the Respondent in favour of the
Appellant was dishonoured with the remarks 'returned for exceeds
arrangement' for which a notice dated 25.05.2021 under Section 138 of the
NI Act was sent by the Appellant to the Respondent. The Respondent sent a
reply to the notice on 09.06.2021 informing the Appellant that after the
finalization of the internal audit of the accounts, it has been ascertained
that an excess payment of Rs. 3.25 Crores has been made and the Appellant
was asked to provide for the account statement for the reconciliation of the
accounts otherwise it was stated to be presumed that an amount of Rs.
Comp. App. (AT) (Ins) No. 215 of 2023 3
3.25 Crores is receivable by the Respondent. It is also the case of the
Respondent that a legal notice dated 23.06.2021 was sent to the Appellant
for the recovery of the amount of Rs. 3.25 Crores. It is further pleaded by
the Respondent that a complaint before the Economic Offences Wing, Delhi
Police (EOW) was filed by the Respondent on 27.08.2021 against the
Appellant for the acts of cheating and criminal breach of trust etc. and
causing loss to the tune of Rs. 11 Crores and that a complaint was made
before the CJM, Patiala House Courts on 29.09.2021 under Section 156(3)
of CrPC under the relevant provisions of the IPC.
6. On the basis of the pleadings and material on record, the Adjudicating
Authority recorded a finding in Para 13 of the impugned order on the basis
of which the petition filed by the Appellant under Section 9 of the Code has
been dismissed. For the purpose of quick reference to the finding recorded
by the Adjudicating Authority, Para 13 of the impugned order is reproduced
as under:-
"13.We have considered the arguments of both sides and have perused the record. We observe from the emails dated 26.04.2021, 28.04.2021, 21.05.2021, 09.06.2021 all exchanged between the parties, before the issuance of the first demand notice dated 30.07.2021 and wherein it is seen that the corporate debtor wrote a letter to the applicant informing them about the internal audit and requested them to share the accounts for the reconciliation. However, the applicant has not provided the same to corporate debtor. Secondly, the existence of dispute can be perceived from the legal notice sent by the corporate debtor to the applicant vide letter dated 23.06.2021 for the recovery of the amount of Rs 3.25 crores, wherein the applicant was called upon to pay the outstanding amount. Further, a notice dated 25.05.2021 filed u/s 138 NI Act, was sent by the applicant to the corporate debtor for the recovery of the amount of the dishonored cheque dated 23.04.2021. Further, from the 'Reply' to the two Demand Notices, read with the legal notice dated 23.06.2021 communicated by the corporate debtor to the applicant, it is seen
Comp. App. (AT) (Ins) No. 215 of 2023 4
that the Corporate Debtor had claimed an excess payment of Rs 3.23 crores to the applicant by the corporate debtor. Further, it is in disputed that prior to the issuance of second demand notice dated 25.01.2022, the corporate debtor filed a complaint dated 27.08.2021 before the EOW for cheating and criminal breach of trust against the applicant in respect of the same business transactions giving rise to the impugned debt-claims. The corporate debtor also filed a complaint dated 29.09.2021 before the CJM Patiala House Court against the applicant for acts punishable under the sections of IPC 1860 accompanied by an application u/s 156(3) CrPC due to delay in preliminary investigation by the EOW, wherein the Ld. CJM sought for the action taken report from the EOW. The EOW after conducting a detailed preliminary enquiry into the complaint of the corporate debtor, found that the allegations made against the operational creditor/applicant herein are prima facie correct and further registered an FIR no. 0058/2022 for offences punishable u/s 420, 406 and 120B of the LP.C. against the applicant herein and other accused persons. The copy of the FIR No. 0058/2022 is annexed with the reply of the corporate debtor.
The aforesaid material on record, evidences that the 'Dispute' in the instant case is not 'transaction centric' but is an ongoing 'Dispute' between the parties. The correspondence between the parties establishes that the 'Dispute' is with respect to the amount of debt claimed to be payable to the applicant. The Hon'ble Supreme Court in Transmission Corporation of Andhra Pradesh Limited V/s. Equipment Conductors and Cables Limited reported in (2019)12 SCC 697, categorically laid down that 'IBC was not intended to be a substitute to a recovery forum and that whenever there was existence of a real 'Dispute', IBC provisions could not be invoked'. The object of the Code, at least insofar as Operational Creditors are concerned, was to initiate Insolvency Process against the Corporate Debtor only in clear cases where a real 'Dispute' between the parties as to the 'debt owed' did not exist. In the instant case, on a thorough consideration of the facts and circumstances as brought out by material placed on record, this Adjudicating Authority is of the considered view that there is sufficient evidence on record to exhibit a 'Pre-Existing Dispute' between the parties prior to the issuance of the First and Second Demand Notices dated 30.07.2021 and 25.01.2022 respectively, as issued by the applicant herein under Section 8, IBC, 2016."
7. Counsel for the Appellant has submitted that the Respondent has
been acknowledging the debt on the basis of summaries of reconciliation of
Comp. App. (AT) (Ins) No. 215 of 2023 5
accounts and in this regard accounts statement dated 31.03.2019,
30.06.2019, 31.10.2019, 31.12.2019, 31.03.2020 and 31.08.2020 have
been referred to which are also reproduced as under:
Comp. App. (AT) (Ins) No. 215 of 2023 6
Comp. App. (AT) (Ins) No. 215 of 2023 7
Comp. App. (AT) (Ins) No. 215 of 2023 8
8. He has further submitted that pre-existing dispute has to be seen
before the issuance of demand notice and not to be raised for the first time
in the reply to the demand notice. In this context, he has submitted that a
complaint before the EOW on 27.08.2021 and a complaint filed before the
CJM Patiala House Courts on 29.09.2021 are both after the demand notice
issued on 30.07.2021 and are of no use. It is therefore submitted that the
only document available on record, discussed in Para 13 of the impugned
order (Supra), are the emails exchanged between the parties dated
Comp. App. (AT) (Ins) No. 215 of 2023 9
26.04.2021, 28.04.2021, 21.05.2021 and 09.06.2021 as these are before the
cut-off date of demand notice dated 30.07.2021. It is submitted that the
Respondent gave a post dated cheque no. 137742 dated 23.04.2021 of Rs.
1.5 Crores and sent an email dated 21.12.2020. In this regard, the
Appellant sent a letter dated 22.12.2020 about the receipt of cheque, also
mentioned therein that Respondent is yet to pay Rs. 8,65,66,175/-and this
letter was signed by Harshit Sharma, present director and son of erstwhile
director of the Respondent. The said letter dated 22.12.2020 is also
reproduced as under:-
9. It is further submitted that since the aforesaid cheque was signed by
late Pradeep Kumar Sharma who had unfortunately expired, therefore, on
22.03.2021, the Respondent through Harshit Sharma informed the
Comp. App. (AT) (Ins) No. 215 of 2023 10
Appellant that a fresh cheque is being sent as the earlier cheque became
redundant due to the death of the signatory and also stated therein that the
amount is being paid keeping in view of the commitment and mutual
undertaking signed by him previously. The said email dated 22.03.2021 is
reproduced as under:-
10. It is further submitted that fresh cheque no. 137742 dated
23.04.2021 of an amount of Rs. 1.5 Crores was deposited by the Appellant
for realization but it was bounced on the ground 'exceeds arrangements' and
thereafter, on 26.04.2021, Harshit Sharma sent an email to the Appellant in
which he referred to the cheque dated 23.04.2021 and stated that the
cheque has been stopped for the purpose of payment because of certain
unmatched accounts to the tune of Rs. 3.80 Crores approximately. He also
stated therein that he will issue a fresh cheque as soon as the accounts are
settled. The said email dated 26.04.2021 is also reproduced as under:-
Comp. App. (AT) (Ins) No. 215 of 2023 11
11. Besides the email dated 26.04.2021, the Respondent has relied upon
another email dated 28.04.2021 in which it was urged by the Respondent
that a sum of Rs. 10,43,11,561.18/- has been paid in excess and in this
regard only a prima facie opinion is drawn. The said email dated 28.04.2021
is also reproduced as under:-
Comp. App. (AT) (Ins) No. 215 of 2023 12
12. Both these emails were denied by the Appellant through its email
dated 21.05.2021 which is also reproduced as under:-
13. The Adjudicating Authority has then referred to reply to the notice
dated 09.06.2021 which was sent by the Respondent through its Advocate.
This reply is about the statutory notice issued under Section 138 of the NI
Act, 1881. The said reply is also reproduced as under:-
Comp. App. (AT) (Ins) No. 215 of 2023 13
Comp. App. (AT) (Ins) No. 215 of 2023 14
Comp. App. (AT) (Ins) No. 215 of 2023 15
Comp. App. (AT) (Ins) No. 215 of 2023 16
14. Besides these documents, the Appellant has referred to email dated
29.05.2020 to contend that the Respondent had admitted its liability (debt)
and also referred to the payment plan. The said email dated 29.05.2020 is
also reproduced as under:-
Comp. App. (AT) (Ins) No. 215 of 2023 17
15. As regards the notice dated 23.06.2021, it was sent through a counsel
by the Respondent by which the Respondent has asked for the payment of
Comp. App. (AT) (Ins) No. 215 of 2023 18
excess amount of Rs. 3.25 Crores. The said notice is also reproduced as
under:-
Comp. App. (AT) (Ins) No. 215 of 2023 19
Comp. App. (AT) (Ins) No. 215 of 2023 20
Comp. App. (AT) (Ins) No. 215 of 2023 21
16. The Adjudicating Authority also observed that since notice dated
25.05.2021 was sent by the Appellant to the Respondent in respect of
dishonoured cheque dated 23.04.2021, therefore, it is a dispute between the
parties which was existing before the demand was raised on 30.07.2021 by
way of a notice issued under Section 8 of the Code. Counsel for the
Appellant has argued that pending of proceedings under Section 138 of the
NI Act, 1881 would not amount to a dispute under the provisions of the
Code and would not preclude an applicant from seeking its remedy under
the Code. He has referred to two decisions of this Tribunal rendered in the
case of Sudhi Sachdev Vs. APPL Industries Ltd., CA (AT) (Ins) No. 623 of
2018 and V. Venkata Satyanarayana Vs. Pattabi Enterprise, CA (AT) (CH)
(Ins) No. 427 of 2022. He further argued that though the Respondent has
urged in its email dated 26.04.2021 that account has to be reconciled but
Comp. App. (AT) (Ins) No. 215 of 2023 22
till the issuance of notice dated 30.07.2021 and filing of the application
under Section 9 of the Code, no account much less prepared by the
Respondent, showing even prime facie, that the Respondent has to recover
the excess amount from the Appellant, about which there is a dispute has
seen the light of the day. It is thus argued that it is a concocted story by the
Respondent for the purpose of denying its liability. In this regard, he has
relied upon a decision of the Hon'ble Supreme Court rendered in the case of
Mobilox Innovations Pvt. Ltd. Vs. Kirusaa Software Pvt. Ltd. (2018) 1 SCC
353 in which it has been held that 'the dispute should not be a patently
feeble legal argument or assertion of fact unsupported by evidence. The
dispute which are spurious, hypothetical or illusory ought not be permitted
to stall the proceedings under Section 9 of the Code.
17. In the end, it is submitted that the Adjudicating Authority has erred in
only referring to the documents placed on record by the Respondent while
making its observation for dismissing the application filed by the Appellant
and has not adverted to even a single document placed by the Appellant in
support of his case. It is further submitted that the defence of the
Respondent has to be looked into only in context with the case set up by the
Appellant which is conspicuous by its absence in the present case as stated.
18. On the other hand, Counsel for the Respondent, while defending the
impugned order, has submitted that there is no error in the impugned order
which may call for any interference by this Court. It is submitted that the
dispute was raised by the Respondent on 26.04.2021 in its email when it
was brought to the notice of the Appellant that because of certain
unmatched accounts to the tune of Rs. 3.80 Crores, the cheque presented
by the Appellant for an amount of Rs. 1.50 Crores, has been dishonoured as
Comp. App. (AT) (Ins) No. 215 of 2023 23
the bank was asked to stop the payment and has also referred to email
dated 23.04.2021. However, he has been candid enough to admit during the
course of hearing that the cheque was not dishonoured because the Bank
was informed to stop the payment rather it was dishonoured because
'exceeds arrangements'. He also admitted that neither the email dated
26.04.2021 nor email dated 28.04.2021 and any account showing the
payment of excess money to the tune of Rs. 3.80 Crores as per email dated
26.04.2021 and Rs. 10,43,11,561.18/- as per email dated 28.04.2021 was
shared with the Appellant or even set up in defence in its reply. He has also
fairly conceded that any dispute post issuance of notice under Section 8 of
the Code is not required to be looked into and therefore, relied upon emails
dated 26.04.2021 and 28.04.2021. He has argued that there has been a pre-
existing dispute between the parties, therefore, the order has rightly been
passed by the Adjudicating Authority.
19. We have heard Counsel for the parties and perused the record with
their able assistance.
20. The summary of reconciliation produced by the Appellant dated
31.03.2019, 30.06.2019, 31.10.2019, 31.12.2019, 31.03.2020 and
31.08.2020 would show that the Respondent was in debt of the amount to
be paid to the Appellant. We have also found that post dated cheque dated
23.04.2021 of Rs. 1.5 Crores given by the Respondent to the Appellant on
21.12.2020 was accepted by the Appellant and in that acknowledgement the
Appellant has raised the issue of payment of Rs.8,65,66,175/- which was
duly acknowledged by the Respondent (Harshit Sharma as a director) and
had at no point of time raised any dispute regarding irregularity in the
accounts. It so happened that since the cheque no. 137742 was drawn by
Comp. App. (AT) (Ins) No. 215 of 2023 24
Pradeep Kumar Sharma (since deceased), therefore, Harshit Sharma, vide its
email dated 22.03.2021, brought to the notice of the Appellant that since
the signatory of the cheque died, therefore, he would require to give another
cheque and again he stated that he is giving its amount for settling
recoveries. On 23.04.2021 the cheque was bounced and from then onwards
the relationship between the parties became sour as the Respondent then
sent an email dated 26.04.2021 and for the first time stated that the cheque
has not been honoured on their instruction as according to the Respondent
it had to recover an amount of Rs. 3.80 Crores, paid excess to the Appellant
but this assertion was made in the email without any supporting evidence.
Thereafter, on 28.04.2021 this amount was raised to Rs. 10.43 Crores i.e.
within two days without supported any evidence much less prima facie, in
order to inspire confidence, that the Respondent is justified in raising the
dispute but the Adjudicating Authority has accepted the assertion made in
both emails as a gospel truth despite the fact that the Hon'ble Supreme
Court in the case of Mobilox Innovations Pvt. Ltd. (Supra) has held that the
dispute should not be a patently feeble legal argument or assertion of fact
unsupported by evidence. The dispute which are spurious, hypothetical or
illusory ought not be permitted to stall the proceedings under Section 9 of
the Code and in the present case we could not find any evidence on record
except the bald assertion of the Appellant that it had paid an excess of Rs.
3.80 Crores thought it had been continuously accepting the reconciliation
accounts.
21. In such circumstances, we are of the considered opinion that there is
an error on the part of the Adjudicating Authority in dismissing the
application. Consequently, the appeal is hereby allowed and the impugned
Comp. App. (AT) (Ins) No. 215 of 2023 25
order is set aside. The application filed under Section 9 is admitted.
However, for the purpose of further proceedings i.e. appointment of IRP and
other orders to be passed under Section 14 of the Code, the matter is sent
back to the Adjudicating Authority. The parties are directed to appear before
the Adjudicating Authority on 11th December, 2023.
[Justice Rakesh Kumar Jain] Member (Judicial)
[Mr. Naresh Salecha] Member (Technical)
New Delhi
22nd November, 2023
Sheetal
Comp. App. (AT) (Ins) No. 215 of 2023
This page reproduces a public judgment and a summary of it. It is research material, not legal advice, and it is no substitute for advice from an advocate on your own facts.